食品安全协管员培训内容

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

食品安全协管员培训内容

新安街食品安全协管员培训内容

1、食品安全协管员的职责是什么?

1.1、积极参加质监部门组织的业务培训,接受当地质监部门的业务领导。对协管区域内的食品安全监管工作负有协调、配合、巡查、报告等责任。

1.2、建立协管区域食品生产加工企业和小作坊档案,及时掌握食品生产加工食业和小作坊数量、生产状况、产品种类、使用原料、生产条件、生产规模、厂名厂址、出厂检验

等变动情况。

1.3、积极向协管区域内食品生产加工企业和小作坊主、从业人员及当地群众宣传食品安全有关法律法规及相关基础知识,督促协管区域内食品生产加工企业、小作坊依法、规范生产。

1.4、协助质监部门对协管区域内食品生产加工企业和小作坊进行巡查和对产品质量进行监督抽查、定期检验,对拒查、拒检企业进行说服、教育。

1.5、定期对协管区域内的食品生产加工企业和小作坊进行巡查访问。

1.6、发现制售假冒伪劣食品、使用非食用物质和回收食品生产加工食品等违法行为时,及时向当地质监部门报告。 car air conditioning refrigeration system of maintenance first unit car air conditioning of overview teaching content: 1 car air conditioning history 2 car air conditioning of composition 3 car air conditioning refrigeration device of features teaching requirements: students through this unit of learning, should car air conditioning of system composition, and installation location has a perceptual of awareness, firm master car air conditioning and

other air conditioning different of unique features. Key and difficult point: 1, train the systemic understanding of automotive air

conditioning components, macro-level understanding of the course's main technical requirements. 2, train students the ability to access, understand the latest development trend of automotive air conditioning. Experimental cognitive experimental unit of auto air conditioning parts automotive air conditioning refrigerating system and principle of the teaching contents: 1. the principle of compression refrigeration 2. teaching of automobile air-conditioning refrigerants and

lubricants ...Foundation and Foundation (JTG D63-2007) of the technical code for construction of highway bridges and culverts (JTG/T F50-

201According to practical problems in the construction, organized by the project manager once a week wrap-up session, which reads as follows: a construction programme, implementation of the construction plan summary;

B Summary of the implementation of security, quality and technical standards;

C summary of work this week, jiangyoufalie;

D Organization of work for the next week. In order to ensure progress and quality, also held regular meetings, invited the representatives of the owner, installed captain and his party, the coordination of all aspects of the project, communication, meeting minutes, returned to the General Manager of the company, so that the whole arrangement. This engineering outside decorative construction cycle full standard paragraph for 60 calendar day, I company has many similar engineering also duration of actual engineering construction experience, I company will plans arrangements

相关文档
最新文档