贝克休斯的关于裸眼封隔器的材料

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
© 2005 Baker Hughes Incorporated All rights reserved.
MPas™ Packer Specifications
Size : 4-1/2” Maximum Packer O.D. : 5.625” Minimum ID : 3.8” Setting Mechanism: Hydrostatic / Hydraulic Tested w/ 4,100 psi Hydrostatic + 3,000 psi Hydraulic Setting Pressure Cylinder Collapse Rating: 7,500 psi (80ksi MYS) Mandrel Burst Rating: 8,440 psi (80ksi MYS) Mandrel Tensile Strength: 289,000 # (80ksi MYS) Setting Tool Required: Workstring Cup Tool Maximum Ovality Tested (to date): 6” x 7-1/2”
Run-In Position Shifting Balance Sleeve (Initiating
Setting) Set Position
© 2005 Baker Hughes Incorporated All rights reserved.
MPas™ Open Hole Packer Sequence
© 2005 Baker Hughes Incorporated All rights reserved.
MPas™ Packer Specifications
Size : 6-5/8” Maximum Packer O.D. : 9.125” Minimum ID : 5.696” Setting Mechanism: Hydrostatic Cylinder Collapse Rating: 5,000 psi (80ksi MYS) Mandrel Burst Rating: 5,700 psi (80ksi MYS) Mandrel Tensile Strength: 575,000 # (80ksi MYS) Setting Tool Required: Workstring Shifting Tool Maximum Ovality Tested (to date): 9-1/2” x 11”
Braided Steel Structural Layer
© 2005 Baker Hughes Incorporated All rights reserved.
Deformable Back Up Rings
Outer Elastomer Cover
MPas™ Open Hole Packer Sequence
© 2005 Baker Hughes Incorporated All rights reserved.
Multilateral Case History
Location : Eastern Province, Saudi Arabia
Operator : ARAMCO
Field : GHZL-9
Multi-Zone Perforated Pipe Case History
Location : Timor Sea, Australia Operator : ConocoPhillips Field : Bayu Undan Date : 1st well May 2004 # Wells : 3 # MPas Packers : 26 (10, 8, 8) Max Deviation : 62 Degrees Max Depth : 10,352 ft TVD Max Temperature : 270 Deg F Job Description : Isolation for water shut off One-Trip System with SelectSet Collet tool run as an integral part of the inner string. Packers set in
Run Liner Assy to Depth, Correlate, Hang, Circulate Hole Volume w/ DIF
Set Liner Top Packer
Pull up Inner String, Set MPas Packers
Pull Above Liner Top, Spot Spacers, Displace Casing w/ Brine
MPas™ New Era Open Hole Packer
© 2005 Baker Hughes Incorporated All rights reserved.
MPas™ Packer Design
Body
Elastomer Packing Element Core
Kevlar Reinforcement
Example Installation Sequence
© 2005 Baker Hughes Incorporated All rights reserved.
Setting Tools
SSC
MAIC
HB-1
Cup Tool
© 2005 Baker Hughes Incorporated All rights reserved.
One-Trip System with MAIC tool run as an integral part of the inner string. Packers used to increase production capabilities of equaliser screen. PLT run and isolation proven.
Baker Oil Tools
Openhole Packer
© 2000 Baker Hughes Incorporated All rights reserved.
MPas™ New Era Open Hole Packers
© 2005 Baker Hughes Incorporated All rights reserved.
© 2005 Baker Hughes Incorporated All rights reserved.
Hale Waihona Puke Baidu
ShiftRinuSgne-tBInPaolPasonistciieotinSonleeve (Initiating Setting)
MPas™ Packer Specifications
Size : 5-1/2” Maximum Packer O.D. : 8.03” / 8.075” Minimum ID : 4.592” – 4.802” Setting Mechanism: Hydrostatic Cylinder Collapse Rating: 10,700 psi (80ksi MYS) Mandrel Burst Rating: 8,400 psi (80ksi MYS) Mandrel Tensile Strength: 261,000 # (80ksi MYS) Setting Tool Required: Workstring Shifting Tool Maximum Ovality Tested (to date): 8-1/2” x 12”
MPas Installations Details
Max Temperature Max Dogleg Severity Max Measured Depth Max Total Vertical Depth Max Deviation Max Deviation at Packer Max Mud Weight
low-permeability silt stringers to enable future shut-off of water as it ingresses. ~4.5 hours from TD to set and individually test each of packer.
© 2005 Baker Hughes Incorporated All rights reserved.
Deepest ML Junction
deployment depth to date of 14,082’ ft. First FBIV w/ Hook
Hanger and LEN systems. First MPas Instillation in ML Well.
© 2005 Baker Hughes Incorporated All rights reserved.
© 2005 Baker Hughes Incorporated All rights reserved.
Example Installation Sequence
TD Hole, Condition Mud, POOH
© 2005 Baker Hughes Incorporated All rights reserved.
The oil reactive section utilizes oleophillic polymers that absorb hydrocarbons into the matrix. This process is a physical uptake of the hydrocarbon which swells, lubricates and decreases the mechanical strength of the polymer chain as it expands.
# Wells : 1
Date : December 2003 # MPas : 2
Max Deviation : 81 Degrees
Max Depth : 13,500 ft TVD
Max Temperature : 260 Deg F
Job Description :
All project objectives were met.
SRheutifnPt-inIongsPiBtoioasnliatniocne Sleeve (Initiating Setting)
© 2005 Baker Hughes Incorporated All rights reserved.
MPas™ Open Hole Packer Sequence
270ºF 8º/100ft 20,682 ft 13,500 ft 93.1º 89.5º 10.6ppg
© 2005 Baker Hughes Incorporated All rights reserved.
REPacker
The water reactive section consists of water absorbing particles incorporated in a field proven Nitrile-based polymer. These particles swell via absorbing water which in turn expands the rubber without being physically absorbed into the rubber matrix which can adversely effect properties
Equaliser Screen Case History
Location : Saudi Arabia Operator : ARAMCO Field : Zuluf Main Sand Date : December 2002 # Wells : 1 # MPas Packers : 4 Max Deviation : 90 Degrees Max Depth : 6,500 ft TVD Max Temperature : 200 Deg F Job Description :
相关文档
最新文档