钢结构连接节点计算表格

合集下载

midas操作例题资料-钢箱梁-新OK

midas操作例题资料-钢箱梁-新OK

midas操作例题资料-钢箱梁-新OKCivil&Civil Designer⼀、钢箱梁操作例题资料1概要钢桥是⾼强、轻型薄壁结构,截⾯和⾃重⽐混凝⼟桥⼩,跨越能⼒⼤,因⽽在实际⼯程中有⼴泛应⽤。

钢桥按形式可⼤致分为钢箱梁、钢板梁(⼯字钢)、钢桁梁、组合梁桥等类型。

钢桥在使⽤时不仅要求钢材具有较⾼的强度,⽽且还要求具有良好的塑性。

钢桥的刚度相对⽐较⼩,变形和振动⽐混凝⼟桥⼤。

为了保证车辆⾏驶安全和舒适性、避免过⼤的变形和振动对钢桥结构产⽣不利的影响,钢桥必须有⾜够的整体刚度[2] 。

钢桥缺点除容易腐蚀影响耐久性外,另⼀缺点是疲劳。

影响疲劳的因素很多,除钢材品质、连接的构造与⽅法等外,与荷载性质、疲劳细节关系也很⼤。

钢箱梁除钢材等⼒学特性外,还具有箱梁的受⼒特点,⼴泛应⽤于市政⾼架、匝道、⼤跨度斜拉桥、悬索桥、拱桥加劲梁、⼤跨连续钢箱梁及⼈⾏桥钢箱梁等⽅⾯。

本专题将通过介绍⼯程概况、结合规范构造检查、midas Civil详细建模过程以及midas Civil Designer设计平台及结果查看等操作流程,希望能为读者结合实际项⽬学习程序,通过程序了解钢箱梁提供帮助。

钢箱梁操作例题资料2 钢桥概况及构造检查2.1 钢桥概况主梁为20+30+40+30m单箱单室正交钢箱梁,钢材为Q345;桥⾯宽8m,梁⾼2.335m,翼缘板长1.8m;顶板、腹板、翼缘板均厚16mm,底板标准段厚16mm,⽀座两侧3~3.5m范围内加厚为24mm;顶板设置闭⼝U型加劲肋;翼缘板、腹板均设置板型加劲肋;底板标准段设置板型加劲肋,桥墩两侧5~7m范围内设置T型加劲肋;横隔板等设置距离详见图1~图3所⽰。

建模之前,应按照《公路钢结构桥梁设计规范》(JTG D64—2015)[1] (以下简称规范)对钢桥⾯板、加劲肋、翼缘板及腹板等尺⼨进⾏构造检查。

2.2构造检查2.2.1钢桥⾯板近年来正交异性钢桥⾯板出现疲劳和桥⾯铺装损伤的现象较为普遍,为保证钢桥⾯板具有⾜够的刚度,需对最⼩厚度有要求;为减⼩应⼒集中和避免采⽤疲劳等级过低的构造细节,需对纵向闭⼝加劲肋尺⼨进⾏规定[1]。

型钢埋入式柱脚(刚性固定)

型钢埋入式柱脚(刚性固定)

软件主要针对型钢混凝土埋入式刚性柱脚节点,计算主要遵循《钢结构连接节点设计手册》(第二版)及《钢骨混凝土结构设计规程》(YB 9082-2006)中的相关条文及规定。

《钢结构连接节点设计手册》(第二版)中埋入式柱脚相关技术内容,主要针对钢柱做埋入式柱脚节点。

设计注意事项刚性固定埋入式柱脚时直接将钢柱埋入钢筋混凝土基础或基础梁的柱脚。

其埋入办法:一是预先将钢柱脚按要求组装固定在设计标高上,然后浇灌基础或基础梁的混凝土;另一种是预先按要求浇灌基础或基础梁的混凝土,在浇灌混凝土时,按要求留出安装钢柱脚用的插入杯口,待安装好钢柱脚后,再用混凝土强度等级比基础高一级的混凝土灌实。

通常情况下,前一种方法对提高和确保钢柱脚和钢筋混凝土基础或基础梁的组合效应或整体刚度有利,所以在工程实际中多被采用。

在埋入式柱脚中,钢柱的埋入深度是影响柱脚的固定度、承载力和变形能力的重要因素,而且有时对于中柱、边柱和角柱,其埋入深度也不尽相同,这就需要选择易于进行钢筋混凝土补强的埋入深度来处理。

为防止钢柱的局部压屈和局部变形,在钢柱向钢筋混凝土基础或基础梁传递水平力处压应力最大值的附近,设置水平加劲肋是一个有效的补强措施;对箱型截面柱和圆管形截面柱处设置水平加劲肋的环形横隔板外,在箱内和管内浇灌混凝土也将获得良好的效果。

为防止基础或基础梁中混凝土早期的压坏和剪坏,应配置补强钢筋,合理地确定钢柱周边的钢筋混凝土保护层厚度及其配筋是很重要的。

在中柱、边柱和角柱中,其钢筋混凝土保护层厚度有时是不尽一致,特别在边柱和角柱的柱脚中,对没有设置基础梁的一侧,钢柱翼缘面处的钢筋混凝土保护层厚度;中柱不得小于180mm;边柱、角柱的外侧不宜小于250mm。

配置在钢柱埋入部分中的钢筋,出基础或基础梁应有的配筋外,尚应在钢柱周边增设补强垂直纵向主筋、架立筋、箍筋、顶部加强箍筋、基础梁主筋在钢柱埋入部分水平方向弯折处的加强箍筋。

在整体框架的内力分析时,对柱脚部分的刚度和刚度区域应留有一定的富裕量,刚度区域的高度应比基础或基础梁混凝土顶面高出1.2倍的钢柱截面高度。

BH500×300等强连接计算表格

BH500×300等强连接计算表格

Vu2 = AnWPL×fu/ 1.732
= 89.6 * 37.5 / 1.732
= 1940.0
梁腹板高强度连接螺栓抗剪最大承载力:
Vu3 = 0.58×nf×n×AebH×fubH = 0.58 * 2 * 20 * = 7310.8
3.03 * 104
Vu = min (
1143.2 ,
1940.0
BH500X300X16X25
1.设计条件:
(除非另有注明,长度单位为厘米,力的单位为千牛,强度单位为千牛/平方厘米)
梁截面 H = 50 B = 30 Tw = 1.6 Tf = 2.5
净截面系数: 0.85




f=
=

=
=



梁材

质:
Байду номын сангаас
Q235
20.5 fv
12
fu
38
fy
22.5

螺栓: 直径 M22 孔径 2.4 等级 10.9 P= 190
高强螺=栓19的8.受0 剪承载力
为:
198.0
4.2.2.弯矩产生的最大螺栓剪力
37.5 * 1.5
∑r2 = 8 * ( + 2* (
+ 10 * (
15 * 0* 11.25 *
15 +
0
+
11.25 +
7.5 * 7.5 +
0
*
0
* 0+
0
*
3.75 * 3.75 )
0 + 0 *0 0 + 0 *0

H型钢柱拼接节点技术手册

H型钢柱拼接节点技术手册

H型钢柱拼接节点技术手册柱与柱的拼接连接节点,理想的情况应是设置在内力较小的位置。

但是,在现场从施工的难易和提高安装效率方面考虑,通常框架柱的拼接连接接头宜设置在框架梁上方1.3m附近。

为了便于制造和安装,减少柱的拼接连接节点数目,一般情况下,柱的安装单元以三层为一根。

特大或特重的柱,其安装单元应根据起重、运输、吊装等机械设备的能力来确定。

H型钢柱的拼接,其翼缘板的拼接主要有高强度螺栓+拼接板的双剪拼接、单剪拼接,或翼缘板直接采用完全焊透的坡口对接焊缝连接;腹板的拼接主要采用高强度螺栓+拼接板的双剪拼接。

我们常用的形式主要是:翼缘板拼接为采用完全焊透的坡口对接焊缝连接,腹板的拼接主要采用高强度螺栓+拼接板的双剪拼接。

其他形式下的各种拼接组合也会用到,计算时应该根据实际的拼接方式加以验算。

拼接节点的验算主要遵循《钢结构连接节点设计手册》(第二版)中的相关条文及规定。

通常情况下,作用于柱拼接节点处的内力有轴心压力、弯矩和剪力。

当拼接连接处的内力小于柱承载力设计值的一半时,从柱的连续性来衡量拼接连接节点的性能,其设计用内力应取柱承载力设计值的1/2。

非抗震设防的高层钢结构,当在拼接连接处不产生拉力,且被连接的柱端面经过铣平加工且紧密结合时,其轴心压力和弯矩的25%分别由柱端面直接传递。

也就是说,符合上述要求的柱的拼接节点连接,可分别按轴心压力和弯矩的75%来计算,而剪力是不能通过柱端接触面传递的。

柱的拼接连接,对H形截面柱其翼缘通常采用完全焊透的坡口对接焊缝连接,腹板采用高强度螺栓连接;也可全部采用高强度螺栓连接。

当采用高强度螺栓连接时,翼缘和腹板的拼接连接板应尽可能成对设置,而且两侧连接板的面积分布应尽可能与柱的截面相一致;在有弯矩作用的拼接连接节点中,拼接连接板的截面面积和截面抵抗矩均应大于母材的截面面积和截面抵抗矩。

柱的拼接连接,当采用完全焊透的坡口对接焊缝连接时,尚应采取以下措施。

(1)为保证上、下柱拼接连接焊缝根部的间隙,可根据具体情况,选用以下的方法:①利用柱腹板的拼接连接板支承上柱。

结构设计计算EXCEL全集小程序

结构设计计算EXCEL全集小程序

钢结构
支撑系统---ST梁,墙面斜撑,风拉杆计算 工型拉(压)弯构件强度及稳定性校核计算 箱形拉(压)弯构件强度及稳定性校核计算 工字型、T型、箱型截面斜撑计算 框架柱计算长度(有侧移及无侧移) 砼-钢组合梁计算 钢梁(工字型、箱型)受扭计算 工型梁加劲肋计算 简支钢梁计算 高强度螺栓连接计算 端板厚度计算系统 端板连接节点计算 吊车反力/牛腿受力 计算 吊车梁整体稳定性计算 柱脚计算 报价系统
朱某整合(非原创),希望各 路英雄继续补遗,使之更加完
基础设计
砌体结构
承台计算
地下室浮力计算
垫层计算
独立基础
筏基底板冲切计算
钢筋混凝土柱基础设计
灌注桩及大直径桩竖向承载力设计值
基础沉降计算
基础计算程序
人工挖孔桩承载力计算
软弱下卧层验算
条形基础
主动土压力计算(库仑、朗肯理论)
桩基设计计算
条基地基梁
双柱设基础梁之基础计算

预应力
预应力计算
结构常用计 算表格汇编
钢筋混凝土
矩形截面单双筋--抗弯抗剪验算 单筋T形截面--抗弯验算 深梁与短梁--抗弯验算 矩形截面受弯剪扭--抗扭验算 剪力墙边缘构件的体积配箍率计算 框架梁板尺寸初定 框架柱尺寸初定 板配筋计算 荷载统计表 墙体荷载计算 楼面荷载计算 楼梯间荷载计算 剪力墙墙肢稳定计算 牛腿设计 受弯构件斜截面承载力计算表 水池侧壁及底板配筋计算 柱体积配箍率计算
水泥搅拌桩计算


2020/2/24
砌体结构梁端局部受压计算
常用资料
材料参数 每米板宽内钢筋截面面积表 纵筋单排最大根数(2010新规范) 钢筋计算截面面积及公称质量表 配箍率(双肢箍、三肢箍、四肢箍) 框架梁受拉钢筋最小配筋率 梁截面配筋率 梁柱受力钢筋最小配筋率 双吊钩桥式起重机参数资料 LH型电动葫芦起重机参数资料 不锈钢天沟落水管 彩板天沟落水管

钢结构合同工程计价表

钢结构合同工程计价表

钢结构合同工程计价表英文回答:Steel structure contract engineering pricing is acrucial aspect of any construction project. It involves determining the cost of the steel structure based onvarious factors such as materials, labor, equipment, and overhead expenses. The pricing table serves as a guide to estimate the overall cost of the project.In order to accurately price a steel structure contract, several key elements need to be considered. Firstly, thesize and complexity of the structure play a significantrole in determining the cost. Larger and more intricate structures require more materials and labor, resulting in higher pricing.Secondly, the type of steel used in the structure is another important factor. Different types of steel have varying costs, with high-grade steel being more expensivethan lower-grade options. The quality and strength of the steel also affect the pricing.Additionally, the location of the project can impact the pricing. Construction costs can vary based on regional factors such as labor rates, transportation costs, andlocal regulations. For example, constructing a steel structure in a remote area with limited access to resources may result in higher pricing due to increased logistics costs.Furthermore, the timeline of the project can influence the pricing. If there is a tight deadline, the contractor may need to allocate additional resources and manpower to complete the project on time, which can lead to higher costs.Other factors that may be considered in the pricing table include the contractor's experience and reputation, the complexity of the design, and any additional services required such as engineering or design work.To illustrate the pricing process, let's consider an example. Suppose I am a contractor pricing a steelstructure contract for a warehouse. The warehouse is large, spanning 10,000 square feet, and requires high-grade steel to ensure durability. The project is located in a remote area with limited resources and has a tight deadline of three months.Based on these factors, I would estimate the cost of materials, labor, equipment, and overhead expenses. I would consider the current market prices for high-grade steel and factor in the transportation costs to the remote location. Additionally, I would allocate sufficient resources and manpower to meet the tight deadline.Considering all these factors, I would then create a pricing table that outlines the estimated costs for each component of the project. This table would serve as a reference for both myself and the client, providing transparency and clarity regarding the pricing of the steel structure contract.中文回答:钢结构合同工程计价表是任何建筑项目中至关重要的一部分。

(整理)钢管柱脚计算手册

(整理)钢管柱脚计算手册

圆形底板刚接柱脚压弯节点技术手册根据对柱脚的受力分析,铰接柱脚仅传递垂直力和水平力;刚接柱脚包含外露式柱脚、埋入式柱脚和外包式柱脚,除了传递垂直力和水平力外,还要传递弯矩。

软件主要针对圆形底板刚接柱脚压弯节点,计算主要遵循《钢结构连接节点设计手册》(第二版)中的相关条文及规定,并对相关计算过程自行推导。

设计注意事项刚性固定外露式柱脚主要由底板、加劲肋(加劲板)、锚栓及锚栓支承托座等组成,各部分的板件都应具有足够的强度和刚度,而且相互间应有可靠的连接。

为满足柱脚的嵌固,提高其承载力和变形能力,柱脚底部(柱脚处)在形成塑性铰之前,不容许锚栓和底板发生屈曲,也不容许基础混凝土被压坏。

因此设计外露式柱脚时,应注意:(1)为提高柱脚底板的刚度和减小底板的厚度,应采用增设加劲肋和锚栓支承托座等补强措施;(2)设计锚栓时,应使锚栓在底板和柱构件的屈服之后。

因此,要求设计上对锚栓应留有15%~20%的富裕量,软件一般按20%考虑。

(3)为提高柱脚的初期回转刚度和抗滑移刚度,对锚栓应施加预拉力,预加拉力的大小宜控制在5~8kN/cm2的范围,作为预加拉力的施工方法,宜采用扭角法。

(4)柱脚底板下部二次浇灌的细石混凝土或水泥砂浆,将给予柱脚初期刚度很大的影响,因此应灌以高强度微膨胀细石混凝土或高强度膨胀水泥砂浆。

通常是采用强度等级为C40的细石混凝土或强度等级为M50的膨胀水泥砂浆。

一般构造要求刚性固定露出式柱脚,一般均应设置加劲肋(加劲板),以加强柱脚的刚度;当荷载大、嵌固要求高时,尚须增设锚栓支承托座等补强措施。

圆形柱脚底板的直径和厚度应按下文要求确定;同时尚应满足构造上的要求。

一般底板的厚度不应小于柱子较厚板件的厚度,且不宜小于30mm。

通常情况下,圆形底板的长度和宽度先根据柱子的截面尺寸和锚栓设置的构造要求确定;当荷载大,为减小底板下基础的分布反力和底板的厚度,多采用补强做法,如增设加劲肋(加劲板)和锚栓支承托座等补强措施,以扩展底板的直径。

钢结构重量计算通用表格

钢结构重量计算通用表格

2 PL 12 * 400 * 200
2 PL 10 * 400 * 200
2 PL 12 * 80 * 80
2 PL 22 * 260 * 500
2 PL 10 * 500 * 200
2 PL 12 * 80 * 80
2 PL 20 * 220 * 550
2 PL 10 * 95 * 150
1 PL 20 * 220 * 650
49.29 51.65 50.47 7.85 7.85 7.85 7.85 7.85 7.85 7.85 7.85 7.85 7.85 7.85
49.29 51.65 50.47 50.47 7.85 7.85 7.85 7.85 7.85 7.85 7.85 7.85 7.85 7.85 7.85
14
4
32
套管
36
18
4
Φ12圆钢 Φ12圆钢 Φ32*2 Φ32*2 Φ32*2 Φ32*2
40.35 26.356
1 1.328 0.5 0.8
0.888 0.888 1.48 1.48 1.48 1.48
501.631 93.617 47.360 70.756 13.320 4.736
0.038 0.038 0.101 0.101 0.101 0.101
1 PL 22 * 260 * 500
1 PL 10 * 500 * 200
1 PL 12 * 80 * 80
1 PL 20 * 220 * 550
1 PL 10 * 95 * 150
1 PL 20 * 220 * 650
1 PL 10 * 95 * 150
106 PL 12 * 90 * 325 180 PL 8 * 150 * 250 180 PL 6 * 220 * 70

钢结构计算书范例

钢结构计算书范例

摘要本工程为三层钢框架超市设计,长64.00m,宽30.00m,层高为4.5m,建筑高度为14.4m,建筑面积5760.00m2,综合运用所学专业知识,进行了钢结构建筑设计和结构设计。

主体采用钢框架结构,钢筋混凝土现浇楼板。

首先确定结构方案并进行荷载统计、梁柱截面选择及刚度验算,计算恒载、活载作用下的框架内力,然后计算风载、地震作用下的框架内力,经内力组合后得出构件的最不利组合内力,最后进行梁、柱截面验算、节点设计、楼板、楼板配筋计算,绘制施工图。

计算竖向荷载效应时采用分层法,计算水平荷载效应时采用D值法;在荷载组合时。

考虑以可变荷载效应控制的组合和以永久荷载效应控制的组合方式;在活荷载计算过程中,采用满布荷载法;框架节点设计采用栓焊混合的连接方式。

关键词:建筑设计;钢框架;内力分析;节点设计ABSTRACTBased on the professional knowledge for learned,the building was designed. The works include two parts: architecture design and structure design.This project is commercial building of 3-floors,steel structure,which is located in Xi An. It is 64.00m long, 30.00m wide. The height of story are 4.5m and5m. The height of the whole building is 14.4m.The total area is 5760.00m2.Architecture design tries hard for simple and clear,which has the ages feels and assort with surroundings environment.Steel frame and reinforce concrete floor were used in the structure. Firstly,the size of the beam and column was determined by the type of the structure and the calculation of the loads. Secondly,the inner forces of the frame under the wind load and earthquake load,the dead load,and the living loads were analyzed separately. By the combination of the inner forces,the most dangerous forces can be got,and then the steel beam,steel column,the frame connections and reinforce concrete floor can be designed. After these,the drawing can be made. In the progress of inter force analysis,the vertical forces are calculated by the layer-wise method,and the horizontal forces are calculated by the D method. In the process of the live load calculation,full load is used. Mixed connection with welding and bolts was used in steel frame,and independent foundation under column was adopted.Key Words:architecture design; steel frame; internal force analysis; connection design目录前言 (1)第1章建筑设计 (2)1.1设计任务和设计要求 (2)1.1.1设计任务 (2)1.1.2设计要求 (2)1.2建筑物所处的自然条件 (2)1.2.1气象条件 (2)1.2.2地形、地质及地震烈度 (2)1.2.3水文 (3)1.3建筑物功能与特点 (3)1.3.1平面设计 (3)1.3.2立面设计 (3)1.3.3防火 (3)第2章结构设计 (4)2.1结构方案选型及布置 (4)2.1.1柱网布置 (4)2.1.2结构形式选择 (4)2.1.3楼板形式选择 (4)2.2荷载计算 (4)2.2.1恒荷载标准值 (5)2.2.2活荷载标准值 (5)2.2.3风压标准值 (5)2.2.4雪荷载标准值 (6)2.2.5地震作用 (6)2.3竖向荷载计算 (6)2.3.1屋面恒荷载 (6)2.3.2楼面恒荷载 (6)2.3.3屋面活荷载 (7)2.3.4楼面活荷载 (7)2.4风荷载计算 (8)2.5内力分析 (9)2.5.1截面初选 (9)2.6内力计算 (12)2.6.1竖向荷载标准值作用下 (12)2.6.2风荷载作用下的内力计算 (18)2.7水平地震作用下结构各层的总重力荷载代表值计算 (20)2.7.1墙自重 (20)2.7.2梁,柱重力荷载标准值汇总 (21)2.7.3集中于各楼层标高处的重力荷载代表值Gi (22)2.7.4水平地震作用下框架内力合侧移的计算 (22)2.7.5水平地震作用下框架内力计算 (25)2.8内力组合 (28)2.9结构构件验算 (33)2.9.1框架柱的验算 (33)2.9.2框架梁的验算 (37)2.10框架连接设计 (39)2.10.1主梁与中柱Z-1的连接: (39)2.10.2次梁与主梁的铰接连接 (40)2.11柱脚设计 (42)2.11.1中柱柱脚的设计 (42)2.11.2边柱柱脚的设计 (44)2.12楼板计算 (47)总结 (49)参考文献 (50)致谢词 (51)前言本次毕业设计是大学教育培养目标实现的重要步骤,是毕业前的综合学习阶段,是深化、拓宽、综合教学成果的重要过程,是对大学期间所学专业知识的全面总结。

钢结构节点介绍

钢结构节点介绍

1.梁与柱的刚性连接(1)梁与柱刚性连接的构造形式有三种,如图所示:(2)梁与柱的连接节点计算时,主要验算以下内容:①梁与柱连接的承载力②柱腹板的局部抗压承载力和柱翼缘板的刚度③梁柱节点域的抗剪承载力(3)梁与柱刚性连接的构造①框架梁与工字形截面柱和箱形截面柱刚性连接的构造:框架梁与柱刚性连接②工字形截面柱和箱形截面柱通过带悬臂梁段与框架梁连接时,构造措施有两种:柱带悬臂梁段与框架梁连接梁与柱刚性连接时,按抗震设防的结构,柱在梁翼缘上下各500mm 的节点范围内,柱翼缘与柱腹板间或箱形柱壁板间的组合焊缝,应采用全熔透坡口焊缝。

(4)改进梁与柱刚性连接抗震性能的构造措施 ①骨形连接骨形连接是通过削弱梁来保护梁柱节点。

骨形连接梁端翼缘加焊楔形盖板梁端翼缘加焊楔形盖板在不降低梁的强度和刚度的前提下,通过梁端翼缘加焊楔形盖板。

(5)工字形截面柱在弱轴与主梁刚性连接当工字形截面柱在弱轴方向与主梁刚性连接时,应在主梁翼缘对应位置设置柱水平加劲肋,在梁高范围内设置柱的竖向连接板,其厚度应分别与梁翼缘和腹板厚度相同。

柱水平加劲肋与柱翼缘和腹板均为全熔透坡口焊缝,竖向连接板与柱腹板连接为角焊缝。

主梁与柱的现场连接如图所示。

2梁与柱的铰接连接(1)梁与柱的铰接连接分为:仅梁腹板连接、仅梁翼缘连接:仅梁腹板连接 仅梁翼缘连接柱上伸出加劲板与梁腹板相连 梁与柱用双盖板相连(2)柱在弱轴与梁铰接连接分为:柱上伸出加劲板与梁腹板相连、梁与柱用双盖板相连柱的拼接节点一般都是刚接节点,柱拼接接头应位于框架节点塑性区以外,一般宜在框架梁上方1.3m 左右。

考虑运输方便及吊装条件等因素,柱的安装单元一般采用三层一根,长度10~12m 左右。

根据设计和施工的具体条件,柱的拼接可采取焊接或高强度螺栓连接。

按非抗震设计的轴心受压柱或压弯柱,当柱的弯矩较小且不产生拉力的情况下,柱的上下端应铣平顶紧,并与柱轴线垂直。

柱的25%的轴力和弯矩可通过铣平端传递,此时柱的拼接节点可按75%的轴力和弯矩及全部剪力设计。

124-朱恒-PKPM钢结构节点设计与施工图

124-朱恒-PKPM钢结构节点设计与施工图

第二十三届全国高层建筑结构学术会议论文 2014年PKPM钢结构节点设计与施工图朱恒(中国建筑科学研究院建研科技股份有限公司设计软件事业部北京100013)提要:本文介绍了PKPM钢结构模块的节点库,列举了有代表性的节点类型,对类型特点做了简单介绍。

同时就节点设计中常见的一些问题和程序的处理方法做了详细介绍,探讨了合理的解决方案。

本文最后还就钢结构框架施工图的三种表达方式,以及其他相关的施工图方式做了介绍。

关键词:钢结构节点施工图1前言钢结构和其他结构的最显著的区别就在于节点,由于连接的构件截面、构件数量、角度、位置、变形要求等等情况的不同,使得钢结构的节点形式也是五花八门,形态各异。

虽然节点连接形式的任意性很大,但是一般常用的节点都通过图集或者设计手册的形式将其构型规范化。

PKPM钢结构软件在编制过程中参考了目前市面上常见的图集和设计手册,尽可能多的完善软件的节点系统,应该说,只要是常用的节点形式,都能在PKPM钢结构软件中找到。

2 PKPM目前所能设计的节点形式由于PKPM钢结构软件的节点库是一个比较庞大的体系,跨越了钢结构软件的多个模块,所以这里也是分模块来介绍各个节点库。

节点库的关系可以用下面一张图来说明:作者简介:朱恒(1981—), 男, 本科, 工程师图1 节点库与模块的关系2.1框架节点这个节点库是钢结构软件最基本的节点库,为各个模块所共享,也是内容最丰富最庞大的节点库。

目前程序可以进行设计的框架节点可分为梁柱节点、柱脚节点、支撑节点等,每个种类中又根据其连接的关系、连接柱的截面又可细分为多个小类。

下面表格列举了比较有代表性的节点:2.2门式刚架节点门式刚架节点在节点库中分为两类,一类是主刚架节点,有梁柱、柱脚、牛腿等节点。

图2 自动生成的主刚架节点另一类是围护构件节点,主要有檩托、隅撑等节点。

图3 程序内置的围护连接节点2.3网架节点网架节点主要是球节点和支座节点,其中球节点分为螺栓球和焊接球两种。

钢结构中GJ\GL\GZ\XG\SC\YC\ZC\LT\GZL\GXL\CG代表含义

钢结构中GJ\GL\GZ\XG\SC\YC\ZC\LT\GZL\GXL\CG代表含义

钢结构中GJ\GL\GZ\XG\SC\YC\ZC\LT\GZL\GXL\CG代表含义来源:郁向娟的日志GJ钢架GL钢架梁或GJL钢架梁GZ钢架柱或GJZ钢架柱XG系杆SC水平支撑YC隅撑ZC柱间支撑LT檩条TL托梁QL墙梁GLT刚性檩条WLT屋脊檩条GXG刚性系杆YXB压型金属板SQZ山墙柱XT斜拉条MZ门边柱ML门上梁T拉条CG撑杆HJ桁架FHB复合板YG:压杆或是圆管(从材料表中分别)XG:系杆LG:拉管QLG:墙拉管QCG:墙撑管GZL直拉条GXL斜拉条GJ30-1跨度为30m的门式刚架,编号为1号3钢结构设计图1)设计说明:设计依据、荷载资料、项目类别、工程概况、所用钢材牌号和质量等级(必要时提出物理、力学性能和化学成份要求)及连接件的型号、规格、焊缝质量等级、防腐及防火措施;2)基础平面及详图应表达钢柱与下部混凝土构件的连结构造详图;3)结构平面(包括各层楼面、屋面)布置图应注明定位关系、标高、构件(可布置单线绘制)的位置及编号、节点详图索引号等;必要时应绘制檩条、墙梁布置图和关键剖面图;空间网架应绘制上、下弦杆和关键剖面图;4)构件与节点详图a)简单的钢梁、柱可用统一详图和列表法表示,注明构年钢材牌号、尺寸、规格、加劲肋做法,连接节点详图,施工、安装要求。

b)格构式梁、柱、支撑应绘出平、剖面(必要时加立面)、与定位尺寸、总尺寸、分尺寸、分尺寸、注明单构件型号、规格,组装节点和其他构件连接详图。

4钢结构施工详图根据钢结构设计图编制组成结构构件的每个零件的放大图,标准细部尺寸、材质要求、加工精度、工艺流程要求、焊缝质量等级等,宜对零件进行编号;并考虑运输和安装能力确定构件的分段和拼装节点。

《常用用术语》钢结构:是由钢板、型钢、冷弯薄壁型钢等通过焊接或螺栓连接所组成的结构。

钢结构的特点:轻质高强;塑性、韧性好;各向同性,性能稳定;可焊性;不易渗漏;耐热但不耐火;耐腐蚀性差;制造简便,施工周期短。

拱架计算

拱架计算

1、拱架计算书1.1 设计依据1、《务川县本桥施工图设计》;2、《公路桥涵施工技术规范》(JTG/T F50-2011);3、《钢结构设计规范》(GB50017-2003);4、《公路桥涵地基与基础设计规范》(JTG D63-2007);5、《公路桥涵施工技术规范》(JTJ 041-2000);6、《公路桥涵钢结构和木结构设计规范》(JTJ 025-86);7、《装备式公路钢桥使用手册》;8、《路桥施工计算手册》。

9、《建筑施工模板安全技术规范》(JGJ 162-2008)10、《钢结构工程施工质量验收规范》(GB50205—2001)11、《建筑结构荷载规范》(GB50009—2001)12、《桥梁工程》、《结构力学》、《材料力学》,《拱桥》,《桥梁设计与计算》;13、其他相关规范手册;1.2 工程概况本桥位于务川县县郊,跨越龙塘河。

桥跨布置为1×16m(预应力混凝土空心板)+125m(钢筋混凝土箱拱)+ 1×16m(预应力混凝土空心板),大桥全长170.6米。

桥梁平面位于直线上,桥面纵坡为双向1.0%,桥面横坡为双向2%。

1.3支架计算荷载的取用原则根据《公路桥涵施工技术规范》JTG/T TF50-2011第5.2.6条:模板、支架的设计应考虑下列各项荷载,并应按表1-3-1进行荷载组合。

⑴模板、支架自重;⑵新浇筑混凝土、钢筋、预应力筋或其他圬工结构物的重力;⑶施工人员及施工设备、施工材料等荷载;⑷振捣混凝土时产生的振动荷载;⑸新浇筑混凝土对侧模板的压力;⑹混凝土入模时产生的水平方向的冲击荷载;⑺其他可能产生的荷载。

如雪荷载、冬天保温设施荷载等。

表1-1 模板、支架和拱架设计计算的荷载组合普通模板荷载计算:⑴模板、支架和拱架的容重按设计图纸计算确定。

⑵新浇筑混凝土和钢筋混凝土的容重:混凝土24KN/m3;钢筋混凝土的容重可采用25KN/m3~26KN/m3(以体积计算的含筋量≤2%时采用25KN/m3,>2%时采用26KN/m3),本检算资料按26×1.2=31.2KN/m3计。

钢结构工程量计算规则规范

钢结构工程量计算规则规范

钢结构工程量计算规则规范篇一:钢结构工程量计算规则1 1.1钢结构施工预算工程量统计施工预算编制依据施工图及施工详图、承揽合同、设计变更、材料代用等。

1.2 施工预算编制要求一套施工图编一份施工预算、按规定标准表格一一准确填写(见附表《钢结构制作安装工程施工预算工程量统计表》及《钢结构制作安装工程施工预算工程量计算式》)。

1.3(1)钢结构工程量计算规则钢结构制作按施工图图示尺寸以吨计算工程量,不扣除孔眼、切边的重量,焊条、铆钉、螺栓等重量已包括在定额内不另计算重量。

在计算不规则或多边形钢板重量时均以其最长边乘以最大宽度的矩形面积计算。

(2) 厂房钢结构实腹柱、吊车梁、H型钢按施工图图示尺寸计算,其中腹板及翼板宽度按图示尺寸每边增加25mm计算。

(3) 厂房钢结构制动梁的制作工程量包括制动梁、制动桁架、制动板重量。

(4) 厂房钢结构墙架的制作工程量包括墙架柱、墙架梁及连接柱杆件重量(不包括山墙防风桁架)。

(5) (6)厂房钢结构钢柱制作工程量包括依附于钢柱上的牛腿及悬臂梁重量。

厂房钢结构轨道制作工程量。

只计算轨道本身重量,不包括轨道垫板、压板、斜垫、夹板及连接角钢等重量。

(7) 厂房钢结构铁栏杆制作按工业厂房中平台、操作台的钢栏杆图示尺寸计算重量(民用建筑的铁栏杆不包括在该项)。

(8) 钢漏斗制作工程量。

金属漏斗按排版图示尺寸以吨计算,不扣除上人孔、检查孔、清扫孔的面积。

矩形按图示分片,园型按图示展开尺寸,并依钢板宽度分段计算。

每段均以其上口长度(园型以分段展开上口长度)与钢板宽度,按矩形计算,依附漏斗的型钢并入漏斗重量内计算。

(9) 各种钢门的五金铁件(包括折页、门轴、门栓、插销等)重量不另计算;推拉钢门及防护门的滑轨、滑轮应另计重量。

(10)钢结构安装(含运输)工程量等于钢结构工程量,所需螺栓、电焊条等重量不另计算。

(11)钢结构高强螺栓、剪力栓钉均按套计算。

1.4 怎样编制钢结构施工预算注意事项按钢结构施工预算编制依据、编制要求、工程量计算规则及计算结果,准确无误的逐一填入钢结构件名称、构件部位、构件编号、材质、施工图(或详图)图号、单位、数量、单重、总重(其中钢板、型钢、钢管重量分列)备注等,完成施工预算编制。

钢结构算量计算表格

钢结构算量计算表格
序 号
构件名称
构件数量 型号(自定义编号) 高(mm)
宽(mm) 厚度1 20 8 2 12
厚度2 长度(m) 2.5 16
数量
单重 8.64 73.35 6.28 122.46 单重
材质
分项合计重量
序号 一、主构件 1 z-1 柱上部节点 柱中部节点 牛腿 柱下部节点
C250*75*20*2.5 H400*200*8*16 □100*100*2 Φ 426*12 构件数量 型号 46 0 0 0 0 4
屋面水平支撑 48
花蓝螺丝 7 屋面檩条 屋面檩托 8 墙面檩条 墙面檩托 9 屋檩拉杆 屋面拉杆 拉杆套管 屋面拉杆 屋面拉杆 檩条斜拉杆 隅撑 节点 48
26 C250*75*20*2.5 23 5 0 C300*75*20*2.5 0 8
39513.76 844.974 0 0
20
2.5
1000
22 22 Φ 33*2.75 22 22 22 23 ∠ 0
12 33 12 12 12 63*5 8 200 150 竖距2600.0 梁高600.0 2.75
檩距1500.0 檩距1500.0 檩距1000.0 檩距300.0 檩距1500.0 KG/M4.82
44 8 4 4 8 8
61.49 24.61 3.82 1.33 19.94 36.30 1.88
250 75 400 200 100 100 426 高(mm) 宽(mm) 厚度1
1000 1 1000 1 1000 1 1000 1 厚度2 长度(m) 数量
分项合计重量 Q345 Q345 Q345 Q345 Q345 Q345 Q345 Q345 Q345 Q345 Q345 Q345 Q345 Q345 Q345 0 Q345 58280.31875 0 0 0 0 1475.477459 86224.26208 0 0 0 0 0 0 0 0 0 0 0
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

22
23.5 单剪螺栓 I类接触面 303.4
8
型钢及螺栓钢材性能 (kN/cm2)
钢材强度 钢材序号
fu
fy
f
fv
2
37.5
22.5
20.5
12
fce
螺栓强度
NbHFv
NbHWv
f
bH u
32
77
77
104
9
焊缝强度信息 (kN/cm2)
焊缝序号 焊条型号
fu
fwc
fwt12
fwt3
fwv
fwf
2
- 20 X 325 / 400
螺栓序号 螺栓等级 螺栓钢号 螺栓直径 螺栓孔径 螺栓形式 接触形式 有效面积
9
10.9
Q235
22
23.5 单剪螺栓 I类接触面 303.4
7
腹板螺栓信息( mm ,mm2 )
螺栓序号 螺栓等级 螺栓钢号 螺栓直径 螺栓孔径 螺栓形式 接触形式 有效面积
9
10.9
Q235
E43xx
37.5
20.5
20.5
17.5
12
16
80 TRUE
80 TRUE
5
拼接连接板的设计 ( mm )
外侧翼缘拼接连接板
内侧翼缘拼接连接板
腹板拼接连接板
t1
b1
l1
t2
b2
l2
t3
b3
l3
推荐值
22
220
965
0
0
0
18
325
400
修订值
20
设计值
22
220
965
0
0
0
20
325
400
校核 6
- 22 X 220 / 965 翼缘螺栓信息( mm ,mm2 )
i 0X (cm) 24.3
4
高强度螺栓联接接点设计
翼缘
螺栓数 螺孔行数 行距( mm ) 列距( mm ) 腹板
螺栓数 螺孔行数 行距( mm ) 列距( mm )
推荐值
12
2
140
80
10
5
80
80
修订值
设计值 校核
12 TRUE
2 TRUE
140 TRUE
80 TRUE
10 TRUE
5 TRUE
H型梁钢结构构件联接计算 ( V2.0 )
说明
1。等强度联接设计法验算梁与梁的联接接点 2。按简化设计法验算梁与梁的联接接点 3。按实用设计法验算梁与梁的联接接点
1
计算模式
1
2
拼接连接处的内力
M
24590 kN-cm
V
210.6
kN
3
构件信息
构件钢号
焊接H型钢
翼缘摩擦型高强度螺栓型号
腹板摩擦型高强度螺栓型号
Q235 Hb (mm)
600
H600x220x12x19-24
Bb (mm)F b (mm) 19
J10.9-M22-1-X1
rb (mm) 24
Ab0 (cm2) 156
Wb0X(cm3) 3070
J10.9-M22-1-X1
Ib0X (cm4) 92084
w ( kN/m ) 1216.8
相关文档
最新文档