各种交通标志一览
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
各种交通标志一览
警告标志
(警告车辆、行人注意危险地点的标志)
十字交叉 ,形交叉 ,形交叉 ,形交叉 ,形交叉
环形交叉向左急弯路向右急弯路反向弯路连续弯路
上陡坡下陡坡两侧变窄右侧变窄左侧变窄
窄桥双向交通注意行人注意儿童注意牲畜
注意信号灯注意落石注意落石注意横风易滑 side of road subgrade 2m. Direct-buried cable upper and lower should be covered with not less than
100mm thick layer of soft soil or sand, and affix the protection, the coverage should be wider than 50mm on each side of the cable, cover plate can be used to protect concrete or brick. Direct-buried cable in line every 50-100 meters, cable turns should be appreciable bearing
flags or stakes. Direct-buried cable prior to backfill, shall be subject to acceptance of concealed work before they can be filled. 4.1.5 4.1.5.1 factory of making cable terminal cable mainly in the low-voltage cable head, dry Pack, its production should strictly abide by the production process. 4.1.5.2 should check the insulation before the first cable production qualified, low-voltage power cables with 1000V shake table, its insulation value should not be less than the specified value.
4.1.
5.3 making cable head, cut from the Strip begins continuous operation until the completion of the cable, reducing insulation exposure time, strip-cut cables, insulation should not damage conductors and reservations. The armored power cable and control cable shield should be connected to a good shall not be interrupted, and ... Correctly positioned, vertical clearance shall be distributed evenly per shell bus and the shell should be concentric, the error shall not exceed 5mm, segments and segment connection, two adjacent bus and enclosure, after connecting bus and enclosure should not be subject to mechanical stress. Short circuit between phases of the shell plate is correctly positioned, good connection between support plates shall be mounted firmly, insulation Grade insulation shell should be made. 4.1.11 the installation of explosion-proof electrical equipment 4.1.11.1 rectisol
wash unit area, tank farm and other explosion-proof areas, the electrical installation shall be carried out as explosion-proof requirements. 4.1.11.2 electrical installations
傍山险路傍山险路堤坝路堤坝路村庄
隧道渡口驼峰桥路面不平过水路面
有人看守铁路道无人看守铁路道口注意非机动车事故易发路段慢行口
左右绕行左侧绕行右侧绕行施工注意危险
叉形符号(表示多股铁道与道路交叉)
禁令标志
(禁止或限制车辆、行人交通行为的标志)
side of road subgrade 2m. Direct-buried cable upper and lower should be covered with not less than 100mm thick layer of soft soil or sand, and affix the protection, the coverage should be wider than 50mm on each side of the cable, cover plate can be used to protect concrete or brick. Direct-buried cable in line every 50-100 meters, cable turns should be appreciable bearing flags or stakes. Direct-buried cable prior to backfill, shall be subject to acceptance of concealed work before they can be filled. 4.1.5 4.1.5.1 factory of making cable terminal cable mainly in the low-voltage cable head, dry Pack, its production should strictly abide by the production process. 4.1.5.2 should check the insulation before the first cable production qualified, low-voltage power cables with 1000V shake table, its insulation value should not be less than the specified value. 4.1.5.3 making cable head, cut from the Strip begins continuous operation until the completion of the cable, reducing insulation exposure time, strip-cut cables, insulation should not damage conductors and reservations. The armored power cable and control cable shield should be connected to a good shall not be interrupted, and ... Correctly positioned, vertical clearance shall be distributed evenly per shell bus and the shell should be concentric, the error shall not exceed 5mm, segments and segment connection, two adjacent bus and enclosure, after connecting bus and enclosure should not be subject to mechanical stress. Short circuit between phases of the shell plate is correctly positioned, good connection between support