闸坝结构布置
水闸类型、组成、工作特点、孔口设计、闸室布置
水闸类型、组成、工作特点、孔口设计、闸室布置下载温馨提示:该文档是我店铺精心编制而成,希望大家下载以后,能够帮助大家解决实际的问题。
本文下载后可定制随意修改,请根据实际需要进行相应的调整和使用,谢谢!并且,本店铺为大家提供各种各样类型的实用资料,如教育随笔、日记赏析、句子摘抄、古诗大全、经典美文、话题作文、工作总结、词语解析、文案摘录、其他资料等等,如想了解不同资料格式和写法,敬请关注!Downloaded tips: This document is carefully compiled by the editor. I hope that after you download them, they can help you solve practical problems. The documentscan be customized and modified after downloading, please adjust and use it accordingto actual needs, thank you!In addition, our shop provides you with various types of practical materials, suchas educational essays, diary appreciation, sentence excerpts, ancient poems, classic articles, topic composition, work summary, word parsing, copy excerpts, other materials and so on, want to know different data formats and writing methods, please pay attention!水闸在水利工程中起着至关重要的作用,根据不同的需要和用途,水闸的类型也各不相同。
钢闸坝施工方案
钢闸坝施工方案1. 引言本文档旨在介绍钢闸坝的施工方案,包括施工前的准备工作、施工过程的步骤和措施,以及施工完成后的验收和监测等内容。
2. 施工前的准备工作在进行钢闸坝的施工前,需要进行以下准备工作:2.1 材料准备根据设计要求,准备钢闸坝所需要的各种材料,包括钢材、混凝土、垫层材料等。
2.2 设备准备准备所需的施工设备和机械设备,包括起重机、挖掘机、打桩机等。
2.3 土地准备清理施工现场,确保施工区域的平整和清洁,同时进行地基处理工作。
2.4 施工人员准备培训施工人员,确保其具备相应的专业知识和技能,熟悉施工方案,并做好施工安全的培训和教育工作。
3. 施工过程钢闸坝的施工过程可分为以下步骤:3.1 基础施工在经过地基处理后,进行基础施工工作。
首先,按照设计要求进行钢闸坝基础的浇筑工作;其次,在基础上进行支墙的施工,采用钢骨混凝土结构。
3.2 翼墙施工在基础施工完成后,进行翼墙的施工。
翼墙采用钢结构,先进行预制件的制作,然后进行拼装和安装。
3.3 闸门施工在翼墙施工完成后,进行闸门的施工。
闸门一般采用钢板焊接而成,根据设计要求进行制作和安装。
3.4 导流施工钢闸坝完成后,需要进行导流施工,即排水来保证下游工程施工的顺利进行。
导流施工可以采用临时堰坝、暂设引流管道等方式。
4. 施工后的验收和监测完成钢闸坝的施工后,需要进行验收和监测工作,以确保钢闸坝的质量和安全性。
4.1 验收由专业的验收机构对钢闸坝进行验收,检查结构的强度、密封性等方面是否符合设计要求。
4.2 监测对钢闸坝进行长期的监测,包括测量水位、位移、应力等参数,及时发现和解决可能存在的问题。
5. 安全措施钢闸坝施工过程中,需要采取一系列的安全措施,以确保施工人员的安全。
5.1 安全培训对施工人员进行安全培训,包括施工现场的安全规范、使用设备的注意事项等。
5.2 安全防护提供必要的安全防护装备,包括安全帽、安全绳等,确保施工人员的人身安全。
第5章7 水闸
50
防渗措施
• 2、垂直防渗
– 木板桩 – 钢筋混凝土板桩
– 混凝土防渗墙 – 高压旋喷灌浆帷幕
51
防渗措施
• 3、排水措施(水平排水与排水井)
52
防渗措施
• 4、两岸防渗
在上下游水压力的作用下,渗水可能从 两岸渗透。因此,水闸闸室两端与岸坡要 有可靠的连接,防止岸坡绕渗。具体防渗 设施有刺墙等形式。
42
消能防冲措施——防淘墙
• 作用:防止海漫下游可能发生的冲刷
43
内容
• • • • • • • • • • 概述 水闸的类型 水闸组成与构造 闸孔尺寸 地基处理 水闸的消能防冲 水闸防渗设计 闸室结构 两岸连接建筑物 其他闸坝建筑
44
七 水闸防渗设计
• 水闸挡水时,在闸基内及绕过翼墙在岸 坡内部都会产生渗流。闸基渗流和两岸 绕流产生的扬压力对闸室的抗滑稳定不 利。渗流还可能造成渗透变形和地基破 坏。因此需要做好防渗设计。
53
内容
• • • • • • • • • • 概述 水闸的类型 水闸组成与构造 闸孔尺寸 地基处理 水闸的消能防冲 水闸防渗设计 闸室结构 两岸连接建筑物 其他闸坝建筑
54
八 闸室结构
• 内容:
闸室结构布置包括底板、闸墩、 胸墙、闸门、工作桥和交通桥等 部分,结构和尺寸的初步确定原 则:安全、稳定、适用、经济。
58
内容
• • • • • • • • • • 概述 水闸的类型 水闸组成与构造 闸孔尺寸 地基处理 水闸的消能防冲 水闸防渗设计 闸室结构 两岸连接建筑物 其他闸坝建筑
59
九 两岸连接建筑物
• 翼墙
• 上游翼墙引导水流平顺地进入闸室, 挡住两侧回填土。
泄洪闸工作闸门安装施工方案
泄洪闸工作闸门安装施工方案一.泄洪闸工作闸门基本概况泄洪闸坝段布置于河道两侧主槽,左槽布置14孔,右槽布置11孔,孔口净宽20m,堰顶高程26.00m。
挡水采用弧形工作门,由两台液压启闭机启闭。
1.泄洪闸金属结构剖面布置总图泄洪闸金属结构剖面布置总图2.泄洪闸工作闸门的主要参数泄洪闸工作闸门的主要参数表序号名称参数l 闸门型式露顶式2孔口宽度20.0 m3 闸门高度14.0m4 支承跨度18.40 m5 设计水头13.5 m6 总水压力19486kN7 支铰型式球铰8支饺高度lO.36m3.主要闸门部件的重量第一节(底节)门叶重量37.1t;第二节门叶重量22.3t;第三节门叶重量34.9t;第四节(顶节)门叶重量17.7t;支臂下支臂重20.6t;支臂上支臂重11.1t(包括前连接板及筋板,每个臂柱的前连接板及筋板重约1.8t)。
二.主要施工依据1.安装工程遵循的技术规范、标准安装所用的材料、设备、安装工艺和工程质量的检验和验收应符合下列国家和行业颁布的技术标准和规程规范规定的技术要求。
当本技术文件的内容与所引用的标准和规程规范的规定有矛盾时,应以有关技术文件的规定或监理人指示为准。
GB3323钢熔化焊对接接头射线照相和质量分级GB50205 钢结构工程施工验收规范GB50221 钢结构工程质量检验评定标准GB11345钢焊缝手工焊超声波探伤方法和探伤结果分析GB50221 钢结构工程质量检验评定标准GB8923 涂装前钢材表面锈蚀等级和除锈等级GB985 气焊、手工电弧焊及气体保护焊焊缝坡口的基本型式与尺寸GB986埋弧焊焊缝坡口的基本型式和尺寸GBJ17钢结构设计规范DL/T5039水利水电工程钢闸门设计规范SL36水工金属结构焊接通用技术条件SL105 水工金属结构防腐蚀规范DL/T5018 水电水利工程钢闸门制造安装及验收规范SDJ2492 金属结构及启闭设备安装工程(试行)SDZ014 涂漆通用技术条件JB3092火焰节割质量技术要求JB/ZQ4000.3 焊接件通用技术要求DL/T5358 水电水利工程金属结构设备防腐蚀技术规程2. 制造承包商提供的施工图、技术资料、技术要求等。
闸坝施工方案
闸坝施工方案施工方案概述:本文将针对闸坝的施工方案进行详细说明。
闸坝是一种用于调节水流、防洪和灌溉的重要水利设施。
在施工过程中,需要考虑到地质环境、工程技术和安全保障等多个方面的因素。
本施工方案将详细介绍闸坝的设计、施工步骤和安全措施,以确保施工过程顺利进行。
一、设计阶段:1. 地质勘察:在施工前,需要进行地质勘察,确保施工地点的地质条件符合闸坝建设要求。
2. 结构设计:根据工程需求和地理环境,进行闸坝的结构设计,包括高度、长度、坝体材料等方面。
3. 施工图设计:根据结构设计,绘制出详细的施工图纸,包括闸门、泄洪孔等构造物的尺寸和布置方式。
二、施工步骤:1. 基础处理:在施工前,需要进行基础处理工作,包括挖掘、浇筑混凝土等操作,以确保基础坚固稳定。
2. 坝体建设:根据施工图纸,进行闸坝的坝体建设,包括石料垒筑、混凝土浇筑等工作。
3. 构件安装:在坝体建设完成后,需要进行闸门、泄洪孔等构件的安装,确保其功能正常。
4. 灌浆封孔:完成构件安装后,进行灌浆封孔操作,以确保闸坝的密封性和稳定性。
5. 检测验收:在施工结束前,对闸坝进行严格的检测,确保其符合相关安全标准和设计要求。
三、安全措施:1. 施工现场安全:在施工过程中,要设置明显的警示标志,限制非相关人员进入施工区域,确保施工现场的安全。
2. 设备操作安全:施工人员需要经过专门培训,熟悉施工设备的操作规程,确保设备操作安全。
3. 安全防护措施:在施工现场设置合适的护栏和安全网,防止人员坠落和物体滑落,确保工作人员的安全。
施工方案总结:本文详细介绍了闸坝的施工方案,包括设计阶段、施工步骤和安全措施。
只有在充分的设计和认真的施工过程中,才能保证闸坝的安全性和功能完善。
通过严格遵守施工方案,并采取必要的安全措施,可确保施工过程的顺利进行,最终建成优质的闸坝水利工程。
水闸的概念及计算
第八章 水 闸§8-5 闸室的布置和构造 教学内容底板、闸墩、工作桥、交通桥 一、底板按形状分:有水平底板、低实用堰底板(上游水位高,流量又受限制)。
河宽、孔多。
需用横缝将闸室分成若干闸段(每个闸段可分为一孔、两孔、三孔)按底板与闸墩的连接方式分:整体式、分离式● 整体式闸底板与闸墩浇筑成整体,墩中分缝。
(也有闸室底板中间分缝的)底板形式⎭⎬⎫⎩⎨⎧--kpa 4030较差,箱式底板:地基承载力实心底板适用于松散地基,地震烈度较高的地区 ● 分离式单孔底板上设双缝,将底板与闸墩分开适用:坚基,紧密的地基上,不会产生不均匀沉降。
底板顺水流方向的长度:满足上部结构布置,结构强度和抗滑稳定要求。
二、闸墩材料:常用混凝土、浆砌石、少筋混凝土。
作用:分隔闸孔,支承闸以及上部结构。
材料:砼或浆砌石。
外形轮廊:过闸水流平顺,侧向收缩小,以加大过水能力。
分方形、三角形、半圆形、流线形。
高程:上游高出最高水位并有一定超高。
长度:与闸底板顺水流长度相同。
上、下游侧:铅直或10:1~5:1竖坡。
闸墩厚度:满足强度,稳定要求,决定于工作门槽深度和门 槽颈部厚度。
门槽颈部厚度最小值为0.5m 门槽深0.3m 槽宽0.5~1.0缝墩:1.2~1.5检修门槽与工作门槽之间须保持1.5 ~2.0m 净距。
胸墙与检修门槽之间也应留足1.0m 以上的间距。
三、闸门检修门---平门----位置:上游侧工作门--弧门平门--位置:① 上游侧②下游侧(利用水重帮助闸室稳定) 闸门顶部高程:应高于可能最高蓄水位。
四、胸墙固定式、活动式作用:减少闸的高度,减轻立门重和降低对启闭机重量的要求。
布置位置:置于门后--闸门紧靠胸墙,且止水效果好而简单;门前---止水结构复杂,易于磨损,有利于启闭,钢丝绳不易磨损•顶高程:顶与闸墩齐平。
底梁梁底高程:满足堰流的要求,堰顶高程+堰顶下游水深+ (0.2m)。
厚度:不小于0.15~0.2m 结构形式:板式、梁板式。
重力式闸坝工程施工方案
一、工程概况本工程为某水电站重力式闸坝工程,位于某河流上游,主要功能为发电、灌溉、防洪等。
闸坝全长100米,最大坝高30米,设计流量为500立方米/秒。
工程总投资约1亿元,建设工期为2年。
二、施工组织1. 施工队伍成立专门的施工项目部,下设施工、质量、安全、材料、财务等职能部门,负责整个工程的施工管理。
2. 施工进度根据工程总进度计划,将工程分为以下几个阶段:施工准备阶段、基础处理阶段、主体结构施工阶段、金属结构及启闭机安装阶段、施工验收阶段。
三、施工方案1. 施工准备阶段(1)施工图纸会审:组织施工、设计、监理等相关部门进行施工图纸会审,明确施工要求和技术标准。
(2)施工组织设计:编制详细的施工组织设计,包括施工进度、施工方案、资源配置、质量控制、安全措施等。
(3)施工材料及设备采购:根据工程需求,采购施工材料及设备,确保材料及设备质量。
(4)施工现场布置:合理规划施工现场,设置材料堆场、施工便道、临时设施等。
2. 基础处理阶段(1)清除表层土:采用挖掘机清除表层土,达到设计要求。
(2)开挖基岩:采用钻爆法开挖基岩,确保基岩质量。
(3)基础处理:对基岩表面进行清理,浇筑混凝土垫层,保证基岩与混凝土垫层紧密结合。
3. 主体结构施工阶段(1)混凝土浇筑:采用分层浇筑、分段施工的方式,确保混凝土质量。
(2)模板工程:采用钢模板,确保模板刚度、稳定性和平整度。
(3)钢筋工程:按照设计要求进行钢筋绑扎,确保钢筋间距、保护层厚度等符合规范。
4. 金属结构及启闭机安装阶段(1)金属结构加工:根据设计图纸,进行金属结构加工。
(2)金属结构安装:采用吊装设备,将金属结构安装到位。
(3)启闭机安装:按照设计要求,进行启闭机安装调试。
5. 施工验收阶段(1)自检:施工过程中,严格执行自检制度,确保工程质量。
(2)监理验收:监理单位对施工过程进行监督检查,确保工程质量符合要求。
(3)竣工验收:工程完工后,组织竣工验收,确保工程达到设计要求。
胜利水电站水力自控翻板闸设计
521 翻板 闸上部结构尺寸 的确定 . . 双支点滚轮连杆式混凝 土水 力 自控翻板 闸门在辽 宁省 已 引进 、 推广2 多年 , 0 运行情况较好 , 尤其是在辽宁省小水电工程
等水电站 , 在泄水建 筑物坝型选择上 , 均对混凝土水力 自控 翻
板闸 、 闸门、 钢 溢流坝进行过经济方 案比较 , 经过 实践 验证 , 混
7 87
技 术 研 发
T HN o N MAR ET EC oL GY A D K
章 以胜 利 水 电站 为例 , 细介 绍 了水 力 自控 翻板 闸布 置 、 流 和 结构 设 计 。该 工 程 的 成 功 设 计 对 于 其 他 类 似 的 水 电 和 河 详 泄
道 工程 具 有 参 考价 值 。
关键 词 : 翻板 闸 : 流 坝 ; 水 电 溢 小
di 03 6 /i n10 — 542 1. . 5 o 1.9 9 .s.0 6 8 5 . 20 1 : js 0 60
图1 水 力 自控 翻 板 闸 泄 流 曲线 图 5 翻 板 坝 设 计 51 自控 翻 板 闸基 本 尺 寸 的确 定 .
根据选定下坝线的工程总体布置及坝型 , 泄水建筑物采用混
凝 土水力 自控翻板闸共1孔 , 4 单跨长度1 翻板 闸净长10m 0 m, 4 。 坝两侧各设 1 m厚边墩 , 中部 设一 中墩 ( 1 1, 厚 . r) 翻板 闸全长 0f 13 4 m;边墩 与中墩均设置通气孔。考虑坝址上覆砂 卵石较厚 ( . 1. I) 58 78T ,故翻板闸设计建基面座落在砂卵石基础上 , I 坝 下消能防冲建筑物按底流消能方式设计 。
52 翻 Hale Waihona Puke 闸 结 构 尺 寸 的 确 定 .
拦河闸坝施工方案
拦河闸坝施工方案1. 引言本文档为拦河闸坝施工方案的详细说明。
拦河闸坝是一种用于阻断河水流动的人工水利工程设施,常用于水库、运河、护岸等环境中。
本方案旨在确保拦河闸坝的施工质量,保证工程的安全、可靠和顺利进行。
2. 工程概述2.1 工程名称拦河闸坝施工2.2 工程地点本工程将在指定的河道位置进行施工,位置详细信息如下:•河名:[河名]•河道宽度:[河道宽度]•拦河闸坝位置:[拦河闸坝位置]•总工程长度:[总工程长度]2.3 工程目标•建设一座具有良好结构和防水性能的拦河闸坝;•保持河水正常流动,并确保工程不对周边环境造成不良影响。
3. 施工开展前的准备工作3.1 技术准备在施工前,需要进行以下技术准备工作:•选取适当的建筑材料,例如混凝土、钢材等;•确定建筑方案和施工框架;•准备相关施工设备和工具。
3.2 施工人员准备•确定施工人员和相关技术人员的组成;•各类人员需具备相关的职业证书和技能,以确保施工质量和安全。
3.3 施工现场准备•清理施工现场,确保施工区域无障碍物和危险因素;•在施工区域周边设置施工警示标志,提醒过往行人和车辆注意施工。
4. 施工步骤4.1 拦河闸坝设计•根据工程需求和环境条件,进行拦河闸坝的详细设计;•确定拦河闸坝的结构形式和尺寸;•确定拦河闸坝的材料和强度要求。
4.2 基础工程施工•进行拦河闸坝的基础工程施工,包括地基处理、基坑开挖、桩基处理等;•按照设计要求,在施工现场进行基础工程的建设。
4.3 拦河闸坝主体结构施工•根据设计方案,进行拦河闸坝的主体结构施工;•包括拦河闸坝墙体的浇筑、施工柱的建设等。
4.4 拦河闸坝的防水处理•进行拦河闸坝的防水处理,保证拦河闸坝具备良好的防水性能;•使用特定的防水材料和技术,对拦河闸坝进行防水处理。
4.5 安全设施建设•在拦河闸坝周边设置安全设施,包括护栏、警示标志等;•提供必要的安全设备和装置,确保施工过程的安全。
5. 施工质量控制5.1 定期检查和监测•在施工过程中,定期对施工质量进行检查和监测;•对施工过程中的关键节点进行特别关注,确保施工质量符合设计要求。
水利水电工程枢纽布置设计基本方法
水利水电工程枢纽布置设计基本方法枢纽布置主要包括拦河大坝坝址、水电站厂房、溢流泄洪闸、船闸、非溢流坝等的相对位置、结构型式等。
一、枢纽布置影响因素枢纽工程是一项涉及面较广,影响因素很多的复杂的系统工程,枢纽工程布置涉及工程区域河流规划、地形地质条件、水文条件、开发规模、工程等级、经济指标、防洪抗震、交通航运、淹没移民、环境影响等方面,对于流量较大流速较高及重要的导流、泄水、航道等建筑物,一般的大中型水利枢纽还应该通过水工模型的试验论证,优化枢纽各个建筑物的布置和工程水力特性,为枢纽工程的优化布置提供依据。
枢纽布置要考虑的因素很多:地形地质条件、水流条件、交通条件、运行条件、工程量和投资、施工导流和通航、施工工期等。
枢纽布置中,首先应选择适宜修建拦河大坝的坝址,其次要考虑泄水和引水发电建筑物位置。
一般情况下,坝址应选择在河床覆盖层不太深、两岸山体雄厚且地形完整、坝址区滑坡及坍塌等物理地质现象不发育的河段。
不同的地形地质条件,结合修筑大坝的料源条件等,可以选择与之相适应的土石坝、混凝土坝以及混凝土与土石混合坝坝型,形成土石坝枢纽、混凝土坝枢纽和混合坝枢纽的布置。
不同坝型的枢纽,其泄水、引水发电建筑物布置可以根据具体条件有不同的布置方式。
地形地质条件较好的“V”形河谷,可以布置混凝土拱坝枢纽,坝身布置泄洪设施,岸边布置地下发电厂房;坝址区地形宽阔,地质条件较好,可以布置混凝土重力坝泄水设施,河床式发电厂房;河床覆盖层深,当地土石材料丰富,可以布置土石坝枢纽,岸边布置泄水建筑物和引水发电厂房;河流上游落差较陡的山区河流上,常在上游取水点修建混凝土拦河泄洪坝,利用引水明渠,隧洞集中水头至下游发电厂房。
布置型式不一而足。
同时,还采取环境保护以及改善移民生产生活的种种措施,比如选址时少占用耕地等,通过设置生态泄水闸或生态放水孔等泄放生态流量消除脱水河段。
必要时设置分层取水取水口下泄不同温度的水以利于下游河道鱼类生长等。
水闸简介
《水闸施工规范》(SL27-91)
《水闸工程管理设计规范》(SL170-96) 《水闸技术管理规程》(SL75-94) 《水闸安全鉴定规定》(SL214-98)
2009.09
南京
主 要 内 容
1 概 述 水闸的类型、组成及构造 水闸的孔口尺寸 闸室安全和地基处理 水闸室消能防冲 闸下防渗 闸室结构与两岸连接建筑物 其他闸坝建筑物
一般
2009.09
南京
概
表2
工程等别 Ⅰ Ⅱ
述
水闸
水闸枢纽建筑物级别划分
永久性建筑物级别 主要建筑物 1 2 临时性建筑物 别 次要建筑物 级 3 3 4 4
Ⅲ
Ⅳ Ⅴ
3
4 5
4
5 5
5
5 \
南京
2009.09
概
2、洪水标准
述
水闸
平原区水闸的洪水标准应根据所在河流流域的防 洪规划规定的防洪任务,以近期防洪目标为主,并考 虑远景发展要求,按下表所列标准综合分析确定。
L j 6.9(h hc)
2009.09 南京
c
水闸消能防冲
③消力池底板(护坦)厚度:
要求满足抗浮和抗冲要求,且不小于0.5m。
水闸
抗冲:
t k1 q H
t k2 U W Pm
抗浮:
b
k1为消力池底板计算系数,可采用 0.150.20;k2为消力池底板安全系数, 可采用1.11.3
0 c s
2 h 8 q b1 0.25 c hc ( 1 1 )( ) 3 2 ghc b2
水闸
(1)
(2)
q h T h 0 2 2 g
3 c 2 0 c 2
最新《水闸设计规范》条文说明
水闸设计规范(山区、丘陵区)条文说明目次1 范围 (134)4 总则 (135)5 闸址选择 (136)6 总体布置 (138)7 水力设计 (157)8 防渗排水设计 (164)9 结构设计 (170)10 防震抗震设计 (186)11 地基计算及处理设计 (190)1 范围本标准规定了水电工程山区、丘陵区水闸的闸址选择、枢纽布置、水力设计、防渗排水设计、结构计算、基础处理及监测设计等设计原则、技术要求和计算方法。
本次修订是在原《水闸设计规范(试行)》(SD133-84)的基础上,结合近二十多年来我国西部地区水电工程建设中水闸建设的实践经验而对原规范进行修订,其适用的范围主要是山区、丘陵区的水闸设计,平原地区的小型水闸可参照使用。
4 总则4.0.1 水闸是具有挡水、调节水位和引水、泄水作用的低水头水工建筑物,在发电、灌溉、供水、航运等方面应用十分广泛。
水电系统现行的《水闸设计规范》SD133-84(试行)自1984年12月31日颁布试行以来,在我国水电工程的水闸建设中发挥了重要作用,但是随着我国水电建设的发展,水闸的布置型式和结构型式不断创新,规模不断发展,在深厚土质地基上修建近40m高的水闸也相继出现。
由于多年来水闸设计和建设积累了丰富的经验,使我国水电工程水闸的设计、科研和施工方面有了长足的发展。
为使水闸设计更加符合技术先进、经济合理的要求,对《水闸设计规范》SD133-84(试行)进行修订。
原水闸规范所规定的适用范围为平原区大、中型工程中的1级、2级、3级水闸,山区、丘陵区的水闸设计只是参照使用;该规范编制所参照的很多都是我国平原区的工程,其挡水高度均在10m左右。
目前国内很多水电站的水闸都是修建在山区、丘陵区的河道上。
所以本标准修订的目的是为了适应山区、丘陵区水闸工程建设的需要,统一山区、丘陵区水闸设计标准和技术要求,进一步提高水闸设计水平,更全面的反映我国山区、丘陵区河流水闸设计的特点。
某引水式电站闸坝设计说明书
水电站闸坝枢纽工程设计说明书水利水电工程专业学生** 指导老师**摘要鱼潭水电站位于四川省某自然保护区境内,系岷江一级支流熊猫河干流上的梯级电站。
电站规划装机24MW,为有压引水式开发方案。
闸址位于岩谷大桥下游约700m处,该处布置有引水发电隧洞取水口,经过约2.6km 的压力隧洞至调压井,然后接约300m长的压力钢管至规划厂址处获得约46m水头。
闸坝左岸有省级干道公路通过,交通方便。
熊猫河系岷江右岸支流,全长87.9km,流域面积1742 km2。
鱼潭水电站闸址距河口约30km,控制流域面积1467 km2,占全流域的84%。
为保护区内水力资源丰富,目前熊猫河干支流上已装机326.8MW,约占其理论蕴藏量的37.5%。
XX 电站出线将以110千伏一回送入四川主网,它的兴建不仅可以扩大电网的规模,支援四川主网电力,更重要的是对加速振兴保护区经济,办好自然保护区,保护珍稀动植物有着重大的经济意义和社会意义。
此前区内已开发兴建的约6.8MW小型水电站的电力,除用于区内大量的农副产品加工、保护区研究中心科研用电、农民以电代柴及生活照明外,多余容量均已送入四川主网。
为加强区内生态环境保护,鱼潭水电站的部分电力将用于进一步实施“以电代柴”,调整区内能源结构。
关键词:水利枢纽;闸坝;全闸方案;枢纽布置The abstractThe Yutan hydrodynamic station is in a nature egis borough of Sichuan province, and it is a rundle hydrodynamic station of the Panda River potamic trunk which is a anabranch of Minjiang River.The hydrodynamic station mark out 24MW capability.And it is a press citation station. The milldam address locates big bridge downstream in the rock valley about the 700 meters. the place's decoration has already led a water to generate electricity the hole to take the water, has been gone to adjust to press well, then connected the pressure steel pipe that grows about the 300 meters to go to the power plant site to acquire about the 46 meters water head about the pressure hole with 2.6 kilo meters.There is a interprovincial highway stand the left of the milldan ,the traffic is so conveniency.The Panda riverkm.The is on the right bank of Minjiang river, it is 87.9 kilo meters long, the drainage area is 1742 2km drainage area,is of the 84% of the milldan address is 30 km long from the bayou, control 1467 2drainage area.The nature egis’s water resource is wealth, Now the river of the Panda has marked out 326.8MW ,aboat having 37.5% of its theories reserves. The Yutan hydrodynamic station stand a line will with once 110 kilo-Volts send a present in return to go into a Sichuan main net.It is not only can accelerate the economy of the nature egis borough,do well for the nature egis borough, and it will protect the rarity animal and foliage.That is having important economic meaning or society meaning.Now,this areas having buiding about 6.8MW mini-hydrodynamic station’s electric power.Those power is for process the farm produce,for investigate center,for farmer’s living illuming or using electricity to substitute firewood.And the superabundance of the power all sending to Sichuan main net. I n order to strengthen the ecosystem of the area, parts of electric powers will used for the further implement"with electricity substitute firewood", adjusting the energy structure inside the area. Keyword: Hydraulic pivot; milldam; entirely milldam project; Pivot lay目录第一章绪言 (4)第二章设计资料综合说明 (4)第一节流域概况 (4)第二节枢纽任务和开发方式 (5)第三节气象水文资料 (5)第四节工程地质 (7)第五节建筑材料 (10)第六节施工条件砼 (11)第三章工程等级及建筑物的级别 (13)第一节工程等级 (13)第二节洪水标准 (14)第三节地震 (14)第四章坝轴线选择及首部枢纽布置 (15)第一节坝址、坝型选择 (15)第二节首部枢纽 (16)1 总论 (16)2 拦河闸 (17)3 闸孔设计 (17)4 闸室设计 (19)5 闸室的布置和构造 (22)6 两岸连接挡水重力坝段。
大坝水利枢纽布置及泄水建筑物设
大坝水利枢纽布置及泄水建筑物设计一、大坝水利枢纽布置1. 大坝的选择与布置大坝是水利工程中的重要组成部分,它主要用于拦截水体形成蓄水库,并提供稳定的水源供应。
在选择大坝的位置时,需要考虑以下几个因素:•地质条件:大坝的建设需要稳定的地质条件,通常选择坚硬的岩石或者厚实的黏土作为基础。
•水文条件:需要确定大坝所处水体的水源情况、水流量等方面的信息,以便确定大坝的高度和长度。
•地貌条件:选择地貌平坦或者适宜建设的地点,以便降低施工难度。
•经济条件:综合考虑建设投资、运营成本等经济因素,选择最优的建设方案。
大坝布置主要包括坝体主体和附属结构的设置。
坝体主体主要包括溢洪道、放空洞、冲击坎、溢流堰等构筑物,它们的布置应根据大坝水文、地质等条件灵活选择,以保证工程的安全性和可靠性。
2. 溢洪道溢洪道是大坝工程中的重要泄水结构,主要用于在洪水来临时,将多余的水流引导至安全地点,以保证大坝的安全运行。
溢洪道的选择和设计需考虑以下几个因素:•洪水流量:根据设计洪水,确定溢洪道的设计流量。
•洪水过程:了解洪水的流量变化过程,确定溢洪道开启和关闭的时机。
•溢洪流型:根据溢洪流型选择适当的溢洪道形式,如自由溢流式、控制溢流式等。
溢洪道的设计要满足以下几个基本要求:•正常下泄:确保大坝正常下泄的能力,以确保水库的正常运行。
•洪水安全:在设计洪水下,能够安全、稳定地排洪,保证大坝的安全。
•通行交通:考虑溢洪道安全通行和溢洪水对下游的交通影响,确保交通畅通。
•砂淤处理:要考虑溢洪道对砂淤的影响,采取相应的疏浚措施,确保溢洪道的畅通。
二、泄水建筑物设计1. 泄水建筑物的类型泄水建筑物是大坝工程中的重要组成部分,它主要用于控制和调节水库的出流,以维持一定的水位和水流量。
根据不同的用途和功能,泄水建筑物可以分为以下几种类型:•泄洪道:用于控制洪水的泄洪,通常位于大坝的下游,通过调节泄洪流量,防止洪水对下游产生影响。
•底孔排水孔:用于控制水库的水位,通过开启或关闭排水孔,可以调节水位,以满足水库的用水需求。
《水利工程概论》第四章-5 水闸
闸室的结构
水闸的闸室由底板、闸墩、闸门、启闭机和工作桥、公 路桥、胸墙等组成.
闸室的结构
闸底板
闸底板作为闸室的基础,将闸室及上部结构重量传到 地基上。 闸底板作为地下轮廓线的组成部分,降低通过地基的 渗透水流的渗透坡降。
底板分为分离式底板和整体式闸底板
闸室的结构
适用条件 : 承载能力较大的中等密实地基; 松软地基或闸孔宽度较大时,宜采用分离式闸底板,闸墩底板采用桩基础。
两岸联结建筑物
两岸连接建筑物在水闸工程中所占比重较大,有的可 达工程总造价的15%~40%,闸孔愈少,所占比重相对 越大。
两岸连接建筑物的作用: 1) 挡土,保护两岸土体的稳定,免受水流的冲刷; 2) 导流,使水流平顺地通过水闸; 3) 防渗,阻止侧向绕渗。
两岸联结建筑物
上下游翼墙
上游翼墙的功能是挡土、平顺引导水流,与铺盖共同 承担防渗的作用。下游翼墙的功能是挡土、引导出闸水 流沿翼墙均匀扩散。
消能防冲
当尾水深度小于跃后水深1.5m以上时,可采用综合式消力池。
消能防冲
辅助消能工的作用:加强扰动,增加消能效果,以减少池深和池长。 其形式有:
在闸室下游接一水平段,并在其后设一道小坎,以防止波状水跃。 在消力池的前部或后部设消力墩,形成对水流的反力作用。
消能防冲
防冲加固措施
(1)海漫 作用:消除余能,调整流速,保护下游河床免受冲刷。
按其形式分为打入混凝土预制桩和钻孔灌注混凝土桩.
按受力形式分为摩擦桩和支承桩.
闸室安全和地基处理
地基处理
7. 高压旋喷灌浆法 利用高压作用,使水、空气、水泥浆等介质向周围土层喷 射,对土体产生冲切、搅拌 、掺和 ,改变原土层结构、组成. 在喷管一定范围内形成新的混合凝结体.
闸坝设计报告
1.4 挡水建造物1.4.1 结构布置挡水建造物由左、右岸挡水坝组成。
左、右岸挡水坝坝型均为混凝土重力坝,①坝段为右岸挡水坝段,⑤坝段为左岸挡水坝段,坝段长分别为13.3m、24.9m,坝顶宽6.0m,坝顶高程2213.00m。
①、⑤坝段均建在覆盖层上,最低建基面高程2260.50m ,最大坝高12.5m。
坝体上游侧在高程2269.50m 处以1 ∶ 1 的反坡向上游悬挑1.5m 至高程2211.00m,牛腿厚2.0m;高程2269.50m ~2261.50m 为铅直面,高程2261.50m ~2262.50m 段坡度为1 ∶0.5。
下游坝坡坡度为1 ∶ 1,起坡点高程为2261.50m 。
在上、下游高程2262.50m 处设宽2.0m 平台,重力坝最大底宽16.0m。
1.4.2 设计计算1.4.2.1 坝顶高程计算根据DL5108-1999 《混凝土重力坝设计规范》的规定,坝顶高程按正常蓄水位和校核洪水位加相应的高差ΔH 确定,并取两者中最大值作为坝顶(或者防浪墙顶)高程,ΔH 值按下式计算:△H=h +h +h式中:(1.4-1)△ H—坝顶或者防浪墙顶至设计水位的高差,m;h1%—波高,m;hz—波浪至设计水位的高差,m;hc—安全超高,m。
波浪要素按DL5011-1991 《水工建造物荷载设计规范》中的官厅水库公式计算,重力坝坝顶高程计算结果见表1.4-1。
表1.4-1 重力坝坝顶高程计算成果表工况水位(m)波高h (m)1%高差波浪至设计水位的高差h Z (m)△H 安全超高h (m)c高差合计△ H(m)校核洪水位工况2211.860.350.100.400.85正常蓄水位工况2210.000.810.210.501.581% z c根据表 1.4-1 坝顶高程计算成果,确定重力坝坝顶高程为 2213.00m 。
1.4.2.2 稳定应力计算a) 计算公式按 SL319-2005 《混凝土重力坝设计规范》的有关公式及规定,对座落于覆 盖层地基上的重力坝分别采用纯摩公式和材料力学公式计算抗滑稳定和基底应 力。
抚顺市高阳橡胶坝平面布置与结构设计
平面布置与结构设计
梁岳 ’ 关庆禄 崔保德
1 阳 农业 大学 水利 学 院 1 0 1 沈 1 1 6
查表 《 橡胶 技 术 规 范》 P3 2
L s S D 1 1× + . 0 × + . 9 l + . 1 3 1 78 3 0 9 J 斗 — 3 5 5
尺 寸
高 阳橡胶坝的任务是使现有浑河抚顺城市 下游段 的李石拦河 闸已形成 的水面继续向下游 延 伸 ,该 段右 岸 为抚顺 市高 湾 经济特 区大 而
积待 开发 的 : 地 ,并通 过 招商 引资建 “ 底 L 海
则:
J —H/ 2 5 0 5-0 2 <04, I ./1 .3 .4 . 故可以满 足 要求 。
4. 0m 。
工作坝 袋螺栓直 段长 50 0mm, 据螺栓 根 埋深 要求工 作坝 袋底坝厚度 应不 小于 06 .m。 ②稳定要求
铺盖 ,游 为充排 气管 管沟 ,管沟 为渐 变 F
管沟 ,最 宽处 为 2 0 m ,深 0 8 米 ,管 沟 .8 .8
底板 厚 0 5 . m。坝 底板 总长为 经 济开发 区急需 改 造 的平 房 区 ,根据 抚顺 市总 体规 划 ,在坝 址 左 岸 上 游规 划 建 “ 平 公 园 ” 和 ,所 以在 此 处 修 建橡 胶坝 是 当务之 急 ,以取 得 最大 限度 的 景 观效 益和 经济效 益 。 高阳橡胶坝是浑河抚顺城区下游段 上的水
×3 1 5 . — 0. m
取 L, - 。 一L -l -
L +1 5 2 一 2 7. m 。 l 一2 0. 7. 5 3
2 抚顺市 水务局 1 5 0 08 1
上下游立面图概念
上下游立面图概念水闸是防洪、排涝、灌溉等方面应用很广的一种水工建筑物。
通过闸门的启闭,可使水闸具有泄水和挡水的双重作用。
改变闸门的开启高度,可以起到控制水位和调节流量的作用。
水闸由三部分组成。
上游段的作用是引导水流平顺地进入闸室,并保护上游河岸及河床不受冲刷。
一般包括上游齿墙、铺盖、上游翼墙及两岸护坡等。
闸室段起控制水流的作用。
它包括闸门、闸墩(中墩及边墩)、闸底板,以及在闸墩上设置的交通桥、工作桥和闸门启闭设备等。
下游段的作用是均匀地扩散水流,消除水流能量,防止冲刷洒岸及河床,其包括消力池、海漫、下游防冲槽、下游翼墙及两岸护坡等。
纵剖视图:是通过建筑物纵向轴线的铅垂面剖切得到的剖视图。
它表达了水闸高度与长度方向的结构形状、大小、材料、相互位置以及建筑物与地面的联系等。
上、下游立面图:表达了水闸上游面和下游面的结构布置。
由于视图对称,故采用各画一半的合成视图表达。
五个断面图用以表示上、下游翼墙的断面形状、材料与尺寸大小。
图中闸门启闭设备采用了拆卸画法,底板排水孔采用了简化画法,消力池反滤层为多层结构,标注方法见纵剖视图。
上、下游翼墙:过水建筑物如溢洪道、水闸、船闸等的进出口处两侧的导水墙称翼墙。
其常见形式有:圆柱面翼墙、扭曲面翼墙和斜墙式翼墙。
上游翼墙的作用是引导水流平顺地进入闸室;下游翼墙的作用是将出闸水流均匀地扩散,使水流平稳,减少冲刷。
铺盖:它是铺设在上游河床之上的一层保护层,紧靠闸室和坝体。
铺盖的作用是减少渗透,保护上游河床,提高闸、坝的稳定性。
护坦及消力池:经闸、坝流下的水具有很大的冲击力,为防止下游河床受冲刷,保证闸、坝的安全,在紧接闸坝的下游河床上,常用钢筋混凝土做成消力池。
消力池的底板称护坦,上设排水孔,用以排出闸、坝基的渗透水,降低底板所承受的渗透压力。
海漫及防冲槽(或防冲齿坎):经消力池流出的水仍有一定的能量,因此常在消力池后的河床上再铺设一段块石护底,用以保护河床和继续消除水流能量,这种结构称海漫。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
6闸坝结构布置
6.1闸室底板高程确定
底板高程与水闸承担的任务、泄流或引水流量、上下游水位及河床地质条件等因素有关。
闸底板应置于较为坚实的土层上,并应尽量利用天然地基。
在地基强度能够满足要求的条件下,底板高程定得高些,闸室宽度大,两岸连接建筑物相对较低。
对于小型水闸,由于两岸建筑物在整个工程中所占比重较大,因而适当降低底板高程,常常是有利的。
当然,底板高程也不能定的太低,否则,由于单宽流量加大,将会增加下游消能防冲的工程量,闸门增高,启闭设备的容量也随之增大。
另外,基坑开挖也较困难。
选择底板高程前,首先要确定合适的最大过闸单宽流量。
它取决于闸下游河渠的允许最大单宽流量。
允许最大过闸单宽流量可按下游河床允许最大单宽流量的1.2~1.5倍确定。
根据工程实践经验,一般在细粉质及淤泥河床上,单宽流量取5~10m3/(sm);在砂壤土地基上取10~15m3/(sm);在壤土地基上取15~20m3/(sm);在黏土地基上取20~25m3/(sm)。
下游水深较深,上下游水位差较小和闸后出流扩散条件较好时,宜选用较大值。
设计闸底板高程根据坝址原水面线高程及比降推算过来确定:
H=1844.50m
整体式底板,闸墩与底板浇筑成整体即为整体式底板。
其顺流向长度可根据闸身稳定和地基应力分布较均匀等条件来确定,同时应满足上层结构布置的需要。
水头愈大,地基愈差,底板应愈长。
初拟底板长度时,对于砂砾石、砂壤土地基可取(1.5~2.5)H,对于粘壤土地基可取(2.0~3.0)H,对于粘土地基可取(2.5~4.0)H,H为上下游最大水头差。
底板厚度必须满足强度和刚度的要求。
大中型水闸可取闸孔净宽的1/6~1/8,一般为1~2m,最薄不小于0.6m,底板内配置钢筋。
底板混凝土强度等级应满足强度,抗渗及防冲要求,一般选用C15或C20。
根据底板构造要求,初拟底板长30m,底板厚拟为2.5m,砼强度等级C20。
6.2闸顶高程确定
挡水时,闸顶高程应不低于水闸正常蓄水位(或最高挡水位)加波浪计算高度与相应安全超高值之和;泄水时,闸顶高程不应低于设计洪水位(或校核洪水位)与相应安全超高值之和。
闸顶高程计算见表5—4。
表6-1闸顶高程的计算
运用情况水位/m 相应级
别相应安全
超高/m
波浪高/m 计算闸顶高程/m
挡水正常蓄水
位1873.00
3 0.
4 1.6 1875.00
泄水设计洪水
位1852.69
3 0.7 0 1853.39
校核洪水
位1854.21
3 0.5 0 1854.71
考虑到两岸建筑的连接及交通桥梁布置的需要,闸顶高程1875.00m和非溢流坝段齐平。
6.3闸室堰型选择
根据《水闸设计规范》,结合薛城水电站的大流量引流发电以及工作运行主要为发电、挡水高度较小、闸槛高程较高,河床深切的特点,本设计就宽顶堰和实用堰进行了对比计算。
经计算得出,使用宽顶堰或者实用堰均能满足泄流要求,达到预计的电站运行指标,但是,由于宽顶堰更有利于泄洪、冲沙、排污、排冰,且泄流能力比较稳当,结构简单,施工方便;实用堰施工难度较大,不利于泄洪排沙、排污等综合考量,最终拟定使用宽顶堰。
图6-1 闸室布置
闸室选用开敞式。
该拦河闸门不考虑过船,灌溉,漂木,过鱼等其他利用因素。
综合上述因素,并结合泄流能力计算,初步拟定冲沙闸、泄洪闸布置在主河床,冲沙闸一孔,紧邻取水口;冲沙闸左侧为3孔泄洪闸,其中1#、2#、3#泄洪闸为同一闸段。
冲沙闸和泄洪闸底板高程均为1844.5m ,闸前钢筋混凝土铺盖。
闸下游设混凝土护坦,其后接钢筋混凝土柔性海漫。
在冲沙闸和排污闸之间的上游设置一道束水墙,迎水面倾斜设置,墙顶高程1850.5m 。
6.4闸孔尺寸确定
根据《水闸设计规范》,闸孔总净宽应根据泄流特点、下游河床地质条件和安全泄流的要求,结合闸孔和孔数的选用,经技术经济比较后确定。
具体计算如下:
(1).由已知上、下游水位及闸底板高程,由公式(6—1)、式(6—2)可求得上游水头及下游水深 。
0v =Q/A (6—1) H 0=H+v 02/2g (6—2) 其中 0v ——行进流速,m/s ; Q ——过流流量,m3/s ;
A ——过水断面面积,m2;
H0——含有行进流速水头在内的闸前水头,m 。
推算的上游水头及下游水深见表5—1。
表6—2 上游水头计算
(2).判别出流流态
流量Q (m 3
/s ) 下游水深 h s (m )
上游水深 H (m )
过水断面积A (m 2
) 行进流速
v 0(m/s )
v 02
/2g
上游水头 H 0(m )
设计流量
1270 7.8
8.19 245.7 5.17 1.36 9.55
校核流量
1640
8.73
9.71 291.3 5.63 1.62 11.33
闸门全开泄洪时,一般属于淹没条件下的水流,所以采用平底板宽顶堰堰流公式,根据设计,校核情况下的上、下游水位及流量进行计算。
对于宽顶堰,其淹没条件为::
hs ≥0.8H0 (6—3) 式中: hs ——下游水深,m ;
H0——含有行进流速水头在内的闸前水头,m 。
根据公式(6—3)判别是否为淹没出流,其判别计算见表6—3。
表6—3 淹没出流判别计算
计算情况 下游水深h s (m ) 上游水头H 0(m )
h s /H 0 流态 设计水位 7.8 8.19 0.95 淹没出流 校核水位
8.73
9.71
0.89
淹没出流
(3).确定闸门总净宽
对于平底板宽顶堰,《闸门设计规范》中推荐的堰流公式为: ε
σ2
3
002B m H g Q
= (6—4)
式中 :0B 为闸孔总净宽,m ;Q 为设计流量,s m /3;0H 为计入行进水头在内的堰顶水头,m ;σ、ε、m 分别为淹没系数、侧收缩系数和流量系数,可由SL265-2001《水闸设计规范》的附录表中查得;g 为重力加速度,2/s m 。
nb
H n K 0
0]
)1([2.0-1ξξε-+= (6—5) 设计流量下m=0.351,校核流量下m=0.372。
表6—4 闸孔总净宽计算
流量Q (m 3
/s )
上游水头 H 0(m )
上游水深 H (m )
下游水深 s h (m )
侧收缩系
数侧收缩系数
设ε
孔流淹没
系数
σ
B 0(m )
设计流量
1270 9.55
8.19
7.8
0.87
1
32.83
校核流量
1640
11.33
9.71
8.73
0.87
1
31.19
由公式(6—4)、(6—5)求校核ε和B
取0B =34m
(4).闸孔尺寸的选择
闸室单孔宽度应根据闸的地基条件、运用要求、闸门结构形式、启闭机容量以及闸门等因素,进行综合比较确定。
根据《闸门设计规范》中闸孔尺寸和水头系列标准,选定泄洪闸单孔净宽b=10m ,选用3孔,冲沙闸1孔,单宽b=4m ,因此闸孔总数为4孔。
闸孔布置如图6—2所示:
图6
—2 闸孔尺寸布置图 (单位:dm )
校ε
设计情况 0B (m )
0.87 设计水位 32.83 0.87
校核洪水位
31.19
闸孔总宽度为:
B=(3×10)+4+(3×2+2×6+1×4.5)
=56.5(m )
根据闸址的地形条件及枢纽建筑物泄洪能力和冲沙的要求,并重点考虑冲排水库沉积的淤沙需要,结合泄洪计算成果,确定孔口尺寸为:泄洪闸3孔,单孔尺寸10.00m×7.00m (宽×高),孔顶以上设胸墙;冲沙闸1孔,孔口尺寸4.00m×10.00m (宽×高),孔顶以上设胸墙。
6.5泄流能力复核
《水闸设计规范》中堰流的计算公式为:
Q=23
00H g 2mB εσ (6—6)
式中 B 0=nb0(n 为闸孔数,b0为单孔净宽),分别按设计、校核两种情况确定计算参数,求出相应的实际过闸流量Q1,校核过流能力。
一般其相对差值不应超过5%。
设
‘
设
设Q Q Q -≤5% (6—7)
校
‘校
校Q Q Q -≤5% (6—8)
根据孔口与闸墩的尺寸可计算侧收缩系数,查《水闸设计规范》(2-2),结果与假定接近,根据选定的孔口尺寸与上下游水位,进一步换算流量如下表所示:
表5—7 过流能力校核计算
计算情况 (m 3
/s )
堰上水头 H 0(m )
m σ ε
Q (m 3
/s )
校核过
流能力
设计流量1270 9.55
0.351 1 0.87 1283.4 1.05%
校核流量1640
11.33
0.372 1 0.87 1684.28 2.7%
两种情况下过流能力都小于5%,说明孔口尺寸的选择较为合理,所以不再进行调整。
泄洪闸闸孔选3孔,单孔净宽为10m ,冲砂闸1孔,单孔净宽4m 。