文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如演讲致辞、策划方案、心得体会、条据文书、合同协议、应急预案、规章制度、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as speeches, planning plans, reflections, legal documents, contract agreements, emergency plans, rules and regulations, teaching materials, essay summaries, and other sample essays. If you want to learn about different sample essay formats and writing methods, please stay tuned!工程项目经理述职述廉报告5篇述职报告是我们向领导展示我们在工作中所展现出的合规管理和法律意识的机会,我们写述职报告的目的是为了总结自己在这段时间里的工作收获和个人进步,以下是本店铺精心为您推荐的工程项目经理述职述廉报告5篇,供大家参考。

工程项目经理述职述廉报告7篇

工程项目经理述职述廉报告7篇

工程项目经理述职述廉报告7篇工程项目经理述职述廉报告1各位领导、同事们:大家好!,本人作为__x工程项目部的项目经理,能够认真履行岗位职责,以安全生产为基础,带领全体员工完成了项目的各项任务指标,现场施工进度、质量以及安全生产等方面皆处于可控状态,现将一年来岗位履职情况和廉洁自律情况汇报如下:一、工作完成情况(一)主动出击,为项目开展打下坚实基础____工程,自项目成立之初,项目部一直秉持着为业主做好服务的原则,积极配合业主完成各项前期准备工作。

特别是土地征迁、管线改移、交通到改等工作,做到掌握政策法规,深入调查摸底,充分考虑节约项目成本,最大限度地为进场施工创造了条件。

(二)攻坚克难,为项目推进保驾护航8月项目部成功进场施工,在工程推进过程中,努力克服不断出现的一系列不利因素,采取主动沟通、灵活博弈、果断处理的政策方针,以保障工程进度正常推进为主要目标,抱着只要问题不解决,就不能有丝毫懈怠的态度要求员工积极推进,坚决杜绝“坐、等、靠”,同时督促员工对非我方因素造成的工期延误做出反索赔依据。

(三)立足安全生产之本,质量进度并驾齐驱加强安全生产管理,确保本质安全,我项目部始终坚持“安全第一、预防为主、综合治理”的方针,深入落实公司安全管理理念,牢固树立全员安全生产意识,夯实基础,细化责任,强化现场监督监管,充分发挥各部门的职能,在确保总体工期目标并兼顾施工成本的前提下,将本工程分为4个施工区段,各个施工区段平行施工,以期达到最短施工周期;同时为了确保施工进度达到业主满意,坚持冬期施工,在腊月二十五将D3盾构井底板混凝土浇筑完成。

(四)强化执行力,提升项目机制运转能力项目执行力是全体员工贯彻项目发展意图,完成项目预定目标的运作能力。

本工程施工具有点多面广、高度分散等特点,这就决定了项目存在管理跨度大、中间环节多、监督难到位等问题,执行力的建设就显得尤为重要和困难。

“态度决定一切”,首先要解决全员的思想认识问题,在大小会议和各种场合多次强调提高执行力紧迫性和重要性,营造良好氛围,使广大员工逐步建立起服务和执行的意识,然后转变成一种自觉行为和习惯。

2024年建筑工程项目经理述职报告参考范文(4篇)

2024年建筑工程项目经理述职报告参考范文(4篇)

2024年建筑工程项目经理述职报告参考范文随着时光荏苒,我们即将告别____年,迎来新的一年。

在过去的一年中,在各位领导的悉心指导和各相关部门的协同支持下,我带领工程部全体员工,严格遵循公司的统一部署和要求,全力以赴履行工程部管理职责。

我们在工程管理方面严谨认真,勇于创新,通力协作,圆满完成了公司交办的各项任务,使工程部的整体建设迈上了新台阶,取得了显著成果,并积累了宝贵的经验与教训。

以下,我将对过去一年的工作成果进行简要汇报:一、今年工作完成情况(一)项目监理招标依据项目开发计划,我部积极配合完成了____A-08地块、A03地块小学;____项目二期安置区B-8、A-5、A-6地块的监理招标、考察、谈判及合同签署工作。

(二)编写工程管理制度我们完成了《工程奖罚管理办法》、《工程检查记录管理办法》、《工程量化考核指标修订》、《工程监理管理办法》的制定,并对《永恒工程管理制度》进行了全面修订。

(三)召开工程专题例会我部每月组织集团招采、成本、物业公司及各项目公司参加工程月度专题例会,全面汇总工程进度情况,协调解决工程问题,讨论下月工作计划,并跟踪问题解决进展。

(四)开展异地项目管理根据集团年初的战略部署,我部将____项目纳入集团统一管理。

在八、____月份,我部在集团分管副总裁的带领下,联合开展了对____异地项目公司的检查,并探索了异地项目管理模式。

(五)部门内部管理为提升员工管理及创新能力,激发工作热情,增强危机感和责任感,我部推行轮流执行经理制度,培养全能型管理人才,践行企业文化,展现团队凝聚力。

(六)外部管理我部员工注重内部团结和外部沟通,强调廉政建设,严格遵守集团规章制度,确保与项目方的经济往来清白。

(七)工程质量管理我部定期对各项目进行检查,及时纠正管理疏漏,传输《工程检查记录表》,加强监督与回访。

总体来看,工程质量虽有亮点,但仍有提升空间。

(八)工程安全管理____年,集团各项目公司安全生产形势稳定,我部重点加强了对____B-5、6;____项目开发区深基坑安全管理,组织汛期、冬季施工安全专项检查,确保安全。

2024年建筑公司经理述职报告(三篇)

2024年建筑公司经理述职报告(三篇)

2024年建筑公司经理述职报告我是工程部____,在____年____月来到公司负责北京昌平中石油项目钻井研发中心的技术负责和现场协调的工作;于____月改派天津负责金融街天津融汇苑南区弱电项目部的组建及管理工作。

现将自己在中石油项目的工作情况向公司报告如下:一、工程概况:中石油钻井研发中心项目由2栋楼组成,其中S楼为实验楼共____层裙楼____层,B楼为办公楼共____层裙楼____层,地下室一层,建筑面积____万平方米。

二、工程特点、难点:本工程总建筑面积不大但是涉及多个系统。

其中系统集成(IBMS)是我院自主研发针对本工程一边研发一边试用。

业主、总包、监理管理严格,审批流程繁琐且周期长。

四、工作情况1、明确任务,有计划、有组织的处理好各系统的技术问题为保证工程的顺利开展,在满足业主需求的前提下优化系统、完善系统。

2、加强安全管理工作,做到生产无事故公司给项目部提出的安全目标是工伤事故频率控制在____‰以内,无死亡、重伤、火灾和坍塌以及重大设备安全事故,为了完成目标项目安排了专人负责安全管理,从职工进场的安全教育抓起到给每位职工进行安全交底、班前安全教育等每一项工作逐步落实。

3、认真做好本职工作弱电工程项目的各专业工程通常是同时安装、交叉施工,各工种需要互相配合、协调施工面,确立设备、管路、管线的安装位置,相互创造施工条件,才能正确地反映符合机电安装工艺的客观规律,满足设计要求,确保工程质量,保证安全,加快进度以完成工程。

在建筑机电工程安装中,弱电工程需要与土建、装饰工程协调配合,所以在房屋建筑中,土建、装饰工程为主线,机电工程为辅线,弱电工程应以土建、装饰的施工进度以及机电工程的施工进度计划。

4、精打细算、控制成本成本是项目管理的根本。

中石油项目在成本管理中,对内项目部在大中型材料、辅材、周转材料租赁、机械租赁、人工、分包等各方面计划使用、严格控制,对外在甲方处积极经营,努力争取,截至目前,签订洽商____份,变更____份,增加温控系统一套。

工程部项目经理述职报告范文

工程部项目经理述职报告范文

工程部项目经理述职报告范文
尊敬的领导:
我是工程部项目经理XXX,现就过去一个季度的工作情况,向领导汇报如下:
一、项目进展情况:
在过去一个季度,我领导团队成功完成了公司下发的5个工程项目,其中包括3个市政基础设施建设项目和2个商业地产开发项目。

在项目进行过程中,我们严格按照计划,高效调配资源,确保了项目的顺利开展和按时交付。

二、团队管理情况:
在过去季度中,我加强了与团队成员的沟通与协作,及时解决了工作中遇到的问题。

通过对团队成员的能力分析,合理分工,提高了工作效率。

同时,我还定期组织团队培训,提升了整体团队的水平和能力。

三、质量安全管理:
为确保项目品质,我们始终牢记安全第一的原则,严格执行安全生产标准,保障项目的良好质量。

过去季度,我们未发生任何重大事故或质量问题,为公司树立了良好的形象。

四、成本控制情况:
在成本控制方面,我密切关注项目经费使用情况,合理安排预算,并对成本进行严格管控。

通过合理的采购和资源调配,成功保证了项目在成本方面的控制,实现了预期的经济效益。

五、下阶段工作计划:
在下一个季度,我计划继续努力,加强团队的管理与培训,提高项目的执行力和执行力。

同时,我将进一步优化项目管理流程,提升团队的专业素养,为公司的发展做出更大的贡献。

以上就是我过去一个季度的工作情况汇报,希望领导认可,并提出宝贵意见和建议,指导我今后的工作。

感谢领导对我的信任与支持!
此致敬礼
XXX。

2024年项目经理述职报告(6篇)

2024年项目经理述职报告(6篇)

2024年项目经理述职报告尊敬的领导:____年度,____项目部在严酷的竞争环境和繁重的施工任务面前,经过公司领导的具体指导与各部门的大力支持,成功实现产值____万元,超额完成了公司设定的年度计划。

在安全生产和施工质量方面,我们持续保持了良好的态势,并获得了顾客高达___%的满意度。

作为项目部经理,我始终坚守“带好队伍,干好项目,创誉逐利,拓展市场”的经营宗旨,致力于以下几方面的工作:一、深入贯彻“三个代表”重要思想,积极参与共产党员先进性教育活动。

____年____月,我依照事业部党委的统一部署,积极参与了公司组织的以实践“三个代表”重要思想为主要内容的共产党员先进性教育活动。

通过此次活动,我再次接受了党的基本路线、基本理论的深刻教育,重温了党章及党的相关政策条例。

同时,我利用多种渠道搜集学习资料,并结合项目实际情况,撰写了多篇学习笔记。

在党风廉政工作方面,我严格自律,廉洁奉公。

在对外礼仪交往中,我坚持控制标准,力求以最小的成本达成最大的效益,持续改善项目的经营运作环境。

在生活中,我保持简朴,工作中注重实效,避免铺张浪费,全心全意投入到项目中。

二、积极拓展市场,稳步增加市场份额。

鉴于____项目的公共市场性质及其激烈的市场竞争,我高度重视市场前期工作,坚持为甲方提供优质服务,真诚解决其技术和其他难题,与甲方业主建立了良好的合作关系,取得了显著的市场效应。

三、坚持创新的市场经营理念,塑造CPL良好的市场形象。

首先,我们加强生产组织管理,确保施工安全高效。

通过严格筛选施工队伍、提前了解技术信息和技术要求等措施,我们成功实现了全年各项目的安全、优质、高效施工,取得了优异的市场反响。

其次,我们注重与合作伙伴的沟通协调,为工作创造宽松的环境。

在面对与____公司合作中出现的矛盾时,我要求我方人员以理服人、以诚待人,从公司发展的大局出发,提供超值服务,成功建立了与甲方之间的良好关系。

回顾过去一年的工作,我深刻体会到项目运作的艰辛与挑战。

2024年建筑工程项目经理述职报告(7篇)

2024年建筑工程项目经理述职报告(7篇)

2024年建筑工程项目经理述职报告作为本公司项目经理,我于____年受公司委托,担任____项目的项目经理一职。

自____年____月项目开工以来,历经____年时间,在公司的大力支持和细致指导下,依托项目部全体员工的共同努力,____项目已顺利完成交付,业主已投入使用,并且工程结算工作已经完成,所有工程款项也已全额回收。

以下是我对____项目工作情况的汇报:一、工程概况____项目由____栋楼组成,其中包括13#、30#、50#楼采用砖混结构,24#、25#楼采用框架结构,总建筑面积达到20000㎡。

二、项目部人员组成作为公司____年的建设项目,我担任项目经理后,迅速启动项目部组建工作。

从公司内部抽调了一批管理人员,建立了完善的质量管理体系,明确了项目管理目标和管理人员的岗位职责。

本项目部由担任项目副经理,担任技术负责人。

项目部成员以年轻人为主,大多数具有大中专院校背景,是一个富有活力且能承担重任的团队。

三、工程特点与难点本工程虽然总建筑面积不大,但包含多个单体结构,由框架结构和砖混结构组成。

在有限的人员配置下,多栋楼同时施工,要求项目部在各项工作中做好统筹协调。

四、工作情况1. 精心组织施工,确保施工质量中标后,根据公司发布的项目管理措施和实施办法,项目部管理人员结合工程特点,精心优化质量创优计划、编制施工方案、进行技术交底和落实。

在工程前期,通过图纸会审解决了多数图纸问题,施工过程中未发生因图纸或设计问题导致的返工或错误,赢得了业主和监理的一致好评。

2. 加强安全管理,确保生产安全项目部积极响应公司提出的安全生产目标,通过设置专人负责安全管理,从职工进场安全教育到日常班前安全教育,逐步落实安全管理工作。

项目部要求所有管理人员参与安全管理,确保施工现场始终有管理人员监控,有效避免了安全事故的发生。

3. 严格成本控制,提高经济效益在成本管理方面,项目部对内严格控制材料、人工、分包等成本,对外积极争取甲方的支持,取得了显著成效。

2024年项目经理述职报告样本(五篇)

2024年项目经理述职报告样本(五篇)

2024年项目经理述职报告样本各位同仁,一、工作情况(一)明确任务,勇于创新,有计划、有组织地推进施工生产。

____年对我所在项目部而言,既充满挑战又责任重大,是生产任务最为繁重的一年。

面对征地难题、农民阻工、材料价格上涨和业主资金紧张等多重不利因素,我们积极分析形势,采取有效措施,协调各方关系,深挖潜力,确保了施工生产的顺利进行,圆满完成了各阶段的生产任务。

在产值及工期进度方面:本年度计划完成产值为____万元,截至____月底,已完成产值____万元,占年度计划的____%。

累计完成产值为____万元,占合同总额____万元的____%。

本年度主要完成的工程量包括:隧道工程左线掘进、初支480米,二衬____米;右线洞身掘进、初支520米,二衬____米。

自开工至今,左洞洞身开挖支护累计____米,右洞洞身开挖累计____米,双洞合计____米。

左洞二次衬砌____米,右洞二次衬砌____米,双洞合计____米。

(二)积极采取措施,精心组织、精细管理。

1. 加强生产组织的严密性。

面对今年工程施工任务量的增加,我们坚持定期召开生产例会,制定措施,解决问题,明确各阶段的生产重点。

2. 强调生产计划的严肃性。

我重点抓了生产计划的执行与考核,对阶段性工期进行严格督查,及时纠正偏差,确保整体和阶段目标的实现。

3. 提升施工管理文明的有序性。

我们重视现场文明施工管理,从工程起点开始,就坚持高标准、严要求,确保施工场地的规范与整洁。

4. 靠前指挥,及时解决问题。

在施工季节,我每天深入工地,靠前指挥、指导、协调和服务,加强监督和检查。

5. 加强成本控制,确保数据真实性。

项目部定期分析成本,对存在的问题进行整改,并确保数据的真实可靠。

6. 完善激励机制,调动员工积极性。

通过制定奖励措施和月度考核,有效提升了员工的劳动积极性。

二、总结经验,加强学习,努力成为合格的生产管理者为了适应新的工作要求,我积极学习业务知识和理论,提高自身素质。

简短的项目经理述职报告(通用8篇)

简短的项目经理述职报告(通用8篇)

简短的项目经理述职报告(通用8篇)简短的项目经理述职报告篇1尊敬的各位领导:大家好!我来自__工程项目部经理。

首先十分感激各位领导能在百忙之中抽出宝贵的时间来听我的述职报告,同时也很荣幸地能够成为安装分公司的一员。

是我人生的转折点,也是我人生的一个新起点。

我从入职培训至今已几年了,这几年里,在领导和同事的帮忙下,我对工作流程了解许多,同时也深刻的体会我们公司以“__”为核心的企业文化及各项规章制度。

来到__项目后,我主要负责现场管理以及项目的资料工作,同时也在进取的学习预算方面的知识。

在项目工作这一段时间来,让我了解到对于一个项目的管理主要分为安全、质量、进度和商务四大块,安全是项目正常工作的前提条件,质量和进度是项目的命脉,商务是项目的成本以及利润,这四大块是环环相扣、相辅相成的,仅有努力的做好这四大块工作才能保证项目高效的运行。

所以这一段时间来,我就在努力的执行和努力的学习这四大块的工作。

下头,我就我入职以来的具体工作情景报告如下:一、虚心请教、努力学习。

在项目上虽然是作为一名管理人员,但作为一名刚入职的新人来说主要还是以学习为主,所以来到项目后我首先的工作就是看图纸,熟悉整个项目的施工工艺,在遇到不明白的地方时,我就进取的向项目上的领导和同事请教,同时还到劳务班组里去和劳务人员一齐干活,向他们学习具体施工方法。

二、以情服务、用心做事。

在工作中我对每一个人都以礼相待,坚持着热情的微笑,耐心地帮忙劳务人员,对他们提出的问题自我不能回答,我向领导请教后,才给予解答;对于出现质量问题,需要劳务人员返工处理时,我都是做到‘礼先到’,不摆架子,耐心地和他们沟通,避免和他们产生矛盾,影响公司形象。

三、遵守制度、敢抓敢管。

在现场进行施工的时候,异常是钢结构安装期间,由于高空作业多,危险性较大,我按制度、按程序对工人进行管理,每一天对进出的人员进行严格的检查,以免可疑人员进入造成公司财物被盗;对于那些安全措施不到位的,比如:‘进入施工区域没戴安全帽;高空作业没系安全带;用火时没有灭火设施’等之类的现象,我都按照公司的制度、程序进行整改处罚,把各项安全措施落实到位,以确保施工期间零事故。

2024年项目经理述职报告个人

2024年项目经理述职报告个人
四、积极组织,全力做好安全生产工作
作为项目部副经理,作为一个国有企业的管理干部,我时刻站在大局的角度,增强自身的责任感和使命感,坚决贯彻二公司20xx年安全工作计划,精心组织,高度重视,统一思想,全面动员,克服了情况复杂、面多人杂的种种困难,确保了分管区域的安全和稳定局面。
回顾一年来,我在思想上、工作上、学习上都取的了一定的成绩,但和公司领导要求和项目部其他领导同志比起来,还有差距和不足。主要是:
2、建立合适的.奖罚制度,调动员工的积极性,通过完善内部承包机制、制定循环奖励措施及月目标任务考核奖等手段,极大的提高了员工的劳动积极性,部分的缓解了因资金紧张带来的消极影响。
3、提高生产效率,降低生产成本,通过不断完善施工工艺,合理安排人员,精心组织,精心施工,在全体员工的努力下,比业主要求的工期提前x个月完成并交验。
二、不足及展望
在项目部工作管理中,虽然我努力学习公司三合一管理体系的管理手册、程序文件,但是由于自己的水平有限,对各文件精神理解不够,在项目部的各项管理工作中,还没有达到完全彻底贯彻执行三合一管理体系文件的标准。
在各项工程施工中,感谢公司各相关部室提供的及时配合和帮助,使我们承建的各项工程顺利完成。但是我本人感到与公司各相关部室的沟通与交流仍然需要继续提高。
20xx年吉林项目部共开钻11口井,交井6口,钻井进尺30566米,井身质量、固井质量合格率均达到100%,平均井深3060米,平均钻机月速度达1291米/台月,平均机械钻速达4。81米/小时。实现产值1。2亿元,各项指标均达到较好水平。我们在生产方面的主要工作是:
(一)强化生产准备的充分性。
针对工程项目点多面广,战线较长、施工难度大的实际情况,重点抓了施工前的组织准备、材料准备以及设备、施工机具准备,体现施工准备的充分性,争取了主动。及时的组织技术、材料、预算等部门对施工方案进行敲定,明确了工期、质量、安全目标,为完成生产任务奠定了基础。

项目经理述职报告优秀5篇

项目经理述职报告优秀5篇

项目经理述职报告优秀5篇时光飞逝,伴随着比较紧凑又略显紧张的工作节奏,我们的工作又将告一段落了,回顾这段时间中有什么值得分享的经验吗?好好地做个总结并写一份述职报告吧。

那么什么样的述职报告才是有效的呢?山草香整理了5篇项目经理述职报告,希望您在阅读之后,能够更好的写作项目经理述职报告。

各位领导、各位同仁:大家好!年初,公司领导再次提出了“二次创业”的战略方针,同时提出了以“五心”撰写20xx年物业优质服务的新篇章的工作宗旨。

紧紧围绕执行领导下达的目标管理责任开展工作。

现对一年来的工作作如下述职总结:一、简述指标完成情况年初,按公司下达的目标管理责任进行分解,并按部门和项目签订了部门和项目的目标责任书,明确了自己的各项任务指标。

科学安排,强化“三全管理”,为创朝阳特色的企业品牌,树良好企业形象,实现多元化管理,力创社会效益、经济效益双丰收,紧紧抓住物业服务工作主线,展开工作,较好地完成了公司下达的经济各项任务。

一年来,虽有项目经理、主管的更换,随着物业遗留问题、安全问题以及服务的缺陷问题的增加发生,影响了物业管理费的收缴,但想方设法还是完成了收费任务,如:新西蓝项目各项收费率:96%?;中天花园项目各项收费率:98%;阳光嘉庭项目各项收费率:98%;中联颐华苑项目各项收费率:96%;丰泰项目各项收费率:100%;华茂玉龙园项目各项收费率:98%。

公司领导在年初公布公司经营状况时说:整个公司盈利约8万元。

企业已经具备一定的规模,如此的利润作为公司的副总脸往何处放,憋屈了一年,而今终于可以挽回些颜面。

二、回顾反思落实整改提高从年初设想管理工作规划的实施到规划的半途扼杀开始认真回顾,就好像写毛笔字在起笔、运笔阶段还算条理清晰顺畅,而点睛之笔却不知为何终止或者说成了涂鸦,细细品味一年来的工作,好像事事都有美中不足的地方。

总之,从个人角度总结20xx年:只求无愧、但求无过。

自身也有许多不尽人意的地方,主要表现在以下几个方面:1、培训抓得不实不细,培训做了,培训的效果如何,总结不够。

建设单位工程部经理的述职报告精彩4篇

建设单位工程部经理的述职报告精彩4篇

建设单位工程部经理的述职报告精彩4篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。

文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作计划、工作总结、述职报告、讲话致辞、合同协议、条据文书、策划方案、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as work plans, work summaries, job reports, speeches, contract agreements, policy documents, planning plans, teaching materials, complete essays, and other sample essays. If you want to learn about different sample formats and writing methods, please stay tuned!建设单位工程部经理的述职报告精彩4篇建设单位工程部经理的述职报告篇1俗话说:“没有规矩,不成方圆”。

项目经理述职报告7篇

项目经理述职报告7篇

项目经理述职报告7篇项目经理述职报告 (1) 尊敬的各位领导各位代表:大家好!在公司领导和各有关部室的热情帮忙下,经过项目部全体员工的共同努力,全年承建的各项工程得以顺利进行,在此我代表项目部全体员工向大家表示真挚的感谢。

20_年项目部先后承建了_路商业街工程、_设施改造工程、_小学危房翻建等6项工程,质量、安全、环境全部受控。

本人在项目部工作过程中,严格遵守国家法律法规,遵守公司的各项规章制度,敢于承担职责,有较高的组织协调潜力,能理论联系实际的开展工作,与同志协作共事,较好地完成了各项工作目标。

为了更好的迎接明年的生产任务,现将20_年全年工作总结如下:一、20_年工作状况:作为项目部负责人,安全一向是我最为关注的重点,安全是根本,是效益的保证。

在实际工作当中,认真落实公司和本项目部各项规章制度,加强对施工队的管理力度。

针对各项承建工程的实际状况,制定切实可行的安全保证措施,对安全薄弱环节部位进行整治,有效的杜绝了违章作业,顺利的透过了上级各部门和建设单位各项安全检查。

全年轻、重伤事故为零。

"质量"是企业永恒的主题,更是自我追求的目标,工作中我与员工共同探讨,“将质量意识灌输到每一名成员,将质量观念体现到每一道工序”。

每项工程都按照《项目管理计划》,明确质量管理目标,编制合理的施工方案,从材料进场到各项工序施工,严格执行“三控,三检”制,从基础管理上保证了各项工程的施工质量,各项报检、报验合格率到达100%。

进度控制也是降低成本、提高企业效益的重要保障措施。

根据施工条件和合同工期,制定科学合理的进度计划。

随着工程的进行,在不一样阶段编制各层次的进度计划,特殊状况、特殊调整,使进度始终处于受控状态。

20_年全年6项工程各个节点全部按时完成,顾客满意度到达95%以上。

企业管理的最终目的是效益,所以实现利润最大化也是考验项目经理重要指标。

在每一项工程开工前,我都组织项目部进行工程分析,结合多年的经验,制定合理的工期,编制科学的施工方案和人机料计划,让成本在工程建设初期就受到全面的控制,以创新的成本管理措施,确保了年初制定不超过去年86%的成本目标。

项目经理工作总结述职报告范文10篇全文

项目经理工作总结述职报告范文10篇全文

可编辑修改精选全文完整版项目经理工作总结述职报告范文10篇1.项目经理述职报告范文尊敬的公司领导:20xx年度,在公司领导的正确指导及公司各职能部门同仁的配合下,我xx工程项目部的全体员工坚持与时俱进、开拓进取的精神,认真开展工程项目管理的各项工作,并取得了必须的成绩。

现将20xx 年的工作情景作一个述职报告如下:一、工程进展情景及产值完成情景1.1工程进展情景xx工程土建结构部分已基本完成,钢构部分构建制作也已完成,目前调配吊装中;xx四期工程基桩工程已完成,目前土建结构部分施工中。

1.2各工程产值完成情景截至目前xx厂2972.9万元,xx四期900万元,预计年底完成产值共约4500万元。

二、项目部人员情景项目部现有管理人员5人:项目经理,安全员,质量员,安全员施工员。

三、安全、质量、进度及礼貌施工控制项目部进取配合建设单位、监理单位及质安站等部门来推动施工现场的安全、质量等工作,经过我们一年的努力,在项目部所有管理人员的努力下,协调各种关系,处理各种问题,保证工程安全及质量。

目前没有出现重大的质量及安全事故,在进度控制及礼貌施工控制上所有项目都做的较好。

四、进取配合公司经营部门做好市场开拓工作干一项工程,树一座丰碑,交一方朋友,开拓一片市场,这是项目部的经营理念,干好在建工程,赢得业主的信任,这是承揽后续工程的关键。

项目部全体员工在干好在建工程的基础上,在外协队伍的努力协助下,进取配合市场经营部开拓市场,配合跟踪潜在中标项目。

五、20xx年目标20xx年,在项目部全体员工团体努力下,克服困难,并取得了不错的成绩,圆满地完成了本年度工作。

展望20xx年,项目部全体员工充满信心,决心为公司的进一步发展贡献一点力量,同时为使工程管理水平能够更上一个台阶,为使我项目部营销指标能够更上一层楼,我项目部力争在20xx年做好以下几方面工作:1、抓好安全、礼貌施工工作在20xx年项目部对于所涉及工程首先制定更高的目标,这样能够做到管理有的放矢。

工程项目经理述职报告5篇

工程项目经理述职报告5篇

【导语】述职报告是领导⼲部与所属单位群众之间的思想感情和⼯作见解交流的渠道。

以下是整理的⼯程项⽬经理述职报告,欢迎阅读!【篇⼀】⼯程项⽬经理述职报告 ⼀年来,在上级领导的⽀持和同事的帮助下,我认真履⾏⾃⼰的职责,突出施⼯⽣产管理,以提⾼队伍素质为重点,以强化管理为⼿段,抓好项⽬管理⼯作,⽀持党组织抓好思想政治⼯作和党建⼯作,加强⾃⾝的道德品质修养,使我项⽬部员⼯的思想政治素质不断提⾼,管理⼯作不断进步,较好地完成了各阶段施⼯⽣产任务。

⼀、战胜重重困难,施⼯迎难⽽上 1、克服了等诸多困难 2、资⾦紧张 3、⽓候恶劣 ⼆、积极采取的措施,精⼼组织、精⼼管理 1、进⼀步完善各项安全质量规章制度、完善管理体制 通过两年来的施⼯⽣产实际,进⼀步完善安全、质量等管理体系,建⽴安全质量⽉检、旬检、⽇检制度及整改制度。

项⽬部除设⽴⼀名专职安全员外,各⼯区也层层设⽴专职安全员共计24名。

将安全⼯作提⾼到了前所未有的⾼度。

质量⽅⾯,绝不放松,强化强施⼯过程控制,坚持施⼯质量检查制度,严格执⾏“⾃检、互检、交接检”的三检制度,使质量问题在每道⼯序作业中都能得以有效控制。

2、完善激励机制,调动员⼯⽣产积极性 通过完善内部承包机制、制定循环奖励措施及⽉⽬标任务考核奖等⼿段,极⼤的提⾼了员⼯的劳动积极性,部分的缓解了因资⾦紧张带来的消极影响。

3、提⾼⽣产效率,降低⽣产成本 通过不断完善施⼯⼯艺,合理安排⼈员,精⼼组织,精⼼施⼯,在全体员⼯的'努⼒下,施⼯产量不断提⾼,效率不断提升。

4、加强成本控制,强化数据管理,确保数据真实性 项⽬部每⽉8⽇定期召开成本分析会,认真分析上⽉存在的问题,找出不⾜,层层落实,下⽉改进,要求各项对⽐实现数据化,数据必须真实可靠,施⼯现场的每⼀个环节,层层控制,每道⼯序都做到有据可查,为了确保数据的准确性,做到每班质检⼯程师和领⼯员进⾏现场收⽅互相复核签认,确保了数据的真实性。

5、⽂明⼯地建设 继续加现场⽂明施⼯管理,根据实际成⽴了第⼀⽂明施⼯班和第⼆⽂明施⼯班,总⼈数32⼈。

工程项目经理述职报告(11篇)

工程项目经理述职报告(11篇)

工程项目经理述职报告(11篇)工程项目经理述职报告1一、本人所负责业务与工作领域描述::1、20__年6月~8月负责贵广高铁第六项目部工作,施工队伍为四川的施工队;2、20__年8月~10月负责吉图珲客专七项目部工作,施工队伍为湖北的施工队;3、20__年10月~20__年1月负责林拉公路第二合同段拉萨段项目部工作,施工队伍为四川和湖北的施工队;4、20__年1月~20__年12月负责林拉公路米拉山隧道段第二合同段项目部工作,施工队伍以湖北施工队为主;5、20__年10月~20__年1月兼职二广高速安邵段TC1标中铁五局一公司项目。

如马家台大桥、伏口大桥、白毛江大桥项目部工作,施工队伍以四川和湖北的施工队伍为主。

二、本人所在岗位主要工作职责:1、负责项目的土建管理工作,包括对监理单位、总包单位及分包单位的管理。

2、跟踪控制施工单位的工程进度、质量、安全文明施工,施工单位按图施工及执行合同情况的跟踪检查处置。

3、日常具体工作任务包括参与各类承包商及分包商的考察和评估,参加相关招投标工作(读图纪要形成、招标技术要求拟稿、标底评审等)及现场收方签证工作。

4、参加各总包单位的各类隐蔽工程、各分部分项工程质量检查与验收。

5、主持对施工单位的各分项技术交底和配置标准要求交底,参与对施工单位的综合管理交底和合同交底,参加设计交底与图纸会审。

6、主持工程技术变更的审签管理,参与工程变更及方案的可行性分析与评价。

7、定期编制个人周月工作执行计划并上报上级审批,按公司工程管理制度要求编制责任区域招标计划与进场计划。

8、定期参加工程部内部沟通例会和周监理例会,主持各重要分项工程样板点评验收工作,不定期主持招开各类专题质量技术会,参与各类质量及技术问题的处理,协调施工单位与设计单位的工作。

9、审核施工单位报送的各类方案和措施在技术方面的可行性及合同执行情况。

10、依据单位工程执行计划考核施工单位的形象进度,审核施工单位报送的周月计划,若有偏差及时要求施工单位采取纠偏措施,审核施工单位报送月报完成工程量和进度款支付申请文件。

项目经理述职报告15篇

项目经理述职报告15篇

项目经理述职报告15篇项目经理述职报告1尊敬的各位领导、同志们:我叫__x,现任__项目部经理,根据处党委关于《党支部书记、项目经理述职暂行办法》的要求,就本人一年来在班子建设、工作目标、安全生产、施工任务、经营管理等方面主要情况述职如下,请予以评议。

一、务实创新、夯实科学发展基石__项目部承建了神宁__煤矿副立井、回风立井两个井筒的施工建设任务,是宁夏首座设计年生产1200万吨的矿井,也是我处首次打入宁夏市场的关键性工程,在项目组建之初,我们就遵照处党政的指示精神确定了以“一流装备建造一流工程、一流环境树立一流形象、一流管理铸造一流品牌”的管理理念。

在施工过程中,班子成员精诚团结,恪尽职守,带领广大职工充分发扬“勇争第一”的企业精神,取得了一个又一个可喜的成绩。

1、优质快速施工享誉“塞上”。

项目部进驻__煤矿施工以来,克服西北的狂风、冰寒,在第一炮掘进中就遇到泥岩砂岩交替的复杂地质条件。

这种岩石硬度小,用伞钻打眼夹钎堵钻杆。

困难是打开智慧之门的钥匙,打眼班班长许海刚在打眼过程中发现影响的关键原因是:钻头上的强力吹风孔太小,岩粉不能及时排出。

发现后,他及时升井将吹风孔直径扩大到10mm。

经试验打眼速度大大加快,每班打眼时间缩短到3小时,功效提高了近三倍。

在随后的施工中,他们又结合地质条件变化,率先采用“伞钻与麻花钻、风钻交替使用”等方法。

打眼速度进一步加快,为项目部在5、6、7、8四个月施工中连续破百米提供了基础保障。

特别是在7月份副立井的施工中,项目部克服地质条件复杂、井筒淋水量大等诸多困难,充分展示“王牌”施工队伍风范,精心组织,广泛发动,一举以130。

5米的成绩刷新了神化宁煤集团月成井114米的纪录,且工程质量优良。

2、加强生产组织,完成了生产指标。

按照处下达的生产任务和项目部制定的生产计划,项目部抓住井筒施工的黄金季节,积极改进作业方式,有效的提高了生产水平。

3、抓好“小改小革”进一步提升生产施工的科技含量在抓好生产施工的同时,项目部积极鼓励技术革新,针对井口甩罐时,费时费力不安全的问题,研制出了“立井施工井口简易甩罐装置”,在井盖门至溜矸仓支撑柱之间铺设钢轨或槽钢作为跑道,在轨道上安放一个车盘,就使原来的“甩罐”变成了平放平移,既省力又安全。

项目经理述职报告范文(精选10篇)

项目经理述职报告范文(精选10篇)

项⽬经理述职报告范⽂(精选10篇)项⽬经理述职报告范⽂(精选10篇) 时光在流逝,从不停歇;万物在更新,⽽我们在成长,这段时间以来的⼯作,收获了不少成绩,是时候写⼀份述职报告了。

那么写述职报告真的很难吗?以下是⼩编整理的项⽬经理述职报告范⽂(精选10篇),仅供参考,⼤家⼀起来看看吧。

项⽬经理述职报告1 ⼀、把握项⽬本质的措施 项⽬,是为了创造独特的产品。

服务或结果⽽进⾏的暂时性努⼒。

为此,在⼯程项⽬开始阶段,我重点的⼯作是熟悉招标⽂件、图纸、现场条件、项⽬部⼈员配备情况及与业主签订的商业合同。

但是每个⼯程的特点是不同的,最主要的是把握好本项⽬的特点,在开展⼯作时才能有主线贯穿始终。

宝武公路的特点就是战线长、⼯期紧、质量要求⾼,在控制上就要交叉作业、流⽔施⼯、节省⼀些⾮关键费⽤开⽀。

⼆、项⽬计划控制 项⽬计划控制分为时间计划和成本计划。

时间计划就是按照整体⼯程量找出节点项⽬,定出节点⼯期,结果都是能顺利完成的。

成本计划关系到⼯料机的各⽅⾯管理,合理安排⽤⼯、机械及项⽬部管理⼈员。

三、公司管理规章制度、⾏业规范标准的执⾏ 作为项⽬经理,理解执⾏⼒对⼀个团队管理来说有着重要的作⽤。

所以,我要求项⽬部的每⼀个动作都要严格执⾏公司的管理制度和⾏业规范。

⽆论在劳务⽤⼯、机械租赁、材料采购等⽅⾯,务必在公司制度规定的框架内进⾏。

⼯程质量标准更要在规范值内进⾏施⼯,从宏观上来说,全国统⼀质量标准应该是⾏业的最低标准,我们必须百分百的达到,但在实际施⼯中,⼀些环节还是因为种种原因出现问题,特别是⼆灰碎⽯养⽣及⼆灰碎级配⽅⾯做的不够,带来的教训也⾜以使我们更加重视质量对企业⽣存的意义。

四、项⽬整体控制的应变 项⽬整体控制的应变应市项⽬经理每天的都要考虑的实际问题。

做项⽬要与建委、质检站、设计、监理、勘察、检测站、分包单位以及公司⼯程部、经营部、财务部等⽅⽅⾯⾯打交道,每⼀个环节、每⼀个细节都可能决定项⽬的成败,所以我每天都在考虑、平衡、处理各⽅的要求,特别是外部能否及时的协调沟通,在公司利益最⼤化的前提下,达到满意的效果是最重要的。

工程项目经理年终述职报告(精选12篇)

工程项目经理年终述职报告(精选12篇)

篇1:工程项目经理述职报告尊敬的各位领导、同志们:大家好!根据会议的安排,下面我就过去一年自己担任XX项目项目经理所做的一些工作向大会述职,请大家评议!去年年初,我所在的XX项目根据责任分解与分公司签订了《20某某年度项目目标责任书》,它在项目这一长期目标的基础上进一步明确了我们20某某年度的工作方向。

作为完成责任目标的主负责人,我去年的主要工作就是实行目标管理,把项目各方统一到项目责任目标和合同条款上来,全力完成公司下达的各项任务、如期履行合同条款。

下面我结合《20某某年度项目目标责任书》的各项指标和与业主的合同约定向大家作简要汇报。

一.产值指标更可喜的是,在公司总部和各级领导的大力支持下,我项目部又在XX承接了XX旗下XX地产投资的XX项目,新签合同额XX万元,回收工程款XX万元,工程竣工决算也正在办理之中。

二.成本控制XX项目的成本控制紧依公司的各项规定和流程,材料、机械设备和人员队伍的采用都以XX部门的预算为考量,施工过程中通过不断完善施工工艺,合理安排人员,精心组织,合理控制成本。

在全体员工的努力下,“四大主材”用量未突破定额,预控成本约XX亿元,符合分公司下达的责任目标书中关于成本的规定,“四大主材”用量未突破定额及预控成本值。

三.进度管理XX项目自20某某年X月份项目部成立以来,前期主要抓XX路的建设,项目部按照业主的要求保证了20某某年X月XX日通车目标的实现;新建的XX路、XX路、XX路在有限的三个月工期内也于XXXX年X月X日通车;XX路、XX路、XX路由于受雨季和征地拆迁的影响于2XXX1年XX月底完成;最后的XX路因为地质情况特殊,原施工图中未考虑软弱地基的存在及处理,我项目部在实地勘察及论证后向设计及业主方提出了旋喷桩施工处理软弱地基的方案,并得到了业主方的肯定,经过紧张施工,XX路全线XX米已于昨天(X月XX日)完成沥青面层施工,我项目部顺利完成了各条承接道路的施工任务,工期满足责任目标书及业主的要求(责任目标书的进度要求:确保建筑面积XXXm2的XX项目,主体为地上二层框架结构的仿古式建筑,该项目在XX年X月X日开始施工,在业主方施工图纸不完善、频繁变更的外部环境下,我项目部积极与业主工程部及设计部沟通,优化施工方案,分秒必争地抓工期,主体工程于XX年XX月底完成,二次结构和收尾于XX年XX月份完成,也满足业主的工期要求。

建设单位工程部经理的述职报告(精选13篇)

建设单位工程部经理的述职报告(精选13篇)

建设单位工程部经理的述职报告(精选13篇)建设单位工程部经理的述职报告(精选13篇)日子如同白驹过隙,不经意间,我们的工作又将告一段落了,回顾这段时间的工作,取得的收获不是一星半点的,制定一份述职报告吧。

来参考自己需要的述职报告吧!下面是小编为大家收集的建设单位工程部经理的述职报告(精选13篇),欢迎大家借鉴与参考,希望对大家有所帮助。

建设单位工程部经理的述职报告篇1我叫XXX,20xx年4月进入公司,现任工程部经理职位。

我自入职以来,得到了公司的重托,领导的信任。

在公司同事们的大力支持帮助下,使我一步步的走向管理岗位,使得各项工作快速进入正规,顺利开展。

在此,首先感谢集团公司!感谢集团公司领导!感谢各位同事!现将我一年来的工作情况向各位领导汇报如下:在本年度所完成工作的具体内容在本年度所完成工作的具体内容在本年度所完成工作的具体内容在本年度所完成工作的具体内容1、花园洋房、会所以及别墅主体施工以及单体验收工作。

2、两栋样板房精装施工及交付使用工作。

3、一、二、三组团的主体施工以及单体验收工作。

4、样板房庭院景观、三角地带以及看房通道的绿化施工以及交付工作。

5、海防林绿化工程施工以及交付工作。

6、组织地方电信、供电、电视电话有关部门对施工方案的制定工作。

7、组织配合项目部进行了劳务施工人员以及工程用料询价招标工作。

8、及时完成了集团公司领导交给的临时性工作。

9、制定完善了本部门管理制度,岗位责任制、工程管理规定。

我认为在一切事物和工作中,“成绩不说跑不了,问题不找不得了”。

今年四月份经公司安排我来到项目,刚到工地时,自己给自己定了一条不公开条文,就是“干好领导交给我的那点事,不管他人瓦上霜”。

违背了来工地前臧总嘱咐我的话,“要敢于大胆管理、敢于承担责任”。

“是骡子是马拉出去溜溜看”。

经过在工地一段时间的工作,发现工程管理中确实存在着诸多问题,质量、安全、进度、队伍管理中都存在着不尽人意的地方,我结合多年来从事建筑工程管理中的经验,经过一段时间的深思熟虑,总觉得好人主义要不得,老好人是害人害己误工作。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

建设工程项目部经理述职报告
尊敬的领导及各位同事们∶
大家好。

忙忙碌碌中我们又到了辞旧迎新的时刻,回首2015这一年是建筑行业饥寒交迫的一年,我们彷徨迷离区仍未放弃希望;放眼2016这一年也必将是充满挑战的一年,我们不惧挑战却始终渴望成功。

在这即载入史册去的一年中,首先要感谢领导及各位同仁对我工作的大力帮助和支持。

一.洛阳路二期项目已经进入竣工验收收尾阶段。

通过全体项目成员近两个月的不懈努力和权力突击,目前已全部完成公司与甲方合同约定的全部施工内容。

由于甲外包精
装修
单位目前仍有少量的收尾工作正在完善。

预计本月底可达到俊前检查的标准。

针对目前情况,甲方要求项目部上保本项目全部结算资料,目前土建结算资料暂未完成,其他各家结算资料已收集准备上报。

各家上报产值情况如下∶
1.土建上报产值约:6450万元
2.安装上报产值:1057.9855万元(不含签证)
3.腻子上报产值:28.5968万元(不含30#楼幼儿园腻子)
4消火栓上报产值:(30#~33#楼消火栓系统)85.9043万元
(物业电缆及给水泵房安装)77.8446万元
5.配电室上报产值:13
6.9328万元(不含签证费用)
共计上报计算产值约7837.234万元
总计为公司创造收益:约373万元(不计甲外包单位配合费)。

二.镇江路12号片区项目与2015年11月22号举办了开工仪式,目前安全报监手续与2015年12月11号申报齐全,建设单位正在加紧办理施工许可证。

现场中组团土方开挖已经基本施工完毕,10-12#楼垫层已经浇筑,部分抗浮锚杆已施工完毕,14#楼基础机械开挖已到位,目前正在进行人工清槽,验槽后垫层施工。

6、7、8、9#楼底下车库部位机械开挖仍在进行,5、22#楼部分车库由于基坑内临时道路占用暂未继续开挖。

三.未来一年的工作展望
(一)安全文明施工管理:
镇江路12号片区项目自开工以来必须重视安全生产为主的管理理念,确保从安全生
产中要效益。

项目部在公司季度生产拉网检查和每月巡查制度的基础上建立每月安全巡查制度,每天安排专人对现场及生活区进行安全检查,对发现的隐患问题逐一制定整改措施,要求做到大的隐患立即排除,小的隐患限时整改。

责任到人,分工到位。

严格落实隐患整
改到位!另外项目部通过不定期组织安全应急消防演练,工人定期进行安全
教育
,严格落实新进场工人的安全教育培训及交底工作,通过加强工人自身的安全意识,从根
源上杜绝安全事故的发生。

针对现场文明施工,项目部必须制定一套切实可行的管理办法,保证办公区及生活区干净整洁,施工场地内材料堆放有序齐整,硬化道路保持清洁无扬尘。

积极创办“安全文明示范工地”。

(二)质量及进度管理控:
镇江路项目坚持落实栋号长原则,把质量控制分工明确,责任到人。

各栋号长直接负责本栋号的质量及进度管理,严格要求分包执行各工序的分级报验制度。

项目部每天下班后组织项目碰头会,对发现的问题安排专人落实解决,举一反三,杜绝问题重复出现。


达到项目部及建设单位的进度要求,项目部必须通过合理安排劳力配置及各工程穿插来确
保关键线路中关键工作节点得到有效落实,另一方面通过合理划分流水施工,进一步优化劳力配置。

(三)商务管理:
总结
以往商务管理中的经验教训,做到新项目开工后,认真组织编制并审核各分包及材料
合同
事宜,把合同履行中以往会出现的纠纷扼杀在摇篮中;建立并建全与建设单位及监理单位往来文件的收发文记录,为日后可能存在争议和风险的情况下为项目部收集第一手强有力的证据;建立各种材料的进场台帐及每月上报公司产值台账记录等等。

使新项目的商务管理工作更加规范化精细化。

最后祝愿公司在新的一年里稳中求胜,再创佳绩!!!
我的述职完毕,谢谢!。