地下连续墙钢筋计算表
地下连续墙施工成本分析
地下连续墙施工成本分析摘要:地下连续墙以它工效高、污染小、能适应从粘土到卵石的各种地层等优点,在水利水电、市政工程、铁路工程、冶金建筑、港口建设等行业得到了广泛的应用。
在地下连续墙的应用过程中,由于结构和地质条件的不同,地下连续墙的施工成本存在着巨大的差异。
所以在地下连续墙成本核算上必须对费用构成进行正确分析,并根据工程量、工期、设备型号等具体情况和施工工艺来计算地下连续墙的成本。
关键词:地下连续墙;成本分析;对比分析;变化成本Abstract: the underground continuous wall, with its high efficiency low pollution, can adapt to all kinds of pebbles from clay strata and other advantages, has widely applied in water conservancy and hydropower, municipal engineering, railway engineering, metallurgy construction, port construction industries. In the process of application of underground continuous wall, the structure and the geological condition is different, the construction cost of underground continuous wall there is a tremendous difference. So in the underground continuous wall cost accounting must be to cost structure on the correct analysis, and according to quantity, time limit, equipment type concrete circumstance and construction process to calculate the cost of underground continuous wall.Keywords: underground continuous wall; Cost analysis; Comparative analysis; Changes cost工程概况广州市某地铁区间明挖段工程,包括明挖段正线区间及两段车辆段出入段线区间,明挖区间正线左长1074.605m;右线长1077.891m。
地下连续墙工程钢筋笼吊装验算方法和计算公式PPT
验算方法以及计算公式
设计图纸
最重钢筋笼重量:34.5吨,长34.15米
端头 6 米首开
钢筋笼宽
幅宽 m 6
6 笼长 m: 34.15 墙厚 m 0.8 笼厚 m: 0.662
m:
间距 单根长 比重
编号 钢筋名称 级别 型号
根数
重量(kg) 大样 பைடு நூலகம்注
(mm) 度:m (kg)
1.7 4 6.318 42.963
19 防绕流铁皮固定筋 Ⅱ 16
15 4 1.580 94.771
20 防绕流铁皮 0.0006*0.5 33.7 4 7850 317.454
21 保护块
0.32*0.005*0.1 36 7850 45.216
22 工字钢 (0.7+0.634)*0.01*33.7 2 7850 7058.060
7、主吊扁担上方卸扣采用弓形55吨(市场上在55吨和85吨之间没有其他型号),共2个。下 方采用弓形35吨(市场上在35吨和55吨之间没有其他型号),共2个。
8、副吊扁担上方卸扣采用弓形55吨,共2个。下方采用弓形35吨,共2个。
9、主吊起重钢丝绳下方采用弓形17吨,共4个,翻转预留钢丝绳下方采用弓形17吨,共2个。 副吊起重钢丝绳下方采用弓形17吨,共6个。
1 内侧主筋 Ⅱ 25 150 34.15 41 3.856 5399.328
2 内侧加筋 Ⅱ 25 150 17 40 3.856 2622.250
3 外侧主筋 Ⅱ 25 150 34.15 41 3.856 5399.328
4 外侧加筋 Ⅱ 25 150 19 40 3.856 2930.750
5 水平筋 Ⅱ 18 200 6 242 1.999 2902.664
地下连续墙钢筋笼吊装计算书
珠机场城际轨道交通工程拱北至横琴段地下连续墙钢筋笼吊装验算书编制:审核:批准:中交四航局珠机城际轨道交通拱北至横琴段三工区项目经理部2014年3月目录一、计算依据 (1)二、吊装参数 (1)2.1、钢筋笼吊点设置 (1)2.1.1、钢筋笼纵向吊点 (1)2.1.2、钢筋笼横向吊点 (1)2.2、履带吊选型 (2)2.3、扁担梁结构形式 (3)2.4、钢丝绳 (3)2.5、钢筋笼吊装细部结构 (4)2.5.1、吊攀 (4)2.5.2、A型吊点 (4)2.5.3、B型横担 (4)2.5、卸扣 (5)2.6、钢筋笼搁置扁担 (5)三、荷载 (6)四、吊装验算 (6)4.1、履带吊验算 (6)4.1.1、双机起吊两台履带吊受力分配验算 (6)4.1.2、履带吊主吊主臂长度验算 (10)4.2、起吊扁担梁验算 (11)4.2.1、扁担截面强度验算: (11)4.2.2、吊钩孔局部承压验算: (12)4.2.3、扁担梁抗剪强度验算 (12)4.2.4、横担梁的稳定性核算 (13)4.3、钢丝绳强度验算 (13)4.4、吊攀验算 (14)4.5、吊点验算 (15)4.5.1、吊点受拉验算 (15)4.5.2、吊点处焊缝抗剪强度计算 (15)4.6、横担验算 (15)4.7、卸扣验算 (16)4.8、钢筋笼搁置扁担 (16)4.8.1、搁置扁担截面强度验算 (17)4.8.2、搁置扁担抗剪强度验算 (17)4.9、地基承载力计算 (18)五、结论 (18)一、计算依据1、《珠海市区至珠海机场城际轨道交通工程拱北至横琴段金融岛站围护结构施工图》;2、《起重吊装常用数据手册》;3、《铁路桥梁钢结构设计规范》(TB 10002.2-2005 J461-2005);4、《钢结构设计规范》(GB50017-2003);5、《工程建设安装起重施工规范》HG20201-2000;6、《建筑施工手册》(第四版);7、《路桥施工手册》。
地下连续墙吊装施工方案
1.2.3钢筋笼加固方法图0-1 钢筋笼X型横向桁架加固图0-2 钢筋笼纵向桁架加固图0-3 钢筋笼剪刀筋加固1.2.3.2.L型钢筋笼加固L型钢筋笼除设置纵、横向起吊桁架和吊点外,增设“人字”Φ20@200mm 斜向加强筋进行加强,以加强钢筋笼的抗弯与抗扭刚度,防钢筋笼在空中翻转角度时产生变形。
具体布置图如下图所示:图0-4 L型钢筋笼加固示意图1.2.3.3.玻璃纤维筋加固措施(1)盾构洞门8m范围所有钢筋均采用高一等级玻璃纤维筋。
受力主筋间玻璃纤维筋与钢筋、玻璃纤维筋与玻璃纤维筋之间的连接应采用钢制U型卡扣连接,U型卡扣应与主筋直径相适应,的钢筋贴于U形扣内侧,玻璃纤维筋贴于外侧,每根筋材连接端的U型卡数量不得少于两个且搭接长度不得少于1.5m。
玻璃纤维筋与玻璃纤维筋或普通钢筋搭接过程中同一断面应错开50%。
玻璃纤维筋强度大于钢筋强度。
其余部位间的玻璃纤维筋筋与钢筋、玻璃纤维筋与玻璃纤维筋之间的连接可以采用铁丝绑扎,绑扎应该牢固,搭接细节如下图所示:图0-5 玻璃纤维筋布置范围示意图图0-6 玻璃纤维筋搭接示意图(2)玻璃纤维钢筋笼沿常规幅钢筋笼设置的横、纵向桁架筋进行加固,设置剪刀筋。
纵向桁架不少于5榀。
图0-7 玻璃纤维筋钢筋笼纵向桁架加固图图0-8 玻璃纤维筋钢筋笼剪刀筋加固图(3)玻璃纤维筋笼制作过程中应注意采取增加玻璃纤维筋笼刚度的措施(玻纤钢筋笼内部采用钢筋桁架,后期下笼时割除),以防止在吊装以及运输过程中出现较大的变形影响玻璃纤维筋笼下放。
玻璃纤维筋钢筋笼加强如图所示。
图0-9 玻璃纤维筋钢筋笼加强示意图1.2.3.4.吊点加固措施为保证钢筋笼安全起吊,钢筋笼施工时需对Q235Φ32圆钢吊点进行局部加强,笼口处采用“C”字型圆钢加固,其余吊点采用“几”字型圆钢。
对设置在钢筋笼的所有吊点均需与桁架筋焊接。
每个吊点上下两侧布置一道横向桁架,增加吊点稳定性。
吊点加固如下图所示:图0-10 吊点加固示意图1.2.4钢筋笼吊点设置(1)“一”型钢筋笼吊点设置钢筋笼采用20点吊方案:纵向上主吊设置2排吊点,副吊设置3排吊点;横向上设置4排吊点。
4.2深基坑支护类型与设计计算
0.5Dmin 0.33Dmin 0.5Dmin 0.33Dmin
25.83Dmin 1.55Dmin
2
3
14.28Dmin 6.45Dmin
2
3
主动区力矩合计: 1.55Dmin3+25.83Dmin2+143.35Dmin+265.2 被动区力矩合计: 6.46Dmin3+14.28Dmin2
沿桩排方向取1m长度计算土压力计算见表2-9,表2-10
2.求反弯点位置 2.求反弯点位置
反弯点位置可以用桩前后土压力为零点近似确定: 35.489+5.403D1=57.288D1 解出:D1=0.68m
表2-10 被动土压力计算表
参数 c=0 φ=32 γ=17.6 Kp=3.255 O
Kp =1.804
2)等反力布置
算例: 算例:某工程基坑支护拟采用悬臂桩结构,主要参数
如图2-3(a)所示。试计算桩的设计长度,桩身最大弯矩 及所在位置。
土压力计算
主动土压力计算表
计算 深度 Z c=10 φ=20 A γ=19 Ka=0.49 =0.7 B C 0 0.45 6.0 0 8.55 114 20 28.55 134 9.8 14 65.66 14 14 14 -4.2 0 51.66 σz=γ·Z σz+q 2C· (σz+q)Ka
因为摩擦力作用方向,墙前墙体摩擦力向下。摩擦力阻止 土体滑动,被动土压力增大。 表4.2中当为混凝土板桩时,40度(3.0);35度(2.6);30 度(2.3);25度(2.1);20度(1.8);15度(1.5);10度 (1.2)。
土压力强度等于零的位置的计算。 t 所需实际板桩的入土深度为: = (1.1 − 1.2)t 0 (用等值梁法计算板桩是偏于安全的,实际 计算时将最大弯矩予以折减,根据丹麦 的研究成果折减系数为0.6-0.8,一般为 0.74。) 对支撑反力,则发现有不够的安全度,实 际设计时,将支撑反力加大35%, R=1.35R0 例4-1
地下连续墙钢筋量计算表
地下连续墙钢筋量计算表
一、钢筋种类
1.HRB400级钢筋
2.HRB335级钢筋
3.冷轧带肋钢筋
4.钢绞线
二、钢筋规格
例如:6mm、8mm、10mm、12mm等,需根据设计图纸进行详细列明。
三、钢筋数量
每种规格的钢筋所需数量,应结合施工图纸和工程量清单进行计算。
四、钢筋长度
1.直钢筋长度:L=n×La式中:L——直钢筋长度;n——钢筋的根数;La——每根钢筋的长度。
2.箍筋长度:L=2×(n/2)×(D/2)+(D/2)×(D/2)+(d/2)×(d/2)式中:L——箍筋长度;n——箍筋的个数;D——直径;d——内径。
3.弯起钢筋长度:L=n×La+2×(LwLa)式中:L——弯起钢筋长度;n——弯起钢筋的根数;La——直线段长度;Lw——弯起角度。
4.环形封闭箍筋长度:L=(Dd)×n+(Dd)/3×n+2×(LwLa)式中:L——环形封闭箍筋长度;D——直径;d——内径;n——个数;La——直线段长度;Lw——弯起角度。
五、弯钩长度
1.钢筋弯钩增加长度:根据不同的弯钩角度(90°、10°、135°、180°等)和弯钩形式(半圆弯钩、直弯钩和斜弯钩)进行计算。
2.钢筋弯曲增加长度:根据不同的弯曲角度(90°、10°、45°等)进行计算。
地下连续墙钢筋计算表
16 16 20 Ф 48,T=4mm 25 25 20
2.011 2.011 3.142 5.529 4.909 4.909 3.142
30.700 2.200 31.500 32.500 46.200 8.000 8.500 32.000
12 316 2 2 4 8 20 102 3
368.400 695.200 63.000 65.000 184.800 64.000 170.000
0.582 1.097 0.155 0.282 0.712 0.247 0.419 长×宽×厚=0.334×0.12×0.004 0.128 Ф 57,T=3.5mm 0.443 96 25.247
钢筋 型号 Ф 28 32 28 28 16 20 16
钢筋重量 (T) 4.720 6.165 2.862 3.237 2.595 0.533 1.070 单位面积 (cm2) 6.158 8.042 6.158 6.158 2.011 3.142 2.011
7 8 9 10 11 12 13
拉结筋连接筋 锁扣管接头钢筋 注浆管 纵向 桁架筋 横向 剪刀筋 钢板垫块 声测管
类型 墙 高L(mm)
编号 1 2 3 4 5 6
幅宽B1(mm) 6000 钢筋名称 1 幅 单根钢筋 每幅墙钢 长(m) 筋数(根) 总长度(m) 迎土侧 31.500 31 976.500 主筋 背土侧 31.500 31 976.500 迎土侧 19.100 31 592.100 附加筋 背土侧 21.600 31 669.600 6.000 274 1644.000 水平筋 6.000 36 216.000 拉结筋 0.800 847 677.600
12 296 2 2 4 7 20 96 3
浅谈控制地下连续墙综合单价的几个建议
浅谈控制地下连续墙综合单价的几个建议地下大型基坑与边坡支护结构形式,有地下连续墙、灌注柱、锚杆与土钉、水泥搅拌桩等几种支护形式,其中地下连续墙结构形式最为稳固。
但造价也是最高的。
地下连续墙是基础工程在地面上采用一种挖槽机械,沿着深开挖工程的周边轴线,在泥浆护壁条件下,开挖出一条狭长的深槽,清槽后,在槽内吊放钢筋笼,然后用导管法灌筑水下混凝土筑成一个单元槽段,如此逐段进行,在地下筑成一道连续的钢筋混凝土墙壁,作为截水、防渗、承重、挡水结构。
标签:地下连续墙;综合单价地下连续墙综合单价由人工费、材料费、机械费、管理费和利润组成。
以下所有分析,是针对一幅标准地下连续墙:长6米、宽0.8米、深20米来分析的。
地下连续墙分包价2017年的市场均价是800元/m3,材料费是400元/m3,综合单价是1200元/m3。
如果施工在现场管理中控制得好的话,利润空间是足够大的。
下文着重分析如果控制地下连续墙的综合单价。
1、人工费的组价分析人工费的具体内容有:钢筋笼制作、导墙制作、回填处理、泥浆处理、集土坑开挖与填平、凿除墙面浮浆与填平、墙面防渗表面处理、土方外運、泥浆外运。
地下连续墙的施工过程比结构要简单,一般现场施工分为两组,按一天一幅地连墙的施工速度,现场是旋挖机1台、成槽机1台加两台内驳车,施工过程中配四个工人负责清污、出土,配合施工机械进行两班倒施工;同时钢筋笼平台处配6个钢筋工,一天能加工一幅地连墙的钢筋笼出来;等钢筋笼吊装入槽后,由第一组4个工人负责配合水下混凝土浇筑。
也就是说现场工人只须配12个人,管理人员2个人,一共14个人工就足够了。
在这人工费组价中,有一块土方外运的组价需要详细说明。
土方外运包括土方装车、土方运输、弃土场土方消纳费及土方城镇垃圾处理费四块。
土方运输一般是1公里1元,土场消纳费20元每立方米,土方城镇垃圾处理费接近15元一立方。
在组价的过程中细节组价是不能漏项。
2、材料费的组价分析地下连续墙材料为泵送商品水下混凝土C35、地下连续墙钢筋、地下连续墙工字钢接头三大块组成。
地下连续墙的设计
地下连续墙的设计作为基坑围护结构,主要基于强度、变形和稳定性三个大的方面对地下连续墙进行建筑设计设计和计算,强度主要指墙体韦尔泰宗的水平和竖向截面承载力、竖向地基承载力;承重主要指墙体的水平变形和作为竖向变形结构的竖向变形;稳定性主要指作为围护结构的整体稳定性、抗倾覆稳定性、坑底抗隆起稳定性、抗渗流稳定性等,稳定性计算方法。
以下针对地下连续墙的主要方面进行详述。
一、墙体厚度和槽段宽度地下连续墙厚度一般为0.5~1.2m,而随着挖槽设备大型化和施工工艺的改进,一楼连续墙厚度可达2.0m以上。
日本东京湾新丰洲地下变电站圆筒形地下连续墙的厚度达到了2.40m。
上海世博500kV地下变电站基坑开挖深度34m,围护结构采用直径130m圆筒形地下连续墙,地下连续墙厚度1.2m,墙深57.5m。
在前述工程中地下连续墙的中其厚度应根据成槽机的规格、墙体的抗渗要求、墙体的受力和变形计算等综合确定。
地下累计的常用墙厚为0.6、0.8、1.0和1.2m。
确定地下连续墙单元槽段的平面形状和成槽宽度时需考虑因素,如墙段的结构受力特性、槽壁稳定性、周边的保护要求要求和施工条件等,需结合诸方面各方面的因素综合确定。
一般来说,壁板式一尽量避免方形槽段宽度不宜大于6m,T形、折线形槽段等槽段各肢宽度总和不宜6m。
二、地下连续墙的入土深度一般工程中地下连续墙入土深度在10~50m范围内,最大深度可达150m。
在基坑工程中,地下连续墙既作为侧向水土压力的受力结构,同时又兼有隔水的作用,因此地下连续墙的入土深度需考虑挡土和隔水两方面的要求。
作为挡土结构,地下连续墙入土深度需满足各项稳定性和强度要求,作为隔水帷幕,地下连续墙入土深度需根据地下水控制要求确定。
1.根据稳定性已确定入土深度作为挡土受力的围护体,地下深度底部需以插入基底以下足够连续墙并进入较好的土层,以满足嵌固深度和基坑稳定性要求。
在软土地层中,地下连续墙在基底以下的嵌固深度一般接近或大于远距离开挖深度方能实现稳定性要求。
地连墙配筋计算-c26
1.设计参数:弯矩设计值:M=370KN.m 弯矩值(标准组合):M k =264.28571KN.m 板厚:h=600mm 设计板宽:b=1000mm 保护层厚度:cover=70mm 混凝土强度等级:C 30混凝土抗压强度设计值:fc=14.3N/mm 2混凝土抗拉强度设计值:ft= 1.43N/mm 2混凝土抗拉强度标准值:f tk = 2.01N/mm 2钢筋抗拉强度设计值:fy=300N/mm 2纵筋的弹性模量:Es=200000N/mm 2混凝土极限压应变:εcu =0.0033系数:α1 = 1.0β1 =0.802.正截面承载力验算:有效高度:h 0=519mm αs =M/α1f c bh 02 =0.096ξ=1-√(1-2*αs ) =0.101<ξb =0.550需配钢筋面积:As=ξα1f c bh 0/f y =2503mm 2选用钢筋排数n =1采用钢筋:φ22@100实配钢筋面积:As=3801mm 2OK!3.裂缝宽度验算:有效受拉混凝土截面面积:A te =0.5bh =300000mm2按有效受拉混凝土截面面积计算的纵向受拉钢筋佩筋率:ρte = A s / A te =0.0127相对粘结特性系数:νi = 1.0等效直径:d eq = ∑n i d i 2/∑n i νi d i =22.0mm σsk = M k / 0.87h 0A s =154.0N/mm 2纵向受拉钢筋应变不均匀系数:ψ=1.1-0.65f tk / ρte σsk =0.430构件受力特征系数:αcr = 2.1(钢筋混凝土受弯构件)最外层钢筋外边缘至受拉区底边的距离:c =65mm最大裂缝宽度:ωmax = αcr *ψ*σsk /E s *(1.9c+0.08d eq /ρte )=0.183mm最大裂缝宽度限值:[ωmax ] =0.2mm OK1.设计参数:弯矩设计值:M=97KN.m 弯矩值(标准组合):M k =75.78125KN.m 板厚:h=600mm 设计板宽:b=1000mm 保护层厚度:cover=70mm 混凝土强度等级:C 30混凝土抗压强度设计值:fc=14.3N/mm 2混凝土抗拉强度设计值:ft= 1.43N/mm 2混凝土抗拉强度标准值:f tk = 2.01N/mm 2钢筋抗拉强度设计值:fy=300N/mm 2纵筋的弹性模量:Es=200000N/mm 2混凝土极限压应变:εcu =0.0033系数:α1 = 1.0β1 =0.802.正截面承载力验算:有效高度:h 0=525mm αs =M/α1f c bh 02=0.025ξ=1-√(1-2*αs ) =0.025<ξb =0.550需配钢筋面积:As=ξα1f c bh 0/f y =624mm2选用钢筋排数n =1采用钢筋:φ10@100实配钢筋面积:As=785mm 2OK!3.裂缝宽度验算:有效受拉混凝土截面面积:A te =0.5bh =300000mm2按有效受拉混凝土截面面积计算的纵向受拉钢筋佩筋率:ρte = A s / A te =0.0100相对粘结特性系数:νi =0.7等效直径:d eq = ∑n i d i 2/∑n i νi d i =7.0mmσsk = M k / 0.87h 0A s =211.2N/mm2纵向受拉钢筋应变不均匀系数:ψ=1.1-0.65f tk / ρte σsk =0.482构件受力特征系数:αcr = 2.1(钢筋混凝土受弯构件)最外层钢筋外边缘至受拉区底边的距离:c =65mm最大裂缝宽度:ωmax = αcr *ψ*σsk /E s *(1.9c+0.08d eq /ρte )=0.192mm最大裂缝宽度限值:[ωmax ] =0.2mm OK1.设计参数:弯矩设计值:M=97KN.m 弯矩值(标准组合):M k =77.6KN.m 板厚:h=600mm 设计板宽:b=1000mm 保护层厚度:cover=70mm 混凝土强度等级:C 30混凝土抗压强度设计值:fc=14.3N/mm 2混凝土抗拉强度设计值:ft= 1.43N/mm 2混凝土抗拉强度标准值:f tk = 2.01N/mm 2钢筋抗拉强度设计值:fy=210N/mm 2纵筋的弹性模量:Es=210000N/mm 2混凝土极限压应变:εcu =0.0033系数:α1 = 1.0β1 =0.802.正截面承载力验算:有效高度:h 0=525mm αs =M/α1f c bh 02=0.025ξ=1-√(1-2*αs ) =0.025<ξb =0.614需配钢筋面积:As=ξα1f c bh 0/f y =891mm2选用钢筋排数n =1采用钢筋:φ10@100实配钢筋面积:As=785mm 2NO GOOD!3.裂缝宽度验算:有效受拉混凝土截面面积:A te =0.5bh =300000mm2按有效受拉混凝土截面面积计算的纵向受拉钢筋佩筋率:ρte = A s / A te =0.0100相对粘结特性系数:νi =0.7等效直径:d eq = ∑n i d i 2/∑n i νi d i =7.0mm σsk = M k / 0.87h 0A s =216.3N/mm2纵向受拉钢筋应变不均匀系数:ψ=1.1-0.65f tk / ρte σsk =0.496构件受力特征系数:αcr = 2.1(钢筋混凝土受弯构件)最外层钢筋外边缘至受拉区底边的距离:c =65mm最大裂缝宽度:ωmax = αcr *ψ*σsk /E s *(1.9c+0.08d eq /ρte )=0.193mm最大裂缝宽度限值:[ωmax ] =0.2mm OK1.设计参数:弯矩设计值:M=97KN.m 弯矩值(标准组合):M k =77.6KN.m 板厚:h=600mm 设计板宽:b=1000mm 保护层厚度:cover=70mm 混凝土强度等级:C 30混凝土抗压强度设计值:fc=14.3N/mm 2混凝土抗拉强度设计值:ft= 1.43N/mm 2混凝土抗拉强度标准值:f tk = 2.01N/mm 2钢筋抗拉强度设计值:fy=210N/mm 2纵筋的弹性模量:Es=210000N/mm 2混凝土极限压应变:εcu =0.0033系数:α1 = 1.0β1 =0.802.正截面承载力验算:有效高度:h 0=525mm αs =M/α1f c bh 02=0.025ξ=1-√(1-2*αs ) =0.025<ξb =0.614需配钢筋面积:As=ξα1f c bh 0/f y =891mm2选用钢筋排数n =1采用钢筋:φ10@100实配钢筋面积:As=785mm 2NO GOOD!3.裂缝宽度验算:有效受拉混凝土截面面积:A te =0.5bh =300000mm2按有效受拉混凝土截面面积计算的纵向受拉钢筋佩筋率:ρte = A s / A te =0.0100相对粘结特性系数:νi =0.7等效直径:d eq = ∑n i d i 2/∑n i νi d i =7.0mmσsk = M k / 0.87h 0A s =216.3N/mm2纵向受拉钢筋应变不均匀系数:ψ=1.1-0.65f tk / ρte σsk =0.496构件受力特征系数:αcr = 2.1(钢筋混凝土受弯构件)最外层钢筋外边缘至受拉区底边的距离:c =65mm最大裂缝宽度:ωmax = αcr *ψ*σsk /E s *(1.9c+0.08d eq /ρte )=0.193mm最大裂缝宽度限值:[ωmax ] =0.2mm OK。
钢筋笼吊装计算书
笼吊装计算书一计算说明豫园站围护体系地下连续墙最大深度为29.5m,为节省施工时间并减少因分节制作带来的不利影响,故决定对钢筋笼采用一次吊装入槽。
在钢筋笼吊放时,拟采用两台大型起重设备,分别作为主吊、副吊,同时作业,先将钢筋笼水平吊起,再在空中通过吊索收放,使钢筋笼沿纵向保持竖直后,撤出副吊,利用主吊吊装钢筋笼入槽。
根据设计要求,拟沿钢筋笼纵向布置四道桁架筋,使得钢筋笼起吊时横向均匀受力,同时使纵向保持良好的抗弯刚度。
计算依据:《起重吊装常用数据手册》《建筑施工计算手册》《钢结构设计规范》(GB50017-2003)二吊装步骤钢筋笼吊装过程进,双机停置在钢筋笼的一侧的施工便道,主、副机双机抬吊,主机吊钩吊钢筋笼的顶部范围,副机吊钩起吊钢筋笼底部范围,主、副机均采用铁扁担穿滑轮组进行工作。
主、副吊机同时工作,使钢筋笼缓慢吊离地面,并逐渐改变笼子的角度使之垂直。
拆下副吊钢丝绳,由主机吊车将钢筋笼移到已挖好槽段处,对准槽段中心按设计要求槽段位置缓慢入槽,并控制其标高。
钢筋笼放置到设计标高后,利用钢板制作的铁扁担搁置在导墙上。
三吊点布置1)钢筋笼横向吊点布置:按钢筋笼宽度L,布置4道;2)钢筋笼纵向吊点布置:按钢筋笼长度方向,布置7道,主吊吊机设四点,副吊吊机设五点。
具体布置参见附图。
四设备选用1)主吊选用:QYU型100t履带式起重机,主臂长度17m~63.0m,主要性能见下表:工作半径R(m)有效起重量Q(t)提升高度H(m)角度(度)12.9 75.0 64 8014 69.5 64 7816 57.7 63.5 7718 48.9 63 752)副吊选用:QYU型50t履带式起重机,主臂长度54.85m,主要性能见下表:工作半径R(m)负载Q(t)提升高度H(m)角度(度)12 43.5 56 7914 40.3 55 7716 35.8 55 7518 34.3 54 73序号名称型号数量备注1 主吊铁扁担2套2 副吊铁扁担2套3 钢丝绳约200米4 滑轮8个5 卸扣30只6 扳手若干五双机抬吊系数K验算按标准幅6m,笼长29.5m进行验算。
地下连续墙钢筋计算表
总重(kg)
钢筋 编号
分类名称
单根长度 (m)
间距参数 (m)
分类数 组根
分类总长 (m)
钢筋直径 (mm)
比重(kg)
总重(kg)
1
开挖面
42.1
0.2
28
1178.80 32
6.313
7442.20 1
开挖面
42.1
0.2
23
968.30 32
6.313
6113.24
14
开挖面
22
0.4
14
308.00 25
0.2
23
16.10 32
6.313
101.65
2
开挖面
29.8
0.4
14
417.20 32
6.313
2633.94 2
开挖面
29.8
0.4
12
357.60 32
6.313
2257.66
3 附加筋 开挖面
25.3
0.4
14
354.20 32
6.313
2236.20 3 附加筋 开挖面
25.3
0.4
12
嵌幅
墙段剖面
2-2剖面
计量单位
1幅
64.6
墙宽(m)
4.5
幅宽(m)
1.2
钢筋 编号
1
分类名称 开挖面
单根长度 (m)
间距参数 (m)
分类数 组根
42.1
0.2
28
分类总长 (m)
钢筋直径 (mm)
比重(kg)
总重(kg)
钢筋 编号
1178.80 36
7.990
地下连续墙水下混凝土灌注记录表
地下连续墙水下混凝土灌注记录表
JTG/TF50-2011公路桥涵施工技术规范编Fra bibliotek:项目名称
施工单位
施工日期
合 同 段
监理单位
单位工程
检验单位
检测日期
分部工程
工程部位
分项工程
桩号范围
槽段编号
砼施工记录号
设计墙底标高(m)
终孔墙底标高(m)
灌注前墙底标高(m)
沉渣厚度(mm)
设计墙顶标高(m)
设计墙宽(m)
重要记事
拆管前
拆管后
拆管前
拆管后
首批导管埋深
自检意见
监理意见
原始记录本
表号
册号
页码
序号
施工员:桥梁工程师:质检工程师:监理工程师:
计算混凝土数量(m³)
实灌混凝土数量(m³
钢筋骨架底标高(m)
导管总长(m)
基准面标高(m)
基准面到孔底深度(m)
灌注时间
混凝土标号(MPa)
首批混凝土体积(m³
配 合 比
时间
混凝土浇筑数量
(m³)
基准面到砼顶面深度(m)
基准面到导管顶(m)
拆管长度(m)
累计拆管长度(m)
导管埋深(m)
已灌注混凝土高度(m)
地下连续墙设计规范
建筑基坑支护技术规程(JGJ 120-2012)4.5 地下连续墙设计4.5.1地下连续墙的正截面受弯承载力、斜截面受剪承载力应按现行国家标准《混凝土结构设计规范》GB50010的有关规定进行计算,但其弯矩、剪力设计值应按本规程第3.1.7条确定。
4.5.2地下连续墙的墙体厚度宜按成槽机的规格,选取600mm、800mm、1000mm或1200mm。
4.5.3一字形槽段长度宜取4m~6m。
当成槽施工可能对周边环境产生不利影响或槽壁稳定性较差时,应取较小的槽段长度。
必要时,宜采用搅拌桩对槽壁进行加固。
4.5.4地下连续墙的转角处或有特殊要求时,单元槽段的平面形状可采用L形、T形等。
4.5.5地下连续墙的混凝土设计强度等级宜取C30~C40。
地下连续墙用于截水时,墙体混凝土抗渗等级不宜小于P6,槽段接头应满足截水要求。
当地下连续墙同时作为主体地下结构构件时,墙体混凝土抗渗等级应满足现行国家标准《地下工程防水技术规范》GB50108及其它相关规范的要求。
4.5.6地下连续墙的纵向受力钢筋应沿墙身每侧均匀配置,可按内力大小沿墙体纵向分段配置,但通长配置的纵向钢筋不应小于总数50%;纵向受力钢筋宜采用HRB400级或HRB500级钢筋,直径不宜小于16mm,净间距不宜小于75mm。
水平钢筋及构造钢筋宜选用HPB300或HRB400钢筋,直径不宜小于12mm,水平钢筋间距宜取200mm~400mm。
冠梁按构造设置时,纵向钢筋伸入冠梁的长度宜取冠梁厚度。
冠梁按结构受力构件设置时,墙身纵向受力钢筋伸入冠梁的锚固长度应符合现行国家标准《混凝土结构设计规范》GB50010对钢筋锚固的有关规定。
当不能满足锚固长度的要求时,其钢筋末端可采取机械锚固措施。
4.5.7地下连续墙纵向受力钢筋的保护层厚度,在基坑内侧不宜小于50mm,在基坑外侧不宜小于70mm。
4.5.8钢筋笼端部与槽段接头之间、钢筋笼端部与相邻墙段混凝土面之间的间隙应不大于150mm,纵筋下端500mm长度范围内宜按1:10的斜度向内收口。
109940_地下连续墙定额
218.78
689.78
4—390
锁口管吊拔,25米以内
段
1707.97
461.12
360.68
886.17
4—391
锁口管吊拔,35米以内
段
2168.70
568.52
506.32
1093.86
5.混凝土接缝桩定额
编号
定额名称
单位
基价
人工费
材料费
机械费
4—392
接缝桩制作
10m3
15044.99
地下连续墙定额
1.导墙定额
编号
定额名称
单位
基价
人工费
材料费
机械费
4—375
导槽开挖
100m3
1969.64
383.54
1176.15
409.95
4—376
现浇混凝土导墙
10m3
6613.98
721.49
5620.34
272.15
4—377
预制混凝土导墙制作
10m3
12765.11
844.19
11229.91
691.01
4—378
预制混凝土导墙安装
10m3
4391.87
821.24
3285.61
285.02
4—379
预制混凝土导墙拆除
10m3
1036.45
457.06
4.80
574.59
2.地下墙挖土成槽定额
编号
定额名称
单位
基价
人工费
材料费
机械费
4—380
井架式液压抓斗成槽,15米以内
10m3
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
16.10 32
23
968.30 32
6.313 6.313
101.65 6113.24
14
迎土面
22
0.4
14
308.00 25
3.853
1186.84 14
迎土面
22
0.4
12
264.00 25
3.853
1017.29
4
锚入圈梁 0.7
0.2
28
19.60 32
6.313
123.74 4
锚入圈梁 0.7
3.853 2.984 7.850 9.865 9.865 6.313 9.865 0.888 0.888 0.888 2.466
1186.84 14
开挖面
156.61 1 9419.03 4
竖向 主筋
锚入圈梁 迎土面
1186.84 14
迎土面
156.61 4
锚入圈梁
3333.58 2
开挖面
2830.18 3 附加筋 开挖面
402.48 284.10
50.51 43.40 509.32 104.14 165.40 73.98 170.17 177.56 42.39
74
总计(kg)
Hale Waihona Puke 2661325.30地下连续墙钢筋统计表
墙型
先行幅
墙段剖面
2-2剖面
计量单位
1幅
墙高(m)
64.6
墙宽(m)
5.5
幅宽(m)
1.2
墙型 墙高(m)
间距参数 (m)
分类数 组根
42.1
0.2
23
分类总长 (m)
钢筋直径 (mm)
比重(kg)
总重(kg)
968.30 36
7.990
7737.06
竖向 主筋
竖向 主筋
14
开挖面
1 竖向 锚入圈梁
4
主筋
迎土面
14
迎土面
4
锚入圈梁
2
开挖面
3 附加筋 开挖面
16
开挖面
5
水平筋
6
水平筋
15
水平筋
7
笼顶拉结筋
40.80 40 28.80 40
8.00 32 4.40 40 573.68 12 117.30 12 186.30 12 30.00 20 69.00 20 72.00 20
8
9.865 9.865 6.313 9.865 0.888 0.888 0.888 2.466 2.466 2.466 7.850
嵌幅
墙段剖面
2-2剖面
计量单位
1幅
64.6
墙宽(m)
4.5
幅宽(m)
1.2
钢筋 编号
1
分类名称 开挖面
单根长度 (m)
间距参数 (m)
分类数 组根
42.1
0.2
28
分类总长 (m)
钢筋直径 (mm)
比重(kg)
总重(kg)
钢筋 编号
1178.80 36
7.990
9419.03 1
分类名称 开挖面
单根长度 (m)
264.00 25
16.10 36
968.30 36
264.00 25
16.10 36
357.60 36
303.60 36
351.90 36
1233.00 25
666.00 22
495.00 16
13.14 16
641.00 16
171.20 16
579.60 16
129.60 16
428.40 25
2 1.1 2.84 0.85 1.35 0.5
承台预 埋
0.4 0.2 0.2 0.4 0.2 0.4 0.4 0.2 0.2 0.2 0.4
0.6 0.4
1.26 4
0.25
0.2 0.2 0.2 0.15
12 23 23 12 23 12 12 23 2 137 2 74 2 55 9 25 2 107 2 161 2 6 51 4 17 2 42 15 2 18 4 4 2 101 6 23 6 23 2 30
0.2
23
16.10 32
6.313
101.65
2
开挖面
29.8
0.4
14
417.20 32
6.313
2633.94 2
开挖面
29.8
0.4
12
357.60 32
6.313
2257.66
3 附加筋 开挖面
25.3
0.4
14
354.20 32
6.313
2236.20 3 附加筋 开挖面
25.3
0.4
12
64.1 0.8
25
641.00 16
0.6
2 107
171.20 16
1.578 1.578
1011.72 270.21
端头筋
端头筋
M筋 竖向
1.8 64.8
0.4
2 161
579.60 16
2
129.60 16
1.578 1.578
914.81 204.55
9 桁架筋
10
纵向 横向
1.4 6.125
6 28
142.80 12
6 28
226.80 12
2 37
37.00 20
2 37
85.10 20
2 37
88.80 20
1
8
2
14
2 253 -506.00 14
2
14
22
4.00 14
22
4.00 8
22
4.00 6
75
总计(kg)
9.865 9.865 6.313 9.865 0.888 0.888 0.888 2.466 2.466 2.466 7.850 7.850 7.850 7.850 7.850 7.850 7.850
303.60 32
6.313
1916.74
16
开挖面
15.3
0.2
28
428.40 32
6.313
2704.65 16
开挖面
15.3
0.2
23
351.90 32
6.313
2221.67
5
水平筋
5.5
0.2
2 137 1507.00 25
3.853
5807.04 5
水平筋
4.5
0.2
2 137 1233.00 25
2 42
84.00 5
7.850
247.28
垫块
0.3
0.25
2 42
84.00
5
7.850
247.28
吊点
2.72
搁置点
0.8
吊筋
2
吊环
1.1
扶壁柱预埋
2.84
0.2
楼层边梁预埋
0.85
0.2
围檩梁预埋
1.35
0.2
接驳器
0.5
0.15
承台预 埋
预埋筋 预埋筋
1.15 1.2
0.15 0.15
钢板
84.00 5 40.80 40 28.80 40
8.00 32 4.40 40 573.68 12 142.80 12 226.80 12 37.00 20
3.853 7.990 7.990 3.853 7.990 7.990 7.990 7.990 3.853 2.984 1.578 1.578 1.578 1.578
8 导管仓 11 限位筋
竖向 水平
22 0.7 42.1 22 0.7 29.8 25.3 15.3 5.5 5.5 5.5 1.46 64.1 0.8
0.4
14
308.00 25
0.2
28
19.60 36
0.2
28
1178.80 36
0.4
14
308.00 25
0.2
28
19.60 36
0.4
14
3.853
1186.84 14
开挖面
22
0.4
12
264.00 25
3.853
1017.29
1 竖向 锚入圈梁
0.7
0.2
4
主筋
迎土面
42.1
0.2
28
19.60 32
6.313
123.74 1 竖向 锚入圈梁
0.7
0.2
28
1178.80 32
6.313
7442.20 4
主筋
迎土面
42.1
0.2
23
416.50 22
84.00
5
40.80 40
28.80 40
8.00 32
4.40 40
573.68 12
117.30 12
186.30 12
30.00 20
3.853 7.990 7.990 3.853 7.990 7.990 7.990 7.990 3.853 2.984 1.578 1.578 1.578 1.578 1.578 1.578 3.853 2.984 7.850 9.865 9.865 6.313 9.865 0.888 0.888 0.888 2.466
地下连续墙钢筋统计表
墙型
先行幅
墙段剖面
1-1剖面
计量单位
1幅
墙高(m)