威德福旋转尾管说明书
合集下载
相关主题
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
WEATHERFORD ASIA PACIFIC
1 of 47
PREPARED BY: LINCOLN WANG
PRE-JOB REPORT
CLIENT: CNOOC LTD. - TIANJIN WELL: CFD18-2E2S
Issue
A
Rev
00
Approved Page Date
2 of 47 11 of Jun., 2009
For well CFD18-2E2S the main objective is to isolate the 8-1/2” open hole section and the casing exit with cement. In order to achieve this 7” liner will be deployed utilising “HNG” hydraulic releasing running tool, “RSM” retrievable seal mandrel packoff bushing, “SWP” liner wiper plug system and LC Lite landing collar. Once the liner has been deployed to setting depth the PHR Liner Hanger will be set and the HNG Running Tool will be released. Once the ball seat on the SWP wiper plug is blown out the cement job will be performed to place cement in the annulus up to the liner top. Next, the TSP5H Liner Top Packer will be set. All excess cement will then be circulated from the well. CFD18-2E2S 尾管 固井主要目的是水泥封固 8-1/2”裸眼以及尾管与上层套管的重叠段。7”尾管固井作业使用威德福液压旋 转尾管悬挂器系统,主要包括 HNG 液压丢手送入工具,RSM 可回收式密封补芯,SWP 带球座的尾管胶 塞和 LC Lite 碰压(胶塞)座系统。尾管下到位后,坐悬挂器。然后将 HNG 送入工具丢手。打掉 SWP 尾管胶塞上的球座后,开始固井作业。固井作业结束后,坐尾管顶部封隔器。最后将尾管顶部水泥全部
循环出来。
Equipment running sequence likes below 尾管下入顺序如下:
• Weatherford Float Shoe, 7” 20-35#, BTC Box Up, Material K55 威德福浮鞋 • Customer Supplied Shoe Joint of Blank Liner, 7” 29#, BTC Box x Pin, Material L-80 甲方套管 • Weatherford Float Collar, 7” 29#, BTC Box x BTC Pin, Material L-80 威德福浮箍 • Customer Supplied Blank Liner Joint, 7” 29#, BTC Box x Pin, Material L-80 甲方套管 • Weatherford Landing Collar, LC Lite, 7” 26-32#, BTC Box x BTC Pin, Material L-80 威德福碰压
WEATHERFORD 7" X 9 5/8" HYDRAULIC ROTATING LINER HANGER SYSTEM CONSISTING OF 威德福 7” X 9-5/8”液压旋转尾管悬挂器系统包括:
POLISHED BORE RECEPTACLE 10FT LONG WITH 7.500” ID, HYDRAULIC ROTATING LINER HANGER “PHR” FOR CEMENTED APPLICATIONS. UTILISING FLOATING JUNK BONNET(FJB), ‘HNG’ HYDRAULIC RELEASE RUNNING TOOL, ‘RSM’ RETRIEVABLE SEAL MANDREL PACK-OFF BUSHING, ‘SWP’ LINER WIPER PLUG SYSTEM INTEGRATED WITH BALL SEAT AND LC LITE LANDING COLLAR. 回 接筒,10 英尺长, 7.5 英寸内径, 固井用液压旋转尾管悬挂器 PHR,FJB 浮式垃圾帽, HNG 液压丢手送入工具, RSM 可回收式密封补芯,SWP 带球座的尾管胶塞和 LC Lite 碰压 (胶塞)座。
(胶塞)座
• Customer Supplied Blank Liner joints, 7” 29#, BTC Box x Pin, Material L-80 甲方套管 • Weatherford Liner Hanger assembly consisting of 威德福尾管悬挂器总成,包括:
德福 7” X 9-5/8”液压旋转尾管悬挂器系统固井作业
PREPARED BY: LINCOLN WANG – SENIOR APPLICATIONS ENGINEER 王利民 APPROVED BY: TOMMY ZHANG – WELL CONSTRUCTION BUSINESS UNIT MANAGER 张亚伟 ACCEPTED BY:
PRE-JOB REPORT施工前报告
Client客户: CNOOC Ltd. - Tianjin中海石油(中国)有限公司天津分公司 Well No.井号: CFD18-2E2S Location地点: Cao Fei Dian, P.R.China中国曹妃甸 Job Type作业: Weatherford 7” X 9-5/8” Hydrauluic Rotating Cemented Liner Hanger System Running And Setting Operations威德福7” X 9-5/8”液压旋转尾管 悬挂器系统固井作业 Revsion版本: 00
PRE-JOB REPORT
CLIENT: CNOOC LTD. - TIANJIN WELL: CFD18-2E2S
Issue
A
Rev
00
Approved Page Date
1 of 47 11 of Jun., 2009
PRE-JOB REPORT 施工前报告
CLIENT 客户: CNOOC LTD. - TIANJIN 中海石油(中国)有限公司天津分
Well Construction Business Unit Weatherford Asia Pacific Pte. Ltd A-5 TEDA New Skyline Technology Building, No.131, DongTing Road, Tianjin, 300457 Peoples Republic of China E-mail : lincoln.wang@ap.weatherford.com Web : www.weatherford.com Tel :+86 22 5988 8188 - 3524 Fax :+86 22 5988 8189
WEATHERFORD ASIA PACIFIC
2 of 47
PREPARED BY: LINCOLN WANG
PRE-JOB REPORT
CLIENT: CNOOC LTD. - TIANJIN WELL: CFD18-2E2S
Issue
A
Rev
00
Approved Page Date
3 of 47 11 of Jun., 2009
- Weatherford TSP5H Liner Top Packer with HNG and RSM Profiles, 201mm -8 Stub ACME Box Up x 7” 26# Vam Top HT Box Down, Material L-80 威德福 TSP5H 尾管顶部 封隔器
- Weatherford Crossover 7” 26# Vam Top HT Box x 7” 26# BTC Pin, Material L-80 威德 福变扣
- Weatherford Hydraulic Rotating Liner Hanger, Type “PHR”, 7” 26# x 9-5/8” 47-53.5# Vam Top HT Pin x Pin, Material L-80 威德福液压旋转尾管悬挂器
具并清洗残余水泥……..…………………………………………………….…….....13
APPENDIX 附件
APPENDIX 1: LINER & RUNNING STRING CONFIGURATIONS 尾管及送入工具管柱结构图 ....14 APPENDIX 2: INSPECTION SHEETS – SALES 销售工具检测表 …..…………………………..16 APPENDIX 3: INSPECTION SHEETS – RENTAL 租赁工具检测表 …..………………………...24 APPENDIX 4: PRESSURE TEST & MAKE UP CHART 试压及上扣扭矩图 .……...……..……….33 APPENDIX 5: SHIPPING MANIFEST 运输单 …………………………………….……….…...45
LINER INSTALLATION PROCEDURE OUTLINE 尾管作业程序
1.0 EXECUTIVE SUMMARY 概述 …………………………………………….……………03 2.0 LINER PRE-JOB CHECKS AND PREPARATION ON RIG SITE施工前现场检查………...06 3.0 RUNNING THE LINER 下尾管…………………………………..…………………….08 4.0 SETTING THE LINER HANGER AND RELEASING THE RUNNING TOOL 坐悬挂器和送入工
- Weatherford Polished Bore Receptacle(PBR) 10ft Long 7.50” ID, Material L-80, Profile Up x 201mm -8 Stub ACME Pin Down 威德福 10 英尺长回接筒
公司
FIELD 油田:
CAO FEI DIAN 曹妃甸
WELL NO.井号: CFD18-2E2S
JOB TYPE 作业: WEATHERFORD 7” X 9-5/8” HYDRAULIC ROTATING CEMENTED
LINER HANGER SYSTEM RUNNING AND SETห้องสมุดไป่ตู้ING OPERATIONS 威
This document has been issued as an "Uncontrolled Copy" and shall not be subject to formal revision controls unless overstamped "Controlled Copy".
1.0 EXECUTIVE SUMMARY 概述
具丢手…………………………………………………………………….. …………...…10 5.0 CEMENTING AND DISPLACING THE LINER SYSTEM 固井和顶替..…………………..11 6.0 SETTING THE LINER TOP PACKER 坐尾管顶部封隔器 ……………….………………….12 7.0 RETRIEVING THE RUNNING TOOLS AND REMOVING THE EXCESS OF CEMENT 回收送入工