基坑支护计算毕业论文
深基坑开挖支护设计毕业论文
毕业设计(论文)题目西安地铁枣园站基坑开挖支护设计专业城市地下空间工程班级城地 081学生张鹏飞指导教师范留明教授2012 年摘要基坑工程是指在地表以下开挖的一个地下空间及其配套的支护体系。
而基坑支护就是为保证基坑开挖,基础施工的顺利进行及基坑周边环境的安全,对基坑侧壁以及周边环境采用的支挡,加固与保护措施。
基坑支护体系是临时结构,安全储备较小,具有较大风险,基坑工程具有很强的区域性。
不同水文,工程地质环境条件下基坑工程的差异很大。
基坑工程环境效应复杂,基坑开挖不仅要保证基坑本身的安全稳定,而且要有效的控制基坑周边地层移动以及保护周围环境。
本文先介绍了枣园站的工程概况,包括水文地质和周围环境,然后通过结合对现有基坑开挖支护工法和车站实际情况的比较选择出了适合本站的开挖支护方案。
下来通过土压力的计算、结构内力的计算,配筋、验算、支撑设计、变形估算等对基坑的开挖支护作了理论上的数据分析,最后通过施工组织说明了各个工序施工的工法和应注意的问题。
关键词:支护方案,地下连续墙,支撑,施工组织设计AbstractFoundation Pit is the excavation of an underground space below the surface and a coordinated support system. Bracing of foundation pit is to ensure that excavation and foundation construction for the smooth and safe environment Foundation Pit and used the pit retaining wall reinforcement and protection.Bracing of Foundation Pit structure is the structural safety of temporary reserves are smaller, more risk. Foundation pit structure has a strong regional. Excavation works under different hydrological environmental and geological conditions are vastly. Effects complex excavation, excavation pit is not only necessary to ensure their own safety,but also to effectively control the pit surrounding strata.First,the paper introduces the general engineering situation of Zaoyuan Station,Including hydrological geology and the environment,Then,based on the existing foundation pit excavation method and station actual situation select the suitable for the station of the excavation and support scheme。
基坑支护_毕业设计论文_范文1
目 录目录 (Ⅰ)摘要 (Ⅳ)英文摘要 (Ⅴ)1 绪论 (1)1.1 贵州岩溶地区特点及遵义地区特点 (1)1.1.1 贵州岩溶地区特点 (1)1.1.2 遵义地区特点 (1)1.2 边坡稳定性评价综述 (1)1.2.1 定性评价方法 (2)1.2.2 定量评价方法 (2)1.3 边坡治理技术综述 (5)2 工程与场区地质概况 (7)2.1 工程概况 (7)2.1.1 场地地理位置与交通 (7)2.1.2 拟建建筑物特征 (7)2.2 场区工程地质概况 (7)2.2.1 地形地貌 (7)2.2.2 地质构造 (7)2.2.3 岩土构造 (7)2.2.4 水文地质条件与岩溶 (8)3 边坡稳定性评价 (9)3.1 概述 (9)3.1.1 边坡稳定性概念 (9)3.1.2 边坡破坏的类型和特征 (9)3.1.3 影响边坡稳定性的因素 (9)3.2 场地边坡稳定性分析 (11)3.2.1 基坑边坡稳定性影响因素 (11)3.2.2 计算指标的确定 (11)3.2.3 边坡稳定分析 (12)4 边坡治理方案 (19)4.1 边坡设计方案选择 (19)4.2 边坡设计计算 (20)4.2.1 抗滑桩—锚索设计计算 (20)4.2.2 土钉墙设计计算 (26)4.2.3 锚杆格构墙设计计算 (30)4.2.4 喷面设计计算 (31)5 施工策划 (33)5.1 施工方法 (33)5.1.1 施工要点 (33)5.1.2 土钉墙施工 (33)5.1.3 锚杆施工 (33)5.1.4 挂网喷浆护面施工 (34)5.1.5 支护桩及锚索施工 (34)5.2 基坑支护过程中的监测 (34)5.3 施工注意事项 (35)5.4 质量检查和验收 (35)5.4.1 质量检查 (35)5.4.2 工程验收 (35)5.5 其他说明 (35)6 结论与建议 (37)6.1 结论 (37)6.2 建议 (37)7 参考文献 (38)8 致谢 (39)附录 (40)计算示意图 (44)基坑支护平面图 (45)基坑支护设计图 (51)工程地质剖面图 (53)遵义航天大厦基坑边坡稳定性评价及治理方案摘 要随着城市建设的发展,高层建筑越来越多,出现了大量的深基坑工程。
毕业论文基坑支护
毕业论文基坑支护毕业论文基坑支护一、引言基坑支护是土木工程中一个重要的环节,它涉及到建筑物的稳定性和安全性。
在建筑物的施工过程中,基坑的挖掘和支护是必不可少的步骤。
本文将探讨基坑支护的方法和技术,以及其在工程实践中的应用。
二、基坑支护的意义基坑支护是为了保证基坑的稳定和安全。
在施工过程中,基坑的挖掘会导致周围土体的失稳,从而对建筑物和地下管线造成威胁。
因此,基坑支护的目的是通过采取一系列措施来防止土体塌方和基坑塌陷,以确保施工的顺利进行。
三、基坑支护的方法1. 土钉墙土钉墙是一种常见的基坑支护方法。
它通过在基坑周围的土体中安装钢筋混凝土土钉,并与钢筋混凝土挡土墙连接,形成一个整体结构。
土钉墙具有施工简便、成本低廉、适用范围广等优点,因此在基坑支护中得到了广泛应用。
2. 桩墙桩墙是另一种常见的基坑支护方法。
它通过在基坑周围驱动或挖孔灌注钢筋混凝土桩,并与钢筋混凝土挡土墙连接,形成一个整体结构。
桩墙具有承载能力强、稳定性好等优点,适用于较深的基坑支护。
3. 挡土墙挡土墙是一种常用的基坑支护结构。
它通过使用钢筋混凝土、砖石、钢板等材料构建,用于抵抗土体的侧压力。
挡土墙具有结构稳定、抗震性好等优点,适用于各种类型的基坑支护。
四、基坑支护的工程实践基坑支护在工程实践中有着广泛的应用。
以某大型商业综合体的地下停车场基坑支护为例,该工程采用了土钉墙和桩墙的组合支护方式。
首先,在基坑周围安装了土钉墙,以增加土体的抗剪强度;然后,在土钉墙内部挖孔灌注了钢筋混凝土桩,以增加整体结构的稳定性。
通过这种组合支护方式,成功地实现了基坑的稳定和安全。
五、基坑支护的挑战和发展趋势基坑支护面临着一些挑战,如复杂地质条件、施工难度大等。
为了应对这些挑战,需要不断改进和创新基坑支护技术。
未来,基坑支护的发展趋势可能包括以下几个方面:1. 新型材料的应用:如高强度钢筋、纤维增强材料等,可以提高基坑支护结构的承载能力和抗震性能。
2. 数字化技术的应用:如计算机模拟、数据采集和监测等,可以提高基坑支护的设计和施工效率,减少工程风险。
基坑开挖支护方案设计毕业论文(优质借鉴)
摘要本论文首先对昆明理工大学津桥学院空港校区场地的工程地质、水文地质条件进行了详细论述和评价,通过对各种基坑围护结构形式的对比分析,选择放坡、混凝土挡土墙为学生会堂、行政办公楼基坑的支护方案,法学、经管系科楼进行放坡支护方案。
然后进行详尽的设计,包括对土压力、水压力、支护结构内力的计算,并进行稳定性验算(围护桩底地基承载力验算、抗渗验算、抗倾覆验算、整体圆弧滑动验算、板式围护桩强度验算)。
并含基坑开挖及支护的施工方案。
关键词:工程地质,水文地质,围护结构,土压力,水压力,围护桩,施工组织AbstractThe thesis firstly evaluates and concentrates on the hydrogeology and engineering geology conditions in detail for Wuxiandian in Pingyang. Comparing with various retaining and protection structure form of foundation pit,single strut system is chosen as the retaining and protection of foundation pit program.Then,the design is done in the thesis ,including soil pressure,water pressure and calculation of internal force of retaining andprotection,verifies the stability of foundation pit(check compatations of foundation bearing capacity at the bottom of surrounding pile,percolation and overturning resistance;check compatations of integral arc slip and the flat-slab type surrounding)Key words: hydrogeology and engineering geology;surrounding and protection structure;earth pressure;water pressure ;protection pile目录摘要 (Ⅰ)第一章绪论 (3)1.1基坑工程的现状和特点 (4)1.2基坑开挖的支护结构 (3)1.3拟建场地工程概况 (5)第二章场地工程地质条件 (7)2.1地形地貌特征 (7)2.2场地地层岩性构成及相关物理力学参数 (10)2.3场地水文地质条件 (11)2.4特殊性土及不良地质作用 (11)2.4.1特殊性土 (11)2.4.2 不良地质作用 (12)2.4.3对特殊土及不良地质作用的处理建议 (14)2.5岩土工程分析评价 (15)2.5.1地基土工程性质评价 (15)2.5.2地基土均匀性评价 (15)2.5.3地震效应评价 (16)2.5.4土对建筑材料及金属的腐蚀性评价 (17)第三章基坑工程评价及结论 (18)3.1基坑安全等级划分 (18)3.2基坑侧壁稳定性评价 (19)3.3结论与建议 (19)第四章基坑开挖支护方案设计 (21)4.1支护方案对比分析 (21)4.2支护方案选型 (22)4.2.1支护方案 (22)4.2.2方案的比较及确定 (25)4.2.3支护方案的选择 (25)4.3支护方案总结 (26)4.4支护方案分析与计算 (27)4.4.1重力式挡土墙计算 (27)4.4.1.1基本参数选取 (27)4.4.1.2土压力计算 (31)4.4.1.3各组合最不利结果 (40)4.4.2施工监测 (44)第五章施工组织设计 (45)5.1整体布局 (45)5.2开挖方案 (47)5.2.1施工准备工作 (47)5.2.2场地平整 (48)5.2.3土方开挖 (49)5.4边坡施工注意事项 (52)结论 (53)结束语 (55)参考文献 (56)致谢 (57)第一章绪论1.1基坑工程的现状和特点我国城市化的不断发展,导致城市人口膨胀,建筑空间日趋拥挤,可利用土地资源日益紧张。
基坑支护技术论文
基坑支护技术论文基坑支护是现代建筑施工的重要环节,在建筑工程施工的过程中,场地整平工程完成之后需要进行的工作就是基坑的开挖。
下面是店铺整理了基坑支护技术论文,有兴趣的亲可以来阅读一下!基坑支护技术论文篇一基坑支护技术浅析摘要:基坑开挖期间,地下水控制也属于基坑支护的一部分,地下水控制方法可分为集水明排、降水、截水和回灌等型式单独或组合使用。
当基坑开挖采用放坡无法保证施工安全或场地无放坡条件时,一般采用支护结构临时支撑,以保证基坑施工安全。
本文现就基坑支护技术做客观分析。
关键词:基坑支护技术土壁灌注桩基坑支护是现代建筑施工的重要环节,在建筑工程施工的过程中,场地整平工程完成之后需要进行的工作就是基坑的开挖。
在开挖周一前首先应当根据相关的规定和规程以及施工现场的具体地质水文情况进行分析和探讨,去顶其开挖的尺寸和边坡的稳定措施,进而计算土方工程量,然后现场放线、实施开挖最后验槽。
一、基槽的支撑方法基坑属于临时性工程,其作用是提供一个空间,使基础的砌筑作业得以按照设计所指定的位置进行。
开挖较窄的基槽时,常采用横撑式钢木支撑。
贴附于土壁上的挡土板,可水平铺设或垂直铺设,可断续铺设或连续铺设。
1、断续式水平支撑。
挡土板水平放置,中间留出间隔,并在两侧同时对称立竖枋木,再用工具式或木横撑上下顶紧。
适用于能保持立壁的干土或天然湿度的黏土类土,地下水很少,深度在3m以内。
2、连续式水平支撑。
挡土板水平连续放置,不留间隙,然后两侧同时对称竖枋木,上下各顶一根撑木,端头加木楔顶紧。
适用于较松散的干土或天然湿度的黏土类土,地下水很少,深度为3~5m。
3、连续或间断式垂直支撑。
挡土板垂直放置,连续或留适当间隙,然后每侧上下各水平顶一根枋木,再用横撑顶紧。
适用于土质较松散或湿度汉高的土,地下水较少,深度不限。
二、浅基坑的支撑方法开挖浅基坑时,采用的支撑方法有斜撑支撑和锚拉支撑。
1、斜撑支撑。
水平挡土板钉在柱桩内侧,柱桩外侧用斜撑支顶,斜撑底端支在木桩上,在挡土板内侧回填土。
基坑支护毕业论文设计
结论14
参考文献15
前言
基坑工程是我国当前地基基础领域一个重要的研究方向。基坑工程在二十世纪八十年代末才开始全面、深入地研究与工程实践,但随着我国建设事业的发展,城市的高层建筑大量涌现,极大的推动了深基坑工程设计理论和施工技术的不断发展,同时也产生了大量的深基坑支护设计与施工问题。
国内外大量工程实践表明,许多工程的最危险阶段不一定是在正常使用阶段,而是在建造阶段和老化阶段。对许多工程事故常常发生在施工阶段而言,其原因除了施工质量没有保证、施工方法发生了不合理的改变、人为错误等原因以外,重要原因之一是由于对环境、地质、荷载等因素认识不足而导致设计和施工中的某种失误和疏忽所致。
深基坑工程是与众多因素相关的综合技术,是一个系统的工程问题,必须具有结构力学、土力学、地基基础、地基处理、原位测试等多种学科知识,同时具有丰富的施工经验,并结合拟建场地的土质和周围环境情况,才能制定出因地制宜的支护结构方案和实施办法。它与场地工程勘察、支护结构设计、施工开挖、基坑稳定、降水、施工管理、现场监测、相邻场地施工相互影响等密切相关。基坑设计与施工涉及地质条件、岩土性质、场地环境、工程要求、气候变化、地下水动态、施工程序和方法等许多相关的复杂问题,是理论上尚待完善、成熟和发展的综合技术学科。如何根据场地工程性质、水文地质、环境条件制定合理的设计方案;如何在保证稳定性的前提条件下,设计最经济的方案,也是基坑比较重要的问题。因此在基坑工程设计与施工中,需要严谨、周密的分析与计算。
1.2
1.2.1
根据本次钻探揭露,拟建场地地基土的组成为:
土层号
1
2
3
4
5
6
7
8
9
名称
粉土
粉质粘土
深基坑支护论文(3篇)
深基坑支护论文(3篇)第一篇:论复杂条件深基坑支护综合施工技术【摘要】深圳某停车库综合楼项目场地狭窄,地下水丰富、地质条件复杂。
基础地下3层,基坑深14.2m。
该项目基坑施工周期长,基坑支护综合使用了旋挖咬合桩、旋挖灌注桩、三管旋喷桩、预应力锚索、钢管混凝土桩及内支撑等施工方式,使基坑支护与止水帷幕形成有机结合,通过优化基坑设计方案及施工措施,实现了基坑稳定及安全的目标。
【关键词】深基坑;地下水;基坑支护;施工1工程概况深圳某项目位于深圳南山区新中心商务区,项目包括地下室3层,楼高20层,高80m,基坑南侧为一加油站;西侧为学校运动场;北侧为市政道路;东侧为市政道路;基坑深14.2m(局部17.8m),施工现场场地狭窄。
2场地工程地质与水文地质条件项目场地地下水位较高,场地常年水位埋深3.75~4.20m,丰水期水位上升0.5~1.0m。
根据现场勘探,揭露地层自上而下为第四系人工素填土、人工素填砂、第四系海陆交互相淤泥质黏土、淤泥质砾砂、第四系冲洪积砾砂、第四系残积砾质黏土,支护桩施工均进入残积砾质黏土层。
3基坑支护设计方案1)根据地下水分布浅的特点,本工程基坑外地下水采用咬合桩﹑旋挖桩与三管旋喷桩作为止水帷幕封堵,基坑内部地下水采用疏干井与排水井明排。
2)本工程项目红线东、北侧紧邻道路红线,南侧红线与加油站红线重合,西侧红线与学校围墙红线重合,因此,基坑采用支护桩进行边坡支护:南侧采用准1200mm咬合桩(AB桩:A为素混凝土桩;B为钢筋混凝土桩)+双排内支撑;西侧、北侧、东侧采用准1200mm旋挖灌注桩+准1000mm三管旋喷桩+双排内支撑,灌注桩间距为1.8m;东南角采用准1200mm旋挖灌注桩+准1000mm三管旋喷桩+三排锚索张拉,整个支撑采用混合型;深基坑边坡支护工程安全等级为一级。
4方案优化设计及施工措施4.1支护桩优化设计本工程原设计为支护桩133根,其中南侧咬合桩42根(21根钢筋混凝土桩+21根素混凝土桩),其余向均为准*********支护桩,东侧、西侧与北侧为一道内支撑+二排锚索;东北角为三排锚索,无内支撑。
基坑支护计算范文
基坑支护计算范文基坑支护计算是在工程建设中常见的计算问题之一,它涉及到土木工程中基坑的支护设计与计算。
在建设过程中,为了保证基坑的稳定和安全,需要进行支护设计,并对支护结构进行合理的计算。
下面将详细介绍基坑支护计算的相关内容。
基坑支护计算的目的是确定基坑支护结构的数量和尺寸,以保证在施工过程中不发生基坑塌方或其他安全事故。
其基本原理是通过对土体和支护结构的力学特性进行研究,结合工程的实际情况和设计要求,确定合适的支护结构,并计算出所需的数量、尺寸和材料参数等。
1.土壤性质:土壤的类型、颗粒分布、含水量等是进行基坑支护计算的重要参数。
不同类型的土壤具有不同的力学性质,需要通过土壤试验和现场勘察获得相关参数。
2.基坑深度:基坑的深度是进行支护计算的基本参数之一,一般需要根据工程实际情况确定。
深度的增加会增加土体的压力,从而对支护结构提出更高的要求。
3.施工条件:施工条件对支护结构的设计和计算也有影响。
例如,施工期间是否存在地下水位变化、是否需要暂时性支护等都会对支护结构的计算产生影响。
基于以上因素,可以采用不同的支护结构来进行基坑支护。
常见的支护结构包括挡土墙、嵌岩锚杆、钢支撑等。
支护结构的计算需要考虑结构的刚度、强度和稳定性等因素,以满足工程的设计要求。
在具体的计算过程中,首先需要对土壤的力学特性进行测试和研究。
一般来说,可以通过进行原位试验、室内试验和现场勘察等方式获得相关数据。
然后,根据基坑的深度、土壤的性质和施工条件等进行初始设计,并对支护结构进行计算。
在计算中,需要考虑土壤的稳定性和支护结构的稳定性。
土壤的稳定性计算需要考虑土体的抗剪强度、土体重力等参数,以确定土壤的稳定状态。
支护结构的稳定性计算需要考虑结构的抗弯强度、抗压强度、抗剪强度等参数,并检查结构的稳定性。
在计算的过程中,可以采用各种力学理论和计算方法进行分析。
常见的方法包括弹性力学理论、塑性力学理论和有限元方法等。
根据计算结果,可以对设计进行调整和优化,以满足工程的要求。
基坑支护设计(毕业论文)
摘要近年来随着经济的发展,社会的进步,城市化进程的加快,高层建筑和市政工程大量涌现。
高层建筑的建造、大型市政设施的施工及大量地下空间的开发,必然会有大量的深基坑工程产生。
建筑物高度越高,其埋置深度也越深,相应的对基坑工程的要求也就越高。
深基坑支护结构的设计、施工、监测等是近年来经常遇到的技术难题。
深基坑支护不仅要求确保边坡的稳定,而且要满足变形控制要求,保证基坑内正常作业安全,而且要防止基坑及坑外土体移动,保证基坑附近建筑物、道路、管线的正常运行。
为了满足如今建筑物的支护,基坑工程也在朝更大、更深的要求迈进。
本设计主要是对某科技楼工程基坑支护结构进行设计,首先要确保周围建筑物、道路、管线等的正常安全使用,同时要求围护结构的稳定性好,沉降位移小。
设计主要采用的支护方式是钻孔灌注桩和土钉墙两种,同时,钻孔灌注桩采用的内支撑形成支护体系。
基坑降水主要在基坑周围设置降水井,采用集水明排法降水方案。
设计最后针对支护和降水方案,对基坑施工工艺及基坑监测进行了大致说明。
关键词:深基坑;钻孔灌注桩;土钉墙;降水;施工;监测AbstractIn recent years, with economic development , social progress , urbanization , and high-rise buildings and public works in large numbers . Construction , construction of large municipal facilities to develop high-rise buildings and a large underground space , there must be a lot of deep excavation produced . The higher the building height , the depth of its buried deeper , corresponding to the requirements of the higher excavation . Deep excavation structural design, construction , monitoring and other technical problems are often encountered in recent years . Deep excavation requires not only ensure the stability of the slope, but also to meet the requirements of distortion control , to ensure the normal operation of the pit safety , but also to prevent the soil pit and pit outside move to ensure pit near buildings, roads, pipelines normal operation. In order to meet today shoring, excavation of the building is also moving in a larger , deeper demands forward. This design is a science and technology building project excavation structure design, first make sure that the surrounding buildings , roads, pipelines and other normally safe to use , while retaining structure requires good stability , a small settlement displacement . Supporting manner designed primarily uses two bored and soil nail wall , while using the support form Bored supporting system . The main setting precipitation pit dewatering wells around the pit , using the method of precipitation scheme catchment next row . Finally, supporting the design and precipitation scheme of excavation pit monitor the construction process and were generally described.Keywords: deep excavation ; bored ; soil nail wall ; precipitation ; construction ; monitoring第1章前言 (3)1.1 基本技术要求 (4)1.1.1设计的基本技术要求 (4)1.1.2 施工的基本技术要求 (5)1.2基坑工程设计 (5)1.2.1设计依据 (5)1.2.2设计内容 (5)1.2.3计算理论 (6)1.3 本设计内容 (6)第2章设计方案的综合说明 (7)2.1概述 (7)2.1.1工程概况 (7)2.1.2环境条件概况 (7)2.1.3工程地质条件 (7)2.1.4地下水情况 (8)2.1.5基坑侧壁支护结构安全等级及重要性系数 (8)2.2 基坑支护方案 (8)2.2.1基坑支护方案选择的依据 (8)2.2.2基坑支护方案选择 (9)2.2.3 基坑支护方案说明 (10)2.3 地下水控制方案 (12)第3章基坑支护结构设计计算书 (13)3.1地质设计参数 (13)3.1.2 计算区段划分 (13)3.1.3计算方法 (14)3.1.4土压力系数计算 (14)3.2 ABCD段支护结构设计 (14)3.2.1土层分布 (14)3.2.2 土层侧向土压力计算主动土压力 (15)3.2.3土压力合力及作用点 (16)3.2.4嵌固深度的确定 (17) (18)3.2.5最大弯矩计算3.2.6稳定性验算 (20)3.2.7配筋计算 (21)3.2.8支撑结构设计计算 (23)3.3 BCFE段支护结构设计 (26)3.3.1土钉设计 (26)3.3.2稳定性验算 (32)3.3.3面层设计 (34)第4章地下水控制方案 (34)4.1 基坑降排水作用及方法 (34)4.2降水方法的依据 (34)4.3降水设计 (35)4.4基坑突涌稳定性验算 (37)第5章施工 (39)5.1基坑土方施工工艺及要求 (39)5.2钻孔灌注桩的施工工艺 (40)5.3冠梁施工工艺 (42)5.4内支撑施工工艺 (43)5.5土钉墙施工工艺 (45)第6章基坑施工监测 (48)6.1监测目的 (48)6.2监测要求 (49)6.3监测原则 (49)6.4基坑监测项目选择依据及监测内容 (49)6.5监测实施 (50)6.5.1周围环境的监测 (50)6.5.2支护桩位移与沉降监测 (50)6.5.3测量精度 (52)6.5.4仪器设备 (53)6.5.5测量周期 (53)6.5.6预警报告 (53)6.5.7信息反馈 (54)第7章电算 (55)7.1 AB段内支撑电算 (55)7.1.1 支护方案 (55)7.1.2 支护信息 (55)7.1.3设计结果 (58)7.1.4稳定性验算 (62)7.1.5 隆起量的计算 (65)7.1.6嵌固深度计算 (66)7.2土钉墙电算 (67)7.2.1设计项目: (67)7.2.2 设计结果 (69)7.2.3 喷射混凝土面层计算 (71)第8章翻译 (73)Reinforced Concrete (73)2.2 Earthwork (75)2.3 Safety of Structures (77)8.1钢筋混凝土 (80)8.2土方工程 (81)8.3结构的安全度 (82)致谢 (85)参考文献 (86)第1章前言随着经济的发展,人们生活水平的提高,人类对生活环境的要求越来越高,尤其在中国这样人口大国,人口基数比较大,增长的比较快。
深基坑的支护技术(论文)
深基坑支护技术摘要:改革开放以来,我国高层建筑发展迅速,目前发展的趋势和特点是层数增多,高度增高,并积极参与国际高层建筑的竞争。
迄今为止,我国已建成高层建筑累计超过2.8亿㎡,高度超过100m的超高层建筑已超过300多幢,高度超过200m的超高层建筑已达40余幢。
随着高层建筑的发展,伴随出现了深基础,基坑的深度主要取决于地下室层数,一般地下室的基坑深度大致为一(4~6)m;二层地下室的基坑深度为一(8~9)m;三层地下室的基坑深度为一(11~12)m;四层地下室的基坑深度为一(14~18)m,目前国内建筑最深的地下室基坑达到31m。
关键词:深基坑;支护结构设计;安全目录一、深坑基础的发展现状............................... 错误!未定义书签。
二、深基坑支护的方法 (2)(一)土钉支护技术 (2)(二)锚固支护技术 (3)(三)复合土钉支护技术 (5)(四)桩挡墙支护技术 (5)(五)逆作法 (6)三、深基坑支护工程技术的进步与展望 (7)参考文献 (7)一、深坑基础的发展现状深基坑支护工程是基础施工所必须的临时结构,深大基坑支护的施工造价与设计的合理紧密相关,合理的设计是影响整个工程施工进度与造价的关键所在。
深基坑的支护工程,采用何种支护方案,除了与基坑深度有直接关系外,更主要的是根据地层土质的好坏采用不同的支护方案。
基坑支护工程包含挡土、防水、降水、挖土等许多紧密联系的环节,如果其中某一环节失效,将会导致整个工程的失败。
在城市地区进行深基坑开挖支护,是当今土木工程最为复杂的领域之一,它不仅要保证基坑施工过程中的土体稳定,而且要严格限制周边的地层位移以确保四周环境的安全。
现代大城市的高层建筑基坑具有深、大的特点,挖深一般在15~20m之间,宽度与长度达100m以上。
基坑邻近多有建筑物、道路和管线,施工场地拥挤,在环境安全上又有很高要求,所以过去对基坑支护结构的选型比较单一,基本上均采用柱列式灌注桩挡墙或地下连续墙作为维护结构,当用明挖法施工时照例采用多道支承(多道内支承或多道背拉锚杆)。
基坑支护毕业论文
基坑支护毕业论文基坑支护毕业论文摘要:文章针对深圳湾填海区某大型地铁上盖综合体项目基坑支护设计过程中,面对毗邻三条地铁线路的复杂环境,结合建筑方案不稳定、开发品质高、销售计划紧的特点,在施工周期短、工程难度大的情况下,如何循序渐进地对基坑支护设计进行选型分析和演变优化,从而有效实现对周边地铁设施的保护,并取得良好的效果。
可为类似工程提供设计及管理方面的参考。
关键词:基坑支护;内支撑;建筑方案;工程策划;分区开挖;分坑桩基坑支护设计及项目整体开发策划对于每一个项目而言均具有非常重要的作用,它受制于多个方面,关乎着整个项目的开发销售计划和工程的顺利实施。
文章以深圳湾填海片区的地铁红树湾物业开发项目(即深湾汇云中心项目)基坑工程为例,重点介绍了临近地铁车站、隧道的超大深基坑在进行支护结构的设计选型时,除了保证自身的稳定和的同时,重点考虑注意事项,并主动适应业态复杂的大型地铁上盖综合体,在前期面对建筑方案调整、分期开挖、分期销售的整体开发需求,又可以控制地铁的位移变形,使其不超过相关规定。
1工程概况红树湾物业开发项目位于深圳湾南侧,东临深湾二路,南临白石四道,西临深湾一路,北临白石三道。
拟建项目用地面积约6.8万m2,为办公、酒店、公寓及大型商业功能的大型地铁上盖综合体项目,总建筑面积近60万m2;项目中间被配套的市政道路分为东西两区,东西区在地下相通;东区为4层地下室,其中地下一、二层与上部四层裙房形成一个近10万m2的大型购物中心,南侧9/11号线车站与北侧2号线下沉广场通过项目地下二层斜向联通实现站外换乘。
周边环境相对复杂,西南侧地下室边线距离地铁11号线隧道边线仅4.4~6.8m,南侧大部分(除西南侧)地下室边线紧贴9号线与11号线换乘车站;东北侧地下室边线距离地铁2号线隧道边线约7~28m,西北侧紧邻地铁2号线车站(局部位置紧邻下沉广场)。
该项目基坑东西长约320m、东西长约分别是190m/130m,平面形状大致呈较不规则的四边形,支护周长约980m,基坑开挖深度约为12.34~20.08m,基坑面积约5.4万m2,其余大部分占地为地铁车站共用,是典型的临近地铁的超大深基坑(见图1)。
毕业论文(深基坑支护技术研究)
毕业设计(论文)评语及成绩毕业设计(论文)任务书毕业设计(论文)开题报告深基坑支护技术研究Research on supporting technology of deep foundation pit2010届土木工程专业学号201001032学生姓名王鑫指导教师严任苗完成日期2014年8月20日摘要近年来,随着经济的发展,我国的各类地下工程的飞速发展,地下空间与地铁等日益受到人们的关注,与之相关的深基坑问题相继出现。
在施工过程中,怎样保证经济合理地处理好地基沉降和基坑支护等方面的问题在整个建筑工程中占有重要地位。
在基坑支护方面,地下连续墙及刚支撑由于施工振动小,噪音低,非常适于城市施工而得到广泛使用。
本次毕业论文的设计内容为深圳市7号线地铁车站基坑设计与分析。
设计内容包括土压力结构内力计算、基坑稳定性分析、支撑设计、基坑变形估算以及控制降水设计;设计中首先根据本基坑的勘查报告和基坑周围的环境情况对将要采取的方案做出初步的估计,然后根据相关规范要求对上述方案做出修改和优化。
降水井的设计包括井点类型的选择,井深,井径及基坑周围总井数的确定;支护结构设计包括支护结构的选型,边坡稳定性验算等以及在设计上部结构荷载作用下复合地基承载力和沉降量的验算。
设计中包括对所选择的降水井方案,支护结构方案及地下连续墙支护处理方案在具体施工过程中的各个工序的施工流程编制,每道工序在整个施工顺序中的合理安排,以及施工过程中应该注意的事项等。
为保证按期优质完工,必须合理的编制施工计划,并严格按照计划进行施工。
关键词:深基坑;地连墙;地铁;沉降;深基坑设ABSTRACTIn recent years, with economic development, China's rapid development of various types of underground construction, underground space and subway increasing people's attention, and its associated problems have appeared deep foundation. During the construction process, and how to ensure economic reasonably handle excavation foundation settlement and other issues in the entire building project occupies an important position. In the excavation, the underground continuous wall and just support the construction of small vibration, low noise, Ideal for urban construction and widely used.The thesis design content is the design and construction organization of Shenzhen Subway Line No. 7 station. Design elements include earth pressure force calculation structure, foundation stability analysis, support design, estimation and control precipitation pit deformation design; construction organizations, including the content of the above six aspects of the design of the specific implementation.The first design under this foundation pit surveys and environmental conditions around the programmed is to make preliminary estimates, based on relevant specifications and then make amendments to the above-mentioned programmed and optimization. Precipitation wells design including wells point type options, the determine of wells Depth, wells Drive and the total number of wells surrounding foundation pit; Supportstructural design including slope of the support structure of the models, slope stability, who checked the contents of a pile;and role in the design of complex load upper structure and the settlement of the foundation supporting who checked.Organizations include the construction of choice precipitation wells programmed, support structures and programmed underground diaphragm wall for dealing with composite concrete construction process in the various processes of the construction process to prepare each individual process in the entire construction reasonable sequence arrangement, and the matter to be paid attention to in the construction process. To ensure the quality completion on schedule, the preparation of construction plans must be reasonable and in strict accordance with the planned construction.Keywords:Deep Foundation; Underground; Subway; Settlement; Deep Foundation Design目录1 工程概况 (2)1.2水文地质工程地质条件 (1)1.2.1 车站工程地质层分布与特征描述 (1)1.2.2 水文地质条件 (3)1.2.3 不良地质现象 (4)2 支护方案的选择及比较 (5)2.1基坑支护的类型及其特点和适用范围 (5)2.1.1 深层搅拌水泥土围护墙 (5)2.1.2 土钉墙 (5)2.1.3 排桩支护 (6)2.1.4 槽钢钢板桩 (6)2.1.5 钻孔灌注桩 (6)2.1.6 钢板桩 (7)2.1.7 SMW工法 (7)2.1.8 地下连续墙 (7)2.2方案的比较及确定 (8)2.2.1 基坑的特点 (8)2.2.2 支护方案的选择 (9)3 土压力计算 (10)3.1荷载的确定 (10)3.2地下水对土压力的影响 (10)3.3按分层土计算土压力 (11)4 结构内力计算 (17)4.1计算理论的确定 (17)4.2结构内力计算及配筋 (17)4.2.1 土压力计算 (17)4.2.2 用等值梁法计算弯矩 (20)4.3地下连续墙的配筋计算 (31)5 基坑稳定性分析 (34)5.1基坑的整体稳定性验算 (34)5.2基坑的抗隆起稳定验算 (35)5.3基坑的抗渗流稳定性验算 (37)5.4基坑支护结构踢脚稳定性验算 (38)6 支撑设计 (40)6.1方案比较 (40)6.2围檩设计 (40)6.3支撑设计 (43)6.4立柱设计 (44)7 基坑变形估算及控制 (45)7.1概述 (45)7.2基坑的变形估算 (45)7.2.1 水平位移估算 (45)7.2.2 基坑隆起估算 (45)7.2.3 地表沉降估算 (46)8 降水设计 (47)8.1概述 (47)8.2降水的作用 (47)8.3降水方案选择 (48)8.3.1 降水施工方案 (48)8.3.2 降水的设计 (48)结论 (51)参考文献 (52)致谢 (53)石家庄铁道大学继续教育学院毕业论文1工程概况1.1 工程概况深圳市城市轨道交通7号线石厦站位于福民路中,东西布置,在石厦北二街交叉口与地铁3号线石厦站〃T〃型换乘。
毕业设计(论文)-深基坑支护结构设计
毕业设计(论文)-深基坑支护结构设计深基坑支护结构设计是在城市建设中常见的工程项目之一。
深基坑是为了进行地下工程而开挖的大型坑穴,例如地铁站、地下商场和地下停车场等。
由于地下土壤的压力和周围环境的限制,深基坑需要进行支护结构设计来确保施工的安全性和稳定性。
本论文的目标是设计一个有效的深基坑支护结构,以应对地下土壤的压力和变形,并确保施工期间及以后的稳定性。
主要研究内容包括以下几个方面:1. 地下土壤力学特性研究:分析地下土壤的物理性质和力学特性,包括土壤的分层结构、抗剪强度、压缩性和弹性模量等。
通过土壤试验和现场勘测,获取土壤参数,并进行合理的土体模型建立。
2. 基坑支护结构类型选择:在分析和比较不同的支护结构类型后,选择最适合的支护结构类型,例如钢支撑结构、混凝土护壁结构、地下连续墙或土钉支护等。
3. 支护结构设计:根据土壤力学参数以及基坑的深度和周围环境的要求,进行支护结构的设计。
包括支撑结构的定位、类型和尺寸的确定,以及支撑结构的布置和施工方法的规划。
4. 数值模拟和分析:利用计算机软件(如PLAXIS)进行支护结构的数值模拟和分析,评估结构的稳定性和变形情况。
通过不同设计方案的比较和优化,确定最佳的支护结构设计。
5. 施工监测与控制:在施工期间,进行支护结构施工的监测和控制,确保施工过程的安全性和质量。
包括对支撑结构的变形和应力的监测,以及必要时的调整和加固。
通过以上的研究内容,可以得出一个完整的深基坑支护结构设计方案,并通过数值模拟和实际施工监测验证设计的可行性和有效性。
最终的目标是为城市建设提供一个可靠和经济的深基坑支护结构设计方案,确保施工的安全性和顺利进行。
建筑基坑论文支护施工论文
建筑基坑论文支护施工论文摘要:基坑支护是进行基础施工的重要工程,在具体的设计与施工中应考虑全面,精确施工,进一步确保施工与建筑的使用安全。
前言由于我国高层建筑的迅猛发展,基坑支护技术得到了广泛的应用,是保证高层建筑物质量的一项必不可少的技术,但是由于场地条件的制约,基坑支护技术在实际应用中存在着很多问题,技术人员对这些问题进行了深入的分析讨论,积极吸取了国外的先进经验,提出了改进技术的措施,使得基坑支护技术发挥了它最大的功效,提升了建筑工程的稳定性和安全性,稳固了高层建筑的地基,保证了高层建筑物的质量。
1.基坑支护施工技术概述所谓的基坑支护施工技术就是在建筑工程进行的过程中,为了有效的保证建筑主体的稳定性,同时不受到周围其他环境的影响,采用土方开挖技术,对建筑的地基进行改进和完善。
在采用基坑支护的过程中,涉及到的机械设备类型和数量比较多。
需要在保证建筑稳定性的同时做好建筑的防水工作。
这也是基坑支护施工技术的重要作用。
从建筑工程的建设中可以看出,基坑支护施工技术是一项系统性相对较强,难度也相对比较大的建筑工程。
所以,对工作人员的技术掌握水平和实际的操作能力提出了较高的要求。
2.基坑支护类型基坑支护的方法有很多,不同的支护方法效果也不同。
大多数基坑支护类型的选择都有其特定的依据,一般根据基坑周边环境,开挖深度、地下水排放、施工作业设备和施工季节等条件选择。
目前我国常见的基坑支护类型有:挡墙支护、桩排支护、深层搅拌水泥桩支护、钢板桩支护、地下连续墙支护、锚杆支护、钻孔灌装支护、放坡支护等。
要根据实际施工情况,进行科学选择。
3.建筑工程基坑支护的原则和要求3.1基坑支护的基本原则基坑边坡的支护要以“分层开挖、先撑后挖、快挖快撑、减少无支撑”为原则,达到“安全、合理、经济、便于施工,同时保证施工周期较短”的目标。
应结合工程周围地质、环境、挖深等诸多因素,在力求经济的同时,还要注意信息的反馈,进行动态设计。
基坑支护毕业论文
基坑支护毕业论文基坑支护毕业论文一、引言基坑支护是土木工程领域中的一个重要课题,它涉及到建筑施工中的基础工程问题。
基坑支护的设计和施工对于保证建筑物的稳定性和安全性至关重要。
本文将探讨基坑支护的相关理论和实践,并分析其在现代建筑工程中的应用。
二、基坑支护的概念和分类基坑支护是指在建筑施工过程中,为了保证基坑的稳定和安全,采取一系列措施来防止土体塌方和基坑坍塌。
基坑支护可以分为主动支护和被动支护两种类型。
主动支护包括钢支撑、混凝土搅拌桩、土钉墙等,它们通过对土体施加外力或刚性约束来保持基坑的稳定。
被动支护则是利用土体的内聚力和摩擦力来保持基坑的稳定,如土壤钉、挡土墙等。
三、基坑支护的设计原则1. 安全性原则:基坑支护设计必须保证施工过程中的安全,防止土体塌方和基坑坍塌。
2. 经济性原则:基坑支护设计应尽可能减少成本,提高施工效率,同时满足工程质量要求。
3. 可行性原则:基坑支护设计必须考虑实际施工条件和土体力学特性,确保设计方案可行。
四、基坑支护的施工技术1. 钢支撑技术:钢支撑是一种常用的基坑支护方法,它通过钢材的刚性和强度来支撑土体。
钢支撑的施工过程包括支撑杆的安装、支撑架的搭建和加固等。
2. 混凝土搅拌桩技术:混凝土搅拌桩是一种主动支护方法,它通过在土体中打入混凝土桩来提高土体的强度和稳定性。
混凝土搅拌桩的施工过程包括桩孔的钻探、搅拌桩的浇筑和固结等。
3. 土钉墙技术:土钉墙是一种被动支护方法,它通过在土体中安装土钉来增加土体的内聚力和摩擦力。
土钉墙的施工过程包括土钉的钻孔、锚固和喷浆等。
五、基坑支护的应用案例1. 某高层建筑施工中的基坑支护:该案例中,采用了钢支撑和混凝土搅拌桩相结合的支护方案。
通过钢支撑对土体进行刚性约束,再利用混凝土搅拌桩提高土体的强度和稳定性,成功保证了基坑的安全施工。
2. 某地铁工程中的基坑支护:该案例中,采用了土钉墙和挡土墙相结合的支护方案。
通过土钉墙增加土体的内聚力和摩擦力,再利用挡土墙对土体进行被动支护,成功保证了基坑的稳定性和安全性。
基坑围护毕业设计计算书论文
作者签名:日期: 年 月 日
导师签名: 日期: 年 月 日
注意事项
1.设计(论文)的内容包括:
1)封面(按教务处制定的标准封面格式制作)
2)原创性声明
3)中文摘要(300字左右)、关键词
4)外文摘要、关键词
5)目次页(附件不统一编入)
6)论文主体部分:引言(或绪论)、正文、结论
作 者 签 名:日 期:
指导教师签名:日 期:
使用授权说明
本人完全了解大学关于收集、保存、使用毕业设计(论文)的规定,即:按照学校要求提交毕业设计(论文)的印刷本和电子版本;学校有权保存毕业设计(论文)的印刷本和电子版,并提供目录检索与阅览服务;学校可以采用影印、缩印、数字化或其它复制手段保存论文;在不以赢利为目的前提下,学校可以公布论文的部分或全部内容。
关键词:深基坑;桩锚支护;基坑稳定性;止水帷幕;基坑降水
Abstract
The project is located in the middle of plains areas. The terrain is relatively flat. Except for the upper miscellaneous fill, the lower mostly layered silt, silty soil and clay soil. The foundation pit surrounded by urban roads and buildings that have been built. The area is rich in groundwater and the water permeability of silt and mucky soil is better. So it is necessary to use the vertical waterproof curtain. The design uses two forms of support structure combined with the surrounding environment and with reference to other construction cases. The north and south sides of the foundation pit is far away from the red line. So the Pile - anchor Support is used that is single row pilesingle tag anchor support;Due to the limitations of space, double row piles support is used on east and west sides. Eement deep mixing method is used to develop waterproof curtain. It plays a role in waterstop, but also enhance the support capability of support piles when the deep mixing cement piles link in the middle of twoadjacent soldier piles 200mmwhich forming a sealed seal waterstop.
深基坑支护毕业论文设计毕业论文设计
安徽工业大学毕业设计(论文)任务书课题名称马鞍山xxS2地块3#楼深基坑支护及施工组织设计学院建筑工程学院专业班级姓名学号毕业设计(论文)的主要内容:●本次毕业论文(设计)内容主要是对马鞍山xxS2地块3#楼深基坑支护及施工组织进行设计。
通过调研,资料查阅,完成在指定的地下室的支护工程设计,设计阶段为施工图设计。
●进行支护方案比选、基坑土体计算参数选取、土压力计算分析、抗力计算分析、支护结构内力计算分析、支护工程平面设计、分区支护断面设计、支护结构构件设计、施工组织设计等设计工作,了解并掌握深基坑支护设计的基本过程及计算方法、施工组织方法。
●对支护工程进行设计概算的编制,掌握工程概算的编制过程。
绘制工程图纸10张A3以上,写出设计说明书,培养计算机应用能力。
起止时间:年月日至月日共周指导教师签字系主任签字院长签字填写说明:"任务书"封面请用鼠标点中各栏目横线后将信息填入,字体设定为楷体-GB2312、四号字;在填写毕业设计(论文)内容时字体设定为宋体、小四号字。
马鞍山xx世际花园S2地块3#楼深基坑工程支护及施工组织设计内容摘要拟建工程安徽马鞍山市xx·xx(S2地块)工程位于马鞍山市xx以西,拟建桥山路以北S2地块内,总建筑面积为170000m2。
±,基坑南北向长40m,东西向宽35m,开挖深度。
结合本工程地质、环境、挖深等诸多因素确定安全可靠的支护方案;为考虑到邻近坑边有建筑和道路(下设有水、电、气等管线),为确保安全,以“变形”控制设计。
本着“安全可靠、经济合理、技术可行、施工方便”原则,整个基坑采用一排钻孔灌注桩作挡土结构, 锚杆支撑作为支撑结构体系。
基坑采用双轴深层搅拌桩作止水帷幕。
关键词:深基坑支护结构锚杆支撑钻孔灌注桩Oriental Pearl Garden, Ma an Shan Sai International, Building 3, Block S2 support deep foundation engineering and construction organization designabstractPlans to construct the project Anhui Ma'anshan oriental pearl* the century garden (the S2 land parcel) the project located at the Ma'anshan kind lake waterway west, plans to construct north of the bridge mountain road in the S2 land parcel, the total floor space is 170000m ². ±0.00 is equal to absolute level , the north and south to long 40m, the thing to extends 35m, cutting depth .Unifies this engineering geology, the environment, the sump and so on many factor determination safe reliable supports and protections plan; In order to consider nearby the neighbor pit and the path (next is equipped with pipelines and so on water, electricity, gas), to ensure the security, by “distortion” control design.The spirit of "safe, reliable, economical, technically feasible and convenient construction" principle, the entire pit with a row of bored piles for retaining structures, anchor support system as a support structure.Foundation for using biaxial waterproof curtain of deep mixing piles.Key words: Foundation pit; Bracing structure;Anchor rod support Nondisplacement pile目录内容摘要 (2)目录 (4)文献综述 (7)第一章设计方案综合说明 (12)1.1 概述 (12)1.1.1 工程概况 (12)1.1.2 场地地形、地貌及地质构造概况 (12)1.1.3 场地内各岩土层的分布、性质 (13)1.1.4 场地地下水概况 (13)1.1.5 基坑侧壁安全等级及重要性系数 (13)1.2 设计总说明 (13)1.2.1 设计依据 (13)1.2.2 支护结构方案比较与选取 (14)1.3 基坑监测 (20)第二章基坑支护结构设计计算书 (21)2.1 设计计算 (21)2.1.1 地质计算参数 (21)2.1.2 计算区段的划分 (21)2.1.3 计算方法 (21)2.1.4 土压力计算 (21)2.3 AB .BC段支护结构设计计算 (23)2.2.1 侧向土压力计算 (24)2.2.2 等值梁计算桩的嵌固深度: (25)2.2.3 配筋计算 (26)2.2.4 锚杆设计 (26)2.2.5 整体稳定性验算 (27)2.2.6 抗倾覆稳定性验算 (28)2.2.7 抗隆起验算 (28)2.2.8 抗管涌验算 (30)2.2.9 变形验算 (30)2.3 CD .AD段支护结构设计计算 (31)2.3.2 等值梁计算桩的嵌固深度: (33)2.3.3 配筋计算 (34)2.3.4 锚杆设计 (35)2.3.5 整体稳定性验算 (35)2.3.6 抗倾覆稳定性验算 (37)2.3.7 抗隆起验算 (37)2.3.8 抗管涌验算 (38)2.变形验算 (39)2.4 圈梁设计计算 (40)段圈梁设计计算 (40)正截面强度计算 (40)2.4.1.2 斜截面强度计算 (40)2.4.2 DA.CD 段圈梁设计计算 (40)正截面强度计算 (40)2.4.2.2 斜截面强度计算 (40)段基坑止水设计 (41)2.5.1 止水桩长确定 (41)2.5.2 基坑止水帷幕设计 (41)段基坑止水设计 (41)2.6.1 止水桩长确定 (41)基坑止水帷幕设计 (41)2.7 基坑监测方案 (41)2.7.1 基坑及周围环境的监测、测试 (41)2.7.2 监测与测试的控制要求: (42)2.7.3 观测频率 (42)第三章施工组织设计 (43)3.1 工程概况 (43)3.1.1 工程概况 (43)3.1.2 现场施工条件 (43)3.1.3 施工主要特点 (43)3.2 施工部署 (43)3.2.1 现场总平面布置 (43)施工指导思想与组织机构 (44)主要施工顺序 (45)3.3 施工准备工作和各项资源需要量计划 (45)施工现场准备工作 (45)技术准备工作 (46)3.3.3 材料、设备准备工作 (46)3.3.4 劳动力组织准备 (47)3.3.5 机械配置计划 (47)3.4 主要工程项目施工 (48)3.4.1 测量放线 (48)3.4.2 双层搅拌桩与钻孔灌注桩施工 (49)3.4.3 土方开挖 (52)3.4.4 锚杆(预应力) (52)3.4.5 冠梁施工工艺流程图 (53)3.4.6 护坡观测方案 (53)3.5 施工进度计划 (53)3.6 临时施工用电组织计划 (54)3.7 保证安全措施 (55)3.8 保证质量措施 (57)3.8.1 质量目标 (57)3.8.2 质量要求 (57)3.8.3 质量技术措施 (57)3.9 保证工期措施 (57)3.9.1 组织管理措施 (57)3.9.2 技术措施 (58)3.9.3 机械设备措施 (58)3.10 雨季施工措施 (58)3.11 文明施工 (59)工程费用概算 (61)英文翻译 (64)致谢 (81)参考文献 (82)文献综述1.1 基坑含义与土方开挖在建造埋置深度较大的基础或地下工程时,往往需要进行较深的土方挖。
深基坑支护毕业论文
深基坑支护毕业论文支护是指在土方工程中为防止地面沉降、地表变形等不利因素的产生而采用的一系列措施。
在城市建设中,深基坑是一种常见的工程形式,由于其开挖深度较大,土体抗力较弱,因此需要采取相应的支护措施。
本文将从深基坑支护的概念、支护结构设计、支护施工方案、支护效果评价等方面进行介绍。
一、深基坑支护的概念深基坑支护是指在土方工程中,为保障基坑在开挖、施工期间的安全性和降低对外部环境的影响,采取的一系列技术措施。
该措施的目的是为了阻止岩土层的土体受力体系在开挖、施工、使用等各阶段发生变形、松动和破坏,并且防止水和外部环境的入侵。
二、支护结构设计深基坑支护结构的设计需要考虑的因素很多,主要包括基坑的尺寸、土质、水位、周围建筑物、周边道路、管线以及地下设施等。
设计支护结构需要确定以下几个要素:1.支撑形式及类型:支撑形式有水平支撑和垂直支撑两种类型,水平支撑多用于基坑较浅的情况下,垂直支撑一般用于基坑深度较大的情况下。
2.支护材料:常用的支护材料有桩、钢筋混凝土板、钢构架、钢板桩等。
支护材料的选择应该根据开挖深度、土体性质、平面布置、施工条件等多方面因素而定。
3.支护方式的选择:包括锚杆支护、桩支撑、钢板桩支撑、钢构支撑等。
锚杆支护适用于开挖较小的基坑;桩支撑适合开挖大于5m深度的基坑;钢板桩用于开挖深度达到15m以上;钢构支撑适用于基坑开挖深度较大,而且土质较松散的情况。
三、支护施工方案1.支护前准备工作:确认现场地质条件及其他相关情况,制定支护安全措施、施工计划及各种手段和设备。
2.钢筋混凝土板的制作:准备模板、钢筋、混凝土等材料进行制作,符合设计要求后进行运输、爬模及吊装等工作。
3.支撑安装:先进行斜撑与端头的安装,然后连接水平支撑及钢板桩的安装,再按设计要求将垂直支撑加固。
4.支撑调整:调整支撑的平直度及垂直度,以使之符合设计要求。
5.支撑加固:加固基坑支撑的脆弱部位,以提高支撑的稳定性。
四、支护效果评价支护施工完成后,需要对支护效果进行评价,可从支护结构的刚度、变形、震动、应力等方面考虑。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
基坑支护计算毕业论文第1章设计背景、资料和要求1.1设计背景本设计位于市青山区团结大街北侧,南临九星电子大楼,北接自来水公司,建筑物西侧为富强路,南北侧临近均有建筑物,以均布荷载考虑,荷载为80kPa 和100kPa,,间距与平面详图见图1。
总建筑面积约为10000平方米,层数为地上8层,地下2层。
围护结构不是主体结构的一部分,基坑周围有管线、道路及树木需要加以保护,但不需严加保护,故基坑工程等级可定为二级。
建筑防火等级为二级;建筑耐火等级为二级,耐久年限二级。
图1 建筑平面布置图1.2设计资料1.2.1气象资料:1.冬季采暖室外计算温度-19℃,夏季室外计算温度33.4℃;2.室计算温度:卫生间、楼梯间和大厅16℃,其他房间18℃;3.日最大降雨量为100.8mm,月最大降雨量为229.2mm,年最大降雨量为673.4mm,年平均降雨日数:91.3天;4.夏季主导风向为东南风,冬季为北风,最大风速25m/s,基本风压0.55KN/m2;5.最大积雪深度210mm,基本雪压S0=0.45KN/m2。
6.冬季相对湿度为55℅,夏季相对湿度为40℅。
1.2.2工程地质水文地质概况本工程场区地形较为平坦。
地层除表层人工填土外,其下为第四纪冲洪积成因的粘性土、粉土、砂类土层。
该场地土类型为中软型土,建筑场地类别为III类,无影响建筑物稳定性的不良地质作用。
场区土层在水平方向的分布比较均匀,成层性好,无软弱土层存在,建筑场地的地基土为均匀地基。
地基土层岩性特征和物理力学参数见以下两表。
场区地下水分两层,上层滞水静止水位 4.50~13.80m,含水层主要为粘质粉土②层,补给来源主要为大气降水;层间水静止水位埋深8.60~14.00m。
含水层主要为细砂⑤层,补给来源主要是地下径流及越流补给;微承压水主要含水层为中砂⑦层,静止水位埋深约20m。
地下水对砼及钢筋砼中钢筋均无腐蚀性。
由于基坑深8m,基底位于水位以上,不需采取降水和护坡措施。
表1 地层岩性特征表2土层物理力学性质参数1.3设计要求1.层高:1层为4.5m,2-8层为3.3m(层高满足建筑功能要求可自定,要求不同设计存在不同)。
设客梯两部 Q=lt(15人)速度1m/s。
2.平面形式:平面“一”字形或自定(应满足结构计算要求),建筑平面可以小于拟建场地,但不得超出场地面积。
3.基础埋深根据地质条件自定,筏板或箱形组合基础,2层地下室,地下室兼做车库。
第2章土钉墙支护计算2.1土钉支护技术2.1.1土钉支护的概念土钉支护亦称锚喷支护,就是逐层开挖基坑,逐层布置排列较密的土钉(钢筋),强化边坡土体,并在坡面铺设钢筋网,喷射混凝土。
相应的支护体称为土钉墙,它由被加固的土体、放置在土体中的土钉与喷射混凝土面板三个紧密结合的部分组成。
土钉是其最主要的构件,英文名叫Soil Nailing,它的设置有打入法,旋入法,以及先钻孔、后置入、再灌浆三种方法。
2.1.2土钉支护的特点与其它支护类型相比,土钉支护具有以下一些特点或优点:1.土钉与土体共同形成了一个复合体,土体是支护结构不可分割的部分。
从而合理的利用了土体的自承能力。
2.结构轻柔,有良好的延性和抗震性。
3.施工设备简单。
土钉的制作与成孔、喷射混凝土面层都不需要复杂的技术和大型机具。
4.施工占用场地少。
需要堆放的材料设备少。
5.对周围环境的干扰小。
没有打桩或钻孔机械的轰隆声,也没有地下连续墙施工时污浊的泥浆。
6.土钉支护是边开挖边支护,流水作业,不占独立工期,施工快捷。
7.工程造价低,经济效益好,国外资料表明,土钉支护的工程造价能够比其它支护低1/2~1/3。
8.容易实现动态设计和信息化施工。
2.1.3土钉支护的适用围土钉支护适用于:地下水位以上或经人工降水措施后的杂填土、普通粘土或弱胶结的砂土的基坑支护或边坡加固。
一般可用于标准贯入基数N值在5以上的砂质土与N值在3以上的粘性土。
单独的土钉墙宜用于深度不大于12m的基坑支护或边坡维护,当土钉墙与放坡开挖、土层锚杆联合使用时,深度可以进一步加大。
土钉支护不宜用于含水丰富的粉细砂岩、砂砾卵石层和淤泥质土。
不得用于没有自稳能力的淤泥和饱和软弱土层。
2.1.4土钉的作用机理土钉在复合土体中有个整体以下几种作用机理:1.箍束骨架作用:该作用是由于土钉本身的刚度和强度,以及它在土体分布的空间所决定的。
它在复合土体中起骨架作用,使复合土体构成一个整体,从而约束土体的变形和破坏。
2.分担作用:在复合土体,土钉与土体共同承担外荷载和自重应力,土钉起着分担作用。
由于土钉有很高的抗拉、抗剪强度和土体无法相比的抗弯刚度,所以在土体进入塑性状态后,应力逐渐向土钉转移。
当土体发生开裂后,土钉的分担作用更为突出,这时土钉出现了弯剪、拉剪等复合应力,从而导致土钉中的浆体碎裂、钢筋屈服。
土钉墙之所以能够延迟塑性变形,并表现出渐进性开裂,与土钉的分担作用是密切相关的。
3.应力传递与扩散作用:当荷载增加到一定程度,边坡表面和部裂缝已发展到一定宽度,边坡应力达最大。
此时,下部土钉位于滑裂区域以外土体中的部分仍然能够提供较大的抗力。
土钉通过它的应力传递作用可将滑裂区域的应力传递到后面稳定的土体中,分布在较大围的土体,降低应力集中程度。
4.对坡面变形的约束作用:在坡面上设置的与土钉连在一起的钢筋网喷射混凝土面板使发挥土钉有效作用的重要组成部分。
喷射混凝土面板对坡面变形起到约束作用,面板的约束力取决于土钉表面与土之间的摩阻力,当复合土体开裂面区域扩大并连成片时,摩阻力主要来自开裂区域后的稳定复合土体。
2.1.5土钉支护设计1.确定土钉墙结构尺寸(1)在初步设计时,应先根据基坑环境条件和工程地质资料,确定土钉墙的适用性,然后确定土钉墙的结构尺寸,土钉墙高度由工程开挖深度决定,开挖面坡度可取60°~90°,在条件许可时,尽可能降低坡面坡度。
(2)土钉墙均是分层分段施工,每层开挖的最大高度取决于该土体可以自然站立而不破坏的能力。
在砂性土中,每层开挖高度一般为0.5~2.0m ,在粘性土中可以增大一些。
开挖高度一般与土钉竖向间距相同,常用1.0~1.5m ;每层单次开挖的纵向长度,取决于土体维持稳定的最长时间和施工流程的相互衔接,一般多用10m 长。
2. 参数设计土钉参数设计主要包括土钉长度、间距、布置、孔径和钢筋直径等。
(1) 土钉长度在实际工程中,土钉长度L 常采用坡面垂直高度H 的60%~70%。
土钉一般下斜,与水平面的夹角宜为5°~20°。
研究表明:对钻孔注浆型土钉,用于粒状土陡坡加固时,L/H 一般为0.5~0.8;对打入型土钉,用于加固粒状土陡坡时,其长度比一般为0.5~0.6.99规程要求L/H 一般为0.5~1.2。
其实,在只有饱和软土中才会取L/H 大于1。
(2) 土钉直径及间距土钉直径D 一般由施工方法确定。
打入的钢筋土钉一般为16~32mm ,常是25mm ,打入钢管一般是50mm ;人工成孔时,孔径一般为70~120mm ,机械成孔时,孔径一般为100~150mm 。
土钉间距包括水平间距(列距)x S 和垂直间距(行距)y S ,其数值对土钉墙的整体作用效果有重要影响,大小宜为1~2m 。
对于钻孔注浆土钉,可按6~12倍土钉直径D 选定土钉行距和列距,且宜满足:L D K S S y x ⋅⋅=⋅式中:K —注浆工艺系数,一次压力注浆,K=1.5~2.5; D 、L —土钉直径和长度,m ;x S 、y S —土钉水平间距和垂直间距,m 。
2.2支护方案选择本工程场区土层在水平方向的分布比较均匀,成层性好,无软弱土层存在,建筑场地的地基土为均匀地基。
基坑开挖深度位于地下水位以上,不需考虑降水和护坡措施,符合土钉墙支护条件,故选择土钉墙作为基坑支护方式。
2.3右侧土钉墙计算2.3.1土压力计算及土钉布置由设计任务书得基坑开挖深度为8m ,穿越三个土层,具体如图2.1所示,地面均布荷载为80 kPa ,开挖深度位于地下水位以上,故不用考虑降水。
1.主动土压力计算()a a a K c K h q 2-+=γσq —地面荷载(kN );γ—土的重度(3m kN );c —土层粘聚力(kPa )a K —主动土压力系数,)245(tan 02ϕ-=a K ,ϕ为土层摩擦角。
图2.1土层分布图1ϕ=018,c=0,528.021845tan 245tan 002021=⎪⎪⎭⎫ ⎝⎛-=⎪⎭⎫ ⎝⎛-=ϕa K592.0,351.027.2845tan ,2.15,7.282002202==⎪⎪⎭⎫ ⎝⎛-===a a a K K kP c ϕ740.0,548.021745tan ,20,17300233==⎪⎪⎭⎫⎝⎛-===a a a K K kP c ϕ各层土压力计算: 填土表面处的土压力a a a kP qK 24.42528.0800=⨯==σ 素填土底面土压力()()a a a kP K h q 97.56528.055.118801111=⨯⨯+=+=γσ 粘质粉土顶面土压力()()a a a a kP K c K h q 88.19592.02.152351.055.1188022211,1=⨯⨯-⨯⨯+=-+=γσ粘质粉土底面土压力()22221122a a a K c K h h q -++=γγσ=()592.02.152351.010.56.1955.11880⨯⨯-⨯⨯+⨯+ =a kP 96.54 粉质粘土顶层土压力()3332211,22a a a K c K h h q -++=γγσ()740.0202548.010.56.1955.11880⨯⨯-⨯⨯+⨯+= =a kP 31.84 粉质粘土底层土压力()333,33221132a a a K c K h h h q -+++=γγγσ=()740.0202548.035.19.1910.56.1955.11880⨯⨯-⨯⨯+⨯+⨯+ =a kP 03.99 2.土钉参数及布置土钉墙水平倾角为03.73,即按1:0.3放坡,土钉与水平面的倾角α取015,土钉竖直间距取m s y 3.1=,水平间距取m s x 6.1=,机械成孔,取孔径130㎜。
具体见图2.2。
土钉处主动土压力计算: 第1点最大主动土压力()111,1112a a a K c K h q e -+=γ ()0528.085.01880-⨯⨯+=a kP 32.50=第2点最大主动土压力 图2.2右侧土钉墙土钉布置()222,221122a a a K c K h h q e -++=γγ()592.02.152351.06.06.1955.11880⨯⨯-⨯⨯+⨯+=a kP 00.24= 第3点最大主动土压力()222221132,,a a a K c K h h q e -++=γγ()592.02.152351.09.16.1955.11880⨯⨯-⨯⨯+⨯+= a kP 94.32=第4点最大主动土压力222221132,,,a a a K c K h h q e -⎪⎭⎫ ⎝⎛++=γγ ()592.02.152351.02.36.1955.11880⨯⨯-⨯⨯+⨯+= a kP 89.41=第5点最大主动土压力222221132,,,a a a K c K h h q e -⎪⎭⎫ ⎝⎛++=γγ ()592.02.152351.05.46.1955.11880⨯⨯-⨯⨯+⨯+=a kP 83.50=第6点最大主动土压力()333,33221132a a a K c K h h h q e -+++=γγγ()740.0202548.07.09.1910.56.1955.11880⨯⨯-⨯⨯+⨯+⨯+=a kP 94.91=2.3.2土钉设计1.折减系数计算 ⎪⎭⎫ ⎝⎛-⎥⎥⎥⎥⎦⎤⎢⎢⎢⎢⎣⎡-+-=245tan /tan 12tan 12tan 02k k k ϕβϕβϕβξ β-土钉墙坡面与水平面夹角,为03.73(坡度1:0.3)。