FAI_Training_For_First Article Inspection AS9102
英文图纸常用词汇
SPC=Statistical Process Control(统计过程控制)FAI=First Artical Inspection(首件检测)TOOL/EQUIP:生产工具SUPPLIER:供应商GAUGE:检验量具PRCS PROC:PKB/LABEL:包装/标识INSP/TEST:检测,如果是铸件图纸的话,我想主要是指各种无损检测,XT,UT,MT,及渗压试验等。
国外图纸中的一些实用翻译图纸中的一些实用翻译ALL WELDS CONTINUOUS UNLESS OTHERWISE STATED. 未注焊缝均为连续焊ALL WELDS 3mm FILLET UNLESS OTHERWISE STATED 未注焊角高3mm.ALL UNSPECIFIED RADI - R3 未注圆角R3REMOVE ALL BURRS AND SHARP EDGES 所有尖角/棱角倒角并去毛11 TOTAL COILS APROX.9 WORKING COILS APROX.RIGHT HAND WOUND ONLY,END COILS SQUARE TO TOUCH. 总圈数约11圈;工作圈数约9圈;右旋;弹簧的端部磨平以便于接触.(此为弹簧技术说明)CHANNEL 槽钢RSA 708 角钢70X70X8M30X1.5 pitch M30X1.5的锥螺纹Tackweld 点焊OD 1/4" outside dimension 1/4"的缩写外径直1/4"75 CRS 尺寸为75 材质为冷轧钢板410 OPENING REF 410 开口参考尺寸40 REF 尺寸为40,参考值2.5" BSP 2.5” 圆锥管螺纹2.5" BSPT HEXAGON 2.5” 六角圆锥管螺纹(即对丝)30x2.5 FLAT BAR 30X2.5 扁钢TYP 2 POSNS 2处FEMALE: 内扣(母扣)MALE: 外扣(公扣)偏心轴eccentric shaft销轴PIN开口销COTTER PIN螺杆screw轴承axletree挡圈closing ring弹性挡圈circlip弹簧SPRING紧定螺钉SET SCREW圆螺母ROUND NUT平键FLAT KEY圆螺母ROUND NUT六角螺栓HEX HD BOLT无扣长non-buckle longth平垫圈FLAT WASHER螺母FULL NYLOCK NUT吊环螺钉LIFTING EYE BOLT内六角螺钉SOCKET HEAD CAP SCREW六角螺钉HEX HD SETSCREW轴承隔套distance sleeve of axletree深沟球轴承DEEP GROOVE BALL BEARING 开槽盘头螺钉SLOTTED PAN HEAD SCREW 圆锥滚子轴承TAPERED ROLLER BEARING 推力球轴承THRUST BALL BEARING弹簧垫圈SINGLE COIL SPRING WASHER缩写全称翻译ACCESS Accessory 附件ADJ Adjustable,Adjust 调整ADPT Adapter 使适应ADV Advance 提前AL Aluminum 铝ALLOW Allowance 允许ALT Alternate 改变ALY Alloy 合金AMT Amout 数量ANL Anneal 锻炼ANSL Amer Natl Stds InstituteAPPROX Approximate 大约ASME Amer Society of Mech Engrs ASSEM Assemble 装配ASSY Assembly 装配AUTH Authorized 授权的AUTO Automatic 自动的AUX Auxiliary 辅助的AVG Average 平均AWG American Wire GaugeBC Bolt Circle 螺栓圆周BET Between 之间BEV Bevel 斜角BHN Brinell Hardness Number布氏硬度值BLK Blank ,Block 空白B/NM Bill of Material 材料费BOT Bottom 底部BP or B/P Blueprint 蓝图BRG Bearing 轴承BRK Break 破裂BRKT Bracket 支架BRO Broach 钻孔BRS Brass 黄铜BRZ Bronze 青铜B&S Brown&Shape 棕色&形状BSC Basic 基本的BUSH Bushing 套管BWG Birmingham Wire GaugeC TO C Center-to-Center 中心到中心CAD Computer-Aided Drafting 电脑辅助设计CAM Computer-Aided MfgCAP Capacity 容量CAP SCR Cap Screw 螺帽CARB Carburize 使渗碳CBORE Counterbore 扩孔CCW Counter Clockwise 逆时针CDRILL CounerdrillCDS Cold-Drawn Steel缩写全称翻译EFF Effective 有效的ENCL Enclose,Enclosure 附上ENGR Engineer 工程师ENGRG Engineering 工程学EQLSP Equally Spaced 等距EQUIV Equivalent 相等EST Estimate 估计EX Extra 额外EXH Exhaust 消耗EXP Experimental 实验性的EXT Exension,External 范围,外部FAB Fabricate 伪造FAO Finish All OverFDRY Foundry 铸造FIG Figure 数据FIL Fillet,fillister 带子FIM Full Indicator MovementFIN FinishFLX Fixture 结构FLX Floor.Fluid,Flush 基地,液体,冲洗FLEX Flexible 易弯曲的FLG Flange 边缘FORG Forging 锻炼FR Frame,Front 边框FIG Fitting 装置FURN Furnish 提供FWD Forward 向前GALV Galvanized 电镀GR Grade 等级GRD Grind 磨碎GRV Groove 凹槽GSKT Gasket 垫圈H&G Harden and Grind 加硬和磨碎HD Head 主要的HDL Handle 处理HDLS Headless 无领导的HDN Harden 使硬化HDW Hardware 硬件HEX Hexagon 六边形HGR Hanger 衣架HGT Height 高度HOR Horizontal 水平的HRS Hot-Rolled SteelHSG Housing 外罩HT TR Heat Treal缩写全称翻译NTS Not to ScaleOA Over All 所有OBS ObsotetcOC On CenterOD Outside Diameter 外直径OPP Opposite 对立OPTL Optional 可选择的OR Outside Radius 外半径ORIG Original 初始的PAT. Patent 专利PATT Pattern 形式PC Piece,Pitch Circle 件,节距圆PCH Punch 打孔PD Pitch DiameterPERF Perforate 打孔PERM Permanent 永久的PERP Perpendicular 垂直的PFD Preferred 首选的PKG Package,Packing 包装PL Parting Line,Places,PlatePNEU PncumaticPNL Panel 面板POL Polish 磨光POS Position,Postive 位置PR Pair 对立PRI Primary 基本的PROC Process 程序PROD Product,Production 产品,产量PSI Pounds per Square InchPT Part,Point 零件,点QTR Quarter 四份之一QTY Quantity 数量QUAL Quality 质量R Radius 半径RA Rockwell Harden,A-ScaleRB Rockwell Harden,B-ScaleRC Rockwell Harden,C-Scale RECD Received 巳收到的RECT Rectangle 长方形REF Reference 相关的REINF Reinforce 增强REL Release,Relief 释放,缓解REM Remove 移除REQD Requird 有需要REE Retainer,ReturnREV Reverse,Revision,Revolution RFS Regardless of Feature Size RGH Rough 粗糙的RH Right Hand 右手RIV Rivet 起皱RM Ream 扩展RND Round 周围RPM Revolutions per Minute RPW Resistance Projection Weld SAE Society of Automotive Engrs SCH Schedule 进度表缩写全称翻译CFS Cold-Finished SteelCH Case HardenCHAM Chamfer 斜面CHAN Channel 渠道CHG Change 改变CHK Check 核查CI Cast Iron 铸铁CIR Circle, Circular 圆周CIRC Circumference 圆周CL Centerline 中心线CLP Clamp 夹子CNC Computer Numerical Control 电脑数值控制COMB Combination 联合COML Commercial 商业的CONC Concentric 同中心的CONN Connect,Connector 连接器COV Cover 盖子CPLG Coupling 联结CQ Commercial Quality 商业等级钢CRS Cold Stds AssociationCRT Cathode Ray Tube 阴级射线管CS Cast Steel 铸铁CSA Canadian Stds AssociationCSK Countersink 埋头孔CSTG Casting 铸件CTR Center 中心CU Cubic 立方米CW Clockwise 顺时针CYL Cylinder,Cylindrical 柱面DBL Double 双倍DEC Decimal 小数DEG Degree 摄氏度DET Detail 详情DEV Develop 发展DFT Draft 草稿DIA Diameter 直径DIM Dimension 尺寸DIST Distance 距离DN Down 向下DP Deep,Diametral Pitch 深度,径节DR Drill,Drill Rod 钻孔DSGN Design 设计DVTL Dovetail 吻合DWG Drawing 图纸DWL Dowel 木钉DWN Drawn 拔出EA Each 每个ECC Eccentric 古怪缩写全称翻译HVY Heavy 重量HYD Hydraulic 水压ID Inside Diameter 内部直径IDENT Identification 鉴定ILLUS Illustration 说明IN Inch 英寸INCL Include,Including 包括INCR Increase 增加INFO Information 信息INSP Inspect 检查INSTL Install 安装INST Instruct,Instrument 指示,工具INT Interior,Internal,Intersect 内部的,内在的,交叉IR Inside Radius 内部半径ISO Internal Stds Organization 国际标准化组织JCT Junction 连结JNT Journal 杂志JT Joint 连接K Key 关键KNRL Knurl 硬节KST KeyseatKWY Keyway 键沟LB Pound 英镑LBL Label 标签LG Length,Long 长度LH Left Hand 左手LMC Least Material ConditionLOC Locate 位于LT Light 光LTR Letter 信LUB Lubricate 润滑MACH Machine 机器MAINT Maintenance 维护MATL Material 材料MAX Maximum 最大MECH Mechanical,Mechanism 机械MED Medium 媒介MFG Manufacturing 制造业MI Malleable Iron 可锻造的铁MIN Minimum, Minute 最小,秒MISC Miscellaneous 混杂的MM Millimeter 毫米MMC Max Material ConditionMS Machine SteelMTG Mouting 装备MULT Multiple 倍数MWG Music Wire GagugNA Not Applicable 不可应用的NATL National 国内的NC Numerical Control 数字电脑控制NEG Negative 忽略的NO. Number 号码NOM Nominal 名义上的NPSM Natl Pipe Straight MechNPT Natl Pipe Tapered缩写全称翻译SCR Screw 螺丝SEC Second 秒SECT Section 部分SEP Separate 独立SEQ Sequence 顺序SER Serial,Series 系列SERR Serrate 锯齿状SF SpotfaceSFT Shaft 轴SGL Single 单个SH Sheet 纸SI Intl System of UnitsSL Slide 使滑动SLV Sleeve 袖子SOC Socket 插座SP Space,Spaced,Spare 空间SPL Special 特别SPEC Specification 规格SPG Spring 跳SPHER Spherical 球体SPRKT Sprocket 链轮齿SQ Square 平方SST Stainless Steel 纯铁STD Standard 标准STK Stock 存货STL Steel 铁STR Straight,Strip 直的SUB Substitute 替代物SUP Supply,Support 供应SURF Surface 表面SYM Symmetrical 对称的SYS System 系统T Teeth,Tooth 牙齿TECH Technical 技术TEMP Template,Temporary模板,暂时的THD Thread 线THK Thick 厚的TOL Tolerance 公差TOT Total 总计TPF Taper per FootTPI Taper per In,Threads per InchTPR Taper 锥形TS Tool SteelTYP Typical 典型UNC Unified Natl CoarseUNEF Unified Natl Extra FineUNF Unified Natl FineUNIV Universal 普遍VAR Variable 变量VERT Vertical 垂直的VOL Volume 音量VS Versus 与..相对W Wide,Width 宽度WASH Washer 洗衣机WDF Woodruff 车叶草WI Wrought Iron 熟铁WT Weight 重量SAE Extra fine 美国汽车工程师协会的超细牙螺纹例:1/2-28 SAE Extra fine SAE Reg 美国汽车工程师协会的标准系列螺纹例:1/2-20 SAE RegSAE-LT 美国汽车工程师协会的圆锥外螺纹例:1/2-28 SAE-LT。
首件检验
FIRST ARTICLE INSPECTION首件检验1、PURPOSE作用1.1The purpose of this procedure is to define a common method used to conduct First ArticleInspection(FAI).这个程序的作用是定义一个用作指导首件检验的通用方法2、SCOPE 范围2.1 This procedure is applicable to all suppliers and facilities for all products which require First Article Inspections to be furnished, as reflected in Design Assurance Tool Applicability, CO-QA-002-R03, to Jarden Consumer Solutions.本程序可用于为所有供应商和所有产品的设备提供首件检验,为JARDEN消费者方案反映设计工具的适用性CO-QA-002-R03,。
3、PROCEDURE 程序3.1 Parts to be used for the purpose of a first article inspection must be produced under conditions that assure the part is representative of the tool.被用于首件检验的零件必须是生产的条件下做出来的,保证是具有代表性的零件。
3.1.1 Every effort should be made to reduce the effects of the process used to make the part.应作出一切努力减少制造过程中产生的影响,。
3.1.1.1 The process will be verified by using the CTQ matrix which is covered in CO-QA-017.此过程将由CTQ模型来判定,包含在CQ-QA-017中CTQ 质量关键点3.2 Single tool/single cavity FAI 单一用具/单腔FA T3.2.1 Complete FAI form for single tool and single cavity inspection,CO-QA-019-F02, to document the results of the FAI.完整的首件检验表格为单一用具和单腔检验,CO-QA-F02,记录首件检验的结果。
生产品质工程用到的IE专业英语对照词汇
BS Brain Storming 脑力激荡Facilities Design and Planning设施规划与设计Material Flow System Analysis物流系统分析Production Planning and Control生产计划与控制Human Engineering人机工程(工效学)Cost Control成本控制Value Engineering价值工程Work Assessment工作评价与考核Engineering Economics Analysis工程经济分析Machine Interference机器干扰Single Minute Exchange of Dies (SMED) 六十秒即时换模Fool-Proof 防止错误法(防错法)Man 人Machine 机Material 料Method 法Environment 环境Temperature(temp)温度Humidity湿度leaning curve学习曲线Time measurement 时间测量Methods of time measurement原则时间测量(MTM)Shop floor observation 现场观测Line Balancing 线平衡Value有价值NO VALUE 无价值Incidental work(necessary)必要Waste挥霍Takt Time生产节拍Transport Empty 伸手Grasp 握取Move 移物Disassemble 折卸Use 应用Assemble 装配Release Load 放手Inspect 检查Search 寻找Select 选择Play 计划Pre-Position预定位Position 定位Hold 持住Rest 休息Unavoidable Delay 迟延Avoidable Delay 故延E: Elimination剔除C :Combination合并R: Re-arrangement重排S :Simplification简化PRA-Probabilistic Risk风险率评估Risk Priority Number (RPN) 风险关键指数What 完毕了什么where 何处做When 何时做who 由谁做Why 为何这样做how 何时做delay等待operation操作inspection检查transportation搬运storage储存Color management 颜色管理Quality Control Circle 品管圈(QCC)Activity-Base Management作业制成本管理(ABM)In-Process Quality Control制程质量管理(IPQC)Incoming Quality Control进料质量管理(IQC)International Organization for Standardization国际原则组织(ISO) Predetermined Motion Time Standard 简称PTS 预定动作时间原则法Methods-time-measurement 措施时间衡量Work factor system 工作原因法(WF)Modolar arrangement of pre-determind time standard MOD法Leveling 平准化= westing 西屋法objective rating 客观评比synthetic leveling 合成评比Work Sampling 工作抽样Motion time analysis 动作时间分析Business Process Reengineering (BPR)企业流程再造Enterprise Resource Planning ERP企业资源规划Economic Order Quantity (EOQ)基本经济订购量Flexible Manufacture System 弹性制造系统(FMS)Finish or Final Quality Control成品质量管理(FQC)In-Process Quality Control制程质量管理(IPQC)Incoming Quality Control进料质量管理(IQC)Just In Time实时管理(JIT)Manufacturing Execution System制造执行系统(MES) Master Production Scheduling主生产排程(MPS) Master Production Planning主生产计划Material Requirement Planning物料需求规划(MRP) Manufacturing Resource Planning制造资源计划(MRPII) Operation Scheduling作业计划Flow shop流水车间Optimized Production Technology最佳生产技术Supply Chain Management供应链管理(SCM)Statistic Process Control记录制程管制(SPC)Total Production Management全面生产管理(TPM) Total Quality Management全面质量管理(TQM)Zero Defect Quality Control零缺陷质量管理:PDCA Cycle PDCA循环:continue Improvement持续改善:Project项目Project Manager项目经理Project Management项目管理Project Plan项目计划Process Improvement现场改善WORK IN PROCESS 半成品Visual management 目视管理bottleneck 瓶颈Layout 布置图quality engineering 质量工程人员(QE)first article inspection 新品首件检查(FAI)first article assurance首件确认(FAA)capability index能力指数(CP)Quality Improvement Team 质量改善小组(QIT)Classification整顿(sorting, organization)-seiriRegulation整顿(arrangement, tidiness)-seitonCleanliness打扫(sweeping, purity)-seisoConservation清洁(cleaning, cleanliness)-seiktsuCulture教养(discipline)-shitsukeSave 节省Safety安全Make-to-stock备货型生产(MTS)Make-to-order订货型生产(MTO)Assemble-to-order按订单装配(ATO)Flexible manufacturing system柔性制造系统Group technology成组技术(GT)Concurrent engineering并行工程(CE)Time compression technology时间压缩技术(TCT)Business process reengineering业务过程重组(BPR)Agile manufacturing敏捷制造(AM)Leap production精细生产(LP)Intelligent manufacturing 智能制造(IM)Computer-aided-manufacturing计算机辅助制造(CAM) Computer-aided-design计算机辅助设计(CAD)Computer-aided-engineering计算机辅助工程(CAE)Computer-aided-process planning计算机辅助工艺编制( CAPP) overall cost leadership成本优先differentiation独具一格Market focus集中一点cost efficiency成本效率quality质量Dependability可靠性Flexibility柔性product date management产品数据管理(PDM)Facility location设施选址Fixed position layout固定式布置process layout工艺过程布置layout based on group technology成组制造单元布置Job design工作设计work measurement工作测量Time study时间研究Basic motion study基本动作世界研究法(BMS)Modolar arrangement of predetermind time standard模特法Human factor engineering人因工程business plan经营计划Fixed capacity固定能力Adjustable capacity可?#123;整能力production rate生产率Inventory库存Job-shop production单间小批生产Bill of materials (BOM)物料清单文献Lead time提前期modular bill of materials模块物料清单Maximum part-period gain最大周期收益(MPG) distribution requirements planning分派需求计划scheduling编制作业计划sequencing排序Dispatching派工controlling控制expediting赶工supply chain供应链Purchasing Management采购管理Quick Response迅速顾客反应JIT Purchasing准时采购physical distribution物流Materials handling物料搬运project项目critical path method关键路线法optimistic time最乐观时间Most likely time最也许时间pessimistic time最消极时间Mean time between failure平均故障期(MTBF) Mean time to repair平均维修期(MTTR)plan 计划do 执行check 检查action 处理level production生产平准化optimized production technology最优生产技术(OPT) Overall Equipment Effectiveness整体设备效能Operation Research运筹学Service Sector服务业Operation Management运作管理Operation System运作系统World Class Manufacturing世界级制造Time-based Competition基于时间旳竞争Operation Flexibility运作战略Product Development产品开发Dependent Demand独立需求Economic Order Lot 经济订货批量:Safety Stock安全库存Shortage Costs缺货成本ABC Classing Method A BC分类法Reorder Point订货点Holding Costs存储成本Productivity Improvement Team生产力提高小组(PIT) Productivity Improvement Center生产力提高中心(PIC) Break PAD 折PADBreak PIN 折脚Paste Base 沾BASEapproved by: 核准Apr.(April) 四月assembly(ass’y)组合Aug.(August) 八月Base 底座bifilar 双线并绕Bobbin(BBN)绕线管bottom 底部Brush Epoxy On Core 铁芯刷胶Brush Epoxy On Loop 线圈刷胶checked by: 审核Choke电感clip耳夹close winding密绕component 组件condition条件condition条件copper铜箔立式core铁芯Curing烘烤current 电流CUT WIRE 裁线Dec.(December) 十二月defective product box不良品箱deficient manufacturing procedure制程不良description: 阐明Design Failure Mode and Effect Analysis DFMEA设计Desk Topdip 浸入Direction 方向ECN Engineering Change Notice工程变更告知Electronic Magnetic In EMI 抗电磁干扰Enameled copper wire 漆包线Engineering Change Request 工程变更规定epoxy胶equipment/instrument设备Failure Mode and Effect Analysis FMEA失效模式与效应分析Feb.(February) 二月fixture治具flow chart 流程窗体flux助焊剂FN: Factory Notice 工厂告知FN: Immediated change 立即变更Function test 测试gap 间隙,缝隙HI-POT安规测试IE﹕Industrial Engineering 工业工程impregnation浸泡inductance 电感ink油墨inspection(INSP)检查Insulating Tape绝缘胶布issued date: 发行日期item发料Jan.(January) 一月Joint Quality Engineering (JQE)Jul.(July) 七月Jun.(June) 六月Kapton Tape高温胶布layer 层line线Magnetic Components 磁性组件magnetic 磁性旳Mar.(March) 三月Margin Tape安胶marking印章materials物料May五月ME: Mechanical Engineering 机械工程measurement测试mechanical dimension 外观尺寸MFG: manufacturing制造Mini-TowerModel: 机种Not Deviate Measure 量平整度Nov.(November) 十一月O/I Operation Instruction 作业指导书Oct.(October) 十月OEM:委托代工(Original Equipment Manufacture)oven 烤箱P/n: part number 品名P/R Pilot-Run试作验证pad 垫片PE Production/Process Engineering 制造工程/制程工程pin adjustment对脚PIN BENDING& WIRE TRIMMING 折弯钢片pin 脚plastic 塑料,塑料poor processing 制程不良Pre-soldering 预焊primary(pri)初级process 流程production capacity生产力卧式production control (PC)生管purchasing采购QCC:品管圈(Quality Control Circle)QE:质量工程(Quality Engineering)remark: 备注Reported by: 草拟Revision(REV﹒): 版本sample样品schematic 构造图second(sec)次级Sept.(September) 九月solder bar锡棒solder iron 烙铁solder wire锡丝soldering焊锡solvent 稀释剂space winding疏绕Specification (Spec)生产规格stand-off 凸点station 站别step步序straighten 弄直,使变直tape 胶带TE: Test Engineering 测试工程terminal 脚,端子Time (时间)timer定期器top顶部,上层transformer 变压器trifler三线并绕tube 套管turn ratio圈数比turn圈数twist绞线vacuum抽真空varnish dipping泡凡立水varnish凡立水warehouse仓库winding direction 绕线方向winding绕线wire trimming理线。
FAIR_LAIR_CAIR training
• The CAIR is required when:
– at any time of the run for specific product requirements verification, even tough the product will still be running in the manufacturing process conditions (same bay, line, facility, parameters, etc.).
FAIR/LAIR/CAIR Content
• The content of the FAIR/LAIR/CAIR, is any physical or functional verification against the Drawing, Specification predetermined by the Customer and/or any applicable Industry Standard, these will be the same as the FAIR.
• Current Article Inspection Report (CAIR), is the First Article
Inspection Report that is performed at any stage of the Production run as verification of the products produced from the start and at that point of the run, meets the Customer Specifications and any other applicable Standard based on the nature of the Product and Process.
企业管理常见英文缩写
企业管理常见英文缩写QMS: Quality Management Systems 质量管理体系EMS:Environment Management Systems 环境管理体系SA :社会责任 Social AccoutabilityHACCP :危害分析与关键控制点 Hazard Analysis and Critical Control PointRoHS:电气电子设备中限制使用某些有害物质指令 The Restriction of the Use of Certain Hazardous Substances in Electrical and Electronic EquipmentWEEE:报废电子电气设备指令 Waste Electrical and Electronic EquipmentIAF: International Accreditation Forum 国际认可论坛IAF/MLA:国际认可论坛多边承认协议CNAB:中国认证机构国家认可委员会英文名称为:China National Accreditation Boardfor CertifiersCNAT:中国认证人员与培训机构国家认可委员会(CHINA NATIONAL AUDITOR AND TRAINING ACCREDITATION BOARD,简称CNAT)CNAL:中国实验室国家认可委员会英文名称为CHINA NATIONAL ACCREDITATION BOARD FOR LABORATORIESIECQ:是国际电工委员会电子委员会电子元器件质量评定体系International Electrotechnical Commission QualityIEC是国际电工委员会 International Electrotechnical CommissionNational/International/Customer Standard. Control Procedure。
电子厂里常见的英文缩写1
QE=品质工程师(Qualit y Engineer )MSA: Measure ment System Analysis 量测系统分析LCL: Lower Control limit 管制下限Control plan 管制计划Correcti on 纠正Cost down 降低成本CS: custome r Sevice 客户中心Data 数据Data Collectio n 数据收集Descripti on 描述Device 装置Digital 数字Do 执行Design of Experim ents 实验设计Environ mental 环境Equipme nt 设备FMEA: Failure Mode and Effect analysis 失效模式与效果分析FA: Failure Analysis 坏品分析FQA: Final Quality Assuran ce 最终品质保证FQC: Final Quality control 最终品质控制Gauge system 量测系统Grade 等级Inductan ce 电感Improve ment 改善on 检验IPQC: In Process Quality Control 制程品质控制IQC: Incomin g Quality Control 来料品质控制ISO: Internati onal Organiza tion for Standar dization 国际标准组织LQC: Line Quality Control 生产线品质控制LSL: Lower Size Limit 规格下限Materials 物料Measure ment 量测Occurre nce 发生率Operatio n Instructi on 作业指导书Organiza tion 组织Paramet er 参数Parts 零件Pulse 脉冲Policy 方针Procedur e 流程Process 过程Product 产品Producti on 生产Program 方案Projects 项目QA: Quality Assuran ce 品质保证QC: Quality Control 品质控制QE: Quality Engineer ing 品质工程QFD: Quality Function Design 品质机能展开Quality 质量manual 品质手册Quality policy 品质政策Range 全距Record 记录Reflow 回流Reject 拒收Repair 返修Repeata bility 再现性Reprodu cibility 再生性Require ment 要求Residual 误差Respons e 响应Responsi bilities 职责Review 评审Rework 返工Rolled yield 直通率sample 抽样,样本Scrap 报废Standar d Operatio n Procedur e 标准作业书SPC: Statistic al Process Control 统计制程管制Specifica tion 规格SQA: Source( Supplier ) Quality Assuran ce 供应商品质保证Taguchi-method 田口方法TQC: Total Quality Control 全面品质控制TQM: Total Quality Manage ment 全面品质管理Traceabil ity 追溯Upper Control Limit 管制上限USL: Upper Size Limit 规格上限Validatio n 确认Variable 计量值Verificati on 验证Version 版本QCC Quality Control Circle 品质圈/QC 小组PDCA Plan Do Check Action 计划执行检查总结Consum er electroni cs 消费性电子产品Commun ication 通讯类产品Core value (核心价值)Love 爱心Confiden ce 信心Decision 决心Corporat e culture (公司文化) Integrati on 融合Responsi bility 责任Progress 进步QC quality control 品质管理人员FQC final quality control 终点品质管制人员IPQC in process quality control 制程中的品质管制人员OQC output quality control 最终出货品质管制人员IQC incoming quality control 进料品质管制人员total quality control 全面质量管理POC passage quality control 段检人员QA quality assuranc e 质量保证人员OQA output quality assuranc e 出货质量保证人员QE quality engineer ing 品质工程人员FAI first article inspectio n 新品首件检查FAA first article assuranc e 首件确认CP capabilit y index 能力指数standard ized supplier quality audit 合格供应商品质评估FMEA failure model effective ness analysis 失效模式分析AQL Accepta ble Quality Level 运作类允收品质水准S/S Sample size 抽样检验样本大小ACC Accept 允收REE Reject 拒收CR Critical 极严重的MAJ Major 主要的MIN Minor 轻微的Q/R/S Quality/ Reliabilit y/Servic e 品质/可靠度/服务P/N Part Number 料号L/N Lot Number 批号AOD Accept On Deviatio n 特采UAI Use As It 特采FPIR First Piece Inspecti on Report 首件检查报告PPM Percent Per Million 百万分之一SPC Statistic al Process Control 统计制程管制Statistic al Quality Control 统计品质管制GRR Gauge Reprodu cibility & Repeata bility 量具之再制性及重测性判断量可靠与否DIM Dimensi on 尺寸DIA Diamete r 直径QIT Quality Improve ment Team 品质改善小组ZD Zero Defect 零缺点QI Quality Improve ment 品质改善QP Quality Policy 目标方针Total Quality Manage ment 全面品质管理RMA Return Material Audit 退料认可7QCTool s 7 Quality Control Tools 品管七大手法通用之件类ECN Engineer ing Change Notice 工程变更通知(供应商) ECO Engineer ing Change Order 工程改动要求(客户) PCN Process Change Notice 工序改动通知Product Manage ment Plan 生产管制计划SIP Standar d Inspecti on Procedur e 制程检验标准程序SOP Standar d Operatio n Procedur e 制造作业规范IS Inspecti on Specifica tion 成品检验规范BOM Bill Of Material 物料清单PS Package Specifica tion 包装规范SPEC Specifica tion 规格DWG Drawing 图面系统文件类Engineer ing Standar d 工程标准IWS Internati onal Workma n Standar d 工艺标准ISO Internati onal Standar dization Organiza tion 国际标准化组织GS General Specifica tion 一般规格部类PMC Producti on & Material Control 生产和物料控制PCC Product control center 生产管制中心Producti on Plan Control 生产计划控制MC Material Control 物料控制DCC Docume nt Control Center 资料控制中心QE Quality Engineer ing 品质工程(部) QA Quality Assuran ce 品质保证处QC Quality Control 品质管制(课)PD Product Departm ent 生产部LAB Laborato ry 实验室Industria l Engineer ing 工业工程ISO 国际标准化组织(ISO,In ternatio nal Organiza tion for Stan-dardizati on缩写)。
制造业常用英文缩写释义
常用英文縮寫釋義ENGLISH CHINESE SHORTHAND DESCRIPTION DESCRIPTIENPC Personal Computer 個人電腦PCE Personal Computer Enclosure 個人電腦機箱ISO International Standard Organization 國際標准化組織3C Computer Communication Consumer electronic 資訊通信消費性電子JIT Just In Time 及時ZD Zero Defect 零缺點QC Quality Control 品質管理TQC Total Quality Control 全面品質管理PDCA Plan Do Check Action 計劃、實施、檢查、處理5W1H When Where Who What Why How to5M Man Machine Material Method MeasurementAQL Accept Quality Level 允許品質水準QCC Quality Control Circle 品管圈4M1T Man Material 人力資源物力資源Money Method 財務資源技術資源Time 時間資源I/O Import/Output 輸入/輸出TQA Total Quality Assurance 全面品質保證SQA Strategy Quality Assurance 策略品質保證DQA Design Quality Assurance 設計品質保證MQA Manufacture Quality Assurance 製造品質保證VQA Vendor Quality Assurance 供應商品質保證SSQA Sales and Service Quality Assurance 銷售服務品質保證LQA Laboratory Quality Assurance 實驗室品質保證SOP Standard Operation Procedure 標準作業規範SIP Standard Inspection Procedure 標準檢驗規範IS Inspect Standard 檢驗規格BOM Bill Of Material 物料清單FAI First Article Inspect 初件檢驗LRR Lot Reject Rate 批退率AOQ Average Output Quality 平均出廠水準FPIR First Product Inspect Record 初件檢驗記錄P/N Part Number 料號BTN Build To Need 按需生產(重要策略客戶) BTCO Build To Comfirmed Order 接單生產(重要客戶)BTI Build To Inventory 按單生產(一般客戶) MRP Material Reguests Planning 日常材料計劃DR Designing Review 設計評審TPM Total Production Management 全面生產管理PAC Performance Analysis Control 執行分析管理QST Quality Show Team 品質指導小組QIT Quality Improvement Team 品質改進小組CAT Corrective Action Team 改正行動小組BS Brain Storming 腦力激蕩EMI Electronic Magnetism Inspect 電磁測試RFI Radio Frequency Inspect 高頻測試MTM Methods-Time MeasurementB/M Board/Mount (Flat Cable)C/P Connector of PCA/P Assembly of PCSeiri classification 整理Seiton regulation 整頓5S Seiso cleanliness 清掃Seiketsu conservation 清潔Shitsuke culture 教養HDD Hard Disk Drive 硬驅FDD Floppy Disk Drive 軟驅SPS Switching Power Supply 電源箱DT Desk Top 臥式(機箱)MT Mini-Tower 立式(機箱)DVD Digital Video Disk 數字化光碟VCD Video Compact Disk 光碟LCD Liquid Crystal Display 液晶顯示CAD Computer-Aided Design 計算機輔助設計CAM Computer-Aided Manufacture 計算機輔助製造CAE Computer-Aided Engineering 計算機輔助工程ABIOS Advanced Basic input/output System 先進的基本輸入/輸出系統CMOS Complementary Metal Oxide Semiconductor 互補金屬氧化物半導體CPU Central Processing Unit 中央處理單元PDA Personal Digital Assistant 個人數字助理IC Integrated Circuit 集成電路ISA Industry Standard Architecture 工業標準體制結構PCI Peripheral Component Interconnect 外圍元件互連MCA Micro Channel Architecture 微通道結構EISA Extended Industry Standard Architecture 擴充的工業標準結構SIMM Single In-line Memory Module 單項導通匯流組件DIMM Dual In-line Memory Module 雙項導通匯流組件LED Light-Emitting Diode 發光二極管CD-ROM Compact Disk-Read-only Memory 光盤只讀存儲器ECN Engineering Change Notice 工程變更通知FMEA Failure Mode Effectiveness Analysis 失效模式分析W/H Wire Harness 金屬線緒束集組件F/C Flat Cable 排線PCB Printed Circuit Board 印刷電路板FQC Final Quality Control 最終品質管制IPQC In Process Quality Control 制程品質管制SPC Statistical Process Control 統計制程管制CAR Correction Action Report 改善報告QA Quality Assurance 品質保證QE Quality Engineering 品質工程IQC Incoming Quality Control 進料品質管制NG Not-Good 不良DCC Delivery Control Center 交貨管制中心PCC Product Control Center 生產管制中心WDR Weekly Delivery Requirement 周出貨需求IE Industry Engineering 工業工程PPM Parts Per Million 百萬分之TPM Total Production Maintenance 全面生產保養MRP Material Requirement Planning 物料需求計劃OS Operation System 作業系統TBA To Be Assigned 待定.空缺5S : 5S管理AVL : 認可的供應商清單(Approved Vendor List)BOM : 物料清單(Bill Of Material)BPR : 企業流程再造(Business Process Reengineering)JIT : 即時管理(Just In Time)PO : 訂單(Purchase Order)PR : 採購申請Purchase Request )QA : 品質保證(Quality Assurance)QC : 品質管制(Quality Control)IPQC : 制程品質管制(In-Process Quality Control)IQC : 進料品質管制(Incoming Quality Control)ISO : 國際標準組織(International Organization for Standardization)ISAR : 首批樣品認可(Initial Sample Approval Request)QCC : 品管圈(Quality Control Circle)QE : 品質工程(Quality Engineering)TQM : 全面品質管理(Total Quality Management)WIP : 在製品(Work In Process)FAI first article inspection 新品首件檢查FAA first article assurance 首件確認TVR tool verification report 模具確認報告3B 3B 模具正式投產前確認CP capability index 能力指數CPK capability index of process 模具制程能力參數SSQA standardized supplier quality 合格供應商品質評估OOBA out of box audit 開箱檢查QFD quality function deployment 品質機能展開FMEA failure model effectiveness analysis 失效模式分析8 disciplines 8項回復內容FA final audit 最後一次稽核CAR corrective action request 改正行動要求corrective action report 改正行動報一、常用術語PDCA Plan, Do, Check, Action計畫執行檢查總結Pilot run 試生產FOUR CONTROL SYSTEM 四大管制系統Engineering control system 工程管制系統Quality control system 品質管制系統Manufacturing control system 生產管制系統Management control system 經營管制系統7SClassification 整理(sorting, organization)-seiri Regulation 整頓(arrangement, tidiness)-seiton Cleanliness 清掃(sweeping, purity)-seisoConservation 清潔(cleaning, cleanliness)-seiktsuCulture 教養(discipline)-shitsukeSave 節約Safety 安全二、英文縮寫QC quality control品質管理人員FQC final quality control終點品質管制人員IPQC in process quality control制程中的品質管制人員OQC output quality control最終出貨品質管制人員IQC incoming quality control進料品質管制人員TQC total quality control全面品質管制QA quality assurance品質保證人員OQA output quality control出貨品質保證人員QE quality engineering品質工程人員品質保證類FAI first article inspection新品首件檢查FAA first article assurance首件確認SSQA standardized supplier quality audit合格供應商品質評估 FQC運作類AQL Acceptable Quality Level允收品質水準ACC Accept允收REE Reject 拒收CR Critical極嚴重的D/C Date Code生產日期碼ID/C Identification Order(供應商)識別碼L/N Lot Number批號P/N Part Number料號OEM Original Equipment Manufacture原設備製造QTY Quantity數量NG Not Good不行,不合格C=0 Critical=0極嚴重不允許APP Approve核准,認可,承認CHK Check確認ASSY Assembly裝配,組裝LRR Lot Reject Rate批退率PCB Printed Circuit Board印刷電路板CAR Correction Action Report改善報告TBA To Be Assured待定,定缺MAJ Major主要的MIN Minor輕微的P/N Part Number料號L/N Lot Number批號UAI Use As It特采FPIR First Piece Inspection Report首件檢查報告DPPM Defective Percent Per Million百萬分之一缺陷制程統計品管類SPC Statistical Process Control統計制程管制SQC Statistical Quality Control統計品質管制DIM Dimension尺寸DIA Diameter直徑其他品質術語類ZD Zero Defect零缺陷QP Quality Policy品質方針TQM Total Quality Management全面品質管理RMA Return Material Audit退貨認可7QCTools 7 Quality Control Tools品管七大手法通用檔類ECN Engineering Change Notice工程變更通知(供應商)ECO Engineering Change Order工程改動要求(客戶)PCN Process Change Notice工序改動通知PMP Product Management Plan生產管制計畫SIP Standard Inspection Procedure制程檢驗標準程式SOP Standard Operation Procedure製造作業規範BOM Bill of Material物料清單SPEC Specification規格DWG Drawing圖面系統檔類ISO International Standard Organization國際標準化組織部類QE Quality Engineering品質工程QA Quality Assurance品質保證生產類PCs Pieces個(根、塊等)CTN Carton卡通箱PAL Pallet/skid棧板PO Purchasing Order採購訂單MO Manufacture Oder生產單AVL Approved Vendor List許可供應商清單EOL End of Life。
QA英语专业词汇
QA英语专业词汇Abrasive wheel砂轮片Accessory附件Adaptor vacuum吸尘器连管Appearance外观Armature转子Assembly line装配线Audit审核Audit client审核委托书Auditee受审核方Attrition/Grinding 磨擦/磨擦的Attenuation变薄的Backing pad支撑垫Barcode条形码Battery电池Bearing轴承Blister pack泡壳Blade刀片Brush电刷Broken破损Bulk run大批量生产Bulletin part分解图Cable tie/tie wrap 扎带Carton label包装盒标签.盒贴Carton insert衬垫Charger 充电器Chuck夹头Clamp夹具Clamshell外壳Clip clamshell箍紧套Color mismatch色差Cord clamp卡线箍Cord protector电源线护套Corset电源线Connection连接Come unglued脱胶Carton包装盒CPAR纠正预防措施报告Current电流Capability能力Characteristic特性Corrective action纠正措施Concession让步D.O(Delivery Order)出货单Disrepair破损Date code日期码DCHR文件更改记录Dissatisfaction不满意Dependability可信性Defect缺陷Design and development设施与开发ECN(Engineering Changenotice)工程文件更改通知单ECR(Engineering changerequest)工程更改申请单Effectiveness有效性Efficiency效率Eyewinker异物Excrescent多余的FAI(Frist articleinspect)首件检测Fade掉色Field定子Finish goods transfer完成品流转单FTP(Frist time pass)一次通过率Gear齿轮Glue胶水Grinding wheel砂轮Hi-pot高压.试验Hold待定、待判、尚未作出决定Hole punch打孔板Housing外壳Incoming inspect进货检验Inner carton纸盒内衬Instruction manual说明书Insulation绝缘Insepction检验Infrastructure基础设施Intermittence间歇性的Interested party相关方Key chuck夹头钥匙Kit box工具箱Knob把手Label标签Label Great Wall长城标签Label output外标签Latch闭锁Power wire电源线Lead wire导线Leaflet safety安全须知Leak泄漏Line leader领班Lock闭锁Location/Position位置loose散货M101/M102等待处理区域/库位Master carton外箱Material handler领料员Material list物料清单Manual instruction说明书MC(Material control)物料控制MFG/PRO生产计划管理系统Motor line马达线MOTOR CLR电机待处理库位MRB材料评审机构MSL小批量制造样品MRP(Material request plan)物料需求计划Measurement测量Metrological requirement计量要求Management system管理体系Nameplate铭牌NG(No Good)不合格No load空载No power不启动Noise噪音OJT(On job training) 在职培训On/off开/关Organization组织Organization structure 组织结构Offered product外供产品P.O(purchase order)采购订单Pallet moisture film 底层防潮膜Pallet wooden木托Paper clamp砂纸Part number(P/N)产品(零件)编号Pass合格Pilot run小批量生产 Plastic bag塑料袋Printing打印Process sheet装配过程卡Pulp piece insert填充块Process过程Product产品Project项目Preventive action预防措施Procedure程序Quality policy质量方针Quality Assurance(QA)质量保证Quantity数量Quality质量Quality control质量控制Quality improvement质量改进Quality objective质量目标Quality planning质量策划Qualification资格Reject不合格(拒收)Rework返工RF security tag磁性标签RTS(Return to supplier)退回供应商RTV退货品库位Release放行Regrade降级Record记录Review评审S.O(Sales order)销售订单SA clamp压钳SA wet Accessory冷却管组件Scrap报废SCRAPEST生产线物品待处理库位Scratch/acotch划伤Screw螺丝Seal tap封箱带Sensor tag感应标签Serial NO.流水号Service服务Sheet slip盖板Side handle手柄signature签字Silica gel硅胶干燥剂Sleeve盒套Sort分拣Spark火花Spindle轴.定子Supervisor主管Switch开关Satisfaction满意System体系Supplier供方Tape封箱带Tester测试仪TQM(Total qualitymanagement)全面质量管理Top moisture film顶层防潮膜Torque扭矩Traceability溯源性Test试验Top management最高管理者UAI让步接收UNPLANND报废品库位Urgent release紧急放行Vibration振动Voltage电压Verification验证Validation确认Warehouse仓库Warning label警示标签Warranty card保修卡Washer垫圈Wrench扳手。
14691名词解释
Dell 名詞說明
1.英文縮寫:CLCA 2.英文全文:Close Loop Corrective Action 3.中 文:循環改善行動
4.定義說明: 當產品或製程發生不良時必須建立的改善行動,一般使 用8D的標準來執行。
Page :3
Dell 名詞說明
1.英文縮寫:FAI 2.英文全文:First Article Inspection 3.中 文:首件檢查
4.定義說明:
4.1 流程/程序/標準的文件建立。
4.2 生產材料與維修材料有效性的管理及防止使用錯誤 的材料。 4.3 維修人員的技能/訓練及維修設備來支援不良解析。 4.4 現場堆放WIP之數量管控。
4.5 維修材料及半成品先進先出。
Page :6
4.6 維修站資料的回饋及驅動製程持續改善。 4.7 不良分析及矯正行動的有效性。 4.8 原先有問題,後來判定無問題,這部分資料要收 集分析及管控。
4.定義說明: 當On-line SPC量測值超出管制界限(±3σ= UCL/LCL =OOC)時,應持續觀察監控製程品位,是否有異常發生?
Page :10
Dell 名詞說明
1.英文縮寫:OOS 2.英文全文:Out of specification 3.中 文:量測值超出產品規格
4.定義說明: 當On-line SPC量測值超出產品規格(USL/LSL=OOS)時, 應即追查發生源、找出根因、擬定對策、對策實施,使
Dell 名詞說明
1.英文縮寫:IFIR 2.英文全文:Initial Field Incident Rate 3.中 文:初期市場批退率
4.定義說明: The percentage of commodity replaced within the first 30 days from product invoice date (in DPPM).
FAI
FAI - Training
Basic Information – FG Level
Product spec. & instruction checked before start Different from OQA or OBA inspection 3 ~ 5 finished units inspected All items defined in product spec. Including product function/ reliability/
ECN/PCN as required by the Dell SQE on critical components
As requested by the Dell RSQE Changes to Critical Components New Sub-Supplier/ Sub-Supplier Site (change to the AVL) New tool/ mold/ dies Major tooling or equipment refurbishment Relocated tooling or production equipment Revised or modified process flow or production sequence Changes in materials or material sources Product following a stop-ship order due to a quality issue
success of the FAI is the responsibility of the Dell SQE. The supplier will
质量管理常用英文单词
QM--qualitymanagement--质量管理qualitymanager质量经理QE--qualityengineer--质量工程师QA--qualityassurance--质量保证QC--qualitycontrol--质量控制IQC--incoming??qualitycontrol--进料检验PQC--processqualitycontrol--制程检验FQC--finishedqualitycontrol--成品检验OQC--outgoingqualitycontrol--出货检验SQE--supplierqualityengineer--供应商质量工程师QSE--qualitysystemengineer--质量体系工程师AQE--assistantqualityengineer--质量助理工程师PQE--processqualityengineer--过程质量工程师CS--clientserver--客户服务PQC--processqualitycontrol--制程检验,,,,,,,,,improcessFQC--finishedqualitycontrol--成品检验,,,,,,,,,final加上VQA--Vendorqualityassurance--供应商质量保证产品保护产品定型产品分等产品规范产品设计产品质量产品合格率产品系列化认证立法自行认证认可安全认证强制性认证实验室鉴定实验室认证自愿认证制法规机构认证活动认证体系认证计划认证机构检验机构??inspectonbody许可证??licence申请人??applicant许可证持有者??licensee合格证书??certificateofconformity合格标记??markofconformity认证体系的利用??accesstocertificationsystem认证体系的参与者??participantincertificationsystem认证体系的成员??memberofcertificationsystem批准??approval型式批准??typeapproval测试实验室的认可??accreditationoftestinglaboratory认可??accreditation认可体系??accreditationsystem认可机构??accreditationbody认可的实验室??accreditedlaboratory认可准则??acreditatincriteria实验室评定??laboratoryassessment实验室评定者??laboratoryassessor认可的实验室的试验报告??accreditedlaboratorytestreport批准签署人??approvedsignatory承认和批准协议??recognitionandapprovalarrangement承认协议??recognitionarrangement单边协议??unilateralarrangement双边协议??bilateralarrangement多边协议??multilateralarrangemetn互利??reciprocity平等待遇??equaltreatmetn国家待遇??nationaltreatment国家和平等待遇??nationalandequaltreatment合格及有关的通用概念??conformityandrelatedgeneralconcept 合格??conformity合格测试??conformitytesting合格合格品合格标志合格认证合格品标志合格证书合格证检查评定合格合格评定型式评价合格监督合格证明合格保证供货商声明生产许可证一致检验不定期检验抽样检验出厂检验第一方检验第二方检验第三方检验定期检验交收检验例行检验生产检验验收检验验证检验仲裁检验制造商担保抽查型质量监督??samplingqualitysupervision环境监测??environmentalmonitoring抽样??sampling多次抽样??multiplesampling分层抽样??stratifiedsampling分层随机抽样??stratifiedrandomsmapling多级抽样??multistagesampling二次抽样??doublesampling试件??testpiece试验报告??testreport试样??testsample测试设备??testingequipment测试试验室??testinglaboratority商标??trademark商品名称??trade-name测试??testing试验??test实验室间的试验比较??interlaboratorytestcomparisons熟练水平试验??proficiencytesting次品??defectiveproduct代用产品??substituteproduct定量试验??quantitativetest出口管理??exportcontrol出口许可证制度??exportcontrol进口许可证制度??importlicencesystem定额管理??quotamanagement非关税壁垒??non-tarrifbarrier关税壁垒??tariffbarrier关税普遍优惠制??generalpreferentialdutiesCorevalue(核心价值)Love????爱心Confidence??信心Decision??决心Progress??7SRegulationCleanlinessCultureSave节约Safety安全二:??品质保证类FAI??????firstarticleinspection????新品首件检查FAA????firstarticleassurance????首件确认CP????capabilityindex????能力指数CPK????capabilityprocessindex????模具制程能力参数SSQA????standardizedsupplierqualityaudit????合格供应商品质评估FMEA????failuremodeleffectivenessanalysis????失效模式分析FQC运作类AQL????AcceptableQualityLevel????运作类允收品质水准S/S????Samplesize????抽样检验样本大小ACC????Accept????允收REE????Reject????拒收CR????Critical????极严重的MAJ????Major????主要的MIN????Minor????轻微的Q/R/S????Quality/Reliability/Service????品质/可靠度/服务P/N????PartNumber????料号L/N????LotNumber????批号AOD????AcceptOnDeviation????特采UAI????UseAsIt????特采FPIR????FirstPieceInspectionReport????????首件检查报告PPM????PercentPerMillion????百万分之一制程统计品管专类SPC????StatisticalProcessControl????统计制程管制SQC????StatisticalQualityControl????统计品质管制GRR????GaugeReproductiveness&Repeatability????量具之再制性及重测性判断量可靠与否DIM????Dimension????尺寸DIA????Diameter????直径N????Number????样品数其它品质术语类QIT????QualityImprovementTeam????品质改善小组ZD????ZeroDefect????零缺点通用之件类系统文件类部类生产类PRS????Pairs????双(对等)CTN????Carton????卡通箱PAL????Pallet/skid????栈板PO????PurchasingOrder????采购订单MO????ManufactureOrder????生产单D/C????DateCode????生产日期码ID/C????IdentificationCode????(供应商)识别码SWR????SpecialWorkRequest????特殊工作需求L/N????LotNumber????批号P/N????PartNumber????料号OEM????OriginalEquipmentManufacture????原设备制造PC????PersonalComputer????个人电脑CPU????CentralProcessingUnit????中央处理器SoonAsPossible????尽可能快的E-MAIL????Electrical-Mail????电子邮件N/A????NotApplicable????不适用QTY????Quantity????数量I/O????input/output????输入/输出NG????NotGood????不行,不合格C=0????Critical=0????极严重不允许APP????Approve????核准,认可,承认CHK????Check????确认ASS'Y????Assembly????装配,组装T/P????TruePosition????真位度5WIH????When,Where,Who,What,Why,Howto6M????Man,Machine,Material,Method,Measurement,Message4MTH????Man,Material,Money,Method,Time,How????人力,物力,财务,技术,时间(资源) SQA????StrategyQualityAssurance????策略品质保证DQA????DesignQualityAssurance????设计品质保证MQA????ManufactureQualityAssurance????制造品质保证SSQA????SalesandserviceQualityAssurance????销售及服务品质保证LRR????LotRejectRate????批退率SPS????Switchingpowersupply????电源箱GRN??????GoodsreceivingnoteA/R??????AccountingreceivableA/P??????Accountingpayable通用类president董事长operator作业员position职务generalmanager总经理specialassistant特助deputymanager|'depjuti|=vicemanager副理deputysupervisor=vicesupervisor副课长groupleader组长lineleader线长supervisor课长responsibledepartment负责单位HumanResourcesDepartment人力资源部Headcount人头数productiondepartment生产部门planningdepartment企划部QCSection品管课stampingfactory冲压厂paintingfactory烤漆厂moldingfactory成型厂administration/generalaffairsdept./总务部productionunit生产单位meetingminutes会议记录distributiondepartment分发单位subject主题conclusion结论decisionitems决议事项pre-fixedfinishingdate预定完成日firstcountfirstcheckdescriptionmodel机种workorderrevisionremarktocontroltonotifytofillin填写statisticsfrontplaterearplatechassis|'∫bezelpanel面板Hood??上盖???? basepan?????????????????????????? bezel??????????risercard??扩充卡????flatcable??排线??????????????????????????TOP drivercage??上磁架???????????? bottomdrivercage??下磁架?????????????? resinfilm??????树脂膜????????????????rawmaterials原料materials物料steelplate钢板roll/coilmaterial卷料spareparts=buffer备品plasticparts塑胶件sheetmetalparts/stampingparts冲件materialchecklist物料检查表finishedproduct成品semi-finishedproduct半成品goodproduct/acceptedgoods/acceptedparts/goodparts良品defectiveproduct/non-goodparts不良品disposedgoods处理品warehouse/hub仓库packingmaterial包材basket蝴蝶竺plasticbasket胶筐flowchart流程表单productiontempo生产进度现状lotsofproduction生产批量manufactureprocedure制程torevise,modify修订toswitchoverto,switch—to,switchingover切换engineeringbottleneck,projectdifficulty工程瓶颈glove(s)手套glove(s)withexposedfingers割手套Band-Aid创可贴Industrialalcohol工业酒精broom扫把mop拖把rag抹布garbagecangarbagebagliaisonrags抹布lampholderairpipe气管dieworkerequipmentresistancebeaconcoolantcrusherclubcarplate电镀resetbuttonforklift叉车patent专利coordinatecareercardbarricadecartonboxworkcell/workshop工作间sub-line支线bottleneck??瓶颈模具工程类plaindie简易模piercedie冲孔模formingdie成型模progressivedie连续模stagedie工程模compounddie复合模shearingdie剪边模rivetingdie铆合模featuredie公母模maledie公模femaledie母模cavity型控母模core模心公模diechange换模tofixadie装模torepairadie修模punchset上模座punchpad上垫板punchholder上夹板stripperpad脱料背板upstripper上脱料板upperplate上模板lowerplate下模板diepad下垫板dieholder下夹板dieset下模座bottomplatetopplatetopblockinsert入块(roundpunchroller滚轴baffleplate定位支承块guideplateslidingblockdielockerdieblockfoldedblockslidingblocklocationpin定位销liftingpin顶料销dieplate,frontboard模板paddingblock垫块steppingbar垫条panelboard镶块toloadadie装上模具tounloadadie??御模具activeplate活动板lowerslidingplate下滑块板upperholderblock上压块uppermidplate上中间板springbox弹簧箱spring-boxeject-rod弹簧箱顶杆spring-boxeject-plate弹簧箱顶板bushingblock衬套coverplate盖板guidepad导料块pilot导正筒trim剪外边pierce剪内边pocketforthepunchhead挂钩槽slughole废料孔radius半径shim/wedge/heel/pad/spacer/gasket楔子torch-flamecut火焰切割setscrew止付螺丝formblock折刀roundpiercepunch=diebutton圆冲子shapepunch=dieinsert异形子stocklocatedblock定位块metalplate钣金miller铣床grindertoleranceslidingblockactiveplatebaffleplatecoverplatecapabilityparameterfactor系数driller钻床setupdiedowelpincoilspringlifterpinpin销guidepinwirespringstopscrewlocatedpinouterbushdieheightflowmarkpiston活塞handlemold手持式模具flashmold溢流式模具positivemold挤压式模具splitmold分割式模具dielifter举模器topstop上死点bottomstop下死点onestroke一行程tocontinue,cont.连动togrip(material)吸料locationlump,locatingpiece,locationblock定位块reset复位tofileburr锉毛刺embeddedlump|in'bed||lùmp|镶块stamping-missing漏冲totightabolt拧紧螺栓toloosenabolt拧松螺栓punchedhole冲孔tocutedge=sidecut=sidescrap切边tobending折弯topull,tostretch拉伸engraving,toengrave刻印stamping油印tostake铆合designing,todesign设计designmodification??????设计修改成gauge(orjig)治具pedal踩踏板stopper阻挡器flowboard流水板torque扭矩spline=themultiplekeys花键quenchingtemperingannealingalloy合金formingdrawholebendingembossdome凸圆stampmarksidestretchreelstretchgroove压线stampletter冲压类jack升降机decoilerfeedertakertoreversematerial翻料toloadmaterial上料tounloadmaterial卸料toreturnmaterial/stockto退料scraped|'skr?pid|报废scrape..v.刮;削robot机械手productionline流水线packagingtool打包机packaging打包成型类welltype蓄料井insulatedrunner绝缘浇道方式hotrunner热浇道runnerplat浇道模块valvegate阀门浇口bandheater环带状的电热器spindle阀针spearhead刨尖头slagwell冷料井coldslag冷料渣airvent排气道weldingline熔合痕ejectpin顶出针knockpin顶出销returnpin回位销反顶针sleeve套筒stripperplate脱料板insertcore放置入子runnerstripperplate浇道脱料板guidepin导销subzerothreeplatestresscrackorientationspruegatenozzle射嘴slagwellsidegateedgegatetabgatefilmgateflashgateslitgatefangatedishgateringgatetunnelgatepingaterunnerlesssprueless??longnozzlespur浇口;waste废料board看板slidingrackabnormalhandling异常处理Assemblyline组装线Layout布置图Conveyer流水线运输带Rivetmachine拉钉机Rivetgun拉钉枪Screwdriver起子Electricscrewdriver电动起子Hydraulicmachine液压机Pneumaticscrewdriver气动起子automation自动化tostake,staking,riveting铆合addlubricantoil加润滑油argonwelding氩焊cylinder油缸robot机械手conveyingbelt输送带transmissionrack输送架todrawholes抽孔bolt螺栓nut螺母screw螺丝identificationtag标示单screwdriverplug起子插座automaticscrewdriver电动启子tomove,tocarry,tohandle搬运beputinstorage入库packing包装staker=rivetingmachine铆合机fittogether组装在一起fasten锁紧(螺丝)fixture夹具(治具)pallet/skid栈板barcodetolubricatespring弹簧toxmachine烤漆类phosphateviscosityrack上料volatiledegreaserinse水洗alkalineetchdesmotD.I.rinseChromateAnodizeseal封孔auxiliaryfunction辅助功能heaterband加热片thermocouple热电偶derustingmachine除锈机degate打浇口dryer烘干机induction感应inductionlight感应光response=reaction=interaction感应ram连杆edgefinder巡边器concave凸convex凹coldslug冷块blush导色gouge沟槽;凿槽satintexture段面咬花witnessline证示线grit沙砾granule=pellet=grain细粒sandblasting喷沙gritmaker抽粒机cushion缓冲fillet镶;嵌边rollerpinformality滚针形式camdriver铡楔shank摸柄crankshaft曲柄轴???????????????????????????????????????????????? 品质类qualifiedproducts,up-to-gradeproducts良品majordefectminordefectmissingpartwrongpartoxidationpoorstakingblister气泡dent压痕scratchdeformationfilings铁削abrasionshortnick缺口speck瑕疪shine亮班splay银纹gasmarkspeckle斑点mildewed=moldy=mouldy发霉deformation变形burr(金属)flash(塑件)毛边poorstaking铆合不良excessivegap间隙过大grease/oilstains油污inclusion杂质shrinking/shrinkage缩水mixedcolor杂色foldofpackagingbelt打包带折皱paintingmake-up补漆discoloration羿色waterspots水渍impurity????杂质Mismatch????错位failure,trouble??故障deformation????变形rust????????生锈peel????????脱漆Shrink??????缩水Contamination????脏污waterspots????水渍Gap????????间隙labelerror??????标签错误Missinglabel????漏贴rejectioncriteria????拒收标准Suspectedrejects????可疑庇abrasion??????损伤、磨损Texturesurface??印花纹表面Streak??????????条纹stains??????????污点Blotch??????????斑点。
生产厂常用英文缩写
Education and Training教育训练proposal improvement/creative suggestion提案改善BS Brain Storming 脑力激荡QCC Quality Control Circle 品质圈PDCA Plan Do Check Action 计划执行检查总结DCC delivery control center 交货管制中心3CComputer 计算机类产品Consumer electronics 消费性电子产品Communication 通讯类产品7SClassification整理(sorting, organization)-seiriRegulation整顿(arrangement, tidiness)-seitonCleanliness清扫(sweeping, purity)-seisoConservation清洁(cleaning, cleanliness)-seiktsuCulture教养(discipline)-shitsukeSave 节约Safety安全质量人员名称类QC quality control 品质管理人员FQC final quality control 终点质量管理人员IPQC in process quality control 制程中的质量管理人员OQC output quality control 最终出货质量管理人员IQC incoming quality control 进料质量管理人员TQC total quality control 全面质量管理POC passage quality control 段检人员QA quality assurance 质量保证人员OQA output quality assurance 出货质量保证人员QE quality engineering 质量工程人员质量保证类FAI first article inspection 新品首件检查FAA first article assurance 首件确认CP capability index 能力指数CPK capability process index 模具制程能力参数SSQA standardized supplier quality audit 合格供货商质量评估FMEA failure model effectiveness analysis 失效模式分析FQC运作类AQL Acceptable Quality Level 运作类允收质量水平S/S Sample size 抽样检验样本大小ACC Accept 允收REE Reject 拒收CR Critical 极严重的MAJ Major 主要的MIN Minor 轻微的Q/R/S Quality/Reliability/Service 质量/可靠度/服务P/N Part Number 料号L/N Lot Number 批号AOD Accept On Deviation 特采UAI Use As It 特采FPIR First Piece Inspection Report 首件检查报告PPM Percent Per Million 百万分之一制程统计品管专类SPC Statistical Process Control 统计制程管制SQC Statistical Quality Control 统计质量管理GRR Gauge Reproductiveness & Repeatability 量具之再制性及重测性判断量可靠与否DIM Dimension 尺寸DIA Diameter 直径N Number 样品数其它质量术语类QIT Quality Improvement Team 质量改善小组ZD Zero Defect 零缺点QI Quality Improvement 质量改善QP Quality Policy 目标方针TQM Total Quality Management 全面质量管理RMA Return Material Audit 退料认可7QCT ools 7 Quality Control Tools 品管七大手法通用之件类ECN Engineering Change Notice 工程变更通知(供货商)ECO Engineering Change Order 工程改动要求(客户)PCN Process Change Notice 工序改动通知PMP Product Management Plan 生产管制计划SIP Standard Inspection Procedure 制程检验标准程序SOP Standard Operation Procedure 制造作业规范IS Inspection Specification 成品检验规范BOM Bill Of Material 物料清单PS Package Specification 包装规范SPEC Specification 规格DWG Drawing 图面系统文件类ES Engineering Standard 工程标准CGOO China General PCE龙华厂文件IWS International Workman Standard 工艺标准ISO International Standard Organization 国际标准化组织GS General Specification 一般规格部类PMC Production & Material Control 生产和物料控制PCC Product control center 生产管制中心PPC Production Plan Control 生产计划控制MC Material Control 物料控制DC Document Center 资料中心QE Quality Engineering 质量工程(部)QA Quality Assurance 质量保证(处)QC Quality Control 质量管理(课)PD Product Department 生产部LAB Laboratory 实验室IE Industrial Engineering 工业工程R&D Research & Design 设计开发部生产类PCs Pieces 个(根,块等)PRS Pairs 双(对等)CTN Carton 卡通箱PAL Pallet/skid 栈板PO Purchasing Order 采购订单MO Manufacture Order 生产单D/C Date Code 生产日期码ID/C Identification Code (供货商)识别码SWR Special Work Request 特殊工作需求L/N Lot Number 批号P/N Part Number 料号OEM Original Equipment Manufacture 原设备制造PC Personal Computer 个人计算机CPU Central Processing Unit 中央处理器A.S.A.P As Soon As Possible 尽可能快的E-MAIL Electrical-Mail 电子邮件N/A Not Applicable 不适用QTY Quantity 数量I/O input/output 输入/输出NG Not Good 不行,不合格C=0 Critical=0 极严重不允许APP Approve 核准,认可,承认CHK Check 确认ASS'Y Assembly 装配,组装T/P True Position 真位度5WIH When, Where, Who, What, Why, How to6M Man, Machine, Material, Method, Measurement, Message4MTH Man, Material, Money, Method, Time, How 人力,物力,财务,技术,时间(资源) SQA Strategy Quality Assurance 策略质量保证DQA Design Quality Assurance 设计质量保证MQA Manufacture Quality Assurance 制造质量保证SSQA Sales and service Quality Assurance 销售及服务质量保证LRR Lot Reject Rate 批退率SPS Switching power supply 电源箱DT Desk Top 卧式(机箱)MT Mini-Tower 立式(机箱)DVD Digital Video DiskVCD Video Compact DiskLCD Liquid Crystal DisplayCAD Computer Aided DesignCAM Computer Aided ManufacturingCAE Computer Aided EngineeringPCB Printed Circuit Board 印刷电路板CAR Correction Action Report 改善报告NG Not Good 不良WDR Weekly Delivery Requirement 周出货要求PPM Percent Per Million 百万分之一TPM Total Production Maintenance 全面生产保养MRP Material Requirement Planning 物料需计划OS Operation System 操作系统TBA To Be Assured 待定,定缺D/C Drawing ChangeP/P Plans & ProcedureEMI Electrical Magnetic Interference 电子干扰RFI Read Frequency Input 读频输入MMC Maximum Material ConditionMMS Maximum Material SizeLMC Least Material ConditionLMS Least Material SizeLED lighting-emitting diode 发光二极管QBR Quarter Business RecordCIP Continuous improvement processFGI Forecasted Goal InventoryCNC Computerized numeral controllerB2C Business to customerB2B Business to businessAVL Approved vendor listPOP Procedure of packagingEOL End of lifeVDCS Vender defect correcting sheetPDCS Process defect correcting sheetGRN Goods receiving noteA/R Accounting receivableA/P Accounting payable三:专业词汇通用类president董事长operator作业员position职务general manager总经理special assistant 特助deputy manager |'depjuti| =vice manager副理deputy supervisor =vice supervisor副课长group leader组长line leader线长supervisor 课长responsible department负责单位Human Resources Department人力资源部Head count 人头数production department生产部门QC Section品管课administration/general affairs dept./总务部production unit生产单位meeting minutes会议记录distribution department分发单位subject主题conclusion结论decision items决议事项pre-fixed finishing date预定完成日Color management 颜色管理Visual management 目视管理production capacity生产力first count初盘first check初盘复棹second count 复盘second check复盘复核quantity of physical inventory second count 复盘点数量physical inventory盘点数量physical count quantity账面数量difference quantity差异量spare parts physical inventory list备品盘点清单cause analysis原因分析waste materials废料description品名specification 规格model机种work order工令revision版次remark备注registration登记registration card登记卡to control管制application form for purchase请购单consume, consumption消耗to notify通知to fill in填写to collect, to gather收集statistics统计cosmetic inspection standard 外观检验规范computer case 计算机外壳(组件)personal computer enclosure 计算机机箱产品front plate前板rear plate后板chassis |'∫æsi| 基座bezel panel面板Hood 上盖base pan 基座bezel 面板flat cable 排线resin film 树脂膜raw materials原料materials物料steel plate钢板roll/coil material卷料spare parts =buffer备品plastic parts塑料件sheet metal parts/stamping parts 冲件material check list物料检查表finished product成品semi-finished product半成品good product/accepted goods/ accepted parts/good parts良品defective product/non-good parts不良品disposed goods处理品warehouse/hub仓库packing material包材basket蝴蝶竺plastic basket胶筐flow chart流程窗体production tempo生产进度现状lots of production生产批量manufacture procedure制程to revise, modify修订to switch over to, switch—to, switching over切换engineering bottleneck, project difficulty工程瓶颈glove(s)手套glove(s) with exposed fingers割手套Band-Aid创可贴Industrial alcohol工业酒精broom扫把mop拖把vacuum cleaner吸尘器rag 抹布garbage container灰箕garbage can垃圾箱garbage bag垃圾袋liaison联络单rags抹布lamp holder灯架to mop the floor拖地to clean a table擦桌子air pipe 气管delivery deadline交货期die worker模工production, to produce生产equipment设备resistance电阻beacon警示灯coolant冷却液crusher破碎机plate电镀power button电源按键reset button重置键forklift叉车Workshop traveler 天车trailer =long vehicle拖板车Hydraulic trolley手压车hydraulic hand jack油压板车casing = containerization装箱velocity速度patent专利coordinate坐标supply and demand供求career card履历卡barricade隔板carton box纸箱to pull and stretch拉深work cell/work shop工作间sub-line支线bottleneck 瓶颈packaging tool打包机packaging打包品质类qualified products, up-to-grade products良品defective products, not up-to-grade products不良品defective product box不良品箱poor processing 制程不良poor incoming part来件不良exposed metal/bare metal金属裸露excessive defect过多的缺陷critical defect极严重缺陷major defect主要缺陷minor defect次要缺陷not up to standard不合规格cosmetic defect外观不良lack of painting烤漆不到位slipped screw head/slippery slipped thread滑丝missing part漏件wrong part错件oxidation氧化defective threading抽芽不良poor staking铆合不良deficient purchase来料不良deficient manufacturing procedure制程不良cosmetic inspection外观检查inner parts inspection内部检查blister 气泡angular offset 角度偏差dent 压痕scratch 刮伤deformation 变形filings 铁削defective label 不良标签abrasion 磨损Breaking. (be)broken,(be)cracked 断裂short射料不足nick缺口speck瑕疪shine亮班splay 银纹gas mark焦痕delaminating起鳞speckle斑点mildewed =moldy = mouldy发霉deformation变形burr(金属)flash(塑件)毛边poor staking铆合不良excessive gap间隙过大grease/oil stains油污inclusion杂质shrinking/shrinkage缩水mixed color杂色fold of packaging belt打包带折皱painting make-up补漆discoloration羿色water spots水渍impurity 杂质Mismatch 错位failure, trouble 故障deformation 变形rust 生锈peel 脱漆Shrink 缩水Contamination 脏污water spots 水渍Gap 间隙label error 标签错误Missing label 漏贴rejection criteria 拒收标准Suspected rejects 可疑庇abrasion 损伤、磨损Texture surface 印花纹表面Streak 条纹stains 污点Blotch 斑点discoloration 脱色Inclusion 杂质slug mark 压痕dirt grime 灰尘blush 毛边薄膜sink 下凹Hickey 漏漆labels and logos 贴纸与商标Configuration labels 组合贴纸corrugated container 瓦摆纸箱Delaminating 脱层splattering 散点Gouge 锉孔puckering 折痕烤漆类phosphate皮膜化成viscosity涂料粘度alkalidipping脱脂main manifold主集流脉organic solvent有机溶剂demagnetization去磁;消磁high-speed transmission高速传递heat dissipation热传rack上料volatile挥发性degrease脱脂rinse水洗alkaline etch龄咬desmot剥黑膜D.I. rinse纯水次Chromate铬酸处理Anodize阳性处理seal封孔scraped products报放品disposed products处理品dismantle the die折模auxiliary function辅助功能heater band 加热片thermocouple热电偶derusting machine除锈机degate打浇口dryer烘干机induction感应induction light感应光response =reaction =interaction感应ram连杆edge finder巡边器concave凸convex凹cold slug冷块blush 导色gouge沟槽;凿槽satin texture段面咬花witness line证示线grit沙砾granule =pellet =grain细粒sand blasting喷沙grit maker抽粒机cushion缓冲fillet镶;嵌边roller pin formality滚针形式cam driver铡楔shank摸柄crank shaft曲柄轴组装类Assembly line组装线Layout布置图Conveyer流水线运输带Rivet machine拉钉机Rivet gun拉钉枪Screw driver起子Electric screw driver电动起子Hydraulic machine 液压机Pneumatic screw driver气动起子automation自动化to stake, staking, riveting铆合add lubricant oil加润滑油argon welding氩焊cylinder油缸robot机械手conveying belt输送带transmission rack输送架to draw holes抽孔bolt螺栓nut 螺母screw 螺丝identification tag标示单screwdriver plug起子插座automatic screwdriver电动启子to move, to carry, to handle搬运be put in storage入库packing包装staker = riveting machine铆合机fit together组装在一起fasten锁紧(螺丝)fixture 夹具(治具)pallet/skid栈板barcode条形码barcode scanner条形码扫描仪fuse together熔合fuse machine/heat stake热熔机processing, to process加工delivery, to deliver 交货to return delivery to. to send delivery back to return of goods退货easily damaged parts易损件standard parts标准件to lubricate润滑spring 弹簧spare tools location/buffer手工备品仓spare molds location模具备品仓tox machine自铆机waste废料board广告牌sliding rack滑料架to impose lines压线to compress, compressing压缩character die字模to feed, feeding送料material change, stock change材料变更feature change 特性变更prepare for, make preparations for 准备rotating speed, revolution转速abnormal handling异常处理工厂常用缩略语5S:5S管理ABC:作业制成本制度(Activity-Based Costing)ABB:实施作业制预算制度(Activity-Based Budgeting)ABM:作业制成本管理(Activity-Base Management)APS:先进规画与排程系统(Advanced Planning and Scheduling) ASP:应用程序服务供货商(Application Service Provider)ATP:可承诺量(Available To Promise)BOM:物料清单(Bill Of Material)BPR:企业流程再造(Business Process Reengineering)BSC:平衡记分卡(Balanced ScoreCard)BTF:计划生产(Build To Forecast)BTO:订单生产(Build To Order)CPM:要径法(Critical Path Method)CRM:客户关系管理(Customer Relationship Management)CRP:产能需求规划(Capacity Requirements Planning)CTO:客制化生产(Configuration To Order)DBR:限制驱导式排程法(Drum-Buffer-Rope)DRP:运销资源计划(Distribution Resource Planning)DSS:决策支持系统(Decision Support System)EC:设计变更/工程变更(Engineer Change)EC:电子商务(Electronic Commerce)EDI:电子资料交换(Electronic Data Interchange)EIS:主管决策系统(Excutive Information System)EOQ:基本经济订购量(Economic Order Quantity)ERP:企业资源规划(Enterprise Resource Planning)FMS:弹性制造系统(Flexible Manufacture System)FQC:成品品质管制(Finish or Final Quality Control)IPQC:制程品质管制(In-Process Quality Control)IQC:进料品质管制(Incoming Quality Control)JIT:实时管理(Just In Time)KM:知识管理(Knowledge Management)L4L:逐批订购法(Lot-for-Lot)LTC:最小总成本法(Least Total Cost)LUC:最小单位成本(Least Unit Cost)MES:制造执行系统(Manufacturing Execution System)MPS:主生产排程(Master Production Schedule)MRP:物料需求规划(Material Requirement Planning)MRPⅡ:制造资源计划(Manufacturing Resource Planning)OEM:委托代工(Original Equipment Manufacture)ODM:委托设计与制造(Original Design & Manufacture)OLAP:线上分析处理(On-Line Analytical Processing)OLTP:线上交易处理(On-Line Transaction Processing)OPT:最佳生产技术(Optimized Production Technology)OQC:出货品质管制(Out-going Quality Control)PDCA:PDCA管理循环(Plan-Do-Check-Action)PDM:产品数据管理系统(Product Data Management)PERT:计画评核术(Program Evaluation and Review Technique) POH:预估在手量(Project on Hand)QCC:品管圈(Quality Control Circle)RCCP:粗略产能规划(Rough Cut Capacity Planning)ROP:再订购点(Re-Order Point)SCM:供应链管理(Supply Chain Management)SFC:现场控制(Shop Floor Control)SIS:策略信息系统(Strategic Information System)SPC:统计制程管制(Statistic Process Control)TOC:限制理论(Theory of Constraints)TQC:全面品质管制(Total Quality Control)TQM:全面品质管理(Total Quality Management)WIP:在制品(Work In Process)>>> 5S:5S管理5S是由JP企业研究出来的一种环境塑造方案,其目的在藉由整理(SEIRI)、整顿(SEITON)、清扫(SEISO)、清洁(SEIKETSU)及身美(SHITSUKE)五种行为来创造清洁、明朗、活泼化之环境,以提高效率、品质及顾客满意度。
AppleTerminologyList苹果用语集苹果术语
Apple T erminology ListAAVL: Approved Vendor List. Shows which vendors are approved to supply items for a specific BOM.ATD: Actual Time of DepartureATA: Actual Time of ArrivalBBOM: Bill of Materials. A listing of all the subassemblies and components that go into a parent assembly.CCOB: Close of Business (i.e. the end of the business day).CRM: Customer Relationship Management.CRU: Customer Replacement Unit. Used to refer to either a product provided to a customer as a replacement for a nonfunctional product, or to the process of replacing a customer’s product. Pronunciation note: CRU is pronounced “crew” in spoken conversation. This term is for internal use only. If you mus t refer to it when speaking with customers, use the term “replacement” or “product replacement” instead.CS: Customer Satisfaction. Used to describe a type of warranty service in Apple business systems (such as SAP and PS8) and in contracts. See also CS Code.DDFM: Design for Manufacturing.DFP: Design for Process-ability.DFS: Design for Service.DOA: Dead on arrival. DOA refers to a product that fails to function when it is first turned on. See also IUFU. This term is for internal use only. If you must refer to it when speaking with customers, use the term “Out of the Box Issue” instead.DOP: Date of Purchase.DPM: Defects per million. The number of failures over the total volume of units built multiplied by a million.DRI: Directly Responsible Individual. The cross-functional team member designated as responsible for schedule commitments and deliverables.DVT: Development Validation Test. The second of three tests performed during a hardware product development cycle, each of which designates a prototype development milestone. See EVT and PVT.EECN: Engineering Changed Notification.ECO: Engineering Changed Order.ECR: Engineering Change Request.EDI: Electronic Data Interchange, the transfer of structured data by agreed message standards from computer to computer by electronic means.EMEA: Europe, Middle, East, and Africa. Used to refer to Apple's region encompassing Europe, Middle East and Africa and as seen in organization titles such as "Apple EMEA AppleCare" and "Apple EMEA Services."EOL: End of Life.EOP: End of Production.EOSS: End of Service Support. End of the period of time (either 5 years or 7 years, depending on geographical area) when Apple has the responsibility to support a particular product. See Vintage Product and Obsolete Product for details on the classifications applied to products for which Apple discontinues hardware service.ERP: Enterprise Resource Planning. Usually used to describe a specific type of software such as SAPETD: Estimated Time of DepartureETA: Estimated Time of ArrivalEVT: Engineering Validation Test. The first of three tests performed during a hardware product development cycle, each of which designates a prototype development milestone. See DVT and PVT.FFAI: First Article Inspection.FATP: Final Assembly Package & Test.FG: Finished Good.FIFO: First In First Out.IID: Industrial Design.MMIL: Major Issue List.MTD: Measurement Technology DocumentNNTF: No Trouble Found refers to the state of a service part that has been classified as defective and returned to Apple but which yields no failures when tested by Apple. It's generally considered a Bad Thing to have a high NTF rate.OObsolete Product: A product that has been discontinued more than seven years ago. Apple has discontinued all hardware service for obsolete products with no exceptions. Service Providers cannot order parts for obsolete products. See Current Product, Recent Product, and Vintage Product.OEM: Original Equipment Manufacturer. Refers to the original manufacturer of the parts that Apple incorporates into our final product.PPOR: Plan of Record.POS: Point of Sale.PVT: Production Validation Test. The last of three tests performed during a hardware product development cycle, each of which designates a prototype development milestone. The PVT is a final run-through on the production line of what amounts to the final product (i.e. the GM product). See EVT and DVT.QQBR: Quarterly Business Review.RRFA: Request for Action. Refers to both the request and the database used for specific technical requests to business areas in AppleCare and Apple. This usually involves requests for documentation or drawings, specs, schematics, etc. RFA equates to an ECN or ECO.RFP: Request for Proposal.RFQ: Request For Quote.RMA: Return Materials Authorization. This can be used to refer to the piece of paper authorizing a reseller or end user to return a product to Apple, or to the process of returning that product, or sometimes even to the warehouse where the product is returned to.SSBM: Supply Base Management.SKU: Stock Keeping Unit.SME: Subject Matter Expert. A contact agent or Coach who has advanced knowledge about a particular Apple product or business area. SMEs act as resources for Contact Agents with specific questions and are expected to lead training Roundtables on their area of expertise. SOP: Standard Operating Procedure.。
FAI_checklist
FAI Check List, page 1, total25
FIRST ARTICLE INSPECTION [FAI] CHECK LIST
Model / Part No.____________________________ Serial No.________________, ________________ Work Order No. _________________ Date _______________
Check Item 檢查項目 2.13 For CPU 8X60 series, check SEC_FLAG under Diag. tool (Flag 3 is correct) 針對 CPU 8X60系列, 使用Diag tool 確認 SEC_FLAG: 3 (Flag 3 為正確) 2.14 Check the Playready key checksum, DTCP-IP key checksum, Widevine key checksum. 確認Playready key checksum, DTCP-IP key checksum, Widevine key checksum 是否正確 3.0 Functionality 功能性檢驗 Perform functional test per CDIT SIP. 依據CDIT SIP執行功能檢驗 3.2 Need to check with PAM for specific device function/ behavior, the device function/ behavior should be the same as User manual. (ex: LED light behavior when received the SMS…) 需與PAM 確認特殊之機台性能/狀態, 機台之性能/狀態表現需與使用者手冊一致. (例如: 當收到SMS 時, LED light 的狀 態…) 3.3 If the bundled micro SD cards have gone through internal FAI or customer FAI, CDIT must return them to MFG for reworking. (note: Android may change content in micro SD card when usage) 當FAI (包含客戶之FAI) 使用彩盒內出貨用之micro SD card, 出貨前此micro SD card頇交由CDIT退回產線重工. (*特別 是Android系統, 使用時會更動卡內資料.) 4.0 Others 其他 4.1 Check ECR introduction status. (Please list checked ECR no.) 確認所有ECR之改變內容,在產品上都已被執行 4.2 Other assistant checklist. (Please list and attach it.) 確認是否還有沒有其他與產品相關之文件,可供檢驗之用 4.3 Check this new color has passed CMF verification if the color of SKU is a new one. 若此SKU為新顏色,需確認此新顏色已通過CMF驗證 4.4 Other customer requirements or specifical requirements check 其他客戶要求或特殊要求項目確認 a. For T13 customer, please check whether carton tape is clear tape. And the sealing method shall be “ 工” type. For T13 客戶, 請注意carton tape是否為透明膠帶, 且膠帶以工字型貼附,封住所有缺口處. For T13 customer, please check RS#XX-XXXX barcode, "-" should show "0" under barcode reader as XX 0XXXX For T13 客戶,請確認RS#XX-XXXX條碼中的 "-"在條碼機讀出應為"0",如XX0XXXX. b. Check if the TAC code is correct for every SKU/ customer (if TAC code did not be defined on Label plan, please check with PAM) 確認使用到正確TAC code給該SKU/客戶(若TAC code沒被定義於label plan, 請與PAM確認) Noted* For customer O6; check IMEI (TAC) range of different color SKU to make sure IMEI (TAC) range is unique for corresponding colors . 注意*For O6 客戶,請確認不同顏色的SKU的IMEI範圍,不同顏色SKU的IMEI (TAC code)不可為同一個範圍. Noted*For customer O6, If the LDI is visible,(Cover/tray removing situation) please make sure it is white instead of red. c. For JPN customer T12 and F1; check battery date code and 製造番號 to make sure both of them could conform to the customer date code control rule: N-3 for customer T12; N-8 for customer F1 (N: ETA month). For T12, F1 日本客戶, 確認電池的D/C 和製造番號符合客人D/C 控管之規則. (T12: N-3, F1: N-8, N: 為到達客戶端的月 份) Check with IE to make sure the battery P/N for customer T12 or F1 has been added to SFC for battery date code control. d. For ITC 710 parts, please make sure the lawsuit attribute on PDM is the same with ITC 710 mark on device software version and label on gift box/carton/pallet. Refer to EN-00021157. 對於 ITC 710所含蓋之料號, 需確認PDM上的lawsuit 屬性與ITC710標示在主機軟體及彩盒/箱子/棧板標簽是一致的. 請 參考EN-00021157 e. For Wimax project, Check if the Wimax address is correct range for shipment and not for RD sample range. (if Wimax address range is not correct, please check with PAM/SFC/EPE) 確認使用到正確 Wimax address出貨範圍而不是 RD sample 範圍(若 Wimax address範圍不正確, 請與PAM/SFC/EPE 確認) Noted* For customer O6; check IMEI (TAC) range of different color SKU to make sure IMEI (TAC) range is unique for corresponding colors . 注意*For O6 客戶,請確認不同顏色的SKU的IMEI範圍,不同顏色SKU的IMEI (TAC code)不可為同一個範圍. Remark: 1. If any IMEI/ESN related failure was found during FAI, please inform SFC team to correct and block the work order of FAI samples. Besides, CDIT has to recheck those FAI devices after rework. 在FAI 時, 若發現任何IMEI/ESN相關不良, 請通知SFC team 將FAI sample 工單凍結, 並重工FAI samples. 重工後, CDIT 必需要重新確認FAI 機台. QA EPE MPE IE TE PAM MPM RD TSE OTHERS Inspection Result □ Accept □ Condition PASS □ Reject 3.1 Doc. No./ Ver 文件編號 /版本 Verification Result MFG CDIT PAM Comments 其他建議
工业工程专业英语名词
好东西总要大家分享,此份资料是我和几个同事一起整理的,里面包括 IE 专业英语,还有工厂的术语。
当然错误难免,希望大家指出并分享! IE 專業詞匯BS Brain Storming 腦力激蕩 Facilities Design and Planning 设施规划与设计 Material Flow System Analysis 物流系统分析 Production Planning and Control 生产计划与控制 Human Engineering 人机工程(工效学) Cost Control 成本控制 Value Engineering 价值工程 Work Assessment 工作评价与考核Engineering Economics Analysis 工程经济分析 Machine Interference 機器干擾 Single Minute Exchange of Dies (SMED) 六十秒即时換模 Fool-Proof 防止錯誤法 (防錯法) Man 人 Machine 机 Material 料 Method 法 Environment 環境 Temperature(temp)溫度 Humidity 濕度 leaning curve 學習曲線 Time measurement 時間測量 Methods of time measurement 標准時間測量(MTM) Shop floor observation 現場觀測 Line Balancing 線平衡 Value 有價值 NO VALUE 無價值 Incidental work(necessary)必要 Waste 浪費 Takt Time 生產節拍Transport Empty 伸手 Grasp 握取 Move 移物 Disassemble 折卸 Use 應用Assemble 裝配 Release Load 放手 Inspect 檢查 Search 尋找 Select 選擇Play 計划Pre-Position 預定位Position 定位Hold 持住Rest 休息Unavoidable Delay 遲延Avoidable Delay 故延E: Elimination 剔除C :Combination 合併R: Re-arrangement 重排S :Simplification 簡化PRA-Probabilistic Risk 風險率評估 Risk Priority Number (RPN) 風險關鍵指數 What 完成了什么 where 何處做 When 何時做 who 由誰做 Why 為何這樣做how 何時做delay 等待operation 操作inspection 檢查transportation 搬運storage 儲存Color management 顏色管理Quality Control Circle 品管圈 (QCC) Activity-Base Management 作業制成本管理(ABM) In-Process Quality Control 製程品質管制 (IPQC) Incoming Quality Control 進料品質管制(IQC) International Organization for Standardization 國際標準組織 (ISO) Predetermined Motion Time Standard 簡稱PTS 預定動作時間標準法Methods-time-measurement 方法時間衡量Work factor system 工作因素法 (WF)Modolar arrangement of pre-determind time standard MOD 法 Leveling 平準化= westing 西屋法 objective rating 客觀評比 synthetic leveling 合成評比 Work Sampling 工作抽樣 Motion time analysis 動作時間分析 Business Process Reengineering (BPR)企業流程再造 Enterprise Resource Planning ERP 企業資源規劃 Economic Order Quantity (EOQ)基本經濟訂購量 Flexible Manufacture System 彈性製造系統 (FMS) Finish or Final Quality Control 成品品質管制(FQC) In-Process Quality Control 製程品質管制(IPQC) Incoming Quality Control 進料品質管制 (IQC) Just In Time 即時管理 (JIT) Manufacturing Execution System 製造執行系統 (MES) Master Production Scheduling 主生產排程(MPS) Master Production Planning 主生產計划Material Requirement Planning 物料需求規劃 (MRP) Manufacturing Resource Planning 製造資源計劃 (MRPII) Operation Scheduling 作業計划 Flow shop 流水車間Optimized Production Technology 最佳生產技術Supply Chain Management 供應鏈管理(SCM) Statistic Process Control 統計製程管制(SPC) Total Production Management 全面生產管理(TPM) Total Quality Management 全面品質管理 (TQM) Zero Defect Quality Control 零缺陷質量管理: PDCA Cycle PDCA 循環: continue Improvement 持續改善: Project 項目Project Manager 項目經理 Project Management 項目管理 Project Plan 項目計划 Process Improvement 現場改善 WORK IN PROCESS 半成品 President 董事長 Visual management 目視管理 bottleneck 瓶頸Layout 布置圖quality engineering 品質工程人員(QE) first article inspection 新品首件檢查(FAI) first article assurance 首件確認(FAA) capability index 能力指數(CP) Quality Improvement Team 品質改善小組(QIT) Classification 整理(sorting, organization)-seiri Regulation 整頓(arrangement, tidiness)-seiton Cleanliness 清掃(sweeping, purity)-seiso Conservation 清洁(cleaning, cleanliness)-seiktsu Culture 教養(discipline)-shitsuke Save 節約 Safety 安全 Make-to-stock 備貨型生產(MTS) Make-to-order 訂貨型生產(MTO) Assemble-to-order 按訂單裝配(ATO) Flexible manufacturing system 柔性制造系統 Group technology 成組技術(GT) Concurrent engineering 并行工程(CE) Time compression technology 時間壓縮技術(TCT) Business process reengineering 業務過程重組 (BPR) Agile manufacturing 敏捷制造(AM) Leap production 精細生產 (LP) Intelligent manufacturing 智能制造(IM) Computer-aided-manufacturing 計算机輔助制造(CAM) Computer-aided-design 計算机輔助設計(CAD) Computer-aided-engineering 計算机輔助工程(CAE) Computer-aided-process planning 計算机輔助工藝編制 ( CAPP) overall cost leadership 成本优先differentiation 獨具一格Market focus 集中一點cost efficiency 成本效率quality 質量Dependability 可靠性Flexibility 柔性 product date management 產品數据管理(PDM) Facility location 設施選址 Fixed position layout 固定式布置process layout 工藝過程布置 layout based on group technology 成組制造單元布置 Job design 工作設計 work measurement 工作測量 Time study 時間研究 Basic motion study 基本動作世界研究法(BMS) Modolar arrangement of predetermind time standard 模特法 Human factor engineering 人因工程business plan 經營計划Fixed capacity 固定能力Adjustable capacity 可?#123;整能力production rate 生產率Inventory 庫存Job-shop production 單間小批生產 Bill of materials (BOM)物料清單文件 Lead time 提前期 modular bill of materials 模塊物料清單 Maximum part-period gain 最大周期收益(MPG) distribution requirements planning 分配需求計划scheduling 編制作業計划 sequencing 排序 Dispatching 派工 controlling 控制 expediting 趕工 supply chain 供應鏈 Purchasing Management 采購管理Quick Response 快速用戶反應JIT Purchasing 准時采購physical distribution 物流 Materials handling 物料搬運 project 項目 critical path method 關鍵路線法 optimistic time 最樂觀時間 Most likely time 最可能時間 pessimistic time 最悲觀時間 Mean time between failure 平均故障期 (MTBF) Mean time to repair 平均維修期(MTTR) plan 計划do 執行 check 檢查 action 處理 level production 生產平準化 optimized production technology 最优生產技術(OPT) Overall Equipment Effectiveness 整体设备效能 Operation Research 運籌學 Service Sector 服務業 Operation Management 運作管理Operation System 運作系統World ClassManufacturing 世界級制造Time-based Competition 基于時間的競爭Operation Flexibility 運作戰略 Product Development 產品開發 Dependent Demand 獨立需求 Economic Order Lot 經濟訂貨批量: Safety Stock 安全庫存Shortage Costs 缺貨成本 ABC Classing Method A BC 分類法 Reorder Point 訂貨點 Holding Costs 存儲成本 Productivity Improvement Team 生產力提升小組(PIT) Productivity Improvement Center 生產力提升中心(PIC) 工厂常用詞匯 Assembly& Loading Clips 組合上耳夾 Break PAD 折 PAD Break PIN 折腳Paste Base 沾 BASE approved by: 核準 Apr.(April) 四月assembly(ass’y)組合 Aug.(August) 八月 Base 底座 bifilar 雙線並繞 Bobbin(BBN)繞線管bottom 底部 Brush Epoxy On Core 鐵芯刷膠Brush Epoxy On Loop 線圈刷膠 checked by: 審核 Choke 電感 clip 耳夾close winding 密繞component 元件condition 條件condition 條件copper 銅箔立式core 鐵芯Curing 烘烤current 電流CUT WIRE 裁線Dec.(December) 十二月defective product box 不良品箱deficient manufacturing procedure 制程不良 description: 說明 Design Failure Mode and Effect Analysis DFMEA 設計 Desk Top dip 浸入 Direction 方向 ECN Engineering Change Notice 工程變更通知 Electronic Magnetic In EMI 抗電磁干擾 Enameled copper wire 漆包線 Engineering Change Request 工程變更要求epoxy 膠equipment/instrument 設備Failure Mode and Effect Analysis FMEA 失效模式與效應分析Feb.(February) 二月fixture 治具flow chart 流程表單flux 助焊劑FN: Factory Notice 工厂通知FN: Immediated change 立即變更 Function test 測試 gap 間隙,縫隙 HI-POT 安規測試 IE﹕Industrial Engineering 工業工程impregnation 浸泡inductance 電感ink 油墨inspection(INSP)檢查Insulating Tape 絕緣膠布 issued date: 發行日期 item 發料 Jan.(January) 一月 Joint Quality Engineering (JQE) Jul.(July) 七月 Jun.(June) 六月Kapton Tape 高溫膠布 layer 層 line 線 Magnetic Components 磁性元件magnetic 磁性的Mar.(March) 三月Margin Tape 安膠marking 印章materials 物料May 五月ME: Mechanical Engineering 機械工程measurement 測試 mechanical dimension 外觀尺寸 MFG: manufacturing 製造Mini-Tower Model: 機種 Not Deviate Measure 量平整度 Nov.(November) 十一月 O/I Operation Instruction 作業指導書 Oct.(October) 十月 OEM:委託代工 (Original Equipment Manufacture) oven 烤箱 P/n: part number 品名P/R Pilot-Run 試作驗證 pad 墊片 PE Production/Process Engineering 制造工程/制程工程 pin adjustment 對腳PIN BENDING& WIRE TRIMMING 折彎鋼片pin 腳plastic 塑料,塑膠poor processing 制程不良 Pre-soldering 預焊 primary(pri)初級 process 流程production capacity 生產力臥式 production control (PC)生管 purchasing 採購QCC:品管圈(Quality Control Circle) QE:品質工程(Quality Engineering) remark: 備注 Reported by: 草擬 Revision(REV﹒): 版本sample 樣品schematic 結構圖second(sec)次級Sept.(September) 九月solder bar 錫棒solder iron 烙鐵solder wire 錫絲soldering 焊錫solvent 稀釋劑space winding 疏繞Specification (Spec)生產規格stand-off 凸點 station 站別 step 步序 straighten 弄直,使變直 tape 膠帶 TE: Test Engineering 測試工程 terminal 腳,端子 Time (時間) timer 定時器 top 頂部,上層 transformer 變壓器 trifler 三線並繞tube 套管 turn ratio 圈數比 turn 圈數 twist 絞線 Unloading The Clips 下耳夾 UPH unit per hour 單小時產量 UPPH unit per person hour 人均單小時產量vacuum 抽真空varnish dipping 泡凡立水varnish 凡立水warehouse 倉庫 winding direction 繞線方向 winding 繞線 wire trimming 理線。
FAI——精选推荐
FAIFAI⽬录编辑本段⾃由电枢式燃油喷射单元(Free Armature Injection-FAI),FAI是浙江飞亚电⼦有限公司⼀个独⽴完整的技术体系,它包括⼯作原理发明、技术突破和理论突破。
FAI技术体系为⼩型发动机的升级提供了⼀个技术平台,在此基础上,⼩型发动机能够在性能、燃油消耗和排放污染三个⽅⾯得到全⾯的提升。
FAI技术体系的诞⽣是⼩型发动机发展史上的⼀个⾥程碑。
⼯件原理FAI体系的燃油喷射执⾏器是⼀个动⼒喷嘴。
动⼒喷嘴能够将电能直接转化为机械能,通过机械能喷射和雾化燃油,FAI动⼒喷嘴的⼯作是由电脉冲(PWM)驱动的。
FAI 动⼒喷嘴包含多项技术突破,其中基本特征是其中包含⼀个独⽴的⾃由电枢,故称为⾃由电枢喷射技术:(Free Armature Injection-FAI)。
FAI技术的发明,极⼤地降低了动⼒喷嘴的制造难度,成本也随之⼤幅度下降。
基本特征泵喷嘴⼀体化。
燃油箱内不再需要⼀个分离式的燃油泵⽤于提供压缩燃油,有利于降低制造成本和电能的消耗。
不需要⼀个内含⾼压油的管道(油轨),与油箱连接的管路均为低压油管,有利于增加安全性。
喷射压⼒⾼,燃油雾化质量好,有利于车辆的冷启动和过渡,见下图。
燃油喷射速度⾼,贯穿距离⼤,有利于动态反应。
技术创新流体附⾯层泵在流体附⾯层不对称交变条件下,液体可以形成定向运动,流体附⾯层泵就是基于这个原理⼯作的,其特点在于:没有阀体和额外的运动件,其输⼊与输出之间时刻保持畅通。
流体附⾯层泵有效地解决动⼒喷嘴的排热难题。
图⽰为流体附⾯层交替变化的CFD模拟结果。
动⼒喷嘴包含⼀种⽆阀式⾼压泵,结构简单可靠,并能够有效避免燃油蒸汽进⼊压缩腔,其⼯作过程如下图所⽰。
垂直喷射FAI动⼒喷嘴能够在垂直于电枢运动⽅向喷射燃油,从⽽⼤⼤地拓展了应⽤范围。
理论突破物理模型燃油喷射技术是以燃油计量⽅法为理论基础的。
传统的燃油共轨系统的燃油计量基于经验公式,FAI体系的燃油计量则基于数学物理模型。
常用质量英文缩写
序号 1
缺陷中文名称 沾胶
缺陷英文缩写 SG (Stick Glue) CS (Cold solder) EP (Excess Part) ES (Excess Solder) FL (Float Part) FM (Foreign Material) FP (Flip Part)
2
3 4 5 6
• SOP----Standard Operate Procedure 标准作业规范 • SIP----Standard Inspection Procedure 标准检验规范 • BOM----Bill of Material 物料清单 • IS----Inspect Standard 检验规格 • CPU----Central Processing Unit 中央处理器 • IC----Integrated Circuit 集成电路 • LED----Light-Emitting Diode 发光二极管
• • • • • • • • •
P/N----Part/Number 料号 Lot No----Lot Number 批号 Defect----缺陷 CRI----Critical 严重的 MAJ----Major 主要的 MIN----Minor 次要的 AQL----Accept Quality Level 品质允收水准 LRR----Lot Reject Rate 批退率 AOQ----Average Output Quality 平均出厂水准
• QST----Quality Show Team 质量指导小组 • QIT----Quality Improvement Team 质量改进小组 • QCC----Quality Control Circle 质量改进圈(品管圈) • CAT----Corrective Action Team 改正行动小组 • CAR----Corrective Action Request 改善动作报告
电子厂常用英语
Plskindlyreviewit请尽快回复TKS::谢start:开始时间End结束时间Target预计结束时间cut off截止时间update更新below is Failure summary以下是不良明细QAquality assurance质量保证IQA:Imcomingqualityassurance进料品质保证进料检验PQA:process quality assurance制程品质保证CQA:customerqualityassurance客户品质保证质检RQA:Recallqualityassurance回收物料品质保证OQA:outputqualityassurance出货品质保证SQA:supplier quality assurance软件质量保证LQA:laboratory quality assurance检验品质保证MQA:manufactune quality assurance制造品质保证VQA进料品质保证QC:quality control品质管控IPQC:in process quality control制程品质管控巡检OQC:out going quality control出货品质管控出货检验RQC:Recall quality control物料回收品质管控FQC:Finallqualitycontrol最终品质管控最终检验TQC:Total quality control全面质量管控TQM:Tontal quality control全面品质管理IQC:Imcomingqualitycontrol进料品质管控SQC:Statisticalqualitycontrol统计品质管控PQC:passage quality control段检品质管控QE:quality engineering质量工程SQE:Supplier quality engineering供应商品质工程师VQE:Verdor quality engineeringJQE:Joint quality engineering协力品质工程师PQE:processqualityengineering制程品质工程师PEproduction engineering制造工程TEtestengineering测试工程MEmechanical engineering机械工程IEindustrialengineering工业工程DE: Desense 拆机测试品质指数:quality index品质目标:quality target品质方针:qualitypolicy品质要求:quality requirement品质改善:qualityimprovement品质保证:qualityAssurance品质管控:quality control品质检验:quality inspcton品质管理:qualitymanagerHRhuman resoures人力资源PCproduction control生管DCCdocument control资料中心PD:product Department生产部制造部:production departmentquality control Department品质部工程部engineering departmentPM:project management专案管理MM:Material management物料管理MC:Material control物控BOMBill Of Material物料清单MLB:Main Logistic Board主板PCB板:printed circuit boardP/Npart munber料号SMT:surface mounting technology表面贴装技术S/Nseries number序列号sop:standardoperationprocedure标准作业指导书Wi:working instruction作业指导书SIP:standard instruction procedure标准检验规范O/Ioperation instuction工作指导书ECN(engineering change notice)工程变更通知FAIfirst article inspection新品首件检查FAAfirst article assurance首件确认OBA:openboxaubit开箱检验outofboxauditPCS:数量ISO:Internationalorganizationforstandardization国际标准化组织通风系统:Ventication system车间环境:working place environment车间:workshop工艺流程图:process flow diagramoperation procedure作业流程生产流程:production flowshut down关机copy复制保存:replace异常机:Abnormal UinitCTR:异常机BTR:正常机脏污:Dirtydeformation变形刮伤:surfacefinished product成品semi-finished product半成品goodproduct/acceptedgoods/acceptedparts/good parts良品defective product/non-good parts不良品WIP work in progress半成品cause analysis原因分析cosmetic inspect外检良率:yield不良率:Failure vate投入数:input quatity插入:plug in释放,流拉:release点击:click拔掉:unplug,remove弹出:display扫描:scan目检:inspect连接:connectmodel机种revision版本异常:abnormalities维修:repair生产人员:production personbel 测试人员:opratorsproduction team作业员线长:Line suppervisor领导:leader经理:manager总经理:general manager老板:boss科长课长主管:supervisor组长:team leader助理:assitand工程师:engineering副手:assitand adunct员工:personrel全技员:multi function厂长:director of a factory董事长:chairman, the board of directors总裁:president, director general customer客户purchasing采购warehouse仓库ENGengineering工程discription描述remark备注MA major主要的MIminor次要的supplier/vendor厂商material物料barcode条码board看板label标签Rivet table拉钉机power wire电源线capacitor电容case外壳washer垫片connector连接器fan风扇heatsink散热片Rivet gun拉钉枪Screw driver起子Electric screw driver风批Pneumatic screw driver电批desktop台式机fasten螺丝screwfixture夹具(治具)pallet栈板硬盘:HD,disk内存:memorry支架:bracket底盖:footbarcode scanner扫描枪IC集成电路电阻resistor开关switch噪音noise程序procedure检验员inspectortarget预计技术员technician抽检sample checkPO purchase order订单deficient purchase来料不良classification整理regulation整顿cleanness清扫conservation清洁三月march四月april五月may六月June七月JuneI will soon get used to the work我很快就会习惯这项工作的this company is our regular customer这家公司是我们的老顾客youbecamemoreandmorebeautiful你变的越来越漂亮了没问题No problemfunction test功能测试flux助焊剂fuse保险丝packing包装station工站temperature温度solder machine锡炉插座socket颜色单词红色red绿色green白色white黄色yellow黑色black蓝色blue棕色brown金色gold紫色purple(violet)银色silverJanuary一月february二月八月August九月september十月October十一月November十二月December11/ 11。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
What is the purpose an FAI?
The purpose of the First Article Inspection is to provide objective evidence that all engineering design and specification requirements are properly understood, accounted for, verified, and documented. The purpose of this standard is to provide a consistent documentation requirement.
Yellow – Blue – White – Required Conditionally Required Optional
Required by Goodrich
1 – Goodrich Part Number
The actu Part Name
YELLOW or LIGHT GREY fields – MANDATORY information required. BLUE or DARK GREY fields – CONDITIONALLY Required REQUIRED. These fields must be completed by when information is available. Goodrich WHITE fields – OPTIONAL information required when available.
The part name listed on the drawing
3 – S/N
The Serial Number for the part being FAI.
4 – FAI Report Number FORMAT: Suppliers choice. We at Goodrich use: 5 – Part Rev
10 – C of C: Number of the certificate: special process completion certification, raw material test report number, Standard Catalog hardware compliance report number, traceability number. 11 – Test Procedure Number and Revision: Enter all functional test procedures (for example, ATP, and ESS) used to test the product. Include document revision. See examples on “Example – Materials, Special Processes & Test Procedures” slide 12 – Acceptance Report Number, if applicable: The functional test certification indicating that test requirements have been met. Some reports will not have a report number – enter ‘N/A’ 13 – Comments: Enter Comments if necessary
Form 1 of Supplier FAI doc.
1 - Part Number 2 - Part Name 3 - Serial # 4 - FAI Report # 5 - Part Rev Level 6- Drawing # 7 - Drawing Rev Level 8 - Additional Changes 9 – Manufacturing Process Ref 10 - Organization Name 11 - Supplier Code 12 - Purchase Order Number 13 – Delta or Assembly FAI 14 – Full or Partial FAI Index of part # or sub-assy required to make assy. – 15 – Part # – 16 – Part Name – 17 – Part S/N – 18 – FAI Report # 19 thru 24 – Signatures and Dates
When is it a Full FAI?
– When one has not been submitted. – Two years since manufacturing the part. – Changes in manufacturing (look at AS9102 for details)
How to write up an FAI step by step
Supplier FAI’s
All Detailed, Assembly, and sub-assembly part shall have a FAI done.
AS9102 Form 1 – Part Number Accountability
* In “Reason for Partial FAI” put in ECO#
Index of Part Numbers or Sub-Assembly required to make assembly.
•The index of part numbers or subs that need to be on this list are all parts from the parts list. If the part is MS put N/A for the FAI Report Number, otherwise all the parts must all have documented FAI’s on file. •All columns must be filled out. If NOT the “FAI Complete” Check box can NOT be checked and “FAI Not Complete” must be checked
Form 2 of Supplier FAI doc.
• 5 - Material or Process Name •6 - Specification Number •7 - Code •8 -Special Process Supplier Code •9 - Customer Approval Y/N •10 - C of C Number •11 - Functional Test Procedure Number •12 - Acceptance Report Number •13 - Comments •14 - Prepared By •15 - Date
5 – Material Specification/Certification or Special Process Name: Enter materials (for example, aluminum bar stock) and any special processes (for example, soldering, brazing, or painting) used in manufacturing with this product. See examples on “Example – Materials, Special Processes & Test Procedures” slide 6 – Specification Number: Enter the specification number for the material or special process used, for example, J-STD-001, Mil Specs, etc. See More examples on “Example – Materials, Special Processes & Test Procedures” slide Procedures 7 – Code: Code is always ‘N/A’ 8 – Special Process: Customer given Supplier code for the organization performing special process(es) or supplying material, as applicable. Or add Special process supplier name and address. 9 – Customer Approval Y/N: Review customer requirements for special process or material source. Write ‘N/A’ if Customer approval is not required.
What is a Full FAI?
– All Notes and Dimensions with the exception of reference dimensions on the drawing are measured and/or inspected at the appropriate step in the process.
7 – Drawing Revision
The revision of the Goodrich drawing for this part that this FAI is being performed to.