变频器水冷系统操作维护手册

合集下载

WCFS G L R 水冷机所有者手册说明书

WCFS G L R 水冷机所有者手册说明书

USES HFC-134A REFRIGERANTOWNERS MANUALBacksplash Model Water CoolersFIG. 142413328,432926253624352723222631322434213839See Fig. 3 (on Page 3)For Push Bar Mechanism29374030NOTE: Non-refrigerated units do notinclude all electrical and refrigeration com-ponents shown above. Other components and rough-in are the same as shown.Uses HFC-134A refrigerantNote: Danger! Electrical shock hazard. Disconnect power before servicing unit.F IG . 2L E G E N D /L E Y E N D A /L ÉG E N D E A = R E C O M M E N D E D W A T E R S U P P L Y L O C A T I O N 3/8 O .D . U N P L A T E D C O P P E R T U B E C O N N E C T S T U B 1-1/2 I N . (38m m ) O U T F R O M W A L L S H U T O F F B Y O T H E R S B = R E C O M M E N D E D L O C A T I O N F O R W A S T E O U T L E T 1-1/4” O .D . D R A I N C = 1-1/4 T R A P N O T F U R N I S H E D **D = E L E C T R I C A L O U T L E T L O C A T I O N E = I N S U R E P R O P E R V E N T I L A T I O N B Y M A I N T A I N I N G 6" (152m m ) (M I N .) C L E A R A N C E F R O M C A B I N E T L O U V E R S T O W A L L .F = P O W E R C O R D 1-1/2F E E T (457m m ) L O N G G = A L T . E L E C T R I C A L O U T L E T L O C A T I O N H = T H I S B O L T H O L E M U S T B E U S E D F O R F A S T E N I N G U N I T T O W A L L .J = O R I F I C E H E I G H T 1-1/4" (32m m ) A B O V E R I MF I N I S H E D F L O O RHANGER BRACKETS & TRAP INSTALLATION1) Remove hanger bracket fastened to back of cooler byremoving one (1) screw.2) Mount the hanger bracket and trap as shown in Figure 2. NOTE: Hanger Bracket MUST be supported securely. Add fix -ture support carrier if wall will not provide adequate support.IMPORTANT:• 5-1/2 in. (140mm) dimension from centerline of unit to centerline of trap must be maintained for proper fit. Anchor hanger securely to wall using all mounting holes.3) Install straight valve for 3/8" O.D. unplated copper tube.INSTALLATION OF COOLER4) Hang the cooler on the hanger bracket. Be certain the hanger bracket is engaged properly in the slots on the cooler back as shown in Figure 2.5) Loosen the two (2) screws holding the lower front panel at the bottom of cooler base and two (2) screws at the top. Remove the front panel and set aside.6) Connect water inlet line--See Note 4 of General Instructions.7) Remove the slip nut and gasket from the trap and install them on the cooler waste line making sure that the end of the waste line fits into the trap. Assemble the slip nut and gasket to the trap and tighten securely.START UPAlso See General Instructions8) Stream height is factory set at 35 PSI. If supply pressure varies greatly from this, adjust screw, ac-cessible by removing front panel (Item 7, Fig. 3). CW adjustment will raise stream and CCW adjustment will lower stream. For best adjustment, stream should hit basin approximately 6-1/2” (165mm) from bubbler.9) Replace the front panel and secure by retightening four (4) screws.PUSH BAR MECHANISMLEGENDA) Note: Water flow directionB) Adjust this screw to eliminate mechanism “Free Play” or continuous flow from bubbler conditions. (See ADJUSTMENT PROCEDURE)C) Stream height adjustment (see note #8)Water Valve Mechanism - ADJUSTMENT PROCEDURE:- Turn adjustment screw (Item 9) “Counter-Clockwise” until water flow from bubbler starts.- Turn adjustment screw “Clockwise” until water flow stops, THEN turn an additional 1/2 turn.NOTE: Adjustments stated above are viewed from underneath unit (bottom side of dispenser panel Item 1)NOTE: If continuous flow occurs at the end of the compressor cycle, turn cold control (Item 46) counterclockwise 1/4 turn.ITEM NO.PART NO.Panel - Bottom DispenserKit - Push Bar/Pivot Blocks/Bumpers/Rivets Kit - Pushbars (Front & Sides)/Inserts/Nuts Kit - Front/Side Pushbar Bracket/Screws Panel - Right Side Panel - Left Side Panel - Front PushScrew - Regulator Brkt. Mtg.Screw - Shoulder x 1/2" Lg.Kit - Regulator/Holder/Nut Bracket - Regulator Mounting Hex Nut26588C 98537C 98895C 98789C See Color Table See Color Table See Color Table75502C 70935C 98531C 23003C 40045CItem No. 5Part No.(w/o hole)COLOR TABLEPlatinum Vinyl Stainless Steel Almond Vinyl Slate Vinyl26644C 26637C 26636C 26646C 26659C 26652C 26651C 26661C 26614C 26607C 26606C 26616C PANEL COLOR123456789101112DESCRIPTION26629C 26622C 26621C 26631C 26599C 26600C 26601C 26602CItem No. 5Part No.(with hole)Item No. 6Part No.(w/o hole)Item No. 6Part No.(with hole)Item No. 7Part No.FIG. 36434733334289 B2C44212111010101345A115V PARTS LISTITEM NO.PART NO.21222324252627282930313233343536*37383940414243Power Cord Fan BracketKit - Fan Motor Assy/Blade/Shroud/Nut/Screws Angle - Bracket Corner Bracket - Front Support Bracket - Basin Mounting Frame - Back/BottomClip (Front and Rear Panels)Kit - Bubbler Chrome (Bubbler/Nipple/Gaskets)Tubing - Poly (Cut to Length)Kit - Condenser/Drier DrierWrapper - Platinum Vinyl Wrapper - Slate Vinyl Wrapper - Almond Vinyl Wrapper - Stainless SteelKit - Compr Mtg (Grommets/Cotter Pin/Washers)StrainerKit - Evaporator Replacement Assembly Compressor Serv. PakKit - Electrical (Relay/Cvr/Overload)Kit - Cold Control/Screws Kit - Heat Exchanger/DrierKit - Drain (Tailpipe/Strainer/Ferrule/Gasket)Basin - Stainless Steel Screw - Basin Mtg.36208C 27095C 98775C 27093C 27094C 28797C 27097C 70142C 98533C 56092C 98776C 66703C 26680C 26682C 22707C 22708C 000000025255996C 98724C 36322C 000000023898773C 98778C 98790C 26664C 75536CDESCRIPTION*INCLUDES RELAY & OVERLOAD. IF UNDER WARRANTY , REPLACE WITH SAME COMPRESSOR USED IN ORIGINAL ASSEMBLY .NOTE: All correspondence pertaining to any of the above water coolers or orders for repair parts MUST include Model No. and Serial No. of cooler, name and part number of replacement part.PRINTED IN U.S.A.2222 CAMDEN COURT OAK BROOK, IL 60523630.574.3500CORRECT STREAM HEIGHTFIG. 4FOR PARTS, CONTACT YOUR LOCAL DISTRIBUTOR OR VISIT OUR WEBSITE 35827C 0000000244100000214798751C 35826CPower CordKit - Fan Motor Assy/Blade/Shroud/Nut/Screws Compressor Serv. PakKit - Electrical (Relay/Cvr/Overload)Power - Inlet2125*3738-230V-50Hz PARTS LIST。

发电机水冷系统操作维护手册

发电机水冷系统操作维护手册

\发电机发电机水冷系统水冷系统 操作操作维护维护维护手册手册B4212艾维恩能源设备(苏州)有限公司A V N E N E R G YInstallation/安装Mounting of the LCU/冷却系统的安装1. Mount the frame of the unit safely supported./将冷却系统安全的固定在支架上。

2. Connect the hoses according to the “Diagram for component placement” and make surethey are safely fastened./根据《零配件装配图》将管路接好,并确保接口已经接牢。

3. Connect transmitters to the control unit. Use the datasheet for each transmitter for correct connection./将传感器接入控制单元。

请严格按照要求将传感器安装在正确的位置4. Prepare the wiring to the pump motor according to the datasheet./根据说明书的要求准备好连接泵电机的电线。

Electrical connections./电路接法The electrical connections should be carried out by an authorized electrician in accordance with local regulations. We are not responsible for any accidents which are caused by non observance of this instruction.仅允许获得授权的专业电气工程师进行电路连接作业。

由于违反此规定而引起的任何事故,我们将不承担任何责任。

Windey-2.5MW发电机水冷系统调试维护使用手册

Windey-2.5MW发电机水冷系统调试维护使用手册

Windey-2.5MW发电机水冷却系统 调试维护使用手册贺德克液压技术(上海)有限公司1.使用范围本系统用于Windey-2.5MW风力发电机组发电机水冷却系统。

2.设计、制造标准本系统针对Windey-2.5MW风机发电机水冷却系统设计,按HYDAC公司相关标准制造。

3.工作环境条件安装地点: 内陆地区:低温、风沙海拔高度: 小于1500米工作环境温度: -30℃ ~ 40℃(大于35℃时降容工作)生存环境温度: -40℃ ~ 50℃4.系统参数4.1冷却对象发电机:发热量: 90 KW最大工作压力: 4 bar冷却介质流量: 250 l/min工作环境设计温度: 35℃(大于35℃时降容工作)额定功率时进水温度: 45℃最高出水温度: 52℃进出水压降: 1.0bar冷却液品质: Antifrogen NClariant GmbH乙二醇45%,水55%或同品质冷却液连接管路: DN404.2 冷却系统冷却介质预充压力: 3.2bar(20°C时)冷却系统工作压力: ≤4 bar冷却系统工作流量范围: 250 l/min,35米扬程时冷却介质工作温度范围: -30 °C <T< +70 °C•推荐工作介质:水添加剂 制造商/经销商 浓度 Varidos FSK NALCO AG *Glythermin GP 42-51 BASF AG *Glythermin P 44-95 BASF AG *> 40 % 至 60 % Antifrogen N Hoechst AG *Antifrogen L Hoechst AG *每2年更换一次冷却介质,或按照介质制造商的说明。

5.设备组成水冷却系统主要由水泵装置、水/风冷却装置(OK-EL11)和连接胶管组成。

5.1水泵装置(见附图)水泵装置:3523190 采用M12螺栓固定z泵数量: 1台z水泵工作流量: 250l/min , 35米扬程时z水泵电机: AC 400V/690V-50HZ-3相3KW 2980rpmz进出到发电机油口尺寸: G1 1/2” 1个z进出到冷却器油口尺寸: G1 1/2” 1个z压力继电器: 0.6 bar发讯 100VAz压力罐: 35L 预充氮气压力1.5 bar,最高工作温度+70°C (若温度超过+70°C,会损坏压力罐的隔膜)z安全阀开启压力: 4 barz PT100: 1个z压力表:0-6 barz充/排水阀:1个z排气阀:1个 材料为铜X = 推荐备件产品WGK-Windey2.5MW-Gen/153/690-50件号 3523190Pos.项 元件描述 数量型号/图纸10 Ausdehnungsgefäss压力罐1Ausdehnungsgefaess35l;p0=1,5;pmax=6606726820 x Umwälzpumpe循环泵 1 GRUNDFOS CRI 15-3 3kW 690-50 347387630 x Widerstands-Thermometer温度传感器2 Widerstandsthermometer PT100 (60mm) 600633740 x Manometer压力表 1 MANOMETER NG 63- 6-G 1/4B-BEHIND*608340250 x Druckschalter压力开关 1 Drucksch.-0166-403-03-1-011/0,6bar(见附图)304521860 x Entlüftung放气阀 1 Schnellentluefter 3/8", 10 bar排气阀302768070 x Sicherheitsventil安全阀1Membransicherheitsvent.1/2"x3/4"4bar342344680 x Kugelhahn球阀 1 KUGELHAHN SIMPLEX FE 1/2" 301418290 Schlauch软管 2 SCHLAUCHDN16-DKOL18-90-0590-DKOL18-003074612100 Schlauch软管 1 Schlauch EN854-1TE-20-NBR 609399 110 x Schraubkuppl测压接头 1 Schraubkuppl.2103-01-18.10 HD-G 1/4 606304 120 Weithals接水瓶 1 Weithals-Plastikflasche 1000ml 3141769水泵电机接线图5.2水/风冷却装置 2个OK-EL11LLL-L 并联(见附图)冷却器电机: AC690V-50HZ-3相1 kW - 450 rpm/ 3 kW - 970 rpm加热带230V 40W 单相每个冷却器进出口尺寸:G1 1/2” 2个产品FD365100/Windey-2.5MW发电机水冷装置件号 3682917Pos.项 元件描述 数量型号/图纸1 X电动机 1 M2QA-132M12/6A-1/3KWX12/6PB5/690V/50Hz*61123772 X 散热片 1 WAERM.OK-EL11/3.0/SPES.113mm NOT FLUSH.32985613 X 风叶 1 LUEFTER1000/12-12/37.5BD/PAG/S/FM38/L82*3255186冷却器电机接线图(含加热带)wiring diagram 2U 2V 2W2U 2V 2W450 r/min970 r/min L1 L2 L3L1 L2 L32221 230V YYY1U 1V 1W 1U 1V 1W space heater400V/50HZ motor of cooler2221 40W5.3连接胶管(见附图)6.功能说明水冷却系统由水泵装置、压力罐、压力继电器、水/风冷却装置、温度传感器等组成。

水冷机组安装使用维护说明书

水冷机组安装使用维护说明书

目录一、产品保修政策 (1)二、水冷螺杆式冷水机组的特点及适用性 (3)三、机组组成及特点 (3)四、搬运、安装及注意事项 (3)五、机组的电气连接 (6)六、操作保养与维护 (8)七、各部件使用及检修方法 (11)八、常见故障分析 (15)附图、冷却〔冻〕水循环连接图 (17)说明:1、2、一、产品保修政策感谢贵公司使用"台佳"中央空调产品,我公司将秉承用户至上、服务第一的理念,为您提供优质、高效的售后服务。

有关产品保修内容说明如下:1.质量保证服务(1)质量保证指产品在本公司规定的使用条件和期限内,对产品因制造、装配及材料等方面造成各类故障及损坏的零部件〔丧失使用功能〕,本公司无偿为用户提供技术服务〔维修或更换相应的零部件〕,以确保用户正常使用。

(2)无偿技术服务以维修、更换零部件、恢复设备性能为主的原则,并保证设备维修后达到正常使用的技术水平。

(3)强制保养的规定:"台佳"水冷螺杆式冷水机组强制保养规定,用户从设备调试之日起计算,设备运行在1000小时范围内,必须由本公司认可的专业技术人员进行强制保养。

由于此次保养对此后设备的使用、安全以及寿命有极其重要的作用,所以本公司强制要求每台新设备投入使用后必须在运行1000小时内,由本公司专业技术服务人员进行一次强制保养,否则按用户自动放弃质量保证权力处理。

"强制保养"中如需更换冷冻油、冷媒、干燥过滤芯等消耗材料,费用均由用户承担。

(4)"台佳"水冷螺杆式冷水机组定期保养规定:设备长时间停机之时需做一次保养工作,设备下次开机之前需做一次开机前的保养工作。

2.不予质量保证服务的事项(1)没有按本手册的要求使用设备。

(2)自行或非本公司专业技术服务人员对设备予以开机调试。

(3)自行或非本公司专业技术服务人员拆修设备。

(4)因水系统、供电系统等其他外围造成的设备损坏。

(5)因搬运、安装、保管不当等造成的设备损坏。

上海电气1.25MW变频器水冷系统维护使用手册(1105)

上海电气1.25MW变频器水冷系统维护使用手册(1105)

Sewind1.25MW 变频器水冷却系统使用维护说明书 贺德克液压技术(上海)有限公司1.使用范围本系统用于Sewind1.25MW风力发电机组变频器水冷却系统。

2.设计、制造标准本系统针对Sewind1.25MW风机变频器水冷却系统设计,按HYDAC公司相关标准制造。

3.工作环境条件水冷却装置安装于有保护的机舱内部。

安装地点: 高空塔架上工作环境温度: -20℃ ~ 30℃生存环境温度: -25℃ ~ 40℃空气相对湿度: 最大95%海拔高度: 小于1000米4.系统参数冷却能力: 32KW/23KW,1420rpm/980rpm(环境温度30℃;冷却器入口温度50℃、出口温度40℃) 冷却系统介质预充压力: 2 bar(20°C时)冷却系统介质工作压力: ≤3 bar冷却系统介质工作流量: 60 l/min , 22米扬程时冷却介质工作温度范围: -15 °C <T< +70 °C冷却系统工作介质: 40%乙二醇,60%水•推荐工作介质:水添加剂 制造商/经销商 浓度Varidos FSK NALCO AG *Glythermin GP 42-51 BASF AG *> 40 % 至 60 % Glythermin P 44-95 BASF AG *Antifrogen N Hoechst AG *Antifrogen L Hoechst AG *每2年更换一次冷却介质,或按照介质制造商的说明。

5.功能说明水冷却系统由水泵装置、压力罐、压力继电器、加热器、水/风冷却器、铜热电阻、温控阀等组成。

水泵工作后,冷却水经变频器、水/风冷却器组成冷却水循环回路。

当冷却水温度升(降)到一定值时,水/风冷却器(加热器)启动;当水温降(升)到一定值时,水/风冷却器(加热器)停止。

1):水泵出口设有压力罐(序号10),预充氮气压力为1.5bar,作用相当于隔膜式蓄能器,正常情况下通过压力罐把液压能转化成弹性势能储存起来并维持泵出口压力的稳定,当系统瞬时需要大流量或泵出口压力出现波动时候,此时压力罐释放之前所储存的能量参与系统的调节。

131209E-SV1.5MW 华锐水冷系统使用和维护手册

131209E-SV1.5MW 华锐水冷系统使用和维护手册
¾ 不合适的冷却液:相应风机机型的技术规格书中所述使用环境要求的冷却液之外的情况;不合 适的冷却液包含如:不正规厂家生产、不正确使用温度的冷却液、不清洁冷却液(过滤精度应 该≤300μm )
¾ 不可抗力:不可抗力包含如:地震、台风等。
3
二.安全信息 2.1.概要
在安装在设备使用前请仔细阅读本手册,这与你的人身安全及设备寿命密切相关,在安装、调 试、维护时应该做好工作人员各方面的防护措施;例如开篇“特别提醒”。
4
2.4.环境清洁
清洁度对水冷系统的安全操作和安全处理是至关重要的。因此应该认真清洁水 冷系统及其工作环境。
泄漏的冷却液可能导致水冷系统之外器件的腐蚀,在拆卸时必须将冷却液收集 好。
如果在维修过程中有冷却液漏出,必须将其清理干净。
2.5. 环境保护
小心 CAUTION
在进行安装、维修以及拆卸工作的过程中,冷却液不可任其污染土壤,应妥善 处理。
没有特力佳公司的明确授权,本手册的全部或部分内容不得通过电子或者机械的方式复制、传 播、更改、转化、翻译或使用。
2
1.4.用户应该遵守的规则:
¾ 用户在接收特力佳产品时请保留好相关单据,以备查询; ¾ 用户在贮存过程中应该在清洁、通风、防雨、雪、水侵袭的地方,不允许在阳光下长期暴晒。
应保证包装物的完好; ¾ 产品在转移过程中不得有文件、设备或随机零部件损坏、丢失等现象; ¾ 产品在打开包装时、安装时注意不得磕碰损伤产品元器件; ¾ 产品在试验过程中按照操作手册中所涉及的基本要求进行; ¾ 在风场风机正式运行之前,确认系统的各项参数达到设定值,方可启动设备; ¾ 必须选择正规厂家生产的低温型冷却液,保证这种冷却介质不会在要求(此要求应遵循相应机
¾ 不合适的转移方式;在贮存转移、运输过程中必要的定位、加固、防震、防撞措施,装卸应小 心平稳,防止损坏防腐层,应保证包装物完好,不得有冷却系统设备或随机零部件的损坏、丢 失等现象,须遵循 GB/T9174-2008。不合适的转移方式包括如:不在规定范围的叉车装置、吊 车装置,不合格的吊索、不正确的吊装位置等;

冷却系统操作手册说明书

冷却系统操作手册说明书
minimum possible
1. Do not use the compressor as a vacuum pump or air building pump
for evacuations and pressure testing the system
2. Do not start the HDI compressor before priming the oil pump 3. Do not let the compressor run without a minimum oil level of half
21. Strainer: These must be placed in the line ahead of all expansion valves of the automatic and manual type. Suction traps are standard equipment with all compressors and are intended to remove the find particles of dirt which may accumulate in the system
10. Replace faulty pressure gauges with correct one’s immediately
11. Do not run the compressor under charged because this will lead to the over heat
12. Do not run the compressor over charged to avoid the liquid coming to the compressor

水冷却系统维护使用手册

水冷却系统维护使用手册

1.5MW风力发电机组齿轮箱水冷却系统使用维护说明书贺德克液压技术(上海)有限公司1.使用范围本系统用于明阳1.5MW风力发电机组齿轮箱水冷却系统。

2.设计、制造标准本系统针对明阳1.5MW风机齿轮箱冷却系统设计,按HYDAC公司相关标准制造。

3.工作环境条件水冷却装置安装于有保护的机舱内部。

安装地点:高空塔架上工作环境温度: -30℃—40℃生存环境温度: -40℃—50℃空气相对湿度: 最大95%4.系统参数齿轮箱发热量: ≤41KW冷却系统介质预充压力: 2 bar(20°C时)冷却系统介质工作压力:≤3 bar冷却系统介质工作流量: 100 l/min , 16米扬程时冷却介质工作温度范围: -15 °C <T< +70 °C冷却系统工作介质: 40%乙二醇,60%水推荐工作介质:每2年更换一次冷却介质,或按照介质制造商的说明。

5.功能说明水冷却系统由水泵装置、水/风冷却器、压力罐、压力继电器、铜热电阻等组成。

水泵工作后,冷却水经齿轮箱润滑油系统中的板式热交换器、水/风冷却器组成冷却水循环回路。

当冷却水温度达到一定值时,例如45℃时,水/风冷却器电机启动;当水温降到一定值时,例如40℃时水/风冷却器电机停止。

水泵出口设有压力继电器,当冷却水压力低于0.6bar时,压力继电器发出低压报警信号.水泵出口设有铜热电阻(PT100),用于检测冷却水的温度并控制水/风冷却器的电机工作或停止.6.设备组成6.1水泵装置(见附图)●水泵工作流量: 100 l/min , 16米扬程时●水泵电机: AC 400V-50HZ-3相1.1KW 2980rpm●水泵进出口尺寸:G1 1/4” 2个●温度变送器: PT100●压力继电器: 0.6 bar发讯 100VA●压力罐: 预充气体压力1.5 bar,最高工作温度+70°C (若温度超过+70°C,会损坏压力罐的隔膜)●安全阀开启压力: 3 barX = 推荐备件6.2水冷却装置(见附图)冷却器电机: AC 400V-50HZ-3相3 KW 1000rpm加热带230V 50W 单相冷却器进出口尺寸:G1 1/2” 2个7.设备安装7.1水泵装置:水泵装置必须垂直安装并可靠固定。

发电机水冷系统操作维护手册

发电机水冷系统操作维护手册

\发电机发电机水冷系统水冷系统 操作操作维护维护维护手册手册B4212艾维恩能源设备(苏州)有限公司A V N E N E R G YInstallation/安装Mounting of the LCU/冷却系统的安装1. Mount the frame of the unit safely supported./将冷却系统安全的固定在支架上。

2. Connect the hoses according to the “Diagram for component placement” and make surethey are safely fastened./根据《零配件装配图》将管路接好,并确保接口已经接牢。

3. Connect transmitters to the control unit. Use the datasheet for each transmitter for correct connection./将传感器接入控制单元。

请严格按照要求将传感器安装在正确的位置4. Prepare the wiring to the pump motor according to the datasheet./根据说明书的要求准备好连接泵电机的电线。

Electrical connections./电路接法The electrical connections should be carried out by an authorized electrician in accordance with local regulations. We are not responsible for any accidents which are caused by non observance of this instruction.仅允许获得授权的专业电气工程师进行电路连接作业。

由于违反此规定而引起的任何事故,我们将不承担任何责任。

麦克维尔VRV水冷变频空调机组操作及维护保养1

麦克维尔VRV水冷变频空调机组操作及维护保养1
● 拆除机组,移动到另一位置时 如果要拆除机组,移动到另一位置时,请联系当地销售商的专业维修人员。 如果安装不当,可能会造成触电或火灾等事故。 如果在拆除管道时处理不当,溢出的制冷剂可能会触到皮肤而引起伤害。切勿将制冷剂排放到大气中,以免造成大气环境污染。 特别提醒用户: ▲ 产品出厂时在室外板式换热器上装有电加热丝,以防止机组在其周围气温过低(<0℃)情况下停机时,板式换热器冻结。如果室外机组 周围气温有可能低于 0℃,请务必使机组保持通电状态。 ▲ 板式换热器虽然配有防冻保护,但是电源发生故障或电加热丝烧断时,以上保护实际是不起作用的;此外对于水泵和水管的防冻保护也 应给予足够的重视,我们不保证在寒冷天气情况下因上述原因导致的板式换热器和水泵、水管的损坏。 ▲ 当机组周围气温有可能低于 0℃时,用户须向水系统中加入防冻剂或采取其它防冻措施。
©2013 Shenzhen McQuay
4
● 有效使用定时器 睡眠及外出时,请利用定时器,使其仅在必要的时间内运转,以便省电。
3 机组的保养措施
! 警告
在保养之前,请务必先切断电源,让室内机、室外机停止运行。
虽然机组在最小限度的保养下具有很长的工作寿命,但是在使用过程中还必须作定期的检查,以便机组更好地运行,延长使用寿命。
吊装于天花板之内,完全隐藏,不占用墙壁和地面空间。此系列室内机有多种静压可供选用。
命名方式如:
McQuay暗装吊顶式空调器室内机
MCC 022 V P-10 R B X A IA
产品描述
额定制冷量,022代表22X100W 设计序列
制冷剂代号,P表示R410A
制热方式: 10-电加热型,电加热量10X100W
MDS-W 040 B R 5 - A AA

水冷中央空调维修技术手册(上)

水冷中央空调维修技术手册(上)

目录(上)前言 (2)第一章维修操作安全规范 (3)1、维修安全 (3)2、焊接安全: (3)3、空调维修工具 (3)第二章空调工作原理 (4)第三章电控操作说明 (7)1、电控面板示意图 (7)2、操作功能 (7)3、显示说明(针对数码管的显示说明) (8)4、故障代码显示 (8)第四章电控端口图(二线制单压三风速主板) (11)第五章空调机组电路图 (12)1、电路图(部分) (12)2、电气端子板符号 (19)3、主控板电路图(单压三风速) (19)前言本《维修技术手册》是一本针对中宇水冷中央空调日常维护保养方面的资料。

在维护保养中,请您细阅读了解手册中各项内容,这将对您的空调日常维护使用中带来方便。

保修期规定:1.整机保修期限为1年(自调试签字确认之日起),或用户购买十八个月内。

2.对于由下列情况造成的损坏,我公司有权不予保修,但可提供收费服务:1)用户因搬运、使用、维护、保管不当造成的损坏。

2)因用户电源电压超出标准规定或超出空调器正常使用范围,或者用户供电电源线路不符合要求造成空调不能正常使用或造成的损坏。

3)因不可抗拒力造成的损坏。

4)不能提供空调保修卡或购机有效凭证。

3.维修:1)如果您的空调出现故障或需要保养,请您联系我公司指定维修点(办事处)上门服务,也可以拨打我公司的服务热线。

2)维修人员上门服务时,请您检查其是否中宇公司的维修人员。

3)空调维修后,应有一小时以上试机运行时间,以检验维修效果。

4)维修运转正常后,请您在《中宇空调维护工作单》上面签名确认,并提出您宝贵的意见,如果单位用户,请加盖公章。

用户投诉途径:用户满意是我们的心愿,本公司力求给每一位用户提供规范满意的服务。

若您对我们上门服务人员的维修技能、服务态度及收费问题等有疑问或不满意之处,欢迎您随时向我们总公司用户服务中心或各地办事处咨询及投诉,我们将热诚为您服务。

第一章维修操作安全规范1、维修安全1.1维修中,要始终把安全用电牢记在心头,从思想上给予高度重视,不能有丝毫的麻痹大意。

水冷中央空调维修技术手册(下)

水冷中央空调维修技术手册(下)

目录(下)第九章空调系统日常维护 (2)1、冷却水系统的维护保养 (2)2、空调机组的维护保养 (2)3、如何解决中央空调水系统中存在的问题 (3)4、空调循环水水质处理的目的 (4)5、中宇水处理药剂及清洗策略简介 (5)6、如果中央空调出现下述问题,请考虑是否您的系统需要水处理了? (7)第十章空调压缩机原理图及维修 (8)1、涡漩式压缩机 (8)2、压缩机点检程序和处置: (9)3.压缩机更换后的确认项目 (10)4、安装工程常见注意事项 (11)第十一章空气除湿机 (13)1、系统图 (13)2、除湿机电气控制及操作说明 (13)3、除湿机电气原理图 (17)第十二章空调工程电路系统控制图 (18)1,系统自动控制原理图 (18)2,系统手动控制原理图 (18)第十三章空调工程水路系统图 (20)1、工程水系统实例 (20)2、空调工程系统实图 (20)3、同程管和异程管走向图 (21)4、电路板图片 (21)第十五章医院洁净手术部净化空调系统 (23)十六章空气源热泵热水器 (28)第一部分热泵热水器电气控制系统 (28)1、系统原理图: (28)2、电器控制设备 (29)3、电气图: (30)4、工程电气图: (35)第二部分故障分析及处理方法 (37)1、热水器电控常见故障及排除方法 (37)2、热水器电控常见故障及排除方法 (37)附录: (38)1、空调配件价格表 (38)2、维修工具价格表 (38)3、水处理药剂价格表 (38)4、质保期外收费表 (38)第九章空调系统日常维护为了使空调系统可靠节能地运行,有必要对系统进行如下日常维护保养。

1、冷却水系统的维护保养由于冷却水量及水质直接影响到空调机的制冷能力和耗电量,因此保证冷却系统管路的畅通至关重要,为此应定期对冷却水系统进行清洗。

对于安装有水处理装置的水系统,两个月应清洗冷却塔水盘、Y型过滤器过滤网一次。

每年应至少进行系统水处理一次,并做好后期的维护保养:1)物理清洗:用水枪冲洗水塔上的填料,扫除水塔盆内的泥沙及附着物,排污。

vacon NX 液冷变频器 说明书

vacon NX 液冷变频器 说明书

用户手册NX 液冷变频器在安装和调试过程中,务必按照以下快速启动指南进行操作。

如有任何问题,请与当地经销商联系。

快速启动指南1.检查产品是否与您的订单相符,见第3章收货。

2.在进行任何试运行前,请仔细阅读第1章中的安全规程。

3.根据章节6.1.1.1-6.1.2, 检查电机电缆,电源电缆,主线熔断器的规格和电缆的连接。

4.根据章节6.1.3中的安装说明进行安装。

5.在6.2.2章中给出了控制连接的说明。

6.确保使用的冷却剂有足够的压力和流量。

见章节5.2。

7.如果启动向导被激活,选择面板语言和需要的应用,并按Enter按钮确认;如果启动向导没有被激活,请按步骤7a和7b进行操作。

7a. 从菜单M6中的6.1页选择面板语言。

面板使用说明参见第7章。

7b. 从菜单M6中的6.2页选择所需要的运用,面板使用说明参见第7章。

8.所有参数都有出厂默认值。

为了保证正确的运行,请检查铭牌上的下列数据及相应的参数组G2.1中的参数:•电机额定电压•电机额定频率•电机额定转速•电机额定电流•电机功率因数 cosϕ“All in One”应用手册中解释了所有的参数。

9.参阅第8章的说明进行调试。

10.至此,可以开始使用VACON NX液冷变频器了。

违反上述操作步骤所造成的任何损失,Vacon Plc概不负责。

目录VACON NX液冷变频器和用户手册索引1 安全2 EU认证3 收货4 技术数据5 安装6 电缆和接线7 控制面板8 调试9 故障跟踪4 • vacon关于VACON NX液冷变频器和用户手册恭喜您选择了Vacon NX_W液冷变频器所提供的(Smooth Control)平滑控制!用户手册将为您提供必要的有关Vacon NX液冷变频器的安装,调试和操作的信息。

我们建议您在第一次给变频器通电前,认真阅读这些说明。

本手册有书面和电子两种版本。

如有可能,我们推荐你使用电子版。

使用电子版将为您带来以下优点:手册包含几个链接和交叉参考到手册的其他位置。

变频器的使用及维修说明

变频器的使用及维修说明

变频器的使用及维修说明变频器是一种用于控制交流电机转速的电子设备,可以实现电机运行的高效稳定控制。

在工业生产中广泛应用,并且在日常生活中也有一些应用场景,如空调、洗衣机等。

本文将详细介绍变频器的使用及维修说明。

一、变频器的使用说明1.接线及安装:(1)在安装变频器之前,应确保维修人员具备一定的电气知识。

(2)严格按照变频器的接线图进行接线,注意接线的正确性和牢固性。

(3)变频器应安装在通风良好、无尘、无腐蚀性气体的环境中,并与电机之间保持一定的距离。

2.参数设置:(1)在使用变频器之前,需要进行参数设置,包括输入电压、输出电压、频率、最大转速等参数,具体设置根据不同的变频器而定。

(2)参数设置应谨慎进行,可以参考变频器的说明书,或者请专业人员进行设置,以确保变频器的正常使用。

3.运行控制:(1)在启动变频器之前,确保电源连接正确,并检查各个指示灯是否正常。

(2)根据需要设定运行的频率和转速,可以通过键盘或者触摸屏进行设定。

(3)在变频器运行过程中,应密切观察运行状态,如有异常情况应及时停机排查原因。

4.故障处理:(1)当变频器出现故障时,首先应停机并切断电源,然后才能进行故障排查。

(2)针对不同的故障情况,需要采取不同的处理方法,如检查电缆连接是否牢固、检查电机是否损坏等。

二、变频器的维修说明1.维护保养:(1)周期性检查变频器的内部结构,如散热器、风扇、电容器等,确保没有积尘或损坏。

(2)检查和清洁变频器的连接器和接线端子,确保连接良好且无松动。

(3)定期检查电源线路,确保电源接地良好,避免因电源问题导致变频器故障。

2.故障排查:(1)当变频器出现故障时,应根据故障指示灯或报警信息进行初步判断,并按照故障码表进行排查。

(2)根据故障排查结果,采取相应的修复措施,如更换损坏的元件、修复连接线路等。

(3)在修复过程中,应根据变频器的维修手册进行操作,确保操作的正确性和安全性。

3.预防措施:(1)定期检查变频器内部的散热器是否正常工作,保持变频器散热良好。

特力佳水冷系统维护手册

特力佳水冷系统维护手册

特力佳水冷系统维护手册特力佳水冷系统作为大型水冷的重要组成部分,它是由计算机设备中水处理系统和冷却系统组成。

计算机设备中水处理系统的好坏直接影响到电脑散热,设备是否能够正常运行,也直接关系到计算机硬件能否正常工作。

因此,计算机设备散热良好可以延长电脑及计算机设备的使用寿命。

而对于计算机设备中来说,水冷系统不仅仅是电脑及计算机设备中散热最为重要的部分(水冷系统对于电脑来说),同时也是电脑设备中最为重要的一部分。

1、水冷系统本身没有任何故障,但是当有使用问题发生时,需要先将水注入到冷系统中,使系统处于工作状态;然后使用压缩空气对冷却主机的系统进行吹扫,对散热器进行清洗,将散热器内部的灰尘及污垢清理干净。

如果不想对冷系统进行清洗,则可以使用无水乙醇清洗风扇以及水泵外壳。

清洗后使用专用吸尘器进行除垢处理。

可以保证散热器的干净以及风道不堵塞。

如果不想清理水泵外壳的话,可以使用过滤器进行清洗。

2、如果出现水管堵塞以及漏水状况需要及时进行更换;通常情况下,需要根据使用情况,定期进行水管的清洗工作;另外需要定期对水冷系统进行检查,确保不会出现水管堵塞以及漏水的状况。

在水冷系统清洗工作中如果出现水管堵塞现象或者是漏水现象时要及时的对水管进行清洗工作。

另外对于水管出现漏水现象或者是水管出现堵塞状况时主要的原因就是在管道或者是在水管内部存在杂质或者是泥沙。

因此通常情况下也是需要定期对管道进行清洗工作;不过如果是出现水管漏水以及水管堵塞现象则会造成大量水流出的状况发生并且水管不能够有效冷却机器内部水温以及达到正常冷却所需要的温度。

3、如果是系统漏水要及时进行处理并进行修复;如果是系统漏气,要及时关闭冷热交换器和散热器,进行冷热交换,并将水冷管上多余的冷热液体排出;如果是系统漏水很可能是冷凝器漏水或者风扇漏气。

而冷凝器漏水一般情况下是不会对电脑造成影响的。

但是如果是系统漏液、风扇漏液或水混在一起会造成系统无法运行以及电脑无法正常工作。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

Base pressure:/基本压力
- Start motor and apply coolant to the system with pump pos. 1. 开启电机通过1号泵向系统内加液 - When the base pressure on the pressure gauge pos. 14 is 2bar, shut off valve pos. 12. 当14号压力显示器显示压力为2bar 时,关闭位于12号阀门。
- Open each of the bleeding valves in the system until all air is removed. 在系统中空气排尽以前不可关闭排气阀。
- When all air is removed leave bleeding valves closed. 在系统中空气排尽后必须关闭排气阀
4
AVN ENERGY
Operation/操作
Precautions on operation/操作提示
Never operate the LCU pump dry or with the suction valve closed, except for the application of coolant, see chapter “Applying coolant to the system”. Otherwise the pump will be damaged. Check the direction of pump rotation indicated on the motor and pump. 本系统严禁在无水状态下工作!也禁止在泵的进口阀关闭的情况下工作(除非是为了加液)。具 体请查阅《冷却系统加液指导》。否则泵将会损坏。注意泵的转向必须与电机与泵外壳的标识一 致!
5
AVN ENERGY
Applying liquid to the system/冷却系统冷却液灌装
The positions mentioned below refer to “B4211-D Diagram for component placement”. 下文所提到的位置请参考《B4211-D 零配件装配图》
Wiring/线路
1. Use an electromagnetic switch that conforms to specification (voltage, capacity, etc.) of the pump motor./仅允许使用符合泵电机技术要求的电磁开关。
2. Electromagnetic switch and push button switch should be firmly installed at the place reasonably distant from the pump./电磁开关和按钮与泵应当保持合理的距离。
- The cap can easily be removed with a screw driver. 该保护盖可以用螺丝刀轻松取出。
- If pressure is to low, then charge gas (Nitrogen) until 0,5 bar is reached. 如果压力过低,请充入氮气,直至达到0.5bar。
- Tighten the air vent screw when the pump has been completely filled with coolant. 在系统中空气排尽后,拧紧螺丝。
A V N E N\ E R G Y
变频器水冷系统 操作维护手册
B4211
艾维恩能源设备(苏州)有限公司
2
AVN ENERGY
3
AVN ENERGY
Installation 安装
Mounting of the LCU/冷却系统的安装
1. Mount the frame of the unit safely supported./将冷却系统安全的固定在支架上。 2. Connect the hoses according to the “Diagram for component placement” and make sure they are safely fastened./根据《零配件装配图》将管路接好,并确保接口已经接牢。 3. Connect transmitters to the control unit. Use the datasheet for each transmitter for correct connection./将传感器接入控制单元。请严格按照要求将传感器接好. 4. Prepare the wiring to the pump motor according to the datasheet./根据说明书的要求准备好连接泵电 机的电线。
- Open valve pos. 12 (coolant is now supplied). 打开12号阀(现在液体正在加入系统)
Bleeding the system, phase 1:/系统排气第一阶段 - Connect each of the bleeding lines in the system to a barrel. 将所有的可能出水的管路连接到一个可以盛放废液的容器,以防废液污染。
6
AVN ENERGY
齿轮箱打开 齿轮箱关闭
齿轮箱打开
齿轮箱关闭 图一

AVN ENERGY
Prepare pump operation:/准备泵操作 - Close valve pos.9. 关闭9号阀。 - Connect the pump motor and run the motor instantaneously to check for correct direction of rotation. The motor should run in the direction indicated with the arrow on the pump. If the direction is reversed, exchange any two wires of the three phase power wires. This operation should only be carried out by authorized personal. 将泵电机接线接好,并尝试接通电源,检测泵的旋转方向是否正确。泵的旋转方向应 当与箭头指示一致。如不一致,应当由电气工程师对换三相电线中的任意两根的位 置。
Expansion tank:/膨胀水箱 - Check that the pre-charge pressure in the expansion tank is 0,5 bar at 20°C. 检查膨胀水箱的初始压力是否为在20°C时为0 .5 bar。 - Measure the pressure at the valve under the top cap of the tank. 检测膨胀水箱顶部保护盖下面的阀的压力。
Connection of external coolant tank:/外部冷却液容器接法
- Connected coolant tank to valve pos. 12 (Closed position). 将外部冷却液容器接到位于12号阀。(阀门必须关闭)
Open valves:/打开阀门 - Open all valves in the system: LCU pos. 2, 5, 9, 13, 19, 21 and valves in the generator, except bleeding valves. 打开系统中所有的阀门:冷却系统的2, 5, 9, 13, 19, 21位置和发电机端的阀门,除了排 气阀.
- Stop the pump. 关闭泵
Bleeding the system, phase 2:/系统排气第二步 - Wait until the air vent valve pos. 18 is closed (no noise of leaking air). 观察18号排气阀直到其关闭(即没有排气的声音) - Open valve pos. 9. 打开位于9号阀。 - Run the pump for 2 sec. 运行泵2秒钟 - Wait until the air vent valve pos. 18 is closed (no noise of leaking air). 观察18号排气阀直到其关闭(即没有排气的声音) - Repeat the 2 last steps (6-10 times) until all air is removed from the system. 重复以上步骤直到系统内的空气被排尽。
- The 3-way valve pos. 8 can be operated manually when the gearbox is switched off as shown below. 位置8的三向阀可以手动调节,如果阀体内的齿轮箱如图一一样关闭.
- The 3-way valve pos. 8 is adjusted to middle position. 位置8的三向阀调节到中间位置,如图二
Electrical connections./电路接法 The electrical connections should be carried out by an authorized electrician in accordance with local regulations. We are not responsible for any accidents which are caused by non observance of this instruction. 仅允许获得授权的专业电气工程师进行电路连接作业。由于违反此规定而引起的任何事故,我们 将不承担任何责任。