汽车行业缩写
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
AAR:
Appearance Approval Report 外观批准报告
A/D/V:
Analysis/Development/Validation 分析/开发/验证
A/D/V–DV:
ADV Design Validation ADV设计验证
A/D/V P&R:
Analysis/Development/Validation Plan and Report.This form is used to summarize the plan and results for validation testing.Additional information can be found in the GP-11 procedure.分析/开发/验证计划和报告
A/D/V–PV:
ADV Product Validation ADV产品验证
AIAG:
AP:
Advance Purchasing 先期采购
APQP:
Advanced Product Quality Planning 产品质量先期策划
APQP Project Plan:
A one-page summary of the SGM APQP process that describes the tasks and the timeframe in which they occur.APQP项目策划
AQC:
Attribute Quality Characteristic 属性质量特性
Advanced Supplier Quality Engineer 先期供应商质量工程师
BIW:
Body in White. Usually the bare metal shell of the body including doors and deck lid prior to paint and trim.白车身
BOM:
Bill of Materials 材料清单
BOP:
Bill of Process 过程清单
Brownfield Site:
An expansion of an existing facility.扩建场地
CMM:
Coordinate Measuring Machine 三坐标测试仪
Cpk:
Capability Index for a stabile process 过程能力指数
CTC:
Component Timing Chart (DRE document)零部件时间表(DRE文件)
CTS:
Component Technical Specifications 零部件技术规范
CVER:
Concept Vehicle Engineering Release 概念车工程发布
Design Complete 设计完成
Defect outflow detection:
A phrase used in the Supplier Quality Statement of Requirements that refers to in-process or subsequent inspection used to detect defects in parts.缺陷检测
DFM/DFA:
Design for Manufacturability / Design for Assembly 可制造性/可装配性设计DFMEA:
Design Failure Modes and Effects Analysis.It is used to identify the potential failure modes of a part, associated with the design, and establish a priority system for design improvements.设计失效模式和后果分析
DR:
Documentation Required DR特性
DRE:
Design Release Engineer 设计释放工程师
DV:
Design Validation 设计验证
E&APSP:
Engineering & Advance Purchasing Sourcing Process.工程&先期采购定点程序EP:
E-Procurement 电子采购流程
Error Occurrence Prevention:
A phrase used in the Supplier Quality Statement of Requirements that refers to poke yoke or error-proofing devices used to prevent errors in the manufacturing process from occurring.防错
FTQ:
First Time Quality 一次通过质量
GA:
General Assembly 总装
GD&T:
Geometric Dimensioning & Tolerancing 几何尺寸与公差
SGM:
ShanghaiGeneral Motors 上海通用汽车
GMAP:
General Motors Asian Pacific 通用汽车亚太
GME:
General Motors Europe 通用汽车欧洲
GMNA:
General Motors North American 通用汽车北美
GP:
General Procedure 通用程序
GPDS:
Global Product Description System 全球产品描述系统
GPS: