MATLAB PowerSystems demo (模型理解任务分配:1-3+兴湘自动化)

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

实验1 MATLAB仿真平台熟悉2(学时)实验2 动态仿真集成环境-Simulink熟悉(任务分配附后)2(学时)实验3 SPWM仿真实现2(学时)实验4 电机建模与仿真2(学时)

《系统仿真》实验2 各班同学具体任务分配

MATLAB/SIMULINK/ power system demo理解要求:

(1)理解模型个各组成模块(反推导出数学公式);

(2)应用场合;

(3)根据实际生产现场,进行相关仿真实验;

(4)对实验结果进行分析(含使用FFT Analysis During Simulation分析输入输出谐波);

(5)根据中国国情进行模型修改(如将电网交流电压从60Hz, 110V改为50Hz, 220V) (6)写上班级、学号、姓名。A4排版,检查无误后,打印,交纸质件1份,电子文档1份,由各班课代表汇总,11周交任课老师。

(7)其他3个实验

FFT Analysis During Simulation频谱分析工具大家共用(分析输入输出谐波)

P.Dahler, ABB® Turgi

1. Switching an Inductive Circuit Using a Breaker With no Snubber

10自动化1 石惠文潘亚辉

This example illustrates the Ideal Switching device solution method of the Powergui block.

G. Sybille (Hydro-Quebec)

2. Steady-State Analysis of a Linear Circuit

10自动化1 金紫君卢佩

This demonstration illustrates use of the Powergui and Impedance Measurement blocks to analyze the steady-state operation of a linear electrical circuit

G. Sybille (Hydro-Quebec)

3. Transient Analysis of a Linear Circuit

10自动化1 周洋李能慧

This demonstration illustrates steady-state and transient simulation of a linear circuit and use of the Powergui block

H. Le-Huy (Universite Laval, Quebec) and G. Sybille (Hydro-Quebec)

4. Three-Winding Distribution Transformer

10自动化1 邹叶刘颖

This demonstration illustrates the use of the linear transformer to simulate a three-winding distribution transformer rated 75 kVA - 14400/120/120 V.

G. Sybille (Hydro-Quebec)

5. Three-Phase Saturable Transformer

10自动化1 阳莉莉徐莹莹

This demonstration illustrates use of Three-phase, Powergui, and Multimeter blocks to study transformer saturation phenomenon

G. Sybille (Hydro-Quebec)

6.Three-Phase Core-Type Transformer

10自动化1 祁梦云孙雪涵

This demo illustrates use of the Three-Phase Transformer Inductance Matrix Type block to model a three-phase core-type saturable transformer. It also demonstrates that using three single-phase transformers to simulate a Yg/Yg core-type transformer is not acceptable. Gilbert Sybille (Hydro-Quebec, IREQ)

7. Current Transformer Saturation

10自动化1 唐朝勇陈治强

This demonstration illustrates measurement distortion due to saturation of a current transformer (CT)

G. Sybille (Hydro-Quebec)

8. Use of Surge Arresters in Transmission System

10自动化1 林勇谭冬烨

This demonstration illustrates use of surge arresters in a series and shunt compensated 735 kV AC transmission system

G. Sybille (Hydro-Quebec)

9. Single Phase Line - Time and Frequency Domain Testing

10自动化1 丁钉邓俊杰

This demonstration compares time domain and frequency domain performance of distributed parameter line model and PI section line model

G. Sybille (Hydro-Quebec)

相关文档
最新文档