BVT是Build Verification Test
品管常用英文缩写名词
品管常用英文缩写名词3C:Computer,Communication,Consumer Electronics产业整合4M:就是人(Man), 机(Machine), 料(Material), 法(Method)5M:制造工程的方法(Method)、材料(Material)、机械(Machine)、人员(Man)、量测(Measurement) 5S:整理(Seiri)、整顿(Seiton)、清扫(Seiso)、清洁(Seiketsu)、素养(Shitsuke)5W1H:5W是Why What Where When Who1H是How6 sigma:〝6个标准偏差〞或〝6倍标准偏差〞(6σ管理)8D:DisciplineDiscipline 1 - Organize and Plan组成小组团队Discipline 2 - Describe the Problem问题描述Discipline 3 - Containment Plan临时遏止措施Discipline 4 - Describe the Cause原因分析Discipline 5 - Permanent Corrective Action Plan永久改善对策Discipline 6 - Verification of Corrective Action改善效果确认Discipline 7 - Prevention of Recurrence预防再发对策Discipline 8 - Communicate Success成功经验的传递ABS:Anti-lock Brake System防死锁煞车系统ACC:Acceptable允收AI:Artificial Intelligence人工智能API:连展生产力改善活动(Acon Productivity Improvement)APQP:(advanced product quality planning and control plan)先期产品质量规划AOQL:Average Outgoing Quality Limit平均出厂质量界限AQL:Acceptable Quality Level允收质量水平AVL:物料承认合格厂商名录(Approved Vendor List)BOM:物料清单(Bill of material)BPM:流程管理or业务流程管理(Business Process Management)BVT:基本验证测试(Build Verification Test),,对完成的代码进行编译和连接,产生一个构造,以检查程序的主要功能是否会像预期一样进行工作。
PMC专用术语
常用生管专用术语1.A/M—action memo.备忘记录2.AVL—avail vendor list合格供应商目录3.ASSY—assemble 组装,装配4.BOM—bill of material物料清单5.BFM—buy from 采购方式6.BU—business unit 业务单位7.BIOS—basic input/output system 基本输入/输出系统8.CFM—consign from 付款方式B—change control board 控制板10.DOA—de ad on arrival到货即损,经销商收到厂家的货品后打开就是坏的,就可以退货,但是这是有个期限的,超过期限就是RMA了11.RMA—return material authorization退料审查12.DVT—design verification test BVT是Build Verification Test,基本验证测试,对完成的代码进行编译和连接,产生一个构造,以检查程序的主要功能是否会像预期一样进行工作。
13.BVT—Build Verification Test,基本验证测试,对完成的代码进行编译和连接,产生一个构造,以检查程序的主要功能是否会像预期一样进行工作。
14.PVT—Process Verification Test意为小批量过程验证测试,硬件测试的一种,主要验证新机型的各功能实现状况并进行稳定性及可靠性测试15.E VT—Engineering Value Test工程样品验证测试16.DC—document center 资料中心17.DIMM—sdram 内存18.ETA—estimate time of arrival预计到货时间19.ETD—estimate time of deliver预计发货时间20.ERP—enterprise resource plan企业资源计划21.EBO M—engineering bill of material试产物料清单22.MBOM—Manufacture bill of material 批量生产物料清单23.PCN —Process Change Notice 工序改动通知24.ECN —Engineering Change Notice 工程变更通知(供货商)25.ECO —Engineering Change Order 工程改动要求(客户)26.PCN —Process Change Notice 工序改动通知27.PMP—Product Management Plan 生产管制计划28.FIFO — First-in First-out, 先入先出29.F/T—function test 功能测试30.JIT—just in time 及时反应31.KC—key component关键元件32.L/T—lead time提前期33.TLT—Transport lead time 调拨提前期34.MLT—manufacture lead time生产提前期35.PLT—purchase lead time36.MRP—material require plan物料需求计划37.MPS—master production schedule主生产计划38.MDS—master demand schedule主需求计划39.MN—manufacturing notice生产通知单40.MP—master production 主计划41.MO—manufacturing order 生产单号42.MFG—manufacturing造模块43.MPI—manufacturing process instruction生产流程说明书44.MTD —month till today 月产量45.MRB—Material Review Board材料审查会议46.OPT—output till today 日产量47.OU—-operation unit 运营单位48.O/H—-overhead间接费用49.O/T— work over time误期50.ODM—original design manufacturing贴牌生产51.OEM—original equipment manufacturing代工生产52.PCBA—PWA印刷线路板组装53.PMR—problem m aterial review report 物料检验报告54.P/S—production and sales meeting产销会55.QVL—qualified vendor list 合格厂商56.IQC—incoming quality contro来料品质控制57.IPQC—InPut Process Quality Cortrol过程品质控制58.FQC—Finish or Final Quality Control成品质量检验59.OQC—Outgoing Quality Control出货品质管制60.OQA—outgoing quality assurance成品最终出货检查61.PQE—production quality engineer产品质量工程师62.SMT—表面黏著技术63.SA—sales authorization销售授权64.SI—sales instruction销售演示65.SOP—standard operation procedure标准作业程序66.T/S—trouble shooting故障分析67.WIP—work in process工作进度68.W/O—work order工单69.W/H—warehouse仓库70.STD—s tandard标准71.I/S ratio—inventory amt / sales amt周转率72.DPPM—defect percentage per million百万分比的缺陷率73.OFD—order fulfill department 订单执行部门74.OP—order processor 订购点75.PD—purchase dep.采购部76.PC—production control生产计划控制77.MC—material control物料控制78.R&D—research and development 研发部79.LMD—logistic management dep.资材部80.ED—engineering department 工程部81.MD—Market department。
电子制造业NPI及常用英文词汇
电子制造业新产品导入NPI及常用英文词汇产品定义〔EVT〕,产品设计〔DVT〕,定型测试〔PVT〕EVT (Engineer Verification Test)工程样品验证测试,DVT (Design Verification Test)设计样品验证测试,PVT(Production/Process/Pilot Verification Test)生产验证测试。
1〕产品确证历程:EVT(Engineering Verification Test)---> DVT(Design Verification Test) ---> PVT(Process Verification Test);2〕EVTPoduct/Engineering Specification plete(由R&D 完成,内容: 一些重要的参数,重要特征)Design Verification Plan ( B-test, patibility-test, EMI )(由技服部作)初步之BOM(R&D完成)Cost Review(PMP 负责)Test equipment and Tooling(R&D 和工程部门)Test process documented and released测试程序或测试文件Failure analysis and corrective actions针对不良点作设计上的改善3〕DVTDesign Verification Test( B-test , patibility-test,EMI ) plete概念1:可靠性测试: 产品在既定的时间内, 在特定的条件下完成特定功能和性能的机率概念2:B-test--- Basic test包括:Function TestSafety TestEnvironment TestMechanical Test概念3:Safety Test主要有:Hit-Pot 高压测试绝缘电阻测试Current Leakage(电流测试)接地测试概念4:Mechanical Test 主要有Vibration Test(振动试验)Drop Test(落体试验)概念5: patibility test --- 兼容性测试硬件与软件之兼容性硬件与硬件之兼容性概念6: EMI Test--- 抗静电,电磁干扰Agency pliances plete安规成认测试,安规组负责Design Change Phased in设计变更切入MPI & TPI & QII 等等制程文件试用的制作完毕BOM 进一步修改Failure Analysis and Corrective actions形成AVL---- Acceptable Vendor List4〕PVTFailure analysis / corrective actionFirst article inspection review with customer and documented 制程安排好, 各种制程文件修改并正式发行Operators/ Inspectors traning / certification programC-Test----仅小变更,仅需做change-test 变可. 此测试可仅针对变更项做ORT Test 〔On Going Reliability Test〕--- ongoing reliability test连续测试2000小时PMP 召开会议---作总结GO or STOP5〕机构件的3B ApprovalTVR--- Tooling Verification Report对生产出来的产品做全尺寸测量Cpk Report plex Process Capability index制程能力报告TVR & Cpk 由品保与工程部门共同完成Flow Chart ----流程图怎样安排制程PMP --- Process Management Plan制程安排,制程控制要点,设备,检验方法, 检验频率等等Flow Chart & PMP 由IE 制作FAP ( Final Audit Program )要求图文并茂试模报告塑料成形条件, 冲压成形条件各单件之图面及组件之装配图材质证明书E--- Engineering Change Notice要求及时地切入工程变更工厂/设计产品测试:BVT是Build Verification Test,根本验证测试,对完成的代码进展编译和连接,产生一个构造,以检查程序的主要功能是否会像预期一样进展工作。
电子制造业NPI及常用英文词汇
电子制造业新产品导入NPI及常用英文词汇产品定义EVT,产品设计DVT,定型测试PVTEVTEngineerVerificationTest工程样品验证测试, DVTDesignVerificationTest设计样品验证测试,PVTProduction/Process/PilotVerificationTest生产验证测试;1产品确证历程:EVTEngineeringVerificationTest--->DVTDesignVerificationTest--->PVTProce ssVerificationTest;2EVTPoduct/EngineeringSpecificationcomplete由R&D完成,内容:一些重要的参数,重要特征DesignVerificationPlanB-test,Compatibility-test,EMI由技服部作初步之BOMR&D完成CostReviewPMP负责TestequipmentandToolingR&D和工程部门Testprocessdocumentedandreleased测试程序或测试文件Failureanalysisandcorrectiveactions针对不良点作设计上的改善3DVTDesignVerificationTestB-test,Compatibility-test,EMIcomplete概念1:可靠性测试:产品在既定的时间内,在特定的条件下完成特定功能和性能的机率概念2:B-test---Basictest 包括:FunctionTestSafetyTestEnvironmentTestMechanicalTest概念3:SafetyTest 主要有:Hit-Pot高压测试绝缘电阻测试CurrentLeakage电流测试接地测试概念4:MechanicalTest主要有VibrationTest振动试验DropTest落体试验概念5:Compatibilitytest---兼容性测试硬件与软件之兼容性硬件与硬件之兼容性概念6:EMITest---抗静电,电磁干扰AgencyCompliancescomplete安规承认测试,安规组负责DesignChangePhasedin设计变更切入MPI&TPI&QII等等制程文件试用的制作完毕BOM进一步修改FailureAnalysisandCorrectiveactions形成AVL----AcceptableVendorList4PVTFailureanalysis/correctiveaction Firstarticleinspectionreviewwithcustomeranddocumented制程安排好,各种制程文件修改并正式发行Operators/Inspectorstraning/certificationprogramC-Test----仅小变更,仅需做change-test变可.此测试可仅针对变更项做ORTTest OnGoingReliability Test---ongoingreliabilitytest连续测试2000小时PMP召开会议---作总结GOor STOP5机构件的3BApprovalTVR---ToolingVerificationReport对生产出来的产品做全尺寸测量Cpk Report ComplexProcessCapabilityindex制程能力报告TVR&Cpk由品保与工程部门共同完成FlowChart----流程图怎样安排制程PMP---ProcessManagementPlan制程安排,制程控制要点,设备,检验方法,检验频率等等FlowChart&PMP由IE制作FAPFinalAuditProgram要求图文并茂试模报告塑料成形条件,冲压成形条件各单件之图面及组件之装配图材质证明书ECN---EngineeringChangeNotice要求及时地切入工程变更工厂/设计产品测试:BVT是BuildVerificationTest,基本验证测试,对完成的代码进行编译和连接,产生一个构造,以检查程序的主要功能是否会像预期一样进行工作;EVT是EngineerVerificationTest,工程样品验证测试;DVT是DesignVerificationTest的简称,设计验证测试,是硬件生产中不可缺少的一个检测环节,包括模具测试、电子性能、外观测试等等;PVT全称为ProcessVerificationTest,意为小批量过程验证测试,硬件测试的一种,主要验证新机型的各功能实现状况并进行稳定性及可靠性测试;EngineeringVerificationTestingEVTIdentifyingdesignproblemsandsolvingthemasearlyinthedesigncycleaspossibl e,,productdesignandperformanceproblemsarenotdetecteduntillateintheprodu ctdevelopmentcycle—whenyou’:Itscostsapennytomakeachangeinengineering, adimeinproductionandadollarafteraproductisinthefield.InthePrototypingstage,EVT,oridentifyareasthatneedtobemodified.Percept’sprovenEVTtestingprocesshelpsclientstoquicklyidentifyandresolv edesignissuesearlyinthedesigncycle,improvingfutureproductperformancewhi lesavingtimeandmoney.EVT:Consistsofbasicfunctionaltests,parametricmeasurements,specificationveri ficationIsperformedonfirstengineeringprototypesEnsuresbasicunitperforma ncetodesigngoalsandspecificationsDVT/EVTDesignVerificationTestingDVTAfterprototyping,theproductismovedtothenextphaseofthedesigncycle:Percept’sthorough,objectiveDVTmethodologydeliversobjective,comprehensi vetestingtoverifyallproductspecifications,interfacestandards,OEMrequire ments,anddiagnosticcommands.DVTisanintensivetestingprogramconsistingoffiveareasoftesting: FunctionalTestingincludingusabilityPerformanceTestingClimaticTestingRel iabilityTestingComplianceTestingProcessorPilotVerificationTestPVT SubsetofDesignVerificationTestsDVTPerformedonpre-productionorproduction unitsVerifiesdesignhasbeencorrectlyimplementedintoproduction CVTCompatibilityVerificationTesting产品定义EVT、产品设计DVT,到定型测试PVT三大阶段是系统化产品研发流程;70&DVT:Design VerificationTest,是由开发样机阶段向生产样机阶段转换所必须的技术评审,DVT阶段:指从EVT评审通过后到DVT评审的阶段;包括模具测试、电子性能、外观测试等.重点是确认:1、是否符合产品定义要求,2、可否批量生产,由项目部输出评审报告;PVT:ProductionVerificationTest,是由生产样机阶段向量产阶段转换所必须的技术评审,PVT阶段:指从DVT评审通过后到PVT评审的阶段;主要验证新机型的各功能实现状况并进行稳定性及可靠性测试;重点是确认:能否量产,由项目部输出评审报告;======================================================================= ==========EVT:EngineeringVerificationTest工程验证测试产品开发初期的设计验证;设计者实现样品时做初期的测试验证,包括功能和安规测试,一般由RDResearch&Development对样品进行全面验证,因是样品,问题可能较多,测试可能会做N次;DVT:DesignVerificationTest设计验证测试解决样品在EVT阶段的问题后进行,对所有信号的电平和时序进行测试,完成安规测试,由RD和DQADesignQualiyAssurance验证;此时产品基本定型;DMT:DesignMaturityTest成熟度验证可与DVT同时进行,主要极限条件下测试产品的MTBFMeanTimeBetweenFailure;HALTHighAcceleratedLifeTest&HASSHighAccelera tedStressScreen等,是检验产品潜在缺陷的有效方法;PVT:Pilot-runVerificationTest小批量过程验证测试,验证新机型的各功能实现状况并进行稳定性及可靠性测试;MVT:Mass-ProductionVerificationTest量产验证测试验证量产时产品的大批量一致性,由DQA验证;MP:Mass-Production 量产电子制造专业术语大集合Engineer工程PE:ProductsEngineer产品工程 Processengineer 制程工程TE:TestEngineer 测试工程ME:ManufacturingEngineer 制造工程;MechanicalEngineer机械工程IE:IndustrialEngineer 工业工程DCC:DocumentControlCenter 文管中心BOM:BillOFMaterial 材料清单ECN:EngineeringChangeNotice 工程变动公告TECN:TemporaryEngineeringChangeNotice 工程临时变动公告ATY:AssemblyTestYield TotalYield 直通率TPM:TotalProductivityMaintenancePM:ProductManager;ProjectManagerECR:EngineeringChangeRequest 工程变更申请ECO:EngineeringChangeRequest 工程变更指令EN:EngineeringNotice 工程通报WPS:WorkProcedureSheet 工作说明书ICT:InCircuitTest 电路测试P/R:pilot run;C/R:controlrun T/R:trialrun试做EVT:engineerVerificationTest 工程验证测试DVT:DesignVerificationTest 设计验证测试MVT:MassVerificationTest 多项验证测试ORT:OnGoingReliabilityTest 出货信赖性测试S/W:software 软件H/W:hardware 硬件DCN:DesignChangeNotice 设计变更通知PVT:ProductionVerificationTest 生产验证测试MTF:ModulationTransferFunction 调整转换功能CAT:CarriageAlignmentTool 载器调整具ID:IndustrialDesign 工业设计外观设计PCBA:PrintedCircuitBoardAssembly 电路板组装F/T:FunctionTest 功能测试CCD:ChargeCoupledDevice 扫描仪之读器ERS:ExternalReferenceSpec 外部规格PMP:ProductionManagementPlan 工程管理计划QA QualityAssurance质量保证QRA:Quality&ReliabilityAssurance质量与可靠性保证MQA:ManufacturingQualityAssurance制造质量保证DQA:DesignQualityAssurance设计质量保证QC:QualityControl质量控制IQC:IncomingQualityControl收益质量控制VQC:VendorQualityControl 售货质量控制IPQC:InProcessQualityControl制程质量控制OQA:OutgoingQualityControl出货质量控制QE:QualityEngineer质量工程AQL:AcceptableQualityLevel可接受的质量水平DPPM:DefectivePiecesPerMillionunits百万件中有损件数PPM:PiecesPerMillion百万分之一CS:CustomService 顾客服务MRB:MarerialReviewBoard DMRDefectiveMaterialReport 材料缺陷报告RMA:ReturnMarerialAdministration 材料回收处理LifeTest寿命测试T/C:TemperatureCycle 温度循环H/T:HighTemperatureTest 高温测试L/T:LowTemperatureTest 低温测试ISO:InternationalStandardOrganization 国际标准化组织SPC:Statisticprocesscontrol 统计过程控制5S:整理.整顿.清理.清扫.素养VMI:VisualMechanicalInspection 外观机构检验MIL-STD:MilitaryStandard 美军标准SPEC:Specification 规格AVL:ApprovalVendorList 合格厂商QVL:QualifiedVendorList 合格厂商FQC:FinalQualityControl 最终质量控制OBA:OpenBoxAudit 成品检验EAR:EngineeringAnalysisRequestFAI:FirstArticleInspection 首件检验VQM:VendorQualityManagement 厂商质量管理CAR:CorrectiveActionRequest 改进对策要求4M:Man;Machine;Material;Method人,机,材,方法5M:Man;Machine;Material;Method;Mwasurment人,机,材,方法,测量MTBF:MeanTimeBetweenFailure平均寿命TTL:TotalFIN Finance&Accounting 财务与账目P&L:Profit&LosePV:PerformanceVariance现象差异3ElementofCost=M,L,OM:Material材料L:Labor人力Overhead管理费用FixOH FixOverhead固定管理费用VarOH VariableOverhead不定管理费用COGS CostOfGoodsSold工厂制造成本AR:AccountReceivable应收AP:AccountPayable应支MIS ManagementInformationSystem资讯管理系统IS:InformationSystem资讯系统IT:InformationTechnology系统技术MRP:MaterialRequisitionPlan材料需求计划I2:InformationIntegrationSystem资迅整合系统SAP:SystemApplicationProgramming系统申请项目ERP:EnterpriseResourceProgramming企业资源项目HRHumanResource人力资源PR:Publicrelation公共关系T/O:TurnOverRate=MonthlyT/OTotalPeople12GR:GeneralAffair总务Organization 组织HQ HeadQuarter总公司Chairmen 主席 Lite-On Group光宝集团President总裁ExecutiveVicePresident常务副总裁VicePresident副总裁HRHumanResource人力资源部FINFinance财务Sales销售R&D:Research&Developing研发部QA:质量保证 QA DQACSMIS:ManagementInformationSystem资迅管理系统PUR 采购 PurchasingIMD:ImageManagementDivision影像管理事业部ITS:InformationTechnologySystem计算机部QRA:QualityReliabilityAssurance品保部MFG:Manufacturing 制造部PMC:Production&MaterialControl生产物料管理Materials材料PC:ProductionControl生产控制MPS:MassProductionSchedule量产计划FGI:FinishedgoodsInventory成品存货UTS:UnitsToStock存货单元WIP:WorkingInProcessInventory在制品C/T:CycleTime循环时间,瓶颈WD:WorkingDays工作天MTD:MonthToDays月初到今日例如总表整理YTD:YearToDays年初到今日SO:SalesOrder销售清单MO:ManufactureOrder制造清单BTO:Build To Order订单生产P/N:PartNumber料号MC:MaterialControl材料控制MRP:MaterialRequisitionPlan材料需求计划INV:Inventory存货清单InvTurnOverDays=INVS/NSBXWD库存周转天数PSI:ProductionShippingInventory预备待出货JIT:JustInTime实时SafetyInventory安全存量CKD:CompletedKitsDelivery全件组装出货SKD:SemiKitsDelivery半件小件组装出货W/H:Warehouse仓库Rec:ReceivingCenter接收中心RawMTL原物料F/G:finishgoods成品Import/Export进出口SI:ShippingInstruction发货指令PL:PackingList包装清单Inv:ShippingInvoice出货发票ETD:EstimatedTimeofDeparture预估离开/发货时间ETA:EstimatedTimeofArrival预估到达/到港时间BL:BillofLanding提货单海运AWB:AirWayBill提货单空运MAWA:MasterAirWayBill主提货单HAWB:HouseAirWayBill副提货单TEU:TwentyfootEquipmentUnitContain二十英尺货柜FEU:FortyfootEquipmentUnitContain四十英尺货柜CY:ContainerYard货柜场THC:TerminalHandingCharge码头费ORC:OriginalReceivingCharge码头费PUR:Purchasing采购FOB:FreeonBoard货运至甲板离岸价CIF:CostInsuranceFreight成本+运费+保险OA:OpenAccount开户TT:TelegramTransfer电汇COD:CashOnDeliveryCRP:CostReductionProgram降低成本方案PR:PurchasingRequisition采购申请PO:PurchasingOrder采购单MFG ManufacturingProduction制造生产DL:DirectorLabor直接人工IDL:IndirectLabor间接人工DLH:DirectLaborHours直接工时Productivity=UTS/DLHPPH:PiecesPerHour每小时件数Efficiency=Actual/Target%DT:MachineDownTime停机时间AI:AutoInsertion自动插入MI:ManualInsertion人工插入SMD:SurfaceMountDevice表面粘着零件SMT:Surfacemounttechnology表面粘着技术B/I:BurnInforhowmanyhoursathowmanydegree烧机WI:WorkInstruction工作说明SOP:StandardOperationProcedure作业指导书R/I:RunIn运转机器ESD:ElectricalStaticDischarge静电释放MP:MassProduction量产。
软件测试系列——冒烟测试(SmokeTest,ST)
软件测试系列——冒烟测试(SmokeTest,ST)1. 核⼼冒烟测试就是完成⼀个新版本的开发后,对该版本最基本的功能进⾏测试,保证基本的功能和流程能⾛通。
如果不通过,则打回开发那边重新开发; 如果通过测试,才会进⾏下⼀步的测试(功能测试,集成测试,系统测试等等)。
简化:门槛测试,⼀个开关⽽不是⼀个阶段。
⽬的:版本验证测试BVT(Build Verification Testing)。
时间:开发转测试,历时半⾄⼀个⼩时,很短。
对象:需求覆盖,主功能路径。
优点:节省测试时间,防⽌build失败。
缺点:覆盖率还是⽐较低。
操作:对着需求⽂档把新功能过⼀遍;把所有流程功能⾛⼀遍;⽤monkey跑个⼀两个⼩时;如果有历史⽤例的话,可以把⽤例分级,冒烟级、详细级、回归级等等⽤例:冒烟测试基本上不需要什么⽤例,如果有的话,就⽤详细⽤例⾥,覆盖需求⽂档级别的⽤例就可以了冒烟测试,是版本验证测试,主要确认新的版本是否存在致命性bug,冒烟测试最⼤的优点在于节约测试的时间成本,减少测试轮数。
回归测试,是软件维护阶段对软件修改后进⾏的测试,指修改了旧代码后,重新进⾏测试以确认修改没有引⼊新的错误或导致其他代码产⽣错误。
2. 定义 维基百科上对冒烟测试的解释: smoke testing is preliminary testing to reveal simple failures severe enough to, for example, reject a prospective software release. Smoke tests are a subset of [test cases] that cover the most important functionality of a component or system, used to aid assessment if main functions of the software appear to work correctly. When used to determine if a computer program should be subjected to further, more fine-grained testing, a smoke test may be called an intake test. Alternately, it is a set of tests run on each new build of a to verify that the build is testable before the build is released into the hands of the test team. In the DevOps paradigm, use of a BVT step is one hallmark of the maturity stage. 冒烟测试这个名称的来历,最初是从电路板测试得来的。
你需要知道的BVT测试
你需要知道的BVT(版本验证测试)What you need to know about BVT (Build Verification Testing)原作者:Vijay Kumar译者:Keith,落日沉鱼原文地址:/bvt-build-verification-testing-process/日期:2009-12-22【E测中国翻译团队作品】E测中国翻译团队作品下载:/questions.php?parentID=182&typeID=184什么是BVT?版本验证测试是运行在每一个新版本上,用来验证该版本在发布给测试团队进行更深入的测试之前是否可测的测试集。
这些测试用例关注核心功能,确保应用程序稳定、能够被彻底的测试。
典型情况下,BVT是自动运行的。
如果BVT失败,版本会再一次分配到开发人员那里进行修正。
BVT也被称为冒烟测试或是版本验收测试(BAT)对于新版本主要检查两件事情z版本确认z版本验收BVT的一些基本原理:z BVT是验证主要功能测试的子集。
z BVT一般在每日build上运行,如果BVT失败,build会被拒绝并且一个新的build 会在修复完成后发布。
z BVT的优势是当应用软件主要功能有问题时,它节省了测试人员搭建和测试build 所需要的大量精力。
z仔细设计BVT使其覆盖基本的功能点。
z一般来说BVT运行不应该超过30分钟。
z BVT是一种回归测试,在每一个新build上执行。
BVT主要检查项目的完整性及所有模块是否被正确的整合。
当项目的各模块是由不同的团队开发时,模块的整合性测试是非常重要的。
我听说过许多由于模块整合不当造成程序失败的例子。
甚至在最坏的情况下,由于模块整合的失败使得整个项目陷入困境。
在版本发布中主要的任务是什么?很显然,文档”check in” 也就是包含所有与各build 相关的新加的和修改的项目文档。
BVT主要用来检查初始版本健康度,也就是检查所有新加的和修改的文档是否被发布,所有文档格式是否正确,每个文档的版本、语言和标志是否和文档一一关联。
SMT英文术语大全
BVT是Build Verification Test,基本验证测试,对完成的代码进行编译和连接,DVT是Design Verification Test的简称,设计验证测试,是硬件生产中不可缺少的一个检PVT全称为Process Verification Test,意为小批量过程验证测试,硬件测试的一种,主EVT-Engineer Verification Test,工程样品验证测试CPU: central processing unit(中央处理器)IC: Integrated circuit(集成电路)Memory IC: Memory Integrated circuit(记忆集成电路)RAM: Random Access Memory(随机存取存储器)DRAM: Dynamic Random Access Memory(动态随机存取存储器)SRAM: Staic Random Access Memory(静态随机存储器)ROM: Read-only Memory(只读存储器)EPROM:Electrical Programmable Read-only Memory(电可抹只读存诸器)EEPROM: Electrical Erasbale Programmable Read-only Memory(电可抹可编程只读存储CMOS: Complementary Metal-Oxide-Semiconductor(互补金属氧化物半导体)BIOS: Basic Input Output System(基本输入输出系统)Transistor:电晶体LED:发光二极体Resistor:电阻Variator:可变电阻Capacitor:电容Capacitor array:排容Diode:二极体Transistor:三极体Transformer:变压器(ADP)Oscillator:频率振荡器(0sc)Crystal:石英振荡器XTAL/OSC:振荡产生器(X)Relay:延时器Sensor:感应器Bead core:磁珠Filter:滤波器Flat Cable:排线Inductor:电感Buzzer:蜂鸣器Socket:插座Slot:插槽Fuse:熔断器Current:电流表Solder iron:电烙铁Magnifying glass:放大镜Caliper:游标卡尺Driver:螺丝起子Oven:烤箱TFT:液晶显示器Oscilloscope:示波器Connector:连接器PCB:printed circuit board(印刷电路板)PCBA: printed circuit board assembly(电路板成品)PP:并行接口HDD:硬盘FDD:软盘PSU:power supply unit(电源供应器)SPEC:规格Attach:附件Case: 机箱,盖子Cover:上盖Base:下盖Bazel:面板(panel)Bracket:支架,铁片Lable:贴纸Guide:手册Manual:手册,指南Card:网卡Switch:交换机Hub:集线器Router:路由器Sample:样品Gap:间隙Sponge:海绵Pallet:栈板Foam:保利龙Fiber:光纤Disk:磁盘片PROG:程序Barcode:条码System:系统System Barcode:系统条码M/B:mother board:主板CD-ROM:光驱FAN:风扇Cable:线材Audio:音效K/B:Keyboard(键盘)Mouse:鼠标Riser card:转接卡Card reader:读卡器Screw:螺丝Thermal pad:散热垫Heat sink:散热片Rubber:橡胶垫Rubber foot:脚垫Bag:袋子Washer:垫圈Sleeve:袖套Config:机构Label hi-pot:高压标签Firmware label:烧录标签Metal cover:金属盖子Plastic cover:塑胶盖子Tape for packing:包装带Bar code:条码Tray:托盘Collecto:集线夹Holder:固定器,L铁Connecter:连接器IDE:集成电路设备,智能磁盘设备SCSI:小型计算机系统接口Gasket:导电泡棉AGP:加速图形接口PCI:周边组件扩展接口LAN:局域网USB:通用串形总线架构Slim:小型化COM:串型通讯端口LPT:打印口,并行口Power cord:电源线I/O:输入,输出Speaker:扬声器EPE:泡棉Carton:纸箱Button:按键,按钮Foot stand:脚架部门名称的专有名词QS:Quality system品质系统CS:Coutomer Sevice 客户服务QC:Quality control品质管理IQC:Incoming quality control 进料检验LQC:Line Quality Control 生产线品质控制IPQC:In process quality control 制程检验FQC:Final quality control 最终检验OQC:Outgoing quality control 出货检验QA:Quality assurance 品质保证 SQA:Source(supplier) Quality Assurance 供应商品质保证(VQA) CQA:Customer Quality Assurance客户质量保证PQA rocess Quality Assurance 制程品质保证QE:Quality engineer 品质工程CE:component engineering零件工程EE:equipment engineering设备工程ME:manufacturing engineering制造工程TE:testing engineering测试工程PPE roduct Engineer 产品工程IE:Industrial engineer 工业工程ADM: Administration Department行政部RMA:客户退回维修CSDI:检修PC:producing control生管MC:mater control物管GAD: General Affairs Dept总务部A/D: Accountant /Finance Dept会计LAB: Laboratory实验室DOE:实验设计HR:人资PMC:企划RD:研发W/H:仓库SI:客验PD: Product Department生产部PA:采购(PUR: Purchaing Dept)SMT:Surface mount technology 表面粘着技术MFG:Manufacturing 制造MIS:Management information system 资迅管理系统DCC:document control center 文件管制中心厂内作业中的专有名词QT:Quality target品质目标QP:Quality policy目标方针QI:Quality improvement品质改善CRITICAL DEFECT:严重缺点(CR)MAJOR DEFECT:主要缺点(MA)MINOR DEFECT:次要缺点(MI)MAX:Maximum最大值MIN:Minimum最小值DIA iameter直径DIM imension尺寸LCL:Lower control limit管制下限UCL:Upper control limit管制上限EMI:电磁干扰ESD:静电防护EPA:静电保护区域ECN:工程变更ECO:Engineering change order工程改动要求(客户)ECR:工程变更需求单CPI:Continuous Process Improvement 连续工序改善Compatibility:兼容性Marking:标记DWG rawing图面Standardization:标准化Consensus:一致Code:代码ZD:Zero defect零缺点Tolerance:公差Subject matter:主要事项Auditor:审核员BOM:Bill of material物料清单Rework:重工ID:identification识别,鉴别,证明PILOT RUN: (试投产)FAI:首件检查FPIR:First Piece Inspection Report首件检查报告FAA:首件确认SPC:统计制程管制CP: capability index(准确度)CPK: capability index of process(制程能力) PMP:制程管理计划(生产管制计划)MPI:制程分析DAS efects Analysis System 缺陷分析系统PPB:十亿分之一Flux:助焊剂P/N:料号L/N:Lot Number批号Version:版本Quantity:数量Valid date:有效日期MIL-STD:Military-Standard军用标准ICT: In Circuit Test (线路测试)ATE:Automatic Test Equipment自动测试设备MO: Manafacture Order生产单T/U: Touch Up (锡面修补)I/N:手插件P/T:初测F/T: Function Test (功能测试-终测)AS 组立P/K:包装TQM:Total quality control全面品质管理MDA:manufacturing defect analysis制程不良分析(ICT) RUN-IN:老化实验HI-pot:高压测试FMI:Frequency Modulation Inspect高频测试DPPM: Defect Part Per Million(不良率的一种表达方式:百万分之一) 1000PPM即为0.1% Corrective Action: (CAR改善对策)ACC:允收REJ:拒收S/S:Sample size抽样检验样本大小SI-SIV:Special I-Special IV特殊抽样水平等级CON:Concession / Waive特采ISO:国际标准化组织ISA:Industry Standard Architecture工业标准体制结构OBA:开箱稽核FIFO:先进先出PDCA:管理循环Plan do check action计划,执行,检查,总结WIP:在制品(半成品)S/O: Sales Order (业务订单)P/O: Purchase Order (采购订单)P/R: Purchase Request (请购单)AQL:acceptable quality level允收品质水准LQL;Limiting quality level最低品质水准QVL:qualified vendor list合格供应商名册AVL :认可的供货商清单(Approved Vendor List) QCD: Quality cost delivery(品质,交期,成本)MPM:Manufacturing project management制造专案管理KPI:Key performance indicate重要绩效指标MVT:Manufacturing Verification Test制造验证试产Q/R/S:Quality/Reliability/Service质量/可靠度/服务STL:ship to line(料到上线)NTF:No trouble found误判CIP:capacity improvement plan(产能改善计划)MRB:material review board(物料审核小组)MRB:Material reject bill退货单JIT:just in time(即时管理)5S:seiri seiton seiso seiketsu shitsuke(整理,整顿,清扫,清洁,修养)SOP:standard operation process(标准作业程序)SIP:Specification inspection process制程检验规格TOP: Test Operation Process (测试作业流程)WI: working instruction(作业指导书)SMD:surface mounting device(表面粘着原件)FAR:failure aualysis report故障分析报告CAR:Corrective action report改善报告BPR: 企业流程再造 (Business Process Reengineering)ISAR :首批样品认可(Initial Sample Approval Request)-JIT:实时管理 (Just In Time)QCC :品管圈 (Quality Control Circle)Engineering Department (工程部)TQEM: Total Quality Environment Management(全面品质环境管理)PD: Production Department (制造)LOG: Logistics (后勤支持)Shipping: (进出口)AOQ:Average Output Quality平均出货质量AOQL:Average Output Quality Level平均出货质量水平FMEA:failure model effectiveness analysis失效模式分析CRB: Change Review Board (工程变更会议)CSA:Customer Simulate Analysis客户模拟分析SQMS:Supplier Quality Management System供应商品质管理系统QIT: Quality Improvement Team 品质改善小组QIP:Quality Improvement Plan品质改善计划CIP:Continual Improvement Plan持续改善计划M.Q.F.S: Material Quality Feedback Sheet (来料品质回馈单) SCAR: Supplier Corrective Action Report (供货商改善对策报告) 8D Sheet: 8 Disciplines sheet ( 8D单)PDCA:PDCA (Plan-Do-Check-Action) (管理循环)MPQ: Material Packing Quantity (物料最小包装量)DSCN: Delivery Schedule Change Notice (交期变更通知) QAPS: Quality Assurance Process Sheet (品质工程表)DRP :运销资源计划 (Distribution Resource Planning)DSS:决策支持系统 (Decision Support System)EC :电子商务 (Electronic Commerce)EDI :电子资料交换 (Electronic Data Interchange)EIS :主管决策系统 (Excutive Information System)ERP :企业资源规划 (Enterprise Resource Planning)FMS :弹性制造系统 (Flexible Manufacture System)KM :知识管理 (Knowledge Management)4L :逐批订购法 (Lot-for-Lot)LTC :最小总成本法 (Least Total Cost)LUC :最小单位成本 (Least Unit Cost)MES :制造执行系统 (Manufacturing Execution System)MPS :主生产排程 (Master Production Schedule)MRP :物料需求规划 (Material Requirement Planning)MRPⅡ:制造资源计划 (Manufacturing Resource Planning)OEM :委托代工 (Original Equipment Manufacture)ODM :委托设计与制造 (Original Design & Manufacture) OLAP:线上分析处理 (On-Line Analytical Processing)OLTP:线上交易处理 (On-Line Transaction Processing)OPT :最佳生产技术 (Optimized Production Technology) PDCA:PDCA管理循环 (Plan-Do-Check-Action)PDM:产品数据管理系统 (Product Data Management))RCCP:粗略产能规划 (Rough Cut Capacity Planning)SCM :供应链管理 (Supply Chain Management)SFC :现场控制 (Shop Floor Control)TOC:限制理论 (Theory of Constraints)TQC :全面品质管制 (Total Quality Control)FYI/R:for your information/reference仅供参考ASAP:尽快S/T:Standard time标准时间TPM:total production maintenance:全面生产保养ESD Wrist strap:静电环IT:information technology信息技术,资讯科学CEO:Chief Executive Officer执行总裁COO:Chief Operaring Officer首席业务总裁SWOT:Strength,Weakness,Opportunity,Threat优势﹐弱点﹐机会﹐威胁Competence:专业能力Communication:有效沟通Cooperation:统御融合Vibration Testing:振动测试IDP:Individual Development Plan个人发展计划MRP:Material Requirement Planning物料需求计划MAT'S:Material材料LRR:Lot Rejeet Rate批退率ATIN:Attention知会3C:Computer ,Communication , Consumer electronic消费性电子5W1H:When , Where , Who , What , Why , Ho5M: Man , Machine , Material , Method , Measurement人,机器,材料,方法,测量4MIE: Man,Material,Machine,Method,Environment人力,物力,财务,技术,时间(资源)7M1I: Manpower , Machine , Material , Method, Market , Management , Money , In 人力, 机器, 材料, 方法, 市场, 管理, 资金, 资讯1 Accuracy 准确度2 Action 行动3 Activity 活动4 Analysis Covariance 协方差分析5 Analysis of Variance 方差分析6 Approved 承认7 Attribute 计数值8 Average 平均数9 Balance sheet 资产负债对照表10 Binomial 二项分配11 Brainstorming Techniques 脑力风暴法12 Cause and Effect Matrix 因果图(鱼骨图)13 CL:Center Line 中心线14 Check Sheets 检查表15 Complaint 投诉16 Conformity 合格(符合)17 Control 控制18 Control chart 控制(管制)图19 Correction 纠正20 Correlation Methods 相关分析法21 CPI: continuouse Process Improvement 连续工序改善22 Cross Tabulation Tables 交叉表23 CS: Customer Sevice 客(户)服(务)中心24 DSA: Defects Analysis System 缺陷分析系统25 Data 数据 Description:品名26 DCC: Document Control Center 文控中心27 Decision 决策、判定28 Defects per unit 单位缺点数29 Description 描述30 Device 装置31 Do 执行32 DOE: Design of Experiments 实验设计33 Element 元素34 Engineering recbnology 工程技35 Environmental 环境36 Equipment 设备37 Estimated accumulative frequency 计算估计累计数38 E Equipment Variation 设备变异39 External Failure 外部失效,外部缺陷40 FA: Failure Analysis 失效分析41 Fact control 事实管理42 Fatigue 疲劳43 FMEA: Failure Mode and Effect Analysis失效模式与效果分析44 FP First-Pass Yield (第一次通过)合格率45 FQA: Final Quality Assurance 最终品质保证46 FQC: Final Quality control 最终品质控制47 Gauge system 测量系统48 Grade 等级49 Histogram 直方图50 Improvement 改善51 Initial review 先期审查52 Inspection 检验53 Internal Failure 内部失效、内部缺陷54 IPQC: In Process Quality Control 制程品质控制55 IQC: Incomming Quality Control 来料品质控制56 IS International Organization for Standardization 国际标准化组织57 LCL: Lower Control limit 管制下限58 LQC: Line Quality Control 生产线品质控制59 LSL: Lower Size Limit 规格下限60 Machine 机械61 Manage 管理62 Materials 物料63 Measurement 测量64 Median 中位数65 MSA: Measurement System Analysis 测量系统分析66 Occurrence 发生率67 Operation Instruction 作业指导书68 Organization 组织69 Parto 柏拉图70 PPM arts per Million (百万分之)不良率71 Plan 计划72 Policy 方针73 Population 群体74 PQA: Process Quality Assurance 制程品质保证75 Practice 实务(践)76 Prevention 预防77 Probability 机率78 Probability density function 机率密度函数79 Procedure 流程80 Process 过程81 Process capability analysis 制程能力分析(图)82 Process control and Process capability制程管制与制程能力83 Product 产品84 Production 生产85 Projects 项目86 QA: Quality Assurance 品质保证87 QC: Quality Control 品质控制88 QE: Quality Engineering 品质工程89 QFD: Quality Function Desgin 品质机能展开(法)90 Quality 质量91 Quality manual 品质手册92 Quality policy 品质政策(质量方针)93 Random experiment 随机试验94 Random numbers 随机数95 R:Range 全距(极差)96 Reject 拒收97 Repair 返修98 Repeatusility 再现性99 Reproducibility 再生性100 Requirement 要求101 Responsibilities 职责102 Review 评审103 Reword 返工104 Rolled yield 直通率105 RPN: Risk Priority Number 风险系数106 Sample 抽样,样本107 Sample space 样本空间108 Sampling with replacement 放回抽样109 Sampling without replacement 不放回抽样110 Scatter diagram 散布图分析111 Scrap 报废112 Simple random sampling 简单随机取样113 Size 规格114 SL: Size Line 规格中心线115 Stratified random sampling 分层随机抽样116 SOP: Standard Operation Procedure 标准作业书117 SPC: Statistical Process Control 统计制程管制118 Specification 规范119 SQA: Source(Supplier) Quality Assurance 供货商品质保证120 Stage sampling 分段随机抽样121 Standard Deviation 标准差122 Sum of squares 平方和123 Taguchi-method 田口(试验)方法124 Theory 原理125 TQC: Total Quality Control 全面品质控制126 TQM: Total Quality Management 全面品质管理127 Traceablity 追溯128 Training 培训129 UCL: Upper Control Limit 管制(控制)上限130 USL: Upper Size Limit 规格上限131 Validation 确认132 Variable 计量值133 Verification 验证134 Version 版本135 VOC: Voice of Customer 客户需求136 VOE: Voice of Engineer 工程需求137 Inventory stock report:庫存清单报告138 Sales order report:出货报告质量人员名称类QC quality control 品质管理人员FQC final quality control 终点质量管理人员IPQC in process quality control 制程中的质量管理人员OQC output quality control 最终出货质量管理人员IQC incoming quality control 进料质量管理人员TQC total quality control 全面质量管理POC passage quality control 段检人员QA quality assurance 质量保证人员OQA output quality assurance 出货质量保证人员QE quality engineering 质量工程人员质量保证类FAI first article inspection 新品首件检查FAA first article assurance 首件确认CP capability index 能力指数CPK capability process index 模具制程能力参数SSQA standardized supplier quality audit 合格供货商质量评估FMEA failure model effectiveness analysis 失效模式分析FQC运作类AQL Acceptable Quality Level 运作类允收质量水平S/S Sample size 抽样检验样本大小ACC Accept 允收REE Reject 拒收CR Critical 极严重的MAJ Major 主要的MIN Minor 轻微的Q/R/S Quality/Reliability/Service 质量/可靠度/服务P/N Part Number 料号L/N Lot Number 批号AOD Accept On Deviation 特采UAI Use As It 特采FPIR First Piece Inspection Report 首件检查报告PPM Percent Per Million 百万分之一制程统计品管专类SPC Statistical Process Control 统计制程管制SQC Statistical Quality Control 统计质量管理GRR Gauge Reproductiveness & Repeatability 量具之再制性及重测性判断量可靠与DIM Dimension 尺寸DIA Diameter 直径N Number 样品数其它质量术语类QIT Quality Improvement Team 质量改善小组ZD Zero Defect 零缺点QI Quality Improvement 质量改善QP Quality Policy 目标方针TQM Total Quality Management 全面质量管理RMA Return Material Audit 退料认可7QCTools 7 Quality Control Tools 品管七大手法通用之件类ECN Engineering Change Notice 工程变更通知(供货商) ECO Engineering Change Order 工程改动要求(客户)PCN Process Change Notice 工序改动通知PMP Product Management Plan 生产管制计划SIP Standard Inspection Procedure 制程检验标准程序SOP Standard Operation Procedure 制造作业规范IS Inspection Specification 成品检验规范BOM Bill Of Material 物料清单PS Package Specification 包装规范SPEC Specification 规格DWG Drawing 图面系统文件类ES Engineering Standard 工程标准CGOO China General PCE龙华厂文件IWS International Workman Standard 工艺标准ISO International Standard Organization 国际标准化组织GS General Specification 一般规格部类PMC Production & Material Control 生产和物料控制PCC Product control center 生产管制中心PPC Production Plan Control 生产计划控制MC Material Control 物料控制DC Document Center 资料中心QE Quality Engineering 质量工程(部)QA Quality Assurance 质量保证(处)QC Quality Control 质量管理(课)PD Product Department 生产部LAB Laboratory 实验室IE Industrial Engineering 工业工程R&D Research & Design 设计开发部生产类PCs Pieces 个(根,块等)PRS Pairs 双(对等)CTN Carton 卡通箱PAL Pallet/skid 栈板PO Purchasing Order 采购订单MO Manufacture Order 生产单D/C Date Code 生产日期码ID/C Identification Code (供货商)识别码SWR Special Work Request 特殊工作需求L/N Lot Number 批号P/N Part Number 料号OEM Original Equipment Manufacture 原设备制造PC Personal Computer 个人计算机CPU Central Processing Unit 中央处理器A.S.A.P As Soon As Possible 尽可能快的E-MAIL Electrical-Mail 电子邮件N/A Not Applicable 不适用QTY Quantity 数量I/O input/output 输入/输出NG Not Good 不行,不合格C=0 Critical=0 极严重不允许APP Approve 核准,认可,承认CHK Check 确认ASS'Y Assembly 装配,组装T/P True Position 真位度5WIH When, Where, Who, What, Why, How to6M Man, Machine, Material, Method, Measurement, Message4MTH Man, Material, Money, Method, Time, How 人力,物力,财务,技术,时间(资源SQA Strategy Quality Assurance 策略质量保证DQA Design Quality Assurance 设计质量保证MQA Manufacture Quality Assurance 制造质量保证SSQA Sales and service Quality Assurance 销售及服务质量保证LRR Lot Reject Rate 批退率SPS Switching power supply 电源箱DT Desk Top 卧式(机箱)MT Mini-Tower 立式(机箱)DVD Digital Video DiskVCD Video Compact DiskLCD Liquid Crystal DisplayCAD Computer Aided DesignCAM Computer Aided ManufacturingCAE Computer Aided EngineeringPCB Printed Circuit Board 印刷电路板CAR Correction Action Report 改善报告NG Not Good 不良WDR Weekly Delivery Requirement 周出货要求PPM Percent Per Million 百万分之一TPM Total Production Maintenance 全面生产保养MRP Material Requirement Planning 物料需计划OS Operation System 操作系统TBA To Be Assured 待定,定缺D/C Drawing ChangeP/P Plans & ProcedureEMI Electrical-Music Industry 电子音乐工业Electrical Magnetic Interference 电子干扰RFI Read Frequency Input 读频输入MMC Maximum Material ConditionMMS Maximum Material SizeLMC Least Material ConditionLMS Least Material SizeLED lighting-emitting diode 发光二极管QBR Quarter Business RecordCIP Continuous improvement processFGI Forecasted Goal InventoryCNC Computerized numeral controllerB2C Business to customerB2B Business to businessAVL Approved vendor listPOP Procedure of packagingEOL End of lifeVDCS Vender defect correcting sheet PDCS Process defect correcting sheet GRN Goods receiving noteA/R Accounting receivableA/P Accounting payable专业词汇通用类president董事长operator作业员position职务general manager总经理special assistant 特助deputy manager |'depjuti| =vice manager副理deputy supervisor =vice supervisor副课长group leader组长line leader线长supervisor 课长responsible department负责单位Human Resources Department人力资源部Head count 人头数production department生产部门planning department企划部QC Section品管课stamping factory冲压厂painting factory烤漆厂molding factory成型厂administration/general affairs dept./总务部production unit生产单位meeting minutes会议记录distribution department分发单位subject主题conclusion结论decision items决议事项pre-fixed finishing date预定完成日Color management 颜色管理Visual management 目视管理production capacity生产力first count初盘first check初盘复棹second count 复盘second check复盘复核quantity of physical inventory second count 复盘点数量physical inventory盘点数量physical count quantity账面数量difference quantity差异量spare parts physical inventory list备品盘点清单cause analysis原因分析waste materials废料description品名specification 规格model机种work order工令revision版次remark备注registration登记registration card登记卡to control管制application form for purchase请购单consume, consumption消耗to notify通知to fill in填写to collect, to gather收集statistics统计cosmetic inspection standard 外观检验规范 computer case 计算机外壳(组件)personal computer enclosure 计算机机箱产品front plate前板rear plate后板chassis |'∫æsi| 基座bezel panel面板Hood 上盖base pan 基座bezel 面板riser card 扩充卡flat cable 排线TOP driver cage 上磁架bottom driver cage 下磁架resin film 树脂膜raw materials原料materials物料steel plate钢板roll/coil material卷料spare parts =buffer备品plastic parts塑料件sheet metal parts/stamping parts 冲件material check list物料检查表finished product成品semi-finished product半成品good product/accepted goods/ accepted parts/good parts良品defective product/non-good parts不良品disposed goods处理品warehouse/hub仓库packing material包材basket蝴蝶竺plastic basket胶筐flow chart流程窗体production tempo生产进度现状lots of production生产批量manufacture procedure制程to revise, modify修订to switch over to, switch—to, switching over切换engineering bottleneck, project difficulty工程瓶颈glove(s)手套glove(s) with exposed fingers割手套Band-Aid创可贴Industrial alcohol工业酒精broom扫把mop拖把vacuum cleaner吸尘器rag 抹布garbage container灰箕garbage can垃圾箱garbage bag垃圾袋liaison联络单rags抹布lamp holder灯架to mop the floor拖地to clean a table擦桌子air pipe 气管delivery deadline交货期die worker模工production, to produce生产equipment设备resistance电阻beacon警示灯coolant冷却液crusher破碎机club car高尔夫球车plate电镀power button电源按键reset button重置键forklift叉车Workshop traveler 天车trailer =long vehicle拖板车Hydraulic trolley手压车hydraulic hand jack油压板车casing = containerization装箱velocity速度patent专利coordinate坐标supply and demand供求career card履历卡barricade隔板carton box纸箱to pull and stretch拉深work cell/work shop工作间sub-line支线bottleneck 瓶颈模具工程类plain die简易模pierce die冲孔模forming die成型模progressive die连续模stage die工程模compound die复合模shearing die剪边模riveting die铆合模feature die公母模male die公模female die母模cavity型控 母模core模心 公模die change 换模to fix a die装模to repair a die修模punch set上模座punch pad上垫板punch holder上夹板stripper pad脱料背板up stripper上脱料板upper plate上模板lower plate下模板die pad下垫板die holder下夹板bottom block下垫脚bottom plate下托板(底板)upper supporting blank上承板upper padding plate blank上垫板top plate上托板(顶板)top block上垫脚stripping plate内外打(脱料板)outer stripper外脱料板inner stripper内脱料板lower stripper下脱料板punch冲头insert入块(嵌入件)deburring punch压毛边冲子groove punch压线冲子stamped punch字模冲子round punch圆冲子special shape punch异形冲子bending block折刀roller滚轴baffle plate挡块located block定位块supporting block for location定位支承块air cushion plate气垫板air-cushion eject-rod气垫顶杆trimming punch切边冲子stiffening rib punch = stinger 加强筋冲子ribbon punch压筋冲子reel-stretch punch卷圆压平冲子guide plate定位板sliding block滑块sliding dowel block滑块固定块die locker锁模器pressure plate =plate pinch压板thickness gauge厚薄规cutting die, blanking die冲裁模folded block折弯块sliding block滑块location pin定位销lifting pin顶料销die plate, front board模板padding block垫块stepping bar垫条panel board镶块to load a die装上模具to unload a die 御模具active plate活动板lower sliding plate下滑块板upper holder block上压块upper mid plate上中间板spring box弹簧箱spring-box eject-rod弹簧箱顶杆spring-box eject-plate弹簧箱顶板bushing block衬套cover plate盖板guide pad导料块pilot导正筒trim剪外边pierce剪内边pocket for the punch head挂钩槽slug hole废料孔radius半径shim/wedge/heel/pad/spacer/gasket楔子torch-flame cut火焰切割set screw止付螺丝form block折刀round pierce punch =die button圆冲子shape punch =die insert异形子stock located block定位块metal plate钣金miller铣床grinder磨床tolerance公差score =groove压线sliding block滑块lathe车active plate活动板baffle plate挡块cover plate盖板groove punch压线冲子air-cushion eject-rod气垫顶杆spring-box eject-plate弹簧箱顶板capability能力parameter参数factor系数driller钻床set up die架模height of die setting up架模高度analog-mode device类模器inner guiding post内导柱inner hexagon screw内六角螺钉dowel pin固定销coil spring弹簧lifter pin顶料销eq-height sleeves =spool等高套筒pin销lifter guide pin浮升导料销guide pin导正销wire spring圆线弹簧outer guiding post外导柱stop screw止付螺丝located pin定位销outer bush外导套press specification冲床规格die height闭模高度flow mark流痕welding mark溶合痕post screw insert螺纹套筒埋值self tapping screw自攻螺丝stripper plate脱料板piston活塞handle mold手持式模具flash mold溢流式模具positive mold挤压式模具split mold分割式模具die lifter举模器top stop上死点bottom stop下死点one stroke一行程to continue, cont.连动to grip(material)吸料location lump, locating piece, location block定位块reset复位to file burr 锉毛刺embedded lump |in'bed| |l mp|镶块stamping-missing漏冲to tight a bolt拧紧螺栓to loosen a bolt拧松螺栓punched hole冲孔to cut edge =side cut =side scrap 切边to bending折弯to pull, to stretch拉伸engraving, to engrave刻印stamping 油印to stake铆合designing, to design设计design modification 设计修改成gauge(or jig)治具pedal踩踏板stopper阻挡器flow board流水板torque扭矩spline =the multiple keys花键quenching淬火tempering回火annealing退火carbonization碳化alloy合金tungsten high speed steel钨高速的moly high speed steel钼高速的forming成型(抽凸,冲凸)draw hole抽孔bending折弯emboss凸点dome凸圆semi-shearing半剪stamp mark冲记号deburr or coin压毛边punch riveting冲压铆合side stretch侧冲压平reel stretch卷圆压平groove压线stamp letter冲字(料号)tick-mark nearside正面压印tick-mark farside反面压印冲压类punch, press冲punching machine 冲床hydraulic machine油压机jack升降机decoiler整平机manufacture management制造管理stamping, press冲压feeder送料机rack, shelf, stack料架taker取料机to reverse material 翻料to load material上料to unload material卸料to return material/stock to退料scraped |'skræpid|报废scrape ..v.刮;削robot机械手production line流水线packaging tool打包机packaging打包成型类well type蓄料井insulated runner绝缘浇道方式hot runner热浇道runner plat浇道模块valve gate阀门浇口band heater环带状的电热器spindle阀针spear head刨尖头slag well冷料井cold slag冷料渣air vent排气道welding line熔合痕eject pin顶出针knock pin顶出销return pin回位销反顶针sleeve套筒stripper plate脱料板insert core放置入子runner stripper plate浇道脱料板guide pin导销eject rod (bar)(成型机)顶业捧subzero深冷处理three plate三极式模具runner system浇道系统stress crack应力电裂orientation定向sprue gate射料浇口,直浇口nozzle射嘴sprue lock pin料头钩销(拉料杆)slag well冷料井side gate侧浇口edge gate侧缘浇口tab gate搭接浇口film gate薄膜浇口flash gate闸门浇口slit gate缝隙浇口fan gate扇形浇口dish gate因盘形浇口diaphragm gate隔膜浇口ring gate环形浇口submarine gate潜入式浇口tunnel gate隧道式浇口pin gate针点浇口runner less无浇道sprue less 无射料管方式long nozzle延长喷嘴方式spur浇口;溶waste废料board广告牌sliding rack滑料架to impose lines压线to compress, compressing压缩character die字模to feed, feeding送料material change, stock change材料变更feature change 特性变更prepare for, make preparations for 准备rotating speed, revolution转速abnormal handling异常处理组装类Assembly line组装线Layout布置图Conveyer流水线运输带Rivet machine拉钉机Rivet gun拉钉枪Screw driver起子Electric screw driver电动起子Hydraulic machine 液压机Pneumatic screw driver气动起子automation自动化to stake, staking, riveting铆合add lubricant oil加润滑油argon welding氩焊cylinder油缸robot机械手conveying belt输送带transmission rack输送架to draw holes抽孔bolt螺栓nut 螺母screw 螺丝identification tag标示单screwdriver plug起子插座automatic screwdriver电动启子to move, to carry, to handle搬运be put in storage入库packing包装staker = riveting machine铆合机fit together组装在一起fasten锁紧(螺丝)fixture 夹具(治具)pallet/skid栈板barcode条形码barcode scanner条形码扫描仪fuse together熔合fuse machine/heat stake热熔机processing, to process加工delivery, to deliver 交货to return delivery to. to send delivery back to return of goods退货easily damaged parts易损件standard parts标准件to lubricate润滑spring 弹簧spare tools location/buffer手工备品仓spare molds location模具备品仓tox machine自铆机烤漆类phosphate皮膜化成viscosity涂料粘度alkalidipping脱脂main manifold主集流脉organic solvent有机溶剂demagnetization去磁;消磁high-speed transmission高速传递heat dissipation热传rack上料volatile挥发性degrease脱脂rinse水洗alkaline etch龄咬desmot剥黑膜D.I. rinse纯水次Chromate铬酸处理Anodize阳性处理seal封孔scraped products报放品disposed products处理品dismantle the die折模auxiliary function辅助功能heater band 加热片thermocouple热电偶derusting machine除锈机degate打浇口dryer烘干机induction感应induction light感应光response =reaction =interaction感应ram连杆edge finder巡边器concave凸convex凹cold slug冷块blush 导色gouge沟槽;凿槽satin texture段面咬花witness line证示线grit沙砾granule =pellet =grain细粒sand blasting喷沙grit maker抽粒机cushion缓冲fillet镶;嵌边roller pin formality滚针形式cam driver铡楔shank摸柄crank shaft曲柄轴品质类qualified products, up-to-grade products良品defective products, not up-to-grade products不良品defective product box不良品箱poor processing 制程不良poor incoming part来件不良exposed metal/bare metal金属裸露。
电子制造业NPI及常用英文词汇
电子制造业NPI及常用英文词汇电子制造业NPI及常用英文词汇电子制造业新产品导入NPI及常用英文词汇产品定义(EVT),产品设计(DVT),定型测试(PVT)EVT (Engineer Verification Test)工程样品验证测试,DVT (Design Verification Test)设计样品验证测试,PVT(Production/Process/Pilot Verification Test)生产验证测试。
1)产品确证历程:EVT(Engineering Verification Test)---> DVT(Design Verification Test) ---> PVT(Process Verification Test);2)EVTPoduct/Engineering Specification complete(由 R&D 完成,内容: 一些重要的参数,重要特征)Design Verification Plan ( B-test, Compatibility-test, EMI )(由技服部作)初步之BOM(R&D完成)Cost Review(PMP 负责)Test equipment and Tooling(R&D 和工程部门)Test process documented and released测试程序或测试文件Failure analysis and corrective actions针对不良点作设计上的改善3)DVTDesign Verification Test( B-test , Compatibility-test, EMI ) complete概念1:可靠性测试: 产品在既定的时间内, 在特定的条件下完成特定功能和性能的机率概念2:B-test--- Basic test 包括:Function TestSafety TestEnvironment TestMechanical Test概念3:Safety Test 主要有:Hit-Pot 高压测试绝缘电阻测试Current Leakage(电流测试)接地测试概念4:Mechanical Test 主要有Vibration Test(振动试验)Drop Test(落体试验)概念5: Compatibility test --- 兼容性测试硬件与软件之兼容性硬件与硬件之兼容性概念6: EMI Test--- 抗静电 ,电磁干扰Agency Compliances complete安规承认测试,安规组负责Design Change Phased in设计变更切入MPI & TPI & QII 等等制程文件试用的制作完毕BOM 进一步修改Failure Analysis and Corrective actions形成 AVL---- Acceptable Vendor List4)PVTFailure analysis / corrective actionFirst article inspection review with customer and documented 制程安排好, 各种制程文件修改并正式发行Operators/ Inspectors traning / certification programC-Test----仅小变更,仅需做 change-test 变可. 此测试可仅针对变更项做ORT Test (On Going Reliability Test)--- ongoing reliability test 连续测试 2000小时PMP 召开会议---作总结GO or STOP5)机构件的 3B ApprovalTVR--- Tooling Verification Report对生产出来的产品做全尺寸测量Cpk Report Complex Process Capability index制程能力报告TVR & Cpk 由品保与工程部门共同完成Flow Chart ----流程图怎样安排制程PMP --- Process Management Plan制程安排,制程控制要点,设备,检验方法, 检验频率等等Flow Chart & PMP 由 IE 制作FAP ( Final Audit Program )要求图文并茂试模报告塑料成形条件, 冲压成形条件各单件之图面及组件之装配图材质证明书ECN--- Engineering Change Notice要求及时地切入工程变更工厂/设计产品测试:BVT是Build Verification Test,基本验证测试,对完成的代码进行编译和连接,产生一个构造,以检查程序的主要功能是否会像预期一样进行工作。
PMC专用术语
常用生管专用术语1.A/M—action memo.备忘记录2.AVL—avail vendor list合格供应商目录3.ASSY—assemble 组装,装配4.BOM—bill of material物料清单5.BFM—buy from 采购方式6.BU—business unit 业务单位7.BIOS—basic input/output system 基本输入/输出系统8.CFM—consign from 付款方式B—change control board 控制板10.DOA—de ad on arrival到货即损,经销商收到厂家的货品后打开就是坏的,就可以退货,但是这是有个期限的,超过期限就是RMA了11.RMA—return material authorization退料审查12.DVT—design verification test BVT是Build Verification Test,基本验证测试,对完成的代码进行编译和连接,产生一个构造,以检查程序的主要功能是否会像预期一样进行工作。
13.BVT—Build Verification Test,基本验证测试,对完成的代码进行编译和连接,产生一个构造,以检查程序的主要功能是否会像预期一样进行工作。
14.PVT—Process Verification Test意为小批量过程验证测试,硬件测试的一种,主要验证新机型的各功能实现状况并进行稳定性及可靠性测试15.E VT—Engineering Value Test工程样品验证测试16.DC—document center 资料中心17.DIMM—sdram 内存18.ETA—estimate time of arrival预计到货时间19.ETD—estimate time of deliver预计发货时间20.ERP—enterprise resource plan企业资源计划21.EBO M—engineering bill of material试产物料清单22.MBOM—Manufacture bill of material 批量生产物料清单23.PCN —Process Change Notice 工序改动通知24.ECN —Engineering Change Notice 工程变更通知(供货商)25.ECO —Engineering Change Order 工程改动要求(客户)26.PCN —Process Change Notice 工序改动通知27.PMP—Product Management Plan 生产管制计划28.FIFO — First-in First-out, 先入先出29.F/T—function test 功能测试30.JIT—just in time 及时反应31.KC—key component关键元件32.L/T—lead time提前期33.TLT—Transport lead time 调拨提前期34.MLT—manufacture lead time生产提前期35.PLT—purchase lead time36.MRP—material require plan物料需求计划37.MPS—master production schedule主生产计划38.MDS—master demand schedule主需求计划39.MN—manufacturing notice生产通知单40.MP—master production 主计划41.MO—manufacturing order 生产单号42.MFG—manufacturing造模块43.MPI—manufacturing process instruction生产流程说明书44.MTD —month till today 月产量45.MRB—Material Review Board材料审查会议46.OPT—output till today 日产量47.OU—-operation unit 运营单位48.O/H—-overhead间接费用49.O/T— work over time误期50.ODM—original design manufacturing贴牌生产51.OEM—original equipment manufacturing代工生产52.PCBA—PWA印刷线路板组装53.PMR—problem m aterial review report 物料检验报告54.P/S—production and sales meeting产销会55.QVL—qualified vendor list 合格厂商56.IQC—incoming quality contro来料品质控制57.IPQC—InPut Process Quality Cortrol过程品质控制58.FQC—Finish or Final Quality Control成品质量检验59.OQC—Outgoing Quality Control出货品质管制60.OQA—outgoing quality assurance成品最终出货检查61.PQE—production quality engineer产品质量工程师62.SMT—表面黏著技术63.SA—sales authorization销售授权64.SI—sales instruction销售演示65.SOP—standard operation procedure标准作业程序66.T/S—trouble shooting故障分析67.WIP—work in process工作进度68.W/O—work order工单69.W/H—warehouse仓库70.STD—s tandard标准71.I/S ratio—inventory amt / sales amt周转率72.DPPM—defect percentage per million百万分比的缺陷率73.OFD—order fulfill department 订单执行部门74.OP—order processor 订购点75.PD—purchase dep.采购部76.PC—production control生产计划控制77.MC—material control物料控制78.R&D—research and development 研发部79.LMD—logistic management dep.资材部80.ED—engineering department 工程部81.MD—Market department。
2022最新软件测试经典面试题
2022最新软件测试经典面试题1、为什么要在一个团队中开展软件测试工作?参考答案:因为没有经过测试的软件很难在发布之前知道该软件的质量,就好比ISO质量认证一样,测试同样也需要质量的保证,这个时候就需要在团队中开展软件测试的工作。
在测试的过程发现软件中存在的问题,及时让开发人员得知并修改问题,在即将发布时,从测试报告中得出软件的质量情况。
2、你以前工作时的测试流程是什么?参考答案:(灵活回答)公司对测试流程没有规定如何做,但每个测试人员都有自己的一套测试流程。
我说下我1年来不断改正(自己总结,吸取同行的方法)后的流程吧。
需求评审(有开发人员,产品经理,测试人员,项目经理)->需求确定(出一份确定的需求文档)->开发设计文档(开发人员在开始写代码前就能输出设计文档)->想好测试策略,写出测试用例->发给开发人员和测试经理看看(非正式的评审用例)->接到测试版本->执行测试用例(中间可能会补充用例)->提交bug(有些bug需要开发人员的确定(严重级别的,或突然发现的在测试用例范围之外的,难以重现的),有些可以直接录制进TD)->开发人员修改(可以在测试过程中快速的修改)->回归测试(可能又会发现新问题,再按流程开始跑)。
3、软件测试的风险主要体现在哪里?参考答案:我们没有对软件进行完全测试,实际就是选择了风险,因为缺陷极有可能存在没有进行测试的部分。
举个例子,程序员为了方便,在调试程序时会弹出一些提示信息框,而这些提示只在某种条件下会弹出,碰巧程序发布前这些代码中的一些没有被注释掉。
在测试时测试工程师又没有对其进行测试。
如果客户碰到它,这将是代价昂贵的缺陷,因为交付后才被客户发现。
因此,我们要尽可能的选择最合适的测试量,把风险降低到最小。
4、如何理解压力、负载、性能测试测试?参考答案:性能测试是一个较大的范围,实际上性能测试本身包含了性能、强度、压力、负载等多方面的测试内容。
软件测试专业技术题库
软件测试专业技术题库1、请试着比较一下黑盒测试、白盒测试、单元测试、集成测试、系统测试、验收测试的区别与联系。
参考答案:黑盒测试:已知产品的功能设计规格,可以进行测试证明每个实现了的功能是否符合要求。
白盒测试:已知产品的内部工作过程,可以通过测试证明每种内部操作是否符合设计规格要求,所有内部成分是否以经过检查。
软件的黑盒测试意味着测试要在软件的接口处进行。
这种方法是把测试对象看做一个黑盒子,测试人员完全不考虑程序内部的逻辑结构和内部特性,只依据程序的需求规格说明书,检查程序的功能是否符合它的功能说明。
因此黑盒测试又叫功能测试或数据驱动测试。
黑盒测试主要是为了发现以下几类错误:1、是否有不正确或遗漏的功能?2、在接口上,输入是否能正确的接受?能否输出正确的结果?3、是否有数据结构错误或外部信息(例如数据文件)访问错误?4、性能上是否能够满足要求?5、是否有初始化或终止性错误?软件的白盒测试是对软件的过程性细节做细致的检查。
这种方法是把测试对象看做一个打开的盒子,它允许测试人员利用程序内部的逻辑结构及有关信息,设计或选择测试用例,对程序所有逻辑路径进行测试。
通过在不同点检查程序状态,确定实际状态是否与预期的状态一致。
因此白盒测试又称为结构测试或逻辑驱动测试。
白盒测试主要是想对程序模块进行如下检查:1、对程序模块的所有独立的执行路径至少测试一遍。
2、对所有的逻辑判定,取“真”与取“假”的两种情况都能至少测一遍。
3、在循环的边界和运行的界限内执行循环体。
4、测试内部数据结构的有效性,等等。
单元测试(模块测试)是开发者编写的一小段代码,用于检验被测代码的一个很小的、很明确的功能是否正确。
通常而言,一个单元测试是用于判断某个特定条件(或者场景)下某个特定函数的行为。
单元测试是由程序员自己来完成,最终受益的也是程序员自己。
可以这么说,程序员有责任编写功能代码,同时也就有责任为自己的代码编写单元测试。
执行单元测试,就是为了证明这段代码的行为和我们期望的一致。
详细介绍一下BVT
详细介绍⼀下BVT BVT 在成熟的软件研发过程中是很普及的⼀项,也是不可或缺的⼀项测试。
然⽽在实际中,尤其是国内⼀些软件企业的实际中,却因为的缺乏⽽根本没有 BVT,甚⾄很多⼈⾄今还不清楚 BVT 究竟是做什么。
【误区】 如果没有接触过具体的实践,单单看⼀些名词的定义,有时候会产⽣⼀些错误的理解。
很多⼈误认为软件集成以后所做的⼀系列测试就是 BVT。
这可以说对 BVT 是毫⽆概念了。
更多⼈认为 BVT 就是 Smoke Testing(冒烟测试)。
这是基于对 Smoke Testing 概念的⽚⾯理解,这⼀点我在《详细介绍⼀下 Smo ke Testing(冒烟测试)》⼀⽂中已经有所解释,本⽂中会有更详细的叙述。
不少⼈认为 BVT 只是基于每⽇构建(daily build)的。
其实,对于每⼀个版本、微版本,都要执⾏ BVT。
【BVT 释义】 BVT 的全称是 Build Verification Test。
可以说这个全称就是 BVT 的定义了。
BVT 只验证 build 构建的成功与失败,不深⼊测试构建好的 build 的功能、性能等等。
【BVT 的执⾏】 在每⽇构建的环境⾥,每个 daily build 构建完成时都要执⾏ BVT。
对于 daily build 以外的每个版本和微版本,构建完成时也要执⾏ BV T。
BVT 可以⼿动执⾏。
版本的构建是相对稳定的过程,因此 BVT 基本上是中最早实现全⾯⾃动化的测试。
现在绝⼤多数版本构建⼯具都附带 BVT 功能。
BVT 最基础的任务是进⾏⽂件版本的⽐对。
伴随开发进程,软件功能越来越固化,BVT 有时会在不影响最基本功能的基础上加⼊⼀些成熟的脚本。
【BVT 对后续测试⼯作的影响】 BVT 是集成测试的⼀道门槛,只有通过了 BVT 的 build 才可以进⼊后⾯的集成测试过程。
BVT 结果成功的 build —— 表明该 build 构建成功,交付集成测试,但不⼀定被测试。
BVT、EVT、DVT、PVT产品开发几个阶段之欧阳家百创编
EVT欧阳家百(2021.03.07)EVT(Engineering Verification Test)工程验证产品开发初期的设计验证。
设计者实现样品时做初期的测试验证,包括功能和安规测试,一般由RD(Research&Development)对样品进行全面验证,因是样品,问题可能较多,测试可能会做几次。
DVT(Design Verification Test)设计验证解决样品在EVT阶段的问题后进行,对所有信号的电平和时序进行测试,完成安规测试,由RD和DQA(Design Quality Assurance)验证。
此时产品基本定型。
DMT(Design Maturity Test)成熟度验证可与DVT同时进行,主要高温环境下测试产品的MTBF(Mean Time Between Failure)。
HALT(High Accelerated Life Test)&HASS(High Accelerated Stress Screen)高加速寿命测试和高加速应力筛选测试,是检验产品潜在缺陷的有效方法。
MVT(Mass Verification Test)量产验证验证量产时产品的大批量一致性,由DQA验证。
BVT是Build Verification Test,基本验证测试,对完成的代码进行编译和连接,产生一个构造,以检查程序的主要功能是否会像预期一样进行工作。
DVT是Design Verification Test的简称,设计验证测试,是硬件生产中不可缺少的一个检测环节,包括模具测试、电子性能、外观测试等等。
PVT全称为Process Verification Test,意为小批量过程验证测试,硬件测试的一种,主要验证新机型的各功能实现状况并进行稳定性及可靠性测试EVT-Engineer Verification Test,工程样品验证测试。
BVTEV VT VT产品开发几个阶段
EVT??EVT(Engineering Verification Test)工程验证产品开发初期的设计验证。
设计者实现样品时做初期的测试验证,包括功能和安规测试,一般由RD(Research&Development)对样品进行全面验证,因是样品,问题可能较多,测试可能会做几次。
DVT(Design Verification Test)设计验证解决样品在EVT阶段的问题后进行,对所有信号的电平和时序进行测试,完成安规测试,由RD和DQA(Design Quality Assurance)验证。
此时产品基本定型。
DMT(Design Maturity Test)成熟度验证可与DVT同时进行,主要高温环境下测试产品的MTBF(Mean Time Between Failure)。
HALT(High Accelerated Life Test)&HASS(High Accelerated Stress Screen)高加速寿命测试和高加速应力筛选测试,是检验产品潜在缺陷的有效方法。
MVT(Mass Verification Test)量产验证验证量产时产品的大批量一致性,由DQA验证。
BVT是Build Verification Test,基本验证测试,对完成的代码进行编译和连接,产生一个构造,以检查程序的主要功能是否会像预期一样进行工作。
DVT是Design Verification Test的简称,设计验证测试,是硬件生产中不可缺少的一个检测环节,包括模具测试、电子性能、外观测试等等。
PVT全称为Process Verification Test,意为小批量过程验证测试,硬件测试的一种,主要验证新机型的各功能实现状况并进行稳定性及可靠性测试EVT-Engineer Verification Test,工程样品验证测试。
BVTEVTDVT、PVT产品开发几个阶段
EVT??EVT(Engineering Verification Test)工程验证产品开发初期的设计验证。
设计者实现样品时做初期的测试验证,包括功能和安规测试,一般由RD(Research&Development)对样品进行全面验证,因是样品,问题可能较多,测试可能会做几次。
DVT(Design Verification Test)设计验证解决样品在EVT阶段的问题后进行,对所有信号的电平和时序进行测试,完成安规测试,由RD和DQA(Design Quality Assurance)验证。
此时产品基本定型。
DMT(Design Maturity Test)成熟度验证可与DVT同时进行,主要高温环境下测试产品的MTBF(Mean Time Between Failure)。
HALT(High Accelerated Life Test)&HASS(High Accelerated Stress Screen)高加速寿命测试和高加速应力筛选测试,是检验产品潜在缺陷的有效方法。
MVT(Mass Verification Test)量产验证验证量产时产品的大批量一致性,由DQA验证。
BVT是Build Verification Test,基本验证测试,对完成的代码进行编译和连接,产生一个构造,以检查程序的主要功能是否会像预期一样进行工作。
DVT是Design Verification Test的简称,设计验证测试,是硬件生产中不可缺少的一个检测环节,包括模具测试、电子性能、外观测试等等。
PVT全称为Process Verification Test,意为小批量过程验证测试,硬件测试的一种,主要验证新机型的各功能实现状况并进行稳定性及可靠性测试EVT-Engineer Verification Test,工程样品验证测试。
测试用例优先级划分
测试用例优先级划分从未有足够的时间做所有我们需要做的事情,这是在软件项目,尤其在测试中的一个普遍的话题。
在可用的有限时间内,如何知道你的测试工作做的最好?当应用程序发布时,总会有些遗漏的缺陷没有被发现。
对于测试而言,目标是通过改进产品质量使风险减到最小,这可以通过建造一套具体的测试用例来将应用程序按照它的速度完成等方法实现。
IEEE Standard 610 (1990) 中定义测试用例为:1. 为一个特定目标而开发一组测试输入,执行条件和的期望结果,例如测试某个程序路径或核实是否满足某个特定的需求。
2.指定输入,预期结果和一组测试项的执行条件的文档(IEEE Std 829-1983)。
当然,你将发现在项目的生命周期里的每一个应用程序的版本上执行你全部的测试用例是很困难的。
但是你将如何知道哪个测试用例必须在每一个版本中执行,什么应该被执行,同时如果你有时间的话,什么又可以被执行?给你的测试用例划分优先级别你的应用程序不需要十全十美,但它必须迎合你目标用户的需求和期望。
为了了解你项目的期望,你需要确定什么是应用程序中最重要的,目标和风险又是什么。
Sue Bartlett在“How to Find the Level of Quality Your Sponsor Wants”一文中详细的讨论了这个问题,她在文中注解到:“当我们在详细的计划,设计或编码之前沟通质量目标时,我们有一个更好的机会来避免在最后时刻的质量不匹配,那意味着迎合计划,弥补花费并且赢利将有一个更好的成功的机会。
”为了测试计划的目的,在项目版本的进度下,测试执行过程中组织和安排你的测试用例将帮助达到这些目标。
作为这种组织的一部分,我们要考虑每一个测试用例的优先级别。
根据优先级别分组测试用例将帮助你决定不同类型的版本需要什么样的测试用例,因此计算需要的时间。
如果你只有有限的时间,你可以查看什么是最合适。
Ross Collard在"Use Case Testing"一文中说:“测试用例的前10%到15%可以发现75%到90%的重要缺陷”。