完整版)设计的进度计划保证措施Design progress plan and measures
1.Develop a design plan
1) Determine the main designers。
proofreaders。
and reviewers for the project。
The ns of the personnel must meet the requirements of our company's system documents and the project contract (or bidding documents).
2) Arrange the design le for the project。
Reasonable arrangements should be made for the review time of us nal design schemes。
the joint signing time of us nal drawings。
the proofreading and review time of us nal drawings。
and the special technical methods and research n time and methods used in the design.
3) Specify the n een us ns。
Specific ns should be made for
the technical contacts een us ns。
including the time and methods。
to meet the needs of the le。
After the design plan is approved by the project manager responsible for the project。
it is transmitted to the relevant management departments。
nal designers。
and
proofreaders。
The plan can be adjusted and supplemented as necessary during the design progress or at the request of the owner。
but it still needs to be approved and transmitted。
There is a n record for each n of the design plan。
The project design manager responsible for the project supervises the n of the design plan.
2.Control the progress of each n drawing design node
1) The project design manager regularly understands the design progress of each nal design manager。
and each nal design manager regularly understands the design progress of their respective designers.
2) The project design department organizes regular n meetings。
and nal designers communicate and coordinate in a timely manner.
3) The technical department regularly understands the design progress of the project and supervises and controls the design nodes according to the overall progress plan.
3.n of the project design plan
Our company strictly follows the approved project design ns for the design。
The project design manager is responsible for checking and verifying all basic data and related materials of the project。
and finally organizes the n after obtaining the owner's approval。
n and n channels should be unblocked during the design process。
and nal design managers and designers should communicate and coordinate in a timely manner。
Establish a n and n re for the entire project general contracting management。
The project management department sets up dedicated personnel to coordinate with the design department's daily work.
4.Technical and design n interface
1) According to the technical characteristics and related ns of each nal design for this project。
the design manager organizes the nals to provide written design materials。
and holds necessary n meetings to handle the technical interfaces een us ns。
and organizes the signing of relevant drawings to avoid conflicts and ns een ns.
2) When the design materials are provided een us ns。
the "Interchangeable Card" should be filled out。
and after being signed by the reviewer。
it should be transmitted.
3) nal designers should confirm and sign the relevant materials provided by other ns。
If there is any ambiguity。
they should negotiate with the provider to resolve it and form written documents and records。
All documents and materials should be saved by nal designers and filed with the drawings for future reference.
5.Clarify the design input
1) Before the design is carried out。
the design manager should organize each nal designer to clarify the basis documents and materials required for the n drawing design of the project。
including:
1) Design contract agreement and attachments
2) Winning bid notice
3.投标书
在投标书中,应包含以下内容:项目概述、设计任务、项目范围、设计要求、设计方案、设计标准、设计计划、设计报价等。
4.设计合同条款
设计合同条款应明确规定设计任务、设计范围、设计标准、设计要求、设计方案、设计计划、设计报价、合同履行期限、合同变更、违约责任等内容。
5.地质勘察报告
地质勘察报告应详细描述工程地质条件,包括地质构造、地层岩性、地下水位、地质灾害等内容,为设计提供可靠的地质基础数据。
7.设计的有关批准文件
设计的有关批准文件应包括施工图审查意见、环评审批、消防审批、规划审批、卫生防疫审批等,确保设计符合国家法律法规和相关要求。
8.国家有关的法律、法规及本工程的有关要求和文件
设计应符合国家有关的法律、法规和相关要求和文件,如《建筑设计规范》、《建筑节能设计标准》等。
9.当地市政府有关部门的审批文件
当地市政府有关部门的审批文件应包括规划、消防、劳动安全、卫生防疫、给水排水、变电所方案、安防、通讯等,确保设计符合当地相关要求。
10.现行有效的各专业的国家标准技术规范规定等
设计应符合现行有效的各专业的国家标准技术规范规定等,如《建筑电气设计规范》、《建筑给水排水设计规范》等。
11.各专业的质量特性
设计应考虑各专业的质量特性,包括功能性、安全性、经济性、可信性、可实施性、适应性和时间性等,确保设计的可行性和可靠性。
6.设计输出
完成的设计图纸和计算书在发放前,必须经过严格的校审,确保符合设计要求和标准。
校审人员应按照设计计划进行校审,确保施工图的设计深度符合国家规定。