目录第3章安装机柜.....................................................................................................................3-13.1 概述....................................................................................................................................3-13.1.1 机柜安装流程...........................................................................................................3-13.1.2 机柜安装说明...........................................................................................................3-23.2 安装支架-滑道....................................................................................................................3-33.2.1 定位支架..................................................................................................................3-43.2.2 固定支架..................................................................................................................3-83.2.3 支架绝缘测试...........................................................................................................3-93.2.4 安装滑道..................................................................................................................3-93.3 安装地脚-压板组件...........................................................................................................3-113.3.1 安装机柜地脚.........................................................................................................3-113.3.2 地脚-压板组件定位................................................................................................3-123.3.3 安装膨胀螺栓.........................................................................................................3-143.3.4 机柜就位和调整.....................................................................................................3-153.3.5 安装压板................................................................................................................3-163.3.6 地脚-压板组件绝缘测试.........................................................................................3-163.4 固定机柜...........................................................................................................................3-163.4.1 单个机柜的固定.....................................................................................................3-163.4.2 机柜间的连接固定..................................................................................................3-183.5 安装机柜配件...................................................................................................................3-213.5.1 安装走线槽............................................................................................................3-213.5.2 安装上下梁及顶盖..................................................................................................3-253.5.3 安装门....................................................................................................................3-273.5.4 安装行列告警灯.....................................................................................................3-323.5.5 安装防尘网............................................................................................................3-343.5.6 安装过线孔盖板.....................................................................................................3-353.5.7 安装地板托和盖板..................................................................................................3-373.5.8 贴装机柜标签.........................................................................................................3-383.6 机柜安装检查...................................................................................................................3-39第3章安装机柜3.1 概述3.1.1 机柜安装流程硬件安装的第一步一般是安装机柜,机柜的安装流程如图3-1所示:图3-1机柜安装流程图如图3-1所示,机柜的安装过程如下:(1) 根据工程环境确定机柜的安装形式如果机柜安装在地面上,则使用地脚-压板组件;如果机柜安装在防静电地板上,则使用支架-滑道系统;(2) 根据机柜安装形式,安装地脚-压板组件或支架-滑道系统。
机柜的安装施工流程
机柜的安装施工流程一机箱摆放将pc机按顺序放到机柜里面,然后将插线板固定在机柜的上部,用螺丝固定,确保其稳定。
二电线分类下一步固定电线,电线分为强电线和弱电线两种,强电线通常指的是机箱电源线的电线,这种电线电压比较大,固称为强电线,弱电线通常指的是我们所说的网线,电话线等等。
固定电线时候为了安全起见,我们通常将强电线和弱电线分开固定,可以确保电线的安全。
三固定电线我们先将强电线由左侧一端由上向下固定,每到一个机箱都要将相应的电线留出来,不在向下继续固定。
电线在向下固定时候每隔一段都要用绑线加以固定,确保其牢固。
为了清楚那个电线对应哪个机箱,我们通常在靠近插线板的一端用标签注明是那个机箱,这样为我们以后工作提供方便。
三网线及电话线安装下一步安装弱电线,也就是网线和电话线,网线和电话线的固定方发和强电线的古代方法类似,我们就不过多的讲解,下面我重点将一下网线的水晶头和电话的水晶投的安装:1,网线水晶头的安装第1步:用双绞线网线钳(当然也可以用其它剪线工具)把五类双绞线的一端剪齐(最好先剪一段符合布线长度要求的网线),然后把剪齐的一端插入到网线钳用于剥线的缺口中,注意网线不能弯,直插进去,直到顶住网线钳后面的挡位,稍微握紧压线钳慢慢旋转一圈(无需担心会损坏网线里面芯线的包皮,因为剥线的两刀片之间留有一定距离,这距离通常就是里面4对芯线的直径),让刀口划开双绞线的保护胶皮,拔下胶皮。
如下图所示。
当然也可使用专门的剥线工具来剥皮线。
【小提示】网线钳挡位离剥线刀口长度通常恰好为水晶头长度,这样可以有效避免剥线过长或过短。
剥线过长一则不美观,另一方面因网线不能被水晶头卡住,容易松动;剥线过短,因有包皮存在,太厚,不能完全插到水晶头底部,造成水晶头插针不能与网线芯线完好接触,当然也不能制作成功了。
第2步:剥除外包皮后即可见到双绞线网线的4对8条芯线,并且可以看到每对的颜色都不同。
每对缠绕的两根芯线是由一种染有相应颜色的芯线加上一条只染有少许相应颜色的白色相间芯线组成。
机柜安装步骤及注意事项
机柜安装步骤及注意事项机柜是安装和保护服务器、网络设备和其他电子设备的重要设备。
正确安装机柜可以确保设备的稳定性和安全性,并方便管理和维护。
下面是安装机柜的步骤及注意事项:步骤一:选择合适的机柜在选择机柜时,需要考虑以下因素:1.大小:根据设备的数量和尺寸选择机柜的大小。
通常机柜的高度为42U或48U。
2.材料:机柜一般由金属制成,具有良好的抗震和防护性能。
也可以选择防静电涂层或其他特殊材料的机柜,以适应特殊环境。
3.通风:机柜应具有良好的通风性能,以确保设备不过热。
4.安全:机柜应具有物理锁定和防盗措施,以保护设备的安全。
步骤二:准备工作在开始安装机柜之前,需要进行以下准备工作:1.确认安装位置:选择一个干燥、通风、无尘和无堆积物的位置安装机柜。
2.测量:测量安装区域的尺寸,确保机柜适合该区域。
3.安装设备:准备好要安装在机柜中的设备,包括服务器、交换机、路由器等。
步骤三:安装机柜以下是安装机柜的步骤:1.拆开机柜:打开机柜的包装箱,仔细检查机柜是否有损坏,并拆卸机柜的其他附件和配件。
2.安装脚轮:将脚轮安装在机柜的底部,确保它们牢固地固定在机柜上。
3.安装支撑架:将机柜的支撑架安装在机柜的底部。
根据设计好的位置,使用固定螺丝将支撑架固定在地面上。
4.安装机柜:将机柜移动到安装位置,并将机柜的底部与支撑架对齐。
使用螺丝将机柜固定在支撑架上。
5.安装托架:根据设备的尺寸和重量,将托架安装在机柜的内部。
确保托架牢固地固定在机柜的前后柱上,并能够安装设备。
步骤四:安装设备以下是安装设备的步骤:1.设计布局:根据设备的尺寸和重量,设计设备的布局。
首先安装较重的设备,然后安装较轻的设备。
2.安装设备:将设备放置在机柜的托架上,并使用螺丝将其固定在托架上。
确保设备安装牢固且稳定。
步骤五:连接设备以下是连接设备的步骤:1.电源连接:将设备的电源线连接到电源插座上。
确保电源线没有断裂或损坏。
2.数据连接:根据设备的连接需求,将设备的数据线连接到交换机、路由器或其他网络设备的正确端口上。
机柜设备安装示意图
32U
理线盒
31U
48口交换机-3 (信息点TD 交换机)
30U
理线盒
29U
48口交换机-4 (信息点TD 交换机)
28U
理线盒
27U
48口交换机-1 (信息点TO 交换机)
26U
理线盒
25U
24U
网络核心交换机
23U
22U
理线盒
21U
空
20U
TD: 24口网络配线架 至 各房间 1-24
19U
理线盒
17U
16U
15U
TP: 24口网络配线架 至各房间 1-24
14U
理线盒
13U
TP: 24口网络配线架 至各房间 25-48
12U
理线盒
11U
TP: 24口网络配线架 至各房间 49-72
10U
理线盒
9U
TP: 24口网络配线架 至各房间 73-96
8U
理线盒
7U
TP: 24口网络配线架 至各房间 97-114
机柜设备安装示意图
42U
41U
40U 39U 38U 37U 36U 35U 34U 33U 32U 31U 30U 29U 28U 27U 26U 25U 24U 23U 22U 21U 20U 19U 18U 17U 16U 15U 14U 13U 12U 11U 10U 9U 8U 7U 6U
48口交换机-2 (监控交换机)
36U
理线盒
35U
室外监控收发器
34U 电话程控交换机
33U
32U
空
31U
程控交换机出线配线架-1
30U
理线盒
安装路由器的步骤和方法
安装路由器的步骤和方法嘿,朋友们!你们知道不,前几天我家那网络突然不给力了,看个视频都一卡一卡的,可把我给急坏了。
这咋整呢?我一寻思,得整个路由器试试呗。
说干就干,我先跑到电脑城,挑了个看着还挺顺眼的路由器。
回到家,我就准备大干一场。
第一步呢,先把路由器从盒子里拿出来。
嘿,这小家伙长得还挺别致,几根天线支棱着,像个小怪物。
然后我找了个合适的地方,准备把它安置下来。
我这儿瞅瞅,那儿看看,最后决定把它放在书架上,离我平时上网的地方不远不近,刚刚好。
接下来就是插线啦。
这线可不能瞎插,得看准了。
先把电源适配器插上,通上电。
这时候路由器上的小灯就开始一闪一闪的,好像在跟我打招呼说:“嘿,主人,我准备好了。
” 然后把网线从猫上拔下来,插到路由器的 WAN 口上。
这口子可别插错了,不然可就白费功夫了。
插好线后,我还特意检查了一遍,生怕出啥差错。
然后呢,就得用电脑或者手机来设置路由器了。
我拿起手机,打开 Wi-Fi,嘿,立马就看到了一个新的无线网络名称。
点进去,手机就自动跳转到设置页面了。
这时候就得输入一些信息啦,比如路由器的管理员密码啥的。
我按照说明书上的步骤,一步一步来,可不敢马虎。
设置好密码后,我还给我的无线网络起了个特别的名字,叫“无敌网络”,嘿嘿,够霸气吧。
最后一步,就是测试一下网络通不通啦。
我打开一个视频,哇,那播放速度,杠杠的,一点都不卡了。
我这心里可别提多高兴了。
安装路由器这事儿啊,其实也不难,只要按照步骤来,谁都能搞定。
以后要是再遇到网络问题,我可就不怕了,自己动手,丰衣足食嘛。
嘿嘿,现在我可以尽情地在网上冲浪啦!。
00-2华为NE系列路由器安装手册总目录
目录第1章安装介绍........................................................................................................................1-11.1 产品简介.......................................................................................................................1-11.2 产品组成.......................................................................................................................1-11.2.1 NE05路由器.......................................................................................................1-11.2.2 NE16E路由器.....................................................................................................1-31.2.3 NE08E路由器.....................................................................................................1-51.3 通用单板介绍................................................................................................................1-71.3.1 路由交换单元RSU..............................................................................................1-91.3.2 路由交换扩展单元RSEU....................................................................................1-101.3.3 路由交换热插拔控制单元RSHC.........................................................................1-111.3.4 通用接口单元VIU..............................................................................................1-121.3.5 第四代通用接口单元VIU4..................................................................................1-131.3.6 通用接口扩展单元VIEU.....................................................................................1-141.3.7 高可靠控制单元HAU.........................................................................................1-151.3.8 告警单元ALU....................................................................................................1-16第2章安装前准备工作.............................................................................................................2-12.1 安全建议.......................................................................................................................2-12.1.1 安全警告.............................................................................................................2-12.1.2 通用安全建议......................................................................................................2-12.1.3 用电安全.............................................................................................................2-22.1.4 搬运安全.............................................................................................................2-22.1.5 防静电.................................................................................................................2-32.1.6 激光安全.............................................................................................................2-42.2 安装场所必备条件.........................................................................................................2-42.2.1 机房环境要求......................................................................................................2-42.2.2 防静电要求..........................................................................................................2-52.2.3 抗干扰要求..........................................................................................................2-52.2.4 接地要求.............................................................................................................2-52.2.5 供电要求.............................................................................................................2-62.2.6 空间要求.............................................................................................................2-62.2.7 机柜安装要求......................................................................................................2-72.3 安装所需要的工具和设备...............................................................................................2-7第3章 B68-22机柜的安装.......................................................................................................3-13.1 机柜简介.......................................................................................................................3-13.2安装流程图...................................................................................................................3-23.3 防静电地板上安装.........................................................................................................3-23.3.1 支架与滑道简介...................................................................................................3-23.3.2 支架与滑道的数量...............................................................................................3-43.3.3 机柜安装流程......................................................................................................3-53.4 水泥地面上安装............................................................................................................3-213.4.1 机柜整体压板的组成...........................................................................................3-223.4.2 机柜安装流程.....................................................................................................3-233.5 机柜的抗震加固安装.....................................................................................................3-333.6 机柜直流电源连接........................................................................................................3-37第4章路由器的安装................................................................................................................4-14.1 安装流程.......................................................................................................................4-14.2 安装准备工作确认.........................................................................................................4-14.3 安装路由器到指定位置..................................................................................................4-24.3.1 安装到安装机柜...................................................................................................4-24.3.2 安装到工作台......................................................................................................4-24.3.3 安装到用户机架...................................................................................................4-24.4 配置电缆的连接.............................................................................................................4-34.5 电源线和保护地线的连接...............................................................................................4-34.6 电源避雷器(防雷接线排)的安装.................................................................................4-64.7 安装布线推介................................................................................................................4-74.8 安装后的检查................................................................................................................4-8第5章路由器的启动与配置.....................................................................................................5-15.1 上电启动.......................................................................................................................5-15.1.1 搭建配置环境......................................................................................................5-15.1.2 路由器上电..........................................................................................................5-35.1.3 启动过程.............................................................................................................5-45.1.4 软硬件版本检查...................................................................................................5-65.2 配置基础.......................................................................................................................5-65.2.1 路由器配置的基本步骤........................................................................................5-65.2.2 命令行接口..........................................................................................................5-65.3 接口命名和排列顺序说明...............................................................................................5-7第6章软件维护........................................................................................................................6-16.1 软件维护概述................................................................................................................6-16.2 BootROM菜单..............................................................................................................6-16.3 软件升级......................................................................................................................6-146.3.1 单主控路由交换单元软件升级.............................................................................6-146.3.2双主控路由交换单元软件升级............................................................................6-196.4 口令丢失的处理............................................................................................................6-21第7章硬件维护........................................................................................................................7-17.1 硬件维护概述................................................................................................................7-17.2 电源模块的更换.............................................................................................................7-17.2.1 NE05路由器电源模块的更换...............................................................................7-17.2.2 NE08E路由器电源模块的更换............................................................................7-37.2.3 NE16E路由器电源模块的更换............................................................................7-57.3 路由器散热风扇的更换..................................................................................................7-77.3.1 NE05路由器散热风扇的更换...............................................................................7-77.3.2 NE16E路由器散热风扇的更换............................................................................7-87.3.3 NE08E路由器散热风扇的更换............................................................................7-97.4 单元单板更换通用方法.................................................................................................7-107.5 路由交换单元的更换.....................................................................................................7-117.6 路由交换扩展单元的更换..............................................................................................7-127.7 路由交换热插拔控制单元的更换...................................................................................7-127.8 通用接口单元的更换.....................................................................................................7-137.9 通用接口扩展单元的更换..............................................................................................7-137.10 高可靠控制单元的更换...............................................................................................7-137.11 告警单元的更换..........................................................................................................7-14第8章安装故障处理与运行监控..............................................................................................8-18.1路由器安装故障处理.....................................................................................................8-18.1.1 电源系统故障处理...............................................................................................8-18.1.2 散热系统故障处理...............................................................................................8-28.1.3 单板、硬盘故障处理............................................................................................8-38.1.4 配置系统故障......................................................................................................8-58.2 运行监控功能................................................................................................................8-6第9章接口模块........................................................................................................................9-19.1 接口模块简介................................................................................................................9-19.2 接口模块更换通用步骤..................................................................................................9-39.2.1 网络接口模块安装前准备.....................................................................................9-49.2.2 网络接口模块的更换............................................................................................9-59.3 以太网接口模块.............................................................................................................9-89.3.1 简介....................................................................................................................9-89.3.2 1端口1端口百兆以太网接口属性.......................................................................9-109.3.3 ETPA/ETKA/ETKB/ETKC面板图及指示灯含义...................................................9-119.3.4 1端口千兆以太网接口属性.................................................................................9-119.3.5 GEPA/GEKA/GEKB/GEKC/GEKD面板图及指示灯含义.....................................9-129.3.6 1GOMPK接口属性............................................................................................9-139.3.7 1GOMP/1GOMPK面板图及指示灯含义..............................................................9-149.3.8 2GOMK接口属性...............................................................................................9-149.3.9 2GOMP/2GOMPK面板图及指示灯含义..............................................................9-159.3.10 2GEMK接口属性.............................................................................................9-169.3.11 2GEMP/2GEMK面板图及指示灯含义...............................................................9-169.3.12 3端口百兆以太网接口属性...............................................................................9-179.3.13 3FEMK面板图及指示灯含义............................................................................9-179.3.14 电缆或光纤的连接............................................................................................9-18 9.4 同步串行接口模块........................................................................................................9-199.4.1 简介...................................................................................................................9-199.4.2 接口属性............................................................................................................9-209.4.3 SAPA/SAKA面板图及指示灯含义......................................................................9-219.4.4 电缆连接............................................................................................................9-22 9.5 cE1接口模块...............................................................................................................9-319.5.1 简介...................................................................................................................9-319.5.2 4端口E1/CE1接口属性.....................................................................................9-329.5.3 8端口E1/CE1接口属性.....................................................................................9-329.5.4 CEPA/QEKA/8EPA/8EKA/8EKB面板图及指示灯含义........................................9-339.5.5 四端口cE1接口电缆连接...................................................................................9-349.5.6 八端口cE1接口电缆连接...................................................................................9-399.5.7 cE1中继电缆连接..............................................................................................9-44 9.6 cT1接口模块................................................................................................................9-459.6.1 简介...................................................................................................................9-459.6.2 接口属性............................................................................................................9-469.6.3 8TPA/8TKA面板图及指示灯含义........................................................................9-479.6.4 电缆的连接.........................................................................................................9-479.6.5 cT1中继电缆连接...............................................................................................9-51 9.7 一端口E3接口模块......................................................................................................9-519.7.1 简介...................................................................................................................9-519.7.2 接口属性............................................................................................................9-519.7.3 E3PA/CE3K面板图及指示灯含义.......................................................................9-529.7.4 电缆连接............................................................................................................9-53 9.8 通道化E3接口模块......................................................................................................9-539.8.1 简介...................................................................................................................9-539.8.2 接口属性............................................................................................................9-549.8.3 CE3P/CE3K面板图及指示灯含义.......................................................................9-549.8.4 电缆连接............................................................................................................9-55 9.9 T3接口模块.................................................................................................................9-569.9.1 简介...................................................................................................................9-569.9.2 接口属性............................................................................................................9-569.9.3 T3PA/CT3K面板图及指示灯含义.......................................................................9-579.9.4 电缆连接............................................................................................................9-579.10 通道化T3接口模块....................................................................................................9-589.10.1 简介.................................................................................................................9-589.10.2 接口属性..........................................................................................................9-589.10.3 CT3P/CT3K面板图及指示灯含义.....................................................................9-599.10.4 电缆连接..........................................................................................................9-59 9.11 POS接口模块............................................................................................................9-609.11.1 简介.................................................................................................................9-609.11.2 接口属性..........................................................................................................9-609.11.3 POPB/PAKA /PAKB/PAKC面板图及指示灯含义...............................................9-629.11.4 光纤的连接.......................................................................................................9-62 9.12 155M ATM接口模块...................................................................................................9-639.12.1 简介.................................................................................................................9-639.12.2 接口属性..........................................................................................................9-639.12.3 ATPB/PAKA/PAKB/PAKC面板图及指示灯含义................................................9-649.12.4 光纤的连接.......................................................................................................9-64 9.13 622M ATM接口模块...................................................................................................9-659.13.1 简介.................................................................................................................9-659.13.2 接口属性..........................................................................................................9-659.13.3 ATHP/PAHA/PAHB/PAHC面板图及指示灯含义...............................................9-669.13.4 光纤的连接.......................................................................................................9-66 9.14 CPOS接口模块..........................................................................................................9-679.14.1 简介.................................................................................................................9-679.14.2 接口属性..........................................................................................................9-679.14.3 CPOP/PAKA/PAKB/PAKC面板图及指示灯含义...............................................9-689.14.4 光纤的连接.......................................................................................................9-68 9.15 八端口E1 ATM反向复用接口模块..............................................................................9-699.15.1 简介.................................................................................................................9-699.15.2 接口属性..........................................................................................................9-699.15.3 E8IP/8EKA/8EKB面板图及指示灯含义.............................................................9-709.15.4 电缆连接..........................................................................................................9-70 9.16 八端口T1 ATM反向复用接口模块..............................................................................9-709.16.1 简介.................................................................................................................9-709.16.2 接口属性..........................................................................................................9-719.16.3 T8IP/8TKA面板图及指示灯含义.......................................................................9-729.16.4 电缆连接..........................................................................................................9-72 9.17 一端口ATM E3接口模块............................................................................................9-729.17.1 简介.................................................................................................................9-729.17.2 接口属性..........................................................................................................9-739.17.3 AESP/CE3K面板图及指示灯含义.....................................................................9-749.17.4 电缆连接..........................................................................................................9-749.18 二端口ATM E3接口模块............................................................................................9-759.18.1 简介.................................................................................................................9-759.18.2 接口属性..........................................................................................................9-759.18.3 AEDP/E3DK面板图及指示灯含义.....................................................................9-769.18.4 电缆连接..........................................................................................................9-769.19 一端口ATM T3接口模块............................................................................................9-779.19.1 简介.................................................................................................................9-779.19.2 接口属性..........................................................................................................9-789.19.3 ATSP/CT3K面板图及指示灯含义.....................................................................9-789.19.4 电缆连接..........................................................................................................9-799.20 二端口ATM T3接口模块............................................................................................9-799.20.1 简介.................................................................................................................9-799.20.2 接口属性..........................................................................................................9-809.20.3 ATDP/T3DK面板图及指示灯含义.....................................................................9-809.21 IP安全加密与压缩模块...............................................................................................9-819.21.1简介.................................................................................................................9-819.21.2 SECP模块属性................................................................................................9-829.21.3 SECP面板图及指示灯含义...............................................................................9-82附录 A 电缆工程标签.................................................................................................................A-1A.1 标签简介.......................................................................................................................A-1A.1.1 标签材料.............................................................................................................A-1A.1.2 标签种类及结构..................................................................................................A-1A.1.3 标签的书写.........................................................................................................A-3A.1.4 标签的粘贴方法..................................................................................................A-5A.1.5 标签的内容.........................................................................................................A-7A.1.6 标签使用注意事项...............................................................................................A-8A.2 光纤的工程标签............................................................................................................A-8A.2.1 设备间光纤标签..................................................................................................A-8A.2.2 设备到ODF配线架的光纤标签.........................................................................A-10A.3 接口线缆的工程标签...................................................................................................A-11A.4 中继电缆的工程标签...................................................................................................A-13A.4.1 设备间中继电缆工程标签..................................................................................A-13A.4.2 设备到DDF架中继电缆工程标签......................................................................A-15A.5 电源线的工程标签.......................................................................................................A-16A.5.1 直流电源线的工程标签......................................................................................A-16A.5.2 交流电源线的工程标签......................................................................................A-17。
总结机柜设备安装流程和要点
总结机柜设备安装流程和要点下载温馨提示:该文档是我店铺精心编制而成,希望大家下载以后,能够帮助大家解决实际的问题。
文档下载后可定制随意修改,请根据实际需要进行相应的调整和使用,谢谢!并且,本店铺为大家提供各种各样类型的实用资料,如教育随笔、日记赏析、句子摘抄、古诗大全、经典美文、话题作文、工作总结、词语解析、文案摘录、其他资料等等,如想了解不同资料格式和写法,敬请关注!Download tips: This document is carefully compiled by theeditor. I hope that after you download them,they can help yousolve practical problems. The document can be customized andmodified after downloading,please adjust and use it according toactual needs, thank you!In addition, our shop provides you with various types ofpractical materials,such as educational essays, diaryappreciation,sentence excerpts,ancient poems,classic articles,topic composition,work summary,word parsing,copy excerpts,other materials and so on,want to know different data formats andwriting methods,please pay attention!一、准备工作1. 确定机柜位置:根据设计图纸或现场实际情况,确定机柜的安装位置。
机柜安装手册指南
机柜安装指南一.目录:A.1在防静电机房安装机柜A.1 .1支架使用方法-------------------------------------------------------------------------------------------2/26A.1.2 安装流程--------------------------------------------------------------------------------------------------4/26A.1.3 确定机柜安装位置-------------------------------------------------------------------------------------4/26A.1.4确定支架安装位置------------------------------------------------------------------------------- -------5/26A.1.5安装支架---------------------------------------------------------------------------------------------------10/26A.A.6安装机柜---------------------------------------------------------------------------------------------------13/26A.1.7绝缘测试---------------------------------------------------------------------------------------------------15/26A.1.8并柜联接---------------------------------------------------------------------------------------------------15/26A.1.9复原防静电地板------------------------------------------------------------------------------------------16/26A.2在水泥地面机房安装机柜A.2.1 安装流程--------------------------------------------------------------------------------------------------18/26A.2.2 确定机柜安装位置-------------------------------------------------------------------------------------19/26A.2.3安装机柜---------------------------------------------------------------------------------------------------22/26A.2.4绝缘测试---------------------------------------------------------------------------------------------------24/26A.2.5并柜联接----------------------------------------------------------------------------------------------------24/26A.1在防静电房安装机柜的方法:在防静电机房安装机柜,首先安装可调节支架,然后再把机柜安装在支架上。
机柜的安装及所注意的事项
机柜的安装及所注意的事项来源:机房360 作者:宏志更新时间:2011-8-5 9:13:12摘要:机柜安装流程分为以下几步:机柜安装计划、机柜安装前的准备、机柜调试。
本文将介绍机柜的安装及所注意的事项。
一、机柜安装流程机柜安装流程分为以下几步:机柜安装计划、机柜安装前的准备、机柜调试。
在各种项目中,机房设施是必需的,而机柜是主要的设施之一,因此机柜安装是尤为重要。
以下详细介绍网络机柜的安装:一般机柜的外型尺寸为:高×宽×深=1800mm×600mm×1000mm。
(1)机柜安装计划在安装机柜之前首先对空间进行计划,为了易于散热和保护设施,机柜前后与墙面或其他设施的距离不应小于0.8米,机房的净高不可以小于2.5米。
(2)机柜安装前的准备安装前,场地要正确没有差错,否则会造成返工。
依照拆箱引导拆解机柜及机柜附件包装木箱。
(3)机柜安装流程机柜固定后,则可以直接施行机柜配件的安装。
将机柜安放到计划好的位置,确认机柜的前后面,并使机柜的地脚瞄准相应的地脚定位标记。
(4)机柜调试在机柜顶部最简单的面两个互相垂直的方向安放水准尺,查看机柜的水准度。
旋动地脚上的螺杆调试机柜的高度,使机柜达到水平,而后锁紧机柜地脚上的锁紧螺丝帽,使锁紧螺丝帽紧贴在机柜的底面。
二、机柜安装注意事项有了机柜相关尺寸,再检查设备的外形,确保和选择的支架搭配。
一个坚固的机柜可承重近500斤,所以检查一下用来拿出设备用的工具,比如提门或手推车。
名牌机柜一般下面装有轮子,所以你只需把设备装进去,再把机柜推到合适的地方即可。
测量一下房间的大小和机柜经过的天花板、门和电梯高度。
再有考虑到机柜里的多类设备,确保把机柜放在距离电源、网线插口、通讯插口近的地方。
检查打开和关闭机柜时柜门打开的角度。
标准机柜门在右边打开,门轴在左边,当然不排除相反的情况。
所有的门和侧板都应很容易打开,以便于维护。
当用户将设备机柜安装入一个已经存在的机柜组时,可以把机柜挨着排成一排,这样安全、整齐。
机柜安装
NGN产品硬件平台 产品硬件平台N68-22机柜安装与规范 产品硬件平台 机柜安装与规范
二、防图。 与滑道的安装示意图。 机柜支架 与滑道的安装示意图
NGN产品硬件平台 产品硬件平台N68-22机柜安装与规范 产品硬件平台 机柜安装与规范
二、防静电地板上安装:
NGN产品硬件安装参考规范二 产品硬件安装参考规范二 NGN产品硬件平台N68-22机柜安装
工程中心质量部
内容目录
N68-22机柜结构简介; - 机柜结构简介 机柜结构简介; N68-22机柜在水泥地面的安装; - 机柜在水泥地面的安装 机柜在水泥地面的安装; N68-22机柜在防静电地板上的安装; - 机柜在防静电地板上的安装 机柜在防静电地板上的安装; N68-22机柜门楣和侧门的安装; - 机柜门楣和侧门的安装 机柜门楣和侧门的安装; N68-22机柜并柜时机柜顶的安装; - 机柜并柜时机柜顶的安装 机柜并柜时机柜顶的安装;
一、水泥地面安装:
水泥地面机柜孔划线模板
水泥地面安装时可使用划线模板注意缺口方向为正面
NGN产品硬件平台 产品硬件平台N68-22机柜安装与规范 产品硬件平台 机柜安装与规范
一、水泥地面安装:
安装时注意绝缘板与垫片的顺序
NGN产品硬件平台 产品硬件平台N68-22机柜安装与规范 产品硬件平台 机柜安装与规范
NGN产品硬件平台 产品硬件平台N68-22机柜安装与规范 产品硬件平台 机柜安装与规范
三、机柜门楣和侧门安装:
侧门安装前先适当 松开机柜立柱上用 于连接侧门的卡柱
NGN产品硬件平台 产品硬件平台N68-22机柜安装与规范 产品硬件平台 机柜安装与规范
四、机柜顶部并柜安装:
机柜并柜时 必须安装并 柜结构件, 柜结构件, 安装顺序 见图所示。 见图所示。
机柜内设备的安装布局及要求
机柜内设备的安装布局及要求机柜是一种用于安装和组织计算机设备和网络设备的结构,它是维护设备的物理环境和提供电力和网络连接的关键组件。
机柜内设备的安装布局和要求是确保设备安全运行和高效工作的重要因素。
一、机柜内设备安装的布局1.设备位置:机柜内设备应尽量按照分类和功能分组布置。
例如,可以将服务器放在顶部,交换机和路由器放在中部,磁盘阵列和存储设备放在底部。
这样可以便于组织和管理设备,同时避免设备之间的相互干扰。
2.路径和通道:机柜内应保留足够的空间,以确保设备之间有充足的通道和路径,方便维护和管理。
通道应具备正确的宽度,便于人员进入机柜内进行维护。
通道两侧也需要保留足够的距离,防止设备发生短路或故障时,人员受到电流的危险。
3.电力布线:机柜内设备的布线应按照安全规范进行。
主要电源线应经过隔离和阻隔处理,以防止火灾和电路短路。
电源线应有足够的长度和插座数量,避免拥堵。
此外,应使用专业的电缆管理系统,确保电源线的整洁和有序。
4.空气流通:机柜内设备应有良好的空气流通,以保持设备冷却。
机柜的顶部和底部通常都有专门的通风或降温设备,如风扇和散热器,以确保设备不会过热。
此外,设备之间也要留出足够的空间,避免热量积聚和设备故障。
二、机柜内设备安装的要求1.重量限制:机柜内设备的重量必须在机柜所能承受的范围内。
机柜通常会标明其承重能力,设备的重量不应超过该限制,否则可能导致机柜变形或损坏。
2.纵深度限制:机柜内设备的纵深度必须与机柜的纵深度相匹配。
机柜通常会标明其纵深度,设备的尺寸不应超过该限制,否则可能无法完全安装或导致设备之间的间隙过大。
3.安全固定:机柜内设备必须通过适当的螺丝和支架进行安全固定。
固定设备的目的是避免设备在运输或使用过程中发生移动或摇晃,以免对设备和机柜造成损坏。
4.光纤隔离:机柜内的光纤设备和电源设备应分开布置,避免电磁干扰。
光纤线缆应采用合适的转弯半径和保护措施,避免折断或损坏。
6.维护和备份:机柜内设备的维护和备份工作也是安装的重要要求之一、设备应定期进行保养和清洁,确保其正常工作和延长使用寿命。
怎样安装路由器
怎样安装路由器1. 确认购买的路由器及其附件在开始安装路由器之前,首先要确保您已经购买了适合您需求的路由器,并被附带了以下附件: - 路由器电源适配器 - 网络电缆 - 路由器说明书2. 准备工作在开始安装之前,请完成以下准备工作: - 熟悉您的网络拓扑结构和需求 - 找到合适的安装位置,远离电源、电器和防止受潮的地方 - 确保您有管理员权限 - 关闭电脑和连接所有设备(如ADSL调制解调器、光纤猫等)3. 连接路由器1.将一端的网络电缆连接到路由器的WAN(广域网)口。
2.另一端的网络电缆连接到您的调制解调器或光纤猫的正常工作端口。
3.将路由器电源适配器插入路由器的电源插孔。
4.将另一端的电源适配器插入一个可靠的电源插座。
4. 配置路由器1.打开您的电脑,并连接到路由器的无线网络或使用网络电缆连接到路由器的LAN(局域网)口。
2.打开任何浏览器,并输入路由器的默认网关IP地址。
您可以在路由器说明书中找到该信息,但通常为192.168.1.1或192.168.0.1。
3.您将看到路由器的登录页面。
输入默认的用户名和密码(也可以在说明书中找到)。
4.登录成功后,您将进入路由器的管理界面。
5.建议您更改默认的用户名和密码,以增强安全性。
6.在管理界面中,您可以根据需要配置路由器的各种设置,如WiFi名称和密码、端口转发等。
7.根据您的网络拓扑和需求,合理配置路由器,并确保保存设置。
5. 测试路由器连接1.确保您的电脑连接到路由器的WiFi网络或使用网络电缆连接到路由器的LAN口。
2.打开任何浏览器,并尝试访问任何网站,确保您可以正常访问互联网。
3.还可以通过连接其他设备,如手机或平板电脑,来确认路由器正常工作。
6. 安全性设置为了保护您的网络安全,您可以采取以下步骤来进一步加强路由器的安全性:- 启用WiFi密码加密,防止未经授权用户接入您的网络。
- 配置访客网络,限制访问主网络的权限。
- 启用防火墙和入侵检测系统,以防止恶意攻击。
03-第3章 路由器的安装
Quidway AR 46系列路由器安装手册目录目录第3章路由器的安装..............................................................................................................3-13.1 路由器的安装流程..............................................................................................................3-13.2 安装机柜.............................................................................................................................3-23.3 将路由器安装指定位置.......................................................................................................3-23.3.1 安装路由器到机柜中................................................................................................3-23.3.2 安装到工作台上.......................................................................................................3-33.4 安装通用模块.....................................................................................................................3-43.5 连接保护地线.....................................................................................................................3-43.6 连接电源线.........................................................................................................................3-53.6.1 连接交流电源线.......................................................................................................3-53.6.2 连接直流电源线.......................................................................................................3-53.7 连接配置终端.....................................................................................................................3-63.8 连接路由器到局域网..........................................................................................................3-73.9 连接路由器到广域网..........................................................................................................3-93.9.1 连接AUX口到Modem..........................................................................................3-103.10 安装后检查.....................................................................................................................3-10第3章路由器的安装3.1 路由器的安装流程图3-1AR 46系列路由器安装流程注意:开始安装路由器前,请确认:z已经仔细阅读第二章内容。
网络机柜的安装课件
安全检查
对机柜的接地、防火、防 水等安全设施进行检查, 确保安全可靠。
常见故障处理
设备故障
如发现设备故障,应及时联系专 业人员进行维修或更换。
线路故障
定期检查机柜内的线路是否松动 或损坏,如有异常应及时处理。
报警故障
如机柜出现报警,应立即检查报 警原因,并根据情况进行处理。
04 网络机柜的安全与注意事 项
安全操作规程
操作前确保电源已关闭,避免触电事故。
使用合适的工具和设备进行安装,避免使用不合适的工具导致设备损坏或人身伤害 。
遵循安装步骤,按照规定的顺序进行操作,避免因操作不当导致设备损坏或人员伤 亡。
注意事项
确保网络机柜的安装位置符合规 定,避免因位置不当导致设备损
坏或网络故障。
在安装过程中,注意保护设备, 避免设备受到撞击、震动或潮湿
网络机柜的安装课件
目录
CONTENTS
• 网络机柜简介 • 网络机柜的安装步骤 • 网络机柜的维护与保养 • 网络机柜的安全与注意事项 • 网络机柜的发展趋势与未来展望
01 网络机柜简介
网络机柜的定义
总结词
网络机柜是一种专门用于安装、保护和管理网络设备的封闭空间,通常由金属材料制成 。
详细描述
发展趋势
模块化设计
网络机柜的模块化设计使得机柜的组装更加灵活,方便后期扩展和维 护。
节能环保
随着绿色环保理念的普及,网络机柜的节能环保设计越来越受到重视 ,如采用环保材料、节能散热技术等。
高密度集成
随着网络设备的不断增加,网络机柜的高密度集成化趋势明显,能够 节省空间,提高设备安装密度。
智能化管理
确保机柜结构稳定。
检查电缆连接
网络机柜的安装
布线设计与施工
情境二 楼层布线
任务1一 任务2二 任务三
3 任务四 任务五 任务六5 任务七
6 任务八
Байду номын сангаас
综合布线系统图的设计
综合综布合线布系线统系施统工施图工的图设的计设计
线管、线槽的使用 线管、线槽的使用
数据配线架的端接
语音配线架的端接
110型跳线架的端接
网11络0机型柜跳和线设架备的的端安接装 铜缆故障检测与分析
情境二 楼层布线
Thank You!
布线设计与施工
情境二 楼层布线
能力目标
1.能够熟练进行综合布线系统图的设计。 2.能够熟练进行综合布线系统施工图的设计。 3. 能够熟练进行PVC线管的安装。 4. 能够熟练进行PVC线槽的安装。 5. 能够熟练进行数据配线架的端接。 6. 能够熟练进行语音配线架的端接。 7. 能够熟练进行110型跳线架的端接。 8. 能够熟练进行网络机柜的安装。 9. 能够熟练进行标准U设备的安装。 10. 能够熟练进行铜缆测试工具的使用。 11. 能够熟练进行铜缆故障检测与分析。
情境二 楼层布线
任务七 网络机柜和设备的安装
图2-70为机柜地脚锁紧示意图。
情境二 楼层布线
任务七 网络机柜和设备的安装
第六步: 安装机柜门。机柜门可以作为机柜内设备的电磁屏蔽层, 保护设备免受电磁干扰。另一方面,机柜门可以避免设备暴露外界, 防止设备受到破坏,如图2-71所示。
情境二 楼层布线
情境二 楼层布线
任务七 网络机柜和设备的安装
该标准适用于可安装各种有源或无源通信设备的集装架, 通信设备安装尺寸如图2-67所示。
情境二 楼层布线
机柜安装规范
机柜安装规范一机柜安装要求1、机柜安装前必须检查机柜排风设备是否完好,设备托板数量是否齐全以及滑轮、支撑柱是否完好等2、机柜型号、规格,安装位置,应符合设计要求。
3、机柜安装垂直偏差度应不大于3mm,水平误差不应大于2mm。
几个机柜并排在一起,面板应在同一平面上并与基准线平行,前后偏差不得大于3mm;两个机柜中间缝隙不得大于3mm。
对于相互有一定间隔而排成一列的设备,其面板前后偏差不得大于5mm;4、机柜的各种零件不得脱落或碰坏,漆面如有脱落应预以补漆,各种标志应完整、清晰;5、机柜安装应牢固,有抗震要求时,按施工图的抗震设计进行加固;6、机柜不宜直接安装在活动地板上,宜按设备的底平面尺寸制作底座,底座直接与地面固定,机柜固定在底座上,然后铺设活动地板;7、安装机柜面板,架前应预留有800mm空间,机柜背面离墙距离应大于600mm,以便于安装和施工;8、壁挂式机柜距地面宜为1200mm;9、机柜内的设备、部件的安装,应在机柜定位完毕并固定后进行,安装在机柜内的设备应牢固10、机柜上的固定螺丝、垫片和弹簧垫圈均应按要求紧固不得遗漏;11、悬挂式壁挂安装应安装在平整坚固的墙面上,距离地面至少300mm,保持与墙面水平、垂直,垂直偏差应小于3mm。
12、墙体上开孔应避免破坏墙体内管线,开孔深度不得低于70mm,固定机柜所用膨胀螺丝钉不得少于4个(悬挂式C型机柜为6个)。
必要时须在机柜下放置支撑物,以保证机柜的安全稳固。
13、落地式柜体安装,安装基座时要综合考虑机柜的开门方向和操作便利性,优先考虑配线舱的开门方向。
设备舱门和配线舱门必须能完全开启。
14、机柜要做好防雷接地保护。
15、柜体安装完毕应做好标识,标识应统一、清晰、美观。
机箱安装完毕后,柜体进出线缆孔洞应采用防火胶泥封堵。
做好防鼠、防虫、防水和防潮处理。
二机柜内设备的安装布局及要求1、机柜由上到下主要分为四个区域:交流分配单元、配线架、有源设备、光缆终端盒。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
Quidway NetEngine16E/08E/05路由器安装手册目录目录第3章B68-22机柜的安装......................................................................................................3-13.1 机柜简介......................................................................................................................3-13.2安装流程图...................................................................................................................3-23.3 防静电地板上安装.........................................................................................................3-23.3.1 支架与滑道简介..................................................................................................3-23.3.2 支架与滑道的数量..............................................................................................3-43.3.3 机柜安装流程.....................................................................................................3-53.4 水泥地面上安装...........................................................................................................3-213.4.1 机柜整体压板的组成..........................................................................................3-223.4.2 机柜安装流程....................................................................................................3-233.5 机柜的抗震加固安装....................................................................................................3-333.6 机柜直流电源连接........................................................................................................3-37第3章 B68-22机柜的安装3.1 机柜简介B68-22机柜的外型尺寸为:宽*深*高=600*800*2200,单位:mm。
如图3-1所示。
图3-1B68-22机柜外观图3.2 安装流程图根据机房种类的不同,B68-22机柜的安装分为在水泥地面的机房安装,以及在防静电地板的机房内安装两种情况。
图3-2为B68-22机柜安装流程图。
图3-2B68-22机柜安装流程图3.3 防静电地板上安装B68-22机柜在装有防静电地板的机房内安装时,采用H800系列支架。
注意:机柜支脚具有绝缘功能、压板组件中有绝缘零件,施工时一定要将绝缘零件正确安装,使整套设备在未连接地线之前,不与大地导通,有效地满足绝缘要求。
3.3.1 支架与滑道简介使用支架的目的是为了将机柜垫高,便于机房铺设地板和走线,支架由钢板焊接而成。
使用滑道,可以让设备在滑道上移动,便于调整位置。
滑道使若干个支架和若干个机柜联成一体,起到保持机柜水平,加固连接的作用。
1. 支架形式H800系列支架如图3-3所示:图3-3H800系列支架外观图&说明:(1) 上支架(2) 下支架(3) 与地面的安装孔(4) 与滑道的连接孔(5) 防静电地板高度丝印2. 支架组件H800系列支架有四种组件:三种高度可调式与一种固定高度式。
每种组件的高度调节范围见表3-1。
表3-1H800系列端部支架与共用支架组件高度表组件适用的防静电地板高度(mm)Ⅰ210~255Ⅱ256~345Ⅲ346~525Ⅳ根据地板高度定做(最低高度100mm)&说明:防静电地板高度指防静电地板的上平面距水泥地面的距离。
H800系列Ⅰ、Ⅱ、Ⅲ组件在其调节范围内均能实现高度的无级调节,它是通过上、下支架的相对移动实现的。
H800系列Ⅳ组件为固定高度式支架,主要适用于特高与特低的情形,该组件适应的最低地板高度为100mm。
3.3.2 支架与滑道的数量1. 支架的数量机柜并柜安装采用N+1方式选用支架,即一排N个机柜需用N+1个支架支撑。
如图3-4所示。
图3-4机柜在滑道上安装示意图2. 滑道的数量滑道的外形尺寸见图3-5,提供的滑道单根长度是600mm,滑道按每台机柜用二根,随支架一起发货。
图3-5滑道外形尺寸示意图3.3.3 机柜安装流程机柜在装有防静电地板的机房内安装主要分支架定位、安装支架、安装滑道、安装防静电地板支撑附件、机柜调平、机柜并柜连接、机柜固定、绝缘测试、复原地板等几个步骤,简单流程如图3-6所示。
图3-6机柜安装流程示意图(防静电地板)1. 支架定位(1) 划线根据施工平面设计图给定的基准尺寸和支架尺寸确定支架安装位置,用卷尺测量出几个划线点,用墨斗划出两条平行于基准且间距为760mm的直线,根据设计要求在两条直线上确定第一个支架的孔位,以此孔为基准点,逐个划出其它支架的安装孔。
为防止出现错误,在所有孔位线划好后进行重复测量,核对尺寸的准确无误。
图3-7为支架安装孔位图;图3-8为单台机柜安装孔位图;图3-9为两台机柜安装孔位图;图3-10为多台机柜安装孔位图。
图3-7支架安装孔位图图3-8单台机柜安装孔位图&说明:(1) 使用M12膨胀螺栓(2) 机柜外轮廓(3) 机柜背面(4) 内墙或参考体图3-9两台机柜安装孔位图&说明:(1) 使用M12膨胀螺栓(2) 机柜外轮廓(3) 机柜背面(4) 内墙或参考体图3-10多台机柜安装孔位图&说明:(1) 使用M12膨胀螺栓(2) 机柜外轮廓(3) 机柜背面(4) 内墙或参考体(2) 钻孔支架是用膨胀螺栓M12固定在地面上的,打孔工具一般是用冲击钻,钻头选择Ф16。
使用冲击钻打孔时要保持钻头与地面垂直,双手紧握钻柄,把握好方向,不要摇晃,以免破坏地面、使孔倾斜。
钻孔深度应为52mm~60mm。
各孔孔深应一致,在测量孔深时应除去孔内灰尘,量取净深度。
钻孔时,使用吸尘器,吸净灰尘。
如果地面特别坚固平滑,钻头不宜定位,可先用样冲在孔位上凿一个凹坑,帮助钻头定位。
划线和打孔是设备硬件安装的基础性工作,如果准确性不高会给以后工作带来极大不便,所以保证它们的质量是保证整个工程质量的必备条件。
注意:钻孔深度必须保持为52mm~60mm,深度小于52mm或大于60mm都将导致膨胀螺栓无法正常安装紧固。
2. 安装支架(1) 安装膨胀管和膨胀螺母安装前,使用吸尘器将所有孔位内部、外部的灰尘清除干净,再对孔距测量,并放置支架看是否与孔位一一对应,对于误差较大的孔先不要安装膨胀螺栓,重新定位、打孔。
取下膨胀螺栓上的膨胀管、膨胀螺母,将膨胀管和膨胀螺母垂直放入孔中,此时膨胀螺母上的导向筋必须事先插入膨胀管的导向槽中,用橡胶锤直接敲打膨胀管使其全部进入地面。
图3-11为膨胀管与膨胀螺母安装示意图。
图3-11膨胀管与膨胀螺母安装示意图&说明:(1) 膨胀管(2) 膨胀管导向槽(3) 膨胀螺母(4) 膨胀螺母导向筋膨胀螺母上的导向筋必须事先插入膨胀管的导向槽中,否则将导致膨胀螺栓无法正常安装紧固。
(2) 调节支架高度根据测量的地板高度值,参照支架上防静电地板高度丝印标记,调节所有支架至预定高度,并用力矩扳手紧固高度锁定螺栓至45Nm。
此时螺栓紧固顺序应遵循“先中间,后两侧”的原则,见图3-12。
(3) 支架的安装与固定清洁地面和支架表面,按图3-11将支架安装孔对正相应的膨胀螺栓,用螺栓、弹垫、大平垫将支架固定于地面,紧固力矩应达到45Nm。
固定支架用的螺栓应依次交叉紧固,以减小螺栓与支架间的应力,也便于在安装过程中对支架进行校正,其它支架也按以上方法安装。
图3-12为支架与地面连接示意图。
图3-12支架与地面连接示意图&说明:(1) 螺栓M12*60 (2) 弹垫12(3) 大平垫12 (4) 膨胀管(5) 膨胀螺母(6) 高度锁定螺栓(两侧)(7) 高度锁定螺栓(中间)(8) 防静电地板高度丝印图3-12中,螺栓的紧固顺序要严格按照下述步骤进行:压板套件螺栓→膨胀螺栓→高度锁定螺栓(先中间,后两侧)。
3. 安装滑道(1) 预装T型螺母在安装滑道前,应将固定地板托、固定弯板及固定滑道用的T型螺母(两者相同)预先装入滑道的下槽道,每台机柜下的每侧滑道中应装入4个T型螺母(其中2个留做固定地板托组件用);否则待滑道装好后,T型螺母就不能装入,T型螺母外形见图3-13。
每台机柜配有4套地板托固定弯板,在机柜下两侧的滑道中各装入2套。
图3-13T型螺母外观图(2) 调平、固定滑道用T型螺母、平垫、弹垫和螺栓M12*20将滑道固定于支架上,如图3-14所示。
首先旋上装有弹垫、平垫的螺栓M12*20(先不拧紧,以螺栓不掉下为宜),然后把螺栓依次卡入支架孔内,然后用水平尺对滑道各段测量(横向与纵向同时测量),看水平尺上的气泡是否在正中,可通过增减垫片调节水平,如果水平则依次拧紧各螺栓,然后再进行水平测试,如图3-15所示。
如果不水平,拧松螺栓,还是通过增减垫片调节水平,过程和上述相同。
滑道安装完毕后,应达到以下几点要求:l单独的一根滑道纵向必须是水平的;l平行的两条滑道横向必须是水平的;l平行的两根滑道槽中心点测量值为720mm±1mm;l如有多条滑道对接安装时,用拉直的细线进行校正,必须保证多条滑道在一条直线上。