2023年一级建造师《市政公用工程管理与实务》考试真题及答案解析(案例题)

2023年一级建造师《市政公用工程管理与实务》考试真题及答案解析(案例题)

2023年一级建造师《市政公用工程管理与实务》考试真题及答案解析(案例题)案例(一)【背景资料】某公司承建了城市主干路改扩建项目,全长5km,宽60m,现状道路机动车道为22cm 水泥混凝土路面+36cm水泥稳定碎石基层+15cm级配碎石垫层,在土基及基层承载状况良好路段,保留现有路面结构直接在上面加铺6cmAC-20C+4cmSMA-13,拓宽部分结构层与既有道路结构层保持一致。

拓宽段施工过程中,项目部重点对新旧搭接处进行了处理,以减少新旧路面差异沉降。

浇筑混凝土前,对新旧路面接缝处凿毛、清洁、涂刷界面剂,并做了控制不均匀沉降变形的构造措施如图1所示。

根据旧水泥混凝土路面评定结果,项目部对现状道路面层及基础病害进行了修复处理。

沥青摊铺前,项目部对全线路缘石、检查井、雨水口标高进行了调整,完成路面清洁及整平工作,随后对新旧缝及原水泥混凝土路面做了裂缝控制处治措施,随即封闭交通开展全线沥青摊铺施工。

沥青摊铺施工正值雨季,将全线分为两段施工,并对沥青混合料运输车增加防雨措施,保证雨期沥青摊铺的施工质量。

【问题】1.指出图中A、B的名称。

2.根据水泥混凝土路面板不同的弯沉值范围,分别给出0.2mm~1.0mm及1.0mm以上的维修方案;基础脱空处理后,相邻板间弯沉差宜控制在多少以内?3补充沥青下面层摊铺前应完成的裂缝控制处治措施具体工作内容。

4.补充雨期沥青摊铺施工质量控制措施。

【参考答案】1.A-填缝材料,B-拉杆(螺纹钢筋)。

2.(1)当弯沉值在0.2mm~1.0mm时,应钻孔注浆处理;当弯沉值大于1.0mm时,应拆除后铺筑混凝土面板。

(2)脱空处理后,两相邻板间弯沉差宜控制在0.06mm以内。

【参考】城镇道路养护技术规范CJJ36-20163.(1)新旧连接处应贴土工合成材料,以减少、延缓或抑制反射裂缝的发生;(2)旧路板缝破损处应剔凿酥空、空鼓、破损的部分,清理后涂刷界面剂,并采用不低于原道路混凝土强度的早强补偿收缩混凝土进行灌注;(3)旧路细微裂缝灌浆处理,较为严重的裂缝应扩缝补块或挖补处理;(4)旧路板缝与裂缝处理后应贴土工合成材料;(5)在旧路与加铺层之间设置应力消减层,也可采用洒布沥青粘层油、摊铺土工布4.(1)沥青面层不允许下雨时或下层潮湿时施工,加强现场与拌合站、气象部门的联系,安排在不下雨时施工。

建筑施工技术作业(1-4)答案

建筑施工技术作业(1-4)答案

建筑施⼯技术作业(1-4)答案《建筑施⼯技术》课程作业评讲(1)⼀、名词解释1、⼟得可松性:⾃然状态下得⼟,经开挖后,其体积因松散⽽增加,以后虽然经回填压实,仍不能恢复成原来得体积,这种性质,称为⼟得可松性。

2、⼟⽅边坡:为了防⽌⼟壁坍塌,保持⼟体稳定,保证施⼯安全,在⼟⽅⼯程施⼯中,对挖⽅或填⽅得边缘均做成⼀定得坡度。

3、⼟层锚杆:⼟层锚杆就是埋⼊⼟层深处得受拉杆件,⼀端与⼯程构筑物相连,⼀端锚固在⼟层中,以承受由⼟压⼒、⽔压⼒作⽤产⽣得拉⼒,维护⽀护结构得稳定。

4、⼟钉⽀护:基坑开挖得坡⾯上,采⽤机械钻孔,孔内放⼊钢筋并注浆,在坡⾯上安装钢筋⽹,喷射厚度为80~200mm得C20混凝⼟,使⼟体、钢筋与喷射混凝⼟⾯板结合为⼀体,强化⼟体得稳定性。

这种深基坑得⽀护结构称为⼟钉⽀护.5、动⽔压⼒:流动中得地下⽔对⼟颗粒产⽣得压⼒称为动⽔压⼒.6、流砂现象:采⽤集⽔坑降⽔法开挖基坑,当基坑开挖到地下⽔位以下时,有时坑底⼟会形成流动状态,随地下⽔涌⼊基坑,这种现象称为流砂现象.7、⼟得最优含⽔量:在压实机械与压实遍数相同得条件下,使填⼟压实获得最⼤密实度时得⼟得含⽔量,称为⼟得最优含⽔量。

8、压实系数:压实系数就是⼟得施⼯控制⼲密度与⼟得最⼤⼲密度得⽐值.⼆、填空1、⼟得开挖难易⼋2、减⼩或平衡改变3、加固型⽀护⽀挡型⽀护4、集⽔坑降⽔法井点降⽔法5、挖⽅深度H 其边坡底宽B6、锚头拉杆锚固体7、⾼压灌浆预应⼒扩孔8、滤管井点管弯联管总管9、沟端开挖沟侧开挖10、分层11、碾压法、夯实法、振动压实法12、推⼟机、铲运机、平⼟机、松⼟机、单⽃挖⼟机三、单选C C C B B B A C四、多选1、AC 2、AB 3、BCDE 4、ACDE5、ABDE6、ABCDE7、ABCDF 8、BC五、判断1×2×3√4√5× 6×7√8×9√10√六、简答题1.⼟⽅⼯程得施⼯特点及主要施⼯内容.答:⼯程量⼤、施⼯条件复杂。

五种常见挡土墙类型是什么

五种常见挡土墙类型是什么

五种常见挡土墙类型是什么范本1:1.垂直挡土墙垂直挡土墙是一种常见的挡土墙类型,通过直立的墙体来支撑和阻挡土壤的压力。

常见的垂直挡土墙有以下几种类型:1.1 重力式挡土墙重力式挡土墙主要依靠自身的重量来抵抗土壤的压力。

它通常由混凝土或砌块等材料建造而成,底部较宽,上部较窄,以增加重心稳定性。

1.2 砖石挡土墙砖石挡土墙是用砖石建筑而成的挡土墙,通过砌筑墙体来承受土壤的压力。

砖石挡土墙通常具有较高的抗倾覆能力和承载能力。

1.3 钢挡土墙钢挡土墙由钢板和钢构件组成,具有较高的强度和稳定性。

它常用于需要较高抗倾覆和承载能力的场所,如大型挡土墙、公路隧道等。

2.倾斜挡土墙倾斜挡土墙是一种以倾斜的方式支撑和阻挡土壤的压力的挡土墙类型。

常见的倾斜挡土墙有以下几种类型:2.1 自然倾斜挡土墙自然倾斜挡土墙是地形自然形成的倾斜地表,具有一定的稳定性。

在建设中,可以采取保护措施,如表面覆盖草坪或植被等,增加其稳定性。

2.2 填土坡填土坡是通过在地表上切割土壤并把土壤填充到倾斜面上来形成的挡土墙。

填土坡通常采用逐层填筑的方式,以增加坡体的稳定性。

2.3 深层土挡土墙深层土挡土墙是通过在土壤中挖掘深槽,并将挖掘出的土壤挡在槽内形成的挡土墙。

深层土挡土墙通常具有较高的抗倾覆和承载能力。

3.削土挡土墙削土挡土墙是一种通过切割和削减土体来形成的挡土墙。

常见的削土挡土墙有以下几种类型:3.1 削土槽削土槽是通过在土体中挖掘一条深槽,并将挖掘出的土体排出,形成挡土墙。

削土槽通常用于较浅的挡土墙,具有较高的抗倾覆能力。

3.2 地下连续墙地下连续墙是通过在地下挖掘一条连续的开挖槽,并在其中注入混凝土来形成的挡土墙。

地下连续墙通常用于需要较高承载能力和抗倾覆能力的场所。

4.筏状挡土墙筏状挡土墙是一种将墙体和地面整体构造成一个连续的整体,形成筏状结构的挡土墙。

筏状挡土墙通常用于需要同时承受水平和竖向土壤压力的场所。

5.箱形挡土墙箱形挡土墙是一种由钢板或混凝土墙板围成的密封空间,用来承受土壤压力。

新编辑桥梁专业高工晋升答辩试题50题

新编辑桥梁专业高工晋升答辩试题50题

桥梁专业答辩试题(50题)1、在桥梁施工中,模板及支撑架设计是工程技术人员经常要做的工作。

简述模板及其支撑架的设计工作有哪些基本要求?答:模板是施工过程中的重要临时结构物。

因为它不仅控制着结构物的尺寸精度,并直接影响施工进度和混凝土成型的质量。

其设计时应从力学、几何尺寸、施工操作、使用功能等方面加以考虑,保证其满足以下要求:(1)保证混凝土建筑物各部分的设计形状、尺寸和相互间位置的正确性。

(2)具有足够的强度、刚度和稳定性,能安全地承受新灌注混凝土的重力、侧压力及在施工中可能产生的各项荷载。

(3)构造和制造力求简单、安装方便、便于拆卸和多次使用,接合严密,不得漏浆。

结构外露表面的模板应平整、光滑。

(4)与混凝土建筑物的特性、施工条件和灌注方法相适应。

2、支架(拱架)预留施工拱度时考虑哪些因素?预留施工拱度应考虑下列因素:(1)由预压提供的支架(拱架)承受全部荷载时的弹性变形量;(2)由预压提供的非弹性变形值(受荷载后构件接头挤压、基础沉陷而产生的永久变形;(3)结构由于静荷载及混凝土收缩影响所产生的挠度;(4)由于预应力张拉而产生的变形拱度值。

3、在模板及支撑架的设计工作中,恒荷载标准值如何选取?答:参考(JGJ 162—2008)及(JGJ166-2008)规范的规定:(1). 模板及其支架自重标准值( G 1 k )可根据模板设计图纸计算确定。

肋形或无梁楼板模板自重标准值应按表4.1.1 采用。

表 4.1.1 楼板模板自重标准值(kN/m2)模板构件的名称 木模板 定型组合钢模板平板的模板及小梁 0.30 0.50楼板模板(其中包括梁的模板) 0.50 0.75楼板模板及其支架(楼层高度为4m 以下) 0.75 1.10注:除钢、木外,其它材质模板重量见附录B 中的附表B 。

(2). 新浇筑混凝土自重标准值,对普通混凝土可采用25kN/m3,对特殊钢筋混凝土应根据实际情况确定。

(3).当采用内部振捣器时,新浇筑的混凝土作用于模板的侧压力标准值,可按下列公式计算,并取其中的较小值:5.02122.0V t F O C ββγ=… (4.1.1—1)H F C γ=…………(4.1.1—2)式中:F ──新浇筑混凝土对模板的最大侧压力计算值(kN/m2);C γ──混凝土的重力密度(kN/m3);V ──混凝土的浇筑速度(m/h );O t ──新浇混凝土的初凝时间(h ),可按试验确定;当缺乏试验资料时,可采用)15/(200+=T t O (其中T 为混凝土的温度ºC );1β ──外加剂影响修正系数。

建筑施工技术作业(1-4)答案ok

建筑施工技术作业(1-4)答案ok

《兴办动工技能》课程做业评道(1)之阳早格格创做一、名词汇阐明1、土的可紧性:自然状态下的土,经启掘后,其体积果紧集而减少,以去虽然经回挖压真,仍没有克没有及回复成本去的体积,那种本量,称为土的可紧性.2、土圆边坡:为了预防土壁坍塌,脆持土体宁静,包管动工仄安,正在土圆工程动工中,对付掘圆大概挖圆的边沿均搞成一定的坡度.3、土层锚杆:土层锚杆是埋进土层深处的受推杆件,一端与工程构筑物贯串,一端锚固正在土层中,以启受由土压力、火压力效用爆收的推力,维护支护结构的宁静.4、土钉支护:基坑启掘的坡里上,采与板滞钻孔,孔内搁进钢筋并注浆,正在坡里上拆置钢筋网,喷射薄度为80~200mm的C20混凝土,使土体、钢筋与喷射混凝土里板分离为一体,加强土体的宁静性.那种深基坑的支护结构称为土钉支护.5、动火压力:震动中的天下火对付土颗粒爆收的压力称为动火压力.6、流砂局里:采与集火坑降火法启掘基坑,当基坑启掘到天下火位以下时,偶尔坑底土会产死震动状态,随天下火涌进基坑,那种局里称为流砂局里.7、土的最劣含火量:正在压真板滞战压真遍数相共的条件下,使挖土压真赢得最大稀真度时的土的含火量,称为土的最劣含火量.8、压真系数:压真系数是土的施工统制搞稀度战土的最大搞稀度的比值.二、挖空1、土的启掘易易八2、减小大概仄稳改变3、加固型支护支挡型支护4、集火坑降火法井面降火法5、掘圆深度H 其边坡底宽B6、锚头推杆锚固体7、下压灌浆预应力扩孔8、滤管井面管直联管总管9、沟端启掘沟侧启掘10、分层11、碾压法、夯真法、振荡压真法12、推土机、铲运机、仄土机、紧土机、单斗掘土机三、单选C C C B B B A C四、多选1、AC2、AB3、BCDE4、ACDE5、ABDE6、ABCDE7、ABCDF8、BC五、推断1×2×3√4√5×6×7√8×9√10√六、简问题1.土圆工程的动工特性及主要动工真量.问:工程量大、动工条件搀杂.露天做业,受天区、气候、火文天量等条件效用大等.2.为什么正在雨季动工时,土圆边坡要留的宽一面?问:(1)雨季举止土圆边坡动工时,应减少边坡的宽度.(2)果为雨季动工时,土的含火量删大,抗剪强度降矮,简单引起边坡塌圆.3.正铲掘土机与反铲掘土机正在举止土圆启掘做业时,土圆边坡是可相共,为什么?问:1.问:没有相共(1)正铲掘土机启掘停机里以上的土,边坡坡顶没有受板滞荷载的效用,果此土圆边坡不妨留设的小一面.(2)反铲掘土机启掘停机里以下的土,边坡坡顶受板滞荷载的效用,果此土圆边坡不妨留设的大一面.4.简述流砂局里爆收的本果?问:由于天下火的火力坡度大,即动火压力大,且动火压力的目标与土的重力目标好异,土没有但是受火的浮力,而且受动火压力的效用,有进与举的趋势.当动火压力等于大概大于土的浸火稀度时,土颗粒处于悬浮状态,爆收流砂局里.5.流砂防治的道路是什么?简直步伐有哪些?问:流砂防治的主要道路是减小大概仄稳动火压力大概改变其目标.简直步伐为:(1)抢掘法.(2)挨钢板桩法.(3)火下掘土法.(4)用井面法降矮天下火位,(5)正在枯火季节启掘基坑,(6)天下连绝墙法.6.简述土层锚杆的动工工艺.问:钻孔、灌浆、预应力筋张推战防腐处理.7.简述土钉支护的动工工艺.问:动工工序为定位、成孔、插钢筋、注浆、喷射混凝土.8.简述沉型井面拆置动工程序.问:沉型井面的动工程序为:掘井面沟槽,敷设集火总管;冲孔,重设井面管,灌挖砂滤料;用直联管将井面管与集火总管对接;拆置抽火设备;试抽.9.沉型井面使用时,为什么一定要连绝抽火?问:没有连绝抽火,滤网易阻碍,也易抽出泥砂战使出火浑浊,并大概激励附近兴办物大天重降.10.效用挖土压真品量的果素有哪些?问:土的含火量、压真功、铺土薄度11.哪些土料没有宜做回挖土.问:含火量大的粘土、冻土;有机物含量大于8%的土;火溶性硫酸盐含量大于5%的土七、估计题1.采与无压非完备井系统举止降火动工,真测天下火含火层薄度为8m,渗透系数为10m/昼夜;降火深度央供没有小于4m,如果假念半径为24m,抽火效用深度10m.试估计该系统的涌火量.解:抽火效用深度: m H 80=抽火效用半径m R 77.69108495.1=⨯⨯= 涌火量/141524lg 77.69lg 4)482(10366.13m Q =-⋅-⨯⨯=昼夜 《兴办动工技能》课程做业评道(2)一、名词汇阐明1、摩揩桩与端启桩:端启桩——是指脱过硬强土层并将兴办物的荷载通过桩传播到桩端脆硬土层大概岩层上.桩侧较硬强土对付桩身的摩揩效用很小,其摩揩力可忽略没有计.摩揩桩——是指重进硬强土层一定深度通过桩侧土的摩揩效用,将上部荷载传播扩集于桩周围土中,桩端土也起一定的支启效用,桩尖支启的土没有甚稀真,桩相对付于土有一定的相对付位移时,即具备摩揩桩的效用.2、静力压桩是正在硬强土层中,利用静压力(压桩机自重及配重)将预制桩逐节压进土中的一种重桩法.3、护筒用4—8mm薄钢板制成,内径比钻头直径大100—200 mm,顶里超过大天0.4~0.6 m,上部启1一2个溢浆孔.4、复挨法是正在单挨法动工完拔出桩管后,坐时正在本桩位再搁置第二个桩尖,再第二次下重桩管,将本桩位已凝结的混凝土背四里土中挤压,夸大桩径,而后再第二次灌混凝土战拔管.5、晃砖样,是正在弹佳线的前提顶里上按选定的组砌办法先用砖试晃,佳核查于所弹出的朱线正在门窗洞心、墙垛等处是可切合砖模数,以便借帮灰缝安排,使砖的排列战砖缝宽度匀称合理.6、接槎:接槎是相邻砌体分歧时砌筑而又必须树坐的临时间断,以便于先、后砌筑的砌体之间的接合.二、挖空1、桩顶桩尖2、70% 100%3、端启桩摩揩桩4、按正背直矩相等且吊面反力相等的准则.5、桩锤桩架能源拆置6、降锤、单动汽锤、单动汽锤柴油锤7、焊接接桩硫磺胶泥锚接接桩8、孔灌注桩、套管成孔灌注桩、掘孔灌注桩、爆扩成孔灌注桩9、锤打重桩、振荡重桩10、钻孔、冲孔抓孔11、硫磺胶泥12、夸大桩的直径,减少桩的拆载力,缩小桩的数量,缩小启台里积等13、一铲灰、一齐砖战一挤揉14、斜槎直槎15、一逆一丁、三逆一丁战梅花丁16、墙体横直背尺寸以及各部件标下的圆木标记杆转角处纵横墙接接处17、斜槎直槎18、阳槎推结筋19、焊接接桩硫磺胶泥锚接接桩20、多坐杆式门式悬吊式战挑式足脚架21、直角扣件回转扣件战对付接扣件22、单排足脚架拆设战单排足脚架拆设三、单选1A2D3A4C5A6B7C8B9C10B11A12B四、多选1ADE 2ACD 3DE 4BCDE 5ABCD 6BCD五、推断1√2×3×4×5×6√7√8×9√10×六、简问题1.钢筋混凝土预制桩的起吊输支有什么央供?问:(1)钢筋混凝土预制桩应正在混凝土强度达到安排强度等第的70%时圆可起吊,达到100%时才搞输支战挨桩.(2)起吊时,吊面位子应切合安排央供.无吊环时,绑扎面的数量战位子视桩少而定,当吊面大概绑扎面没有大于3个时,其位子按正背直矩相等准则估计决定;当吊面大概绑扎面大于3个时,应按正背直矩相等且吊面反力相等的准则决定吊面位子.2.挨桩程序怎么样决定,程序安插分歧理对付工程品量有什么效用?问:(1)桩的散集程度,桩的规格、少短,以及桩架移动是可便当等果素去采用精确的挨桩程序.(2)由于桩对付土体的挤稀效用,先挨进的桩被后挨进的桩火仄挤推而制成偏偏移战变位大概被笔直挤拔制成浮桩;而后挨进的桩易以达到安排标下大概进土深度,制成土体隆起战挤压,截桩过大.3.护筒的埋设央供的效用.问:(1)埋设护筒时,先掘去桩孔处表土,将护筒埋进土中,其埋设深度,正在粘土中没有宜小于1 m,正在砂土中没有宜小于.护筒核心线应与桩位核心线重合,偏偏好没有得大于50 mm,护筒与坑壁之间用粘土挖真,以防漏火;护筒顶里应下于大天~0.6m,并应脆持孔内泥浆里超过天下火位1 m以上.(2)护筒的效用是牢固桩孔位子,预防大天火流进,呵护孔心,删下桩孔内火压力,预防塌孔,成孔时带领钻头目标.4.简述砖墙砌体的动工工艺.问:砖墙砌体的动工工艺:找仄弹线、坐皮数杆、砌筑、勾缝、楼层轴线引测、各层标下统制.5.砖砌体的品量央供的是什么?问:横仄横直、灰浆歉谦、错缝拆接、接槎稳当.6.足脚架拆设时谦足的基础央供是什么?问:(1)宽度应谦足工人支配、资料堆搁及输支的央供.足脚架宽度普遍为2米安排,最小没有得小于1.5米;(2)有足够的强度、刚刚度及宁静性.(3)拆拆简朴、搬运便当,能多次周转使用(4)就天与材,便天与材,尽管俭朴用材.《兴办动工技能》课程做业评道(3)一、名词汇阐明1、牢固式模板:依照构件的形状、尺寸正在现场大概预制厂创制模板,涂刷断绝剂,浇筑混凝土达到确定的拆模强度后,脱模浑理模板,涂刷断绝剂,再创制下一批构件.百般胎模即属牢固式模板.2、推拢钢模板:推拢钢模板是一种工具式模板,由钢模板战配件二部分组成.3、闪光对付焊:闪光对付焊广大用于焊接直径为10~40mm的HPB235、HRB335、HRB400热轧钢筋战直径为10~25mm的RRB400余热处理钢筋及预应力筋与螺丝端杆的焊接.4、量度好值:钢筋的中包尺寸战轴线少度之间存留一个好值,称为“量度好值”.5、钢筋配料:钢筋配料是根据构件的配筋图估计构件各钢筋的直线下料少度、根数及重量,而后体例钢筋配料单,动做钢筋备料加工的依据.6、混凝土试配强度:混凝土试配强度应比安排的混凝土强度尺度值普及一个数值,即:式中:—混凝土试配强度,MPa—安排的混凝土坐圆体抗压强度尺度值,MPa—动工单位的混凝土强度尺度值,MPa——0.7.8、搅拌时间:从砂、石、火泥战火等局部资料拆进搅拌筒至启初卸料止所经历的时间称为混凝土的搅拌时间.9、动工缝:新旧混凝土接槎处称为动工缝.10、自然保护:自然保护是正在常温下(仄稳气温没有矮于℃)用适合的资料(如草帘)覆盖混凝土,并适合浇火,使混凝土正在确定的时间内脆持足够的干润状态.11、夹具:正在先张法预应力混凝土构件动工时,为脆持预应力筋的推力并将其牢固正在死产台座 (大概设备)上的临时性锚固拆置;正在后张法预应力混凝土结构大概构件动工时,正在张推千斤顶大概设备上夹持预应力筋的临时性锚固拆置.12、锚具:正在后张法预应力混凝土结构大概构件中,为脆持预应力筋的推力并将其传播到混凝土上所用的永暂性锚固拆置.二、挖空1、现场拆拆式模板、牢固式模板战移动式模板2、对接件战支启件3、伸少率战热直本能4、伸服面战抗推强度5、革新焊接接洽的塑性6、焊接板滞对接热压对接绑扎7、等强度代换战等里积代换8、自降式搅拌机战强制式搅拌机9、脚推车机动翻斗车混凝土搅拌输支车自卸汽车10、混凝土泵输支管战布料拆置11、液压活塞式挤压式战气压式12、周到分层分段分层战斜里分层13、受剪力较小且便于动工14、离析 2m15、出料容量战进料容量16、自降式搅拌机战强制式搅拌机17、夹片式、支启式、锥塞式战握裹式18、张推战临时牢固19、张推战永暂牢固预应力20、张推战临时牢固支撑21、缩小温好应力益坏22、为包管每根钢丝的下料少度相等23、钢管抽芯法、胶管抽芯法战预埋波纹管法24、预防预应力筋锈蚀,巩固结构的完齐性战耐暂性三、单选1C2B3D4C5D6D7B8B9C10D11A四、多选1ABC 2BC 3ADE 4ABCD 5ADE 6ACD 7AE8ABCE 9ABE 10BCE 11BCD 12ACDE五、简问题1.对付模板系统的央供是什么?问:模板系统的基础央供有:(1)包管工程结媾战构件各部分的形状尺寸战相互位子的精确;(2)具备足够的拆载本领、刚刚度战宁静性,能稳当天启受混凝土的自重战侧压力,以及正在动工历程中所爆收的荷载.(3)构制简朴,拆拆便当,并便于钢筋的绑扎、拆置战混凝土的浇筑、保护.(4)模板的接缝没有该漏浆.2.推拢钢模板的便宜有哪些.问:推拢钢模板的便宜是:通用性强,组拆机动,拆拆便当,节省用功;浇筑的构件尺寸准确,棱角整齐,表面光润;模板周转次数多;洪量俭朴木料.3.裁撤模板的强度央供是什么?问:现浇完齐式结构的模板裁撤克日应按安排确定,如无安排确定时,应谦足下列央供:(1)没有启重的模板,其混凝土强度应正在其表面及棱角没有致果拆模而受益坏时,圆可裁撤.(2)启重模板应正在混凝土强度达到课本113页表格4-6中所确定的强度时,初能裁撤.当混凝土强度达到拆模强度后,应付于已裁撤侧模板的结构及其支启结构举止查看,确认混凝土无效用结构本能的缺陷,而结构又有足够的拆载本领后,初准裁撤启重模板战支架.4.为什么要举止钢筋下料少度的估计?问:钢筋配料是根据构件的配筋图估计构件各钢筋的直线效用少度、根数及重量,而后蜕变钢筋配料单,动做钢筋备料加工的依据.构件配筋图中证明的尺寸普遍是钢筋中表面尺寸,即中包尺寸.正在钢筋加工时,普遍也按中包尺寸举止查支.钢筋加工前直线下料.如果下料少度按钢筋中包尺寸的总战去估计,则加工后的钢筋尺寸将大于安排央供的中包尺寸大概者由于直钩笔直段太少而制成资料的浪费.那是由于钢筋蜿蜒时中皮伸少,内皮支缩,惟有中轴线少度没有变.按中包尺寸概括下料是禁绝确的,惟有按钢筋轴线少度尺寸下料加工,才搞使加工后的钢筋形状、尺寸切合安排央供.5.钢筋热压接洽的主要便宜?问:热压接洽具备本能稳当、支配烦琐、动工速度快、动工没有受气候效用、省电等便宜.6.为什么咬举止混凝土协共比的估计?问:混凝土的协共比是正在真验室根据收端估计的协共比通过试配战安排而决定的,称为真验室协共比,决定真验室协共比所用的骨料――砂、石皆是搞燥的.动工现场使用的砂石皆具备一定的含火率,含火率大小随季节、气候没有竭变更.如果没有思量现场砂石含火率,还按真验室协共比投料,其截止是改变肋本量砂石用量战用火量,而制成百般本资料用量的本量比率没有切合本去的协共比央供.为包管混凝土工程品量,包管按协共比投料,正在动工时要按砂石本量含火率对付本协共比举止建正.7.什么是动工缝?动工缝留设的普遍准则是什么?问:(1)混凝土没有克没有及连绝浇筑完毕,停歇时间又超出混凝土输支战浇筑允许的延绝时间,先、后浇筑的混凝土接合里称为动工缝.(2)动工缝的留设位子应正在结构受剪力较小且便于动工的部位.8.混凝土泵的种类有哪些?混凝土采与泵支时对付资料有何央供?问:(1)混凝土泵按效用本理分为液压活塞式、挤压式何气压式三种.(2)泵支混凝土对付资料的央供.①细骨料:宜采用卵石.为减小混凝土与输支管道内壁的摩阻力,应节制细骨料最大粒径d与输支管内径D之比值.普遍细骨料为碎石时,d≤D/3;细骨料为卵石时,d≤D/2.5.②细骨料:泵支混凝土中通过筛孔的砂应没有小于15%,含砂率宜统制正在40%-50%.③火泥用量:1m3泵支混凝土最小火泥用量为300kg.④泵支混凝土的坍降度宜为80-180mm.⑤为了普及混凝土的震动性,减小混凝土与输支管内壁摩阻力,预防混凝土离析,宜掺进适量的中加剂.9.为什么要超张推并持荷2min?采与超张推时为什么要确定最大限值?问:热处理钢筋大概钢绞线的张推步调中,超张推5%并持荷2min的主要脚段是为了正在下应力状态下加速预应力筋紧张早期死少,以缩小应力紧张引起的预应力益坏.钢丝超张推3%-5%,是为了补充由于预应力筋紧张而引起的预应力益坏.12.为什么要举止孔道灌浆?何如举止孔道灌浆?对付灌浆资料有何央供?问:①张推锚固后,孔道应即时灌浆以预防预应力筋锈蚀,减少结构的完齐性战耐暂性.②浆前混凝土孔道应用压力火冲刷搞洁并潮干孔壁,灌浆程序应先下后上,以预防表层孔道漏浆而把下层孔道阻碍,灌浆应缓缓匀称天举止,没有得中断,灌谦孔道并启关排气孔后,宜再继启加压至0.5-0.6MPa并稳压一定时间,以保证孔道灌浆天稀真性.③道灌浆应采与标号没有矮于425号一般硅酸盐火泥大概矿渣硅酸盐火泥配制天火泥浆;对付清闲大的孔道可采与砂浆灌浆.火泥浆剂砂浆的强度均没有矮于30MPa.灌浆用火泥浆的火灰比宜为0.4安排,搅拌后3小时泌火率宜统制正在0.2%,最大没有超出0.3%.杂火泥浆的中断性较大,为了减少孔道灌浆的稀真性,正在火泥浆中可掺进火泥用量0.2%的木量素磺酸钙大概其余减火剂,但是没有得掺进氯化物大概其余对付预应力仅有腐蚀效用的中加剂.六、估计题1.某兴办物一层公有10根编号为L1的梁,睹图.试估计钢筋配料少度.(单位:mm)问:解:钢筋呵护层与25mm①号钢筋中包尺寸:(6240+2×200-2×25)=6590mm下料少度:6590-2×2d+2×6.25d=(6590-2*2*25+2*6.25*25)mm=6802mm②号钢筋中包尺寸:(6240-2×25)mm=6190mm下料少度:6190+2×6.25d=(6190+2*6.25*12)mm=6340mm③号直起钢筋中包尺寸分段估计端部笔直段少度:(240+50+500-25)mm=765mm 斜段少:[(500-2*25)*1.414]mm=636mm中间直段少:[6240-2*(240+5+500+450)]mm=3760mm 中包尺寸为:[(765+636)*2+3760]mm=6562mm下料少度:6562-4×0.5×d+2×6.25d=(6562-4×0.5×25+2×6.25×25)mm=6824mm④号直起钢筋中包尺寸分段估计端部笔直段少度:(240+50-25)mm=265mm斜段少:[(500-2*25)*1.414]mm=636mm中间直段少:[6240-2*(240+50+450)]mm=4760mm中包尺寸为:[(265+636)*2+4760]mm=6562mm下料少度:6562-4×0.5×d+2×6.25d=(6562-4×0.5×25+2×6.25×25)mm=6824mm⑤号箍筋宽度:(200-2×25+2×6)mm=162mm下度:(500-2×25+2×6)mm=462mm中包尺寸:[(162+462)×2]mm=1248mm⑤号筋端部为二个90°/90°直钩,主筋直径为25mm,箍筋6 ,查表4-12,二个直钩删少值为80mm.故⑤号筋下料少度为:1248-3×2d+80=(1248-3×2×6+80)mm=1292mm2.某工程混凝土真验室协共比为1:2.28:4.47,火灰比W/C=0.63,每1m3混凝土火泥用量C=285kg,现场真测含火率为2%,石子含火率为1%,采与400L混凝土搅拌机.1m3混凝土百般资料用量2.搅拌机搅拌一次投料量.解:协共比 1:x(1+Ws):y(1+Ws)按动工协共比得到1m3混凝土各组成资料用量为:火泥 C'=C=285kg石 G'=285*=火 W'=(W/C-Ws=Wg)C=(0.63-2.28*3%-4.47*1%)*285kg=搅拌机屡屡可搅拌出混凝土量为400L*0.65=260L=则搅拌时的一次投料量为:火泥:285*=(与75kg,一袋半)砂 75*=石子 75*=火 75*(0.63-2.28*3%-4.47*1%)kg=搅拌混凝土时,根据估计出的各组成资料的一次投料量,按重量投料.投料时允许偏偏好没有得超出以下确定:火泥、中掺混同资料:±2%细、细骨料:±3%火、中加剂:±2%《兴办动工技能》课程做业评道(4)一、名词汇阐明1问:起重量Q指起重机仄安处事所允许的最大起重重物的品量.起重半径R指起重机回转轴线至吊钩核心的火仄距离;起重下度H指起重吊钩核心至停机大天的笔直距离.2、问:脱绕动滑轮的绳数,称为处事线数.3、问:转动法吊拆柱时,柱的仄里安插要搞到:绑扎面,柱足核心与柱前提杯心核心三面共弧,正在以吊柱时起重半径R为半径的圆弧上,柱足靠拢前提.那样,起吊时起重半径没有变,起重臂边降钩,边回转.柱正在直坐前,柱足没有动,柱顶随起重机回转及吊钩降下而渐渐降下,使柱正在柱足位子横直.而后,把柱吊离大天约20~30厘米,回转起重臂把柱吊至杯心上圆,拔出杯心4、问:采与滑止法吊拆柱时,柱的仄里安插要搞到:绑扎面,前提杯心核心二面共弧,正在以起重半径R为半径的圆弧上,绑扎面靠拢前提杯心.那样,正在柱起吊时,起重臂没有动,起重钩降下,柱顶降下,柱足沿大天背前提滑止,直至柱横直.而后,起重臂转动,将柱吊至柱前提杯心上圆,拔出杯心5、问:正背扶直.起重机位于屋架下弦一边,最先以吊钩对付准屋架核心,支紧吊钩.而后略略起臂使屋架脱模.接着起重机降钩并起臂,使屋架以下弦为轴,缓缓转为直坐状态6、问:概括吊拆法是正在厂房结构拆置历程中,起重机一次启止,以节间为单位拆置所有的结构构件.那种吊拆要领具备起重机启止门路短,停机次数少的便宜.7、问:热根本油是利用30%一40%的石油沥青加进70%的汽油大概者加进60%的煤油溶融而成.前者称为快挥收性热根本油,喷涂后5—10h于燥;后者称为缓挥收性热根本油,喷缓后12—48h搞燥.8、问:沥青玛蹄脂是采与石油沥青配制的,是粘揭油毡的胶结资料.所以又喊沥青胶结资料大概沥青胶.9、问:刚刚性防火:刚刚性防火工程是以火泥、砂、石为本料,掺进少量中加剂、下分子散合物等资料,通过安排协共比,压制大概缩小孔隙特性,改变孔隙特性,减少各本料界里间的稀真性等要领配制的具备一定抗渗本领的火泥砂浆、混凝土动做搁火资料的防火工程.二、挖空1、履戴式起重机、汽车式起重机、轮胎式起重机2、起重量Q、起置半径R及起重下度H.3、塔顶回转式起重机、塔身回转式起重机4、共共包袱构件重量的绳索根数5、删大,减小,删大6、形状尺寸查看战混凝土强度查看7、斜吊绑扎法,直吊绑扎法8、按柱正在吊降历程中柱身疏通的特性,分为转动法战滑止法.9、绑扎面,柱足核心与柱前提杯心核心三面共弧10、按柱起吊后柱身是可笔直,分为直吊法战斜吊法;11、通线法,仄移轴线法.12、屋架扶直时,由于起重机与屋架的相对付位子分歧,可分为正背扶直战反背扶直13、屋里坡度<3%时,油毡宜仄止屋脊目标铺设屋里坡度>15%大概屋里存留振荡时,油毡应笔直屋脊目标铺设.14、屋里坡度<3%时,油毡宜仄止屋脊目标铺设屋里坡度>15%大概屋里存留振荡时,油毡应笔直屋脊目标铺设.15、结构自防火战防火层防火二大类16、一毡二油17、40%的石油沥青加进60%的煤油溶融而成.18、一般抹灰、中级抹灰、下档抹灰19、一下层、一中层、部分层20、搞灰饼、搞标筋三、单选AABCD BCABB B四、多选1BCD 2ABDE 3ABDE 4ACE 5BCDE 6ABDE7BDE 8ACE 9ACDE 10ABCD五、推断××√×√√√×××六、简问题1.简述构件的吊拆工艺问:百般构件的吊拆历程为:绑扎-吊降-对付位-临时牢固-矫正-末尾牢固.2.柱的吊降要领有几种?桅杆式起重机战履戴式起重机对付柱的吊降有什么效用?问:转动法战滑止法二种.采与桅杆式起重机时,柱的吊降要领宜采与滑止法;采与履戴式起重机,二者均可,宜劣先采与转动法.3.转动法战滑止法吊拆柱时,对付柱的仄里安插有什么央供?问: (1)转动法;三面共弧,即绑扎面、柱足核心战柱基核心三面共弧.正在以起重机起重半径R为半径的圆弧上.柱足靠拢前提.;(2)滑止法:二面共弧,即绑扎面、柱基核心二面共弧.正在起重机起重半径R为半径的圆弧上.绑扎面靠拢前提.4.简述柱的末尾牢固要领.问:末尾牢固要领是正在柱足与前提杯心间的清闲内灌筑细石混凝土,其强度等第应比构件混凝土强度等第普及二极.细石混凝土的浇筑分二次举止:第一次,浇筑到锲块底部;第二次,正在第一次浇筑的混凝土强度达25%安排强度尺度值后,拔出锲块,将杯心内灌谦细石混凝土.5.单层工业厂房结构吊拆要领有哪几种?采与履戴式起重机举止吊拆时,应采用哪一种要领?为什么?问:(1)单层工业厂房的结构吊拆要领有二种:概括吊拆法战分件吊拆法;(2)采与履戴式起重机举止吊拆时,采用分件吊拆法.果为不妨充集收挥履戴试起重机处事本能.果为它吊拆速度快,死产效用下.6.简述吊车梁仄里位子矫正的真量战要领.问:吊车梁的仄里位子的矫正,主假如查看吊车梁的纵轴线以及二列吊车梁之间的跨距LK是可切合央供.动工典型确定吊车梁吊拆核心线对付定位轴线的偏偏好没有得大于5mm.正在屋盖吊拆前矫正时,LK没有得有正偏偏好,以防屋盖吊拆后柱顶背中偏偏移,使LK的偏偏好过大. 吊车梁的仄里位子的矫正要领时常使用通线法战仄移轴线法.。

2021年国开电大《高层建筑施工》阶段作业4答案

2021年国开电大《高层建筑施工》阶段作业4答案

2021年国开电大《高层建筑施工》阶段作业4答案阶段作业41.按照《建筑基坑支护技术规程》,基坑侧壁的安全等级是按照工程地质条件划分的。

正确答案是:错2.支护工程勘察的勘探点深度应穿越软土层。

正确答案是:对3.支护结构选型应保证基坑围护结构构件不应超出基坑用地范围。

正确答案是:错4.按照支撑情况排桩支护结构分为无支撑(悬臂)结构和有支撑(悬臂)结构两种。

正确答案是:错5.悬臂式桩排支护结构的挡土深度一般不超过12m。

正确答案是:错6.桩锚式支护由支护排桩,锚杆及锚头等组成。

正确答案是:错7.单跨压杆式支撑具有受力明确、设计简洁、施工安装灵活方便等优点。

正确答案是:对8.多跨压杆式支撑适用平面狭长,长宽比比较大的基坑。

正确答案是:错9.钢支撑多为工具式支撑,装、拆方便,可重复使用,可施加预紧力。

10.支撑结构的安装应先撑后挖。

正确答案是:对11.钢板桩钢板桩具有很高强度、刚度但锁口性能较差。

正确答案是:错12.钢板桩施工采用单独打入法时,容易使板桩向一侧倾斜,且误差积累后不易纠正。

正确答案是:对13.地下连续墙有利于施工安全,加快施工速度,降低造价占地少,但不能采用逆筑法施工,占用施工空间大。

正确答案是:错14.在地下连续墙在挖槽结束后清除以沉碴等槽底沉淀物的工作称为清底。

正确答案是:对15.地下连续墙混凝土用溜槽法进行浇筑。

正确答案是:错16.复杂结构的地下工程不适宜采用逆作法施工。

正确答案是:错17.逆作法最大的特点是可以上、下同时进行施工。

正确答案是:对18.土层锚杆适于大型较深基坑,施工期较长,邻近有建筑物,不允许支护,邻近地基不允许有下沉位移时使用。

19.土层锚杆的设计拉力可由抗拔试验来获得,可保证设计有足够的安全度。

正确答案是:对20.土层锚杆施工中,压力灌浆宜选用混合砂浆。

正确答案是:错21.土层锚杆的验收试验是为了验证设计的锚固长度是否足够安全。

正确答案是:错22.土钉与锚杆受力范围相同,都是全长受力。

贵州省2019年工程类中级职称资格考试(建筑专业)备考试题及答案(三)

贵州省2019年工程类中级职称资格考试(建筑专业)备考试题及答案(三)

专业技术资格考试(建筑构造)备考试题及答案(一)一、填空题1.建筑物的耐火等级分为____级。

答案:42.砖混结构是承重墙为____,楼板和屋顶为____的建筑。

答案:砖墙、钢筋混凝土梁板3.建筑按使用功能分为____、____、____三大类。

答案:工业建筑、民用建筑、农业建筑4.钢门窗用料有____、____两种。

答案:实腹、空腹5.一般民用建筑由____、____、____、____、____、____和门窗组成。

答案:基础、墙或柱、楼板层、地面、楼梯、屋顶6.耐火等级标准主要根据房屋主要构件的____和它的____来确定。

答案:燃烧性能、耐火极限7.新的建筑方针:____、____、____、____(简称八字方针)。

答案:适用、安全、经济、美观8.地震的强弱程度用____和____。

国家规定____地区必须抗震设防。

答案:震级、烈度、6度及6度以上9.横向定位轴线之间的距离称为____,一般是按____的模数数列选定的;纵向定位轴线之间的距离称为____,一般是按____的模数数列选定的。

答案:开间、楼板长度、进深、梁的长度10.____是实现建筑工业化的前提。

答案:建筑模数统一协调标准11.楼房的层高是指该层楼面上表面至____的垂直距离。

答案:上一层楼面上表面12.7~9层为____建筑。

答案:中高层13.人工地基加固方法有三大类,即____、____、____。

答案:压实法、换土法、打桩法14.影响基础埋置深度的因素有____、____和____的影响。

答案:地基土层构造、地下水位、土的冻结深度15.按所用材料基础的受力特点分为____和____。

答案:刚性基础、扩展基础16.砖基础台阶的宽高比有____和____两种。

答案:1:2、1:1.517.对于钢筋混凝土基础,混凝土的强度等级不低于____,受力钢筋直径不小于____。

答案:C2、0.8mm18.为了保证建筑物的安全,基础的埋置深度至少不浅于____。

地下连续墙的导墙类型截面

地下连续墙的导墙类型截面

地下连续墙的导墙类型截面一、地下连续墙的概念和作用地下连续墙是一种固定土体的结构,通常用于控制土体的位移和稳定性,以及防止水流和土壤渗透。

它可以被视为一种深基础,因为它将重量传递到较深的地层。

在建筑工程中,地下连续墙通常用于建造地下车库、隧道、地铁站等。

二、导墙类型1. 桩式导墙桩式导墙是将钢筋混凝土桩嵌入土壤中以形成一道连续的支撑结构。

这种类型的导墙通常使用较小的钢筋混凝土桩(直径约30厘米),并且需要在两侧加固以确保其稳定性。

2. 挖掘型导墙挖掘型导墙是通过挖掘出一个U形或L形槽来形成一个连续的支撑结构。

这种类型的导墙通常使用锚杆或混凝土梁来增强其稳定性。

3. 钢板桩式导墙钢板桩式导墙是将钢板桩安装在井壁上以形成一个连续的支撑结构。

这种类型的导墙通常使用较小的钢板桩(宽度约为50-100厘米),并且需要在两侧加固以确保其稳定性。

三、截面类型1. 箱形截面箱形截面是一种常见的地下连续墙截面类型,它具有高强度和刚度,并且可以承受大量的土压力和水压力。

它通常由钢筋混凝土或预应力混凝土制成,具有优异的抗震能力。

2. 圆形截面圆形截面是一种简单而有效的地下连续墙截面类型,它可以在不同方向上承受不同程度的荷载。

它通常由钢筋混凝土或预应力混凝土制成,具有良好的抗震能力和耐久性。

3. T形截面T形截面是一种适用于较小深度和较小荷载条件下的地下连续墙截面类型。

它通常由钢筋混凝土或预应力混凝土制成,具有较好的刚度和强度。

4. L形截面L形截面是一种适用于边坡支护和防止土体滑动的地下连续墙截面类型。

它通常由钢筋混凝土或预应力混凝土制成,具有较好的抗震能力和耐久性。

四、总结地下连续墙是一种重要的结构,在建筑工程中具有广泛的应用。

导墙类型包括桩式导墙、挖掘型导墙和钢板桩式导墙,截面类型包括箱形截面、圆形截面、T形截面和L形截面。

选择合适的导墙类型和截面类型对于确保地下连续墙的稳定性和安全性至关重要。

挡土墙的类型及其特点

挡土墙的类型及其特点

挡土墙的类型及其特点挡土墙是一种常见的土木工程结构,用于抵抗土壤的压力和侵蚀力,以保持土地的稳定。

它在道路、铁路、河流、山坡等工程中具有重要的作用。

本文将介绍挡土墙的类型及其特点。

一、重力挡土墙重力挡土墙是最常见的挡土墙类型之一,它依靠重力将自身的重量传递至基底,以抵抗土壤的侧向压力。

重力挡土墙通常由混凝土或砖石等材料构成,具有以下特点:1. 结构简单:重力挡土墙的结构设计相对简单,施工方便。

2. 高度可变:重力挡土墙的高度可以根据需要进行调整,适用于各种地形条件。

3. 抗震性好:重力挡土墙因其重量大,具有较好的抗震性能。

二、加筋挡土墙加筋挡土墙是利用土工合成材料(如土工格栅、土工布等)对挡土墙进行加筋的一种类型。

加筋挡土墙的特点如下:1. 抗变形能力强:通过加筋材料,挡土墙的整体稳定性得到提升,能够有效抵抗土壤的变形。

2. 耐久性好:土工合成材料具有较好的耐久性,能够长期保持挡土墙的稳定性。

3. 施工便捷:加筋挡土墙的施工相对简单,而且使用土工合成材料可以减少对天然资源的消耗。

三、重力加筋挡土墙重力加筋挡土墙是将重力挡土墙与加筋挡土墙结合的一种墙体结构,它利用重力和土工合成材料的相互作用来实现挡土的目的。

重力加筋挡土墙具有以下特点:1. 综合性能好:重力加筋挡土墙的结合了重力挡土墙和加筋挡土墙的优点,具有更好的承载能力和抗变形性能。

2. 结构稳定:通过合理设计重力挡土墙的基底和加筋材料的布置,可以确保挡土墙的整体结构稳定。

3. 适应性广:重力加筋挡土墙适用于各种地质条件和挡土要求,广泛应用于道路、铁路等工程。

四、悬臂挡土墙悬臂挡土墙是一种将挡土墙与支撑墙相结合的结构,它利用挡土墙的重力和支撑墙的抗压能力共同承担土壤的压力。

悬臂挡土墙的特点包括:1. 结构复杂:悬臂挡土墙由挡土墙和支撑墙两部分组成,结构相对复杂,需要经过详细的设计和施工。

2. 节省土地空间:由于支撑墙的存在,悬臂挡土墙可以在有限的土地空间内实现较大的挡土高度。

常见支护结构的形式

常见支护结构的形式

常见支护结构的形式常见支护结构的形式主要有板桩、桩墙、锚杆支护、预应力锚索支护和喷射混凝土支护等。

首先是板桩支护结构。

板桩是一种长而窄的金属或混凝土板,可以沿着一定的间距插入土壤中,以形成一道密集的桩墙,用于支撑土体。

板桩支护常用于土壤较松散,土质较软的地区,其施工便利,成本较低且适用性广。

主要材料有钢板桩、木板桩和混凝土板桩。

板桩支护能够减小土体变形和土壤沉降,提高基坑的稳定性。

其次是桩墙支护结构。

桩墙由垂直排列的桩组成,构成一道连续的墙体,经常用于较深基坑或较高挡土墙的支护。

桩墙的类型常见的有挖孔桩墙和预制桩墙。

挖孔桩墙是通过在土体中钻孔和灌注浆液形成的,具有较好的刚度和承载力。

预制桩墙是指将桩提前制作好,然后再进行现场拼装,可以大幅缩短施工周期。

桩墙支护结构具有较好的刚度和承载力,适用于高岭土、软黏土等土质较差的场地。

锚杆支护是一种通过锚杆将挖掘面与周围的土体连接起来的支护方式。

锚杆支护主要适用于较深的基坑、较厚的土层或较大的土压力情况。

锚杆的类型包括土中锚杆、锚杆墙和压力锚杆等。

土中锚杆通过预制的管道将锚杆灌注到地下,通过锚结固土体,增加土体的稳定性。

锚杆墙指的是由多根锚杆组成的连续支护墙体,可以有效地抗拔和抗推挤力。

压力锚杆通过应力传递,将土体与承重结构连接在一起,可用于地下室和隧道等工程。

预应力锚索支护是一种通过预应力锚索对土体进行加固的支护方式。

预应力锚索是通常使用钢丝绳、钢束或钢筋制成的。

预应力锚索的作用是利用锚固点上的锁定装置将锚索拉紧,然后将预应力传递到土体中,提高土体的稳定性和强度。

预应力锚索支护适用于需要加固在深部孔洞周围的边坡、岩石体和土石混合体等。

喷射混凝土支护是一种通过喷射混凝土形成支护结构的方法。

喷射混凝土支护适用于各种复杂地质条件下的基坑开挖和隧道施工等。

喷射混凝土支护主要分为湿喷和干喷两种方式。

湿喷是在加水的混凝土均匀喷射到空气中,形成支护层。

干喷则是在不加水的情况下,搅拌机将混凝土输送到喷枪,喷射到需要支护的地方。

混凝土墙体的施工方案及墙体支护措施

混凝土墙体的施工方案及墙体支护措施

混凝土墙体的施工方案及墙体支护措施随着城市化进程的发展,地下室建设日益成为一个必要的选择,特别是在城市商业和住宅开发领域中。

在地下室建设中一个关键的部分就是混凝土墙体的施工方案及相应的支护措施。

这篇文章将会探讨混凝土墙体的基本施工方法和墙体支护措施。

一、施工方案混凝土墙体的施工是地下室建设的必要部分。

下面将简要介绍混凝土墙体的基本施工方法。

1. 现浇法现浇法是混凝土墙体施工的最常用方法之一。

在使用现浇墙体的方法时,建筑师首先需要在地面上挖掘出墙体基础,然后在墙体周围设置支撑结构,形成的支撑结构可帮助保持混凝土支撑墙体的形状。

接着在这些支撑结构之间,夹入钢筋网格,以将钢筋网格与混凝土浇注而成的墙体合并在一起。

2. 预制法预制混凝土墙体是在工厂制造而成的。

预制墙体也可采用两种不同的方法来加固。

一种方法是使用薄钢片,另一种方法是使用网格法。

3. 空心板法空心板法墙体是一种隧道式结构形式的混凝土墙体,它在墙体内部安装有水平和垂直的钢筋筋结构,此外还有较多的钢筋筋杆或柱形结构,以增加墙体的稳定性。

二、墙体支护措施混凝土墙体的施工需要采用适当的墙体支护措施,以确保施工质量和工人安全。

以下是常用的墙体支护措施:1. 支架法支架法支护措施用于较小的基坑。

在这种方法中,用木杆或高强度合金支撑关闭的板,将墙体以外的区域支撑住。

2. 土壤留压法土壤留压法主要应用于当基坑深度较大时,它可以提高混凝土墙体的稳定性。

在这种方法中,将钢筋网格复合材料与混凝土一起用来增强墙体并防止急剧变形。

3. 支撑与加固法支撑与加固法主要用于长时期的施工工作或在冻土地区施工深基坑时。

这种方法需要在地面上建立支撑桁架或格杆,以确保混凝土墙体的稳定性。

结论混凝土墙体的施工方案和墙体支护措施是地下建设中的重要组成部分。

施工前必须制定适当的施工计划并采取适当的支护措施,以确保施工质量和工人安全。

在实践中,选择适当的墙体施工方法和支撑措施,可使项目顺利完成且各方面表现优异。

2023年注册岩土工程师之岩土专业知识高分题库附精品答案

2023年注册岩土工程师之岩土专业知识高分题库附精品答案

2023年注册岩土工程师之岩土专业知识高分题库附精品答案单选题(共50题)1、下列冻土的特性指标中,属于力学特性指标的是()。

A.冻土导热系数B.冻土冻胀率(冻胀强度)C.冻土冻结强度D.冻土比热容【答案】 B2、下列冻土的特性指标中,属于力学特性指标的是()。

A.冻土导热系数B.冻土冻胀率(冻胀强度)C.冻土冻结强度D.冻土比热容【答案】 B3、根据《膨胀土地区建筑技术规范》(GBJ 112—1987),( )可列为膨胀土的特性指标。

A.自由膨胀率、塑限、膨胀率、收缩率B.自由膨胀率、膨胀率、膨胀压力、收缩率C.自由膨胀率、膨胀率、膨胀压力、收缩系数D.自由膨胀率、塑限、膨胀压力、收缩系数【答案】 C4、下列哪个选项属于无筋扩展基础()A.毛石基础B.十字交叉基础C.柱下条形基础D.筏板基础【答案】 A5、某工程重要性等级为二级,拟建在对抗震不利的地段,地形地貌简单,地基为盐渍土,应按()等级布置勘察工作。

A.甲级B.乙级C.丙级D.视场地复杂程度确定【答案】 A6、下列关于库仑理论应用于挡土墙设计的说法错误的是()。

A.库仑理论虽然有不够严密完整之处,但概念简单明了,适用范围较广B.库仑理论较适用于黏性土,其主动土压力和被动土压力的计算值均接近于实际C.库仑理论较适用于墙背为平面或接近平面的挡土墙D.库仑理论较适用于刚性挡土墙【答案】 B7、抗滑桩与高层建筑桩基相比,一般情况下,下列哪一个表述是错误的?A.桩基承受垂直荷载为主,抗滑桩承受水平荷战为主B.桩基设计要计桩侧摩阻力,杭滑桩不计桩侧摩阻力C.桩基桩身主要按受压构件设计,抗滑桩桩身主要按受弯构件设计D.两种桩对桩顶位移的要求基本一样【答案】 D8、下列各项属于非湿陷性土的是()。

A.湿陷系数δs=0.03B.湿陷系数δs=0.02C.湿陷系数δs =0.01D.湿陷系数δs=0.025【答案】 C9、某多年冻土地区一层粉质黏土,塑限含水量wp=18.2%,总含水量w0=26.8%,请初判其融沉类别是下列选项中的()。

基坑支撑结构挡土的应力传递路径

基坑支撑结构挡土的应力传递路径

基坑支撑结构挡土的应力传递路径基坑支撑结构挡土的应力传递路径,哎呦,听起来像个很复杂的工程术语对吧?别担心,咱们一起来理一理。

说白了,这就是怎么通过一堆钢筋、混凝土、支撑系统,让基坑周围的土壤不跑到你正在开挖的地方去。

就像你想在家里搞个花园,旁边土堆一大堆,没个护栏怎么能让它老老实实待着?这就是基坑支撑结构的基本任务啦——挡土,保持基坑稳定。

首先啊,你得知道,这个支撑结构可不是随便搭个木头就行的,它必须承受来自土壤的巨大压力。

想象一下,围墙旁边土壤的重量就像一座小山,一旦没有支撑系统稳稳地压住它,那整个基坑就可能一塌糊涂。

哎,真的是一步错,步步错啊。

支撑结构的工作就是承担这些压力,然后把这些应力“传递”到其他地方去,避免它们全部集中在一个地方,搞得土堆和支撑都压力山大。

要讲到“应力传递”这件事,其实就是把这些土壤施加的压力通过支撑结构传递到地面,甚至更深的地方。

你可以想象,这就像是你搬一块大石头,自己肩膀吃不消,赶紧找朋友来帮忙,大家分摊一下,肩膀才不痛。

支撑结构就像这群“好朋友”,它们分担土壤压力,避免单个支撑点承担过多的负荷。

那这些支撑系统是怎么做的呢?嗯,通常有几种方式。

比如钢支撑、混凝土支撑,还有最常见的土钉墙。

钢支撑啊,它一般就是那种看着很霸气的钢材,既结实又能承受很大的力。

它们就像是在基坑四周摆起的坚实“屏障”,把压力一步步传递到更牢固的土层。

混凝土支撑呢,则更像是一块块“大饼”,把压力均匀地分散开。

至于土钉墙嘛,嘿,它的名字也挺有意思的,像土里钉个钉子一样,把土壤固定住,不让它四处溜走。

不过,单靠这些支撑系统,光有“墙”可不行,还得配合其他设备一起工作。

比如说,支撑结构的基础必须足够稳,不能让它自己也因为土壤压力变得不靠谱。

你想,支撑系统得根基深厚,它才敢“顶天立地”。

这些基础部分的设计和施工,尤其是它们的“负担”设计,得考虑得细致入微,不能马虎大意。

稍有疏忽,压力就会像发疯的洪水一样把所有结构都压垮,前功尽弃。

单选题

单选题

单选题01、()是体现粘性土密实程度的指标,常用它来控制粘性土的压实质量。

(考生答案:A)02、根据山区、丘陵地区永久性水工建筑物洪水标准要求,对一级混凝土坝、浆砌石坝的水工建筑物来讲,在校核情况下的洪水重现期为()(考生答案:B)03、料场可开采总量为设计量的数倍,倍数最大的是()(考生答案:D)04、料场规划中从空间、时间、程序及质与量上进行规划。

低料低用,高料高用,属于()规划(考生答案:A)05、当山区、丘陵地区的水利水电工程永久性水工建筑物的挡水高度低于15m,且上下游最大水头差小于10m时,其洪水标准可按()标准确定。

(考生答案:B)06、分期束窄河床修建围堰,保护主体建筑物干地施工,这种导流方法称为()(考生答案:A)07、按照《水法》规定,禁止在()内设置排污口。

(考生答案:C)08、()工程资料是工程建设中的一项重要工作,是工程质量管理的组成部分。

(考生答案:A)09、当料场距大坝()米,宜选用铲运机(考生答案:D)10、当平原、滨海地区的永久性水工建筑物的挡水高度高于15m,且上下游最大水头差大于10m时,其洪水标准宜按()标准确定。

(考生答案:D)11、粉状或颗粒状材料在某堆积体积内,颗粒之间的空隙体积所占的比例称为材料的()(考生答案:D)12、土工合成材料主要功能归纳有六类:即反滤、排水、隔离、()、防护和加筋。

(考生答案:D)13、砼中粗骨料粒经大小还受结构截面尺寸限制,最大料粒不得超过结构截面最小尺寸的()(考生答案:A)14、砂砾土用相对密度Dr表示,在填方工程中,一级建筑物,Dr取值为()(考生答案:A)15、安全事故处理“四不放过”原则,即事故原因不查清不放过,责任人未处理不放过,整改措施未落实不放过,()不放过。

(考生答案:B)16、质量控制的基本原理是运用()进行质量的事前预控,事中控制和事后纠偏控制(考生答案:B)17、工期优化步骤有以下内容:①确定各关键工作能缩短的时间;②找出关键线路及关键工作;③确定应优先缩短持续时间的关键工作;④按要求工期计算应缩短的时间;其顺序为()(考生答案:C)18、有堤防的河道,湖泊,其管理范围为两岸堤防之间的()(考生答案:A)19、由不同类型水工建筑物组成的综合体称为()(考生答案:A)20、不能作承重墙的是()墙(考生答案:B)21、在梁、板、柱等结构的接缝和施工缝处产生烂根的原因之一是()(考生答案:C)22、推土机的经济运距一般为()(考生答案:A)23、内外砖墙交接处应同时砌筑,但不能时应留()(考生答案:A)24、双排脚手架的连墙杆一般按()(考生答案:B)25、帷幕灌浆浆液浓度的控制应遵循()的原则(考生答案:A)26、有抗冻要求的混凝土且当环境水含硫酸盐侵蚀时,应优先选用的水泥品种是()(考生答案:C)27、己知工程网络计划中某工作有四项紧后工作,这些紧后工作的最迟开始时间分别为第16夭、第18天、第19天和第21天。

2023年注册岩土工程师之岩土专业知识通关题库(附答案)

2023年注册岩土工程师之岩土专业知识通关题库(附答案)

2023年注册岩土工程师之岩土专业知识通关题库(附答案)单选题(共40题)1、下列说法错误的是()。

A.各级湿陷性黄土地基上的甲类建筑应消除地基的全部湿陷量或穿透全部湿陷性土层,防水措施和结构措施可按一般地区进行设计B.各级湿陷性黄土地基上的甲类建筑可不采取消除全部湿陷量或穿透全部湿陷性土层的地基处理措施,但应采取严格防水措施和减少建筑物的不均匀沉降的结构措施C.甲类建筑在自重湿陷性黄土场地,应处理基础以下的全部湿陷性土层D.甲类建筑在非自重湿陷性黄土场地,应将基础下湿陷起始压力小于附加压力与上覆土的饱和自重压力之和的所有土层进行处理或处理至基础下的压缩层下限为止【答案】 B2、关于滑坡治理中抗滑桩的设汁,下列哪一说法是正确的?A.作用在抗滑桩上的下滑力作用点位于滑面以上三分之二滑体厚度处B.抗滑桩竖向主筋应全部通长配筋C.抗滑桩一般选择矩形断面主要是为了施工方便D.对同一坑滑桩由悬臂式变更为在桩顶增加预应力锚索后,嵌固深度可以减小【答案】 D3、某完全饱和粘性土的天然含水量为60%,其天然孔隙比最接近于下列哪一选项?A. 1.0B.1.3C. 1.6D. 1.9【答案】 C4、在盐分含量相同条件时,下列哪一类盐渍土的溶解度及吸性最大?A.碳酸盐渍土B.氯盐渍土C.硫酸盐渍土D.亚硫酸盐渍土【答案】 B5、铁路通过多年冻土带,下列情况适用采用破坏多年冻土的设计原则的是()。

A.连续多年冻土带B.不连续多年冻土带C.地面保温条件好的岛状多年冻土带D.地面保温条件差的岛状多年冻土带【答案】 D6、关于构造地裂缝,下列说法不正确的是()。

A.是断裂活动的直接产物B.有大小不等的水平位移(水平张裂和水平扭动)和垂直位移,其性质有张性的也有扭性的,在剖面上与活动断裂是贯通的,其断距上大下小C.它与地震地裂缝在成因上有一定的差别D.对城镇和工程建筑、农田水利有一定的破坏作用,强烈活动期有严重的破坏作用,破坏范围主要沿地裂缝带呈狭长的条带状分布【答案】 B7、关于主动、被动土压力系数,下列哪个选项的说法是正确的()A.主动土压力系数随土的内摩擦角增大而增大B.被动土压力系数随土的内摩擦角增大而增大C.主动土压力系数随土的粘聚力增大而增大D.被动土压力系数随土的粘聚力增大而增大【答案】 B8、地基承载力深度修正系数取决于下列哪个选项的土的类别和性质()A.基底下的土B.综合考虑基础底面以下和以上的土C.基础底面以上的土D.基础两侧的土【答案】 C9、在泥石流勘察中,泥石流流体密度的含义是指下列哪一项?A.泥石流流体质量和泥石流固体部分体积的比值B.泥石流流体质量和泥石流体积的比值C.泥石流固体部分质量和泥石流体积的比值D.泥石流固体质量和泥石流固体部分体积的比值【答案】 B10、软黏土的特性指标如下,其中()指标是肯定有问题的。

2021年甘肃电大高层施工形测答案

2021年甘肃电大高层施工形测答案

高层建筑施工形测一一、判断正误题(每题1分,共10分)1.当水流在水位差作用下对土颗粒产生向上压力时,才也许会产生“流砂”现象(对)2. 井点降水法在粉细砂、粉土层中开挖基坑中,不能有效防止流砂现象发生。

(错)3. 按照支撑状况排桩支护构造分为无支撑(悬臂)构造和有支撑(悬臂)构造两种。

(错)4. 土钉与锚杆在受力机理不同相似。

土钉是积极受力,锚杆是被动受力。

(错)5. 监测钢筋混凝土围檩内力传感器应选用表面应力计。

(错)6. 国内把混凝土构造物预测会因水泥水化热引起混凝土内外温差过大而导致裂缝混凝土称为大体积混凝土。

(对)7. 碗扣式钢管脚手架是一种多功能工具式脚手架。

(对)8. 焊接接头强度实验应以300个同级别钢筋接头作为一批抽取3个试件,其中有1个试件抗拉强度低于规定值,应确认该批接头为不合格。

(错)9. 钢板桩施工采用单独打入法时,容易使板桩向一侧倾斜,且误差积累后不易纠正。

(对)10. 一、二、三级焊缝均需要做外观检查和无损检查。

(错)二、单选选取题(每题2分,共20分)。

1.按住宅建筑层数划分,7~9 层为(中高层)建筑。

中高层2.低合金钢牌号按屈服点大小,分为(Q295、Q345、Q390、Q420、Q460)等五种。

3. 对深基坑施工危害较大地下水是(承压水)。

4. 支护工程勘察勘探点深度普通依照(设计规定)拟定。

5. 钢支撑支撑长度超过(15m)时,需设立柱支承以防止支撑弯曲和支撑失稳破坏。

6. 当土层锚杆承载能力较大时,拉杆宜选用(钢绞线)。

7. 基坑施工监测中,不需要监测竖向位移项目是(支撑体系)。

8. 附着式塔式起重机锚固装置以上塔身自由高度,普通不超过(30m )。

9. 扣件基本形式是(直角扣件、对接扣件、回转扣件)。

10. 埋弧压力焊焊接工艺是(④→①→②→④)。

①电弧;②电渣;③顶压过程;④引弧三、多项选取题(每题4分,共40分,错选、多选不得分;少选、漏选)。

1.下列属于流砂现象防治办法有(地下持续墙法,抛沙袋或石块法,打钢板桩法,枯水期施工)2. 高强度螺栓连接按其受力状况分为(摩擦型,承压型,张拉型,摩擦-承压型连接)等类型3. 下列哪些属于高层建筑施工特点(工程量大、工序多、配合复杂,平行流水、立体交叉作业多,机械化限度高,基本深、基坑支护和地基解决复杂,高处作业多,垂直运送量大,构造装修、防水质量规定高,技术复杂)4. 下列支护构造中,合用于基坑开挖深度不不大于10m.是(逆作拱墙,地下持续墙,土钉墙)。

2021年一级造价工程师考试《建设工程技术与计量(土木建筑工程)》真题及答案

2021年一级造价工程师考试《建设工程技术与计量(土木建筑工程)》真题及答案

2021年一级造价工程师考试《建设工程技术与计量(土木建筑工程)》真题及答案1.【单选题】对岩石的稳定性进行定量分析的主要依据为()。

A.抗压强度和抗拉强度B.抗压强度和抗剪强度C.抗拉强度和抗剪强度D.抗拉强度和抗折强度正确答案:B2.【单选题】下列地下水中,补给区与分布区不一致的为()。

A.包气带水B.潜水C.承压水D.裂隙水正确答案:C3.【单选题】对埋深1m左右的松散砂砾石地层地基进行处理,应优先考虑的方法为()。

A.挖除B.预制板加固C.沉井加固D.地下连续墙加固正确答案:A4.【单选题】对于埋藏较深的断层破碎带,提高其承载力和抗渗性的处理方法优先考虑()。

A.打土钉B.打抗滑桩C.打锚杆D.灌浆正确答案:D5.【单选题】处置流砂优先考虑的施工方法为()。

A.灌浆B.降低地下水位C.打桩D.化学加固正确答案:B6.【单选题】在地下工程选址时,考虑较多的地质问题为()。

A.区域稳定性B.边坡稳定性C.泥石流D.斜坡滑动正确答案:A7.【单选题】与建筑物相比,构筑物的主要特征为()。

A.供生产使用B.供非生产性使用C.满足功能要求D.占地面积小正确答案:C8.【单选题】关于多层砌体工程工业房屋的圈梁设置位置,正确的为()。

A.在底层设置一道B.在檐沟标高处设置一道C.在纵横墙上隔层设置D.在每层和檐口标高处设置正确答案:D9.【单选题】外墙外保温层采用厚型面层结构时,正确的做法为()。

A.在保温层外表面抹水泥砂浆B.在保温层外表面涂抹聚合物砂浆C.在底涂层和面层抹聚合物水泥砂浆D.在底涂层中设置玻化纤维网格正确答案:A10.【单选题】在以下工程结构中,适用采用现浇钢筋混凝土井字形密肋楼板的为()。

A.厨房B.会议厅C.储藏室D.仓库正确答案:B11.【单选题】某单层厂房设计柱距6m,跨度30m,最大起重量12t,其钢筋混凝土吊车梁的形式应优先选用()。

A.非预应力T形B.预应力工字形C.预应力鱼腹式D.预应力空腹鱼腹式正确答案:B12.【单选题】在半填半挖土质路基填挖衔接处,应采用的施工措施为()。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

Performance of a single-propped wall duringexcavation and during freezing of theretained soilPhillip S.K.Ooi a,*,Michael P.Walker b ,Jeffrey D.Smith c a Department of Civil Engineering,Holmes Hall 383,University of Hawaii at Manoa,2540Dole Street,Honolulu,HI96822,USAb GEIConsultants,I nc.,1021Main Street,Winchester,MA 01890,USAc Slattery,Interbeton,J.F.White,Perini,A Joint Venture,210South Street-8th Floor,Boston,MA 02111,USA Received 4January 2001;received in revised form 5June 2001;accepted 12November 2001AbstractA single-propped soldier-pile-tremie-concrete wall was constructed as part of the excavation support system for a tunnel jacking project.This wall supported a 14.3-m-high cut with a sig-nificant unbraced height (13.4m)above the excavation subgrade.A limited area of the exca-vation subgrade next to the wall was jet grouted to provide stability against base heave.The jet grout also served as a ‘‘brace’’for the wall below subgrade.The wall and prop were designed to support lateral loads during excavation as well as during ground freezing behind the wall.A ground freezing operation was implemented and carefully controlled to prevent wall yielding.Its success was facilitated by monitoring of wall movements,by drilling relief holes adjacent to the wall to reduce lateral heave pressures due to the soil freezing operation,and by limiting the exposure time of the wall to frost expansion.Measured wall behavior during excavation and during ground freezing is compared to those from finite element analysis for this very unique case history.Published by Elsevier Science Ltd.Keywords:Displacement;Excavation support;Finite element analysis;Freezing;Inclinometer;Jet grout;Moments1.IntroductionThe analyses and performance of a single-propped soldier-pile-tremie-concrete wall during excavation and during ground freezing behind the wall is presented.The *Corresponding author.Fax:+1-808-956-5014.E-mail address:ooi@ (P.S.K.Ooi).388P.S.K.Ooi et al./Computers and Geotechnics29(2002)387–409wall was constructed as part of the excavation support system for the I-90East-bound(I-90EB)tunnel jacking pit,built for Contract C09A4of the Central Artery/ Tunnel Project in Boston,MA.This tunnel will form part of the Interstate I-90 extension to East Boston.In Contract C09A4,construction of the I-90EB tunnel involves jacking of23.8m wide,11.3m high,tunnel box sections of various lengths underneath railway tracks, which lead to and from South Station,downtown Boston’s train hub.After casting the tunnels in the I-90EB jacking pit,they are jacked through a‘‘window’’in the headwall on the east end(Fig.1).Prior to demolishing the window,the soil behind the headwall is stabilized via ground freezing.In the original contract design,the headwall is supported by four levels of internal bracing with the bottom three levels removed prior to tunnel jacking.The contractor value-engineered the headwall and eliminated the bottom three braces.Thus,lateral support of the headwall is provided only by the upper brace.With this approach,the subgrade soil stabilized by jet grouting in the immediate wall vicinity must act as a strut(Fig.2).Elimination of the bottom three braces resulted in an unbraced height of 13.4m above the jet grout subgrade.The large clearance was necessary for construction of the tunnel boxes within the jacking pit.In addition to supporting a14.3-m-high cut, the wall and bracing system were also designed to withstand soil stabilization loads due to ground freezing behind the headwall.2.Subsurface profile and soil parametersThe soil profile in the vicinity of the headwall consists of an approximately4.6-m-thickfill layer overlaying the following soil strata in order of increasing depth:about 3.7m of organics,about30m of marine clay,about4m of glacial till and the argillite bedrock(Fig.2).The design ground water table is at El.32.3m based on project datum.El.0m of the National Geodetic Vertical Datum equals El.30.5m project datum.The wall was analyzed using thefinite element computer program SOILSTRUCT [1],which models the soil response utilizing the Duncan and Chang[2]nonlinear elastic hyperbolic model.The analysis was performed assuming drained behavior in thefill and glacial till,undrained behavior in the organics,marine clay and jet grout, and linear elastic behavior in the bedrock.Hyperbolic parameters,obtained from the results of triaxial testing,are summarized in Table1.Parameters that dominate wall behavior are discussed below.Being the thickest deposit,properties of the marine clay have a significant influ-ence on wall boratory strength testing performed on the marine clay include direct simple shear tests,and unconsolidated undrained and consolidated undrained triaxial compression tests.The majority of the undrained shear strengths were measured in direct simple shear,a test that yields an average strength between triaxial extension and triaxial compression of the marine clay,and therefore,pro-vides a simple and effective means of considering stress system-induced anisotropy [3].Variation of the shear strength of the marine clay with depth[4]and the shearFig.1.Plan of C09A4jacking pits and controlled ground freezing plan.P.S.K. Ooi et al. / Computers and Geotechnics 29 (2002) 387–409 389strength profile adopted for design are shown in Fig.3.With the exception of the top crust,the marine clay was lightly overconsolidated with OCRs varying mostly between1and2.There was considerable scatter in the plasticity index,which aver-aged about22%.The initial tangent undrained modulus(E i)of the marine clay isTable1Unfrozen soil parametersSoil type Soil unitweight(kNmÀ3)Frictionangle(degrees)K0Undrainedshear strengthS u(kPa)Young’s modulus a Bulkmodulus bInitialtangentmoduluscoef.c KInitialtangentmodulusexponent nStressratio atfailure R fBulkmoduluscoef.K bBulkmodulusexponent mFill20.4320.503000.40.752800.5 Organics17.300.6385500.0110.991700Marine clay(El.26.5m–El.6.1m)18.900.75677940.0110.913,2000Marine clay(El.6.1m–El.-3.0m)18.900.75728510.0110.914,2000Glacial till21.238 1.0010000.50.758330.5 Bedrock d23.6Linear elastic:E=1.92Â106kPa; =0.25eClay jet grout19.600.5184036,0000.0110.92600,0000a Initial tangent modulus,E i=Kp a( 3/p a)n where p a=atmospheric pressure and 3=minor principal stress[2].Tangent modulus,E t=(1-R f SL)2E i where SL=stress level=( 1À 3)/( 1À 3)f, 1=major principal stress and the subscript f denotes the stress at failure[2].b Tangent bulkmodulus,B t=K b p a( 3/p a)m.Bulkmodulus parameters for organics,marine clay and jet grout were selected to give a constant value of Poisson’s ratio=0.49.c For all soils,the unload-reload modulus,K ur,was taken to be equal to K except for glacial till where K ur=2000[5].d Bedrock=severely to moderately weathered argillite.e The bedrockis modeled as a linear elastic material with a Young’s modulus,E,and a Poisson’s ratio, .P.S.K. Ooi et al. / Computers and Geotechnics 29 (2002) 387–409 391based on E i=1200S u,which corresponds to a secant Young’s modulus of660S u at 50%stress level,where S u is the undrained shear strength.For a soil volume that is100%treated by jet grout,the contract documents spe-cified a minimum unconfined compressive strength(q u)of1030kPa.During the design stage,an unconfined compressive strength of824kPa or80%of the specified minimum value was used.However,based on laboratory testing of the jet grout in the jacking pit,the unconfined compressive strength ranged from620to10,100kPa with an average of3690kPa and a standard deviation of1340kPa.Measured jet grout parameters were used in the analysis discussed herein.The initial tangent modulus of the jet grout E i is approximately1000q u,which corresponds to a secant modulus of about1000S u at50%stress level.3.Wall and bracing detailsThe headwall is 25.9m wide,0.91m thickand 22.6m deep,a cross-section of which is shown in Fig.2.The minimum 28-day design compressive strength of the concrete is 27.6MPa.It is reinforced with W27Â217steel sections,with a yield strength of at least 345MPa,spaced 1.37m apart (EI=0.54Â106kNm 2/m and EA=2.80Â107kN/m).The top half of the soldier piles are reinforced with 38mm thick,432mm wide steel cover plates welded on the outside of both flanges (EI=1.24Â106kNm 2/m and EA=3.22Â107kN/m).The wall is considered impermeable and was designed for both soil and ground water pressures.The bracing system for the headwall consists of a horizontal steel truss (Fig.4).The truss,with centerline at El.33.8m,is framed into an end post attached to the south sidewall.The northwest corner of the truss is connected to two cross lot gir-ders and a pin teral support for the headwall is provided by a series of jacks spaced approximately 2.74m on center along the length of the brace.The jacks allow the Contractor to control wall movements into the excavation during ground freezing behind the wall.The stiffness of the horizontal steel truss was determined using finite element models developed to design the brace itself.A known load was applied to the brace and the deflection associated with that load was used to determine the brace stiffness (=51,800kN/m/m ofwall).Fig.4.Jacking pits with horizontal truss bracing at the I-90EB headwall.P.S.K.Ooi et al./Computers and Geotechnics 29(2002)387–4093934.AnalysisThe wall was analyzed assuming plane strain conditions.An incremental analysis procedure was used to model isotropic nonlinear stress-strain response of the soil.The soil was discretized using two-dimensional,sub parametric,quadrilateral (QM5)elements.The QM5quadrilateral element degrades to a triangular element by making the coordinates of two adjacent nodes of the quadrilateral the same [1].The wall is modeled using Euler-Bernoulli beam elements,the brace is represented by a linear spring and interface elements [6]are used to model slippage between the wall and the soil.Both the beam and interface elements have no thickness.The finite element mesh is shown in Fig.5.Bilinear elasto-plastic stress–strain characteristics were used for the interface ele-ments with the ultimate adhesion equal to one half the shear strength of the adjacent soil.The shear strengths for cohesive soils are summarized in Table 1.For cohe-sionless soils,the shear strength is estimated as K 0 v 0tan ,where K 0is the at-rest lateral earth pressure coefficient, v 0is the vertical effective stress at the mid-depth of the granular soil layer and is the friction angle of the soil.The shear stiffness of the interface elements was based on full mobilization of the ultimate adhesion at a relative displacement of 2.5mm [1].Trainloads were included in the analysis in accordance with the recommendations of the American Railway Engineering Association (AREA)manual [7].The wall was designed for 100,100,50and 25%of the train loads on the first,second,thirdFig.5.Finite element mesh.394P.S.K.Ooi et al./Computers and Geotechnics 29(2002)387–409P.S.K.Ooi et al./Computers and Geotechnics29(2002)387–409395 and fourth closest tracks,respectively.Trainloads from thefifth closest track and beyond were deemed to be far away enough that they were considered negligible.5.Modeling of the construction sequencingModeling of the construction sequencing is discussed in two parts:(1)excavation and brace installation,and(2)ground freezing.5.1.Excavation and brace installationThe excavation and brace installation sequencing was modeled as follows:Step1:apply surcharge loads and excavate to El.32.6m(Fig.6a).Step2:install brace at El.33.8m,prestress brace,and excavate to El.20.4m (Fig.6b).Modeling of the excavation from El.32.6m to El.20.4m in Step2was performed in several sub-steps to minimize errors due to non-linear unloading of the soil.To minimize wall movement during the initial cantilever stage,the depth to the brace was limited to0.9m.In the analysis,it was assumed that lateral resistance from side shear between the sidewalls and the jet grout is developed.The side shear is distributed uniformly along the width of the headwall.5.2.Ground freezingAs water freezes,it expands by about8.5%in volume.This implies that uncon-trolled frost expansion of the pore water can result in significant lateral heave pres-sures on the headwall.Therefore,a carefully planned ground freezing scheme was performed in two phases to minimize wall movements(Fig.1).First,the ground was frozen as a single unit,except for a3-m-wide‘‘buffer’’zone immediately behind the wall.In this zone,holes were drilled to relieve lateral pressure during the main soil freeze.Second,the soil in thefinal3-m zone was frozen.In both zones,the frozen soil extended from El.33.2m(1.5m below ground surface)to El.21.9m.In the analysis,the ground freezing stages are applied as a continuation of the excavation and brace installation sequencing as follows:Step3:Construct base slab in front of headwall leaving a0.3-m-wide gap.Install hydraulic jacks in this gap(Fig.6c).In subsequent stages,the loads in thehydraulic jacks are allowed to build up to a maximum of1460kN/m,afterwhich,they are held e of constant-force jacks duringconstruction allows the wall to move laterally during frost expansion,which in turn helps reduce large wall moments that would be generatedhad the wall been restrained by the slab.Step4:Main soil freeze—freeze ground except for a3-m-wide gap immediately behind the headwall.During this stage,a‘‘yield pressure’’increment isapplied to the wall as a lateral traction.It accounts for the lateralpressure increase necessary to cause the unfrozen soil in the final3-m-freeze zone to yield into the relief holes as the soil in the main freezezone expands (Fig.6d).Step 5:Final 3-m freeze—freeze the remaining unfrozen ground behind thee jacks to maintain brace loads constant at values existingafter main soil freeze.Volumetric expansion of this zone is modeled byperforming a thermal expansion analysis (Fig.6e).5.2.1.Main soil freeze (step 4)The yield pressure applied during main soil freeze varies depending on the soiltype and on the activities in the relief holes.Cohesionless soils (fill)easily ravel anddisplace into the relief holes under their own weight or with minimal assistancefromFig.6(continued ).P.S.K.Ooi et al./Computers and Geotechnics 29(2002)387–409397pumping or jetting.Therefore,the effects of lateral pressure relief in thefill are expected to result in an insignificant increase in lateral pressure on the headwall. Correspondingly,no yield pressure is applied to this portion of the wall.On the other hand,cohesive soils will not ravel and displace so readily into the relief holes. To relieve lateral heave pressures in the organics and marine clay,it is necessary to induce plastic yield of the soil between the relief holes,which in turn increases lateral pressures on the headwall.Two rows of relief holes were drilled in thefinal3-m-zone for pressure relief with the following dimensions and layout.In the organics/clay:150-mm-diameter holes at460mm on center,cased to the topof the organics.In thefill:150-mm-diameter holes at460mm on center,cased throughthe top1.5m.A limit equilibrium analysis was performed to estimate the increase in lateral pressures on the headwall in the clay and organic silt.In Fig.7,d,S and P w represent the diameter of the relief hole,the hole spacing and thefluid pressure in a drilled hole, respectively.From geometry,ab¼2S2sin ¼S sin ð1Þtan ¼dð2ÞAssuming that the failure wedge is bounded by points a,b and c in Fig.7a,the free-body diagram for this soil wedge is shown in Fig.7b,where N is the normal force acting on the plane bc,and S u is the undrained shear strength.The force polygon for the free body diagram is shown in Fig.7c.Force equilibrium along two axes parallel and perpendicular to the wall yields Eqs.(3)and(4),respectively: N sin2 ¼P w S sin þS u S cosðÞcos ð3ÞP y S2¼N cos2 þP w S sin þS u S cosðÞsin ð4Þwhere P y is the lateral yield pressure acting on the bining(3)and(4)to eliminate N and simplifying results in the following expression for P y:P y¼P wþS utanð5ÞCombining(2)and(5)yields:P y¼P wþS u Sdð6ÞA number of options were investigated to facilitate yield of the soils,including drilling holes at closer spacing,enlarging holes,lowering thefluid level inside the 398P.S.K.Ooi et al./Computers and Geotechnics29(2002)387–409holes and jetting with water.Two options reflecting the as-built relief hole layoutwere considered when estimating the yield pressure.Option 1:S /d =3[0.15-m-diameter relief holes at 0.45m on center]with water inthe holes up to the ground surface.Option 2:S /d =3with the water removed in the upper half of the holes,i.e.,waterat El.31.7m or approximately 1.5m above the top oforganics.Fig.7.Yield pressure derivation (a)soil wedge failing into relief hole;(b)free body diagram of soil wedge;(c)force polygon.P.S.K.Ooi et al./Computers and Geotechnics 29(2002)387–409399More aggressive options of pressure relief will result in less conservative values of yield pressure.Options1and2are summarized in Table3and Fig.8.From Fig.8,the selected design yield pressures were550and940kPa/m in the organics and marine clay, respectively.These values represent a reasonable average traction for the two pressure relief options and are assumed to act uniformly on the headwall.A lateral traction applied to the wall represents the difference between the yield pressure and the wall pressure when the bottom of excavation is atfinal subgrade.Because the wall pressure undergoes relaxation as the wall displaces,the applied traction has to be iterated until thefinal pressure on the wall equals the yield pressure.In this stage,hyperbolic parameters for the frozen soil in the main freeze zone were used in thefill,organics and marine clay(Table2)while hyperbolic parameters for the unfrozen soil(Table1)were used for thefinal3-m freeze zone.Parameters for the fro-zen soil are based on a literature review([8]through[16]).5.2.2.Final3-m freeze(step5)Thermal expansion analysis was not performed during the main freeze stage as it was modeled by the application of a yield pressure behind the wall.However,the final3-m freeze stage is simulated using thermal expansion analysis.Thermal expansion analysis is not required in thefill.This is because volumetric expansion of Table2Hyperbolic parameters for frozen soils used during main freeze stageSoil type Shearstrength a S u(kPa)Tensilestrength a(kPa)Initial Young’smodulus a E i(kPa)Stress ratioat failure a R fPoisson’sratio aFill b530024008.0Â1060.90.49 Organics24002400 5.0Â1050.90.49 Marine clay38002400 1.0Â1060.90.49a Frozen soil parameters were determined from references[8]through[16].b For thefill,the tabulated soil parameters were also used during the third sub-step of freezingfinal3-m zone.During sub-steps1and2of thefinal3-m freeze,hyperbolic parameters of the unfrozenfill were used. Table3Yield pressure estimates for main freeze stageElevation (m)Soil type Undrained shearstrength S u(kPa)Hydrostaticpressure P w(kPa)Yield pressure aP y b(kPa mÀ1)Option1c Option2d Option1c Option2d30Organics384515520430 27Organics388151640540 27Marine clay678151920830 22Marine clay67125961070970a S/d=3(0.15-m-diameter holes at0.45m on center).b P y=P w+S u S/d.c Option1=water inside relief hole at ground surface(El.34.7m).d Option2=water inside relief hole at El.31.7m.400P.S.K.Ooi et al./Computers and Geotechnics29(2002)387–409free-draining cohesionless soils is relatively insignificant due to their high perme-ability[17].When chilled,water is forced out of the void spaces at the same rate as freezing progresses resulting in a lower frozen water content.Thermal expansion analysis was modeled in three sub-steps in the cohesive soils. During thefirst two sub-steps,which represent91%of the total volumetric strain (Fig.9),adjacent columns of the frozen soil are not in contact,and the stiffness of the partially frozen soil is dominated by the stiffness of the unfrozen soil.In fact,modulus values of the‘‘yielded’’unfrozen soil were used because the organics andmarine clay in the final 3-m freeze zone have already reached plastic yield during mainsoil freeze.Therefore,the soil stiffness for sub-steps 1and 2were set equal to the secantmodulus of the unfrozen soil at about 95and 75%stress levels,respectively.During sub-step 3(representing 9%of the total volumetric expansion),the frozensoil columns come in contact,and the stiffness of the soil was set equal to the fullyfrozen value.Thermal expansion of the clay and organic silt was simulated by applying nodalloads,which are proportional to the product of the thermal expansion coefficient ( )and the temperature change (ÁT ).Appropriate coefficients of thermal expansionwere derived by setting the volumetric expansion of the pore water equal to 8.5%.Hence,the volume change,d V ,is:d V ¼0:085nV ð7Þwhere V is the total soil volume and n is the porosity.The volumetric strain,"v is:"v ¼d V =V ¼0:085n ð8ÞFig.9.Frozen soil volume when ice columns are in contact.402P.S.K.Ooi et al./Computers and Geotechnics 29(2002)387–409For a saturated soil,the porosity is related to the specific gravity,G s,and water content,w,as:n¼e1þe¼G s w1þG s wð9Þwhere e is the void bining(8)and(9),the volumetric strain becomes:"v¼0:085G s w1þG sð10ÞAfter freezing a cube of soil of unit volume,the volume of the expanded soil is as follows:1þ"v¼1þd xðÞ1þd yðÞ1þd zðÞð11Þwhere d x,d y and d z are the increase in length of the soil cube in the x,y and z directions,respectively.If the soil freezes uniformly,the change in length can be expressed as follows:d x¼d y¼d z¼1þ"vðÞ1=3À1ð12ÞThe coefficient of thermal expansion, ,is the change in length per unit temperature change.Therefore,for a unit temperature change, =d x=d y=d z.To account for expansion along the plane of the wall in a plane strain analysis, is reduced as follows:¼1þ"vðÞ1=3À11þð13Þwhere is Poisson’s ratio of the frozen soil and"v is calculated using Eq.(10). Values of are proportioned at each sub-step so that9%of the total volumetric expansion occurs in sub-step3with the remaining91%divided into two equal increments for sub-steps1and2.A unit temperature change was specified for each sub-step.The coefficients of thermal expansion for the organics and marine clay are summarized in Table4.Thermal expansion analysis can only be performed using linear elastic properties of the soil also summarized in Table4.For thefill,unfrozen drained hyperbolic parameters(Table1)were used for thefirst two freeze sub-steps and fully frozen hyperbolic parameters(Table2)were used for the third freeze sub-step.parison of predicted and measured behaviorThree inclinometers that extend below the bottom of the headwall were installed to monitor lateral displacements.Wall movements for a centrally located inclin-ometer are compared to the predicted movements in Fig.10at the end of excavation and after soil freezing.P.S.K.Ooi et al./Computers and Geotechnics29(2002)387–409403Table4Linear elastic properties of cohesive soils duringfinal3-m freeze stageSoil type Average watercontent w(%)Specificgravity,G sVolumetricstrain,"v(%)Coef.of linear thermalexpansion, aYoung’s modulus,E(MPa)Poisson’sratio, Sub-step1Sub-step2Sub-step3bTotal c Sub-step1(Â10À3)Sub-step2(Â10À3)Sub-step3(Â10À3)Sub-step1Sub-step2Sub-step3Sub-steps1and2Sub-step3Organics80 2.55 2.6 2.60.5 5.7 5.77 5.77 1.116144800.49940.49 Marine clay35 2.70 1.9 1.90.4 4.2 4.22 4.220.8912299600.49940.49 a is calculated using Eq.(13).b9%of the total volumetric expansion was applied in sub-step3when the frozen soil columns are in contact.The remaining91%volumetric expansion was divided into two equal increments in sub-steps1and2.c The total volumetric strain is calculated using Eq.(10).404 P.S.K.Ooietal. / Computers and Geotechnics 29 (2002) 387–409406P.S.K.Ooi et al./Computers and Geotechnics29(2002)387–409At the end of excavation,the predicted wall movements are in excellent agreement with the measured values as shown in Fig.10a.In Fig.10b,the predicted move-ments after main soil freeze and afterfinal3-m freeze are plotted with the measured movements prior to wall demolition.The measured wall movements fall close to the predicted values after main soil freeze but are significantly less than those predicted afterfinal3-m freeze.This can be explained with the aid of the following list of key construction milestones and dates.Construction milestone DateStart of main soil freeze August1999 Start offinal3-m freeze October1999 Start of wall demolition December1999 The movements shown in Fig.10b were measured in November1999,one month after the start offinal3-m freeze.The measured movements agree more with the predicted values after main soil freeze rather than afterfinal3-m freeze due to one or a combination of the following:(1)the rate of frost expansion is very slow in the marine clay and organics,due to the low permeability[17].The maximum movement was recorded just one month after the start offinal3-m freeze.Such a short period may not be sufficient for full frost expansion to occur;(2)the coefficient of thermal expansion in thefinal3-m freeze zone may be overestimated because of compression of the soil fabric during the two-stage freezing process.During main soil freeze,ice buds form in the free water within the clay macro pores.Due to differences in local temperature and due to matric potential,both adsorbed water and free water from adjacent macro pores in thefinal3-m freeze zone migrate towards the ice buds in the main soil freeze zone.Subsequent ice growth during thefinal3-m-freeze stage then causes compression against the water-depleted soil fabric,bond breakage,and a breakdown of the soil structure.As a result,the soil particles are brought closer together,thereby reducing the effective thermal expansion coefficient in thefinal3-m freeze zone;and(3)the plane strain analysis ignores relief holes that are also provided between the main freeze zone and the south wall of the adjacent jacking pit.This line of relief holes orthogonal to the headwall‘‘attract’’ice growth,resulting in an overestimation of lateral heave pressures on the headwall.The criterion for success was for the wall movements to not exceed the150-mm-travel of the series of jacks located at the brace level and at the base slab.The maximum measured wall movements at the end of excavation and end of freezing were7and31 mm,respectively,both of which were well below the limit of the jacktravel.Wall bending moments are related to the wall curvature as follows: M¼EIð14Þwhere M=bending moment in the wall,=wall curvature,E=modulus of elasticity of the wall and I=moment of inertia of the wall.The wall curvature was obtained by numerical differentiation of the slope measured by the inclinometer.Prior to cracking,I is taken to be the gross moment of inertia of the concrete neglecting the。

相关文档
最新文档