重力坝埋石混凝土施工工法(参考模板)

合集下载

埋石混凝土重力坝施工流程

埋石混凝土重力坝施工流程

埋石混凝土重力坝施工流程英文回答:Embankment Concrete Gravity Dam Construction Process.Embankment concrete gravity dams are a type of concrete dam that is constructed by placing concrete in layers on an embankment of compacted earth or rockfill. The embankment provides stability and support for the dam, while the concrete provides strength and impermeability.The construction process of an embankment concrete gravity dam typically involves the following steps:1. Site preparation.The first step is to prepare the site for construction. This includes clearing the area of vegetation and debris, and excavating the foundation to the required depth.2. Embankment construction.The embankment is then constructed by placing layers of compacted earth or rockfill on the prepared foundation. The embankment is typically built up in lifts of 6 to 12 inches, and each lift is compacted to achieve the desired density.3. Concrete placement.Once the embankment has been constructed to the desired height, the concrete is placed in layers on the embankment. The concrete is typically placed in lifts of 6 to 12 inches, and each lift is allowed to cure before the next lift is placed.4. Curing.The concrete is cured by keeping it moist for a periodof time. This allows the concrete to gain strength and achieve its full potential. The curing period typicallylasts for 28 days.5. Grouting.Once the concrete has cured, it is grouted to fill any voids or cracks in the concrete. Grouting is typically done by injecting a cement-based grout under pressure into the concrete.6. Completion.The dam is now complete and can be put into service. The dam will be monitored regularly to ensure that it is performing as expected.中文回答:碾压混凝土重力坝施工工艺流程。

混凝土重力坝工程施工方案

混凝土重力坝工程施工方案

混凝土重力坝工程施工方案一、工程概况混凝土重力坝是一种采用混凝土建造的重力式水坝。

它主要依靠自身重量和抗倾覆能力来抵抗水压力和外力作用,具有结构稳定、造价低等优点。

本工程为一座混凝土重力坝,位于XXXX大坝建设项目中,主要承担水库的蓄水和防洪功能。

本施工方案旨在对混凝土重力坝的建造过程进行全面规划和安排,确保工程质量、进度和安全。

二、工程内容本工程包括以下几个主要方面的施工内容:1. 土地平整及基础处理:根据设计要求,对坝址区域进行地面整平,清理遗留物,准备基础工作。

2. 坝基础开挖:开挖混凝土重力坝的坝基,按照设计要求进行挖掘,确保基础结构的承载能力和稳定性。

3. 地基处理:根据地质勘察报告要求进行地基处理,包括加固处理、填筑处理等。

4. 混凝土浇筑:按照设计要求,对混凝土重力坝的主体进行浇筑施工。

5. 防渗处理:对混凝土重力坝本体和坝基进行防渗处理,确保水库的密封性和防渗效果。

6. 辅助设施建设:包括护坡、排水系统、坝顶护栏等辅助设施的建设。

7. 安全设施建设:包括监测设备、报警设备等安全设施的建设。

三、施工组织1. 组织结构:本工程将设立项目经理部、施工部、质量部、安全部、技术部等部门,负责分工协作、监督管理和技术保障。

2. 人员配置:将安排项目经理、总工程师、施工员、监理工程师、施工队长等人员参与本工程的施工和管理。

3. 设备配置:将配置混凝土搅拌站、起重机、挖掘机、压路机、打桩机等设备,在保障施工质量和进度的同时,最大程度保障工人安全。

四、施工工艺1. 土地平整及基础处理:进行坝址区域的场地清理和地面整平工作,清除障碍物,确保施工场地清洁整齐。

2. 坝基础开挖:按设计要求进行开挖工作,确保坝基础的稳定和承载能力。

3. 地基处理:根据地质勘察报告,进行地基处理工作,包括地基加固、填筑等,确保地基的承载能力和稳定性。

4. 混凝土浇筑:依据设计要求进行混凝土浇筑,确保混凝土重力坝的主体结构质量和稳定性。

混凝土坝(埋石)施工方案

混凝土坝(埋石)施工方案
1.
1
在2018年10月初,底孔部位坝基开挖完成后,利用预留土坎挡水,进行底孔坝段的混凝土浇筑,浇筑到814.00m度汛高程。
截流并完成导流底孔浇筑后,进行左岸剩余坝基及基坑的二期开挖,完成后开始进行坝体混凝土的浇筑;2019年3月底,完成814.00m度汛高程以下坝体混凝土的浇筑。
2019年3月底,完成814.00m度汛高程以下溢流坝段面板及消力池抗冲耐磨混凝土的浇筑。
1.5.2.7
混凝土在右岸拌合站集中拌制,塌落度及温度等测试合格后,根据浇筑部位不同分别采用自卸汽车或搅拌罐车运至运送至浇筑现场,控制混凝土的运输时间在25min内;根据现场实际条件及工程进度考虑,采用挖掘机、吊罐等方式入仓浇筑。
用于埋石混凝土中的块石,必须为湿饱状态,抗压强度大于300kg/㎝2。选择新鲜、完整的岩块,无风化剥落层或裂纹,石材表面应冲洗干净,不能留有树根、杂草等污物,所有进仓块石表面应处于湿润状态。
(4)块石经过电子秤称重,采用自卸汽车或吊罐运至仓面,采用挖掘机铺设,辅以人工码放。
1.6.2
(1)混凝土在拌合站集中拌制,所用各种粗细骨料及外加剂必须经检测合格后使用,按规定的时间进行拌制。
(2)拌制过程中严格控制配合比,出、入仓温度,添加必要的外加剂减少水化热,提高混凝土质量。
混凝土浇筑后,严格控制拆模时间,以不造成混凝土表面和棱角受损为准。
1.6
1.6.1
(1)用于埋石混凝土中的块石,必须为湿饱状态,抗压强度大于300kg/2。
(2)选择新鲜、完整的岩块,无风化剥落层或裂纹,石材表面应冲洗干净、无杂物。
(3)所选取的块石按不同粒径适时埋入混凝土中,在满足设计要求和实际情况的前提下,尽可能提高埋石率。
坝体上、下游面板混凝土随坝体埋石混凝土同步浇筑,取水口、交通桥等混凝土施工与坝体混凝土同步进行,2019年10月底,完成坝体全部混凝土的施工;2019年11月底完成导同时大坝下部坝体混凝土量较大,月高峰浇筑强度较高。采用塔机吊运的方式进行混凝土施工,浇筑强度较低,很难满足度汛安排和工期计划要求;采用有轨运输的方式进行混凝土施工,不能将混凝土和块石运输至各个坝段,而同一个仓内的混凝土和块石都要经多次转运,生产效率过低且存在很大安全隐患,无法满足生产要求。

混凝土重力坝工程施工方案

混凝土重力坝工程施工方案

混凝土重力坝工程施工方案1.1 项目概况本工程是一座混凝土重力坝工程,位于某省某市,项目总投资约为XX亿元,计划施工周期为XX个月。

工程包括坝基基础、防渗体系、坝体及坝顶设施等,设计坝高为XX米,坝长为XX米,坝顶宽为XX米,坝底宽为XX米。

1.2 施工任务本工程的施工任务包括:确定施工方案和计划、准备施工现场及设备、实施主体工程施工、进行监理和质量检验、完成工程验收等内容。

1.3 施工条件本工程地处山区,交通条件较差,气候多变,地质条件复杂,施工难度较大。

需采取科学合理的施工措施,确保工程质量和进度。

1.4 施工组织为保证施工进度和质量,经评审确定了施工组织机构,包括总包单位、监理单位、设计单位等,各单位各司其职,密切配合,共同推进工程进度。

二、施工方案2.1 主体工程施工(1)坝基基础工程坝基采用开挖法施工,先进行坝基开挖,然后进行坝基灌浆处理,最后进行坝基回填和压实。

开挖时应根据具体地质情况采取合适的措施,确保开挖稳定。

(2)防渗体系施工防渗体系主要包括混凝土心墙、防渗帷幕等。

先进行混凝土心墙的浇筑,确保质量和密实度。

然后进行防渗帷幕的施工,采用封闭式作业,确保施工质量。

(3)坝体及坝顶设施施工坝体采用混凝土重力坝结构,先进行模板的布置和支撑,然后进行混凝土的浇筑,最后进行坝顶设施的施工。

每一道工序都需严格按照标准施工,确保质量。

2.2 安全措施施工过程中,要加强安全管理,确保施工人员和设备安全。

要建立健全的安全管理机制,定期进行安全检查和培训,加强现场监督,及时处理安全事故。

2.3 质量控制施工过程中,要加强质量管理,确保工程质量。

要建立健全的质量管理体系,严格遵守规范和标准,确保施工质量符合设计要求。

2.4 环境保护施工过程中,要加强环境保护,避免对周边环境造成污染。

要建立健全的环保措施,减少施工对环境的影响,确保环境质量达标。

2.5 施工总结本工程是一座重要的水利工程,采用了科学合理的施工方案和措施,确保了工程的质量和进度。

(整理)s重力坝埋石混凝土施工工法

(整理)s重力坝埋石混凝土施工工法

重力坝埋石混凝土施工工法1.前言根据水电站重力坝具有坝身较宽、较高、较长,混凝土体积大,水泥水化热大,结构内不易散失,易产生温度裂缝、施工难度高等特点,如何在满足设计要求的前提下,尽可能的节约资源,控制质量、保护环境,是水电站建设人员重点研究的问题之一。

湖南省建筑工程集团总公司承建的云南xx水电站大坝等工程,采用了新型的埋石混凝土施工技术,此技术主要针对坝体埋石混凝土,如何调整混凝土埋石率,来控制水泥用量,降低温升,减少干缩,减少施工难度及温控等措施。

此关键技术于2010年通过湖南省住房和城乡建设厅组织的鉴定,并形成重力坝埋石混凝土施工工法。

在节约材料,减少混凝土裂缝,提高工程质量方面有明显效果,技术先进,故有明显的社会效益和经济效益。

2.工法特点2.1在浇筑混凝土的同时埋入大量块石,减少水泥用量,有效节约资源,降低工程造价。

2.2在混凝土中埋石,并调整混凝土配合比,能有效降低温升,减少温度裂缝,提高工程质量。

3.适用范围水电站重力坝大体积混凝土施工。

4.工艺原理在满足设计要求的前提下,水电站重力坝大体积混凝土中最大可埋入30%~40%块石,块石间用混凝土填充,并振捣密实,形成耐压,承载力强的整体构件。

通过埋石减少了水泥用量,节约资源,降低造价。

同时,由于水泥用量减少,降低了混凝土施工过程中的温升,通过砼分仓分层施工,减少一次性混凝土浇筑量,有效减少因混凝土水化热引起的温度裂缝,提高混凝土施工质量。

4、提高埋石经济效益如下表所示埋石率埋石量(m3)C15砼与埋石价差(元)降低成本(元)提高1% 1291.11 122.97 158768提高5% 6455.55 122.97 793839提高10% 12911.1 122.97 15876785.施工工艺流程及操作要点5.1施工工艺流程1.基面验收、仓面准备2.测量放样、立模3.混凝土、块石入仓5.2操作要点5.2.1基面验收、仓面准备在施工区周围设置挡水围堰和开挖周边排水沟以及采取集水坑抽水等措施,阻止场外水流入场内,并有效排除积水。

混凝土重力坝工程施工方案

混凝土重力坝工程施工方案

混凝土重力坝工程施工方案1. 引言混凝土重力坝是一种常见的水利工程结构,用于阻挡水流并提供稳定的水能储存和控制。

本文档将讨论混凝土重力坝工程施工方案,包括施工前准备、施工工艺和施工管理等方面内容。

2. 施工前准备施工前的准备工作对于保证施工进度和质量至关重要。

以下是施工前准备的一些建议和步骤:2.1 项目管理计划在施工前,应制定项目管理计划。

该计划应包括施工目标、施工计划、资源分配、风险评估以及质量控制等内容。

2.2 地质勘测进行详细的地质勘测是施工前必不可少的步骤,以确定地质条件和地质风险。

地质勘测结果将指导后续的施工工艺和措施。

2.3 材料准备准备施工所需的材料,包括混凝土、钢筋和其他辅助材料。

确保材料的品质符合相关规范和标准。

2.4 设备准备准备必要的施工设备和机械,例如混凝土搅拌机、起重机和泵车等。

确保设备的运行状况良好,并定期进行维护和检修。

3. 施工工艺混凝土重力坝的施工工艺需要经过详细的规划和执行。

本节将介绍施工过程的关键步骤和技术要点。

3.1 坝基处理在施工前,应对坝基进行处理以确保其稳定性和密实性。

常用的坝基处理方法包括坝基开挖、填筑和压实等。

3.2 坝体浇筑混凝土重力坝的坝体是由多层混凝土浇筑而成。

在浇筑前,需要进行模板安装和钢筋绑扎等工作。

浇筑时,应采用适当的浇筑方法和技术,确保混凝土的均匀性和强度。

3.3 渗漏控制混凝土重力坝的渗漏控制是一个重要的施工技术问题。

可以采用渗漏控制帷幕、防渗板和温度缝等措施来处理渗漏问题。

3.4 坝体养护混凝土坝体在浇筑后需要进行养护,以确保混凝土的强度和稳定性。

养护期间应控制温度、湿度和水分等因素,避免混凝土的开裂和变形。

4. 施工管理施工管理是保证施工质量和进度的关键环节。

本节将介绍一些常用的施工管理措施和方法。

4.1 施工进度管理制定详细的施工进度,并与施工团队进行有效的沟通和协调。

及时调整施工计划以应对可能出现的风险和问题。

4.2 质量控制建立质量控制制度和流程,并进行质量检查和测试。

自密实堆石混凝土重力坝快速施工工法(2)

自密实堆石混凝土重力坝快速施工工法(2)

自密实堆石混凝土重力坝快速施工工法自密实堆石混凝土重力坝快速施工工法一、前言自密实堆石混凝土重力坝(又称“自密实堆石坝”)是一种在建筑水利工程中广泛应用的重力坝类型。

为了提高施工效率和施工质量,针对传统施工方法中存在的缺点,发展出了自密实堆石混凝土重力坝快速施工工法。

该工法以其高效、安全、经济的特点受到了广泛关注和推崇。

二、工法特点1. 高效快速:自密实堆石混凝土重力坝快速施工工法采用先进的施工技术和装备,施工效率显著提高,施工周期大大减少。

2. 施工质量高:通过预先制定严格的施工工艺和质量控制措施,确保施工过程中的质量达到设计要求。

3. 环保节能:采用的石料和混凝土材料可充分利用局部资源,减少了运输和消耗,对环境影响小。

4. 示范作用:自密实堆石混凝土重力坝快速施工工法的成功应用,为其他类似工程提供了可行性和指导意义。

三、适应范围自密实堆石混凝土重力坝快速施工工法适用于各种大小的水利工程,包括水库、水电站、引水渠等,在各种地质条件下都能顺利实施。

四、工艺原理自密实堆石混凝土重力坝快速施工工法通过合理的施工工艺和技术措施实现高效施工和优质工程。

具体包括以下几个方面:1. 石料选择与处理:根据工程需要选择合适的石料,并进行清洗、分类和筛选,确保石料质量和均匀性。

2. 自密实技术:通过振动等方法,使堆石体内的颗粒紧密结合,形成自密实的堆石体。

3. 混凝土浇筑:在堆石体内预埋钢筋,施工时采用层块浇筑的方法,确保混凝土与石块紧密结合。

4. 坝体养护:在浇筑完成后进行适当的养护措施,保证混凝土的强度和稳定性。

五、施工工艺自密实堆石混凝土重力坝快速施工工法包括以下阶段:1. 地基处理:对坝基进行清理和加固处理,确保坝基的稳定性。

2. 堆石施工:按照设计要求,将经处理的石块堆积在坝基上,采用自密实技术使其紧密结合。

3. 钢筋预埋:在堆石体内适当位置预埋钢筋,为混凝土浇筑做好准备。

4. 混凝土浇筑:按照层块浇筑的方法,将混凝土均匀浇筑在堆石体上,并在其中预留渗漏道、弹性体和潜流带等。

自密实堆石混凝土重力坝快速施工工法

自密实堆石混凝土重力坝快速施工工法

自密实堆石混凝土重力坝快速施工工法自密实堆石混凝土重力坝快速施工工法一、前言自密实堆石混凝土重力坝快速施工工法是一种现代化、高效的坝体建设技术。

通过采用特殊的施工工艺和技术手段,可以在短时间内完成坝体的施工,提高工程进度,减少施工周期,同时确保施工质量,提高工程安全性。

二、工法特点1. 快速施工:采用堆石自密实技术,可以大幅度缩短坝体施工周期,提高施工效率。

2. 环保节能:采用堆石填筑,减少了对环境的破坏,同时节约了人力和物力资源。

3. 稳定可靠:自密实堆石具有良好的抗水侵蚀和抗渗透性能,可以保证坝体的稳定性和安全性。

4. 灵活性好:该工法适应性强,适用于各种地质条件和坝高要求。

三、适应范围该工法适用于土石坝、混凝土面板坝以及小型水利工程等各类重力坝建设。

四、工艺原理该工法采用了自密实堆石的技术。

在施工过程中,采用合理的施工工艺和技术措施,通过挖填法和振实法相结合,使得堆石填筑体具有较高的密实度和稳定性。

五、施工工艺1. 基础处理:对坝基进行处理,确保坝体的稳定性。

2. 堆石填筑:按照设计要求,采用适宜的填筑材料,采用挖填法和振实法相结合,逐层填筑,逐层振实,确保填筑体的密实度和稳定性。

3. 防渗和抗剪结构施工:根据设计要求,对堆石填筑体进行防渗和抗剪结构的施工,提高坝体的稳定性和安全性。

4. 坝面整平和防冲设施施工:对坝面进行整平处理,同时根据需要设置防冲设施,提高坝体的抗冲刷能力。

六、劳动组织在施工过程中,需要合理组织工人和机械设备,确保施工进度和质量。

七、机具设备1. 挖掘机:用于开挖和清理施工现场。

2. 翻斗车:用于运输填筑材料。

3. 振动轮压机:用于振实填筑体,提高其密实度。

八、质量控制1. 填筑材料的选择和质量检验,确保填筑体的质量符合要求。

2. 施工工艺和技术措施的合理应用,确保填筑体的密实度和稳定性。

3. 定期的质量检查和评估,及时发现和解决存在的问题。

九、安全措施1. 提供必要的个人防护装备,确保施工人员的安全。

埋石混凝土施工方案

埋石混凝土施工方案

四川省毛滩水电站主体工程(MT-SG-2010-01)埋石混凝土施工方案中国水利水电第四工程局毛滩项目部2011年03月27日批准:审核:编制:目录一、概述 (2)1、工程概况 (2)二、施工进度计划 (3)尾水右堤(0+000.0~0+100.0),尾水右堤(0+100.0~0+150.0)施工时间为2011年4月1日至2011年11月30日; (3)三、施工布置 (3)3.1、施工交通 (3)3.2、供电系统 (3)3.3、施工供水 (3)3.4、石料来源 (3)四、施工工艺 (4)4.1、施工准备 (4)4.2、测量放样 (4)4.3、基面清理 (4)4.4、模板制安 (5)4.5、混凝土、块石入仓 (5)4.6、伸缩缝处理 (7)4.7、混凝土拆模养护 (7)五、人员、设备配置情况 (8)六、质量保证措施 (9)6.1、质量目标 (9)6.2、质量方针 (9)6.3、质量原则 (9)七、安全文明施工 (9)一、概述1、工程概况毛滩水电站工程位于夹江县顺河乡境内的青衣江干流上,是千佛岩电站至青衣江汇口河段推荐的两级规划方案中的第一级开发方案。

采用河床式长尾水渠开发方式,工程开发任务为发电,兼顾灌溉、防洪、城镇工业、生活及景观用水。

埋石混凝土主要施工部位为厂房尾水反坡段左边墙、厂房尾水反坡段右边墙、尾水渠右堤扭面段尾0+000.00-尾0+100.00、尾0+100.00-尾0+150.00 。

各部位具体埋石混凝土工程量见表1-1埋石混凝土主要工程量表1-1编制依据(1)《设计更改通知》川设毛电改(2011)011号(2)《厂房尾水反坡段左边墙结构钢筋图》毛电(施)7-8-4-20~21(3)《厂房尾水反坡段右边墙结构钢筋图》毛电(施)7-8-4-22~23(4)《尾0+000.00~尾0+300.00面板分缝及右堤横剖面图》毛电(施)7-8-7-18(5)《砌体工程施工及验收规范》GB50203-2002;(6) 《水工混凝土施工规范》DL/T 5144-2001。

混凝土坝(埋石)施工方案

混凝土坝(埋石)施工方案

混凝土坝(埋石)施工方案一、项目背景混凝土坝(埋石)是水利工程中常见的一种重要建筑结构,它具有较强的防洪、蓄水、供水等功能,是保障人们生活用水、农田灌溉等重要设施。

本文将介绍混凝土坝(埋石)的施工方案,确保工程质量、安全,保障工程顺利实施。

二、施工准备1. 项目资料准备•获取工程设计图纸和相关技术文件。

•订购混凝土、钢筋等施工材料。

•申请相关施工许可证和批文。

2. 人力资源准备•安排专业施工队伍,包括工程师、技术员、工人等。

•培训施工人员,确保他们具备相关技术和操作经验。

3. 施工机械设备准备•确保所有施工机械设备完好,满足施工需要。

•定期检查维护施工机械设备,保证施工过程顺利进行。

三、施工流程1. 土方开挖•根据设计要求对坝基进行土方开挖,清除表土和不良土。

•控制土方开挖的深度和坡度,确保基础稳固。

2. 坝基处理•对土石方进行夯实处理,确保坝基坚实。

•进行平整处理,为混凝土浇筑做准备。

3. 混凝土浇筑•根据设计要求进行混凝土配合比设计。

•采用搅拌车进行现场搅拌,确保混凝土质量。

4. 埋石处理•在混凝土未完全凝固之前,将石子按照设计要求铺设在混凝土表面。

•确保石子堆积均匀,密实,符合设计要求。

5. 坝面整形•对坝面进行整形处理,确保表面平整。

•按照设计要求进行坝面防渗处理。

四、施工质量控制1. 施工过程监测•定期检查施工质量,确保符合设计要求。

•对混凝土强度、坡度、坡面光洁度等进行监测。

2. 质量验收•完成施工后,进行质量验收。

•对混凝土坝(埋石)进行静载试验和动载试验,确保其安全可靠。

五、安全施工1. 安全措施•制定施工安全方案,明确责任人和安全措施。

•定期进行安全检查和培训,确保施工人员安全意识。

2. 应急预案•制定应急预案,应对突发事件。

•配备必要的应急救援设备,确保施工过程安全。

六、总结混凝土坝(埋石)施工是一项复杂的工程,需要充分的准备、严格执行施工方案、严密的质量监控和安全保障措施。

混凝土坝(埋石)施工方案

混凝土坝(埋石)施工方案

目录1.1坝体施工的整体安排 (2)1.2混凝土入仓方式选择 (2)1.3混凝土分层分块原则 (3)1.3.1分层、分块原则 (3)1.3.2分层、分块方法 (3)1.4运输及吊运设备选择 (3)1.4.1塔吊的选型及布置 (3)1.4.1.1塔吊的选型 (3)1.4.1.2塔吊的布置 (3)1.4.2自卸车、反铲的选型 (4)1.5工艺流程及施工方法 (6)1.5.1施工工艺流程 (6)1.5.2施工方法 (6)1.5.2.1基面验收 (6)1.5.2.2仓面准备 (7)1.5.2.3测量放样 (7)1.5.2.4支立模板 (7)1.5.2.5钢筋制安 (10)1.5.2.6止水片加工及安装 (10)1.5.2.7混凝土、块石入仓 (10)1.5.2.8混凝土铺料及平仓 (11)1.5.2.9混凝土振捣 (12)1.5.2.10混凝土施工缝处理 (12)1.5.2.11混凝土养护及保护 (13)1.6质量控制措施 (13)1.6.1块石的埋放控制 (13)1.6.2混凝土的拌制控制 (13)1.6.3混凝土铺料间隔控制 (14)1.6.4混凝土裂缝控制 (14)1.6.5混凝土温度控制 (14)1.6.6块石、混凝土入仓控制 (15)1.7坝体施工安全控制措施 (15).8主要施工机械设备配置 (15)1. 坝体混凝土浇筑1.1坝体施工的整体安排在2018年10月初,底孔部位坝基开挖完成后,利用预留土坎挡水,进行底孔坝段的混凝土浇筑,浇筑到814.00m度汛高程。

截流并完成导流底孔浇筑后,进行左岸剩余坝基及基坑的二期开挖,完成后开始进行坝体混凝土的浇筑;2019年3月底,完成814.00m度汛高程以下坝体混凝土的浇筑。

2019年3月底,完成814.00m度汛高程以下溢流坝段面板及消力池抗冲耐磨混凝土的浇筑。

坝体上、下游面板混凝土随坝体埋石混凝土同步浇筑,取水口、交通桥等混凝土施工与坝体混凝土同步进行,2019年10月底,完成坝体全部混凝土的施工;2019年11月底完成导流底孔的封堵。

水利工程中重力坝埋石混凝土施工技术

水利工程中重力坝埋石混凝土施工技术

水利工程中重力坝埋石混凝土施工技术发布时间:2022-10-24T07:55:03.150Z 来源:《中国科技信息》2022年第6月第12期作者:李天明[导读] 随着社会的发展,水利工程行业也取得了极大的发展李天明广南县水利水电勘测设计队云南文山 663300摘要:随着社会的发展,水利工程行业也取得了极大的发展,水利工程的建设规模不断扩大,建设项目越来越多。

在这种情况下,人们逐渐重视起水利工程的施工质量。

水利工程中,重力坝施工时,使用埋石混凝土浇筑技术,能够最大程度的提高埋石用量的同事,保证重力坝结构的稳定性,减少温度裂缝的出现,从而降低工程项目的施工成本。

关键词:重力坝;水利工程;施工技术;埋石混凝土引言埋石混凝土浇筑技术就是用块石对部分混凝土进行替代,将块石和混凝土同时进行浇筑的技术。

埋石混凝土是浆砌石和混凝土的中间状态,必须要合理控制埋石量。

为了减少混凝土的用量,可以提高埋石率。

但不得出现埋石率过高的情况,否则就会影响混凝土的施工质量。

1重力坝埋石混凝土施工技术1.1材料的选择与处理技术埋石混凝土施工质量直接受到块石质量的影响,在施工前,必须挑选合适的块石,尽量减少裂纹、风化块石的用量。

对块石的切割形状和规格进行合理控制,保证块石的硬度能够达到施工标准。

在清理块石时,可以使用高压水枪冲洗,也可以将快石放入清洗槽中清洗,将块石表面的泥土、油污等杂质清理干净。

同时,做好块石的储存工作,减少二次污染的出现。

重力坝的施工质量也会受到水泥质量的影响,必须要选择合适的水泥,比如矿渣硅酸盐、粉煤灰硅酸盐等水泥。

水泥进场前,需要做好质量检验工作,保证水泥的质量,合格的才能投入使用。

同时要做好水泥的仓储工作,减少水泥因为受潮变质而导致不能使用的问题的发生。

1.2 仓面施工技术分析为了保证重力坝中埋石混凝土的施工质量,需提高块石和混凝土的连接效果。

在混凝土表面均匀的铺装块石,不可以使用抛投的方式,避免出现不均匀的连接。

埋石混凝土重力坝施工流程

埋石混凝土重力坝施工流程

埋石混凝土重力坝施工流程英文回答:Roller Compacted Concrete (RCC) Gravity Dam Construction Sequence.1. Site preparation: Excavation, foundation treatment, and abutment preparation.2. Foundation grouting: Strengthening and sealing the bedrock beneath the dam.3. RCC placement: Compacting and placing RCC in layers to build the dam structure.4. Curing: Maintaining specific temperature and moisture conditions to ensure proper hydration of the RCC.5. Concrete facing: Applying a layer of conventional concrete to the face of the dam for watertightness andaesthetics.6. Reservoir filling: Gradually filling the reservoir behind the dam, allowing the structure to settle and consolidate.7. Monitoring and maintenance: Regular inspections and measurements to ensure the dam's integrity and performance.中文回答:埋石混凝土重力坝施工流程。

1. 工地准备,基坑开挖、地基处理、坝肩整理。

[重庆]小(1)型埋石砼重力坝施工方案_secret

[重庆]小(1)型埋石砼重力坝施工方案_secret

1 编制说明及引用标准1.1 编制说明1.1.1 编制依据本工程施工组织设计主要依据招标文件、招标图纸、招标文件补充通知,在充分考虑我公司现有的技术水平、施工管理水平和机械配套能力的基础上,围绕着确保安全、保证质量、保证工期、降低造价的目标来编制。

施工组织设计编制过程中,我们依据招标文件,结合工程特点和我单位的施工能力,对设计文件中涉及的各单项工程按设计、施工要求进行了细化,针对招标文件中所提出的安全、文明施工、质量和工期目标,从劳、材、机等几个方面提出了合理的组织计划和相应的保证体系。

编制上述文件的主要依据包括:(1)本工程招标文件、招标图纸及招标文件补充通知。

(2)踏勘现场调查资料。

(3)设计、施工过程中涉及的有关规范、规程。

(4)我单位现有的施工管理水平、技术水平和机械设备配套能力。

(5)我单位在类似工程的施工经验和科研成果。

1.1.2 施工组织设计编制原则在认真阅读业主招标文件和仔细研究招标设计的基础上,详细分析本工程设计施工特点及类似工程的施工经验,依据相关设计施工规范,充分发挥现有的施工管理、技术水平和机械设备配套能力,施组的编制将基于以下原则进行系统阐述:针对本工程的特点,选择稳妥可行、经济合理的施工机械和施工方法,以确保安全为前提,保证工期、保证质量、节省投资,并具有较强的可操作性。

(1)合理的原则针对工程的实际情况,本着经济、可靠、合理的原则比选施工方案,并配备足够数量的适合本工程施工的机械设备和其他资源以满足施工要求;对整个施工过程实施信息化动态管理,从而达到合理组织和不断优化施工方案,确保按期按质完成施工任务的目标。

(2)技术先进和可靠性原则根据本工程特点,结合以往施工经验,选用先进的具有优异性能的施工机械,采取可靠性高、可操作性强的施工技术方案进行施工,确保工程质量、安全、工期、文明施工满足招标文件要求。

(3)质量保证原则建立完整的质量管理体系和控制程序,严格进行质量管理与控制,明确工程质量方针和质量目标,结合本工程特点与实际情况制定切实可行、有效的工程质量保证措施,确保工程质量在国内同类工程达到领先水平。

混凝土坝(埋石)施工方案

混凝土坝(埋石)施工方案

目录1。

1坝体施工的整体安排 (2)1.2混凝土入仓方式选择 (2)1.3混凝土分层分块原则 (2)1。

3.1分层、分块原则 (2)1.3。

2分层、分块方法 (3)1.4运输及吊运设备选择 (3)1.4。

1塔吊的选型及布置 (3)1。

4。

1.1塔吊的选型 (3)1。

4.1.2塔吊的布置 (3)1.4.2自卸车、反铲的选型 (3)1。

5工艺流程及施工方法 (4)1。

5.1施工工艺流程 (4)1。

5。

2施工方法 (4)1.5.2。

1基面验收 (4)1.5.2.2仓面准备 (5)1。

5。

2.3测量放样 (5)1。

5。

2.4支立模板 (5)1.5。

2.5钢筋制安 (6)1。

5。

2。

6止水片加工及安装 (6)1。

5。

2.7混凝土、块石入仓 (7)1.5。

2。

8混凝土铺料及平仓 (7)1。

5.2.9混凝土振捣 (8)1。

5。

2.10混凝土施工缝处理 (9)1。

5。

2。

11混凝土养护及保护 (9)1。

6质量控制措施 (10)1。

6。

1块石的埋放控制 (10)1.6.2混凝土的拌制控制 (10)1。

6。

3混凝土铺料间隔控制 (10)1.6。

4混凝土裂缝控制 (10)1.6。

5混凝土温度控制 (11)1。

6.6块石、混凝土入仓控制 (11)1。

7坝体施工安全控制措施 (11)。

8主要施工机械设备配置 (12)1。

坝体混凝土浇筑1。

1坝体施工的整体安排在2018年10月初,底孔部位坝基开挖完成后,利用预留土坎挡水,进行底孔坝段的混凝土浇筑,浇筑到814。

00m度汛高程.截流并完成导流底孔浇筑后,进行左岸剩余坝基及基坑的二期开挖,完成后开始进行坝体混凝土的浇筑;2019年3月底,完成814。

00m度汛高程以下坝体混凝土的浇筑。

2019年3月底,完成814.00m度汛高程以下溢流坝段面板及消力池抗冲耐磨混凝土的浇筑。

坝体上、下游面板混凝土随坝体埋石混凝土同步浇筑,取水口、交通桥等混凝土施工与坝体混凝土同步进行,2019年10月底,完成坝体全部混凝土的施工;2019年11月底完成导流底孔的封堵。

重力坝埋石混凝土施工工法

重力坝埋石混凝土施工工法

重力坝埋石混凝土施工工法1>前言根据水电站重力坝具有坝身较宽、较高、较长,混簽土体积大,水泥水化热大,结构内不易散失,易产生温度裂缝、施工难度高等特点,如何在满足设计要求得前提下,尽可能得节约资源,控制质量、保护环境,就是水电站建设人员重点研究得问题之一。

此关縫技术于2010年通过湖南省住房与城乡建设厅组织得鉴定,并形成重力坝埋石混凝土施工工法。

在节约材料,减少混凝土裂缝,提高工程质量方面有明显效果,技术先进, 故有明显得社会效益与经济效益。

2、工法特点2、1在浇筑混凝土得同叶埋入大量块石,减少水泥用量,有效节约査源,降低工程造价。

2、2在混凝土中埋石,并调整混凝土配合比,能有效降低温升,减少温度裂缝,提高工程质量。

3、适用范围水电站重力坝大体积混凝土施工。

4、工艺原理在满足设计要求得前提下,水电站重力坝大体积混凝土中最大可埋入30%"40%块石,块石间用混凝土填充,并振捣密实,形成耐压,承载力强得整体构件。

通过埋石减少了水泥用量,节约资源,降低造价。

同时,由于水泥用量减少,降低了混凝土施工过程中得温升,通过於分仓分层施工,减少一次性混凝土浇筑量,有效减少因混凝土水化热引超得温度裂缝, 提高混凝土施工质量。

4、提高埋石经济效益如下表所示5、施工工艺流程及操作要点5、1施工工艺流程栓;10-工作平台;11-支垫座;12-设计钢筋(3)半悬臂模板半悬臂模板用于柱子、闸门槽等大模板不便安装部位。

其纵横向围楞均用(J)50mm 双 钢管焊接而成,两钢管间净距为16mm,采用(M4圆钢作拉条加固,参见下图。

浇筑方式为使用泵送车罐等方式入仓浇筑。

用1里te 於中:得派石,/須为湿饱:血企度大于300kg/鲜、完整得岩块,无风化,落层或裂纹,石材表而应冲洗干净,不能®有树根、杂草等污物, -4 T 牆润状态。

所选取得块石粒径在20cm-120 cm 之间,且20 cm-50cni 得块石与50-120顷得块石分开堆放或者分开适时埋入血中,在满足实际得前提下,尽 可能提高埋石率;块石经过电子秤称重,使用塔吊调运入仓,辅以人工放码。

砼砌石重力坝施工技术

砼砌石重力坝施工技术

砼砌石重力坝施工技术‘i:I国j鬈蠢§《蘑簿-§《砼砌石重力坝施工技术口佛山市南海区水利局九江利管理所胡肖姬鞠酝=l=】■细石砼砌石坝是把浆砌石坝的胶结材料由砂浆改为砼,有效保证工程施工质量,本文主要讨论砌石坝体的施工程序,质量控制及检测,探讨如何合理安排材料的上坝,进仓以加快施工速度.蘸潮砼砌石坝施工速度施工质量上坝与进仓水工挡水建筑物中浆砌石坝在我国具有悠久的历史.并且有一套成熟的施工工艺,主要施工内容有坝体砌石,防渗面板砼,坝体分缝,分缝止水坝体排水,坝基排水,固结灌浆及帷幕灌浆等.浆砌石坝的优点是就地取材,节约钢材,木材,水泥.水化热低,温控措施简单.坝顶可以泄流.施工期允许坝体过水,施工技术易于掌握.工期安排灵活.缺点是施工机械化较困难.施工速度较慢.使用劳力较多.施工质量容易波动.近年来随着新型筑坝材料及筑坝工艺的发展.由于浆砌石坝在施工质量和速度上的不足,在大型水库使用甚少但是在中小工程中仍具有广泛的应用前景.细石砼砌石坝与浆砌石坝的不同之处是把胶结材料由砂浆改为细石砼,采用振捣器进行振捣.坝体的密实度,容重容易控制从而保证施工质量.同时.由于施工作业面相对平整.可适当增加机械化作业.提高施工速度.施工过程中,筑坝石料,胶结材料,砌筑工艺,施工机械,材料运输,质量控制等方面均有特殊的技术要点筑坝材料要求2.1筑坝石料砌体材料为块石,石料必须质地坚硬.尽量使用新鲜岩石.最低必须保证每块石料有两个新鲜面,石料标号不低于300号,石块尺寸原理上越大越好.可以节省胶结材料,提高砌体强度,但石料太大.人工搬运砌筑困难.因此要求石块重量以2~4人能够抬运为宜,采用5O一200Kg.砌筑时,为了各种尺寸的石料都能得到充分利用,通常大,中,小块石搭配使用有利于减少砌体的空隙,节省胶结材料用量,提高砌体密实度.块石使用搭配方法是:大块石(50~200Kg)占70%:中块石(20~50Kg)占20%:小块石(2.5~20Kg)占1O%.石方开采总量计算:V=Vn(1一e)P/v式中:V一石方需要开采总量,m3:Vn一砌石坝体的几何体积,m3e一块石空隙率,按12%P一石料施工损失系数,取1.05~1.1.Y一石料开采成品率,%;(由爆破试验确定,无试验条件时,块石按6O一8O%):规划阶段选择石料料场时.科场石料的储藏量应大于需要开采量的2—3倍.施工阶段应大于开采量的1.5倍.2.2胶结材料细石砼砌块石胶结材料为C1O细石砼.材料组成:水泥,砂,水,一级细石.细石粒径:一级细石5—20mm.材料配比:通过实验确定,塌落度为5—8cm为宜.使用特点:受力好节省水泥.但和易性较差,不容易捣实.改善方法:配制时,掺入适量的塑化剂或者其他掺和料用以改善和易性.并用小型振捣器捣实.砌筑工艺浆砌石坝施工最大的难题是施工质量和施工速度.浆砌石坝的质量要求主要控制指标是砌体容重和石料问粘结力.重力坝的抗滑稳定与砌体容重,接触面的摩擦系数密切相关,细石砼砌石坝采用分层砌筑,对同一砌筑层之间的石料粘结力容易达到结构标准,重点要控制层间的粘结力应注意层面的清理.保证层面干净,确保新老层间能很好地粘结,保证砌体完整性.要保证砌体的容重能达到设计指标, 一是应选用密度大的石块.二是砌体要尽量密实,不能出现架空.砌石工程施工的工序流程是:砌筑工作面清理一材料选择一铺垫砂浆一石料安放一竖缝灌浆一表面勾缝一质量检查一成品养护.采用分层砌筑,均衡上升的施工顺序.砌筑工作面清理是一道关键工作,因为砌石坝施工以手工为主,工作面上活动的人员较多,而且材料运输主要是从工作面上经过.施工中很难保证层面的新鲜.因此在砌筑下一层之前一定要认真清理, 验收合格后才能进行砌筑施工,否则层间结合不好摩擦系数达不到设计指标会造成安全隐患.铺垫砂浆:铺浆主要是控制铺浆的厚度.以确保砂浆饱满,安石稳固.座浆厚度应比设计砌缝宽度厚1/3为宜.对于毛石砌体.座浆厚度约8cm左右.以盖住凹凸不平的层面为度.铺浆后经人工稍加平整.并剔除超径突出的骨料.然后摆放石DP|atfom~i料.胶结材料铺设后.石料的安砌应在座浆初凝时间以内完成.砂浆超前铺垫宽度一般不超过1.5m.以免石料安砌完成前砂浆发生凝固.石料安放:在已座浆的砌筑面上,摆放洗净湿润的石料摆正后用铁锤敲击石面.使座浆开始溢出为度.石料安放主要是控制块石之间灰缝的宽度.要求石料之间的竖缝宽度为细石砼骨料最大粒径的2 —2_5倍.约4~5cm.石料必须在砂浆初凝前完成安放.竖缝灌浆与捣实:竖缝灌浆与捣实,是保证砌体质量的重要措施.石料安放好,应立即进行灌捣工作.砌层高度在50cm以下的,可以一次性灌平后.用小型插入式振捣器进行振捣,超过50cm时应分层贯注,振捣.由于块石的不规则性. 为了节省细石砼用量,同时有利于增加砌体容重.在灌上砼的竖缝上嵌入小块石,边振捣边用脚踩小块石,使小块石挤进竖缝中.表面应尽量砌平整.可用砼砂浆和小石块把大石块间的凹陷部位填平.以利于下一层施工时材料的运输.石料砌筑要求可归纳为”平,稳,满,错”:平”:同一层石块应大致砌平相邻石块高差不宜过大,以便上下层水平缝座浆结合密实.并有利于丁,顺石的交错安砌.稳:单块石料的安砌务求自身稳定.要求大面向下放置,切勿轻重倒置或依赖小块石或片石支撑维持稳定,上下两面应稍加平整.四角应无尖角突出.任何石料均不得属于有扭曲,楔形等异形石,以免形成架空.“满:砌体上下左右砌缝中的胶结材料必须饱满密实,使各单块石料能互相胶结紧密.水平砌缝应防止被石瘤或小石架空. 锚”:同一砌筑层内,石块应互相错缝砌筑不允许存在顺流向的通缝上下相邻砌筑层的石块应错缝搭接避免形成竖向通缝.做到同一层径向错缝.上下层竖向错缝.浆砌石体砌筑时还应注意:应先从外围的边行开始砌筑.行列定位的镶面石应选用坚硬,平整的石料.石料需事先试放.不合适的地方用小锤修凿,保证石块放平座稳.砌体每层厚度视石块尺寸而定,约为50cm.但由于石块大小不一.故应每砌三层找平一次.为了保证砌体的整体性.当砌筑工作需要中断时,在间断处宜留平缓的台阶.禁止在已砌成但砂浆未达足够强度的砌体上敲击,滚动石块,拖拉重物以防震动脱缝.浆砌石体结构尺寸和位置的砌筑允许偏差,应符合规范规定.砌体经砌筑完成或在间歇时间内应及时进行养护,砼砌体养护时间为21天.施工机械与材料上坝及进仓浆砌石工程是一种以手工施工为主的工程.所需施工机械主要有:塔吊或门机~用于提升石料及砼进仓自卸汽车一运输块石及砼进仓,砼搅拌机一拌制细石砼,小型插入式振捣器一石缝砼振捣,保证砌石密实度.浆砌石坝施工速度慢的主要原因就是上坝及进仓方法落后.传统的进仓方法是靠人工抬.架子车运输.或采用简易提升设备运输上坝.因而难于提高施工速度.利用坝肩修筑上坝公路,合理利用坝体断面宽度,采用自卸汽车通过坝面运输可大大提高施工速度.抗压强度验算:以汽一10为例,前轴重力为30KN.后轴重力为70KN前轮着地宽度及长度为0.25×0.2×2后轮为O.5×0.2×2,汽车对地面地压强为:前轮为0.3Mpa.后轮为0,35Mpa.冲击系数取2,则汽车对地面地最大压强为0.7Mpa.坝体胶结材料为C10砼,气温为25.C时,3天砼强度可达到设计强度的43 %.5℃时,可达到设计强度的2O%.则C10砼3天的胶结强度为2-4.3Mpa.远大于0.7Mpa.砌石体完成3天后,汽车口可在上面运输行走.塔吊输送进仓是汽车运输进仓的有效补充途径.采用钢丝绳自制的绳网作为吊篮,人工把块石搬入钢丝网内,冲洗干净后直接进仓砌筑.石料储存是影响施工速度的不可忽视的因素,必须合理规划,统筹安排.料场较远或者有夜间施工要求的应在坝址附近设立储料场,设立在坝址上游还是下游应根据水库蓄水计划及施工期洪水进行合理布置.雨季前应储备一定的石料.避免洪水毁坏运输道路导致材料供应中断影响施工.质量控制及检测砼砌石坝的主要质量控制项目有仓面清理,砌筑厚度,坝体排水孔保护,坝体分缝.每砌一层砌体时,前一层砌体表面的浮碴必须清除,砂浆或砼表面必须凿毛,并将仓面冲洗干净.排干积水.控制砌体每层的砌筑厚度.防止厚度过大造成漏振和架空,每层砌筑厚度为50cm左右.因为仓面上作业人员较多,相互干扰大应避免小块石,砼掉入排水孔内造成堵塞.坝体分缝应挂线砌筑.做到上下垂直,前后平顺,分缝面用M7.5砂浆摸平.砌体质量的检查内容主要包括砌体的容重,灰浆是否饱满,砌筑的坝体是否存在漏水通道等.通常采用挖试坑的办法进行检测.计算砌体干容重,干容重必须大于或等于设计容重.对开挖试坑还应进行表面观测.观察试坑表面胶结材料的密实情况.同时直接对试坑进行充水.观测砌体漏水情况.试坑要求每砌5-1Om挖一组,每组3个试坑.结论砼砌石坝是浆砌石坝改进的坝型施工技术简单施工设备投入小.工程造价相对较低.建筑材料丰富,在中小型工程中仍有较强的生命力,关键是规范施工工艺确保工程质量,解决材料的上坝及进仓以提高施工速度.从施工实践总结来看砼砌石干容重达到了2.35t/m3以上.完全满足设计2.2t/m3的要求.而且缩短了工期.。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

重力坝埋石混凝土施工工法1.前言根据水电站重力坝具有坝身较宽、较高、较长,混凝土体积大,水泥水化热大,结构内不易散失,易产生温度裂缝、施工难度高等特点,如何在满足设计要求的前提下,尽可能的节约资源,控制质量、保护环境,是水电站建设人员重点研究的问题之一。

湖南省建筑工程集团总公司承建的云南老石寨水电站大坝等工程,采用了新型的埋石混凝土施工技术,此技术主要针对坝体埋石混凝土,如何调整混凝土埋石率,来控制水泥用量,降低温升,减少干缩,减少施工难度及温控等措施。

此关键技术于2010年通过湖南省住房和城乡建设厅组织的鉴定,并形成重力坝埋石混凝土施工工法。

在节约材料,减少混凝土裂缝,提高工程质量方面有明显效果,技术先进,故有明显的社会效益和经济效益。

2.工法特点2.1在浇筑混凝土的同时埋入大量块石,减少水泥用量,有效节约资源,降低工程造价。

2.2在混凝土中埋石,并调整混凝土配合比,能有效降低温升,减少温度裂缝,提高工程质量。

3.适用范围水电站重力坝大体积混凝土施工。

4.工艺原理在满足设计要求的前提下,水电站重力坝大体积混凝土中最大可埋入30%~40%块石,块石间用混凝土填充,并振捣密实,形成耐压,承载力强的整体构件。

通过埋石减少了水泥用量,节约资源,降低造价。

同时,由于水泥用量减少,降低了混凝土施工过程中的温升,通过砼分仓分层施工,减少一次性混凝土浇筑量,有效减少因混凝土水化热引起的温度裂缝,提高混凝土施工质量。

4、提高埋石经济效益如下表所示5.施工工艺流程及操作要点5.1施工工艺流程5.2操作要点5.2.1基面验收、仓面准备在施工区周围设置挡水围堰和开挖周边排水沟以及采取集水坑抽水等措施,阻止场外水流入场内,并有效排除积水。

基坑开挖通过柴动空压机、地质钻机自上而下分层造孔,爆破可按实际情况选择炸药类别(乳化硝铵或普通硝酸炸药等)进行,保护层厚度不应小于1.5米,采用浅孔、密孔的方法进行,土、石碴采用挖机进行挖掘,通过验收工作组验收合格后进行仓面准备,将岩基上的杂物、泥土及松动岩石清除(混凝土仓面凿毛或冲毛完成),并冲洗干净,排除积水和其他杂物,处理完毕,验收合格后,再放样立模。

5.2.2测量放样、立模测量人员必须具有相应的专业知识和工作经验,且持证上岗。

测量放样应用全站仪、水准仪、钢尺进行,按设计坐标及结构物外形设计尺寸进行测量放样,多方向设立控制点,以便校正。

测量过程中,对测量的基准点、基准线和水准点设置防护设施,以免被破坏。

模板工程本工程采用的模板种类有:组合定型钢模板和拼装钢模板、悬臂大模板、异形模板、牛腿模板、承重模板等。

(1)模板施工的技术要求①、工程所用的模板均满足建筑物的设计图纸及施工技术要求。

②、所用的模板均能保证混凝土浇筑后结构物的形状,尺寸与相对位置符合设计规定和规范要求;③、模板和支架具有足够的稳定性、刚度和强度,做到标准化、系列化、装拆方便。

本工程所用模板厚度选为4mm。

④、模板表面光洁平整、接缝严密、不漏浆,混凝土表面的质量达到设计和规范要求。

⑤、模板安装,均按设计图纸测量放样,设置控制点,并标注高程,以利检查、校正。

⑥、模板的面板处理均涂刷脱模剂,且对钢筋及混凝土无污染。

⑦、模板的偏差,应确保能满足规范要求,蜗壳、尾水管段、门槽等要求较高的部位均应满足设计要求,钢筋混凝土梁柱的安装允许偏差,确保能满足GB50204-92的有关规定。

(2)悬臂大模板悬臂大模板采用钢材制作,安装速度快,适用于混凝土表面平整且面积较大的部位,如重力坝、溢流坝段墩墙、船闸墩墙、厂房混凝土墩墙和进口段边墙等部位,在施工中被广泛应用。

我集团在贵州东风电站大坝、湖北汉江王甫洲水利枢纽、浙江赵山渡工程中已成功应用,效果很好,面板尺寸3×4m,用P3015模板拼装组成,悬臂大模板的应用为混凝土快速施工创造有利条件,为一期工程防洪渡汛提供了有力的保障。

其结构见8-拉条;9-调节螺栓;10-工作平台;11-支垫座;12-设计钢筋(3)半悬臂模板半悬臂模板用于柱子、闸门槽等大模板不便安装部位。

其纵横向围楞均用φ50mm 双钢管焊接而成,两钢管间净距为1-拉条;2-支撑;3-预埋插筋;4设计钢筋;5-面板;6-φ50双钢管纵围楞;7-φ50双钢管横围楞5.2.3混凝土、块石入仓拌合站生产的混凝土通过塌落度等测试合格后,在25分钟内运送至浇筑现场。

最佳浇筑方式为使用泵送车浇筑,根据现场实际条件及工程进度考虑,采用装载机,挖掘机、吊罐等方式入仓浇筑。

用于埋石砼中的块石,必须为湿饱,抗压强度大于300kg/㎝2,选择新鲜、完整的岩块,无风化剥落层或裂纹,石材表面应冲洗干净,不能留有树根、杂草等污物,所有进仓块石表面应处于湿润状态。

所选取的块石粒径在20cm-120 cm 之间,且20 cm-50 cm的块石与50-120 cm的块石分开堆放或者分开适时埋入砼中,在满足实际的前提下,尽可能提高埋石率;块石经过电子秤称重,使用塔吊调运入仓,辅以人工放码。

(1)混凝土施工缝处理施工缝面处理方法及适用条件见下表施工缝面处理方法②、冲毛a、压力水冲毛:冲毛的压力水一般为3~5kgf/cm2。

冲毛时间一般在混凝土初凝后至终凝前进行,冲毛标准遵守有关规范要求。

b、高压冲毛机冲毛:高压冲毛机冲毛压力一般可达400kgf/cm2左右,最高可达500kgf/cm2,冲毛质量能满足混凝土施工规范要求。

③、清洗当仓面模板、钢筋工序按设计完成后,即可进行仓面冲洗,清除仓面杂物,排除施工缝面积水。

④、砂浆铺设水工混凝土施工规范规定,在接缝面摊铺2~3cm厚砂浆。

实际施工中,砂浆入仓后用人工铺平,保证厚度,且做到随盖随铺。

在仓面窄小,钢筋密集,不便于铺砂浆的个别部位,则采用增大砂浆含量的办法来解决。

(2)混凝土入仓方式本工程的混凝土入仓主要由门机或履带起重机吊运入仓。

吊罐以3m3卧罐为主,另根据需要配少量1.5m3卧罐。

吊罐平台均布置在基坑内。

作为辅助入仓手段,厂房主机段二期、副厂房上部排架等部位,则采用1台HB30D 混凝土泵输送熟料再转运入仓;两岸重力坝门机工作范围以外部分,采用履带吊吊运入仓,局部采用溜槽入仓。

(3)铺料方法①、平铺法对仓面面积不大的部位,采用平铺法铺料。

铺料顺序由低到高,先行填塘,再按顺序铺料。

有廊道、钢管或埋件的仓位,卸料时,廊道钢管两侧均匀上升,其两侧高差不超过铺料层厚50cm,一般铺料层厚采用25~50cm。

②、台阶法在重力坝、船闸以及闸坝底板等大面积仓号施工中,均采用台阶法铺料。

台阶法混凝土浇筑程序从块体短边一端向另一端铺料,边前进、边加高,逐步向前推进并形成台阶,直至浇完整仓。

其浇筑程序参见下图。

单位:cm水平施工缝采用逐步覆盖,接缝砂浆在老混凝土面上边摊铺边浇混凝土;在浇筑过程中,台阶层次应分明,铺料厚度50cm,浇筑层厚度为1.5~2.0m,台阶宽度一般大于1.0m,坡度一般不大于1:2。

(4)平仓①、人工平仓在靠近模板和钢筋较密的部位用人工平仓,使骨料分布均匀;水平止水、止浆片底部用人工送料填满,严禁料罐直接下料,以免止水、止浆片卷曲及其底部混凝土架空;各种预埋仪器周围用人工平仓,防止位移和损坏;板梁柱等小仓面也采用人工平仓。

②、机械平仓为了加混凝土施工进度,避免因浇筑时间过长而产生混凝土冷缝,在建筑物底板大体积混凝土部分则可采用机械平仓;混凝土坍落度一般要求在3~6cm之间。

凡能够利用机械平仓的仓面尽量优先考虑机械平仓。

(5)振捣根据施工规范规定,振捣时间以混凝土不再显著下沉、不出现气泡、开始泛浆为准。

采用插入式和软轴式振捣器振捣,移动距离均不超过其有效半径的1.5倍,并插入下层混凝土5~10cm,顺序依次、方向一致,避免漏振。

(6)混凝土铺料间隔时间混凝土铺料间隔时间均应遵守规范要求。

《水工混凝土施工规范》规定,用振捣器振捣30s,振捣棒周围10cm内仍能泛浆且不留孔洞、混凝土还能重塑时,仍可继续浇筑混凝土。

否则,作为“冷缝”按施工缝处理后继续浇筑。

(7)二期混凝土施工①、门槽二期混凝土浇筑门槽二期模板均采用P3015钢模板,用φ14mm圆钢用作拉条固定,螺杆焊接在预埋插筋的根部、模板安装每隔1.5m预留一个高30cm的孔洞作为临时进料口。

混凝土运输通过溜筒卸入槽内。

卸料层厚20~40cm,浇筑上升速度以每台班不超过3m为宜。

每个门槽一次性连续浇筑到设计顶部。

②、厂房主机段二期混凝土施工a、混凝土运输主机段二期混凝土水平运输用12t自卸汽车,垂直运输用混凝土泵送入仓。

b、混凝土浇筑由于过流面混凝土抗裂性能和温控均要求较高,在施工中为确保过流面混凝土浇筑质量,施工中可采取以下措施确保混凝土施工质量:降低混凝土水灰比,减少水泥用量,同时掺入适量外加剂和粉煤灰,以减小混凝土水化热,为增强混凝土抗裂性能,在每方混凝土中可加入0.9kg聚丙烯纤维。

该项施工技术我集团已在湖北王甫州、温州赵山渡水库等闸坝工程中有成熟的施工经验。

对增强混凝土抗裂性能非常显著,而且成本也较低;选择气温较低的时段浇筑混凝土,混凝土采用二级配料,坍落度控制在3~6cm以内;混凝土浇筑按要求保证两边墙同时上升,平铺法浇筑,层厚<25cm,浇筑速度不大于25cm/h;浇筑完毕后及时进行表面流水养护。

模板安装:坝面预留钢筋螺杆装设三角形平衡支撑槽钢架,在钢架上搭设悬空式脚手架及竹架板进行模板安装,模板采用预埋钢筋安装钢管拉固、方木支撑(模板、支撑的稳定性、刚度和强度应满足设计要求)。

模板表面应光洁、无污物,安装时,相邻两块板搭接应平整,无缝隙,拉撑稳固后方可进入下一道工序。

5.2.4混凝土温控砼通过分仓分层施工,减少一次性混凝土浇筑量,调整混凝土埋石率,优化了混凝土配合比,来减少水泥用量,同时采用低发热量、低含碱量、初期强度高、塑性性能好、初凝期长的特制大坝水泥,通过在混凝土配合比中掺加20%~30%粉煤灰,以降低水泥水化放热量、延缓水化热释放速度,并采用了制冷风系统对骨料进行了降温处理,从而在拌合中降低了混凝土水化热,有效将混凝土入仓温度控制在26℃~28℃。

并在浇筑过程中对大体积混凝土使用测温工具,多频率对砼内部温度和外界气温进行实时监测,根据内外温差采用移动提温房进行温度控制,保证砼强度,保证了工程质量。

5.2.5块石混凝土浇筑完成(复查、检验)埋石混凝土施工采用静态法与动态法相结合施工,这样既可以提高埋石率(约25%)。

又可以相应提高砼入仓浇筑速度,使仓内砼接头在初凝前能够及时覆盖,确保砼质量达到设计要求。

静态埋石砼浇筑法是:首先2-3cm厚的水泥砂浆,铺筑50cm厚砼料并振捣——将充分湿润满足要求的块石吊入仓内——人工配合摆好块石——砼入仓覆盖块石并振捣块石间的砼——然后有摆放块石和砼入仓覆盖振捣,每仓浇筑长度10~15米,宽4~8米,高度在1.2m~1.5m。