竣工验收工作小结
竣工工作总结7篇
竣工工作总结7篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作总结、报告大全、合同协议、演讲致辞、规章制度、应急预案、心得体会、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays, such as work summaries, report summaries, contract agreements, speeches, rules and regulations, emergency plans, experiences, teaching materials, essay summaries, and other sample essays. If you want to learn about different sample formats and writing methods, please pay attention!竣工工作总结7篇通过工作总结,可以发现自己工作中的不足和改进的空间,我们可以在工作总结里面回忆自己这段时间以来的工作收获和成长,本店铺今天就为您带来了竣工工作总结7篇,相信一定会对你有所帮助。
竣工验收工作总结8篇
竣工验收工作总结8篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作计划、工作总结、述职报告、合同协议、演讲致辞、条据文书、心得体会、策划方案、教学资料、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays, such as work plans, work summaries, job reports, contract agreements, speeches, documents, insights, planning plans, teaching materials, other sample essays, and more. If you want to learn about different sample formats and writing methods, please stay tuned!竣工验收工作总结8篇通过工作总结,我们可以更好地评估工作中的进展和挑战,通过工作总结的写作可以提升我们的工作能力哦,因此要认真对待才行,以下是本店铺精心为您推荐的竣工验收工作总结8篇,供大家参考。
竣工工程施工小结(3篇)
第1篇一、工程概况本项目为XX市XX区XX住宅小区,总建筑面积约10万平方米,包含住宅楼、商业楼、地下车库等配套设施。
自201X年X月X日开工以来,经过全体施工人员的共同努力,于XX年X月X日顺利竣工。
现将本次工程竣工施工小结如下:二、施工管理1. 严格执行施工规范:在施工过程中,我们严格按照国家相关施工规范和标准进行操作,确保工程质量。
2. 加强施工现场管理:施工现场实行封闭式管理,严格控制施工现场的文明施工、安全施工和环境保护。
3. 优化施工组织:根据工程特点,科学合理地安排施工进度,确保工程按期完成。
4. 强化质量控制:建立健全质量管理体系,对原材料、施工过程和成品进行严格把关,确保工程质量。
三、施工亮点1. 技术创新:在施工过程中,我们积极引进新技术、新材料、新工艺,提高施工效率和质量。
2. 环保施工:施工现场采用绿色施工措施,减少对周边环境的影响,实现文明施工。
3. 安全生产:加强安全生产管理,严格执行安全生产规章制度,确保施工安全。
4. 团队协作:全体施工人员团结协作,共同克服施工过程中遇到的困难,确保工程顺利进行。
四、存在的问题及改进措施1. 问题:部分施工环节存在进度滞后现象。
改进措施:加强施工进度管理,优化施工方案,确保工程按期完成。
2. 问题:部分施工质量问题。
改进措施:加强质量检查,严格执行质量标准,提高施工质量。
3. 问题:施工现场环保措施不足。
改进措施:加强环保意识,严格执行环保法规,提高施工现场环保水平。
五、总结本次工程竣工,得益于全体施工人员的辛勤付出和各部门的密切配合。
在今后的工作中,我们将继续发扬优良传统,不断提高施工水平,为我国建筑事业贡献力量。
同时,我们也将认真总结本次工程的经验教训,为今后类似工程提供借鉴。
XX市XX区XX住宅小区竣工工程施工小组XX年X月X日第2篇一、工程概况本工程名为XXX,位于XXX地区,由XXX建设单位投资建设。
该工程于XXXX年XX 月XX日开工,经过XXX个月的紧张施工,于XXXX年XX月XX日顺利完工。
竣工验收后相关工作总结
竣工验收后相关工作总结竣工验收是一个项目完工的重要节点,标志着项目的完成和交付。
在竣工验收之后,还有一系列相关工作需要进行总结和处理。
本文将对竣工验收后的相关工作进行总结,包括项目收尾、质量整改、经验总结等方面。
首先,在竣工验收后,需要进行项目的收尾工作。
这包括完成项目的交付手续,如出具竣工报告、颁发竣工证书等。
同时,还要进行项目档案的整理和归档工作,确保项目的相关资料完整保存,以备后续查阅和管理。
其次,竣工验收后的重要工作之一是质量整改。
在验收过程中,可能会发现一些质量问题和不足之处,需要及时进行整改。
这包括对工程质量存在的问题进行追溯和分析,并制定相应的整改方案。
同时,还要跟进整改的进展情况,确保问题能够得到有效解决,确保项目的质量达到标准要求。
此外,竣工验收后还需要进行项目经验的总结。
通过对项目的经验总结,可以总结出项目的成功经验和教训,为今后的类似项目提供参考和借鉴。
在总结过程中,可以回顾项目的整体进展和管理方式,分析项目成功的原因和失败的教训,并提出改进意见和建议,以提高今后项目的管理水平和效率。
另外,竣工验收后还需要进行项目的结算工作。
这包括对项目的成本进行结算和核对,确保项目的成本控制在合理范围内。
同时,还要对项目的支付款项进行核对和结算,确保供应商和承包商的合法权益得到保障。
最后,竣工验收后还需要进行项目的交接工作。
这包括将项目交接给项目的使用方或运营方,确保项目的正常运营和维护。
在交接过程中,需要将项目的相关资料和信息进行详细说明和交接,确保使用方或运营方能够顺利接管项目,并能够熟悉和掌握项目的运营和维护要点。
总之,竣工验收后的相关工作是项目完工后的重要环节。
通过项目的收尾工作、质量整改、经验总结、结算工作和交接工作,能够确保项目的顺利交付和后续管理工作的开展。
这些工作的完成将为今后的类似项目提供有益的经验和教训,为项目管理工作的持续改进提供参考和借鉴。
工程竣工验收工作总结7篇
工程竣工验收工作总结7篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如演讲致辞、汇报材料、自我鉴定、条据文书、合同协议、心得体会、方案大全、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as speeches, presentation materials, self-evaluation, documentary evidence, contract agreements, reflections, comprehensive plans, teaching materials, essay summaries, and other sample essays. If you want to learn about different sample essay formats and writing methods, please stay tuned!工程竣工验收工作总结7篇态度的端正是我们在写工作总结的时候要注意的一点,工作总结是我们对自己工作的一种自我评估,可以帮助我们发现自己的不足之处,进而改进和提升,以下是本店铺精心为您推荐的工程竣工验收工作总结7篇,供大家参考。
2024消防竣工验收总结
2024消防竣工验收总结2024年是一个重要的年份,也是我们消防队的一个重要时刻。
在这一年,我们完成了一项重要任务——竣工验收。
经过长期的努力和奋斗,我们成功地完成了竣工验收工作。
现在,让我来总结一下这次验收的情况。
首先,我要感谢所有参与竣工验收工作的人员。
他们的辛勤工作和专业能力为本次验收的顺利进行做出了重要贡献。
他们用自己的努力和智慧,保证了建筑物的安全性和消防设施的有效性。
在本次竣工验收中,我们特别注重了以下几个方面的工作。
首先是建筑物的消防设施。
我们对建筑物的内部和外部消防设施进行了全面的检查和测试。
确保了消防设施的正常运行和可靠性。
我们还对建筑物的消防通道进行了全面检查,确保了通道的畅通和安全。
其次是人员的消防意识培养。
我们开展了一系列的消防宣传活动,提高了员工和业主对消防知识的了解和认识。
通过这些活动,我们让每个人都明白了火灾的危害和预防方法。
这不仅提高了员工和业主的自我保护能力,同时也增加了他们对消防工作的支持和配合。
再次是应急预案和演练。
我们制定了一份详细的应急预案,并组织了消防演练。
通过演练,我们提高了员工和业主的应急反应能力,让每个人都能够熟悉和掌握应急处理程序,提高了组织抢险救援的能力和水平。
最后是消防设施的维护和保养。
我们制定了一套完善的消防设施维护计划,确保设施的正常运行和有效性。
同时,我们还进行了定期的消防设施维修和保养,确保设施的可靠性和稳定性。
通过本次竣工验收,我们消防队取得了一系列的成果和经验。
我们通过该项目,提高了自身的消防技术和管理水平,积累了宝贵的经验和教训。
我们将继续努力,为消防事业做出更大的贡献。
在今后的工作中,我们将继续加强消防宣传和教育工作,提高员工和业主的消防意识和灾害防护能力。
同时,我们还将加强与相关部门的合作,共同推动消防事业的发展。
感谢所有参与本次竣工验收的人员和单位!让我们一起携手努力,为消防事业贡献力量!。
验收工作总结(精选5篇)
验收工作总结(精选5篇)验收篇1在分公司领导的信任和培养下,我于20__年月被任命为项目经理至今已有十个月的时间,在分公司的大力支持和关心下,项目部各项工作进展顺利,现就近一年来的工作总结如下:一、积极采取的措施,精心组织、精心管理1.进一步完善各项安全质量、完善管理体制通过多年来的施工生产实际,进一步完善安全、质量等管理体系,建立安全质量月检、旬检、日检制度及整改制度。
项目部除设立一名专职安全员外,各工区也层层设立专职安全员。
将安全工作提高到了前所未有的高度。
质量方面,绝不放松,强化强施工过程控制,坚持施工质量检查制度,严格执行“自检、互检、交接检”的三检制度,使质量问题在每道工序作业中都能得以有效控制。
2.完善激励机制,调动员工生产积极性通过完善内部承包机制、制定循环奖励措施及月目标任务考核奖等手段,极大的提高了员工的劳动积极性,部分的缓解了因资金紧张带来的消极影响。
3.提高生产效率,降低生产成本通过不断完善施工工艺,合理安排人员,精心组织,精心施工,在全体员工的努力下,施工产量不断提高,效率不断提升。
4.加强成本控制,强化数据管理,确保数据真实性项目部每月日定期召开成本分析会,认真分析上月存在的问题,找出不足,层层落实,下月改进,要求各项对比实现数据化,数据必须真实可靠,施工现场的每一个环节,层层控制,每道工序都做到有据可查,为了确保数据的准确性,做到每班质检工程师和领工员进行现场收方互相复核签认,确保了数据的真实性。
进场所有材料无论多晚,都由材料员签收,保证足额入库。
5.文明工地建设继续加现场文明施工管理,根据实际成立了第一文明施工班和第二文明施工班,总人数8人。
专门进行文明工地建设相关工作,保持工地卫生清洁,使道路干净畅通,尽量减少对周围居民和环境的影响。
各种设备物资标识齐全,堆放有序。
6.认真搞环保、水保工作积极与业主和地方水务、水保主管部门联系,主动邀请其进场检查,征求意见,逐步完善排污、水保方案、措施。
工程竣工工作总结
工程竣工工作总结(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作总结、工作计划、演讲致辞、策划方案、合同协议、规章制度、条据文书、诗词鉴赏、教学资料、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as work summaries, work plans, speeches, planning plans, contract agreements, rules and regulations, doctrinal documents, poetry appreciation, teaching materials, other sample essays, etc. If you want to learn about different sample formats and writing methods, please stay tuned!工程竣工工作总结工程竣工工作总结(通用17篇)工程竣工工作总结篇1______年______月______日内蒙古德克斯有限公司10kV输配电工程随着变压器”嗡”的一声,标志着这个项目送电成功,所有的付出得到了回报,作为此工程的工程负责人,我的心情是很激动的。
检测单位竣工验收总结
检测单位竣工验收总结检测单位竣工验收总结(通用5篇)总结就是把一个时段的学习、工作或其完成情况进行一次全面系统的总结,它能使我们及时找出错误并改正,因此十分有必须要写一份总结哦。
总结怎么写才是正确的呢?以下是小编为大家整理的检测单位竣工验收总结(通用5篇),希望对大家有所帮助。
检测单位竣工验收总结1由xx集团有限公司承建的工程自从20xx年x月x日开工以来,经过近一年的精心施工,在质监站、设计、勘察、建设、监理单位的细心指导和帮助下现已完成了该工程,现就工程的施工情况,做如下总结:1.工程概况1.1总体概况工程位于xx院内,主体结构为x框架结构,主楼的建筑高度x米。
建筑面积为x平方米,预算总造价为x万元。
1.2建设单位:质监单位:工程质量监督站设计单位:建筑设计研究院勘察单位:建筑设计研究院勘察所监理单位:工程项目管理有限公司施工单位:集团有限公司1.3建筑结构设计概况1.3.1结构概况本工程为x框架结构,电梯井为200厚砖混结构,基础采用水泥土桩地基,条形混凝土基础,基础埋深为-2.05米。
,基础垫层为100厚C15素混凝土,主体结构为C30混凝土,砌体为填充墙砌体,采用A3.5蒸压加气混凝土砌块组合M5水泥砂浆砌筑。
1.3.2 建筑设计本工程根据功能划分。
2.工程施工情况2.1 本工程从20xx年x月x日开工x年x月x日基础完成,并于x月通过地基与基础分部工程验收,核定等级合格。
于20xx年x月x 日主体封项,并经业主、设计、质监、监理、施工等单位于x月x共同验收,核定主体分部工程为优良,通过项目部全体职工的精心施工,工程于20xx年x月x日顺利竣工,并于20xx年x月x日经业主、监理、施工等单位进行竣工初验。
2.2 该工程自开工以来项目部全体以严谨的工作态度,精心组织施工,按设计文件和现行的标准、规范来约束自己的施工行为,认真贯彻执行公司颁布的《质量手册》和《程序文件》等质保体系内控制度。
建设单位竣工总结5篇
建设单位竣工总结5篇遵守公司及所在项目部的各项规章制度,积极服从领导的工作安排,圆满完成工作任务,维护集体荣誉,思想上要求进步,积极响应公司的号召,认真贯彻执行公司文件及会议精神。
下面小编给大家带来建设单位竣工总结,希望大家喜欢!建设单位竣工总结1参加工作已多年了,根据自身工作的实际情况,我对自己的工作做出分析评定,总结经验教训,提出改进方法,以便自己在今后的工作中扬长避短,为今后不断改进工作方法。
作为一名技术人员,我将工作定位为协助好技术负责人的工作和不断的自我学习充实,在参与建设的工程中,在完成工程的施工测量放线的同时,还协助技术负责人编制施工方案、技术交底,并负责工程技术资料的指导与编制,和施工员一起进行现场质量检查,以及协助安全员落实、督促、检查施工现场安全工作。
在工程施工过程中,我一直以积极的心态认真地对待自己的工作,在从事的各项工作中,都能尽职尽责,以求圆满的完成工作任务。
“不要急于出成绩,埋下头来干工作”,是我的工作格言,提醒自己不要好高骛远,而要脚踏实地,多干实事,在实践中检验自己的知识并获得施工现场的经验累积。
施工现场工作更使我深深明白,在学校学习的东西和自己翻看规范、规程死记硬背的知识远不如实际经历过的记得牢固,而且好多学问更是书本里学不来的,完全是凭自己的经验。
工作以来,我一直在多看,多学,碰到施工现场的做法与书本里不一样的地方及时的向技术负责人、工长等虚心请教,尽管有时候得不到理论上的解释,但是却是很好的经验。
刚工作时觉得技术资料工作、测量工作,质量检查工作都比较简单,而实际上却学问大着,一直觉得自己会,而实际操作起来才发觉自己的不足,时常事倍功半,缺乏效率。
现在实践操作多了,方法掌握了,经验有了,才得心应手起来。
比如说测量,重要的是要抓好其关键工作,个人认为,测量关键性的工作一是选择施测方案,二是一定要进行复测以避免人为错误。
另外,拿技术交底工作来说,并不是简单的把交底写完交给劳务施工队签字就完成工作了。
竣工验收工作总结(通用13篇)
竣工验收工作总结竣工验收工作总结(通用13篇)总结是指对某一阶段的工作、学习或思想中的经验或情况进行分析研究,做出带有规律性结论的书面材料,它可以提升我们发现问题的能力,不如立即行动起来写一份总结吧。
那么我们该怎么去写总结呢?下面是小编整理的竣工验收工作总结,仅供参考,大家一起来看看吧。
竣工验收工作总结篇1一、项目执行情况从项目的执行情况来看,绝大多数是好的,达到了项目建设目的,项目在我市的野生动物保护、工程造林、城镇绿化和优质苗木的提供和推广等工作中发挥了积极作用。
二、项目效与评价野生动物自然保护区项目建设和基础设施的加强,使我市野生动物保护管理工作进一步加强,一批野生动物保护站、观测点的建,促进了我市野生动物保护工作的规范化运转,保护站等,使大熊猫等野生动物在自然保护区得到进一步保护,数量不断增加。
近期内在我市出现的“胜林一号”放归;金丝猴数活动范围扩大,常在旅游景点与游人相遇;野生鸟类明显增加,在城区时常可见。
都充分说明了我市森林生态环境质量得到了明显改善,以及人们生态意识和保护动物意识的明显提高。
三、存在问题和建议问题1:骨干苗圃项目设计、批复与实际投入不符,在一定程度上影响了项目功能的发挥。
xx年和xx年,国家分别下达给我市骨干苗圃建设项目7个。
各项目承担区县按照要求,由具备设计资格的省林业设计院对项目进行了初设,并经省厅批复。
按照设计要求,每个骨干苗圃项目,国家投资在80—100万元。
但实际投资均为40万元,再加上地方配套投资不能完全兑现,致使项目建设内容受到限制和缩减。
但苗圃类林业建设项目与工业建设项目不同,虽然缩减了大量建设内容,仍能依据土地这一自然条件进行苗木生产,但与我们建设骨干苗圃所要求的高起点、高质量和高科技含量育苗,确不相适应。
建议:国家将小型林业基建项目的投资计划、资金以及项目建设的要求,通过省厅直接下达给地市州林业行政主管部门,以充分调动和发挥地市州林业行政主管部门的监督管理职能。
建设单位竣工验收工作报告
建设单位竣工验收工作报告(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如演讲致辞、总结报告、心得体会、合同协议、条据文书、策划方案、导游词、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as speeches, summary reports, insights, contract agreements, documentary evidence, planning plans, tour guides, teaching materials, complete essays, and other sample essays. If you want to learn about different formats and writing methods of sample essays, please stay tuned!建设单位竣工验收工作报告建设单位竣工验收工作报告7篇建设单位竣工验收工作报告具体如何写呢?随着个人的文明素养不断提升,报告对我们来说并不陌生,以下是本店铺精心收集整理的建设单位竣工验收工作报告,下面本店铺就和大家分享,来欣赏一下吧。
工程竣工安全验收小结
工程竣工安全验收小结根据您提供的要求,我为您撰写了一篇关于工程竣工安全验收的小结。
以下是小结的内容:工程竣工安全验收小结一、引言工程竣工安全验收是在工程施工完成后对整个工程的安全进行检查和评估的过程。
本次工程竣工安全验收旨在确保工程施工过程中的安全措施得到了有效实施,并对工程的安全性能进行评估。
本次验收工作由专业验收团队负责,团队成员经过培训和资质认证,具备相关的专业知识和经验。
二、验收环境和时间本次验收工作是在工程竣工后进行的,验收时间为2022年1月1日至2022年1月10日。
验收地点为工程现场。
三、验收内容1. 安全措施的实施情况:针对工程施工过程中采取的各项安全措施,我们对其进行了全面的检查和评估。
通过实地查看和与参与施工的工作人员沟通,我们确认了各项安全措施的有效实施情况,并对措施的执行情况进行了记录。
2. 工程材料的安全性能:我们对工程施工所使用的各种材料进行了抽样检验和实验研究。
结果显示,工程材料的安全性能符合相关标准和要求,并未发现明显的安全隐患。
3. 施工质量的安全性能:我们对工程的整体施工质量进行了评估,包括建筑结构、电气系统、给排水系统等方面。
通过测量、试验和观察,我们确认了工程的整体施工质量达到了相关标准和要求,不存在明显的安全隐患。
4. 相关文件和证明的齐全性:我们检查了工程竣工所需的各种相关文件和证明,包括施工记录、验收报告、工程图纸等。
通过核实与整理,我们确认了相关文件和证明的齐全性,能够提供完整的工程竣工资料。
四、验收结果根据对工程竣工安全的全面评估和检查,我们得出以下结论:1. 工程施工过程中采取的各项安全措施得到了有效实施,没有发现明显的安全隐患。
2. 工程施工所使用的各种材料的安全性能符合相关标准和要求,能够满足工程的使用需求。
3. 工程的整体施工质量达到了相关标准和要求,不存在明显的安全隐患。
4. 相关文件和证明的齐全性能够提供完整的工程竣工资料。
五、建议和改进措施在本次验收工作中,我们注意到以下几个方面可以进一步改进:1. 加强对施工人员的安全培训,提高施工人员对安全措施的认知和执行能力。
竣工验收工作总结报告 竣工验收报告(优秀6篇)
竣工验收工作总结报告竣工验收报告(优秀6篇)竣工验收工作总结报告篇一由我公司承建的输煤系统消防完善工程,由xxx有限责任公司承包改造,市建设工程质量监督站负责质量跟踪监督,并委托消防工程监理有限公司承担现场监督,并由消防设施检测单位于20xx年4月26日完成本工程消防工程电气及消防设施检测,确认检测结果为合格。
本工程,自开工以来,在上级领导、质监站、建设单位、设计单位、监理单位及有关部门的大力支持下,通过全体参建员工的努力和辛勤劳动,工程于20xx年4月24日通过了预验收工作,并完成了有关问题的质量整改闭合,现消防工程已具备竣工验收条件。
下面就工程具体情况汇报如下:1、喷淋系统由原来湿式报警系统该为干式预作用报警系统。
2、输煤管道原消防系统改为干式预作用报警系统。
按20xx年国家消防规范规定,原输煤系统喷淋所有管道全不符合消防规范,所有管线重新铺设,改为手、电两用系统。
1、本工程消防报警系统采用消防中心控制系统,由自动报警系统、消火栓系统、喷淋系统等系统组成。
消防中心采用集中报警控制器控制。
2、本工程联动系统为集中控制,联动控制台设在消防控制中心内,联动功能主要有:火灾报警后接通警报装置,启动消防水泵、喷淋泵。
3、消防控制室的联动逻辑和手动功能:a、手动按钮动作时,立即联动消防设备。
b、消防栓按钮动作时,立即启动消防泵和喷淋泵。
在施工过程中经我公司、项目部不懈努力,全体员工的辛勤劳动下,我施工方均已按设计要求和验收规范的规定,以及合同约定的施工内容,完成了各项工作,各设备经调试运行正常,各报警系统,经检测公司检测合格。
建设单位(公章):施工单位(公章):年月日年月日工程验收报告与工程竣工验收报告篇二(主要讲述工程位处的地理位置、各施工有关单位、该工程的基本情况、工程特点、工程的开工时间、××阶段完成时间)××工程位于西安市××区××街××路××号,南边为××,北边××。
验收工作总结(通用6篇)
验收工作总结(通用6篇)验收工作总结(通用6篇)时光飞逝,如梭之日,辛苦的工作已经告一段落了,回首这段不平凡的时间,有欢笑,有泪水,有成长,有不足,让我们对过去的工作做个梳理,再写一份工作总结。
那么要如何写呢?下面是小编为大家收集的验收工作总结(通用6篇),欢迎大家分享。
验收工作总结1为贯彻落实国务院关于开展药品安全专项整治工作部署,进一步解决影响药品安全的深层次问题,全面提升我区的药品安全水平,保障人民群众用药安全,20xx年12月起,北仑区开展了药品安全专项整治工作,现将专项整治工作总结如下。
一、制定方案,落实责任。
20xx年1月18日,区府办印发了《关于北仑区药品安全专项整治工作实施方案的通知》(仑政办[2010]4号,明确了本次专项整治的指导思想、目标任务、整治措施、工作步骤,并对整治工作提出了要求。
同时为加强药品安全专项整治工作的领导,区政府成立了药品安全专项整治工作协调小组,由刘文科副区长任组长,区政府办公室季夏副主任、食品药品监管分局陆信祥任副组长,区发改局、公安局、卫生局、工商分局、科技局(工业局)、邮政局、食品药品监管分局分管领导为成员。
各个街道、乡镇也成立了相应的协调小组和工作机构,使专项整治工作有序推进。
二、明确目标,加强协调。
本次专项整治的总体目标是通过深入整治,进一步强化组织领导,明确职责分工,完善工作机制,全面落实“地方政府负总责、监管部门各负其责、企业是第一责任人”的药品安全责任体系;进一步完善药品生产经营规范和质量标准,严格药品市场准入审批,严格实施质量规范和质量追溯,强化日常监督管理,全面建立科学有效的监督管理体系,药品质量安全控制水平显著提高;进一步加大对制售假劣药品违法行为的打击力度,着力解决影响公众用药安全的突出问题,药品生产经营秩序显著好转,人民群众的用药的安全感得到加强,药品消费信心明显增强。
进一步加大药品安全宣传力度,提高公众安全用药知识和自我保护意识,营造全社会关注药品安全的良好社会氛围。
工程竣工验收移交工作总结
工程竣工验收移交工作总结经过多个月的辛勤努力,我们终于完成了工程的竣工验收移交工作。
在此,我要对整个工作进行总结,以便我们能够更好地吸取经验教训,为以后的工程项目提供参考。
首先,我们要感谢整个团队的努力和合作。
在整个工程过程中,每个人都发挥了自己的专业能力和团队精神,克服了各种困难和挑战,最终完成了工程的竣工验收移交工作。
团队的凝聚力和协作能力是我们成功的关键。
其次,我们要对工程的质量进行认真的评估。
在工程竣工验收移交的过程中,我们要对工程的各个方面进行全面的检查和评估,确保工程的质量符合相关标准和要求。
同时,我们也要对工程中出现的问题和不足进行深入分析,找出原因并提出改进措施,以确保以后的工程能够更加顺利地进行。
此外,我们还要对工程的安全进行重点关注。
在工程竣工验收移交的过程中,我们要对工程的安全进行全面的检查和评估,确保工程的安全符合相关标准和要求。
同时,我们还要对工程中存在的安全隐患进行深入分析,找出原因并提出改进措施,以确保工程的安全问题得到有效解决。
最后,我们要对整个工程竣工验收移交工作进行总结和反思。
我们要认真总结工作中的经验和教训,找出不足之处并提出改进措施,以便我们能够更好地提高工作效率和质量。
同时,我们还要对整个工程过程中的困难和挑战进行深入分析,找出解决方法,为以后的工程项目提供参考。
总之,工程竣工验收移交工作的总结是我们不断提高工作质量和效率的重要途径。
我们要充分吸取经验教训,不断完善我们的工作,为以后的工程项目提供更好的服务。
希望我们能够在以后的工作中取得更大的成绩,为工程事业的发展做出更大的贡献。
竣工验收工作报告8篇
竣工验收工作报告8篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如报告大全、培训计划、策划方案、合同协议、规章制度、应急预案、心得体会、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as report summaries, training plans, planning plans, contract agreements, rules and regulations, emergency plans, reflections, teaching materials, essay summaries, and other sample essays. If you want to learn about different sample essay formats and writing methods, please stay tuned!竣工验收工作报告8篇工作报告是我们工作一段时间之后一定要接触的文本,可以从中收获到更多的感触,没有出色的工作报告,我们就无法在后续工作中表现更好,本店铺今天就为您带来了竣工验收工作报告8篇,相信一定会对你有所帮助。
竣工验收业主单位工作总结
竣工验收业主单位工作总结
在竣工验收的过程中,业主单位扮演着至关重要的角色。
他们需要对整个工程
的质量、安全和合规性进行严格的审核和验收,以确保工程的顺利竣工和交付使用。
在这个过程中,业主单位需要做好各项工作,才能保证工程的质量和安全。
首先,业主单位需要对施工单位的资质和信誉进行严格审核,确保施工单位具
备相应的资质和能力来承担工程。
其次,业主单位需要对施工过程进行全程监督和检查,确保施工单位按照设计要求和合同约定进行施工,保证工程质量和安全。
同时,业主单位还需要对工程材料和设备进行抽样检测,确保其符合国家标准和工程要求。
在竣工验收的最后阶段,业主单位需要对整个工程进行综合验收,包括工程质量、安全、环保和合规性等方面。
只有通过严格的验收,业主单位才能确保工程的质量和安全,为工程的交付使用打下坚实的基础。
在竣工验收的过程中,业主单位的工作总结至关重要。
通过总结工作,业主单
位可以发现工作中存在的问题和不足,及时进行整改和改进,提高工作效率和质量。
同时,总结工作还可以为今后的工程建设提供宝贵的经验和教训,为提升工程质量和安全提供参考和借鉴。
总之,竣工验收业主单位的工作总结对于工程的质量和安全至关重要。
只有通
过严格的审核和验收,及时总结工作,业主单位才能确保工程的质量和安全,为工程的交付使用提供保障。
希望各业主单位能够重视竣工验收的工作总结,不断提高工作水平,为建设更加安全、高质量的工程做出贡献。
竣工验收勘察单位总结汇报
竣工验收勘察单位总结汇报尊敬的领导、各位同事:您好!首先,我代表竣工验收勘察单位向大家汇报工作进展及成果。
经过多个月的努力,我们终于完成了本次竣工验收工作。
在此,我将从以下几个方面对我们的工作进行总结和汇报。
一、团队组织与管理在本次竣工验收过程中,我们充分认识到团队的组织与管理对于保证工作的高效进行至关重要。
为此,我们建立了一个高效的团队组织架构,确保了各个工作环节的紧密协作。
同时,我们也注重人员的合理分配,根据各自的专业特长和经验,分工明确,发挥了每个人的优势,提高了工作效率。
二、勘察工作在竣工验收过程中,我们先后进行了现场勘察和资料搜集,全面了解了工程项目的结构、装修、设备与系统等情况。
我们充分运用勘察技术和工具,对建筑物的结构、质量等进行了详细的测量、分析和评估,确保了对工程项目的准确把握和科学评估。
三、验收工作在竣工验收的过程中,我们秉承公正、客观、科学的原则,依据相关法规和规范,认真进行各项验收工作。
我们对建筑物的结构、装修、设备与系统进行了全面细致的检查和测试,以确保其符合相关质量标准和验收要求。
同时,我们对工程项目的技术文件和资料进行了审查,确保其真实、有效。
通过我们的努力,最终顺利完成了竣工验收。
四、问题发现与解决在竣工验收的过程中,我们也发现了一些问题和隐患。
我们积极与相关部门进行沟通,提出了解决方案,并向建设单位进行了及时汇报。
在其配合下,我们解决了一系列问题,并确保了问题的妥善处理和彻底解决。
五、心得与体会通过这次竣工验收工作,我们不仅学到了很多专业知识,也更加深刻认识到团队精神和组织能力对于工作的重要性。
我们在工作中遇到了许多困难和挑战,但我们相信,只要我们团结一心,共同努力,任何困难都能够克服。
同时,我们也认识到自身的不足,今后需要不断学习和提升自己的专业素养,以更好地为客户提供优质的服务。
最后,感谢各级领导对我们工作的大力支持和信任,感谢各位同事的辛勤付出和合作。
我们会以本次竣工验收为新的起点,不断提高专业水平和工作能力,为建设单位提供更专业、更优质的服务!谢谢大家!。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
北值班室及仓库工程
竣
工
验
收
小
结
镇江市昱然建设工程有限公司2015年11月10日
北值班室及仓库工程项目
竣工验收小结
一、基本概况
北值班室及仓库工程项目位于镇江市新民洲民心家园内,共计一栋住宅单体建筑,2015年8月15日开工,至2015年11月18日竣工
项目各参建单位有:
●建设单位:江苏国营共青团农场
●施工单位:镇江昱然建设工程有限公司
●监理单位:镇江方圆建设监理咨询有限公司
二、工程检查验收工作的回顾
检查验收工作贯穿于工程的整个施工过程中,回顾该项工作的开展,主要包括以下几项内容:
1.进场材料的检查验收。
严扒进场材料关,是保证工程质量的前提,对所有进场的工程材料、设备、构配件除监理单位认真检查验收外,工程部主管人员同时进行检查验收,对一些关键材料如:钢材、防水材料、门窗等,指定厂家和品牌,或进行甩项专业承包,有效的规范了施工单位对合格材料的使用,为保证工程的质量奠定了基础。
2.隐蔽工程的验收。
隐蔽工程验收,是在施工过程中工程质量控制的重要环节。
主要包括:基础工程、钢筋混凝土工程、防水工程(屋面、卫生间)以及一些关键部位的预留预埋等均要进行隐蔽验收。
为加强该项工作的实施,首先由监理单位按照有关程序进行检查,若不符合要求,责令施工单位进行整改,若监理
单位通过重新检验认为符合要求,再由工程部主管工程师进行复验,确认符合要求,均在隐蔽验收记录上签字,施工单位方可进行下道工序施工。
这样,加强了隐蔽工程的监督控制,有利于保证工程的内在质量。
3、检验批的检查验收。
该项工作主要由现场监理工程师完成,工程部管理人员进行监督。
严格按照验收规范的规定进行。
4、分项、分部工程的验收。
该工作是施工过程控制的关键环节,按照规定程序进行,分项工程由专业监理工程师负责组织进行,重要的分部工程监理单位组织,施工单位质量、技术负责人及设计单位项目负责人及工程部有关人员参加,共同验收,并形成验收资料文件,
6、竣工预验收。
竣工预验收是单位工程竣工验收前,监理单位按程序应组织完成的验收工作,按照规范要求的程序和标准进行,工程部配合及监督。
验收整改合格后,监理单位总监理工程师签字及向甲方提供质量评估报告。
该项工作已按规定较好的完成。
7、单位工程竣工验收。
工程竣工验收是工程交付使用的最后一次验收,验收合格标志着工程施工过程的结束,质量保修期的开始。
由建设单位组织,首先工程部编制了竣工验收方案,组织建设单位、勘察单位、设计单位、监理单位、各施工单位及市质监站有关单位和人员参加。
三、主体工程小结
主体工程总承包单位为镇江市昱然建设工程有限公司,在施工过程中严格按照有关程序和规范进行,其主要依据有:各专业施工图纸、标准规范、施工统一做法、变更单等文件。
工程测量定位由建设单位认定,地基采用C30砼,基础开挖后,经施工、监理、勘察、设计及建设单位检查,进行基槽验收,对地基不符合要求的,进行了相应的处理。
基础及钢筋砼施工中,监理单位对钢筋、水泥、砂、石和粘土砖等材料均进行见证取样、送样,并具有合格证及试验报告。
砼浇注前,施工单位自检合格后报验,监理工程师及建设单位工程管理人员,对现场施工人员、机械、材料等准备情况进行检查,并对钢筋工程、模板工程进行验收,全部符合要求后,签署浇注令,施工单位进行浇注。
浇注过程中监理人员进行旁站监督,发现问题及时整改。
该分部完成后,经有关单位验收合格,方可进入下道工序施工。
在砌体施工过程中,对砌体砂浆饱满度、拉结筋放置、轴线尺寸、砌体灰缝、垂直度、空心板搁置长度等,随机进行抽检,发现问题及时要求施工单位整改。
装饰装修工程施工质量,是保证工程观感质量合格,顺利交付使用的关键一环。
在施工过程中对空鼓、裂纹、起皮、阴阳角顺直、防水及砂浆面层等进行严格检查,尽可能减少质量通病的发生。
为了保证工程的顺利进行,我们十分重视工程施工资料的收集、整理和监督检查工作,每周进行一次工程资料检查,发现有遗漏、不齐全,甚至错误的,由施工单位及时补充和整改,基本做到了质量与工程进度的同步,保证了整个工程的顺利进行。
六、管理经验小结
1、严格管理及检查验收,促进整体工程质量提高。
工程伊始,为保证工程质量,促进工程的顺利进行,每周由工程部组织监理、各施工单位进行质量、安全大检查,并进行奖惩。
同时制定了“工程综合检查评比办法”,并每月进行一次,由甲方、乙方、监理方及质监站管理人员参加,进行工程质量、安全文明施工、
工程进度、资料管理等方面进行综合打分、评比考核,对前几名和后几名分别进行奖励和处罚。
同时工程部与监理部联合每周召开一次工程例会,统筹安排,严格要求,注意协调与配合,严格按照程序规定检查验收,特别是注重关键程序、关键部位检查,从总体评价,本期工程不管是从结构施工、功能要求,还是装饰装修及外装饰施工质量,均比以往项目有所提高,并且整个工程没有发生重大质量问题及安全责任事故。
2、注重事前管理与控制,保证工程有序进行。
为了使工程按步骤有序进行,在工程进展中,力求做到事前管理与控制,首先重视图纸会审及技术交底工作,并对一些要求及变更、做法等及时编制下发。
同时,每月组织有工程部、设计单位、监理单位、施工单位参加的工程质量及使用功能座谈会,广开思路、收集客户意见,做到及时协调与沟通、修改,完善下步工作。
3、加强信息沟通、及时总结工程进展情况。
工程建设涉及方方面面,信息管理是保证整个工程顺利进展的重要方面。
在工程进展中利用会议、联系单、座谈、通知、简报等多种形式沟通协调,相互通报情况及时解决问题,有效的促进了工程的进展。
4、吸取经验教训,重视细部做法。
本期工程对各细部做法进行了有效控制,减少了一些质量通病问题的发生。
对于外饰面平整度、线条水平顺直及外墙面色差等均进行了严格控制要求,从而使外立面观感质量明显改观。
八、结束语
以上是对北值班室及仓库工程项目验收的一个简要总结。
通过总结,我们从中获得了很多工程管理的宝贵经验,同时也吸取了不少管理中的教训和不足。
需我们在以后的工作中吸取精华,去其糟粕,不断锐意进取、努力创新,提高工程管理水平,为公司的发展做出新的贡献