变电站外文翻译外文文献英文文献变电站的综合概述(工程科技)
变电站建设外文文献翻译
变电站建设外文文献翻译变电站建设外文文献翻译(文档含中英文对照即英文原文和中文翻译)General Requirements to Construction of SubstationSubstations are a vital element in a power supply system of industrial enterprises.They serve to receive ,convert and distribute electric energy .Depending on power and purpose ,the substations are divided into central distribution substations for a voltage of 110-500kV;main step-down substations for110-220/6-10-35kV;deep entrance substations for 110-330/6-10Kv;distribution substations for 6-10Kv;shop transformer substations for 6-10/0.38-0.66kV.At the main step-down substations, the energy received from the power source is transformed from 110-220kV usually to 6-10kV(sometimes 35kV) which is distributed among substations of the enterprise and is fed to high-voltage services.Central distribution substations receive energy from power systems and distribute it (without or with partial transformation) via aerial and cable lines of deep entrances at a voltage of 110-220kV over the enterprise territory .Central distribution substation differs from the main distribution substation in a higher power and in that bulk of its power is at a voltage of 110-220kV;it features simplified switching circuits at primary voltage; it is fed from the power to an individual object or region .Low-and medium-power shop substations transform energy from 6-10kV to a secondary voltage of 380/220 or 660/380.Step-up transformer substations are used at power plants for transformation of energy produced by the generators to a higher voltage which decreases losses at a long-distancetransmission .Converter substations are intended to convert AC to DC (sometimes vice versa) and to convert energy of one frequency to another .Converter substations with semiconductor rectifiers are convert energy of one frequency to another .Converter substations with semiconductor rectifiers are most economic. Distribution substations for 6-10kV are fed primarily from main distribution substations (sometimes from central distribution substations).With a system of dividing substations for 110-220kV, the functions of a switch-gear are accomplished by switch-gears for 6-10kV at deep entrance substations.Depending on location of substations their switch-gear may be outdoor or indoor. The feed and output lines at 6-10kV substations are mainly of the cable type .at 35-220kV substations of the aerial type .When erecting and wiring thesubstations ,major attention is given to reliable and economic power supply of a given production.Substations are erected by industrial methods with the use of large blocks and assemblies prepared at the site shops of electric engineering organizations and factories of electrical engineering industry .Substations are usually designed for operation without continuous attendance of the duty personnel but with the use of elementary automatic and signaling devices.When constructing the structural part of a substation .it is advisable to use light-weight industrial structures and elements (panels ,floors ,etc.) made of bent sections .These elements are pre-made outside the erection zone and are only assembled at site .This considerably cuts the terms and cost of construction.Basic circuitry concepts of substations are chosen when designing a powersupply system of the enterprise .Substationsfeature primary voltage entrances .transformers and output cable lines or current conductors of secondary voltage .Substations are mounted from equipment and elements described below .The number of possible combinations of equipment and elements is very great .Whenelaborating a substation circuitry ,it is necessary to strive for maximum simplification and minimizing the number of switching devices .Such substations are more reliable and economic .Circuitry is simplified by using automatic reclosure or automatic change over to reserve facility which allows rapid and faultless redundancy of individual elements and using equipment.When designing transformer substations of industrial enterprises for all voltages ,the following basic considerations are taken into account:1. Preferable employment of a single-bus system with using two-bus systems only to ensure a reliable and economic power supply;2. Wide use of unitized constructions and busless substations;3.Substantiated employment of automatics and telemetry ;if the substation design does not envisage the use of automatics or telemetry ,the circuitry is so arranged as to allow for adding such equipment in future without excessive investments and re-work./doc/554c0a220622192e453610661ed9ad5 1f01d5431.html e of simple and cheap devices-isolating switches ,short-circuiting switches ,load-breaking isolators ,fuses ,with due regard for their switching capacity may drastically cut the need for expensive and critical oil ,vacuum ,solenoid and air switches .Substation and switch-gear circuitries are so made that using the equipment of eachproduction line is fed from individual transformers ,assemblies ,the lines to allow their disconnection simultaneously with mechanisms without disrupting operation of adjacent production flows.When elaborating circuitry of a substation, the most vital task is to properly choose and arrange switching devices(switches ,isolators ,current limiters ,arresters ,high-voltage fuses).The decision depends on the purpose ,power and significance of the substation.Many years ago, scientists had very vague ideas about electricity. Many of them thought of it as a sort of fluid that flowed through wires as water flows through pipes, but they could not understand what made it flow. Many of them felt that electricity was made up of tiny particles of some kind ,but trying to separate electricity intoindividual particles baffled them.Then, the great American scientist Millikan, in 1909,astounded the scientific world by actually weighing a single particle of electricity and calculating its electric charge. This was probably one of the most delicate weighing jobs ever done by man,for a single electric particle weighs only about half of a millionth of a pound. To make up a pound it would take more of those particles than there are drops of water in the Atlantic Ocean.They are no strangers to us, these electric particles, for we know them as electrons. When large numbers of electrons break away from their atoms and move through a wire,we describe this action by saying that electricity is flowing through the wire.Yes,the electrical fluid that early scientists talked about is nothing more than electrical flowing along a wire.But how can individual electrons be made to break awayfrom atoms? And how can these free electrons be made to along a wire? The answer to the first question lies in the structure of the atoms themselves. Some atoms are so constructed that they lose electrons easily. An atom of copper, for example ,is continually losing an electron, regaining it(or another electron),and losing it again. A copper atom normally has 29 electrons, arranged in four different orbits about its nucleus. The inside orbit has 2 electrons. The next larger orbit has 8.The third orbit is packed with 18 electrons . And the outside orbit has only one electron.It is this outside electron that the copper atom is continually losing, for it is not very closely tied to the atom. It wanders off, is replaced by another free-roving electron, and then this second electron also wandersaway.Consequently,in a copper wire free electrons are floating around in all directions among the copper atoms.Thus, even through the copper wire looks quite motionless to your ordinary eye, there is a great deal of activity going on inside it. If the wire were carrying electricity to an electric light or to some other electrical device, the electrons would not be moving around at random. Instead, many of them would be rushing in the same direction-from one end of the wire to the other.This brings us to the second question .How can free electrons be made to move along a wire? Well ,men have found several ways to do that .One way is chemical. V olta,s voltaic pile,or battery, is a chemical device that makes electricity(or electrons)flow in wires. Another way is magnetic. Faraday and Henry discovered how magnets could be used to make electricity flow in a wire.MagnetsAlmost everyone has seen horseshoe magnets-so called because they are shaped like horseshoes. Probably you have experimented with a magnet, and noticed how it will pick up tacks and nails, or other small iron objects. Men have known about magnets for thousands of years.Several thousand years ago, according to legend, a shepherd named Magnes lived on the island of Crete, in the Mediterranean Sea .He had a shepherds crook tipped with iron. One day he found an oddly shaped black stone that stuck to this iron /doc/554c0a220622192e453610661ed9ad51f0 1d5431.html ter, when many other such stones were found, they were called magnets(after Magnets).These were natural magnets.In recent times men have learned how to make magnets out of iron. More important still, they have discovered how to use magnets to push electrons through wires-that is, how to make electricity flow. Before we discuss this, there arecertain characteristics of magnets that we should know about.If a piece of glass is laid on top of a horse- shoes magnet, and if iron filings are then sprink ledon the glass, the filings will arrange themselves into lines. If this same thing is trid with a bar magnet(a horseshoe magnet straightened out),the lines can be seen more easily. These experiments demonstrate what scientists call magnetic lines of force. Magnets, they explain, work through lines of force that ext- end between the two ends of the magnet. But electrons seem to have magnetic lines of force around them, too.This can be proved by sticking a wire through a piece ofcard board, sprinkling iron filings on the cardboard, and connecting a battery to the wire. The filings will tend to form rings around the wire,as a result of the magnetism of the moving electrons(or electricity).So we can see that there is arelationship betweenmoving electrons and magnetism, Magnetism results from the movement of electrons.Of course, electrons are not really flowing in the bar magnet, but they are in motion, circling the nuclei of the iron atoms. However, in the magnet, circling thelined up in such a way that their electrons are circling in the same direction. Perhaps a good comparison might be a great number of boys whirling balls onstrings in a clockwise direction around their heads.翻译:变电站建设的一般要求变电站(所)在电源系统的工业企业是一个至关重要的因素。
220KV变电站外文翻译
山东理工大学毕业设计(外文翻译材料)学院:电气与电子工程学院专业:电气工程及其自动化学生姓名:***指导教师:***State enumeration technique combined with a labeling busset approach for reliability evaluation ofsubstationconfiguration in power systems1. IntroductionSubstation reliability can be assessed using either Monte Carlo simulation or analytical methods [1–7]. There are two popular enumeration techniques for reliability evaluation of substation configuration in power systems: cut set enumeration [6–9] and network state enumeration [1,2]. There exist two essential differences between the two techniques. The first one is that in the cut set method, the minimum cut sets that lead to a network failure have to be identified before all of them are enumerated,whereas in the network state technique, network states are enumerated first and then an appropriate approach is used to identify whether each of the states is a failure one or not. The second one is that a cut set contains only failed components whereas a network state is defined by both failed and non-failed components.The network state technique has following features compared to the minimum cut set method:• Dependent failures between components can be easier to incorporate, such as one component failure causing outages of multiple components, cascading failures, etc. [1,2].• Multiple failure modes of network components can be easier to consider, such as active and passive failures of a component in a substation configuration [1,2].• Operation actions can be taken into consideration. This requires a model for multiple states of components, such as success, repair and switching states for a component in a substation configuration [1,2].• Network states could be mutually exclusive if the enumeration is properly performed. The first three features are due to the fact that the network state technique focuses on a state of whole network that can easily cover any status ofsubstation components including operational switching and cascading failure sequences. The fourth merit can result in significant simplification in calculations compared to the minimum cut set method. The total failure probability is simply a sum of probabilities of mutually exclusive network failure states in the network state technique. Identifying2. ExampleThe example is a simple substation network as shown in Fig. 4. The network includes three breakers and two transformers.Losing load at the bus load is used as the criterion of substation network failure.2.1. Considering only open circuit failuresIn order to compare the network state technique with the minimum cut set method, it has been first assumed that only open circuit failures of transformers and breakers are considered and all short circuit faults are ignored. To obtain a relatively simple analytical expression of the result, it is assumed that the open circuit failure probability of all the breakers and transformers is identical and it is U. In the computer program, different failure probability values for different components can be easily specified in the data file. Using the cut set method, four minimum cut sets are identified.They are: S1 = (T1, T2}; S2 = (B1, B2), S3 = (B1, B3, T2);S4 = {B2, B3, T1). The probability of substation network failure is calculated b y Fig. 4. A simple substation network.P f = P(S1 ∪S2 ∪S3 ∪S4) = 2U2 + 2U3 − 5U4 + 2U5 (4)As usual, the four minimum cut sets are not mutually exclusive. The calculations from the left side of the second equality sign to its right side are associated with intersections among the minimum cut sets. For this simple case, it can be expressed asfollows:P f = P(S1 ∪S2 ∪S3 ∪S4)= P(S1) + P(S2) + P(S3) + P(S4) −P(S1 ∩ S2)−P(S1 ∩ S3) −P(S1 ∩ S4) −P(S2 ∩ S3) −P(S2 ∩ S4)−P(S3 ∩ S4) + P(S1 ∩ S2 ∩ S3) + P(S1 ∩ S2 ∩ S4)+P(S1 ∩ S3 ∩ S4) + P(S2 ∩ S3 ∩ S4)−P(S1 ∩ S2 ∩ S3 ∩ S4) (5)For a relatively large network, identifying all minimum cut sets and performing calculations of the union of non-mutually exclusive cut sets require considerable computational efforts. Using the presented network state enumeration with the labeling bus set approach, 16 network states are identified as failure states that lead to loss of load. Generally, although the number of network failure states is more than the number of minimum cut sets, it is much easier and faster to identify them using the labeling bus set approach in programming. Particularly, once the network failure states are identified, the total network failure probability is just the sum of probabilities of all network failure states without any calculation associated with the union and intersections. In this example, we can have the following analytical expression of substation network failure probability:P f = 2U2(1 −U)3 + 8U3(1 −U)2 + 5U4(1 −U) + U5 (6)It is interesting to note that Eqs. (4) and (6) look so different but they lead to the same result. This can be proven by assign Ua value. For instance, by letting U= 0.015, the substation network failure probability from both the equations is identical, which is0.000456498.2.2. Considering both open circuit failures and shortcircuit faultsIt is relatively difficult for the cut set method to incorporate dependent failure events, multiple failure modes and switching actions, which are associated with short circuit faults and need to be modeled in reliability evaluation of a substation configuration.It has been assumed in this example that the breakers can clear their own short circuit faults and only the short circuit faults on the two transformers are considered. When a short circuit fault happens on either transformer, thebreakers B1 and B2 will be opened by a protection action. This results in a switching state. In this state, B1 and B2 are still healthy components. Their outages are not due to a failure and cannot be treated as components in a cut set. Then, the switches (not shown in the figure) at both sides of the failed transformer are manually opened to isolate it, and B1 and B2 are re-closed so that the load may be supplied through another transformer if the second transformer is not simultaneously down. This second state corresponds to a repairing state of the faulted transformer.3. ConclusionsThe network state enumeration technique combined with the labeling bus set approach proposed in the paper is suitable for reliability evaluation of a substation configuration or a looped distribution network that needs to model dependent failures, multiple failure modes and multiple states of components.Another advantage of the presented network state enumeration technique is that enumerated network states are mutually exclusive resulting in great simplification in calculating the total network failure probability compared to the minimum cut set method. The key in the presented technique is identification of whether a state is a failure one or not. The labeling bus set approach has been proposed for this purpose.A substation configuration is used to explain the procedure including a switching action associated with dependent outages and multiple states of network components. The presented method is easy to program and can be applied to any substation or looped distribution networks.The example of a substation network demonstrates that in the case of considering only open circuit failures, the same result is obtained using the proposed method and the minimum cut set method. The example also shows that the presented technique can handle the case of considering both open failures and short circuit faults which are associated with switching actions and protection logic.结合国家统计技术在电力系统的配置标签母线变电站集方法的可靠性评价1介绍变电站的可靠性可以使用蒙特卡洛仿真法或者分析法进行评估1-7。
变电站英文范文
变电站英文范文A substation, also known as a switching station, is a crucial component of an electrical system that plays a vital role in the transmission and distribution of electricity. 变电站是电气系统中至关重要的组成部分,起着在电力传输和分配中至关重要的作用。
Substations are responsible for converting high-voltage electricity from power plants into lower-voltage electricity that can be used by homes and businesses. 变电站负责将发电厂产生的高压电力转换为可供家庭和企业使用的低压电力。
These facilities are essential for ensuring a reliable and stable supply of electricity to consumers, as they help regulate the flow of power and protect the grid from disruptions and overloads. 这些设施对确保向用户提供可靠稳定的电力供应至关重要,因为它们有助于调节电力流动并保护电网免受干扰和过载。
In addition to their primary function of voltage transformation, substations also serve as points where power can be switched and distributed to different areas, allowing for greater flexibility inmanaging the electrical grid. 除了主要的电压转换功能外,变电站还可用作电力切换和分配到不同区域的点,从而增加了管理电网的灵活性。
变电站设计英文参考文献
变电站设计英文参考文献以下是关于变电站设计的英文参考文献列表及简介:1. "Modern Power Station Practice Vol 1: Electrical Systems and Equipment" by Central Electricity Generating Board (CEGB) - 这本书是关于电站设计的权威参考书之一,其中包含了变电站设计的细节和要求。
2. "HVDC Transmission: Power Conversion Applications in Power Systems" by K.R. Padiyar - 这本书主要涉及高压直流输电的理论和应用,而变电站通常是将交流电转换成直流电进行输电的一部分,因此这本书可以帮助设计师更好地理解变电站的工作原理。
3. "Electric Power Substations Engineering" by John D. McDonald- 这本书是变电站设计和工程的综合指南,包含了变电站的各个方面,从概述到详细设计,以及施工和运行。
4. "Transformer and Inductor Design Handbook" by Colonel Wm. T. McLyman - 压变和电感器是变电站中常见的元件,因此设计师需要了解它们的设计和制造,这本书提供了详细的指导和案例。
5. "Electric Power Distribution Handbook" by Thomas Allen Short- 这本书提供了关于配电系统的基础知识和设计方法,这对于变电站设计师来说也非常重要,因为变电站通常是配电网络的一个关键组成部分。
6. "Switchgear and Protection" by J.B Gupta - 变电站中使用的开关设备和保护系统非常关键,这本书提供了涵盖相关主题的详细信息,包括故障和过电压保护,以及开关设备的选择和维护。
变电站设计英文参考文献
变电站设计英文参考文献# Design of SubstationSubstations play a vital role in the power system infrastructure, serving as the main junction point for the transmission and distribution of electrical energy. The design of substations requires careful consideration of various factors to ensure safe and efficient power transfer. This article provides an overview of the design considerations involved in the planning and construction of a substation.## Site SelectionThe first step in substation design is to identify an appropriate location. The site must be strategically chosen, considering factors such as proximity to power sources, accessibility, land availability, and environmental impacts. Adequate land area is required to accommodate the equipment, structures, and necessary safety clearances.## Electrical System AnalysisOnce the site is finalized, an electrical system analysis is conducted to determine the voltage level, load capacity, and other electrical parameters. This analysis helps in determining the type and rating of transformers, circuit breakers, and other equipment required for the substation.## Substation LayoutThe layout of the substation depends on several factors, including the configuration of the electrical system and available land area. The layout should be designed to allow for efficient power flow, adequate spacing between equipment, and clear access for maintenance and operation. Different areas for high voltage, medium voltage, and low voltage equipment are designated within the substation.## Equipment SelectionCareful selection of equipment is crucial for a well-functioning substation. Transformers, circuit breakers, switchgear, protection relays, and control systems are some of the essential components. The equipment should be reliable, efficient, and compatible with the electrical system requirements. Factors such as load capacity, fault current ratings, and safety features are considered during equipment selection.## Safety ConsiderationsSafety is of utmost importance in substation design. Adequate safety measures should be implemented to protect personnel and equipment. Safety clearances, grounding systems, fire suppression systems, and protective barriers are some of the key considerations. Compliance with relevant codes, standards, and regulations is essential for ensuring a safe working environment.## Environmental ImpactThe environmental impact of a substation should be minimized. Measures such as proper disposal of waste materials, noise reduction, and landscaping are undertaken to mitigate the impact on the surrounding ecosystem and nearby communities. Environmental regulations and guidelines must be followed throughout the design and construction process.## Construction and CommissioningOnce the design is finalized, the construction phase begins. The construction process involves civil works, installation of equipment, wiring, and testing. The commissioning phase includes the initial energization, functional testing, and synchronization with the power grid. Proper coordination between various stakeholders, including engineers, contractors, and utility companies, is crucial for a successful construction and commissioning process.## Maintenance and UpgradesRegular maintenance and upgrades are essential for the efficient operation of a substation throughout its lifespan. Periodic inspections, equipment testing, and preventivemaintenance help ensure the reliability and safety of the substation. Upgrades may be required to accommodate future growth, technological advancements, or changes in the electrical system.In conclusion, the design of a substation involves several critical considerations, including site selection, electrical system analysis, layout design, equipment selection, safety measures, environmental impact, and construction and commissioning processes.A well-designed and properly maintained substation is vital for the reliable and uninterrupted transmission and distribution of electrical energy.。
变电站建设外文文献翻译
变电站建设外文文献翻译(文档含中英文对照即英文原文和中文翻译)General Requirements to Construction of SubstationSubstations are a vital element in a power supply system of industrial enterprises.They serve to receive ,convert and distribute electric energy .Depending on power and purpose ,the substations are divided into central distribution substations for a voltage of 110-500kV;main step-down substations for110-220/6-10-35kV;deep entrance substations for 110-330/6-10Kv;distribution substations for 6-10Kv;shop transformer substations for 6-10/0.38-0.66kV.At the main step-down substations, the energy received from the power source is transformed from 110-220kV usually to 6-10kV(sometimes 35kV) which is distributed among substations of the enterpriseand is fed to high-voltage services.Central distribution substations receive energy from power systems and distribute it (without or with partial transformation) via aerial and cable lines of deep entrances at a voltage of 110-220kV over the enterprise territory .Central distribution substation differs from the main distribution substation in a higher power and in that bulk of its power is at a voltage of 110-220kV;it features simplified switching circuits at primary voltage; it is fed from the power to an individual object or region .Low-and medium-power shop substations transform energy from 6-10kV to a secondary voltage of 380/220 or 660/380.Step-up transformer substations are used at power plants for transformation of energy produced by the generators to a higher voltage which decreases losses at a long-distance transmission .Converter substations are intended to convert AC to DC (sometimes vice versa) and to convert energy of one frequency to another .Converter substations with semiconductor rectifiers are convert energy of one frequency to another .Converter substations with semiconductor rectifiers are most economic. Distribution substations for 6-10kV are fed primarily from main distribution substations (sometimes from central distribution substations).With a system of dividing substations for 110-220kV, the functions of a switch-gear are accomplished by switch-gears for 6-10kV at deep entrance substations.Depending on location of substations their switch-gear may be outdoor or indoor. The feed and output lines at 6-10kV substations are mainly of the cable type .at 35-220kV substations of the aerial type .When erecting and wiring thesubstations ,major attention is given to reliable and economic power supply of a given production.Substations are erected by industrial methods with the use of large blocks and assemblies prepared at the site shops of electric engineering organizations and factories of electrical engineering industry .Substations are usually designed for operation without continuous attendance of the duty personnel but with the use of elementary automatic and signaling devices.When constructing the structural part of a substation .it is advisable to use light-weight industrial structures and elements (panels ,floors ,etc.) made of bent sections .These elements are pre-made outside the erection zone and are only assembled at site .This considerably cuts the terms and cost of construction.Basic circuitry concepts of substations are chosen when designing a powersupply system of the enterprise .Substations feature primary voltage entrances .transformers and output cable lines or current conductors of secondary voltage .Substations are mounted from equipment and elements described below .The number of possible combinations of equipment and elements is very great .Whenelaborating a substation circuitry ,it is necessary to strive for maximum simplification and minimizing the number of switching devices .Such substations are more reliable and economic .Circuitry is simplified by using automatic reclosure or automatic change over to reserve facility which allows rapid and faultless redundancy of individual elements and using equipment.When designing transformer substations of industrial enterprises for all voltages ,the following basic considerations are taken into account:1. Preferable employment of a single-bus system with using two-bus systems only to ensure a reliable and economic power supply;2. Wide use of unitized constructions and busless substations;3.Substantiated employment of automatics and telemetry ;if the substation design does not envisage the use of automatics or telemetry ,the circuitry is so arranged as to allow for adding such equipment in future without excessive investments and re-work.e of simple and cheap devices-isolating switches ,short-circuiting switches ,load-breaking isolators ,fuses ,with due regard for their switching capacity may drastically cut the need for expensive and critical oil ,vacuum ,solenoid and air switches .Substation and switch-gear circuitries are so made that using the equipment of each production line is fed from individual transformers ,assemblies ,the lines to allow their disconnection simultaneously with mechanisms without disrupting operation of adjacent production flows.When elaborating circuitry of a substation, the most vital task is to properly choose and arrange switching devices(switches ,isolators ,current limiters ,arresters ,high-voltage fuses).The decision depends on the purpose ,power and significance of the substation.Many years ago, scientists had very vague ideas about electricity. Many of them thought of it as a sort of fluid that flowed through wires as water flows through pipes, but they could not understand what made it flow. Many of them felt that electricity was made up of tiny particles of some kind ,but trying to separate electricity intoindividual particles baffled them.Then, the great American scientist Millikan, in 1909,astounded the scientific world by actually weighing a single particle of electricity and calculating its electric charge. This was probably one of the most delicate weighing jobs ever done by man,for a single electric particle weighs only about half of a millionth of a pound. To make up a pound it would take more of those particles than there are drops of water in the Atlantic Ocean.They are no strangers to us, these electric particles, for we know them as electrons. When large numbers of electrons break away from their atoms and move through a wire,we describe this action by saying that electricity is flowing through the wire.Yes,the electrical fluid that early scientists talked about is nothing more than electrical flowing along a wire.But how can individual electrons be made to break away from atoms? And how can these free electrons be made to along a wire? The answer to the first question lies in the structure of the atoms themselves. Some atoms are so constructed that they lose electrons easily. An atom of copper, for example ,is continually losing an electron, regaining it(or another electron),and losing it again. A copper atom normally has 29 electrons, arranged in four different orbits about its nucleus. The inside orbit has 2 electrons. The next larger orbit has 8.The third orbit is packed with 18 electrons . And the outside orbit has only one electron.It is this outside electron that the copper atom is continually losing, for it is not very closely tied to the atom. It wanders off, is replaced by another free-roving electron, and then this second electron also wandersaway.Consequently,in a copper wire free electrons are floating around in all directions among the copper atoms.Thus, even through the copper wire looks quite motionless to your ordinary eye, there is a great deal of activity going on inside it. If the wire were carrying electricity to an electric light or to some other electrical device, the electrons would not be moving around at random. Instead, many of them would be rushing in the same direction-from one end of the wire to the other.This brings us to the second question .How can free electrons be made to move along a wire? Well ,men have found several ways to do that .One way is chemical. V olta,s voltaic pile,or battery, is a chemical device that makes electricity(or electrons)flow in wires. Another way is magnetic. Faraday and Henry discovered how magnets could be used to make electricity flow in a wire.MagnetsAlmost everyone has seen horseshoe magnets-so called because they are shaped like horseshoes. Probably you have experimented with a magnet, and noticed how it will pick up tacks and nails, or other small iron objects. Men have known about magnets for thousands of years.Several thousand years ago, according to legend, a shepherd named Magnes lived on the island of Crete, in the Mediterranean Sea .He had a shepherds crook tipped with iron. One day he found an oddly shaped black stone that stuck to this iron ter, when many other such stones were found, they were called magnets(after Magnets).These were natural magnets.In recent times men have learned how to make magnets out of iron. More important still, they have discovered how to use magnets to push electrons through wires-that is, how to make electricity flow. Before we discuss this, there arecertain characteristics of magnets that we should know about.If a piece of glass is laid on top of a horse- shoes magnet, and if iron filings are then sprink ledon the glass, the filings will arrange themselves into lines. If this same thing is trid with a bar magnet(a horseshoe magnet straightened out),the lines can be seen more easily. These experiments demonstrate what scientists call magnetic lines of force. Magnets, they explain, work through lines of force that ext- end between the two ends of the magnet. But electrons seem to have magnetic lines of force around them, too.This can be proved by sticking a wire through a piece ofcard board, sprinkling iron filings on the cardboard, and connecting a battery to the wire. The filings will tend to form rings around the wire,as a result of the magnetism of the moving electrons(or electricity).So we can see that there is arelationship between moving electrons and magnetism, Magnetism results from the movement of electrons.Of course, electrons are not really flowing in the bar magnet, but they are in motion, circling the nuclei of the iron atoms. However, in the magnet, circling thelined up in such a way that their electrons are circling in the same direction. Perhaps a good comparison might be a great number of boys whirling balls onstrings in a clockwise direction around their heads.翻译:变电站建设的一般要求变电站(所)在电源系统的工业企业是一个至关重要的因素。
变电站外文翻译3
英文文献Power System Substation is an important and indispensable component of the power it assumed the task of conversion and distribution of grid security and the economy play a decisive role in running is to contact the user's power plants and intermediate links. With economic development, expanding grid capacity, reliability of operation of the power grid is getting higher and higher requirements. Development of science and technology, intelligent switches, photoelectric current and voltage transformer, a run-line state detection, training simulation Substation Operation matures, such as high-tech, as well as fiber-optic technology, computer high-speed network system in the development of real-time applications, bound to the existing substation automation technology have a profound impact, all-digital substation automation system development trend.Keywords: substation automationPower system is operated by the production, transmission, distribution and consumption of a variety of power linked to the composition of electrical equipment. As a result of a large number of power can not be stored, we must ensure that the production of electricity and energy balance. With the scientific and technological advances in the technological development of our country has reached a certain level. Intelligent switches, photoelectric current and voltage transformer, a run-line state detection, training simulation Substation Operation matures, such as high-tech, as well as fiber-optic technology, computer high-speed network system in the development of real-time applications, significantly increase the transformation degree of automation.Design of our substation substation cable programs tend to be simple, many of the recent domestic new 220 k V substation and 110kV voltage levels of wiring without the use of dual-bus bypass bus. The use of GIS, the priority sub-bus single wire. Terminal Substation, the line as far as possible, such as transformer unit wiring.A large number of the introduction of new technology, transformer substation rising level of electrical equipment, power distribution devices from the traditional form of moving toward oil-free, vacuum switches, SF6 switches and mechanical, electrical equipment combination of the development of small-scale integration. In recent years the world famous high-voltage electrical equipment companies have been developing, the development of the various types of 145-550 kV outdoor high-pressure and ultrahigh-pressure combination of electrical appliances, some high-voltage switchgearplant has also started production of 145 k V compact outdoor portfolio electrical appliances. Smart plug-in type outdoor switchgear is a more complete high-pressure and ultrahigh-pressure switch system, which includes electrical first and second equipment, as well as the associated fiber optic cable, such as plug-type compound. The entire distributed substation automation system; the introduction of advanced network technology; substation and the construction area covers an area of reduced substation program to simplify wiring, switchgear, bus and steel pipes, such as the use of stents to substation layout is more simple, the abolition of the former station area and optimize the layout to make a substantial decline in an area substation.With technological advances, the traditional relay protection devices are gradually being replaced by microprocessor-based protection. Microprocessor-based protection is referred to as the protection of PC computer, a digital relay protection, is based on the programmable digital circuit technology and real-time digital signal processing technology of the Power System Protection. At present, both at home and abroad have been developed to 32-bit digital signal processor for hardware-based protection, control, measurement, and data communications integration of microprocessor-based protection control devices, and artificial intelligence technology into a number of relay protection, such as artificial neural networks, fuzzy theory to determine the realization of fault type, fault location, the direction of protection, the main equipment and other new methods of protection. By means of wavelet analysis of the theory of digital signal failure of the entire frequency band information and to achieve fault detection. These artificial intelligence technology to improve the accuracy of failure to provide a means of identification, but also some single-frequency signal based on the traditional method difficult to identify the problems to be resolved. At present, the microprocessor-based relay protection is along the microprocessor-based protection network, and intelligent, adaptive and protection, control, measurement, signal, data communications integration direction.The most basic request that charged barbed wire net in the city circulates is safe and stable.The core problem of charged barbed wire net safety in the city stability wants to build up to be a with the city mutually accommodative of, reasonable of charged barbed wire net structure.This text passes and programs to the charged barbed wire net with electric power and designs the technique principle of the aspect analysis.Elaborated the standard concerning electric voltage grade, power supply credibility, power supply ability and charged barbed wire net safe power supplyrequests etc. some problems that should notice in the charged barbed wire net safety;And have already aimed at sex's elaborating request to the concrete design principle opposite charged barbed wire net safe power supply of the 220 kV transformer substation and 110kV transformer substation.How to promise power supply credibility1)Satisfy charged barbed wire net power supply safe standard.The power supply network satisfies the request of power supply credibility.The standard that all satisfies N-l, city area center high burden density important customer in the district satisfy the standard of N-2.Disallow transformer over carry.Help a southern city net power supply credibility rate index sign programming target is 99.99%.2)Press to go together with charged barbed wire net burden to transfer ability in the city satisfy following request:①The transformer substation loses any once enter line or one set lord transformer but lower power supply ability, win press to go together with charged barbed wire net to have to transfer burden to ensure the ability of power supply.②When a female line of transformer substation stops a luck because of putting, winning to press to go together with charged barbed wire net should have the ability that transfer all burden.③When the 10 kv goes together with electric wire road any check to fix or breaks down, going together with the charged barbed wire net should have non- check of transfer to fix, non- breakdown segment ability for carrying.The non- check fixs,The non- breakdown segment carries to the power is off time only for go together with to give or get an electric shock an equipments to pour a Zha operation for time.3)Ask to satisfy a following principle while allowing the capacity of the power outage and the target of the instauration power supply while going together with charged barbed wire net breakdown to make the customer the power is off:①The customer of two back track power supplies , after losing a back track, should be unlimited to give or get an electric shock.②The customer of three back track power supplies , after losing a back track, should be unlimited to give or get an electric shock, again after losing a back track, should satisfy power supply capacity 50-70% is used an electricity.③When all of a back track or much customer's the power of back track power supplies stopped, resume target time of power supply broke down to handle for a back track restored of ask.④At wreath net power supply method in for open the customer in the wreath network, the lowest instauration power supply request for breaking down wreath net is to need to pass charged barbed wire net operation instaurationPower supply of time, its target time need for operating of ask;It is the power supply that passes to go together with net automation restriction to resume an intact block in the lmin to go together with net automation circuit.Power supply ability and safety1)Of each electric voltage layer net capacity in the city net, press definitely change the electric capacity carry to compare an allocation, the all levels electric voltage net changes the electric capacity carry compare satisfy the upper limit request that current 《electric power net in the city programming design lead 》stipulates. According to 2001 national economy trade committee promulgation of electric power profession standard 《electric power system safety stability lead 》middle finger:N.a standard is under the normal movement method of the any component(is like circuit, generator, and transformer...etc.) in the electric power system have no break down or because of break down break to open, electric power system shouldCan keep stable to circulate with normal power supply, other components however carry, electric voltage and frequency all are allowing inside the scope.This is usually called N. one standard.The charged barbed wire net power supply safe standard has:N-l standard and quasi- N one 2 standards and Ns is one 2 standards.City's going together with the power supply safety of charged barbed wire net to usually request is to adopt N one one standard.It is one 2 standards to have already adopted quasi- N as well at the power supply safety specially important place one 2 standards or Ns.2)Medium press and go together with charged barbed wire net and have certain back up capacity, generally should have 50% Yu degrees, while being any component check and fixing and breaking down and stopping and carrying should pass and pour a Zha operation can keep a segment the customer continue toward the customer or non- trouble power supply, go together with each component of charged barbed wire net while transfering burden however carry, unlimited electricity.When two set lords hanpen that the power is off at the same time,that is used circuit should adjust above 60% burden.译文:变电站是电力系统中不可缺少的重要组成部分,它担负着电能转换和分配的任务,对电网的安全和经济运行起着举足轻重的作用,是联系发电厂和用户的中间环节。
(完整版)变电站外文翻译外文文献英文文献变电站的综合概述
英文翻译A comprehensive overview of substationsAlong with the economic development and the modern industry developments of quick rising, the design of the power supply system become more and more completely and system. Because the quickly increase electricity of factories, it also increases seriously to the dependable index of the economic condition, power supply in quantity. Therefore they need the higher and more perfect request to the power supply. Whether Design reasonable, not only affect directly the base investment and circulate the expenses with have the metal depletion in colour metal, but also will reflect the dependable in power supply and the safe in many facts. In a word, it is close with the economic performance and the safety of the people. The substation is an importance part of the electric power system, it is consisted of the electric appliances equipments and the Transmission and the Distribution. It obtains the electric power from the electric power system, through its function of transformation and assign, transport and safety. Then transport the power to every place with safe, dependable, and economical. As an important part of power’s transport and control, the transformer substation must change the mode of the traditional design and control, then can adapt to the modern electric power system, the development of modern industry and the of trend of the society life.Electric power industry is one of the foundations of national industry and national economic development to industry, it is a coal, oil, natural gas, hydropower, nuclear power, wind power and other energy conversion into electrical energy of the secondary energy industry, it for the other departments of the national economy fast and stable development of the provision of adequate power, and its level of development is a reflection of the country's economic development an important indicator of the level. As the power in the industry and the importance of the national economy, electricity transmission and distribution of electric energy used in these areas is an indispensable component.。
变电站外文翻译外文文献英文文献变电站的综合概述
附录Ⅲ英文翻译A comprehensive overview of substationsAlong with the economic development and the modern industry developments ofquick rising, the design of the power supply system become more and more completelyand system. Because the quickly increase electricity of factories, it also increases seriously to the dependable index of the economic condition, power supply in quantity. Therefore they need the higher and more perfect request to the power supply. Whether Design reasonable, not only affect directly the base investment and circulate the expenses with have the metal depletion in colour metal, but also will reflect the dependable in power supply and the safe in many facts. In a word, it is close with the economic performance and the safety of the people. The substation is an importancepart of the electric power system, it is consisted of the electric appliances equipmentsand the Transmission and the Distribution. It obtains the electric power from theelectric power system, through its function of transformation and assign, transport and safety. Then transport the power to every place with safe, dependable, and economical.As an important part of power’s transport and control, the transformer substation must change the mode of the traditional design and control, then can adapt to the modernelectric power system, the development of modern industry and the of trend of thesociety life.Electric power industry is one of the foundations of national industry andnational economic development to industry, it is a coal, oil, natural gas, hydropower,nuclear power, wind power and other energy conversion into electrical energy of the secondary energy industry, it for the other departments of the national economy fastand stable development of the provision of adequate power, and its level of development is a reflection of the country's economic development an important indicator of the level. As the power in the industry and the importance of the national economy, electricity transmission and distribution of electric energy used in these areasis an indispensable component.。
变电站中英文对照外文翻译文献
中英文对照外文翻译文献中英文对照外文翻译一般要求的变电站建设变电站(所)在电源系统的工业企业是一个至关重要的因素。
他们接收,转换和发送电能。
根据能源和需求,变电站分为中央配电变电站电压为110-500kV;主要降压变电所电压为110-220/6-10-35kV;深入口变电站为110-330/6-10Kv;二次变电站的电压为6-10Kv;车间变电所电压为6-10/0.38-0.66kV。
在主要的降压变电所,电源能量转化电压为110-220kV,通常使用6-10Kv(有时为35kV变电所)的电压分配给企业和被用来满足高压服务。
中央配电变电站从电力系统接收能量并分发它(不包括或者包括部分变换) 给企业不同区域,通过空中电缆和地下电缆线路电压为110-220kV。
中央分配变电站站不同于主配电变电它是一个更强大的电力设施,它的电压大部分在110-220kV的电压。
它可以简化初级电压、中级电压或地区的开关电路。
中低级别变电站改造能量来自6-10kv的电压,它的二次侧电压为380/220或660/380。
升压变压器变电站用于将电厂产生的能量转化使发电机产生的电压升高,从而有效地减少在远距离输电能量的损失转换器变电站的目的是为了将直流转换成交流(有时相反)和转换成能量时改变频率。
转换器变电站的能量转换是用半导体整流器来变频的。
带半导体整流器的转化器变电站是最经济的。
6-10kV的配电变电站主要依据主配电变电站(有时依据中央配电变电站)。
110-220kV变电站系统区域的划分时,根据变电站设备功能划分时是有学问的,6-10kV的变电站设备划分在变电站的入口。
根据变电站变的位置,电站设备在可以露天或室内。
6-10kV变电站的在电缆的类型主要是供给输出线。
在35-220kV变电站空中线路样式,在变电站架线和接线,主要注重供电生产的可靠和经济。
用工业的方式建设变电站,是使用大量的数块和在电气工程组织和工厂电气工程等行业的车间的位置进行组装。
变电站毕业设计~外文翻译
山东理工大学毕业设计(外文翻译材料)学院:专业:学生姓名:指导教师:电气与电子工程学院电气工程及其自动化韦柳军孟繁玉Reliability modelling and analysis for SheffieldSubstation 220 kV upgrade projectCaroline Lee Transend, Networks Pty Ltd , TasmaniaDr Sudhir Agarwal,San Diego, California, USAABSTRACTThis paper describes the application of a defensible probabilistic process in reliability evaluation for Sheffield 220 kV Substation redevelopment project. Sheffield Substation is a hub of 220 kV transmission system in the North and North-West regions of Tasmania. It provides connection to West Coast and Mersey Forth hydro power stations and facilitates power transfers from these power stations to major industrial customers in George Town area and retail andindustrial loads in the North and North-West regions of Tasmania. Therefore, it is important that integrity of Sheffield Substation is protected as much as possible and consequences of unplanned outages minimised to prevent possible widespread system disturbances.Together with General Reliability from San Diego,California, Transend undertook the reliability evaluation of four redevelopment options for Sheffield Substation using SUBREL, substation reliability and TRANSREL, transmission system reliability programs.1.INTRODUCTIONTransend, as a Transmission Service Provider and Transmission Network Operator in Tasmania is responsible for providing reliable electricity supply and providing cost effective development solutions- 1 -of the transmission network. Transend has identified a need for a comprehensive and more objective process in justification of development projects from its capital works program. The need to combine customer reliability targets and economics to achieve cost effective development solutions has been long recognised. A hierarchical framework for overall power system reliability evaluation is presented in [1].Different design, planning and operating principles and techniques have been developed in different countries over many decades in an attempt to find balance between reliability targets and economic constraints [2].Following the reliability concept and principles, differentutilities applied different reliability criteria to justify projects from their capital works program. Reliability criteria can be viewed as conditions that should be satisfied by electricity generation, transmission and distribution systems in order to achieve requiredreliability targets. Reliability criteria usually fall into two categories: established numerical target levels of reliability (eg level of expected energy not supplied) and performance test criteria (eg N-1, N-2 incidents that the system has to withstand). An attempt to combine these two categories into one set of reliability criteria is currently underway in Tasmania [3]. The use of reliability criteria from the first category is the core of probabilistic reliability evaluation approach. The second category is a deterministic reliability evaluation approach. The usefulness of deterministic criteria and security standards in justification of projects from capital works program is challenged in [4]. Instead, an approach involving customers in decision making and simulating a realistic system operation and failure is commended. The basic steps suggested in proper reliability evaluations are based on complete understanding of the equipment and system behaviour including:• Understanding the way the equipment and system operate;- 2 -• Identify the situations in which equipment can fail;• Understand consequences of the failures;• Incorporate these events into the reliability model;•Use the available evaluation techniques tocalculate reliability indices and costs.With this understanding of the system behaviour probability theory is then only seen as a tool to transform this understanding into the likely system future behaviour.2. SELECTION OF EVALUATION TECHNIQUE AND SOFTWARE TOOLS There are two main categories of evaluation techniques[5]: analytical (stateenumeration) and Monte Carlo simulation. The advantages and disadvantages of both methods are discussed in [1].Analytical technique was chosen by Transend because of its usefulness in comparing different development options for network development projects. This approach was presented also in the Electricity Supply Association of Australia Guidelines for Reliability Assessment Planning [6]. Consequently, decision was made to acquire SUBREL, and TRANSREL, substation reliability and transmission system reliability programs from General Reliability,USA.2.1. SUBREL - SUBSTATION RELIABILITYPROGRAMSUBREL is a computer program which calculates reliability indices for an electricity utility substation and generating station switchyard [7]. The methodology used to analyse impact of substation generated outages on overall system reliability performances has been described in [8]. The program models the following outage events, including all required subsequent automatic and manual switching operations:1. Forced outage of any substation component:- 3 -• Breaker• Transformer• Bus Section• Disconnector2. Forced outage of an incoming line.3. Forced outage overlapping a maintenance outage for substation equipment or an incoming line.4. Stuck breaker (failure to open when needed to clear the fault). SUBREL calculates the following load point indices:• Frequency of Interruption (per year)• Number of Circuits Interruptions (per year)• Outage Duration (minutes per outage)• Annual Total Outage Duration (minutes per year)• Customer Minutes of Interruption CMI (per year)• Expected Unsupplied Energy (EUE) (kWh per year)• Expected Outage Cost ($ per year)SUBREL also calculates the following substation or totalsystem indices:• SAIFI, System Average Interruption Frequency Index• SAIDI, System Average Interruption Duration Index• CAIDI, Customer Average Interruption Duration Index• ASAI, Average Service Availability Index• EUE, Expected Unsupplied Energy (kWh per year)- 4 -• Expected Outage Cost ($ per year)SUBREL generates a list of substation generated outages that can be used further by TRANSREL to analyse impact on overall system reliability performance.2.2. TRANSREL – TRANSMISSION SYSTEM RELIABILITY PROGRAMTRANSREL uses contingency enumeration of transmission contingencies to evaluate power network reliability. It is designed to aid electric utility system planners for reliability assessment of bulk power systems. The process involves specifying contingencies (outages of transmission lines and station originated outages) and performing load flow analysis to determine system problems such as circuit overloads, low/high bus voltages, bus separation or islanding. Using the probability, frequency and duration of the contingencies evaluated, indices of system problems as measures of system unreliability are calculated. Both post contingency and post remedial action indices can be calculated. If no remedial actions are taken to alleviate a problem, the post contingency indices may provide a pessimistic assessment of system reliability. If remedial actions such as generation redispatch, switching of facilities, curtailment of load alleviates some of the system problems, the post remedial action reliability indices provide a more realistic measure of system performance. The amount of load shedding is used as an indicator of contingency severity or system capability to withstand contingencies. Using probabilities of contingencies, expected load curtailment at buses can be calculated as reliability indices. TRANSREL was used with load flow program, PTI PSS/E to examine the impact of an outage on system performance. The types of failures identified for checking the impact of a contingency on system performance are: Transmission circuit overloads - by comparing flows based on the load flow solution with user- 5 -selected circuit ratings; Bus voltage violations - by checking bus voltages against high and low voltage limits, or maximum allowable voltage deviation from the base case; Load curtailment - by tabulating the amount of load curtailed as a result of system failure;Load flow divergence - by tabulating the bus mismatches above a predefined tolerance. TRANSREL computes reliability indices using a contingency enumeration approach, which involves selection and evaluation of contingencies, classification of each contingency according to specified failure criteria, and computation of reliability indices. Reliability indices include frequency, duration and severity (overloads, voltage violations, load curtailed, and energy curtailed). Both system and bus indices are calculated.3.SUBREL AND TRANSREL APPLICATION FOR SHEFFIELD 220 KV SUBSTATION Sheffield Substation is a hub of 220 kV transmission system in the North and North-West regions of Tasmania. As shown on Figure 1, it provides connections from the West Coast and Mersey Forth hydro power stations to the rest of the system. In addition, it supplies Aurora Energy customers in North and North-West regions and major industrial customers in the George Town area.During winter months, from May to September, the amount of energy supplied through and transferred from Sheffield Substation can reach more than 50% of the energy supplied to the rest of the system as shown in Figure 2.As such, Sheffield Substation has been recognized as a vulnerable point in the Tasmanian power system. The total loss of Sheffield Substation during times of large power transfer from West Coast of Tasmania to the rest of the system could possibly lead to a large system disturbance in Tasmania. With the present Sheffield Substation 220 kV layout, the total loss of Sheffield Substation can be caused by a single element failure.- 6 -3.1. DEVELOPMENT OPTIONS ANALYSEDThe need to redesign the existing substation 220 kV layout has been recognised long time ago. The following three options have been selected for detailed modeling and analysis:Option 1: Triple busbar arrangementOption 2: Full breaker and a half and double breaker arrangement Option 3: Partial breaker and half and double breaker arrangement These options were compared against the existing 220 kV busbar design (Do Nothing option).A brief description of each of these options is as follows:3.1.1. DO NOTHING OPTION- 7 -The “Do nothing option” represents the existing 220 kV busbar arrangement at Sheffield Substation. The existing 220 kV Sheffield Substation has had some major changes since substation commissioning and installation of two autotransformers for the North and North-West regions of Tasmania supply in 1967. The substation 220 kV busbar arrangement is double, strung busbar arrangement with one bus coupler. In normal system configuration main bus coupler A752 is closed, 220 kV“S” by pass bus and second bus coupler S752 are not in service. The schematic diagram of this option is shown below. Total number of circuits connected at Sheffield Substation is 12. Total number of circuit breakers is 14 (12 plus 2 bus couplers). Sheffield Substation is a main supply point to the North-West Region of Tasmania. Total load in the region is around 260 MVA. The fault on bus coupler A752 will result in the loss of both busbar A and B and therefore loss of more than 50% of supply in Tasmania during winter season leading to a blackout in the North-West region.West Coast region will loose synchronism with the rest of the system, experience over frequency and will be islanded. The rest of the system will experience.Under frequency and significant amount of load must be shed to prevent total blackout. In the case of 220 kV busbar A fault at Sheffield Substation, two elements supplying the North-West region which are the Sheffield–Burnie 220 kV line and autotransformer T1, would be lost. During high winter load the remaining autotransformer T2 will be overloaded and tripped on overload conditions. This will lead to total blackout in the North-West region of Tasmania. In the case of 220 kV busbar B fault, two elements supplying George Town which are the Sheffield–George Town No 1 transmission line and Sheffield–Palmerston transmission line will be lost. During high winter loads the remaining Sheffield–George Town No 2 line will tripped on overload.- 8 -This will cause significant change in network impedance with requirement to shed load at major industrial customers at George Town. Consequently, this will produce excessive generation connected at Farrell and Sheffield, which can move the system towards unstable operation and cascade of events with possible blackout in the North and North West regions of Tasmania.3.1.2. OPTION 1-TRIPLE BUSBAR ARRANGEMENTThe schematic diagram of this option is shown below In comparison with “do nothing option” this option proposes to use the spare S752 circuit breaker and upgrade a nd energise “S” bypass bus to full size. The existing 12 circuits will be spread across the three busbars. Only one additional 220 kV circuit breaker is required in this option. The total number of circuit breakers in this option is 15.3.1.3. OPTION 2 - FULL BREAKER AND A HALF AND DOUBLE BREAKER ARRANGEMENT The schematic diagram of this option is shown below. This option includes- 9 -creating double breaker and breaker and half arrangements. Breaker and a half arrangement is proposed between Hydro Tasmania’s C ethana power station and autotransformer T1; and Lemonthyme power station and autotransformer T2. The total number of circuit breakers in this option is 19.3.1.4. OPTION 3 - PARTIAL BREAKER AND A HALF AND DOUBLE BREAKER ARRANGEMENTThe schematic diagram of this option is shown below. The main difference in comparison with option 2 is thatthere is no breaker and half arrangements between Hydro Tasmania’s Cethana power station and autotransformer T1; and Lemonthyme power station and autotransformer T2. The establishment of breaker and a half arrangements between these circuits could have as a consequence increase in connection charges for Hydro Tasmania for middle breakers, which needs to be discussed and agreed with this customer. Total number of circuit breakers in this option is 17.3.2. RESULTSIn this study, the following outages are examined:• n-1 forced outage of a station component including transmission lines and transformers• n-1 maintenance overlapping n-1 forced outages•breaker stuck condition following a fault. For a fault on line, transformer, bus or a breaker, only those breakers will be considered for being in a stuck condition that are supposed to trip to clear the fault. In this case back up protection will clear the fault.Apart from the above outages examined, higher order of outages can also be considered and simulated in the programs, however the probability and frequency of- 10 -their occurrence is quite low. Based on the Transend outage data, it was decided that the above settings should capture most of the credible outage events. The number of events for each of the options is given in the following table. These events are generated by the program to study their impact on substation performance. For each event, the program calculates the probability, frequency and duration. Using the connectivity model, it also computes the amount of loss of load and energy for a load point and for the overall substation. Using a linear flow method it checks if the load can be supplied without violating the ratings of any component. The number of outage events enumerated and examined by the SUBREL program depends on the number of components in a station and the program settings. If more components are added to a station, their exposure to failures also increases. To select an optimal design, a balance between the redundancy provided by adding a component (breaker or a busbar) and the increased exposure should be kept in mind. As seen from the tables above, the number of outage events for options 1,2 and 3 is higher than for the existing configuration since these options have more breakers and buses in their suggested configurations. There is no event that causes the complete loss of load in the area (including Burnie, Sheffield and George Town substations in the model) in any of the options. However there are events in each option that will cause partial loss of load. Option 2 has the lowest number of events causing loss of load while the existing configuration has the highest number of events causing loss of load. Reliability indices computed by SUBREL program for each of the option is given in the table below. These indices are computed using the load Probability Density Function (PDF) as unity. PDF of unity means that the load is same throughout the year. The widely used reliability indices such as SAIFI, SAIDI, CAIDI, ASAI,and EUE are computed by the program.Outage costs are calculated based on calculated expected- 11 -unsupplied energy (EUE) and value of lost load applied to particular customer groups. A comprehensive analysis of value of lost load for different customer groups has been undertaken by Monash University for Victorian utilities [9]. Based on the table above it is clear that option 1 – triple busbar arrangement, has lowest outage costs. Based on the list of substation originated outages generated by SUBREL, TRANSREL program was used to indicated consequences on the overall system performances. The voltage violations were encountered only for option2 in 9 simulation events. There were few contingencies for which solution did not converge. For these contingencies, a potential exists that the system will face major problems including a collapse. The system stress and its response will, of course, depend on the system conditions present at the time outages. There are four events for Option 1 that result in non-convergence of the power flow. The probability of these non-convergence cases for Option 1 is 0.0026 which means that there is a potential that exists that the system may collapse once every 400 years. This is a very low likely event and during this time the system is likely to go through several changes. It should also be noted that in this analysis no remedial actions are included. With remedial actions, operators may be able to avoid such a situation.4. CONCLUSIONSThe implementation and application of a probabilistic based planning for selecting a substation configuration provides quite useful information to an engineer in deciding the best option. The use of both SUBREL and TRANSREL programs for Sheffield Substation study has sufficiently demonstrated that it is important to examine all credible outage scenarios that are not possible to do manually. Quantitative indices computed by these programs provide an objective assessment of various- 12 -options considered. For transmission substations it is important that only SUBREL analysis may not provide the complete information. Without performing a TRANSREL analysis,it is likely that the risk posed by a configuration may not be correctly assessed from the overall system point of view. For the Sheffield Substation the triple busbar arrangement (Option 1) is the cheapest option, easy to implement, and reliability indices for Sheffield Substation are the best in this option. The low probabilities divergent cases can be resolved with appropriate remedial actions in place, including, generation rescheduling, voltage support and load shedding.REFERENCES[1] Billinton, R. and Allan, R.N.,:”Power-system reliability in perspective”, IEE Electronic and Power, pp. 231-236, March 1984.[2] “Power System Reliability Analysis. Application Guide,” CIGRE WG03 of SC 38,Edited by Lesley Kelley-Regnier, 1987.[3] “Transmission Network Security and Planning Criteria-draft”, Office of Tasmanian Energy Regulator, August 2005.[4] Al lan, R.N., and Billinton, R.:”Probabilistic methods applied to electric power systems-are they worth it?”,Power Engineering Journal, pp.121-129, May 1992.[5] Billinton, R. and Allan, R.N.,:” Reliability Evaluation of Power Systems”, Pitmans Books, New Yor k and London, 2nd edition, 1996. [6] “ESAA Guidelines for Reliability Assessment Planning,”, November 1997.[7] “Subrel-Substation Reliability Program User Manual”, General Reliability, San Diego, CA, 2002.- 13 -[8] Agarwal, S.K., and Anderson, P.M..: “Effect o f Station Originated Outages on Bulk Power System Reliability, ”, Cigre Symposium, S 38- 91, Montreal, 1991.[9] Monash University,:” Study of the Value of Lost Load” , Study conducted for the Victorian Power Exchange (VPX) company,Melbourne,2000.- 14 -谢菲尔德变电站220千伏升级项目的可靠性建模与分析创见网络私人有限公司,塔斯马尼亚阿加瓦尔博士,美国加利福尼亚州圣迭戈摘要本文介绍了在可靠性评估中的应用一个可防御概率过程谢菲尔德220千伏变电站重建项目。
220kv变电站设计及外文文献
前言近十年来,随着我国国民经济的快速增长,用电也成为制约我国经济发展的重要因素,各地都在兴建一系列的用配电装置。
变电所的规划、设计与运行的根本任务,是在国家发展计划的统筹规划下,合理的开发和利用动力资源,用最少的支出(含投资和运行成本)为国民经济各部门与人民生活提供充足、可靠和质量合格的电能。
这里所指的“充足”,从国民经济的总体来说,是要求变电所的供电能力必须能够满足国民经济发展和与其相适应的人民物质和文化生活增长的需要,并留有适当的备用。
变电所由发、送、变、配等不同环节以及相应的通信、安全自动、继电保护和调度自动化等系统组成,它的形成和发展,又经历了规划、设计、建设和生产运行等不同阶段。
各个环节和各个阶段都有各自不同的特点和要求,按照专业划分和任务分工,在有关的专业系统和各个有关阶段,都要制订相应的专业技术规程和一些技术规定。
但现代变电所是一个十分庞大而又高度自动化的系统,在各个专业系统之间和各个环节之间,既相互制约又能在一定条件下相互支持和互为补充。
为了适应我国国民经济的快速增长,需要密切结合我国的实际条件,从电力系统的全局着眼,瞻前顾后,需要设计出一系列的符合我国各个地区的用以供电的变电所,用以协调各专业系统和各阶段有关的各项工作,以求取得最佳技术经济的综合效益。
本次所设计的课题是地区220kV降压变电站的设计,该变电站是一个区域性重要的降压变电所,它主要承担220kV及110kV两个电压等级功率的交换,把接受功率全部送往110 kV侧线路。
因此此次220 kV降压变电站的设计具有220 kV、110 kV及10kV三个电压等级。
220kV侧为主功率输出,110kV侧以接受功率为主,10kV 主要用于本所用电以及无功补偿。
本次所设计的变电所是枢纽变电所,全所停电后,将影响整个地区以及下一级变电站的供电。
1 变电站基本资料1.1变电站的规模本次降压变电站设计为一区域性变电站,以供给附近地区的工业,农业,民用电。
变电所中英文对照外文翻译文献
中英文对照外文翻译Reliability of Lightning ResistantOverhead Distribution LinesLighting continues to be the major cause of outages on overhead power distribution lines. Through laboratory testing and field observations and measurements, the properties of a lightning stroke and its effects on electrical distribution system components are well-understood phenomena. This paper presents a compilation of 32 years of historical records for outage causes, duration, and locations for eight distribution feeders at the Oak Ridge National Laboratory (ORNL) .Distribution type lightning arresters are placed at dead-end and angle structures at pole mounted wormer locations and at high points on the overhead line. Station class lightning arresters areused to protect underground cable runs, pad mounted switchgear and unit substation transformers. Resistance to earth of each pole ground is typically 15 ohms or less. At higher elevations in the system, resistance to earth is substantially greater than 15 ohms, especially during the dry summer months. At these high points, ground rods were riven and bonded to the pole grounding systems in the 1960's in an attempt to decrease lightning outages. These attempts were only partially successful in lowering the outage rate. From a surge protection standpoint the variety of pole structures used (in-line, corner, angle, dead end, etc.) and the variety of insulators and hardware used does not allow each 13.8 kV overhead line to be categorized with a uniform impulse flashover rating (170 kV, etc.) or a numerical BIL voltage class (95 kV BIL; etc.). For simplicity purposes in the analysis, each overhead line was categorized with a nominal voltage construction class (15 kV, 34 kV, or 69 KV). Six of the eight overhead lines (feeders 1 through 6) were built with typical REA Standard horizontal wood cross arm construction utilizing single ANSI Class 55-5 porcelain pin insulators (nominal 15 kV insulation). The shield angle of the overhead ground wire to the phase conductors is typically 45degrees. One overhead line (feeder 7) was built with transmission type wood pole construction because the line extended to a research facility which was to have generated electrical power to feed back into the grid. Pole structure of this line are of durable wood cross a construction which utilize double ANSI 52-3 porcelain suspension insulators to support the conductors (nominal 34 kV insulation). The shield angle of the overhead ground wire to the phase conductors for feeder 7 is typically 30 degrees. In 1969, an overhead line (feeder 8) was intentionally built with "lightning resistant" construction in an attempt to reduce lightning caused outages. Pole structures of the line have phase over phase 24-inch long fiberglass suspension brackets with double ANSI 52-3 porcelain suspension insulators to support the conductors (nominal 69 kV insulation). The shield angle of the overhead ground wire to the phase conductors for feeder 8 is typically 30 degrees. The failure data was compiled for each of the eight 13.8 kV feeders and is presented in Table, along with pertinent information regarding feeder construction, elevation, length, and age.A key finding of the failure analysis is that weather-relatedevents account for over half (56%) of the feeder outages recorded. Fifty-seven of the 76 weather-related outages were attributed to lightning. Insulation breakdown damage due to lightning is also suspected in at least a dozen of the equipment failures observed. The data indicates overhead lines which pass over high terrain are less reliable because of the greater exposure to lightning. For example, feeder 3 had the most recorded outages (48), of which two-thirds were due to weather-related events; this feeder is also the highest line on the plant site, rising to an elevation of 450 above the reference valley elevation. Overhead lines that are longer and to which more substations and equipment are attached were also observed to be less reliable (more exposure to lightning and more equipment to fail). The age of the line does not appear to significantly lessen its reliability as long as adequate maintenance is performed; none of the lines have had a notable increase in the frequency of outages as the lines have aged. As would be expected, the empirical data presented in Table I confirms the two overhead lines which have been insulated to a higher level (34 or 69 KV) have significantly better reliability records than those utilizing 15 kV class construction. Feeder 7 (insulated to 34 KV)and feeder 8 (insulated to 69 kV) have bad only 3 outages each over their 32 and 23 year life spans, respectively. These lines follow similar terrain and are comparable in length and age to the 15 kV class lines, yet they have a combined failure rate of 0.22 failures per year versus 4.32 failures per year for the remaining feeders.On typical 15 kV insulated line construction, lightning flashovers often cause 60 cycle power follow and feeder trip. With the higher insulation construction, outage rates are reduced by limiting the number of flashovers and the resultant power follow which causes an over current device to trip. This allows lightning arresters to perform their duty of dissipating lightning energy to earth. The number of re closer actions and their resultant momentary outages are also reduced. This is beneficial for critical facilities and processes which cannot tolerate even momentary outages. An additional benefit is that outages due to animal contact are also reduced because of the greater distance from phase conductor to ground on pole structures. Distribution line equipment to increase line insulation values are "off the shelf" items and proven technology. New lightning resistant construction typical by utilizes horizontal line posts, fiberglass standoff bracketsor any other method which world increase the insulation value. The replacement of standard pin insulators with line post insulators of greater flashover value is an effective means to retrofit existing wood cross arm construction. The doubling and tripling of dead end and suspension insulators is also a means of increasing flashover values on existing angle and dead-end structures. Current fiberglass, polymer, and epoxy technologies provide an affordable means to increase line insulation.While the use of increased insulation levels to reduce lightning flashovers and the resultant outages on overhead distribution lines has been thoroughly tested and demonstrated in laboratory and experimental tests [5], long term history field data has positively demonstrated that the use of "lightning resistant" construction can greatly reduce outages. Field use at ORNL has shown that in areas which are vulnerable to lightning, the use of increased insulation and a smaller shielding angle is an impressive and cost effective means to appreciably increase the reliability of overhead distribution lines. This reliability study clearly illustrates that the insulation requirements for high-reliability distribution feeders should be determined not by the 60 Hz operating voltage but ratherby withstand requirements for the lightning transients or other high voltage transients that are impressed upon the line. Electrical equipment (switchgear, insulators, transformers, cables, etc.) have a reserve (BE level or flashover value) to handle momentary over voltages, and by increasing that reserve, the service reliability is appreciably increased. As the electrical industry gradually moves away from standard wood cross arm construction and moves toward more fiberglass, polymer and epoxy construction, increased insulation methods can be applied as part of new construction or as part of an upgrade or replacement effort. In considering new or upgraded overhead line construction, the incremental increased cost of the higher insulation equipment is d in proportion to the total costs of construction (labor, capital equipment, cables, electric poles, right-of-way acquisition), Its cost effectiveness varies with the application and the conditions to which it is be applied. Economic benefits include increased electrical service reliability and its inherent ability to keep manufacturing processes and critical loads in service. Other more direct benefits include less repair of overhead distribution lines, which can have a significant reduction in maintenance cost due to less replacement materials anda large reduction in overtime hours for maintenance crews.抗雷击架空配电线路的可靠性闪电仍然是架空配电线路上的中断1的主要原因。
变电站中英文资料对照外文翻译文献综述
变电站中英文资料对照外文翻译文献综述XXXns are an essential part of electrical power systems。
servingas the interface een high-voltage n lines and lower-voltage n lines。
They play a critical role in XXX homes。
businesses。
and industries.Types of nsThere are several types of ns。
including n ns。
n ns。
and customer XXX to the end-users and step down the voltage for n to XXX a single customer or group of customers.XXXns consist of us components。
including transformers。
circuit breakers。
switches。
XXX are used to step up or step down thevoltage of the electricity。
XXX are used to control the flow ofXXX to the system.XXXXXX stages。
including site n。
layout design。
equipment n。
XXX n lines。
land availability。
and environmental ns。
The layout design involves determining the placement of equipment。
XXX appropriate transformers。
circuit breakers。
and other components。
变电站设计英文文献
变电站设计英文文献Design of a Substation: A Literature ReviewIntroductionSubstation LayoutThe layout of a substation plays a crucial role in ensuring efficient operation and maintenance. Various factors need to be considered during the design phase, such as the available land area, location of power sources, and ease of access for maintenance personnel. In a research paper by Chen et al. (2024), a review of substation layout design methodologies is presented. The paper discusses optimization techniques such as Genetic Algorithms and Simulated Annealing for determining the optimal layout configuration based on specific constraints and objectives.Equipment SelectionThe selection of equipment is another critical aspect of substation design. Key equipment includes transformers, circuit breakers, and switchgear. In a study by Zhang et al. (2024), entitled "Optimal Design of a 110 kV Substation Based on Life Cycle Cost and Carbon Emission," a multi-objective optimization model is proposed for selecting the optimal equipment configuration considering both life cycle cost and carbonemissions. The study emphasizes the importance of incorporating environmental considerations into the design process.Safety ConsiderationsConclusionThe design of a substation involves several key considerations to ensure optimal operational efficiency, cost-effectiveness, and safety. Substation layout, equipment selection, and safety measures must be carefully planned and executed. Additionally, environmental concerns, lightning protection, and security considerations also need to be addressed. The review of various literature articles highlighted the importance of incorporating advanced optimization techniques and a multi-objective approach to achieve an optimal and sustainable substation design.References。
浅谈变电站改造英文作文
浅谈变电站改造英文作文Transforming a substation is a complex process that involves upgrading equipment, improving safety measures, and enhancing overall efficiency. It's crucial to ensure that the new design meets the growing demand forelectricity and incorporates the latest technology to support renewable energy sources.One of the key challenges in substation transformation is the need to minimize downtime and disruption to the power supply. This often requires careful planning and coordination to carry out the necessary work while ensuring that customers continue to receive uninterrupted service.In addition to modernizing the equipment, substation transformation also involves implementing advanced monitoring and control systems. These systems enable operators to remotely monitor the substation's performance, identify potential issues, and take proactive measures to prevent outages.Another important aspect of substation transformationis enhancing cybersecurity measures to protect the substation from potential cyber threats. This involves implementing robust security protocols and using advanced encryption techniques to safeguard critical infrastructure.Furthermore, substation transformation often includes integrating smart grid technologies to improve energy management and distribution. This may involve installing sensors and automation systems to optimize the flow of electricity and reduce wastage.Moreover, substation transformation provides an opportunity to incorporate sustainable practices, such as using eco-friendly materials and implementing energy-efficient solutions. This not only reduces the environmental impact but also helps to lower operational costs in the long run.In conclusion, substation transformation is a multifaceted process that requires careful planning,advanced technologies, and a commitment to sustainability. By upgrading equipment, enhancing cybersecurity, and integrating smart grid technologies, substations can meet the increasing demand for electricity while ensuring reliable and efficient power supply.。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
附录Ⅲ英文翻译A comprehensive overview of substationsAlong with the economic development and the modern industry developments of quick rising, the design of the power supply system become more and more completely and system. Because the quickly increase electricity of factories, it also increases seriously to the dependable index of the economic condition, power supply in quantity. Therefore they need the higher and more perfect request to the power supply. Whether Design reasonable, not only affect directly the base investment and circulate the expenses with have the metal depletion in colour metal, but also will reflect the dependable in power supply and the safe in many facts. In a word, it is close with the economic performance and the safety of the people. The substation is an importance part of the electric power system, it is consisted of the electric appliances equipments and the Transmission and the Distribution. It obtains the electric power from the electric power system, through its function of transformation and assign, transport and safety. Then transport the power to every place with safe, dependable, and economical. As an important part of power’s transport and control, the transformer substation must change the mode of the traditional design and control, then can adapt to the modern electric power system, the development of modern industry and the of trend of the society life.Electric power industry is one of the foundations of national industry and national economic development to industry, it is a coal, oil, natural gas, hydropower, nuclear power, wind power and other energy conversion into electrical energy of the secondary energy industry, it for the other departments of the national economy fast and stable development of the provision of adequate power, and its level of development is a reflection of the country's economic development an important indicator of the level. As the power in the industry and the importance of the national economy, electricity transmission and distribution of electric energy used in these areas is an indispensable component.。
Therefore, power transmission and distribution is critical. Substation is to enable superior power plant power plants or power after adjustments to the lower load of books is an important part of power transmission. Operation of its functions, the capacity of a direct impact on the size of the lower loadpower, thereby affecting the industrial production and power consumption.Substation system if a link failure, the system will protect the part of action. May result in power outages and so on, to the production and living a great disadvantage. Therefore, the substation in the electric power system for the protection of electricity reliability, sensitivity and other indicators.Power plants and substations are connected user link in the middle, transformation and distribution of electric energy to play the role. According to the different tasks substation can be divided into step-up transformer step-down transformer substation and two broad categories. Step-up substation built on the general power plant, the general step-down transformer near the load center built on the low.V oltage can also be divided according to medium voltage substation (60 kV and below), high-voltage substations (110 ~ 220 kV), EHV Substation (330 ~ 765 kV) and Ultra High V oltage Substation (1000 kV and above). In electric power system according to their status as a hub substation can be divided into the middle substation substations and terminals. This requires a substation part of economic rationality, the second part of safe and reliable, the only way to the normal operation of substation work services for the national economy. There are step-up transformer step-down transformer substation and two broad categories.Substations have been equipped with various protection devices, these devices are based on lower short-circuit load to a maximum load conditions, such as configuration settings and, therefore, in the event of the failure was similar to the specific circumstances under to judge by the system should automatically trip protection, and now the protection of the whole trip has been a very short time, the lifting of the fault, the system will automatically reclosing devices and the gateway to restore power quickly. This is to protect the lower the load is very favorable. This will not only protect the safety of the load equipment is in favor of extending the service life and reduce equipment investment, and improved reliability of electricity supply, which is to improve the efficiency of industrial and agricultural production is very effective.Substations have been equipped with various protection devices, these devices are based on lower short-circuit load to a maximum load conditions, such as configuration settings and, therefore, in the event of the failure was similar to the specific circumstances under to judge by the system should automatically trip protection, and now the protection of the whole trip has been a very short time, the lifting of the fault, the system will automatically reclosing devices and the gateway to restore power quickly. This is to protect the lower the load is veryfavorable. This will not only protect the safety of the load equipment is in favor of extending the service life and reduce equipment investment, and improved reliability of electricity supply, which is to improve the efficiency of industrial and agricultural production is very effective.Increase in the efficiency of industrial products means lower product costs, increase market competitiveness, which will enable enterprises to increase for the national economy and make a greater contribution to development. Electricity supply reliability and other fields, can improve people's quality of life, improve their living conditions.Analyse change to give or get an electric shock a mission for carrying and customers carries etc. circumstance, choose the address, make good use of customer data proceed then carry calculation, ascertain the correct equipment of the customer. At the same time following the choice of every kind of transformer, then make sure the line method of the transformer substation, then calculate the short-circuit electric current, choosing to send together with the electric wire method and the style of the wire, then proceeding the calculation of short-circuit electric current. This first step of design included:(1) ascertain the total project (2) load analysis(3) the calculation of the short-circuit electric current (4) the design of an electric shock the system design to connect with system and the choice of line project (5) the choice and the settle of the protective facility (6) the contents to defend the thunder and protection of connect the earth. Along with the high and quick development of electric power technique, electric power system then can change from the generate of the electricity to the supply the power.Design the task this time is aim at intensity of mastering of every subject knowledge of this speciality reflecting, and of test this speciality’s study result. first, analyze the tend of load department according to all parameter of load about system and circuit on task book. It expounds the necessity to this situation from the rspect of increasing load. Then through to the generalization of planning to build the transformer substation and the analysis of the load materials, safe, economy and dependability are considered, has confirmed the mainly wiring form of 10kV. Calculated and supplied power in the range and confirmed TV station's number of the main voltage transformer through load finally, capacity and type, capacity and type of using the voltage transformer stand surely at the same time, finally, the result of calculation of calculating that and short out according to the electric current of largest lasting job, make the circuit to protect, the voltage transformer is protected, the bus bar is protected,prevent the thunder from protecting.This graduation project take the 10kV transformer substation as the main design object, this 10kV transformer substation is the local important transformer substation, is the electrical power system 10kV voltage rank important part. This transformer substation is equipped with 2 main transformers, in the station the host wiring divides into 10kV,and 0.4 kV two voltages ranks.This design first chapter is an introduction, mainly elaborated the transformer substation in electrical power system status. Designs the transformer substation the principle and the goal as well as the transformer substation basic situation. Second chapter is shoulders the computation and the transformer choice, carries on the load computation according to the known transformer substation load material to the transformer substation. Through the load which obtains had determined the host changes the capacity and a number, the host change the pattern, the winding wiring way, the accent press the way and the host changes the impedance. Third chapter is the transformer substation electricity host wiring design, separately through to 10kV side electricity host wiring drawing up, chooses the stablest reliable wiring way. Fourth chapter is the short class computation, first determined short-circuits the spot, calculates various parts reactance, then to respectively short-circuits separately to carry on the computation, obtains respectively short-circuits the short-circuit current. Fifth chapter is the electrical equipment choice, the electrical equipment including the generatrix, the circuit breaker, the isolator, the electric current and the voltage transformer, the fuse. Sixth chapter is the power distribution equipment, mainly carries on the design to the transformer substation power distribution equipment. Seventh chapter is anti-radar with the earth, this chapter has carried on the choice to the arrester, as well as has determined the earth way. Through to the 10kV transformer substation design, causes me has to the electrical engineering and its the automated specialized branch curriculum to be comprehensive, system grasping, strengthened apply theory to reality the ability, raised the project consciousness, exercised me independently to analyze and the solution electric power project design question ability.[key words] substation ,load ,transmission system , distribution high voltage network ,correction equipment.变电站的综合概述随着经济的发展和现代工业建设的迅速崛起,供电系统的设计越来越全面、系统,工厂用电量迅速增长,对电能质量、技术经济状况、供电的可靠性指标也日益提高,因此对供电设计也有了更高、更完善的要求。