2.1编制依据8
2.2基础单价编制9
2.2.1人工预算单价的组成9
2.2.2人工预算单价计算方法9
2.2.3人工预算单价计算标准10
2.2.4主要材料预算价格10
2.2.5其他材料预算价格11
2.2.6施工用电价格11
2.2.7施工用水价格11
2.2.8施工用风价格11
2.2.9施工机械台时费11
2.2.10混凝土材料单价11
关键词:除险加固初步设计;基础单价;建筑工程单价;概算表
Abstract
Through the understanding ofMontenegro, in order to further reservoir dam, solve the problem of security, to have an accurate evaluation ofMontenegroreservoir danger-eliminating and reinforcing the preliminary design. To get the market survey () to material price, what books. Based on the water conservancy project design budgetary estimate) is compiled by the water conservancy construction engineering budget norm of water conservancy and hydropower equipment, prentice-hall budget norm of the installation of hydraulic engineering construction machinery Taiwan ", "when fixed fee charging standards of survey and design of engineering and construction method, using artificial budget price, construction and installation, the main unit price materials, construction, water, wind, and the application of such that the computation basis unit price of. Calculate architectural engineering, mechanical and electrical equipment and installation, metal structure, equipment and installation project, the construction cost and temporary works, independent annual investment estimate, points to total budget summary tables, calculates the total investment of the reservoir, strengthening project cost base of preparation.
3.3.6主要工程量汇总表33
3.3.7主要材料量汇总表33
3.3.8工时数量汇总表33
4概算附件33
4.1主要材料运输费用计算表33
4.2混凝土、水泥砂浆材料单价表33
4.3建筑工程单价33
4.4安装工程单价表33
4.5独立费用计算书(勘察费、设计费)33
参考文献33
致谢33
摘要
通过对黑山水库的了解,为了进一步解决问题,对水库大坝安全现状有一个准确的评价,对黑山水库进行除险加固初步设计。先进行市场调查得到主(次)要材料价格,查阅所学书籍。本文依据《水利工程设计概(估)算编制规定》、《水利建筑工程概算定额》上下册、《水利水电设备安装概算定额》《水利工程施工机械台时费定额》、《工程勘察设计收费标准》及采用的施工方法,运用人工预算单价、建筑单价、安装单价、主要材料、施工用电、水、风、砂石料等基础单价的计算依据得出单价汇总表。计算出建筑工程、机电设备及安装工程、金属结构设备及安装工程、施工临时工程、独立费用及分年度投资概算表,汇总得总概算表,计算出工程总投资,编制了水库除险加固工程造价编制。
Keywords:Base reinforcement design;Basic unit; Conruction unit; Budget table
2.5.2设备及安装工程18
2.5.3费用18
2.6预备费、静态总投资、总投资18
2.6.1基本预备费18
2.6.2静态总投资18
3概算文件18
3.1编制说明18
3.1.1工程概况18
3.1.2投资主要指标18
3.2概算表19
3.2.1总概算表19
3.2.2建筑工程概算表20
3.2.3机电设备及安装工程概算表23
3.2.4金属结构设备及安装工程概算表24
3.2.5施工临时工程概算表25
3.2.6独立费用概算表25
3.2.7分年度投资概算表26
3.3概算附表28
3.3.1建筑工程单价汇总表28
3.3.2安装工程单价汇总表30
3.3.3主要材料预算价格汇总表31
3.3.4次要材料预算价格汇总表32
3.3.5施工机械台时费汇总表33
2.3建筑、安装工程单价11
2.3.1建筑工程单价11
2.3.2安装工程单价12
2.3.3费率标准13
2.4分部工程概算编制14
2.4.1建筑工程14
2.4.2机电设备及安装工程15
2.4.3金属结构设备及安装工程15
2.4.4施工临时工程15
2.4.5独立费用16
2.5分年度投资17
2.5.1建筑工程18
黑山水库除险加固工程造价编制毕业设计
摘要1
Abstract2
前言3
1黑山水库工程概况4
1.1工程概况4
1.2主体工程施工4
1.2.1土坝ห้องสมุดไป่ตู้固施工4
1.2.2溢洪道加固施工6
1.2.3输水洞加固施工6
1.2.4金属结构施工7
1.3施工总进度7
1.3.1工程准备期进度7
1.3.2主体工程施工进度8
2编制方法及计算标准8
2.2基础单价编制9
2.2.1人工预算单价的组成9
2.2.2人工预算单价计算方法9
2.2.3人工预算单价计算标准10
2.2.4主要材料预算价格10
2.2.5其他材料预算价格11
2.2.6施工用电价格11
2.2.7施工用水价格11
2.2.8施工用风价格11
2.2.9施工机械台时费11
2.2.10混凝土材料单价11
关键词:除险加固初步设计;基础单价;建筑工程单价;概算表
Abstract
Through the understanding ofMontenegro, in order to further reservoir dam, solve the problem of security, to have an accurate evaluation ofMontenegroreservoir danger-eliminating and reinforcing the preliminary design. To get the market survey () to material price, what books. Based on the water conservancy project design budgetary estimate) is compiled by the water conservancy construction engineering budget norm of water conservancy and hydropower equipment, prentice-hall budget norm of the installation of hydraulic engineering construction machinery Taiwan ", "when fixed fee charging standards of survey and design of engineering and construction method, using artificial budget price, construction and installation, the main unit price materials, construction, water, wind, and the application of such that the computation basis unit price of. Calculate architectural engineering, mechanical and electrical equipment and installation, metal structure, equipment and installation project, the construction cost and temporary works, independent annual investment estimate, points to total budget summary tables, calculates the total investment of the reservoir, strengthening project cost base of preparation.
3.3.6主要工程量汇总表33
3.3.7主要材料量汇总表33
3.3.8工时数量汇总表33
4概算附件33
4.1主要材料运输费用计算表33
4.2混凝土、水泥砂浆材料单价表33
4.3建筑工程单价33
4.4安装工程单价表33
4.5独立费用计算书(勘察费、设计费)33
参考文献33
致谢33
摘要
通过对黑山水库的了解,为了进一步解决问题,对水库大坝安全现状有一个准确的评价,对黑山水库进行除险加固初步设计。先进行市场调查得到主(次)要材料价格,查阅所学书籍。本文依据《水利工程设计概(估)算编制规定》、《水利建筑工程概算定额》上下册、《水利水电设备安装概算定额》《水利工程施工机械台时费定额》、《工程勘察设计收费标准》及采用的施工方法,运用人工预算单价、建筑单价、安装单价、主要材料、施工用电、水、风、砂石料等基础单价的计算依据得出单价汇总表。计算出建筑工程、机电设备及安装工程、金属结构设备及安装工程、施工临时工程、独立费用及分年度投资概算表,汇总得总概算表,计算出工程总投资,编制了水库除险加固工程造价编制。
Keywords:Base reinforcement design;Basic unit; Conruction unit; Budget table
2.5.2设备及安装工程18
2.5.3费用18
2.6预备费、静态总投资、总投资18
2.6.1基本预备费18
2.6.2静态总投资18
3概算文件18
3.1编制说明18
3.1.1工程概况18
3.1.2投资主要指标18
3.2概算表19
3.2.1总概算表19
3.2.2建筑工程概算表20
3.2.3机电设备及安装工程概算表23
3.2.4金属结构设备及安装工程概算表24
3.2.5施工临时工程概算表25
3.2.6独立费用概算表25
3.2.7分年度投资概算表26
3.3概算附表28
3.3.1建筑工程单价汇总表28
3.3.2安装工程单价汇总表30
3.3.3主要材料预算价格汇总表31
3.3.4次要材料预算价格汇总表32
3.3.5施工机械台时费汇总表33
2.3建筑、安装工程单价11
2.3.1建筑工程单价11
2.3.2安装工程单价12
2.3.3费率标准13
2.4分部工程概算编制14
2.4.1建筑工程14
2.4.2机电设备及安装工程15
2.4.3金属结构设备及安装工程15
2.4.4施工临时工程15
2.4.5独立费用16
2.5分年度投资17
2.5.1建筑工程18
黑山水库除险加固工程造价编制毕业设计
摘要1
Abstract2
前言3
1黑山水库工程概况4
1.1工程概况4
1.2主体工程施工4
1.2.1土坝ห้องสมุดไป่ตู้固施工4
1.2.2溢洪道加固施工6
1.2.3输水洞加固施工6
1.2.4金属结构施工7
1.3施工总进度7
1.3.1工程准备期进度7
1.3.2主体工程施工进度8
2编制方法及计算标准8