Docu Title Pre Product Qualification Report
Exec. Period Mar 05TH, 2015 ~ May05TH, 2015
1. Purpose
The purpose of this document is to Qualify XXX (SOPXX_150mil) in Manufacturing Process and
Inform to XXX so that Process and Product is qualified with Gelite Qualification Spec.
3. Material(BOM) and Machine Summary
3.1 Material List
3.2 Machine List
4. PPQ Data & Summary
▣Tape Mount
▣Wafer Saw
SAWING TOP SAW BOTTOM ▣Die Attach & Cure Oven
▣Wire Bond
▣Molding
Sweeping ▣Tin plating
▣Marking
▣Trim-Form
5. Assembly Overall Yield Summary
6. Conclusion of PPQ
6.1 All PPQ Conditions and Results are Qualified with correspond to PPQ Specifications.
6.2 Test Result will be reported after Test completed!
7. Appendix
Items check Data.
THE END