勇拓蓝澳岛(二期)建设工程
-5-
重庆建工第二建设有限公司
高精度砌块专项施工方案
原强度
≥1.0
7
压剪粘接强度
MPa
耐冻融
≥0.4
8
可操作时间
h
≥4
9
收缩值
%
≤0.3
界面剂 材料进场时,生产厂家按批量提供产品的质量证明文件及使用说明 书。各项指标应符合下表要求:
序号
项目
单位
性能指标
1
外观
第五章 构造要求 ·························································································18 第六章 质量检查和控制措施 ··········································································22
第二章 材料、设备、工艺 ·············································································· 3 一、主要材料························································································ 3 二、机械设备························································································ 7 三、工艺流程························································································ 7
第三章 施工部署 ·························································································· 8 一、总体思路························································································ 8 二、施工段划分及施工顺序······································································ 8 三、施工的基本要求··············································································· 8 四、管理架构及劳务用工········································································· 9
烧结页岩多孔 砖
强度等 密度等 砂浆强度


等级
MU5.0 600 级
M5
备注
MU5.0 600 级
M5
MU3.5 600 级
M5
MU10 600 级
M5
MU10 800 级
12 孔及以 M10

砌块专用
专用粘结剂
厂家提供
高精砌块标准要求: a) 出厂砌块上必须用钢钉刻印生产日期,保证养护期限 7d,项目现
0
0
的裂纹方向尺寸总和的
裂纹长度
任一面上的裂纹长度不得大于裂纹方向尺寸的
0
0
大于以上尺寸的裂纹条数,不多于/条
0
0
爆裂、粘模和损坏深度不得大于/mm
10
10
平米弯曲
不允许
表面输送、层裂
不允许
表面油污
不允许
立方体抗压强度
平均值不得小于/MPa
3.5/5.0
A3.5/A5.0
单组最小值不得小于/MPa
2.8/4.0
≥160
耐碱拉伸断裂强力(经、
2
N/50 mm
纬向)
≥1300
耐碱断裂强度保留率
3
%
(经、纬向)
≥75
4
氧化锆含量
%
14.5±0.8
5
氧化钛含量
%
6.0±0.5
6
涂塑量
g/m2
≥20
勇拓蓝澳岛(二期)建设工程
-6-
重庆建工第二建设有限公司
二、机械设备
序号
机械(工具)名称
1
塔吊、施工电梯、
3
砂浆强制式搅拌机、搅拌器
场验证,不足龄期退货处理。(每一包装外围砌块都有生产日期, 里面砌块无法刻印) b) 出厂砌块上必须标注厂家 LOGO,战略供应商提供现场材料验证服 务,如发现总包未采用指定供应商厂品,必须知会监理甲方,项目 中心除验证现场材料外,需对供货清单验证。 c) 产品出厂需用塑料膜包装保护,防止雨淋,厂家负责卸车落地。 d) 材料规格尺寸,强度检查按相应规范及检测办法执行(优等品执行, 详见下附表)。
勇拓蓝澳岛(二期)建设工程
-4-
重庆建工第二建设有限公司
高精度砌块专项施工方案
项目
指标 优等品(A) 合格品(B)
长度 L
±3
±4
尺寸允许偏差/mm
宽度 B
±1
±2
高度 H
±1
±2
最小尺寸不得大于/mm
0
0
缺棱掉角
最大尺寸不得大于/mm
0
0
大于以上尺寸的缺棱掉角个数,不多于/个
0
0
贯穿一棱二面的裂纹长度不得大于裂纹所在面
勇拓蓝澳岛(二期)建设工程
-7-
重庆建工第二建设有限公司
高精度砌块专项施工方案
第三章 施工部署
加强标准化生产管理,有效提高施工效率,根据结构施工进度有效 组织砌体施工,在提高工程质量的前提下,加快施工进度。
一、总体思路 本工程为洋房工程,11-15 层,在结构施工完毕后砌体施工队伍
开始进场,做好前期人员、材料及设备的准备工作,并先做砌体样板, 当每栋楼施工面达到五层且施工电梯就位后,大面积展开施工,追随 混凝土结构施工进度。 二、施工段的划分及施工顺序 根据本工程实际情况,将工程划分为四个施工段,如下图所示:
干燥收缩值(标准法)不得大于/(mm/m)
0.2
0.5
粘结剂 材料进场时,生产厂家按批量提供产品的质量证明文件及使用说明 书。各项指标应符合下表要求:
序号
项目
单位
性能指标
1
外观
--
均匀一致,无结块
2
保水性
%
≥99
3
流动性
mm
120~150
4
抗压强度
MPa
5.0~10.0
5
抗折强度
MPa
≥2.2
6
拉伸粘结强度
高精度砌块专项施工方案
上道工序的完成要为下道工序创造施工条件、下道工序的施工能够 保证上道工序的成品完成不受损坏,以减少不必要的返工浪费,确保工 程质量。
勇拓蓝澳岛(二期)建设工程
-2-
重庆建工第二建设有限公司
高精度砌块专项施工方案
第一章 工程概况及编制依据
一、工程概况
勇拓蓝澳岛(二期)工程地处重庆渝北区回兴街道金果大道北侧, 建筑面积 75539.01 m2,包括左区车库、售房部、右区车库以及 10 栋洋 房。基础形式有桩基础、独立基础、筏板基础,主体结构形式为框架剪 力墙结构,建筑层数-1F/11F~15F。该地块属于两路组团石盘河片区, 整体地形起伏较大,与周边高差较大,高差约 30 米。项目交通便利,场 地开阔,施工条件便利。
一、检查标准要求 ················································································· 22 二、质量通病防治 ················································································· 22 三、成品保护 ······················································································· 23 四、雨期施工措施 ················································································· 24 第七章 安全文明施工 ···················································································24 一、安全施工保证措施 ··········································································· 24 二、文明施工与环境保护措施·································································· 26
三、 施工的基本要求
工程施工的总的原则是先地下后地上;先结构后围护;先主体后装饰 装修;室内砌筑和粗装修,除特殊要求外,原则上是由下至上逐层进行, 及早插入装修,降低劳动力高峰,减少装修和设备安装占用的有效日历 天数,做到科学管理,均衡施工。
勇拓蓝澳岛(二期)建设工程
-8-
重庆建工第二建设有限公司
施工组织设计文件
勇拓蓝澳岛(二期)建设工程
高精度砌块专项施工方案
重庆建工第二建设有限公司 二〇一七年十一月
重庆建工第二建设有限公司
高精度砌块专项施工方案
目录
第一章 工程概况级编制依据 ··········································································· 3 一、工程概况························································································ 1 二、编制依据························································································ 1
第四章 主要施工工序 ···················································································10 一、施工准备 ······················································································· 10 二、砌筑施工 ······················································································· 13 三、水电安装 ······················································································· 15 四、砌筑施工工艺要点及注意事项···························································· 15
-3-
重庆建工第二建设有限公司
高精度砌块专项施工方案
第二章 材料、设备、工艺
一、主要材料
部位
外墙;楼电梯间隔墙 厨房、卫生间 200
厚内墙 其它 200 厚内墙
100 厚内墙 基础顶面至地坪以
上 300 高 墙体;挡土砖砌体
砖或砌块
蒸压加气混凝 土精确砌块 蒸压加气混凝 土精确砌块 蒸压加气混凝 土精确砌块 蒸压加气混凝 土精确砌块
二、编制依据
1、施工图纸、施工合同 2、蒸压加气混凝土砌块应用技术规程 (DBJ50-05源自文库-2006) 3、钢筋混凝土过梁(03G322) 4、砌体工程施工质量验收规范(GB50203-2011) 5、万科产品质量实测操作指引(A5 版) 6、万科高精度砌块操作指引(2017.3.19)
勇拓蓝澳岛(二期)建设工程
4
切割机、手锯、镂槽器
5
手推小车、灰斗、灰铁锹
6
刮勺、刮刀、橡胶锤、磨板
7
线锤、皮数杆
8
支模具、夹具
9
靠尺、卷尺、放线工具
10
其他工具、材料
三、工艺流程
高精度砌块专项施工方案
用途 材料运输 制作砂浆、搅拌粘结剂 砌块切锯、切割管线预留槽、镂槽埋筋 运输铲运及盛放砂浆 铺灰、压实、刮平 砌筑找水平及垂直用 构造柱、混凝土梁设置 放线、实测
--
均匀一致,无结块
2
保水性
%
≥99
3
流动性
mm
120~150
7天
6
拉伸粘结强度(7 天)
MPa
14 天
≥0.4 ≥0.6
7天
≥1.0
7
剪切粘接强度
MPa
14 天
≥1.5
耐碱玻纤网格布 选用成品宽度200mm宽的耐碱玻纤网格布。各项指标应符合下表要 求:
序号
项目
单位
性能指标
1
标准单位面积质量
g/m2