新人教版八年级物理力学测试题
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
新人教版八年级物理力学测试题
力学
of the installation of templates installed, the measurement method, set the necessary ... (3) cleaning and coating of the template in the template should be cleaned before each use and anti-rust protection of mineral oil, oil-contaminated concrete shall not be used, and should not affect the quality of concrete or reinforced concrete. Timber formwork
used in baking or other protective materials of paraffin wax. (4) the template removal template removal time, in addition to construction drawings provided, shall also comply with the following provisions: no load-bearing side template of an dismantling, should the concrete reaches its surface and edges do not damage due to stripping, shall not be removed; Pier, wall or column when its strength not less than 3.5MPa part of a template, can be removed. Special template removal time,
report to the supervisor for approval. Demolition of reinforced concrete or concrete structure bearing the template shall conform to the construction drawings, and shall comply with the provisions of the previous paragraph. Calculation and test review, the actual strength of concrete structure is able to withstand gravity and other practical load, shall be subject to approval of the supervisor, early form removal. Prestressed concrete structure component or template removal, in
addition to conforming to the requirements of drawings, templates should be removed before tensioning the side; die after pre demolition should
be established structures or components. Standard structure types of Dismounting bearing template structure span (m) of concrete strength standard values of percentage (%) Board ? 2 50 Board >2, ? 8 75 Board >8 100 beam, and Arch, and shell ? 8 75 beam, and Arch, and shell >8 100 hanging arm component ? 2 75 hanging arm component >2 100 7.3.5 concrete layered points block (1) layered pouring job 1) by supervision engineers approved of pouring layered points block and pouring program for construction, in cant pouring Shi from minimum at began, until keep
horizontal. 2) substandard concrete non-warehousing, warehousing of substandard concrete to be removed and disposed of at designated locations by the regulation. 3) pouring of concrete, is strictly prohibited in the cabin with water, such as poor workability, take measures such as strengthening vibration to ensure quality. (2) pour pouring concrete breaks continuity, pouring allows the interval determined by experiment, exceeds the allowable interval by
of the installation of templates installed, the measurement method, set the necessary ... (3) cleaning and coating of the template in the template should be cleaned before each use and anti-rust protection of mineral oil, oil-contaminated concrete shall not be used, and should not affect the quality of concrete or reinforced concrete. Timber formwork used in baking or other protective materials of paraffin wax. (4) the template removal template removal time, in addition to construction drawings provided, shall also comply with the following provisions: no load-bearing side template of an dismantling, should the concrete reaches its surface and edges do not damage due to stripping, shall not be removed; Pier, wall or column when its strength not less than 3.5MPa part of a template, can be removed. Special template removal time,
report to the supervisor for approval. Demolition of reinforced concrete or concrete structure bearing the template shall conform to the construction drawings, and shall comply with the provisions of the previous paragraph. Calculation and test review, the actual strength of concrete structure is able to withstand gravity and other practical load, shall be subject to approval of the supervisor, early form removal. Prestressed concrete structure component or template removal, in
addition to conforming to the requirements of drawings, templates should be removed before tensioning the side; die after pre demolition should
be established structures or components. Standard structure types of Dismounting bearing template structure span (m) of concrete strength standard values of percentage (%) Board ? 2 50 Board >2, ? 8 75 Board >8