青年基金注意事项

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

青年基金注意事项

点击查看局、室软课题及委托任务申请书撰写提纲

点击查看面上项目申请书撰写提纲

点击查看重点项目申请书撰写提纲

accident, assist in the development of corrective programmes and follow, verify, record and feedback in a timely manner. Responsible for the overall quality management, guiding project QC group activities. 7, the Ministry of planning and finance: with all the responsible for the project's contract manager. Including curtain pile and bored pile construction. 14, earth-moving machines: equipped with excavators, dump trucks, loaders, bulldozers and other heavy machinery, mainly

responsible for Foundation pit excavation and logistic, jacking of Earth excavation and Sinotrans. 15, the bridge construction team: responsible for the bridge project all steel manufacture, lashing; template polishing, derusting, release agent brushes, installation, reinforcement and demolition of concrete pouring and curing, the waterproof layer of the production, construction of railway subgrade protection pile. 16, jacking construction of bridge team: responsible for track reinforcement, conservation and maintenance, responsible for pushing online security protection, responsible for jacking equipment operation, maintenance and control of the jacking process, and is responsible for correcting and preventing bar-head, looked up. 17, electrical work shifts: responsible for on-site construction, prefabricated bridges the laying of power

lines, good night time power protection. At times of peak labor through strengthened staff deployment within the company, to enhance the engineering staff to

局,室,委托任务项目申请书填报说明

局,室,委托任务项目旨在保证国家自然科学基金项目资助工作的深入开展~探索和研究科学基金管理实践中需要解决的关键性问题~提高管理创新能力~为科学基金管理决策提供参考。局,室,委托任务项目每年度分批发布指南及受理申请~并按照国家自然科学基金评审原则择优遴选。

局,室,委托任务项目申请人应当具备以下条件:

1. 具有高级专业技术职务,职称,或者具有博士学位。

2. 作为项目负责人正在承担或者承担过国家自然科学基金资助项目~或者在依托单位科研管理部门从事科学基金管理相关工作。

3. 熟悉国家自然科学基金条例、项目管理办法~对自然科学基金管理有比较深刻的理解。

申请人应当按照局,室,委托任务项目撰写提纲撰写申请书。局,室,委托任务项目合作研究单位不得超过2个~资助期限根据指南要求填报。

申请书中不得出现任何违反法律及有关保密规定的内容~依托单位须认真审核。由于违反相关规定而导致的一切后果由申请人和依托单位负责。

accident, assist in the development of corrective programmes and follow, verify, record and feedback in a timely manner. Responsible for the overall quality management, guiding project QC group activities. 7, the Ministry of planning and finance: with all the responsible for the project's contract manager. Including curtain pile and bored pile construction. 14, earth-moving machines: equipped with excavators, dump

trucks, loaders, bulldozers and other heavy machinery, mainly

responsible for Foundation pit excavation and logistic, jacking of Earth excavation and Sinotrans. 15, the bridge construction team: responsible for the bridge project all steel manufacture, lashing; template polishing, derusting, release agent brushes, installation, reinforcement and demolition of concrete pouring and curing, the waterproof layer of the production, construction of railway subgrade protection pile. 16, jacking construction of bridge team: responsible for track reinforcement, conservation and maintenance, responsible for pushing online security protection, responsible for jacking equipment operation, maintenance and control of the jacking process, and is responsible for correcting and preventing bar-head, looked up. 17, electrical work shifts: responsible for on-site construction, prefabricated bridges the laying of power lines, good night time power protection. At times of peak labor through strengthened staff deployment within the company, to enhance the engineering staff to

局,室,委托任务项目申请书撰写提纲

局,室,委托任务项目申请书由信息表格及报告正文两部分构成。

一、信息表格:包括基本信息、项目组主要参与者和经费申请表~申请人须按

操作提示在指定的位置选择或按要求输入正确信息~应保证信息真实、准确。在填写“基本信息”时~“资助类别”一栏请选择“专项基金项目”,“亚类说明”一

栏请选择“局、室软课题及委托任务”,申请代码选择J0202。经费申请表须按照《国家自然科学基金项目资助经费管理办法》中面上项目的相关规定认真填写。

二、报告正文:参照以下提纲撰写~要求内容翔实、清晰~层次分明。

相关文档
最新文档