爱立信5G基站安装手册BB6630andAAS6488 PA4
5G基站安装篇(超完整详细)
检查结果 合格/不合格 合格/不合格 合格/不合格
合格/不合格
合格/不合格
11
三、5G配套设备及5G设备安装监理工作要点
1.4、配套电源监理检查表
检查项目
检查方式及标准
6. 机房电源线布放方式如下:采用上走线方式
一、5G基站简介
1、5G基站组成示意图(华为设备)
AAU
5G射频模块
定位
工作带宽160M
天线
华为BBU5900
包含5G主控、基带 4G主控、基带
升压配电盒 光纤
电源线
传D输 设C备 PTN
直电DC流源 柜 DC
定位天线馈线
(1) 天面安装涉及 AAU 主 设 备 、AAU 电源线、AAU保护地 线、AAU至BBU光纤 安装、定位天线安装 ; (2) 机房涉及BBU 、BBU至AAU光纤、 B B U 至P T N 光纤, BBU电源线、AAU电 源线,定位天线馈线 安装。
1、室内电源...............................................................................................08 2、综合机柜...............................................................................................13 3、室内BBU...............................................................................................16 4、机房同步系统...................................................................................... 20 5、传输设备...............................................................................................25 6、室外电源...............................................................................................27 7、室外AAU.............................................................................................. 28 8、定位天线安装...................................................................................... 36 四、 5G工程监理安全管理要点 1 、 施 工 现 场 注 意 事 项 及 危 险 源 识 别.................................................... 42 2、登高作业安全注意事项..................................................................... 45 3、加电作业监理检查要求..................................................................... 54
FDD LTE基站安装指导书 最新
FDD-LTE安装指导手册CONTENTSCONTENTS1文档修改历史 (4)2FDD-LTE无线子系统工程系统框架 (5)3BBU安装指导 (7)3.1BBU总体结构 (7)3.2BBU安装方式 (8)3.2.1BBU机架加固方式 (8)3.2.2BBU对墙加固 (9)3.3BBU散热空间 (11)3.4机架加固 (12)3.5机架布局 (12)3.6电源线的连接 (14)3.7接地线的连接 (16)3.8电缆连接 (16)3.8.1PTN传输光纤连接 (17)3.8.2BBU和RRU光纤连接 (18)3.8.3网线的连接 (19)4RRU的安装场景 (19)5RRU 2T/4R安装指导 (20)5.1总体结构 (20)5.2RRH散热空间 (21)5.3安装方式 (22)5.3.1抱杆安装 (22)5.3.2挂墙安装 (24)5.3.3落地支撑安装方式 (25)5.4RRU底部接口类型 (26)5.4.1电源线的连接 (26)5.4.2接地线的连接 (30)5.4.3光纤连接 (31)5.4.4R2TC光纤防水套管制作方法 (32)5.4.5电缆卡具的安装 (36)5.4.6RF跳线连接 (38)6GPS安装 (40)6.1GPS天线的制作 (41)6.2GPS馈线的连接 (42)6.3GPS馈线接地要求 (42)6.4GPS避雷器的安装 (43)7防雷箱的安装 (46)7.1防雷箱的安装方式 (46)7.2防雷箱的电缆连接 (47)8AC/DC的安装 (49)8.1AC/DC接地线连接 (51)8.2对墙安装 (52)8.3抱杆安装 (53)9天线安装 (55)9.1天线4端口2T4R (55)9.2天线安装材料 (56)9.3安装工具 (56)9.4天线安装 (56)文档修改历史1文档修改历史日期 版本 作者 描述 审核 2013-5 01 张雄 创建文档2013-7 02 王卉 增加2T4R天线 张雄开箱流程2开箱流程开箱过程需要有设备接收方(用户方)、监理方、设备供应方人员到场共同监督开箱。
爱立信5G移动通信5GNR NSA基站调测流程2019
爱立信5G移动通信5GNR NSA基站调测流程2019概述本文档简单介绍了NR基站NSA部署方案的调测流程,包括调测的准备,调测详细流程以及NR基站与LTE及5GEPC的联调,供参考。
1调测准备1.1 调测工具准备•笔记本电脑一台•一根网线•T20螺丝刀,小平口和十字起各一把•RJ45压线钳•Java 1.61.2电脑操作系统及应用软件的安装配置1.2.1操作系统Windows 7以上1.2.2 应用软件的安装配置1.2.2.1浏览器的版本1.2.2.2Java 的安装配置安装Java 1.6 (如果电脑上安装有其他版本必须删除)按照Java安装提示一步一步执行。
1.2.2.3安装moshell 18.0或以上版本。
1.2.2.4电脑安装msftp servermsftpsrvr.zip1.3 调测设备硬件1.3.1 Baseband型号Baseband66301.3.2 Baseband6630基带特性Baseband6630支持以下功能1.3.3 Baseband6630接口2NR NSA基站调测流程2.1NR基站部分调测流程NR基站调测,需要用网线将本地电脑直连Baseband6630 LMT口进行数据调测。
2.1.1 设置本地电脑IP2.1.2 脚本放置将起局版本包,站点脚本数据,license文件放在本地Cygwin目录下,文件夹不能是中文名注:版本包,脚本数据的名字,一定要与DT中的脚本中各文件名一致,否则在测自动执行XML脚本时,会出现找不到文件而报错。
打开00_RBSSummary.xml脚本文件,修改软件包名字以及sitebasic和siteequipment文件名2.1.3 设置Core FTP将自己电脑设置成FTP server,打开 Core FTP,点击Options,按照下图进行配置,配置完成后点击Start.2.1.4 IE调测部分2.1.4.1 格式化主板格盘网址:https://169.254.2.2/ea.html2.1.4.2 格盘完成后Baseband会重启,过程2分钟左右,重启完成后重新开启浏览器查看格盘是否完成注:格盘后站点会自动重启,注意刷新下网址或重新输入网址。
5G基站设备安装与维修手册
5G基站设备安装与维修手册介绍本手册旨在提供5G基站设备的安装和维修指南。
以下是一些建议和步骤,以确保设备的正确安装和维护。
安装步骤1. 准备工作:在开始安装之前,确认已经准备好所需的设备和工具。
2. 安全措施:在进行任何安装操作之前,请确保遵循所有安全规定和操作指南。
3. 基站位置选择:选择一个适当的位置来安装5G基站设备。
确保该位置具备良好的信号覆盖和稳定的基础设施。
4. 安装设备:按照设备制造商提供的指南,正确安装5G基站设备。
5. 连接电源:将设备正确连接到电源,并确保电源供应稳定。
6. 连接网络:根据需要,将设备连接到网络,并进行必要的网络配置。
维修指南1. 故障排除:如果设备出现故障,请首先检查设备是否正确连接,并确保电源供应正常。
2. 重启设备:尝试重新启动设备,以解决一些常见的问题。
3. 查看日志:检查设备的日志文件,以了解可能的错误或异常情况。
4. 联系技术支持:如果问题无法解决,请联系设备的技术支持团队,并提供详细的故障描述和设备信息。
注意事项- 在进行安装和维修操作时,请遵循所有相关的安全规定和操作指南。
- 在任何时候都不要尝试修复或更改设备的内部组件,除非您是经过合适培训和授权的技术人员。
- 定期检查设备并进行维护,以确保其正常运行。
- 在进行任何维修操作之前,请确保设备断开电源。
以上是5G基站设备安装与维修手册的简要内容。
根据设备制造商的具体要求和指南,进行安装和维修操作是非常重要的。
请始终遵循相关的安全准则,并咨询专业技术人员的意见,以确保设备的正确安装和维护。
爱立信基站调测新手册
爱立信无线基站调测手册为完善爱立信无线基站的调测工作,使调测工作走向正规化、标准化、制度化。
依照GMCC无线技术文件Version2.1内容,结合爱立信无线基站验收规范V2.5的要求,制订此调测手册。
调测队员务必严格按照如下内容、按序进行基站调测工作一、开站前准备。
1、准备好开站所用的一切工具,如电脑、放线做头等工具。
2、准备该站的钥匙,图纸,资产,传输线,传输头等,如果是开站还应准备该站的电路资料。
3、询问该站施工人员,了解该站的一些施工情况,如是否为敏感站点,门禁是否能上电正常工作,是否缺连线或设备,如果某设备故障,则我们可带上一些备件,一次调测到位,尽量避免重复跑站,加大工作量。
二、调测开站。
1、进站后先检查机房各个部件是否正常。
如是否有被人为损坏的部件,机房环境是否卫生,如有异常,则如实上报主管和如非我司施工造成,则上报监理。
2、核对图纸。
检查无线设备安装的位置、机架数、载波配置是否符合本基站设计图纸的设计要求,如有不同如实上报,。
3、调测电源。
调测电源是我们要按部就班,不能随意上电,否则容易造成意外事故。
1)、首先检查市电,要求提供稳定的三相交流电输入,其单相的输入电压允许波动范围是187V~242V。
2)、检查交流输入正常后,打上熔丝上电。
打熔丝前,先检查电池线正负极是否接反,电池连接条是否松动,接着较准电压,让DC电源汇流牌处输出电压与电池端电压一致,避免打熔丝时造成打火花。
3)、打上熔丝后,给模块上电,打开关时,要注意先打上一个模块,让其正常工作后,再接着打上下一个,不可盲目一下子打几个模块。
4)、调测电源参数,根据《中国移动广东公司基站验收规范version2.5》里的要求,按照不同的电池设置正确的参数。
a、直流输出. 要求电源系统提供恒定的直流输出电压,根据具体使用的电池型号,应严格采用其供应商所要求的电压值。
b、系统均流.电源系统内各个整流器提供的输出电流应该相等,其均流误差≤±5%。
ERICSSON 5G 商用基站设备说明5G AAS6488 withCWDM S111Site 2019
Outdoor cabinet OMD-6
室外LC-LC 光纤 10m *3(对)
CWDM SFP+(1370) ) ECPRI3 CWDM SFP+(1290) ECPRI1
CWDM SFP+(1330) ECPRI2
室外LC-LC 光纤 10m *9(对)
CWDM SFP+(1370) ECPRI3
Cable Lug, 16sqmm, M8
Earthing Cable
15M,Optical Fiber DuplexPatchcord 2xSM, 2 LC - 2 FC
2LC(FullAXS) - 2LC,SM,100 Meter
CWDM SFP+(1330) ECPRI2
室外LC-LC 光纤
CWDM SFP+(1370) ECPRI3
10m *3(对) 共18芯 CWDM SFP+(1290) ECPRI1
CWDM SFP+(1330) ECPRI2
Байду номын сангаас
AIR 6488 AIR 6488
室外LC-SC 光纤 70m *3(芯)
OMD-6
COM AIR 6488
跳纤架
假定是 SC接口
爱立信无线基站主设备参数
Baseband 6630参数:
Radio 6488 B41参数:
BBU型号×尺高寸×(深宽)高(U度)
重量 (Kg)
供电 方式
功耗(最 是否是标准 单基带板IR接口的个数
大/平均) IR接口
*接口速率
Baseban 483x45x35
普通光模块 光纤产品 CBC-RPM2531610/xx
5G工程建设设备实体安装图册
盘放在走线 架侧面
AAU和RRU的野战光缆盘放
盘放在室外光 缆终端盒旁
严禁野战光缆盘放 到综合柜顶部,堵 住散热口
馈线窗封堵
线缆进机房后, 馈线窗进行封堵
进机房的线缆注 意做回水弯
机房和室外整体卫生打扫
室外卫生未打扫 干净
设备安装工程翼扫码
华为NSA站点的 BBU共2块主控板, 3块基带板,BBU 机框1个、3台 AAU和3台RRU, 共12处扫码。华 为或中兴SA站点 的BBU共1块主控 板、2块基带, BBU机框1个、3台 AAU、共6处扫码
BBU横装安装规范
BBU占用1U,BBU与BBU或 DCDU之间间隔为1U距离
BBU竖装安装规范-NET501F
BBU采用子框竖 装,上出风散热
GPS安装规范
接头防水 标识标牌
GPS避雷器安装规范
注意GPS避雷器金属部 分与走线架绝缘隔离
GPS避雷器及接地, 采用16方黄绿线
GPS避雷器安装规范
5G-NR建设设备安装图册
目录
1 5G设备介绍 2 5G设备安装规范 3 5G设t one
1
5G设备介绍
华为AAU5639W
华为AAU5639W线缆图
华为AAU5639W安装规范示意图
华为2.1G-RRU3638
华为BBU-5900
华为BBU-5900
GPS避雷器接地在防雷 地排
两头做好接地标 牌标签
AAU安装规范
规范:1、抱杆顶部需高出AAU顶部;2、避雷针 必须比AAU顶部高出30cm;3、设备必须在避 雷针45度保护范围以内;4、AAU的保护接地线 必须连接到塔体的地网扁铁上。
AAU电源线防雷接地规范
AAU电源线剥 出的屏蔽层
爱立信操作维护手册
HuBei EnSHi UNICOM
Molan.rotbio
网络建设部.移动 中心
10
二,进入操作状态: 进入操作状态: 1,按TRU单元上的LOCAL/REMOTE按钮,LOCAL模式指示灯闪烁. 2,等到LOCAL模式指示灯熄灭时,表示新的TRU单元进入REMOTE模式. 注意:如要采用跳频,则换板前应先由BSC停止跳频,换TRU 并处于REMOTE之后,再重新启动跳频,建立新的序列. 这样做的目的是防止更换TRU后会解不开.
HuBei EnSHi UNICOM
Molan.rotbio
网络建设部.移动 中心
13
进入操作状态: 三,进入操作状态: 1,连接主AC电源的电缆到机架顶的连接区域B. 2,装回BFU单元并连接好通信电缆. 3,检查DXU单元上的Operational绿色状态指示灯是否为常亮着,BS fault状态指示灯是否熄 灭. 4,按DXU单元上的LOCAL/REMOTE接钮,LOCAL模式灯将会闪动. 5,等到LOCAL模式灯熄灭,这时DXU单元进入REMOTE状态.
HuBei EnSHi UNICOM
Molan.rotbio
网络建设部.移动 中心
4
三,进入操作状态: 进入操作状态:
1,检查所有的TRU是否处于REMOTE状态,如果不是,应按LOCAL/REMOTE接钮使其进 入REMOTE状态. 2,按新DXU单元上的LOCAL/REMOTE接钮,LOCAL模式灯将会闪动. 3,等到LOCAL模式灯熄灭,这时新的DXU单元进入REMOTE状态. 进行下列检查: DXU单元上的BS fault指示灯是否熄灭. DXU单元上的Operational状态指示灯是否亮. TRU单元上的发射机的not enabled 指示灯是否熄灭. 注意:可能由于TRU单元没有配置使TRU单元不能进入服务状态,这时TRU单元上的not enabled 指示灯不能熄灭. 问:若新更换的DXU为老版本,为防止它对下级单元刷新,怎么 办? 答:只有DXU加电,其它单元掉电.先对DXU升版,升完版后 再给其它单元加电.
5G基站工程安装最全教程,遇到5G项目再也不难了
5G基站工程安装最全教程,遇到5G项目再也不难了已经步入5G时代了,在我们弱电VIP群中,很多的项目经理已经接到相关的基站安装项目,各大运营商在2020年也是在快速的进行5G基站的建设,华为、中兴、烽火等厂家是5G基站的主角,很显然,2020年,是5G快速发展的一年,那么有不少朋友也是在问到,遇到5G基站建设项目如何施工安装呢?今天弱电行业网和大家一起来看下这个非常详细的移动5G基站安装过程。
要了解5G基站如何安装,就需要了解以下这6个方面:1、系统结构2、安装BBU3、安装AAU4、安装GPS:天线与馈线的安装5、系统供电和接地6、线缆连接一、系统结构5G基站系统结构有两种供电方式:12咋一看这两种方式,大部分朋友对结构图肯定是一头雾水,我们来看下详细安装步骤。
二、安装BBUBBU原型机V9600,19”标准宽,6U高,475mm深,可以安装在600*600*2200mm的标准机柜内。
图 2-1 V9600整体示意图V9600正面视图&背面视图图 2-3 ZXA10标准机柜正视图&侧视图&开门图1、将ZXA10机柜搬运放置在机房指定安装位置,注意柜体垂直度,机柜正面/背面与柜顶走线架保持水平;安装柜体时,可先将前后柜门拆卸下来;2、使用自攻螺钉,将机柜底部固定在机房地板上;3、将机柜内V9600安装位置后侧的走线槽拆除,便于V9600安装;4、将V9600插入机柜指定位置的托架上(一般在机柜中下部),使其两侧耳部紧靠机柜两侧的固定筋;5、在机柜两侧固定筋的对应位置,安装浮动螺母,并用M6螺丝固定V9600机框;6、拆卸假面板:拇指按住蓝色按钮,向外侧扳动扳手使模块连接器脱开,然后平缓向外拉出假面板即可;7、插入单板:装入前确认模块前面板扳手处于脱开状态,将单板对准指定槽位,平放向前平缓推入,当扳手支角与插箱接触时,将扳手向内侧扳动,直到蓝色按钮自动扣住为止;BBU安装完成(正面&背面)三、安装AAU图 3-1 A9601外观示意(六面)图图 3-2 A9601最小安装空间要求安装过程1.拆分安装支架(实际商用发货的安装支架(上)结构差异在本节末描述)2.用力矩扳手检查安装支架(上)和安装支架(下)是否紧固到位,保证螺栓、弹簧垫圈、平垫圈无遗漏,紧固力矩40N·m;3.使用M10×25螺栓组合件将安装支架的设备紧固件和安装支架(下)固定到整机上,力矩40 N·m;注意:安装支架的丝印黑色“箭头”标识均为向上4.将安装支架(上)的角度调节件安装至设备紧固件上注意:实际发货商用的角度调节件与图中所示的调节件不同。
基站安装规范
爱立信基站设备安装规范DOCUMENT 本文件主要包括以下部分:●总则●RBS1107产品描述●基站机房●基站设备●工艺说明CDMA无线基站安装工艺标准描述总则为保证CDMA无线基站工程的施工质量,明确工程质量监查的技术规范,特制定本检查细则。
本细则既是工程管理部门对工程质量的质监细则,又是相关工程施工部门所应遵的技术指导标准。
RBS1107产品描述爱立信CDMA系统称为CMS11,目前使用的无线基站产品称为Radio Base Station 1107 Compact(RBS1107 Compact)。
RBS1107 Compact(以下简称RBS1107)采用模块化设计,室内外均适合安装。
根据实际需要,一个RBS1107的基站可由2到7个单元组成,其中包括1个主单元(Main Unit)和1到6个远端单元(Remote Unit)。
1个远端单元可支持1个扇区(a single sector),并可最多装载2个载频(RF carrier)。
由于采用模块化设计,远端单元的第二个载频可根据需要决定是否安装。
另外RBS1107的multi-sector功能还可以让多个远端单元共用1个载频。
RBS1107体积小巧,安装灵活,可以在墙壁、房顶、抱杆、铁塔等多种地方安装,只是在安装时应注意确保易于维护和升级。
主单元(Main Unit)执行数字处理和单元控制的功能,处理信号,分配时钟同步信号。
主单元上有若干接口,其中包括:连接远端的多模光纤接口、E1/T1接口、告警接口、GPS接收器接口;另外9针串口和以太网口是调测时连接PC用的。
主单元装备有金属遮阳罩,可以阻挡阳光直射、风吹。
主单元还装备有安装支架,可适合在墙壁、抱杆、铁塔等地方安装。
远端单元(Remote Unit)实现RBS1107的无线功能,每个远端可最多支持两个载频。
远端的主要功能有:滤波、功放和CDMA信号的转换;对应的组成部分包括:能量放大器、低噪音放大器、收发滤波器以及基带信号和无线频率之间的互转器。
G移动基站安装操作指导书
4G移动基站安装操作指导书施工前准备说明:文中数字序号 1)、2)…表示安装步骤;字母序号 a)、b)…表示不同场景抵达现场,依据EHS要求着装,在作业区域设立安全警示标识后开始设备安装Step1:开箱验货1)确认现场设备安装位置、走线路由及长度,电源、传输、地排等配套与设计文件相符,开箱并按装箱单清点货物并签字确认,记录BBU框ESN报后台Step2:安装机柜/机框并接地将机柜/机框安装在设计位置,并用25mm2黄绿地线连接至机房室内接地排a)BTS3900L机柜场景:b) IMB/OMB机框场景:c) APM30机柜场景:Step3:安装DCDU/ ETP48100及BBU1)按照机柜门背面的安装指示标识,安装DCDU/ETP48100和BBU若模块安装在非华为机柜,需用6mm2接地线通过设备外壳或面部的接地连接至机柜内部就近接地点,安装在华为机柜/机框,无需再做接地模块安装后需与原有设备前面板在同一平面Step4:安装DCDU/ETP48100电源输入线a)直流:裁剪16mm2蓝黑电源线并压接端子,连接至DCDU与电源柜b)交流:将交流输入电源线两端分别连接至ETP48100与AC220V电源插排,多余线缆盘绕绑扎在机框旁边线缆布放时须用绝缘胶带缠绕端头,使之绝缘,电源柜侧接电时,须使用经过绝缘处理的工具,接电前需确认空开关闭或拔出熔丝电源线和信号线需间隔30mm 固定,室内用白色线扣十字交叉绑扎,齐根剪平不拉尖,室外用黑色线扣,留3-5mm 后剪掉Step5:天线预安装并连接跳线1) 安装天线支架并调至预定下倾角;2a)常规天线:连接跳线并做好防水用防水盒或冷缩套管2b)合路天线:用绝缘胶带和防水胶带做1+3+3防水或冷缩套管3)在天线侧安装标识牌,在跳线尾部做临时标识 Step6:安装天线及RRU 到抱杆或墙面1) 若为改造场景,原网天馈参数测量记录,然后拆除原网天线与RRU ;2) 安装滑轮和吊绳,将天线吊到预定高度,调整好方位角与下倾角后紧固天线;3) 安装RRU 扣件后将RRU 挂装在抱杆或墙面主扣件上天线安装角度最大误差:方位角2度,下倾角0.5度跳线与天线的连接处300mm 以内不能有折弯Step7:RRU 侧电源线、光纤、GPS 馈线布放1) 参照设计路由将RRU 电源线、光纤、GPS 馈线沿走线路由穿过馈窗布放至机柜,在馈窗处留好避水弯后密封馈窗,使用馈线夹或扎带固定可靠、整齐Step8:机柜侧RRU 光缆及电源线连接1a )光纤盒场景:将光纤连接至BBU LBBP 和光纤盒(需现场安装)特定接口,冗余长度盘盘绕成直径200mm 的线盘,固定至光纤盒附近走线架上1b )直连光纤场景:将光模块和光纤连接至 LBBP ,从机柜侧布放固定至室外2)将电源线从走线架垂直穿入机柜,制作接头连接DCDU/ETP48100DCDU-12B RRU 接线图DCDU-12B ,1-3扇区分别连接LOAD 0-2Step9:连接传输1a)若机房内有传输设备,直接安装传输光纤到传输设备,BBU 侧光纤插在6号槽位FE1端口,从机柜左侧出线穿入走线架连接至PTN1b)若机房内不配置传输设备,传输光纤连接至ODFtep10:馈窗处接地1) 用美工刀剥除RRU 电源线外护套60-70mm2) 将接地夹的金属片缠绕在屏蔽层上,用扎带绑扎固定,通过“防水胶带、绝缘胶带 3+3”防水规范,将接地夹另一端连接至室外接地排Step11:连接RRU 线缆1) 量测并裁剪25mm 2地线,两端连接至RRU 接地螺栓和地排2) 连接跳线到RRU 底部相应接口(天线和RRU 端口连接关系:1-ANT1;2-ANT2…)用绝缘胶带、防水胶、冷缩管做1+1+1防水3a) 光纤盒场景:将RRU 光纤两头分别连接至光纤盒及维护腔的光口3b) 直连纤场景:安装光模块后连接光纤,将多余长度盘绕固定在RRU 背面4) 按RRU 上的标识制作电源插头并连接,紧固维护腔底部的线缆固定螺钉及电源线屏蔽夹紧螺钉,合上盖子,紧固面板螺钉RRU 维护腔防水胶塞不能剪断,未走线的接口使用防水胶棒塞好Step12:安装GPS 并接地单模 多模共框 DCDU-12B RRU 接线图:1)选定安装位置打孔(M10*60mm)固定天线支架,接头处用绝缘胶带、防水胶带做1+3+3防水2)在室内馈窗1m内剪断GPS馈线,制作接头连接至避雷器,压接6mm2地线端子,保护地线两端分别安装到GPS避雷器的GND端和室外地排3)将GPS馈线在走线架上布放固定至机柜右侧,垂直进入机柜,平齐BBU后剪断制作接头4)将GPS时钟信号线黄色接头连接至UMPT单板GPS端口,从BBU右侧穿入,连接至GPS 馈线接头GPS天线必须安装在避雷针45度角的保护区域内,且天线垂直张角90°范围无遮挡Step13:标签制作与粘贴1)裁剪室内各接头(含:DCDU电源线、地线、传输、RRU光纤、RRU电源线、GPS馈线、告警线)的标签纸,撕掉背面的离型膜,粘贴于塑料标签架上2)将室内标签用白色线扣固定于线缆端头20mm处3)室外跳线、地线、光纤选用相应标签,用黑色线扣固定施工时,若现场没有配发客户标签,需粘贴临时标签固定标签时,需考虑方向和朝向,以便查看标签内容Step14:安装自检及拍照按照《中国移动LTE项目站点安装质量标准Checklist》,完成质量自检,现场督导、监理确认硬装质量并签字Step15:上电测试1)用万用表调至欧姆档测量确认DCDU的正负极和地线绝缘2)接通输入电源,测量DCDU正负极电压在-36V DC ~-60V DC后,将DCDU上对应各部件的开关拨至ON,打开BBU的PWE开关,测量BBU、RRU的输入电压在-36V DC ~-60V DC3)查看确认各模块状态正常4)待设备调试运行正常后,利用测试手机进行数据业务测试Step16:清理现场、离站1)整理现场工具和多余线缆,清洁打扫机房及天馈施工区域,将施工垃圾打包带离站点2)填写机房出入记录,关闭机房门锁,通知网管中心确认无告警后离站3)拍摄完工照片。
5G基站无线侧设备安装指导手册
RRU RRU RRU RRU (FA) (D) 1800 900
RRU RRU RRU (FA) 1800 900
F-BBU 1800-BBU
D-BBU 900-BBU
拆除:D频段BBU 新建:5G 5900BBU, D频段与5G共BBU
F-BBU 1800-BBU 900-BBU
5G-BBU
直流电源线 跳线 传输线缆 保护地线 CPRI光纤
5G机柜
典型安装场景介绍
本站场景说明
主选方案
接电原则
使用升压配电盒3.0 EPU02S,AAU单 路供电,无需ODM03D二合一。 备选方案
若使用DCDU-12B情况下,AAU 需双路供电,每个AAU配2路电,在 天面使用ODM03D进行二合一。
AAU从EPU02S取电一路, <70m可用6mm²线径, 70m-100m为10mm²线 径的电源线。
ODF
典型安装场景介绍
1. 无需天面改造场景
场景
场景1 D、F共RRU/共BBU
场景2 无D频段
新增安装
AAU BBU5900 DCDU/升压配电盒 PTN990 AAU电源线 每个AAU 2条野战光纤
新建北斗GPS
AAU BBU5900 DCDU/升压配电盒 PTN990 AAU电源线 每个AAU 2条野战光纤
5G 基站 施工指导书
1
目录
一、典型场景及设备介绍 二、工序流程分解及注意事项 三、案例分析 四、安装步骤分解 五、工艺质量要点
典型安装场景介绍
5G-AAU
5G天面
GPS 室内
EPU02S BBU5900
P
T
直流配
N
电箱
NOKIA基站设备安装工程运作手册(doc 33页)
NOKIA基站设备安装工程运作手册(doc 33页)NOKIA基站设备安装工程运作指南1 概述2 运作流程2.1 工程运作整体流程项目启动会议(PM ,FM ,Eng )LM 接到PM 项目需求预测LM 项目筹备工作启动资源调配(工程师,工具等)(FM/TL )整理会议纪要并发送给与会人员,PM ,LM项目正式运作FM/TL 组织打印,派发SiteFolder ,SiteLog项目预结束,验收文档整理,装订质量监控与客户召开项目总结会议项目初验及移交管理进度控制风险控制项目结束,终验第三方质量检查PM/FM 反馈(评估)项目需求得到确认更新项目需求 否是2.2 现场技术实施流程确认基站是否具备安装条件?到达工地现场完成全部Site LOG/Folder 填写(最后完成Int 的工程师补充LOG 、Folder剩余内容)驻波比测试货物清点Commissioning拨打测试督导硬件的安装具备Integration条件?是填写已经完成的Site LOG 、Folder(记录下问题)否Site LOG 放存放在机柜内Integration 提交Site Folder 给TL/FMBTS 硬件安装现场检查是否符合安装标准?是工作继续?与客户协调,并说服客户尽快整改协调结束,反馈协调结果给TL/FM和TL/FM 取得联系确认是否开工是否 否功率测试TL 安排合适人选推动客户基础建设工作是否2.3问题处理流程2.3.1客户相关问题处理流程2.3.1.1 客户相关各类问题处理原则1、不影响施工质量或进度但涉及与客户相关的问题,务必第一时间通知客户,并必须由现场工程师与客户协商就地解决问题,并记录在案并继续跟踪,直到问题的解决。
(如空调没有安装等。
)2、在问题影响到施工质量或进度时(比如涉及到达现场后才发现较多基站准备情况与客户提供的信息不符,如电源,传输没到位,没有接地排等不符合施工条件,造成该站施工受阻等)。
Ericsson GE Mobile Communications MDX 手机基站操作手册说明书
LBI-38976Mobile CommunicationsMDXOperator's ManualCopyright © September 1993, Ericsson GE Mobile Communications Inc.INTRODUCTIONFigure 1 - Base Station Controls and IndicatorsThe front panel of the Ericsson GE Desk Top Station, as shown in Figure 1, includes the front of an MDX conventional/ EDACS™radio, as well as a Control Panel. The Station is assembled as a standard Station with or without one of the combinations of options. The control panel is illustrated for each combination:•Standard Desk Top Station, Without Options - The standard Station has only a single RED LED to indicate when the power supply is ON (see Figure 2).The power supply ON/OFF switch is mounted on the rear of the Station housing.Figure 2 - Control Panel With Single LED Power Indicator •Standard Station with Remote Option - In addition to the LED POWER indicator, there is a REMOTE ON/OFF switch, an INTERCOM ON/OFF/Momentary switch and a VOLUME control (see Figure 3).Figure 3 - Control Panel With Remote OptionOPERATION OF THE STANDARD STATION WITHOUT OPTIONSOperation of the Standard Station without any option begins with turning ON the POWER switch. The POWER switch is located on the rear of the power supply, accessible at the rear of the Desk Top Station housing. The POWER indicator lights, showing that the power supply is ON. The radio is not ON yet. The Power Supply provides power to the Station cooling fan. The fan operation is temperature controlled. Internal cabinet temperature determines when the fan runs. The radio has its own ON/OFF POWER Switch.The radio uses the Station Speaker mounted behind the front cap of the Station. The radio's internal speaker is not used. The radio must be programmed for a variable volume control.Further operation of the Station is that of the MDX radio. Refer to the applicable Operator's Manual for more detailed information. STATION WITH REMOTE OPTIONThe DC/Tone Remote Options permit use of ERICSSON GE's RCN-1000 Remote Control Consoles with the Desk Top Station. Any of these options require that the Station have a DC or Tone Remote Board with a Remote Interface Board. These options provide for a two or four wire interface to the consoles for these functions:•Transmit, Receive and Intercom Audio•Transmit Keying (PTT) Control•Channel Guard MonitorOPERATION OF THE STATION WITH REMOTE OPTIONOperation of the Desk Top Station is described for four combinations of the INTERCOM switch and the REMOTE switch positions. These two switches control the various audio paths between remote and local microphones, the radio, and remote and local speakers.With this switch arrangement, intercom communication is possible between the Desk Top Station and the Remote Console.Also, the Remote Console can key the radio transmitter and hear the receiver's audio output.When the Desk Mic PTT is keyed, there is no connection to the radio transmitter. If the radio receiver is squelched, the speaker at the Remote Console hears the audio as an intercom conversation.Should the radio receiver be unsquelched, receiver audio is heard on both the Desk Top speaker and the Remote Console speaker, with priority over the intercom message from the Desk Mic to the Remote speaker.The audio from the microphone at the Remote Console is heard on the Desk Top Station speaker. The Remote Console's INTERCOM switch must be OFF to key the station's radio transmitter.The audio from the unsquelched radio receiver is heard on both the Station speaker and the Remote Console speaker.Intercom messages from the Remote Consoles are muted when radio messages are being received, or when the Desk Top Station operator is using the Desk Mic PTT.2.Desk Top Intercom Switch ON, Remote Switch OFFThis arrangement offers intercom service only. Neither the Desk Top Station nor the Remote Console microphone can be used to key the radio transmitter. The radio receiver's audio can be heard on the Station speaker, but not on the Remote Console speaker.A message from the Desk Mic is heard on the Remote speaker.An intercom message from the Remote Mic can be heard on the Station speaker, but only if the Desk Mic is not active. The Desk Mic has priority over the Remote Console microphone in the intercom connection.These switch settings are for remote control of the radio, without an intercom connection.When the Desk Mic is keyed, the radio transmitter is keyed and the Remote Console is able to monitor the transmission.The Remote Console microphone is connected to the radio transmitter if the Remote Console Mic is keyed and the Desk Mic is not keyed. Also, the Remote Console Mic is connected to the Station speaker if the radio receiver is squelched and the Desk Mic is not keyed (so that the "Desk Mic Audio to Line Path" is inactive).The radio receiver audio is connected to the Remote Console speaker if the receiver is unsquelched. The P.A. output from the receiver is unconditionally connected to the Station speaker, but is subject to the radio's internal squelch.4.Desk Top Intercom Switch OFF, Remote Switch OFFThis arrangement is for operating the Desk Top Station as a radio.The Desk Mic is connected only to the radio transmitter, when the Desk Mic is keyed.The radio receiver's P.A. audio output is connected only to the Station speaker.A summary of the audio path connections for the four combinations of INTERCOM and REMOTE Switches is given in the Table Remote and Intercom Audio Interface Summary.The VOLUME Control is a rotary potentiometer on the Desk Top Station Control Panel which controls the level of the audio signal fed to the Station speaker as determined by the choice of INTERCOM and REMOTE switch positions.The volume control on the mobile must be variable for the local control station only.With the MDX remote radio, the rotary VOLUME control adjusts both the receiver and the intercom audio levels. The radio volume control buttons are disabled by a PC programming option so that the receiver audio volume level is fixed and the internally adjusted "Intercom Level" adjusts the intercom audio relative to the receiver audio. This arrangement allows all Alert Tones generated by the radio to pass to the Remote Consoles at a suitable level independent of the Desk Top Station rotary VOLUME control. Refer to applicable Operator's Manual for specific information on setting the audio level of the particular radio installed.KEYPAD/FREQUENCY SELECT BOARD OPTIONThe Keypad Option is compatible with the MDX radio (see Figures 4 & 5). When the desktop station is equipped with the Keypad/Remote board, the unit is capable of placing individual calls to other mobiles on the system as well as making interconnect calls. The board also allows operation with a five (5) function remote RC-1000 controller when tone remote control board 19A704686P8 is installed in the station.KEYPAD OPERATIONTo Make An Individual Call From The Keypad1.Push the MENU button on the radio to select the special callmode2.Enter the unit ID of the radio to be called using the keypad. Theallowed range is from 1 to 16382 (this range may be restricted by the PC programmer).3.Key the desk microphone to call the individual unit. The radiowill transmit and receive only to the individual radio in this mode and no other units in the fleet can hear the call. The individual unit ID will be displayed on the radio as long as the call is in progress.4.Push either the CLR button on the radio or the pound (#) key onthe keypad to end the call and return to normal operation.To Make A Telephone Interconnect Call From The Keypad:1.Push the MENU button on the radio to select the special callmode.2.Enter the desired phone number using the keypad.3.Push the star (*) key on the keypad and wait for the radio to dialthe number.4.Key the desk microphone PTT switch to talk and release it tolisten.5.Push either the CLR button on the radio or the pound (#) key onthe keypad to end the call and return to normal operation.Figure 4 - Control Panel with Remote Options and KeypadFigure 5 - Control Panel With Remote and Keypad OptionsEDACS REMOTE OPERATIONThe RCN-1000 Remote Controller is capable of selecting up to five (5) predefined radio system/group/special call combinations. The presets are programmed into the radio by the PC Programmer.The remotes and desktop station can operate as an intercom by setting the INTERCOM switch to ON or M.Remotes can be disabled by setting the station REMOTE switch to OFF.To Place A Call From The Remote:1.Select the desired SF function switch on the RCN-1000. TheLED next to the function switch will illuminate.2.Key the microphone PTT switch and wait for a short beepbefore beginning to speak. Release the PTT when you'refinished.3.Adjust the volume as needed while receiving a call.TABLE - REMOTE & INTERCOM AUDIO INTERFACE SUMMARYPrinted in U.S.A.。
Ericsson GE Mobile Communications Inc. 天线系统组装说明书
LBI-38983ERICSSONZMMobile CommunicationsANTENNA SYSTEMSERICSSONZMEricsson GE Mobile Communications Inc.Mountain View Road•Lynchburg Virginia 24502Printed in U.S.A.Assembly ManualDESCRIPTIONAntenna systems are generally installed by crews with spe-cialized equipment and skills for installing antennas and work-ing on antenna towers. This manual includes assembly drawings that provide information to assemble complete antenna systems (with vendor options) for radio station equipment operating in the VHF. UHF, 800 MHz, and 900 MHz frequency bands. System configurations addressed include both conventional and trunked radio systems as well as auxiliary receivers. Upon completing the installation, a physical inspection of the antenna system should be made to verify that all connections are made and secure.INSTALLATIONCoaxial cable and connectors are supplied separately in bulk and must be cut to length and terminated in the field. Select the appropriate antenna system configuration from the drawings included in this manual. Begin at the point where the antenna cable enters the equipment room and assemble the necessary cables from the entry point to the individual TX and Rx. first measure to determine the correct length when the cable is routed from the repeater to the RF equipment via the cabinet top ducts then terminate with the proper connectors as shown on the antenna system assembly diagram. refer also to the station transmitter manual for general information pertaining to the trunked repeater.In order to cut the coaxial cable properly for easy connector attachment it is recommended that an Andrew "EASIAX" cut-ting tool be used when terminating the coaxial cable.ANTENNA SYSTEM INSPECTIONEach transmitter and receiver antenna system must be in-spected per the following procedure.This inspection is to verify proper installation of the antenna system components and may be accomplished using field glasses from various positions on the ground to view the antenna system. Complete one data sheet for each antenna at the site. A typical data sheet is shown in Figure 1.1. Record the make of antenna.2.Record the type of antenna: omni or directional.3.Record the design gain of the antenna.4.If the antenna is directional, record the bearing of themain lobe. If it is omni, write "Omni" in the data entryline.5.Record the height of the antenna above ground.6.Confirm that cable hoisting grips were installed asrequired to prevent damage to the coaxial cable.Hoisting grips should be installed at the antenna endof the cable plus one for each 200 ft of cable length.7.Confirm the cable is secured to the tower at intervalswhich do not exceed 3 feet.8. Confirm the cable is grounded at the top of the tower.9. Confirm the cable is grounded at the point where itleaves the tower.10.Confirm the cable is grounded at the point where itenters the building.Copyright© August 1993, Ericsson GE Mobile Communications Inc.DATE_________________________________________TECHNICIAN_________________________________SITE_________________________________________ANTENNA NO_________________________________ANTENNA TESTS1. Make of antenna___________________________________2. Type of antenna___________________________________3. Design gain of antenna___________________________________dB4. Bearing of antenna___________________________________5. Height of antenna above ground___________________________________Ft.6. Are hoisting grips installed as specified?___________________________________7. Is cable secured to tower at specified intervals?___________________________________8. Is cable grounded at top of tower?___________________________________9. Is cable grounded at bottom of tower?___________________________________10. Is the cable grounded at the point where the cableenters the building?___________________________________11. Transmission paths OK?___________________________________12. Is cable feed through properly installed?___________________________________13. Are coaxial connectors weather sealed?___________________________________14. Cable entrance weather sealed?___________________________________DATA SHEET 1SHEET 1 OF 1LBI-389831UHF/800 MHz ANTENNA SYSTEM (With Vendor Options)(19D904223 Sh. 1, Rev. 1)ANTENNA ASSEMBLY DRAWINGSLBI-38983 2ANTENNA ASSEMBLY DRAWINGS LBI-38983VHF ANTENNA SYSTEM (136-174 MHz)(With Vendor Options)(19D904223 Sh. 2 Rev. 0)3800 MHz AUXILIARY RECEIVER SITE (With Vendor Options andTower Top Amplifier)(19D904223 Sh. 3 Rev. 1)ANTENNA ASSEMBLY DRAWINGSLBI-38983 4ANTENNA ASSEMBLY DRAWINGS LBI-38983800 MHz AUXILIARY RECEIVER SITE(With Vendor Options andNo Tower Top Amplifier)(19D904223 Sh. 3A Rev. 0)5VHF AUXILIARY RECEIVER SITE (136-174 MHz)(With Vendor Options)(19D904223 Sh. 4 Rev. 0)ANTENNA ASSEMBLY DRAWINGSLBI-38983 6ANTENNA ASSEMBLY DRAWINGS LBI-38983900 MHz AUXILIARY RECEIVER SITE(With Vendor Options)(19D904223 Sh. 5 Rev. 0)7VENDOR OPTION TABLE Repeater & Auxiliary Receivers VHF/UHF/800 MHz(19D904223 Sh. 6 Rev. 1)ANTENNA ASSEMBLY DRAWINGSLBI-38983 8ANTENNA SYSTEM(With Vendor Options Test Unit)(19D904223 Sh. 8, Rev.1)ANTENNA ASSEMBLY DRAWINGS VENDOR OPTION TABLE Trunked Repeaters 900 MHz(19D904223 Sh. 7, Rev.0)LBI-389839ANTENNA SYSTEM (With Vendor Options Control Station)(19D904223 Sh. 9, Rev.1)ANTENNA SYSTEM Alignment Receiver With Vendor Options (19D904223 Sh. 10, Rev.1)ANTENNA ASSEMBLY DRAWINGS LBI-3898310ANTENNA ASSEMBLY DRAWINGS LBI-38983ANTENNA SYSTEMSCAT Site With Vendor Options(19D904223 Sh. 11 Rev. 1)11。
广州5G NR工程方案-爱立信
AIR
6454
961.5*509.5* 178
<67
160 64通道
240
直流 -48 VDC(36VDC~-58VDC)
<1400
Ericsson Internal | 2018-02-21
AIR 6454
5G NSA连接方案
— 4G锚定基站软件升级、开通功能和数据配置,增加路由接入 5G EPC系统
— S111配置,室外部分:
— 配置3个5G NR AAS — BBU-AAS直连场景,每个AAS配置3个10G光模块(1.4km),3根直连光纤(按需配置长度) — BBU-AAS拉远场景,每个AAS配置3个10G BiDi光模块,2根AAS-ODF跳纤(LC-FC,每根2芯,按需配置长度) — 每个AAS配置接地线,线径16mm2,按需配置长度 (按捆打包订货) — 本次工程设计AAS供电方式为AC,每个AAS配置1套ACPSU,按需配置3x2.5mm2交流电源线(按捆打包订货)
抱杆
区为例
AAS及安装件
预制直流电源线
Power 6322
通往核心网 和网管
光网
Bidi CPRI光纤(每扇区3芯) ODF
机房电源系统
交流电源 线3X2.5平
交流电源分配端子
各设备接地方式与4G同,地线16平
Ericsson Internal | 2018-02-21
CRAN工程方案说明(非彩光)
电源列头柜
直流电源线
电源分配端子
ODF
每扇区尾纤3芯
各设备接地方式与4G同,地线16平
Ericsson Internal | 2018-02-21
标准19”机架
5G无线设备形态与安装
其他
机柜接地线缆安装正确 机柜内没有其它杂物 机柜顶部出电缆孔正对准 机房走线槽的下方 防静电腕带没有丢失,且 不能挪作它用 单板拔插应顺畅 门、门锁等开关顺畅 钥匙不能插在门锁上
7-16
6.2 室内设备安装工艺要求
机柜安装工艺要求
机柜标签粘贴 整齐、可靠
问题: 膨胀螺栓 入地过深
防静电手腕应该安 装到机柜的防静电 插孔中
9.92
32%
0
5
10
15
注:以上数据标准图集中的标准塔型进行的测算。
注:以上数据标准图集中的0.65风压的抱杆,规格70x4测算。
7-9
6.1 5G时代的设备形态及影响
ZTE 5G基站电源容量需求: 5G基站S111配置情况下,单站典型功率3700W,单站 峰值功率4700W,单站电源容量配置需求2*100A。
信号带宽(IBW) 200MHz
eCPRI 输出功率 功耗
安装方式
1*25G(SFP28),2*100G(QSFP28)
200W <1100W 挂墙/抱杆(抱杆需直径60~120mm,壁厚 4mm以上,铁塔抱杆承重及风载需满足以上需 求。)
7-2
6.1 5G时代的设备形态及影响
3.5GHZ,8×8×2阵子 7-3
建站方式
利用社会杆塔
利用存量杆塔
利用楼宇建筑物
示例
说明 特点
利用路灯杆、监控杆、电 力塔、传输杆、广告杆 (牌)等具备挂载能力的 社会杆塔资源
利用运营商现有存量地面杆塔 资源
利用各类楼宇及围墙等建筑 物的天面和外立面资源
建设周期短,成本低,建 设方式灵活
无需协调,直接利用
建设成本低,建设方式灵活
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
GPS接收器有3个版本:GPS01/GPS02/GPS03,其中GPS02/03集成了避雷 功能。
GPS接收器安装
GPS接收器安装在DF盒中(右图)或者是 DIN-rail上(下图)。 DF盒可以固定在墙上或者19”机柜中,使用16mm2接地线连接至室内地排
开箱
安装基带单元 基带单元接地
GPS安装 GPS接地 与AAS光纤连接 与传输PTN连接
安装AAS AAS接地 与基带单元光纤连接
电源连接 收尾
BB6630介绍
-48V直流 电源接口
BB间级联 接口RJ45来自 同步 本地太网电 口 调测
口
接口
指示灯
可拆卸固定 支架及接地 端子
SFP+以太 网电口/光口
天线支臂和抱杆位置,接地等
如与设计不符,需要与施工单位、客户及设计院确认 后,方能进行安装,并最终得到设计院的书面确认。
开箱验货
检查到货配置是否与基站配置信息一致。
根据箱单检查到货数量,是否有缺货或损坏,如有必 须拍照并填写《MSR缺货报告》。
填写《开箱查验报告》,由负责开箱工程师和客户代 表同时签字。
PLU安装
安装在设计规划的综合柜里,地线连接至综合柜保护地排 提供6路-48V直流电源输出,PLU 输出1、2和3端子,每路≤45 A;建议给AAS供电(电源线10 mm²~25 mm²); 4
、5和6端子,每路≤25 A给建议给BBU供电(电源线4 mm²~10 mm²) 使用灰黑两色电源线时,灰色线缆为“+”接0V,黑色线缆为“-”,接-48V。 使用红蓝两色电源线时。红色线缆为“+”接0V,蓝色线缆为“-”,接-48V。 电源柜到PLU的正负极连接正确,铜鼻子做好绝缘 PLU到AAS/BB的正负极连接正确,PLU输出端子从左往右依次给 AAS1\AAS2\AAS3\BB供电,并且线缆右侧走线 PLU 输入需 100A-150A (电源线25 mm²)熔丝或空开。 PLU接地线的横截面积应≥16mm²,接地电阻应≤4Ω。
Power6322安装
22
光纤连接
24
线缆布放要求
26
安装准备
工具准备
安装步骤
个人防护装备:安全帽、安全带、安全绳等
安装工具:螺丝刀(T15/T20/T30/平口/十字)、扳手、 斜口钳、套筒等
测试工具:万用表、光功率计等
安装准备
检查现场的配套情况,并与安装设计文件进行核对。
机房结构,面积强度,空调 ,电源,传输,接地 等
在拔插电源头时千万注意不能拉 红色箭头所指的回环线缆,请拉 下面的蓝色辅助拉环。
RJ45引脚 1 2 3 4 5 6 7 8
外部告警引脚定义
信号 A2+ A2A3+ A1+ A1A3A4+ A4-
功能 告警 2 告警 2 告警 3 告警 1 告警 1 告警 3 告警 4 告警 4
双绞线颜色 橙白 橙 绿白 蓝白 蓝 绿 棕白 棕
CPRI口,其中 D/E/F为eCPRI 口
SAU EC 外部 接口 线接 告警
口 接口
尺寸:高1U,宽19“,深350mm 重量:<6.5Kg 工作温度:0 至 +55 ℃ 工作电压:-48V直流,电压波动范围-38V ~ -
58.5V 空开大小:10~20A 可直接安装在19英寸机架上,采用可调整支架固
DF-OVP安装
DF-OVP用于防雷击以及电涌冲击,其内置的DIN-Rail可以放置12个标准模块。 支持的OVP模块有:
外部告警支持模块:SAU 01 01, SAU 02 01,支持32路外部告警 外部告警过压保护模块:OVP-ALM8,8路告警输入 传输过压保护模块:OVP-TRM1、OVP-TRM2,2路E1输入 GPS接收器模块:GPS02/03模块 外部同步模块:OVP-TRM1(仅GSM)
DF-OVP可以安装墙上或19英寸机柜中,占用高度5U。 接地端子位于背面,使用16-35mm2地线连接至室内地排。
GPS安装
GPS天线安装-京信天线
此天线通过馈线外导体接地。
GPS天线安装-京信天线
此天线可以通过馈线外导体或4颗固定螺栓接地。
天线组装
支架组装
挂墙安装
抱杆安装
抱杆安装
挂墙安装
爱立信BB6630+AAS6488基站安装手册
本手册仅适用于BB6630+AAS6488
2019-02-01
目录
安装准备
4
安装步骤
4
BB6630介绍
5
BB6630安装
6
PLU安装
7
DF-OVP安装
8
GPS安装
9
AAS6488介绍
13
AAS6488安装
14
电源线接线盒安装
20
Power6322介绍
21
GPS馈线进入室内后使用射频跳线连接到GPS接收器
GPS馈线接地
GPS信号放大器(需注意信号放大方向)
1.馈线接地卡。
2.铜丝垫放置在接地卡内
3.馈线去皮9圈
4.接地卡安装在馈线上。
5.连接接地线
6.拧紧螺栓
7.做好防水处理
GPS安装
GPS接收器 GPS接收器用于将接收到的GPS信号转化为数字信号。 GPS接收器一侧为射频同轴接口,通过预制的射频跳线与GPS馈线相连, GPS馈线需要制作馈线接头。
定,不再需要RBS6601机框。
硬件告警指示灯,红色表示有硬件告警,灯灭表示无硬件告警 运行指示灯,绿色表示正常 维护指示灯,蓝色表示该板件处于维护 状态指示灯,黄色灯亮表示基站有内部或者外部错误,灭灯表示正常 风扇指示灯,黄色灯亮表示风扇故障
BB6630安装
Baseband 6630采用直流-48V供电,采用爱立信专用的电源接头,自带2X5mm²直流电源线。 必须使用 16-35 mm2 接地线连接到室内地排。 为了冷却的目的,Baseband后面需要预留最小的自由空间30毫米,且不得为封闭空间。 外部告警接口采用RJ45接头,每个支持4路外部告警,可以连接到外部告警过压保护模块或告警输出端子。
地面安装
GPS安装
GPS馈线安装
GPS天线与馈线的接头需要做防水,做到3+3+3工艺(3层胶带+3层胶泥+3层胶带)。
GPS馈线在进入馈线窗或室外机柜前需要用馈线接地卡进行接地并连接到室外地排。
GPS馈线应在塔顶和离塔拐弯前就近接地,塔上长度超过50米时,每30米增加一处接地。
GPS馈线超过125m需添加放大器,安装放大器时应紧靠GPS天线