SGS
Atte nding Surveyor Han dli ng/Report Procedure
现场检验员操作和报告规程
Index
1. Scope范围
2. Draft Survey 水尺计重
3. Weighing or random/check Weighing衡重和随机/抽检重量
4. Tally 理货
5. Supervisi on of container uni oad ing 集装箱的监卸
6. Supervisi on of the vessel discharg ing船舶的监卸
7. Supervisi on of container stuffi ng 集装箱的监装
8. Supervisi on of the vessel load ing船舶的监装
9. Manual sampli ng 人工取样
10. Sample preparation制样
Attached docume nt 附相关表格
1. Moisture Determination Record.测量水份计算表
2. Outturn weight.按每批加权平均计算表
3. ISO standard Scoop. ISC标准取制样铲尺寸
4. International Sieve.国际标准筛网对照表
5. Calculation of Proportion.明金属比例计算表
6. Melting of Metallic Material Record.金属熔锭重量记录Page No. 2
2
4
6
6
7
8
9
11
14 Page No.
32
33
34
35
37
38
SG^J
1. Scope 范围
- This procedure specifies how to report to the han dli ng office whe n atte nding surveyors are perform ing the in specti on at the locati on of the in specti on. The main job is in clud ing daily report and Final In specti on Report after completi on of the in spect ion.
这个规程是现场检验员在现场如何操作和报告给办公室,主要工作是包括汇报每天
的工作进展和检验完毕后递交最终检验报告.
- The in spectors should carefully read the work in struct ion and know in specti on scope in details before to perform the in spect ion.
在检验工作之前,检验员必须认真,仔细阅读工作指令单上的具体内容和明确知道检验工作的内容.
- Attending surveyor should prepare all related the equipments and documents in accorda nee with work in structio n.
检验员必须按工作指令单的内容准备相关工具和资料.
- During in specti on, atte nding surveyors should report irregular situati on if have at the locati on of the in spect ion to han dli ng office (ha ndli ng T/C for this file, sect ion head or line man ger) on the time.
检验过程中,现场检验员如发现一切异常情况必须在现场第一时间报告办公室具体负责的协调员,主
管或操作经理.
- Daily report should be sent han dli ng office before noon time of the work ing day or phone call to report in details if atte nding surveyors have no eno ugh times to prepare whe n in spect ion is started.
现场检验员每天中午前报告工作进展,如没时间写报告可以电话通知.
- Final in spect ion report should be prepared by atte nding surveyor with in 24 hours after completion of the inspection and sent to handling office on time including photos.
最终检验报告和现场照片必须在检验工作完成后24小时交办公室.
2. Draft Survey 水尺计重
The total discharged or loaded quantity should be determined by initial and final draft survey in accorda nee with the vessel displaceme nt in atte ndance of the SGS surveyor, local CIQ/CCIC surveyor, vessel chief officer and other releva nt parties.
SGS检验员,本地商检局/商检公司,船舶大副或其他检验机构对根据船舶轻,重排水量计算出装,卸货物的重量.
The survey must be con ducted meticulously, tak ing into acco unt all the prevail ing
circumstances. The draft survey consist of the “ initial ” and “ final ” surveys, whic by measurement, calculation of the vessel ' s displacement before and after loading or discharg ing. The differe nee betwee n these two displaceme nts is the weight of cargo discharged/loaded.