1.保险:由卖方按中国人民保险公司海洋货物运输保险条款照发票总值110%投保综合险及战争险。如买方欲增加其他险别或超过上述保额时须于装船前征得卖方同意,所增加的保险费由买方负担。

Insurance:To be covered by the Sellers for 110% of invoice value against All Risks and War Risk as per the relevant Ocean Marine Cargo Clauses of the People’s Insurance Company of China.If other coverage or an additional insurance amount is required, the Buyers must have the consent of the Sellers before shipment,and the additional premium is to be borne by the Boyers.

2.付款条件:买方应由卖方可接受的银行不可撤销的即期信用证,于装运月份前30天开到卖方并至装运月份后第15天在中国议付有效。

Terms of Payment:The Buyers shall open with a bank acceptable to the Sellers an Irrevocable Sight Letter of Credit to reach the Sellers 30 days before the month of shipment,valid for negotiation in China until the 15th day after the monthe of shipment.

3.不可抗力:如由于不可抗力的原因,致使卖方不能全部或部分装运或延迟装运合同货物时,卖方对于这种不能装运或延迟装运不负有责任。但卖方须用传真或电传通知买方,并须在15天内以航空挂号信件向买方提交事故发生地权威机构出具的证明此类事故的证明书。

Force Majeure:If shipment of the contracted goods is prevented or delayed in whole or in part due to Force Majeure, th e Sellers shall not be liable for non-shipment or late shipment of the goods under this Contract. However,the Sellers shall notify the Buyers by fax or telex and furnish the latter within 15 days by registered airmail with a certificate issued by the competent authourities at the place of occurrence attesting such event or events.

4.仲裁:凡因执行本合同所发生的或与本合同有关的一切争议,双方应通过友好协商解决。如果协商不能解决时,应提交中国国际经济贸易仲裁委员会根据该会仲裁规则进行仲裁。仲裁的裁决是终局性的,对双方都有约束力。

Arbitration: All disputes arising out of the performance of , or relating to this Contract, shall be settled amicably through negotiation. In case no settlement can be reached through negotiation, the case shall then be submitted to the China International Economic and Trade Arbitration Commission for arbitration in accordance with its arbitration rules. The arbitral award is final and binding upon

both parties.

5.Payment: The Buyers shall open through the Bank of China, Beijing, an irrevocable letter of credit in favour of the Sellers in US Dollars covering the FOB stowed and trimmed value of each shipment payable against receipt by the issuing Bank of the following shipping documents:

(1) A full set (including three copies each of the negotiable and non-negotiable ) of clean on board Bill of Lading or Charter Party Bill of Lading in accordance with the charter party , made out to order, blank endorsed, notifying the China National Foreign Trade Transportation Corporation at the port of destination.

(2) Provisional invoice covering an amount corresponding to the full value of each shipment,weight 1% less than that in B/L. And quality based on 72% Tribasic Phosphate of Lime.

(3)Certificate of quality and weight determination issued by the Sellers at the port of loading.

The Buyers shall open the relative letter of credit latest 20 days before the arrival of the carrying vessel at the port of loading with validity for 90 days from the date of opening.

5.We hereby agree with the drawers, endorsers and bona fide holders of drafts/documents drawn under and in compliance with the terms and conditions of this credit that such drafts/documents will be duly honoured on due presentation.

我们特此同意出票人、背书人和善意持有人和下的汇票/单据符合信用证的条款和条件,这种将承兑汇票/文档表示。

6.According to the ICC Model International Sales Contract (Manufactured Goods for resale),the liquidated damages to be claimed by the Buyer against the seller shall be 0.5% per week with a maximum amount of 5% of the price of the delayed goods in case of delay in delivery or non-delivery of the goods.

根据ICC模型国际销售合同(转售制成品),声称的违约金由买方对卖方应当0.5%每周最多数量的5%的迟延交付的货物的价格,交货延迟或不能交货的货物。