最新变电站建设工程设计合同中英文对照

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

变电站建设工程设计合同中英文对照

变电站建设工程设计合同(中英文)

Design Contract for Project of Electric and 10KV Substation

GF—2000—0210

建设工程设计合同

Design Contract for Construction Project (II)

(专业建设工程设计合同)

(Design Contract for Professional Construction Project)

工程名称:10KV变电所新建工程

Project Name:10KV Substation New Construction

工程地点:

Project Site:

合同编号:Contract No.:

(由设计人编填) (Filled in by Designer)

设计证书等级:设证甲级A121001826

Design Certification Rank: Design Certificate Class A 121001826

发包人:Employer:

设计人:电力勘察设计院

Designer: Electric Power Survey Design Institute

签订日期:Date:

中华人民共和国建设部国家工商行政管理局

Supervised and Manufactured byMinistry of Construction of People’s Republic of

China and the State Administration of Industry and Commerce 发包人:Employer:

设计人:电力勘察设计院Designer: Electric Power Survey Design Institute

发包人委托设计人承担 10KV变电所新建工程设计,工程地点为,经双方协商一致,签订本合同,共同执行。

The Employer entrusts the Designer to undertake 10KV Star Mall Plaza 1 # Substation New Construction; the project site is No.6, Bei’Er Zhong Road, Tiexi District, Shenyang City. Upon agreement by both parties through consultation, the two parties shall sign and implement the Contract jointly.

第一条本合同签订依据Article 1: This Contract is signed in accordance with:

1.1《中华人民共和国合同法》、《中华人民共和国建筑法》和《建设工程勘察设计市场管理规定》。

1.1Contract Law of the People’s Republic of China, Construction Law of the People's Republic of China and Market regulations of Construction Survey and Design.

1.2国家及地方有关建设工程勘察设计管理法规和规章。

1.2 Laws and regulations of the related state and local construction survey and design management.

1.3建设工程批准文件。1.3 Documents of Approval for Construction.

第二条设计依据Article 2 Design Basis

2.1发包人给设计人的委托书或设计中标文件

2.1 The Trust Deed or Design Documents of the tender accepted provided to the designer by the employer;

2.2发包人提交的基础资料2.2 Fundamental materials submitted by the employer;

2.3设计人采用的主要技术标准是:2.3 The major technical standards adopted by the designer are:

B-01R5-SJ-02-2010标准、规程、规范

B-01R5-SJ-02-2010 Standards, Procedures, Norms

第三条合同文件的优先次序Article 3 Priority of Contract Document

构成本合同的文件可视为是能互相说明的,如果合同文件存在歧义或不一致,则根据如下优先次序来判断:

The documents consisting of this Contract may be deemed as demonstrating mutually; if there is any ambiguity or discordance in the contract document, the following priority shall be followed to judgment,

3.1合同书 3.1 The Contract;

3.2中标函(文件) 3.2 Letter of Acceptance (Document);

3.3发包人要求及委托书 3.3 Requirements of the employer and Letter

of Authority;

3.4投标书 3.4 The Tender

第四条本合同项目的名称、规模、阶段、投资及设计内容(根据行业特点填写)

Article 4 Name, Scale, Phase, Investment and design Content for the

Contract Items (fill in based on industry characteristics)

10KV星摩尔购物广场1#变电所新建工程

10KV Star Mall Plaza 1 # Substation New Construction

变电所电气及10KV进线

Electric and 10KV inlet wire of the substation 变电所设在地下,内设6台1600KVA变压器及2台1250KVA变压器。

相关文档
最新文档