摘要本设计矿井为鸡西矿业集团盛和煤矿1.5Mt/a新井设计。

此矿区内有四层煤全区可采,分别是23#、34-2#、48#和54#,平均总厚度8.4米。

煤层工业牌号为1/3焦煤和焦煤,煤层倾角为20°,地质构造条件简单。

设计井田的工业储量为169.83Mt,可采储量为123.9Mt,矿井服务年限为59年,本矿井设计采用立井开拓方案,划分三个水平,采用上山开采,一个工作面达产。

采用集中布置,走向长壁后退式采煤法采煤,综合机械化回采工艺。

工作面采用刮板输送机运输;区段运输平巷采用带式输送机运输;大巷采用14t架线式电机车牵引,3t底卸式矿车运输,采用1.5t固定式矿车作为辅助运输。

通风方式为分区抽出式通风。

工作面长度为220m,年工作日为330d,提升方式采用1对16t箕斗提升,净提升时间为16h,采用〝三八〞工作制。

关键词可采储量分区抽出式走向长壁由于本设计时间有限,本人的工作能力及现场经验也有限,因此在本设计中会出现一些问题,请各位专家及老师批评指正。

全套图纸,加153893706AbstractThis design mine pit is abundant and the coal mine 1.5Mt/a newwell design for the Jixi mining industry group. In this mining area has four coals entire areas to be possible topick, respectively is 23#, 34-2#, 48# and 54#, the average totalthickness 8.4 meters. The coal bed industry trademark is 1/3 cokingcoal and the coking coal, the coal bed inclination angle is 20°, thegeologic structure condition is simple. The design well fieldcommercial production is 169.83Mt, the recoverable resources is123.9Mt, the mine pit service life is 59 years, this mine pit designuses the vertical shaft development plan, divides three levels, usesclimbs mountains mining, a working surface reaches produces. Uses thecentralism arrangement, moves towards the long wall backlash type topick mining coal, the synthesis mechanization picks the craft.The working surface uses the scraper conveyer transportation; Thesector transports the even lane to use the belt type conveyertransportation; The big lane uses the 14t wire laying type electriclocomotive to tow, the 3t mine car transportation, uses the1.5t stationary type mine car to take the assistance transportation.Ventilates the way to extract the type for the district to ventilate.The working surface length is 220m, the year working day is 330d, thepromotion way uses1pairof16tpromotion, promotes the timeis only 16h,uses 38 work systems. The key word recoverable resources district extracts the type to movetowards the long wall Because this design time limited, myself working ability andscene experience also limited, therefore in this design has someproblems to be againunavoidable, asks fellow experts teacher tocriticize points out mistakes.目录摘要 (I)Abstract (II)目录 (1)绪论 (1)第1章井田概况及地质特征 (2)1.1 井田概况 (2)1.1.1 交通位置 (2)1.1.2 地形地势 (2)1.1.3 气象地震 (3)1.1.4 水文地质情况 (3)1.1.5 煤田开发史 (3)1.1.6 工农业及原料供应状况 (3)1.1.7 水源及电源 (3)1.2 地质特征 (3)1.2.1 矿区范围内的地质情况 (3)1.2.3 煤层赋存状况及可采煤层特征 (5)1.2.4 岩石性质、厚度特征 (6)1.2.5 井田内水文地质情况 (6)1.2.6 沼气、煤尘及煤的自燃性 (7)1.2.7 煤质、牌号及用途 (7)1.3 勘探程度及可靠性 (7)第2章井田境界、储量、服务年限 (8)2.1 井田境界 (8)2.1.1. 确定井田的依据 (8)2.1.2. 井田境界 (8)2.1.3.井田未来发展情况 (8)2.2 井田储量 (8)2.2.1 井田储量计算 (8)2.2.2 保安煤柱的设计方法 (8)2.2.3 储量计算方法 (9)2.2.4 储量计算评价 (10)2.3 矿井工作制度、生产能力、服务年限 (11)2.3.1 矿井工作制度 (11)2.3.2 矿井生产能力的确定 (11)2.3.3 矿井服务年限的确定 (11)第3章井田开拓 (13)3.1 概述 (13)3.1.1 井田内外及附近生产矿井开拓方式概述 (13)3.1.2 影响本设计矿井开拓方式的因素及具体情况 (13)3.1.3 确定井田开拓方式的原则 (13)3.2 矿井开拓方案的选择 (13)3.2.1 井硐形式和井口位置 (13)3.2.2 开采水平数目和标高 (17)3.2.3 开拓巷道的布置 (19)3.3 选定开拓方案的系统描述 (20)3.3.1 井硐形式和数目 (20)3.3.2 井筒位置及坐标 (20)3.3.3 水平数目及高度 (20)3.3.4 石门、大巷的布置 (20)3.3.5 井底车场形式的选择 (20)3.3.6 煤层群的联系 (23)3.3.7 采区划分 (23)3.4 井筒布置和施工 (24)3.4.1 井硐穿过的岩石性质及井硐支护 (24)3.4.2 布置及装备 (24)3.4.3 井筒施工 (28)3.4.4 延深意见 (28)3.5 井底车场及硐室 (28)3.5.1 井底车场形式的确定及论证 (28)3.5.3 存车线长度的确定 (29)3.5.4 井底车场设计 (30)3.6 开采顺序 (35)3.6.1 井田开采顺序 (35)3.6.2 沿井田走向的开采顺序 (36)3.6.3 沿煤层垂直方向的开采顺序 (36)3.6.4 采区接替计划 (36)第4章采区巷道布置及采区生产系统 (40)4.1 采区概述 (40)4.1.1 采区位置、范围及采区煤柱 (40)4.1.2 采区地质、煤层情况 (40)4.1.3 采区生产能力、储量及服务年限 (40)4.2 采区巷道布置 (42)4.2.1 区段划分 (42)4.2.2 采区上山布置 (42)4.2.3 采区车场布置 (42)4.2.4 采区煤仓形式、容量及支护 (48)4.2.5 采区硐室简介 (49)4.2.6 采区工作面接续 (49)4.3 采区准备 (49)4.3.1 采区巷道的准备顺序 (49)4.3.2 采区巷道的断面图及支护方式 (50)第5章采煤方法 (51)5.1 采煤方法的选择 (51)5.2 回采工艺 (51)5.2.1 回采工艺的选择及使用设备 (51)5.2.2 回采工作面的循环方式和劳动组织形式 (52)第6章井下运输和矿井提升 (55)6.1 矿井井下运输 (55)6.1.1 运输方式和运输系统的确定 (55)6.1.2 矿车的选型与数量 (55)6.1.3 采区运输设备的选择 (56)6.2 矿井提升系统 (57)第7章矿井通风与安全 (61)7.1 通风系统的确定 (61)7.1.1 概述 (61)7.1.2 矿井通风系统的确定 (61)7.1.3 主扇工作方式的确定 (61)7.2 风量计算和风量分配 (62)7.2.1 矿井风量计算的规定 (62)7.2.2 采掘工作面及硐室所需风量的计算 (63)7.2.3 矿井总供风量 (67)7.2.4 风量分配 (67)7.2.5 风量的调节方法与措施 (68)7.2.6 风速验算 (68)7.3 矿井通风阻力的计算 (70)7.3.1 确定全矿井最大通风阻力和最小通风阻力 (70)7.3.2 矿井等积孔的计算 (71)7.4 通风设备的选择 (72)7.4.1 主扇的选择计算 (72)7.4.2 电动机的选择 (73)7.4.3 反风措施 (73)7.5 矿井安全技术措施 (73)7.5.1 预防瓦斯和煤尘爆炸的措施 (73)7.5.2 预防井下火灾 (74)7.5.3 预防水灾措施 (74)7.5.4 其它事故预防 (74)7.5.5 避灾路线及自救 (75)第8章矿井排水 (76)8.1 概述 (76)8.1.1 矿井水来源及涌水量 (76)8.1.2 对排水设备的要求 (76)8.2 矿井主要排水设备 (76)8.2.1 排水方式和排水系统简介 (77)8.2.2 主排水设备及管路选择计算 (77)第9章矿井主要技术经济指标 (81)结论 (83)致谢 (84)参考文献 (85)附录一 (86)附录二 (91)绪论通过大学四年对采矿工程基础课的学习,让我们对矿井的主要生产系统:运输、排矸、通风和运料,有了初步的了解,对整个矿井的开拓方式、准备方式和回采方式有了更深一层的认识。

采矿工程毕业设计图纸

采矿工程毕业设计图纸

采矿工程毕业设计图纸【篇一:采矿工程毕业设计论文附5张图纸】第一章矿区概况及井田地质特征第一节矿区概述一、地理位置及交通条件区内交通极为便利。

京沪铁路大动脉纵贯井田中部,从东滩店车站起,南去邹城6km,徐州162km,上海818km;北去兖州14km,济南156km,青岛549km。

另有兖新铁路支线,西去济宁至鲁西南菏泽和河南新乡,与京九铁路和京广铁路联网;东去有兖石铁路专线至石臼港308km。

公路四通八达,有104国道、京福高速公路、邹兖公路、济兖公路和济邹公路分别从井田东部、中部、南部和西部通过。

京杭大运河由济宁市西流过,一般能通航85t小轮,一、二月份水位变浅,不能通航。

二、地形特点及居民点分布区内为第四系冲积平原,地形平坦,地面标高+42.46~+54.58m,地势由东北向西南逐渐降低,坡度极为平缓。

矿区范围内分布有大小村庄15个,大部分分布在井田边界。

另外,在矿区南部有大片职工住宅区。

三、工农业生产和原料及电力供应矿区内工业以煤炭为主,农业主要种植小麦、玉米、棉花,间杂有果园、桑园、菜园和苗圃等。

本矿井建设期间,所需要建设材料,除钢材、木材和部分水泥需由国家计划供应外,其它砖、石、砂等土产材料,均由当地供应,满足建设需要。

矿区已建有110kv罗广区域变电所,向本矿井供电的两回35kv输电线路已建成送电。

四、矿区气候条件本区属温带季风区的海洋——大陆性气候。

根据邹城市气象局1959—1999年气象资,历年平均气温17.9℃,最高气温40.3℃,最低气温-18.3℃。

历年平均降水量为708.14mm,年最大降水量为1263.8mm。

区内冬季多北风,夏季多南风,最大风速16m/s。

冰冻期为十二月至次年三月,最大冻土深度0.27m。

五、矿区水文及工农业供水区内主要河流有白马河及其支流泥河,纵贯全区,向南流入南阳湖,皆属季节性河流。

白马河全长76km,河床宽10~420m,曾测得最大流量为568m3/s,流量随季节变化,由干枯断流至洪水泛滥,与第四系有水力联系。

煤矿设计图样本

煤矿设计图样本

1.矿区概述及井田特征1.1矿区概述1.1.1地理位置五龙煤矿位于阜新市西南10公里处,阜新煤田的中部,井田东为海州立井和海州露天矿,西至F2断层,南至煤层最低可采边界线,北至-100米标高线。

其行政区域属于阜新市所辖。

1.1.2 交通状况五龙煤矿东北距阜新火车站3.5km,有矿区专用线与新义铁路线连接,西北5km处有锦阜公路通过,交通比较便利,1.1.3 自然地理1)矿区地形、地貌五龙矿地表呈丘陵构造,地面标高为+173.5 m。

总的趋势是东高西低,南高北低。

井田内无较大地表水系,对本井影响较小。

2)矿区的气候、雨期及降雨量本区属大陆干旱气候,蒸发量大,降水量小,夏季短而干燥,冬季漫长。

年平均气温-3.3℃,最低气温-46.7℃,最高气温+36.5℃。

月平均降雨量为60.8mm,最小降雨量为37.3mm,最大降雨量为178.5mm。

月平均蒸发量99.1mm,一月份最小为 4.3mm,五月份最大为258.3mm。

3)矿区的风速、风向及冻结期、冻结深度年平均风速2.9m/S,最大风速为23m/S。

夏季多东北风,冬季多为西北风。

降雪期为每年12月份至次年2月中旬。

冻结期为每年11月中旬至次年3月末,冻结深度在3m以下,并有岛状永久冻土层存在。

1.2矿井地质概况五龙矿区内构造比较简单,经钻探、物探证实,共有九条断裂。

这些断裂分别属于近乎走向的北东东(F1、F2、F4、F5、F6、F9)组和斜交走向的北西西(F3、F7、F8)组,其力学性质皆属于张扭性。

煤系地层共含煤21层,煤层总厚43.03m。

可采及局部可采煤17层,其中全区发育- 1 -稳定可采煤层有25#、27#、30#、36#层,全区发育较稳定煤层有28#层下、29#层。

煤层走向北40o~80o东,向西北倾斜,倾角变化较大,浅部16o~22o,深部0o~3o,呈单斜构造,煤层深部被F2断层所切割。

第四系地层为弱含水层,主要含水层是煤系风化带风化裂隙含水层;次要含水层为风化带下承压含水层,该地层中厚层泥岩为良好隔水层。

采矿工程毕业设计(论文)龙煤集团鹤岗分公司兴山矿1.5mta新井设计[2]【全套图纸】

采矿工程毕业设计(论文)龙煤集团鹤岗分公司兴山矿1.5mta新井设计[2]【全套图纸】

摘要本设计新矿井为鹤岗矿业集团兴山煤矿 1.5Mt/a的新井设计,共有7层可采煤层,总厚度为14.7m。

设计井田的可采储量为114.7Mt。

服务年限为70a。

划分两个水平开采。

井田平均走向长5000m,平均倾斜长2000m,煤层平均倾角20°,属于缓倾斜煤层。

本设计矿井采用双立井的开拓方式,分组集中大巷布置方式。

共划分12个采区,其中首采区为1个,达产工作面2个。

本设计采区为西六采区,采用语大巷装车式下部车场,综合机械化采煤。

矿井年工作日为330d,采用“三、八”式工作制,设计工作面长为190m,每刀进度为0.8m,每日割四刀。

提升设备为主井采用箕斗提升,副井采用罐笼提升。

由于井田走向长度较大,且为缓倾斜煤层,以及煤层地质条件等因素影响,因此本井田内全部采用走向长壁采煤法开采。

关键词可采储量走向长壁开采立井综合机械化全套图纸,加153893706AbstractThe task of this design is to construct a 1.5million tons new shaft for Hegang Ming Administration.This mine has three minable Coal Seam,and its average thickness is14.7 meters.Designed field of minable capacity is 114.7Mt. It can adapt for 70years, and is divided into two levels. Average alignment in farmland in well lengthways 5000 ms, average slant lengthways 2000ms, average rake angle in coal seam 20°, belong to the the slant the coal seam.This mine shaft is applied to double indined shaft develop ment method; Layout of gathing gallergand mining district eross heading; The well farmland turns to is divided into totally 9 adopt the zone mines and 2 worked faces. This worked fece is west six worked face, words 330 days every year. Adapt “thee-eight”work situation, work face is 190meters length of circle is 0.8meters, and times is 4 one day.Because the well farmland lengthways length is bigger, and incline the coal seam for the , and coal seam geology condition etc. factor effects, so this well farmland inside the complete adoption lengthways.Key words Recoverable reserves Adoption lengthways Vertical shaft comprehensive mechanization目录摘要 (I)Abstract (II)绪论 (1)第1章井田概况及矿井地质特征 (2)1.1 井田概况 (2)1.1.1 井田位置及范围 (2)1.1.2 交通位置 (2)1.1.3 地形与河流 (3)1.1.4 气象 (3)1.2 地质特征 (3)1.2.1 矿区范围内的地层情况 (3)1.2.2 井田范围内和附近的主要地质构造 (4)1.2.3 煤层赋存状况及可采煤层特征 (4)1.2.4 岩石性质、厚度特征 (6)1.2.5 井田内的水文地质情况 (6)1.2.6 沼气、煤尘及煤的自燃性 (7)1.2.7 煤质、牌号及用途 (7)1.3勘探程度及可靠性 (7)第2章井田境界、储量、服务年限 (9)2.1 井田境界 (9)2.1.1 井田周边状况 (9)2.1.2 井田境界确定的依据 (9)2.1.3 井田未来发展情况 (9)2.2 井田储量 (9)2.2.1 井田储量的计算 (9)2.2.2 保安煤柱 (10)2.2.3 储量计算方法 (10)2.2.4 储量计算评价 (10)2.3 矿井工作制度、生产能力及服务年限 (11)2.3.1 矿井工作制度 (11)2.3.2 矿井生产能力、服务年限 (11)2.3.3 矿井设计服务年限 (12)第3章井田开拓 (13)3.1 概述 (13)3.1.1、井田内外及附近生产矿井开拓方式概述 (13)3.1.2、影响本设计矿井开拓方式的原因及其具体情况 (13)3.2矿井开拓方案的选择 (13)3.2.1、井筒形式和井口位置 (13)3.2.2 方案经济比较 (14)3.2.3 开采水平数目和标高 (17)3.2.3 开拓巷道的布置 (18)3.3 选定开拓方案的系统描述 (21)3.3.1 井筒形式和数目 (21)3.3.2 井筒位置及坐标 (21)3.3.3 水平数目及高度 (22)3.3.4 石门、大巷(运输大巷、回风大巷)数目及布置 (22)3.3.5 井底车场的形式选择 (23)3.3.6 煤层群的联系 (24)3.3.7 采区划分 (24)3.4 井筒布置及施工 (25)3.4.1 井筒穿过的岩层性质及井硐维护 (25)3.4.2 井筒布置及装备 (25)3.4.3 井筒延伸的初步意见 (27)3.5 井底车场及硐室 (27)3.5.1 井底车场形式的确定及论证 (27)3.5.2 井底车场的布置、存储线路、行车线路布置长度 (28)3.5.2 井底车场通过能力计算 (29)3.5.4 井底车场主要硐室 (31)3.6 开采顺序 (33)3.6.1 沿井田走向的开采顺序 (33)3.6.2 沿井田倾斜方向的开采顺序. (33)3.6.3 采区接续计划 (33)3.6.4 三量控制情况 (34)第4章采区巷道布置 ........................................ 错误!未定义书签。

采矿工程毕业设计(论文)-阳煤集团一矿3.0Mta新井设计【全套图纸】

采矿工程毕业设计(论文)-阳煤集团一矿3.0Mta新井设计【全套图纸】

采矿工程毕业设计(论文)-阳煤集团一矿3.0Mta新井设计【全套图纸】1 矿区概述及井田地质特征1.1矿区概述1.1.1地理位置山西国阳新能股份有限公司一矿位于沁水煤田北端,太行复背斜西翼,矿区位于山西省阳泉市西北部和盂县东南部,东南距阳泉市10km,地跨阳泉和盂县两市县,行政区划属山西省阳泉市。

其地理坐标:东经113°21′10″~113°31′11″北纬37°53′17″~37°58′51″。

1.1.2交通条件一矿的交通运输条件极为方便,工业广场旁有铁路专用线与电气化双轨石太线阳泉车站接轨,运距10km。

一矿的公路往南行2km经赛鱼口,和太旧高速公路以及307国道线相连,与阳泉、平定、盂县、寿阳等各市县结成公路网。

阳泉市内有一路公共汽车和阳煤集团矿交车直达一矿,交通十分便利。

见一矿交通位置示意图1-1。

图1-1一矿交通位置示意图1.1.3地形、地貌及河流本井田位于太行山北段西翼,以落雁垴——庙梁——佛爷梁——王兰山——刘备山分水岭呈大致东西向横贯井田中南部,形成中部高而南北低的地势。

井田内地形切割强烈,南坡较北坡更甚,“U”字形、“V”字形冲沟极为发育,其山脊与沟谷多数呈大致北北东向排列于分水岭两侧,尤如羽状,形成了复杂的中低山地形地貌。

最高点落雁垴,标高为+1369.3m,北坡最低点为皇后村前的召山河谷,标高为+1035m,南坡最低点为一矿沸腾锅炉房旁的蒙村河床,标高为+766.3m,一般相对高差为300m左右。

本井田总的地形地貌特征是:坡陡谷深,地表裸露、植被较少。

本井田河流属海河流域的滹沱河水系。

分水岭南坡为桃河水系,主要有保安沟河、芦湖沟河和蒙村河等河流。

分水岭北坡为温河水系,主要有召山河、燕龛河、元子沟河、白家沟河、鸽子塄沟河等支流,都自南而北注入10km 以外的温河。

这些水系的基本特点是受季节性控制明显,为间歇性河流,冬、春季节往往干涸无水,唯到每年的6~9月份雨季时,常因山洪暴发流量剧增,切割强烈。

采矿工程毕业设计(论文)-东曲矿150万吨矿井设计

采矿工程毕业设计(论文)-东曲矿150万吨矿井设计

摘要本设计是东曲矿150万吨矿井设计。

东曲矿区位于山西省古交市汾河南岸,由井田到太原公路42km,铁路距省城太原56km。

地理位置优越,交通十分便利。

井田走向最大为5000 m,最小2650 m,平均大约4500 m。

倾斜长最大为3900 m,最小1850 km,平均大约3087 m。

井田面积13.89 km2。

主采煤层为4、8、9号煤,平均倾角4°,平均厚度分别为5.40m、2.52m、3.66m。

煤层赋存稳定,倾角平均2.56°为近水平煤层。

井田工业储量28266.25万吨,可采储量24386.513万吨。

矿井服务年限为67.74a。

矿井正常涌水量15.8 m3/h,最大涌水量75.8m3/h。

矿井瓦斯相对涌出量为0.95~3.48m3/t,属低瓦斯矿井。

东曲煤矿设计年生产能力为150万t/a,矿井年工作日为330d,工作制度为“三八”制。

矿井的采煤方法主要为倾斜长壁后退综合机械化一次采全高开采。

矿井的开拓方式为双斜井两水平开拓方式,一水平布置在+695 m,二水平布置在+620 m。

主斜井用来提煤,副斜井用来提升设备和人员。

矿井采用一矿一面的高效作业方式,另外设一备用面。

工作面的长度为180m。

运输大巷采用胶带运输机运煤,辅助运输采用电机车牵引矿车。

矿井通风方式为中央分列式。

本设计共包括10章:1矿区概况及井田地质特征;2 井田境界和储量;3 矿井工作制度、设计生产能力及服务年限;4 井田开拓;5 准备方式;6 采煤方法;7 井下运输;8 矿井提升;9 矿井通风及安全技术;10 设计矿井基本技术经济指标。

关键词:新井设计;工业储量;斜井开拓;采煤方法;通风方式目录1 矿井概述及井田地质特征 (7)1.1矿区概况 (7)1.1.1交通位置 (7)1.1.2地理位置 (8)1.1.3地形地貌 (8)1.1.4水文情况 (8)1.1.5气候条件 (8)1.1.6地震资料 (8)1.2井田地质特征 (8)1.2.1煤田地层概述 (8)1.2.2含煤地层概述 (10)1.2.3地质构造 (11)1.3煤层特征 (14)1.3.1煤层赋存情况 (14)1.3.2煤质 (14)1.3.3顶底板条件 (16)1.3.4瓦斯、煤尘、煤的自燃 (17)2 井田境界和储量 (18)2.1井田境界 (18)2.1.1井田境界 (18)2.1.2井田特征 (19)2.2矿井工业储量 (19)2.2.1矿井工业储量 (19)2.2.2矿井可采储量 (20)3 矿井工作制度、设计生产能力及服务年限 (25)3.1矿井工作制度 (25)3.2矿井设计生产能力及服务年限 (26)3.2.1矿井设计生产能力的确定 (26)3.2.2井型校核 (26)3.2.3矿井的服务年限 (27)4 井田开拓 (28)4.1井田开拓的基本问题 (28)4.1.1井筒形式的选择 (28)4.1.2水平的选择 (30)4.1.3井筒位置的选择 (31)4.1.4大巷形式的选择 (34)4.1.5大巷方位的选择 (35)4.1.6开拓方案和综合经济比较 (35)4.1.7工业广场的位置、形状和面积的确定 (41)4.2矿井基本巷道 (41)4.2.1井筒 (41)4.2.2井底车场 (45)4.2.3主要开拓巷道 (46)5 准备方式——带区巷道布置 (49)5.1煤层的地质特征 (49)5.2带区巷道布置及生产系统 (49)5.2.1确定带区的倾斜长度(推进长度) (49)5.2.2带区煤柱的确定 (49)5.2.3工作面的长度和数目的确定 (49)5.2.4带区内煤层的开采顺序 (50)5.2.5带区巷道布置 (50)5.2.6生产系统 (50)5.2.7确定带区各种巷道的尺寸、支护方式及通风方式 (51)5.2.8带区内部巷道的掘进方法 (51)5.2.9带区生产能力的确定 (52)5.3带区车场选型设计 (54)5.3.1确定带区车场的形式 (54)5.3.2带区主要硐室布置 (54)6 采煤方法 (56)6.1采煤工艺方式 (56)6.1.1采煤方法的确定 (56)6.1.2回采工艺 (56)6.1.3工作面设备布置图见设计图纸 (67)6.1.4劳动组织和循环作业 (67)6.1.5主要技术经济指标 (68)6.2回采巷道布置 (70)6.2.1带区巷道布置 (70)6.2.2保护煤柱尺寸的确定 (71)7 井下运输 (73)7.1概述 (73)7.1.1井下运输设计的原始条件和数据 (73)7.1.2矿井运输系统 (73)7.2带区运输设备选择 (73)7.2.1工作面及分带斜巷运输设备的选择 (73)7.2.2带区辅助运输设备的选择 (74)7.3大巷运输设备选择 (75)7.3.1轨道大巷运输设备的选择 (75)7.3.2运输大巷运输设备的选择 (77)8 矿井提升 (80)8.1概述 (80)8.2主副斜井提升 (80)8.2.1主斜井提升 (80)8.2.2副斜井提升 (80)9 矿井通风设计 (81)9.1选择矿井通风系统 (81)9.1.1矿井概况 (81)9.1.2矿井通风系统的基本要求 (81)9.1.3矿井的通风方式方案的提出 (83)9.1.4通风方式方案的技术比较 (84)9.1.5通风方案的经济比较 (85)9.1.6矿井主扇工作方法的选择 (87)9.1.7带区内通风系统 (88)9.2全矿风量的计算与分配 (89)9.2.1确定带区及矿井所需风量 (89)9.2.2确定带区、全矿的风量分配及矿井所需的总风量 (92)9.2.3风速验算 (92)9.3全矿井巷通风阻力 (93)9.3.1通风容易时期和通风困难时期最大阻力路线的确定 (93)9.3.2矿井摩擦阻力及通风阻力计算 (95)9.3.3矿井总风阻及总等积孔的计算 (97)9.4矿井通风设备的选型 (98)9.4.1确定风机设计工况点 (98)9.4.2矿井主扇选择 (99)9.4.3电动机的选择 (99)9.4.4对矿井通风设备要求: (100)9.4.5反风、风硐的基本要求 (101)9.5防止特殊灾害的安全措施 (101)9.5.1瓦斯管理措施 (101)9.5.2煤尘的防治 (101)9.5.3防火 (102)9.5.4防水 (102)9.5.5其他安全措施 (102)9.5.6避灾线路 (102)10 矿井基本技术经济指标 (103)11 结束语 (106)参考文献 (107)致谢 (109)1 矿井概述及井田地质特征1.1 矿区概况1.1.1 交通位置东曲矿位于山西省古交市境内,市区北10 km 处。

矿大矿建专业毕业设计

矿大矿建专业毕业设计

第一部分同朔矿设计基本情况1 矿井与矿体特征1.1 矿井的自然条件1.1.1 地理位置与交通同朔井田位于山西省朔州市南部、朔南矿区东南部,行政区划属朔州市朔城区管辖。

井田地理座标为东经112°22′00″ ~112°29′30″,北纬39°08′00″~39°14′30″。

图1-1 同朔矿交通位置示意图矿区交通方便,北同蒲铁路、大运公路在井田西部通过,朔黄铁路在井田西北部通过,朔州火车站北至大同129km,南至太原226km。

公路以朔州城为中心,可通往大同、太原及周边。

交通位置见图1-1。

1.1.2 井田地貌区内地形平坦开阔,为厚层新生界沉积物所掩盖,地势西南高,东北低;海拔一般在1080~1200m之间,最高点位于本区东南部,海拔1342m,最低点位于东北部的恢河河床,为1060m,相对高差270m。

井田西侧和北侧有恢河和七里河二条常年性河流,属海河流域桑干河水系,其特点是:平时流量甚小,雨季山洪暴发而流量大增,但历时很短,最大洪峰量出现在7、8两月,最小流量在1月、12月。

其他地表水体不发育。

1.1.3 气象条件本区属典型的大陆性气候,干燥寒冷。

气温一般较低,年温差和日温差较大。

年平均温度4.8~8.6℃,最高温度38.2℃,最低温度-32.4℃,年降雨量273.9~686.9mm,平均461.8mm,主要集中在6、7、8三个月,可占全年降雨量的70%左右。

全年降雪量20.21~63.2mm,最大积雪厚度47cm。

年蒸发量2028.9~2516.7mm,一般2351mm,约为年降雨量的4~5倍。

本区风沙大,有风时间占全年的70%,春、冬季多西北风,平均风速2.1m/s,最大风速3.6m/s,故区内建造了大面积的防风林带。

结冻期自每年10月下旬至翌年四月下旬,最大冻结深度1.25~1.5m。

1.2 矿井地质1.2.1 地质构造及断层同朔井田位于朔县向斜东翼南段,基本构造形态为一向西倾斜而略有起伏的单斜构造。

采矿工程毕业设计--新井设计

采矿工程毕业设计--新井设计

学士学位论文某集团公司六矿新井设计学生:吴佐香指导教师:张明清专业:采矿工程2021年7月18日第一章井田概况及建设条件.................................................................................................... - 3 - 第一节井田概况.............................................................................................. - 3 -一、井田位置及交通................................................................................................ - 3 -第一章井田概况及建设条件第一节井田概况一、井田位置及交通1、位置贵州省普定县猴场乡XX煤矿处于贵州省普定县猴场乡管辖区内。

区范围由11个拐点圈定,呈不规则多边形。

其拐点坐标见表1-1。

表1-1 XX煤矿扩大矿区范围拐点坐标表2、交通XX煤矿位于普定县城北北东方向,矿区距普定县36公里,距安顺市52公里,距安顺电厂52公里,矿区有公路与普定~补郎~猴场乡村公路通达,交通较方便(见图1-1)。

图1-1 交通位置图二、地形地貌地处云贵高原,向东、向南倾斜的斜坡地带,地势较高,属中切割中山地貌。

地形复杂,山峦重叠,坡度较陡。

平均海拔约1650m。

区内最高处为北面孟别北侧高山,海拔高大于1700m;最低处为南部孟登水库一带,海拔高约1520m,相对高差约200m。

三、气象1、气候条件矿区属亚热带季风气候,年平均气温14℃,极端最高气温33.4℃,极端最低气温-6.2℃;七月最热,平均气温为21.0℃,一月最冷,平均温度为4.6℃,年平均降雨量1588.2mm,降雨主要集中在5~8月份。

采矿工程毕业设计(论文)-鸡西矿业集团盛和煤矿1.5Mta新井设计[2]【全套图纸】

采矿工程毕业设计(论文)-鸡西矿业集团盛和煤矿1.5Mta新井设计[2]【全套图纸】

摘要本设计矿井为鸡西矿业集团盛和1.5M t/a新井设计,共有4层可采煤层,分别为15#、18#、23#和34-2#,平均总厚度7.2m,煤层倾角为18 ,构造条件简单。

煤的工业牌号为1/3焦煤,设计井田的可采储量109.18Mt,服务年限为56a,本矿井设计采用双立井方案开拓,划分为三个水平,一个工作面达产。

大巷采用10t架线式电机车牵引3t底卸式矿车运输,采煤方法为走向长壁后退式采煤法,采煤工艺采用综合机械化采煤工艺,工作面用刮板输送机,区段运输采用带式输送机。

年工作日为330天,采用“四、六”式工作制,工作面长为180m,每刀进度为0.6m,每日割十二刀,提升用一对16t 箕斗。

关键词:可采储量走向长壁分区抽出式全套图纸,加153893706AbstractThe task of this design is to construct a 1.5million tons new shaft for Jixi Ming Administration.This mine has four minable Coal Seam, and its average thickness is 7.2 meters, 15#、18#、23#and 34-2#,types of coal seam is 1/3 coking coal. Designed field of minable capacity is189million tons. It can adapt for 90years, and is divided into three level.This mine shaft is applied to double indined shaft development method; Layout of gathing gallergand mining district eross heading; This level is divided into 8 mining districts and tow worked faces.2 faces reach to ptoduce. With a pair of concentration, big alley is arranged, big alley adopt the wiring type generator vehicle of 14t pull the base of 5t unload type mine vehicle transportation, with tape transportation oblique alley, connect every coal seam, the method of coal mining slope the wall of coal mining to incline.Adapt “theree-eight” work situation, work face is 180 meters length of circle is 0.6 meters, and times is 6 one day.key words:Recoverable reserves Trend grows arm Thesubarea draws out style绪论本设计矿井为鸡西矿业集团盛和煤矿1.5Mt/a新井设计,其中包括了:开拓方式、采区巷道布置、采区生产系统、采煤方法、井下运输和矿井通风等。

采矿工程毕业设计(论文)-山西泽州天泰锦辰煤业有限公司矿井120万吨初步设计(全套图纸)

采矿工程毕业设计(论文)-山西泽州天泰锦辰煤业有限公司矿井120万吨初步设计(全套图纸)

第一章矿区概述及井田地质特征第一节矿区概述一、地理位置山西泽州天泰锦辰煤业有限公司矿井位于沁水煤田的东南部,地处山西省晋城市城区北东直距约15km处,泽州县巴公镇北板桥村附近,行政区划隶属泽州县巴公镇管辖。

其地理坐标为东经112°53′09″~112°57′42″,北纬35°38′09″~35°39′37″。

全套图纸加153893706二、地形特点该矿井井田地貌特征为低山丘陵类型,黄土覆盖面大,“V”字型冲沟发育,地势北东高南西低,最高点位于井田的北中部山包上,标高为888.50m,最低点位于井田的西南部东板桥村,标高为780.10m,最大相对高差为108.40m。

三、交通条件该矿井工业场地北距高平市区约20km,东距长(治)—晋(城)高速公路约5km,南距北板桥火车站1.5km,并有运煤专线与该站相接,西部边缘为太(原)~焦(作)铁路与太(原)~洛(阳)公路,所产原煤均通过太(原)~焦(作)铁路与太(原)~洛(阳)公路销往全国,交通运输条件十分便利。

交通位置详见附图1-1-3。

四、居民点分布矿井井田内有10个村庄,其中北板桥村、东板桥村和坡头村位于井田西部,老凹沟村、西张村位于井田北部,城公村位于井田中部,小河西村位于井田西南部,蔡河村、沟东村位于井田东北部,王沟村位于井田东南部。

五、矿井周边煤矿分布山西泽州天泰锦辰煤业有限公司矿井井田周边与多个煤矿相邻,井田北西侧与兰花集团莒山煤矿相接、北东侧与高平市新庄煤矿相邻,并且与高平新庄煤矿界内西南角的朝阳、刘轩窑两座小煤矿相接,南西侧与山宗岭煤矿相接。

详见四邻关系附图1-1-5。

六、矿区工农业生产情况矿井所在区域分布有煤化工、煤矿、铸造、冶炼等一大批工业企业,基础设施完备。

区域内土地肥沃、耕地平整,有着良好的农业生产基础。

矿井建设和生产所需的原料和建筑材料,如砖瓦、水泥、石料、砂子等当地可以满足供应,钢材、木材需由外地购进。

采矿工程毕业设计(论文)-七台河精煤集团公司龙湖七矿0.9Mta新井设计【全套图纸】 模板

采矿工程毕业设计(论文)-七台河精煤集团公司龙湖七矿0.9Mta新井设计【全套图纸】 模板

摘要本设计为七台河精煤集团有限责任公司龙湖七矿0.9Mt/a新井设计,共有7层可采煤层,煤层总厚度为17.2m,煤层工业牌号为焦煤、1/3焦煤。

设计井田的可采储量98.21Mt,服务年限为77.94年。

本设计矿井采用双立井开拓方式,划分三个开采水平,采用集中大巷布置,大巷采用10t架线式电机车牵引3.0t底卸式矿车运煤、1t固定矿车辅助运输。

采煤方法为走向长壁采煤法,采煤工艺为普通机械化采煤工艺,采空区处理方法为全部垮落法。

主井采用钢丝绳罐道多绳摩擦箕斗提升,副井采用刚性组合罐道罐笼提升。

关键词:开拓水平集中大巷走向长壁全套图纸,加153893706AbstractThis is a new design of 0.9Mt/a for longhu seven mine of Qitaihe coal mining Group,which has seven workable coal seams ,total thickness of coal seam is 17.2m ,The coal seam industry trademark is coking coal、1/3 coking coal.The mining filed workable is 98.21 Mt, the service life limit is 77.94 a.The mine pit design uses the double vertical shaft development, this shaft as three levels,Adoption concentrated big lane decoration, the main funnel adopts 10t electrical haulage motor to lead the 3.0 t bottom–dump bogie, 1t station bogie ,Coal winning technelegy is strike longwall working.is conventional machinery mining,the goaf is caving method roof control.The hoist uses the multiropes to rub the ore basket promotion, the chippy hoist uses the rigid combination pot cage promotion.Keywords: Development mode level Grouping centralismStrike long wall mining目录摘要 (I)Abstract (II)绪论 (1)第1章井田概况及地质特征 (2)1.1 井田概况 (2)1.1.1 交通位置 (2)1.1.2 地形地势 (2)1.1.3 气候、温度、雨量、风向、风速 (3)1.1.4水系 (3)1.1.5地震史 (3)1.1.6现有生产、在建矿井及小窑生产情况 (3)1.1.7 水源和电源 (4)1.2 地质特征 (4)1.2.1 矿区范围内的地层情况 (4)1.2.2 井田范围内和附近的主要地质构造 (6)1.2.3 煤层赋存状况及可采煤层特征 (7)1.2.4 岩石性质、厚度特征 (8)1.2.6 瓦斯、煤尘爆炸性及煤的自然性 (9)1.2.7煤质、牌号及用途 (9)1.3 地质勘探程度及可靠性 (10)第2章井田境界储量服务年限 (11)2.1 井田境界 (11)2.1.1 井田周边状况 (11)2.1.2 井田境界确定的依据 (11)2.1.3 井田境界未来发展情况 (11)2.2 井田储量 (11)2.2.1 储量计算范围 (11)2.2.2 保安煤柱 (11)2.2.3 储量计算方法 (11)2.2.4 储量计算的评价 (12)2.3 矿井工作制度生产能力服务年限 (14)第3章井田开拓 (15)3.1 概述 (15)3.1.1 井田内外及附近生产矿井开拓方式概述 (15)3.1.2 影响本设计矿井开拓方式的因素及具体情况 (15)3.2 矿井开拓方案的选择 (15)3.2.1 井硐形式和井口位置 (15)3.2.2 水平划分及水平标高确定 (19)3.2.3 开拓巷道的布置 (20)3.3 选定开拓方案的系统描述 (21)3.3.1 井筒形式和数目 (21)3.3.2 井筒位置及坐标 (21)3.3.3 水平数目及标高 (21)3.3.4 石门、大巷数目及布置 (22)3.3.5 井底车场的形式及选择 (24)3.3.6 煤层群的联系 (24)3.3.7 采区划分 (24)3.4 井筒布置和施工 (25)3.4.1 井筒穿过的岩层性质及井硐支护 (25)3.4.2 井硐布置及装备 (25)3.4.3 井硐延深的初步意见 (26)3.5 井底车场及硐室 (29)3.5.1 井底车场形式的确定及论证 (29)3.5.2 井底车场的布置、存储线路、行车线路布置长度 (29)3.5.3 通过能力计算 (30)3.5.4 井底车场主要硐室 (31)3.6 开采顺序 (33)3.6.1 沿井田走向的开采顺序 (33)3.6.2 沿井田倾向的开采顺序 (34)3.6.3 采区接续计划 (34)3.6.4 “三量”控制情况 (34)第4章采区巷道布置 (37)4.1 采区概述 (37)4.1.1 设计采区的位置、边界、范围、采区煤柱 (37)4.1.2 采区的地质和煤层情况 (37)4.1.3 采区的生产能力、储量及服务年限 (37)4.2 采区巷道布置 (38)4.2.1 区段划分 (38)4.2.2 采区上山布置 (39)4.2.3 采区车场布置 (39)4.2.4 采区煤仓形式、容量及支护 (44)4.2.5 采区硐室简介 (46)4.2.6采区工作面接续 (46)4.3 采区准备 (48)4.3.1 采区巷道的准备顺序 (48)4.3.2 采区主要巷道的断面示意图及支护方式 (48)第5章采煤工艺 (53)5.1 采煤方法的选择................................................................... 错误!未定义书签。

地质毕业设计

地质毕业设计

地质毕业设计摘要通过对矿区地质特征的研究得出井⽥总体为⼀⾛向北东,倾向北西的单斜构造;本区位于滕鱼复向斜中滕县背斜的倾伏部位,井⽥内褶皱构造较为发育,以龙固背斜为主,另有⼩王庄背斜、张庙向斜、张庙背斜、刘官屯向斜、陶官屯背斜和韩庄背斜;落差≥20m有32 条;本井⽥构造复杂程度为中等偏复杂。

再通过应⽤矿井构造规律的研究⽅法,对矿井构造进⾏分析,研究矿井内⼩断层发育的原因、展布和组合规律,矿井构造演化以及矿井构造对煤层赋存的影响,得到了矿井构造规律、矿井构造对煤层的影响,从本质上揭⽰矿井构造和井⽥内⼩断层发育、展布和组合规律,进⾏矿井不同块段构造复杂程度的分析,并进⽽探讨矿井构造对煤厚变化的控制规律,就可以为矿井⽣产的总体部署提供理论依据和为矿井安全、⾼效⽣产提供可靠的地质保障。

关键词:矿井地质构造及特征分析断层影响控制⽬录前⾔ (4)1.1.研究的⽬的和意义 (4)1.2研究的内容 (4)1.3研究的思路和⽅法 (5)矿区概况 (5)2.1井⽥位置 (5)矿井地质 (6)3.1区域地层 (6)3.2井⽥地层 (6)3.3煤层 (11)4.构造及特征分析 (14)4.1构造及特征演化分析 (14)4.2褶曲、断裂构造分析 (16)4.3构造复杂程度分析 (17)5矿井断层展布规律分析 (18)5.1断层统计分析 (18)5.2断层构造发育特征 (18)5.2.1断层的落差分布及⽅向性 (19)5.2.2断层的组合形式 (20)5.2.3中⼩断层展布规律与边界⼤断层成因关系分析 (21)6.矿井构造对煤层的影响 (23)6.1 断层构造的分析 (23)6.1.1断层构造的演化 (23)6.1.2 断层构造特征 (24)6.2井⽥断裂构造对煤层的影响 (25)7.矿井⽣产揭露断层特征及其规律 (25)7.1⽣产过程中揭露主要断层的特征 (26)7.2断层的分布规律 (27)7.3断层的切割关系 (28)7.4井下揭露⼩断层对煤矿⽣产的影响 (29)结论 (32)参考⽂献 (34)致谢 (35)前⾔1.1 研究的⽬的和意义我国煤炭资源丰富,其储量约占全国矿产资源储量的90%,化⽯能源的95%,具有巨⼤的资源潜⼒。

煤矿毕业设计1

煤矿毕业设计1

煤矿毕业设计1第一章矿区概述及井田特征1.1矿区概述1.1.1位置与交通磁县六合工业有限公司安阳新矿位于河北省磁县与河南省安阳县交界处磁县观台镇境内,岳城水库南岸。

矿井北部井田位于岳城水库洪水位线之内,东距磁县县城约25km,西距磁县观台镇2km,北距峰峰矿区20公里。

该矿井南临磁观公路,西为峰观公路,距峰峰集团公司黄沙矿火车站14公里,南距河南安阳岗子窑火车站12公里,交通条件比较便利。

该矿井行政区划隶属河北省磁县黄沙镇所管辖。

详见(图1-1)。

1.1.2自然地理六合工业有限公司井田地处河北、河南两省交界处,矿井中北部为漳河河床与岳城水库库区。

岳城水库是海河流域南运河水系漳河上的一座大型水利工程,该水库于1958年10月开始动工兴建,1960年开始拦洪,1970年11月竣工,最大库容量13亿m 3,控制流域面积18100km 2。

漳河为常年性河流,是岳城水库的补给水源。

该河流发源于山西省,其源头有二:一是山西省平乐县南少山,名为清漳;二是山西省长子县发鸠山,名为浊漳。

二河至涉县东南合漳(田家嘴)汇流,至丁岩村东入磁县,流经都党、观台、黄沙、岳城、时村营、讲武城出磁县。

磁县境内河流长度55km,河床宽500~1300m,平时流量5~20m 3/s,汛期最大流量9200 m 3/s(1956年8月4日),结冰期75天左右(1~3月中旬)。

矿井坐落于岳城水库南岸,为丘陵山坡地形,地势由东向西逐渐增高,标高变化于 + 134~+ 231m之间。

该区地处北温带,属半干旱大陆性季风气候,四季分明,雨热同期,昼夜温差大。

冬季寒冷少雪,多西北风;春季干旱少雨,多南风;夏季炎热多雨,多东南风;秋季晴朗,冷暖适中。

据峰峰矿区气象局1997~2007年资料,气温在-11.1℃~+42℃之间,年平均气温13.9℃;降水量在271.5mm~728.7mm之间,年平均降水量500.1mm,降水主要集中在7、8月份;年蒸发量介于1531.2mm~2056.2mm,年平均蒸发量1831.4mm;无霜期介于206天~258天,年平均无霜期为233天。

采矿工程毕业设计图纸

采矿工程毕业设计图纸

采矿工程毕业设计图纸【篇一:采矿工程毕业设计论文附5张图纸】第一章矿区概况及井田地质特征第一节矿区概述一、地理位置及交通条件区内交通极为便利。

京沪铁路大动脉纵贯井田中部,从东滩店车站起,南去邹城6km,徐州162km,上海818km;北去兖州14km,济南156km,青岛549km。

另有兖新铁路支线,西去济宁至鲁西南菏泽和河南新乡,与京九铁路和京广铁路联网;东去有兖石铁路专线至石臼港308km。

公路四通八达,有104国道、京福高速公路、邹兖公路、济兖公路和济邹公路分别从井田东部、中部、南部和西部通过。

京杭大运河由济宁市西流过,一般能通航85t小轮,一、二月份水位变浅,不能通航。

二、地形特点及居民点分布区内为第四系冲积平原,地形平坦,地面标高+42.46~+54.58m,地势由东北向西南逐渐降低,坡度极为平缓。

矿区范围内分布有大小村庄15个,大部分分布在井田边界。

另外,在矿区南部有大片职工住宅区。

三、工农业生产和原料及电力供应矿区内工业以煤炭为主,农业主要种植小麦、玉米、棉花,间杂有果园、桑园、菜园和苗圃等。

本矿井建设期间,所需要建设材料,除钢材、木材和部分水泥需由国家计划供应外,其它砖、石、砂等土产材料,均由当地供应,满足建设需要。

矿区已建有110kv罗广区域变电所,向本矿井供电的两回35kv输电线路已建成送电。

四、矿区气候条件本区属温带季风区的海洋——大陆性气候。

根据邹城市气象局1959—1999年气象资,历年平均气温17.9℃,最高气温40.3℃,最低气温-18.3℃。

历年平均降水量为708.14mm,年最大降水量为1263.8mm。

区内冬季多北风,夏季多南风,最大风速16m/s。

冰冻期为十二月至次年三月,最大冻土深度0.27m。

五、矿区水文及工农业供水区内主要河流有白马河及其支流泥河,纵贯全区,向南流入南阳湖,皆属季节性河流。

白马河全长76km,河床宽10~420m,曾测得最大流量为568m3/s,流量随季节变化,由干枯断流至洪水泛滥,与第四系有水力联系。

采矿工程毕业设计图

采矿工程毕业设计图

采矿工程毕业设计图【篇一:采矿工程毕业设计说明书】摘要本设计收集了北辛窑煤矿的地质资料及图纸,在此基础上按照国家规程规范的规定,提出了开拓开采方案,确定了主要技术参数,撰写了本说明书。

采煤方法,采用全部垮落法处理采空区。

矿井前期采用中央并列式通风,后期分区通风,并对矿井运输、矿井提升和矿井通风等各个生产系统进行设备选型计算。

设计时根据现有经济技术条件,尽可能采用先进的开采技术和设备,以及对矿井安全技术措施和环境保护提出要求,完成整个矿井的初步设计。

矿井全部实现机械化,采用先进技术和借鉴已实现高产高效现代化矿井的经验,实现一矿一面高产高效矿井从而达到良好的经济效益和社会效益。

关键词:斜井开拓、综合机械化采煤方法、全部垮落法管理顶板第 1页abstractmine tthis design is a collection of shanxi beixinyao coal mine geological data and drawings, on the basis of in accordance with the provisions of national regulations proposed exploitation scheme, determined the main technical parameters, writing this manual.zezhou tian chaoyang coal mine area in the design of 13.6476 square meters, the annual output of 0.9mt. ida internal coal seam occurrence is relatively stable, can coal seam has two levels, are 1, no. 2, coal seam, seam dip angle of 0-10. the average coal thickness of no. 1 coal seam is 1.84m, and the average thickness of coal seam is 2.7m, 2.. overall geological conditions are more complex. the mine is a high gas coal mine, coal spontaneous combustion of coal, coal is explosive. according to the actual geological data, the coal mine exploration way, preparation method and coal mining method were preliminarily designed.. the design of mine inclined single level to develop, the comprehensive mechanized coal mining.coal mining method, adopt all caving method to deal with goaf. the central parallel ventilation, the late district ventilation, and theransportation, mine upgrading and mine ventilation andother production systems for equipment selection calculation. design in accordance with the existing economic and technological conditions, as far as possible the use of advanced mining technology and equipment, and on mine safety technology measure and the environmental protection request, to complete the preliminary design of the whole mine. all mine mechanization, using advanced technology and reference has achieved a modern high-yielding and efficient mine experience, realize side of a mine high yield andefficiency of mine to achieve good economic and social benefits.keywords: inclined shaft development system, comprehensive mechanized coal miningmethod, roof caving method第 2页前言大学生在老师的指导下做毕业设计是采矿工程专业最后一个教学环节,其目的是使本专业学生运用大学阶段所学的知识联系矿井生产实际进行矿井开采设计,并就本专业范围的某一课题进行较深入的研究。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

矿井毕业设计图【篇一:煤矿毕业设计】目录目录...............................................................01 摘要...............................................................03 英文摘要.. (04)第一章井田概述和井田地质特征 (07)第一节矿区概述 (07)第二节井田地质特质 (09)第三节煤层的埋藏特征 (10)第四节水文地质 (13)第二章井田境界与储量 (15)第一节井田境界 (15)第二节地质储量计算 (16)第三章矿井工作制度及生产能力 (19)第一节矿井工作制度 (19)第二节矿井生产能力及服务年限 (19)第四章井田开拓 (20)第一节井田开拓方式的确定 (20)第二节达到设计生产能力时工作面的配备 (26)第五章矿井基本巷道及建井计划 (27)第一节井筒 (27)第二节井底车场 (28)第三节建井工作计划 (30)第六章采煤方法 (32)第一节采煤方法的选择 (32)第二节工作面主要设备选型 (34)第三节确定采(盘)区巷道布置和要素 (39)第四节巷道掘进 (41)第七章井下运输 (44)第一节运输系统和运输方式的确定 (44)第二节运输设备的选择和计算 (44)第八章矿井提升 (57)第一节主斜井的提升 (57)第二节副斜井的提升 (62)第三节矿井的排水 (68)第九章矿井通风与安全 (73)第一节矿井通风安全情况 (73)第二节矿井的通风 (75)第三节计算负压及等积孔 (91)第四节通风设施、防止漏风和降低风阻的措施 (97)第十章经济部分 (98)第一节劳动定员和劳动生产率 (98)第二节技术经济指标表...........................................102 致谢..........................................................107 参考文献. (108)摘要本设计所选题目为《上深涧煤业90万t/a矿井初步设计》,根据山西省上深涧煤业有限责任公司的井田概况和地质特征资料。

井田概况包括井田境界;地表的交通位置以及自然地理和水源、电源的供应情况。

地质特征资料包括底层;地质结构;煤层及煤质;煤层顶、地板情况及煤层的瓦斯、煤尘、煤的自燃性;以及矿井的水文地质情况。

此次设计的目的是其目的是运用大学阶段所学的知识联系矿井生产实际进行矿井开采设计,并就本专业范围的某一课题进行较深入的研究,一培养和提高学生的学习分析和解决实际问题的能力,是学生走上工作岗位前进行的一次综合性能力训练,也是对一个未来采矿工程高级工程技术人才的基本训练。

设计时应以当前煤矿开采发展的趋势和方向,结合本煤矿的特征以综合机械化大采高为首选采煤方法。

并合理的布置开拓巷道和工作面,以简化采煤生产系统提高煤炭的利用率。

此次设计需要解决的专题是低瓦斯煤层的开采,要求我们需要在采取巷道的布置上(尤其是通风问题)及以后的生产管理上采取特殊的措施,以实现矿井的安全生产。

该矿井的设计生产能力为90万t/a,采用两个水平分组开采,采用条带式布置后退式开采一次采全高,采用完全垮落法管理顶板。

采用综合机械化开采。

设计过程中我们队矿井的各个系统又有了一次比较全面的认识和了解,同事在老师的辅导和帮助下也解决了一些接近实际的问题。

使我们在掌握专业知识的同事也提高了自己以后再显示工作岗位上的能力。

关键词:顶板管理;地质灾害;综采采矿班学生:孙博文2013年5月10日abstract the design of the selected topic is shen jian coal mine 900000 t/a preliminarydesign, according to the field survey and geological data of shanxi provinceshangshenjian coal limited liability company. ida ida state; supply surface traffic location and natural geography and water, power supply. geological characteristics of theunderlying data including; geological structure; coal and coal; coal seam roof, floor and coal seam gas, coal dust, coal spontaneous combustion; and mine hydrogeology.the purpose of this design is its purpose is to mine mining design using theuniversity stage knowledge with mine production, and the thorough research on a topic of the professional range, a train and improve the analysis of students learning and the ability to solve practical problems, is the student go to work before the comprehensive ability training, but also the basic training on a future mining engineering senior engineering and technical personnel.the design should be based on the current coal mining development tendency and the direction, combined with the characteristics of the coal mine in the comprehensive mechanized mining is the first choice of mining method. and the reasonable arrangement of roadway and working face, to simplify the mining production system to improve the utilization rate of coal.this design needs to solve feature is the low gas coal mining, we need to take the roadway layout (especially the problem of ventilation) production management and later to take special measures, in order to realize the safety production of coal mine. the mine design and production capacity of 900000 t/a, using two levels of packet of mining, the strip layout retreat mining full height mining at one time, the management of roof caving method. the comprehensive mechanized mining.the design process of each system our team mine has a more comprehensive understanding and the understanding, colleagues in the teachers guidance and help solvesome practical problems. to enable us to master the knowledge of my colleagues also improved their ability to show job after.keywords: roof management in fully mechanized mining; geological disaster;mining class student: sun bo wenmay 10, 2013【篇二:毕业设计-矿井初步设计】河南理工大学成人教育学院本科毕业设计(论文)毕业设计(论文)题目新郑煤电有限责任公司赵家寨矿井初步设计站别年级专业学生姓名指导教师2013年 4月10 日毕业设计(论文)任务书站名郑州函授站年级专业2011级采矿工程一、设计(论文)题目:新郑煤电有限责任公司赵家寨矿井初步设计二、设计(论文)任务与要求1、赵家寨矿矿井设计说明书一份。

2、井田开拓平、剖面图(1:1000或1:2000)各一张。

3、采区巷道布置及机械配备平、剖面图(1:1000或1:2000)各一张。

4、矿井设计内容及附图要符合设计大纲要求。

6、矿井设计说明书格式符合统一格式要求。

7、附图的图纸格式、图例符合国家有关规定要求。

三、设计(论文)时间: 2013 年 4 月 1 日至2013年 4 月 10 日指导教师(签名)成教院院长(签名)毕业设计(论文)评定书站名郑州授站年级专业2011级采矿工程学生姓名樊庆林一、设计(论文)题目:二、设计(论文)共 96 页,附图 11 张三、审阅意见及评语根据学院教学管理的有关规定,同意(不同意)该生参加毕业答辩指导教师(签名)职称?工作单位河南理工大学新郑煤电有限责任公司赵家寨矿井初步设计毕业设计(论文)答辩委员会(小组)决议站名郑州函授站年级专业2011级采矿工程学生姓名樊庆林该生于年月日进行毕业设计(论文)答辩设计(论文)题目:答辩委员会:主任委员(组长)委员(成员)答辩学生向答辩委员会(小组)提交如下资料:设计(论文)说明书共页新郑煤电有限责任公司赵家寨矿井初步设计设计(论文)图纸共页指导教师评阅意见共页根据学生所提供的毕业设计(论文)材料和指导教师意见以及在答辩过程中学生回答问题的情况,毕业设计(论文)答辩委员会(小组)作出如下决议:一、毕业设计(论文)的总评语二、毕业设计(论文)的总评成绩:毕业设计答辩委员会主席(组长)(签字)委员(成员)(签字)【篇三:煤矿毕业设计】第一节井田地质特征一、交通位置山西长治联盛西掌煤业有限公司位于长治县西火镇南2.7km上西掌、关家村一带,行政区划隶属长治县西火镇管辖。