工程管理专业英语词汇短语
工程项目管理英语术语
Engineering project management is a complex field that requires a deep understanding of various concepts, processes, and terminologies. The following is a comprehensive list of English terminology commonly usedin engineering project management, categorized by different aspects of the field.I. Project Planning and Scheduling1. Project charter - A document that authorizes the project and providesa high-level description of the project's objectives, scope, stakeholders, and major constraints.2. Project scope - The defined limits of the project, including the work to be performed and the deliverables.3. Work breakdown structure (WBS) - A hierarchical decomposition of the project scope into smaller, manageable components called work packages.4. Project schedule - A document that outlines the project activities, their sequence, and the duration required for each activity.5. Critical path method (CPM) - A project management technique that calculates the critical path, the longest sequence of dependentactivities that determines the minimum project duration.6. Program evaluation and review technique (PERT) - A project management technique that estimates activity durations using a probabilistic model.7. Gantt chart - A bar chart that illustrates a project schedule, showing the start and end dates of activities and milestones.8. Milestone - A significant event or achievement in the project that marks a transition from one phase to another.9. Project baseline - The approved project plan that serves as a reference point for measuring progress and changes during the project execution.10. Project schedule variance (SV) - The difference between the earned value and the planned value for a specific project activity.II. Project Execution and Control1. Project team - A group of individuals working together to achieve the project objectives.2. Project manager - The person responsible for planning, executing, and controlling the project to ensure its successful completion.3. Resource allocation - The process of assigning resources (human, material, and financial) to project activities.4. Change management - The process of managing changes to the project scope, schedule, and resources.5. Scope creep - The uncontrolled expansion of a project scope, often leading to cost and time overruns.6. Risk management - The process of identifying, analyzing, and responding to project risks.7. Quality management - The process of ensuring that the project deliverables meet the specified requirements and standards.8. Configuration management - The process of identifying, documenting, and controlling changes to project artifacts.9. Project control - The process of monitoring and controlling the project's progress, performance, and changes.10. Earned value management (EVM) - A project performance measurement technique that integrates scope, schedule, and cost.III. Project Monitoring and Closing1. Project status report - A document that provides an overview of the project's progress, performance, and issues.2. Progress report - A document that summarizes the progress of the project activities, including completed, in-progress, and delayed tasks.3. Project review - A meeting or session to assess the project's progress, performance, and compliance with the project plan.4. Lessons learned - Knowledge gained from the project experience that can be applied to future projects.5. Project closure - The formal process of ending a project, including finalizing deliverables, conducting a project review, and documenting lessons learned.6. Project handover - The transfer of the project deliverables and responsibilities to the customer or another entity.7. Post-project evaluation - A review of the project's performance, outcomes, and lessons learned to identify areas for improvement.IV. Project Management Tools and Techniques1. Project management software - Tools that assist project managers in planning, executing, and controlling projects.2. Agile methodology - A project management approach that emphasizes flexibility, collaboration, and iterative development.3. Waterfall methodology - A linear project management approach that follows a sequential order of phases.4. Lean project management - A project management philosophy that focuses on minimizing waste and maximizing value.5. Six Sigma - A set of techniques and tools for process improvementthat aims to reduce defects and variations.6. Brainstorming - A creative technique for generating ideas and solutions to a problem.7. Root cause analysis - A problem-solving technique that identifies the underlying cause of an issue.8. Decision matrix - A tool used to evaluate and compare alternative solutions based on their pros and cons.9. Cost-benefit analysis - A technique for evaluating the financial feasibility of a project or investment.10. PERT and CPM software - Computer-based tools that assist in scheduling and analyzing project activities.In conclusion, engineering project management encompasses a wide range of terminologies that are crucial for understanding and executing projects successfully. Familiarizing oneself with these terms can greatly enhance communication, planning, and control throughout the project lifecycle.。
工程管理专业词汇3
工程管理专业词汇3Building Engineering and Construction VocabularyProject name: Albachiara Printing & Dyeing Plant(Jiaxing)亚曦嘉兴纺织整理厂1. 项目治理project management现场治理site management施工治理construction management政府报批permitting & approvals监理单位supervisory agent质检站quality inspection station设计院design institute和谐coordination质量监督quality monitoring工期操纵schedule control /工期跟踪schedule tracking安全操纵safety control / safety monitoring安全培训safety training安全手册safety manual / handbook每周例会weekly meeting周报weekly report月报monthly report会议记要meeting minutes通知notice记要(备忘录)MOU / memo (memorandum of understanding)指令instruction业主指令client instruction工程治理公司指令Consultant’s instruction监理单位指令supervisory agent’s instruction验收acceptance inspection中间验收hold-point inspection / milestone inspection隐藏工程验收concealed work inspection竣工验收final completion inspection会议记要格式meeting minutes template公司信笺company letterhead文件归档archiving / archive文件签收记录单transmittal2. 人员和单位roles & staff业主client业主工程师client engineer / consultant治理公司project management company = consultant = engineer 总承包公司general contractor项目经理project manager施工经理construction manager / site manager政府报批员government permitting liaison土建工程师civil engineer结构工程师structure engineer机电工程师M&E engineer (mechanical & electrical)安全工程师safety engineer质检工程师quality assurance / quality control (QA/QC) engineer 档案治理员document control合同经理contract manager采购经理procurement manager / purchasing manager项目操纵工程师project controls engineer / manager工地秘书site secretary工人workers分包公司sub-contractors专业分包specialist sub-contractor指定分包designated sub-contractor / supplier供应商suppliers / vendors政府机构authorities / agents总部headquarters3. 开工预备construction preparation进场做开工预备mobilization preparation场地平坦site leveling / land grading清理腐土和植物remove cultivation soil and vegetation / site cleaning 受污染土壤contaminated soil受污染水polluted water / river / air pollution水塘pond碎砖瓦砾,废墟rubble垃圾debris / garbage / rubbish / refuse地势地貌terrain搭建临时设施set up temporary facilities安排施工用水、用电、排污arrange construction power, water, sewage 打桩机进场piling machine move in site地质条件geological conditions / terrine开工会议(工程启动会) project kick-off meeting永久水电permanent r water / power开工典礼ground-breaking ceremony开工典礼服务公司 GBC service agent搭建主席台/讲台set up a stage / podium横幅banner汽球balloons临时棚temporary shelter临时停车场/道路temporary parking/roads奠基石corner stone(engraved with project name and ground-breaking date) 土堆soil pile铲子shovels / spade奠基仪式inauguration ceremony出席嘉宾guests政府官员government officials政府机构governmental bureaus / agents施工许可证construction permit地质勘探geo-tech survey / report红线图red-line map (property-line map)植物/花篮 plants/flower bouquet邀请函invitation card / letter鞭炮crackers礼花fire work红地毯red carpet主持人host发言speech发言人speaker发言稿speech script礼物give-away gifts晚宴dinner banquet着装要求dress code(晚宴装black tie,商务便装business casual,便装casual) 礼仪小姐model attendants / waitress / ritual girls登记registration登记薄registration book / sing-in book 音响系统audio system麦克风microphone扩音器loudspeaker观众audience彩排rehearsal4. 采购purchasing / procurement下定单place PO (purchasing order)交货期lead time长交货期材料long lead time items催货expediting海关清关customs clearance陆地送货inland transportation运送shipping一批物资shipment卸货unloading仓库storage / warehouse库存inventory帐单invoice / bill发票receipt / legal receipt提货单Bill of Landing / Cargo Bill信用证Letter of Credit (LC)离岸价FOB (Free on Board)到岸价CIF (Cost, Insurance and Freight)5. 工地治理site management工地site / job-site现场治理site management场地布置site layout第一期phase I第二期phase Ⅱ施工段segment / section分段施工segmented construction施工区construction zone生活区living quarter / living compound物料仓储区 material storage / storage yard / logistical center 加工区fabrication yard现场办公室site offices工人宿舍worker s’ dormitory门卫间保安guardhouse / security guard围墙fence / boundary fences进场预备mobilization / preparation for construction临时水、电temporary power & water for construction临时排污temporary sewage system工地标志site signage安全标志safety signs / warning signs安全生活用具safety equipment安全帽helmet手套gloves安全鞋safety boots保险带safety tie-back / harness急救箱first-aid kit担架stretcher安全眼镜safety glasses / goggles工作服uniform焊工眼镜面罩welder’s mask监工/工头/组长superintendent / foreman安全拉杆safety barrier安全带子safety banner ( yellow banner)吊车驾驶员crane operator生产组construction crew施工记录construction record施工日记daily log进度Progress进度报告Progress report进度付款Progress payment进度表Progress schedule进度趋势Progress trend / forecast晚间巡逻night patrol工期schedule工期表schedule chart (Microsoft Project) 结点milestone检查check / inspect验收inspection流程图flow chart / flow diagram施工打算construction plan / execution plan施工组织打算construction execution plan施工人员组织表site organization chart治理人员management staff工人workers / labor技术人员technical staff / engineers质量员quality inspector日常作业routine operation / daily operation常规施工作业conventional process材料materials设备equipment临时堆放区temporary lay-down area / storage生产设备(进口)临时仓库temporary storage for imported production equipment租赁的仓库 leased warehouse租金/月租金rental / monthly rental桩临时堆放区pile storage yard中间验收hold-point inspection评判标准judgment standards完工complete / completion竣工final completion竣工验收final acceptance inspection工期延误schedule delay超过预定工期ahead of schedule落后预定工期behind of schedule罚款penalty雨季rainy season (5, 6月)工程验收记录inspection record隐藏工程验收记录concealed work inspection record安全事故报告accident report入住move-in / occupancy关键途径critical path材料样品material sample样品板sample board通过accepted / passed拒收declined / rejected运行不正常 mal function有缺陷的产品defective缺陷defects次品substandard products / sub-grade / off-grade product / seconds 变形deformation局布变形local deformation下弯deflection卷曲变形warping / warpage翻边turn-up / turn-over along edge脱落/松动loosing剥落peeling off分离detached隆起swell生锈rust退色color deterioration不平均unevenness起砂sanding起泡bubbling起皱wrinkling刮痕scratches印痕marks裂缝crack / cracking / fracture细裂缝fissure漏水leaking / leakage渗漏seepage水痕water stain / water marks平坦度flatness光滑度smoothness凹凸起伏sags and crests凹凸小麻点 dimples and nipples突起物bumps / raised bumps表面凹坑dent (被砸的)返工rework6. 打桩及基础工程piling & foundation work桩pile方桩square pile圆桩round pile导桩pilot pile空心桩hollow pile运桩shipping of piles桩临时堆放区temporary lay-down yard for piles 桩的养护curing (所有混凝土的养护)浇制场地casting yard现场拌挠On-site mixing开控excavation地沟ditch坑pit制作桩帽pile-cap模板form work (steel, timber)支模板erect formwork钢筋笼re-bar cage扎钢筋tie re-bar浇制casting浇制板,梁,柱cast / slab , beam , column浇混凝土pore concrete缓凝剂retarder / retarding agent缓凝混凝土 retarded cement按体积配料 proportioning by volume散装材料bulk material / in bulk养护curing制作地梁cast ground beams钢结构预埋件cast-in anchor bolts回填土back-fill夯实compacting / compaction振动夯土机 vibro-soil compactor设备基础production equipment foundation地基处理soil treatment / foundation treatment 压密注浆injection grouting防渗水层impervious course / layer单层sole course土工布geo-fabric灌浆grouting地下水位underground water table预制桩pre-cast piles打桩机pile driver / piling machine起重机械lifting / appliance / equipment起重滑轮lifting block / chain block导杆guide pillar起重杆lifting rod / suspender定位positioning起吊hoisting打桩piling (drive piles)试桩pile testing抗拨试验uplift load test养护期curing time地面以下below ground level (±0.00)地面以上above ground level7. 地坪工程ground slab地板/楼板 slab钢筋re-bar箍筋stirrup砼(混凝土)concrete碎石(骨料)aggregate石块gravel大石块boulder水泥cement地坪浇制ground slab casting沙浆底层mortar bedding表面找平层 surface screening表面封闭sealant防水膜water proofing membrane防滑条Non-skid strips (non - slip形容人) / cuts伸缩缝expansion joint沉降缝settlement joint表面硬化处理hardened surface地下管道预埋underground pipes (pre-buried)现场浇铸cast-in-sites / cast-in-place / cast-in-situ倒塌collapse沉降settlement沉降观测settlement survey坡道ramp / slope坡度grade of slope / gradient管道沟pipe ditch8. 钢结构及砖石工程/结构工程steal structure & masonry work/ structure work上部结构superstructure钢结构steel structure地脚螺栓anchor bolt / screw锚座anchor socket螺纹screw thread预埋件cast-in anchor主立柱main columns柱子底座plinth型钢section steel ( H,C,L,□,○) I ,angle主梁main beams次梁secondary beams大梁girder脊梁Ridge beam檩条purlin圈梁ring girder工字钢H-column / H-beam / I-beam / 腹web plate / II双腹double-webbed屋顶桁架roof truss屋檐eaves屋脊rigid飞檐cornice / upturned eaves门、窗框架window door frames压条gasket / rubber gasket / bead 金属木板墙面板wall panels屋面板roof panels采光带light belt / skylight / meltable skylight panel彩钢板steel sheet彩钢板三明治板(中间有保温)sandwich panels拼接splice (splice joint, spliced connection, splicer)空间网架space gird钢丝网Barbed wire保温层insulation (fiber, foam)表面钢板skin sheet外层external内层internal室内exterior室外interior表面油漆处理surface coating防火涂料fire-proof coating女儿墙parapet wall山墙gable红砖clay bricks层面天沟roof gutter天沟roof valley落水管downspout / down pipe暗雨水管concealed fall pipe护栏(水泥)balustrade落差falling head搭接lap connection屋顶气楼ventilation tower屋顶坡度pitch of roof四坡屋顶hip roof缓坡屋面low pitched roof不上人屋面 non-accessible roof百叶窗louver (louver window)铝合金门、窗aluminum doors & windows 雨棚canopy小雨棚awning氟碳烤柒FCP (fluorine carbon paint)铝型材aluminum extrusion双层中空玻璃double glazing抗紫外线玻璃low-e glass铸铁cast iron紧固件fastener / fastening bolt夹层mezzanine / mezzanine floor人行桥cat-walk楼梯井staircase well楼梯staircase (single flight, double flight) 螺旋式楼梯 spiral stairs圆弧扶梯winding stairs车间workshop辅助建筑subsidiary / auxiliary buildings裙房annex / podium局布承压local bearing局布照明local lighting高杆照明high mast lighting9. 砖石工程masonry work水泥cement水泥标号cement grade (200 300 400)钢筋re-bar (steel re-bar)石子aggregate大石块boulder道砖ballast砂子sand木材timber混凝土concrete钢筋混凝土 reinforced concrete (RC)商品混凝土 Ready-mixed / plant –mixed混凝土等级concrete grade ( C20, C30, C40) 混凝土坍落度试验slump test配方recipe整体式混凝土monolithic concrete整块浇筑monolithic pour整体浇铸integral cast砂浆砌筑mortar bond混合比mix proportion中间层intermediate layer砌块墙block wall人字辅砌herring bond pavement丁砖砌合header bond一丁一顺砌合Flemish bond墙面照平抹灰plastering打磨polishing / sanding涂料paint / painting底漆primer coating过梁lintel门、窗框frames for doors and windows / door jamb / header地砖floor tiles管线预埋管子wire duct / conduit排水系统drainage system检修孔inspection hole = man-hole集水坑collection hole / pit / sinkhole水管工程plumbing work供水water supply排水drainage / sewerage污水管sewer化粪池septic tank过滤池filtering tank / filtration tank蓄水池reservoir排水孔drain hole / sewer outfall / sinkhole混凝土砌块concrete block砂浆mortar ( cement mortar)水泥砂浆抹灰cement mortar plastering现浇梁/板 cast-in-site beam/slab (= cast-in-situ) / cast slab, castbeam,cast column堤dike污泥sludge污泥,腐土 muck soil疏通河道dredge填塞,捣实 tamping / stuff10. 机电系统mechanical & electrical systems设备安装equipment installation供电系统power supply and distribution system变压器transformer变电站power sub-station配电房power transformer room高压电柜hi-voltage switchgear低压电柜low-voltage switchgear电缆cable (power cable) 粗电线wire 细电缆桥架cable tray母线槽bus bar / bus rail配电板/箱 distribution panels / box信号线cable / signal cable (IT/ /投影仪)网络/通讯系统IT/telecom systems]网络中的结点node服务器server程控交换机programmed exchanger中转板harbor空调系统air conditioning system / AHU (air handling unit) 冷冻机chiller中央空调centralized AC system温度操纵temperature control湿度操纵humidity control局布采暖local heating局布通风local ventilation区域吸顶空调VRV ceiling mount AC units 独立式空调 free-stand unit挂壁式空调 wall mount unit操纵板control pad / thermostat遥控器remote control风管duct / pipe冷媒管coolant pipe / cooling media 冷凝水管condensation pipe冷凝器condenser落水管rain leader风冷冷凝器 air cooled condenser空调出风口 air outlet回风口air inlet回风管道air return duct散流器diffuser新风make-up air空气压缩机air compressor压缩空气compressed air罩子hood电梯elevator / lift液压电梯hydraulic lift自动扶梯escalator快速滑升门 fast-speed overhead door红外线感应 infra-red sensor防撞杆bollard / bump post移门sliding door阀门valve球阀ball valve止回阀backwater valve / non-return valve 减压阀reducing valve溢流阀relief valve调剂阀regulating valve加气砼air-entrained concrete通风ventilation排废气exhaustion支架bracket牛腿corbel支撑bracing (泛指)支撑柱bracing column撑杆brace (柱条、撑条)吊杆suspender / hanger支杆strut / tie壳case泵壳pump case架板,脚手架gang board大小头变径管reducer / reducing镀锌铁管galvanized iron pipe光钢筋plain bar铜管copper tube盘管coil爱护套管protective sailing轴承bearing扬程lift of pump弹性缝resilient joint支承块rest pad花纹钢板raffled plate垫板padding plate油毡roof felt管长pipe clip基座pedestal刚度rigidity柏油毡pitched felt白铁皮galvanized iron sheet阳极电镀anodized镀烙(克罗米)chrome plated法兰flange环箍hoop / hoping / insulation block 垫圈弹簧垫圈washer / spring washer管套collar / sleeve90度接头elbow connector / bend三通Tee joint / connector闷头end-cover压力调剂器 pressure regulator预应力砼priestesses concrete滑轮pulley减震木垫wooden cushion block柴油diesel润滑油lubrication oil汽油gasoline / gas齿轮gear内套筒inner sleeve绝缘子insulator11. 消防系统fire-fighting system 总管main pipeline支管branch pipeline消防水管fire water pipes消防水泵房pump room消防栓fire hydrant消火栓箱hose cabinet软管hose喷嘴nozzle灭火器fire extinguisher喷淋头sprinkler head喷淋灭火系统sprinkling system烟感smoke detector压力表pressure meter备用发电机back-up generator紧急照明灯emergency light疏散指示灯evacuation light消防水池fire water tank消防验收fire marshal inspection防火卷帘门fire roller door防火门fire door旋转门revolving door防暴门blast-resistant door隔音门sound-proof door弹簧门swing door12. 废水处理waste water treatment废水处理站waste water treatment station 排水沟/管 drainage ditch/pipe排水井drainage well明沟Open drain地漏drainer / drain hole沉淀池sedimentation tank管道沟pipe ditch沉积物sediment13. 室内装修interior decoration / fit-out朝向orientation空房vacant room概念设计schematic design放样lay out / set out平面布置floor layout风水geomancy空间利用率 space efficiency / floor efficiency门厅foyer门廊(室外)porch走廊过道passage / walkway背景墙logo wall接待大厅lobby接待台reception desk办公区office = open office坐位间过道 aisle / walkway走廊hallway / corridor小办公室private office / manager’s office会议室meeting room / conference room公共洗手间common washing room茶水间pantry / tea room / coffee room办公隔断单元cubical / work station办公桌隔断workstation cubical partition隔墙/隔断partitionpartition wall / dry wall / gypsum board / frames / ribs轻刚龙骨light gauge steel joist承重墙load bearing wall玻璃隔断glass partition护墙板墙裙wall panel花窗lattice window文件柜file cabinet文印间printing and faxing room食物预备间food preparation room清洗间washing room更衣间locker room挂衣柜wardrobe / built-in wardrobe搁板shelves挂衣杆rail衣架hanger壁橱closet食堂厨房canteen / kitchen茶水柜counter / island counter吊柜cupboard / wall-hung cupboard / wall-mounted cupboard 展现柜show case展现架display shelves家具furniture单人沙发armchair长沙发sofa / couch沙发床davenport / divan bed休闲椅lounge chair壁炉fireplace阳台balcony露天大平台 terrace清洁工人房 janitor’s room娱乐设施recreation facility健身房gym / fitness center地砖floor tilePVC地砖PVC floor tile玻化地砖vitrified floor tile瓷砖ceramic tile防滑地砖anti-slip tile防滑anti-slip防磨损anti-abrasion / anti-friction墙砖wall tile瓷砖ceramic tile多孔砖porous bricks机房server room防静电架空地板anti-static raised floor地毯carpet / carpet tile (块毯) / wall-to-wall (全铺) 地毯底衬under-layer / lining门口踏毯door mat挂毯rug承重墙bearing walls / partitions非承重墙non-bearing wall空心墙hollow core wall螺纹接连nipple joint六角螺栓hexagonal head bolt反拱inverted arch拉毛hacking悬挂脚手架 hanging scaffold硬木板条地板hardwood strip floor楼板slab楼层floor楼梯staircase单距single flight双距double flight旋转楼梯spiral stair圆弧楼梯winding stair楼梯间staircase楼梯井stair well电梯井elevator shaft垃圾滑道井 refuse chute扶手railing / rail / handrail / grab rail拉手Pull / pull bar踏步tread侧踏步riser休息平台landing入口出口entrance / exit吊顶(600x600) suspension ceiling / suspended ceiling吊顶龙骨ceiling joist / sub joint / suspender / double-nead / T-joint T形龙骨石膏板gypsum board石膏板吊顶gypsum board suspension ceiling造型吊顶featured suspension ceiling装饰板ornamental board装饰柱ornamental column镶边margin挑檐overhanging eaves打眼holing吊杆吊筋suspender / hanger (斜inclined 硬stiff 软flexible)照明灯具lighting fixture吸顶式ceiling mount / ceiling-hung / ceiling hanging工矿灯workshop light日光灯fluorescent lamp泛光灯flood light (外墙、广告牌)卤素灯halogen light白炙灯incandescent light低压卤钨灯 low-voltage tungsten halogen lamp霓虹灯neon tube乳白灯泡opal lamp天花嵌入式射灯recessed spot light in ceiling高压汞灯high pressure mercury lamp射灯spot light筒灯down light可调剂方向射灯directional spotlight灯带light trough隐形灯槽concealed light trough吊灯pendent lamp / light水晶吊灯crystal pendent light挂壁灯torch照度luminance (流明) LUX开关switch声控开关sound control switch / acoustic control switch 双向开关 2 way switch插座socket / outlet接线板Patch panel可调剂亮度开关dimmer / dimmer switch电插座power socket / power outlet网络插座IT/telephone socket线槽/管duct / conduit地插座floor embedded socket防触电式电源插座ground fault interrupt outlet双电源插座 dual voltage outlet复式插座duplex outlet (2 pin / 3 pin combination)转换插头adaptor暗线concealed wiring电视插座TV antenna outlet / cable TV outlet保险丝箱fuse box电闸power brake窗帘盒pelmet窗帘杆curtain rail窗台window sill / elbow board百页窗roller shutter窗扉window casement / sash平开窗side-hung window / door窗调窗套window opening / window casing单窗single sashed window / casement双窗double sashed window / casement防门窗weather tight window防眩眩玻璃 glare control glass防潮水泥垫层moisture-proof / damp-proof cement bedding 猫眼peep hole移门sliding door / panel旋转门revolving door隔音门sound-proof door防暴门blast-resistant door防风窗weather tight window天窗skylight /skylight belt老虎窗dormer window滑轨(上) slide rail滑轨(下) slide track滑轨条guide bead支架support hanger平头flush butt screw平头钉flat head nail / screw平面框架plane frame木门timber door / wooden door木贴面门timber veneer隔汽层vapor barrier五金hardware / ironmongery配件accessories闭门器door closer门吸door stop铰链、合页 hinge把手/锁handle / bar / lock榫头rabbet榫头/榫眼plug tenon (tail) / eye (socket) 燕尾榫dovetail人字榫herring bond joint内嵌式recessed / flush mount外紧固式surface mount插销latch助推助拉铰链inject / eject hinge移门sliding door移门轨道(上,下)rail, track窗户滑轨guide bead地弹簧floor spring窗钩window catch暗锁mortise lock / bolt插槽slot踢脚线skirting / skirt凹阳台recessed balcony凸阳台cantilever balcony厕所toilet马桶隔间booth卫生洁具sanitary ware手纸器roll-tissue dispenser擦手纸盒paper towel dispenser洗手盆及龙头washing basin and faucet / washing bow拖把洗槽mop washing sink冲淋房shower room马桶toilet 、water closet (WC)小便斗urinal蹲便器squat unit手动manual自动sensor controlled / automatic浴缸bath tub拉手杠grab bar肥皂盒soap dish液体肥皂器 liquid soap dispenser毛巾架towel rack毛巾杆towel rail系杆tie bar钢性吊杆rigid hanger / stiff hanger可伸缩凉衣绳retractable washing line浴缸龙头mixer冲淋房shower chamber冲淋头shower head冲淋器shower tower洗手盆washing basin水垢deposit of scale / scale (硬皮的) / gunk(粘软的) 垃圾桶waste bin镜子mirror存水trap壁挂历式取暖器wall radiator木材timber木饰面板wood veneer木纹理grain木节knot三聚氰胺贴面刨花板MFC (melamine faced chipboard) 不锈钢stainless steel (sss)纤维板particle board钢化玻璃tempered glass / annealed glass喷砂玻璃frosted glass / sand blasted glass透亮玻璃clear glass有色玻璃tinted glass有机玻璃plexiglass水磨石terrazzo大理石marble人造大理石 imitation marble花岗岩granite表面纹理texture粗面砖texture tile / rough surface大石砾gravel大石块boulder光泽gloss / glossiness水磨石terrazzo框饰finish casing复合板laminated wood board安全玻璃laminated glass丙烯酸底涂 acrylic primer喷漆spray painting乳胶涂料latex paint / emulsion paint( 室外墙面厚)滚涂刷roller brush环氧涂料epoxy coating (地面)自流坪self-leveling epoxy coating底漆primer / undercoating瓷釉漆enamel paint丙烯涂料acrylic paint榫头rabbet沟缝caulking腻子putty勾缝Pointing / pointing joint勾缝料Pointing stuff勾缝刀Pointing trowel油灰缝Putting joint浇筑缝Joint between cast poring抹灰plastering (墙面砂浆抹灰)抹灰面plaster finishing复合地板laminated timber floor搁栅(龙骨)joist夹板plywood消音板acoustic panels凸窗bay window窗台板elbow board of window / window sill 窗帘blinds / curtain / drapery / shade电动窗帘motorized drapery空心抹灰hollow plastering (不行)刮平抹平striking填缝seal crakes / joints大理石贴面 marble facing灰饼lime mark企口拼接match joint企口地板matched floor盆景miniature garden微裂缝micro-fissuring假窗mock window护角条corner bead开槽砖notched tile悬挑板overhanging slab架空线overhead line pipe凹缝recessed joint切口,凹口 notch层理lamination装玻璃工作 glazing花边lace work踢脚板kick panel / kicking panel / skirting 螺旋弹簧helical spring拼花地板overlay flooring / matched floor铺设管道laying pipes找平/刮平leveling找平层leveling course原型prototype锁紧力,咬合力locking force修边nip / nipping阴文incised engraving焊脚leg of weld照明带light band / trough薄板light gauge sheet石灰浆lime paste / slurry灰土垫层lime-soil cushion里衬liner外墙面facade玻璃幕墙curtain wall铝型材aluminum extrusion氟碳烤柒fluorine carbon paint (FCP)硅胶silicon glue / silica橡皮垫圈、压条rubber gasket上下推开关窗sash window中空玻璃double-glazing安全玻璃(夹胶玻璃)laminated glass纱窗mosquito screen外挂包裹clad干挂dry fixing湿挂wet fixing龙骨架joist frame定位卡positioning pin分割线/分隔沟division joint重叠overlap墙面抹灰压角条plaster stop拼缝条splicing plate错位拼接staggered joint / alternate joint嵌入(固定)built-in埋入的(小件)embedded (socket box) ( anchor holts) 内凹recessed (light)浅槽groove切口槽notch (v形)边缘切口reveal (along edge) 企口突缘flange / raised edge槽条channel木线条molded strip一样的/ architrave 带造型嵌缝的小条子calking strip耐磨涂料high resistance paint防霉涂料mildew resistant paint防潮涂料damp-proof coating防腐涂料corrosion-proof coating防水涂层waterproof coating节能材料energy-saving products / materials防腐材料preserving material环保材料environment friendly products (green products) 拉毛抹灰stucco油毡malthoid混水油漆opaque timber finish (painting)清漆varnish / lacquer paint防潮漆damp-proof paint防锈漆anti-rust paint瓦棱板(波浪板)corrugated glass / panel半亚光涂料semi-gloss latex paint亚光low gloss喷砂玻璃opaque / sand-blasted / frozen glass砂纸sand-paper金属板吊顶metal panel ceiling合金alloy铝合金aluminum alloy刨花板chip board / particle board刨花shavings夹板plywood / plywood panel铝塑板Alucbond (alum and plastic laminated board)人造大理石 artificial marble木贴面夹板plywood with wood veneer木材纹理grain樱桃木cherry wood橡木oak wood松木pine wood榉木beech wood黑胡桃木dark wood树脂resin聚胺脂polyurethane (PU)表面质感surface texture耐用性durability门禁系统door access control system刷卡器sensor pad卡card key密码combination红外线感应探头infra-red motion sensor / detector 监视系统surveillance system风格style仿古pseudo-classic现代modern / contemporary后现代post-modern仿旧reconstruction保守conservative传统traditional经典classical新潮fashionable / trendy流行popular前卫cutting-edge落后潮流out-of-fashioned中国元素China elements / flavors浮雕relief sculpture新古典主义 neo-classical豪华luxury简洁simple and elegant粗圹rustic步行街pedestrian mall装饰品ornament14. 施工工具tools / 施工设备construction machinery打桩机pile driver打夯机rammer挖土机excavator推土机bulldozer (履带式crawler)压路机roller钻孔机boring machines砼搅拌车concrete agitating truck铲车dumper翻斗卡车dumper track小翻斗车skip car斗bucket / hoe料斗bucket漏斗funnel / silo装料斗hopper塔吊crane履带式起重机caterpillar crane起重半径crane radius吊车/起重机hoisting machine重型heavy duty锤夯hammer tamping起重设备hoisting equipment起重葫芦hoister手拉葫芦chain block卷扬机cable hoist / cable crane / winching hoist / winch龙门吊gantry crane龙门架portal frame行车overhead traveling crane脚手架scaffolding / scaffold混凝土搅拌车/机concrete mixer / concrete truck 卡车truck小卡车pick-up / lorry混凝土振捣机concrete vibrator压缩空气机air compressor氧气瓶oxygen cylinder电焊机welding machine亚弧焊机arc welding machine火焰切割flame cutting千斤顶jack电焊条welding rod钨丝条tungsten超载overload筛子sieve锤子hammer钻枪、冲击钻/电钻impact drill / power drill刨子planer板手wrench锯子saw电锯power saw凿子chisel锉子file风钻pneumatic drill镐pick螺栓、螺帽bolts and nuts螺丝screw自攻螺丝self-tapping screw螺丝刀screw driver钉子nail铆钉rivet平头铆钉flush head rivet铆钉枪rivet pistol钢筋弯折机angle-bender / bar bender老虎钳pincer / clamp刷子brush夹子clamp烙焊lap welding榫接mortise joint木工carpenter电焊工welder电工electrician刮刀chaser超声波探伤 ultrasonic detection15. 室外工程yard work / external work道路road伸缩缝expansion joint围墙fence / boundary fence临时板围墙 hoarding (施工用)格栅围墙grill fence树篱笆hedge一砖墙one brick wall阁楼pavilion小溪creek / brook池塘pound门卫guardhouse红外线探头infra-red motion sensor避雷针lightning rod道路照明灯road light灯杆light pole停车场parking / parking lot停车位berth临时戒备围栏hurdle架空管道hanged pipe螺旋线helical line防滑条non-slip strip 人/ nonskid strips 车踏步前缘nosing凸缘条nosing strip卸货平台loading/unloading dock升降机dock leveler坡道ramp滑升门overhead door转弯半径turning radius大斗sharp减小弯度reduce sharpness柏油碎石路tarmac road柏油路tar road碎石拼的路面crazy paving毛石墙rubble wall毛石护坡rubble mound化学品仓库chemical storage高压电房power station / transformer room 烟囱stake / chimney自动移门automatic sliding door手动移门manual sliding door伸缩门articulated sliding door自动起落杆automatic lift bar带遥控with remote control雨水管、落管downspout / down pipe旗杆flag pole侧石kerb / kerb stone人行道sidewalk溢水沟spillway路边窨井kerb inlet阴沟under drain / under ground sewer 阴沟洞sinkhole混凝土路面 concrete pavement路面标志traffic control lines / marks道路分隔线 lane division lines斑马线zebra crossing检修孔man-hole绿化landscaping草地grass lawn草皮turf种花种草planting种植土topsoil施肥fertilizing跟土sowing除杂草weeding播种seeding发芽germination护根mulch护树杆stake and tie修剪trim常青树evergreen shrubs trees灌木shrubs灌木丛shrubbery香樟树camphor tree梧桐树phoenix tree枫树maple tree松树pine tree柳树willow杨树poplar tree棕吕Palm tree柏树cypress白杨树white poplar tree黄杨树box tree银杏树gingko tree冷杉fir竹子bamboo喷泉water fountain绿化带green belt花坛border树篱笆hedge小路path灌溉系统irrigation system草地灯lawn lamp年轮annual rings16. 生产工艺设备production equipment定型机stenterO型染色机beamJ型染色机j et汽蒸机steamer印花水洗机washing machine蒸化定型机fixing machine。
工程管理专业英语期末题库二
《工程管理专业英语》考点提炼二一、词汇汉译英1.skyscraper:摩天大楼2.credentials:凭证、资信证明3.subcontract:分包合同4.progress payment:进度款5.innovation:革新6.creep:徐变、塑性变形7.shrinkage:收缩8.load action and propagation mechanism:荷载作用和传递机理9.the law of equilibrium:平衡原理10.horizontal seismic action:水平地震作用二、词汇英译汉1.抗震性能:seismic behavior2.抗压强度:compressive strength3.活载:live load4.专业建筑师:specialty architects5.剪切变形:shear deflection6.传递,传导,传播:propagation7.隔墙:partitioning wall8.规范,说明书:specification9.流动资金:working capital10.合同管理:contract management三、句子英译汉1、Concrete and steel reinforcement form such a strong bond-the force that unites them-that no relative movements of the steel bars and the surrounding concrete occur.混凝土和钢筋之间形成一种强大的粘合力,这个力能够将它们联合在一起而使周围混凝土和钢筋不出现相对移动。
2、Compared with concrete, the enormous advantage of steel reinforcement is its tensile strength; that is, it does not lose its strength when it is under a calculated degree of tension, a force which, as we have seen, tends to pull apart many materials.与混凝土相比,钢筋的最大优点是抗拉强度;也就是说,它在一定的拉力作用下,强度不损失,正如我们看到的,这个力能够拉开许多材料。
(完整版)工程英语词汇
(完整版)工程英语词汇一、基础工程词汇1. 工程:Engineering2. 项目:Project3. 设计:Design4. 施工:Construction5. 监理:Supervision6. 材料:Material7. 结构:Structure8. 质量:Quality9. 安全:Safety10. 进度:Schedule二、土木工程词汇1. 土壤:Soil2. 基础:Foundation3. 桥梁:Bridge4. 隧道:Tunnel5. 路面:Pavement6. 水利:Hydraulic Engineering7. 港口:Harbor8. 道路:Road9. 铁路:Railway10. 地铁:Subway三、建筑工程词汇1. 建筑物:Building2. 楼层:Floor3. 墙体:Wall4. 屋顶:Roof5. 窗户:Window6. 门:Door7. 楼梯:Stairs8. 幕墙: Curtain Wall9. 装修:Decoration10. 室内设计:Interior Design四、电气工程词汇1. 电路:Circuit2. 电线:Wire3. 开关:Switch4. 插座:Outlet5. 发电机:Generator6. 变压器:Transformer7. 电动机:Motor8. 电池:Battery9. 照明:Illumination10. 控制系统:Control System五、机械工程词汇1. 机械:Machine2. 零件:Part3. 轴承:Bearing4. 齿轮:Gear5. 润滑:Lubrication6. 紧固件:Fastener7. 焊接:Welding8. 冲压:Stamping9. 加工:Machining10. 装配:Assembly六、环境工程词汇1. 环境:Environment2. 污染:Pollution3. 废水:Wastewater4. 废气:Waste Gas5. 噪音:Noise6. 固体废物:Solid Waste7. 污染治理:Pollution Control8. 节能:Energy Saving9. 环保:Environmental Protection10. 可持续发展:Sustainable Development七、信息技术工程词汇1. 信息技术:Information Technology (IT)2. 网络:Network3. 服务器:Server4. 数据库:Database5. 编程:Programming6. 软件开发:Software Development7. 硬件:Hardware8. 云计算:Cloud Computing9. 大数据:Big Data八、化学工程词汇1. 化学反应:Chemical Reaction2. 流体力学:Fluid Mechanics3. 热力学:Thermodynamics4. 分离过程:Separation Process5. 反应器:Reactor6. 材料 science:Material Science7. 质量传递:Mass Transfer8. 能量传递:Energy Transfer9. 过程控制:Process Control10. 安全工程:Safety Engineering九、航空航天工程词汇1. 航空:Aeronautics2. 航天:Astronautics3. 飞行器:Aircraft4. 发射:Launch5. 航天器:Spacecraft6. 导航:Navigation7. 飞行控制系统:Flight Control System8. 火箭:Rocket9. 卫星:Satellite10. 航天站:Space Station十、生物医学工程词汇1. 生物医学:Biomedical2. 生物材料:Biomaterial3. 医疗设备:Medical Device4. 生物力学:Biomechanics5. 细胞工程:Cell Engineering6. 基因工程:Genetic Engineering7. 仿生学:Bionics8. 生物传感器:Biosensor9. 医学影像:Medical Imaging10. 组织工程:Tissue Engineering十一、项目管理词汇1. 项目管理:Project Management2. 项目经理:Project Manager3. 项目规划:Project Planning4. 项目预算:Project Budget5. 项目进度:Project Schedule6. 风险管理:Risk Management7. 质量管理:Quality Management8. 成本控制:Cost Control9. 团队协作:Team Collaboration10. 项目交付:Project Delivery十二、建筑信息模型(BIM)词汇1. 建筑信息模型:Building Information Modeling (BIM)2. 三维模型:3D Model3. 四维建模:4D Modeling(时间维度)4. 五维建模:5D Modeling(成本维度)5. BIM软件:BIM Software6. 模型协调:Model Coordination7. 数字化施工:Digital Construction8. BIM协作:BIM Collaboration9. 可视化:Visualization10. 仿真分析:Simulation Analysis十三、绿色建筑与可持续性词汇1. 绿色建筑:Green Building2. 可持续性:Sustainability3. 节能:Energy Efficiency4. 碳排放:Carbon Emission5. 绿色认证:Green Certification6. 生态设计:Esign7. 资源循环:Resource Recycling8. 生物多样性:Biodiversity9. 低影响开发:Low Impact Development (LID)10. 环境生命周期评估:Environmental Life Cycle Assessment十四、电子工程与自动化词汇1. 电子工程:Electronics Engineering2. 电路板:Circuit Board3. 集成电路:Integrated Circuit (IC)4. 传感器:Sensor5. 自动化:Automation6. 控制系统:Control System7. 技术:Robotics8. 伺服电机:Servo Motor9. 可编程逻辑控制器:Programmable Logic Controller (PLC)10. 工业互联网:Industrial Internet of Things (IIoT)十五、地质工程与矿业词汇1. 地质工程:Geological Engineering2. 地层:Stratum3. 岩土工程:Geotechnical Engineering4. 钻探:Drilling5. 矿业:Mining6. 采掘:Excavation7. 岩石力学:Rock Mechanics8. 地下水:Groundwater9. 防滑坡:Landslide Prevention10. 矿物加工:Mineral Processing。
工程管理专业英语词汇
1、Construction industry 建筑业2、High-rise apartments 高层公寓3、Institution and commercial building construction 办公和商业用房建设4、Oligopoly 垄断,供过于求5、Specialized industrial construction 专业化工业项目建设6、Infrastructure and heavy construction 重大基础项目建设7、Residential housing construction 住宅类房屋建设8、Take charge 负责9、Single-family house 独户住宅10、Professional consultant 专业征询人士11、General contractor 总承包商12、Mission-oriented 以目的(任务)为导向的13、Continuity 连续性14、Indispensable 不可或缺的15、Common-place 常见的16、Schedule 进度17、Maximization 最大化18、Communication 沟通19、Certification 认证20、Distinguish 区别,区分21、Predetermined 预定的22、Ingredient 组成部分,成分23、Linear programming 线性规划24、Trade off 均衡,权衡25、Delineation 叙述,说明26、Utilization 使用27、Integration 综合,整合28、Shop drawings 施工图,安装图29、Simultaneously 同时的30、Prebid site 投标前现场31、Nominated subcontractor 指定分包商32、Prequalified 预审合格33、An manual of professional practice 专业人员从业手册34、Risk-reward 风险和回报35、Structural design 结构设计36、Specialized subcontractor 专业分包商37、Work package 工作包38、Construction planning 施工计划39、Technical feasibility 技术可行性40、Construction operations 施工作业41、Structural or foundation details 结构或基础的具体情况42、Ingenuity and creativity 灵活性和发明性43、Construction constractors 施工承包商44、Monitoring and control 监督和控制45、Facility design 设施设计46、Estimate stage 估算阶段47、Evaluation stage 评估阶段48、equity partners 股权伙伴49. 、specifications and drawings 技术规范和图纸50.、Placing concrete on site 现场浇混凝土1、Job-site productivity 工地生产率2、Contractual agreements 协议3、Safety consciousness 安全意识4、Labor productivity 劳动生产率5、Foreign operations 国外施工6、Labor efficiency 劳动效率7、Infrastructure 基础设施8、Linear interpolation 线性内插9、Labor jurisdictions 劳动仲裁10、Non-productive activities 非生产性活动11、On-site 现场12、Labor characteristics 劳动力的特性13、Security sensitivity 安全敏感性14、Recognized strength 公认的实力15、Processing plant 加工厂16、Logistic problems 后勤问题17、Drilling platform 钻井平台18、Building construction 建筑施工19、Material procurement and delivery 材料采购和运送20、Bulk materials 大宗材料21、Overlapping and rehandling 搭接和再解决22、Semi-processed 半加工的,半成品的23、Concrete mix 混凝土拌和物24、Steel beams and columns 钢梁和柱25、. bills of quantity 工程量清单26、. minutes of the conference 会议纪要27、the lowest evaluated cost 经评审的最低造价28、reimbursable expenses 可补偿费用29、.Hierarchical structure 层级结构30、Critical path scheduling 关键线路进度控制程序31、.bonus and penalty clauses 奖励和处罚条款32、lump-sum agreement 总价协议33、.written authorization 书面授权34、unit-price agreement 单价协议35、Bids and quotations 投标和报价36、Off-the-shelf material 现货材料37、Earthwork to be excavated 土方开挖38 .general procurement notice 通用采购公告39、. conditions of contract 协议条件40、Construction supervision 施工监督41、Freight delivery 货品运送44、Slippage or contraction 延误或提前45、.Marginal efficiency of capital 边际资本收益46、.Equivalent uniform annunual net value 等额净年值47、changes clause 变更条款49、prequalification 资格预审49、limited international bidd ing 有限国际招标50、Unit Cost of Estimetion 单位估价1、Cost estimation 成本估算2、Cost engineering 工程估价3、Profitability 赢利4、Production function 生产函数5、Statistical inference 记录推断6、Construction equipment 施工机具7、General office overhead 总部管理费8、The cost engineer or estimator 估算师9、Cost control 成本控制10、Empirical cost inference 经验成本推论法11、Allocation of joint costs 综合成本的分摊12、Bill of quantities 工程量清单2、Cooling system 冷却系统3、Heat exchanger 热互换器4、Slabs and beams 楼板和梁5、Furnaces 锅炉6、Plus ancillary items 辅助设备7、Formwork 模板8、Detailed Estimates 具体估算9、Preliminary Estimates 具体估算10、Subcontractor Quotations 分包报价11、Construction Procedures 施工方法12、Factored Estimate Formula 系数估算公式13、Reinforcing bars 钢筋14、Building foundation 建筑物基础1、Economic evaluation 经济评价2、Sensitivity 灵敏度3、Planning horizon 规划周期4、Project alternative 备择项目5、Opportunity cost 机会成本6、Financial investment 金融投资7、Minium attractive rate of return 最低收益率8、Social rate discount 社会折现率9、Investment consideration 投资分析10、Decision maker 决策者11、Cash flow profile 钞票流分布形态12、Net annual cash flow 年净钞票流13、Capital project 资本项目14、Socially desirable programs 社会公益项目15、The Office of Management and Budget 财政部门16、Government agency 政府部门17、linear programming线性规划18、network analysis 网络分析19、Under ordinary circumstances, 在通常情况下20、best price/performance characteristics最优性价比特性21、an acceptable quality levelallowable可接受的质量水平22、a allowable fraction of defective items.可接受的缺陷比例23、ill structured棘手的24、critical ingredients关键因素25、identified as被看作为26、the rate of return资本回收率 cash flow 净钞票流量28.financing options 融资方式29.project finance 项目融资30.negative cash balance 负钞票结余31.profit measure 利润指标值32.private corporations 私营股份制公司33.Public agencies 公告机构34 instructions to bidders 投标人须知35 . conditions of contract协议条件36.Equivalent uniform annunual net value 等额净年值37.Capital recovory factor 资金回收因子38.Benefit cost ratio 收益费用比39.Profitability index 赚钱指数40. prequalification 资格预审41. bidding documents 招标文献42. domestic contractor 国内承包商43.Marginal efficiency of capital 边际资本收益44.Adjusted internal rate of capital 调整后的内部收益率45.Return on investment 投资收益46. international competitive bidd ing 竞争性国际招标47limited international bidd ing 有限国际招标48.national competitive bidd ing 国内竞争性招标49 .general procurement notice 通用采购公告50 substantially responsive 实质性响应1. changes 工程变更2. contract awards 协议授予3.changes clause 变更条款4.publicly financed priject 公共项目融资5.extra work 附加工作6.the prime contractor 主承包商7. pre-construction sercices 施工前服务8.reimbursable expenses 可补偿费用9. overhead and profit 管理费和利润10.Construction planning 施工计划11. chioce of technology 施工技术的选择12.The definition of work tasks 工作任务的定义13.Normative problem 规范性问题14.Cost control 成本控制15.Schedule control 进度控制16.Critical path scheduling procedure关键线路进度控制程序17.Job shop scheduling procedure 工作现场进度控制程序18.Datebases and information systes m 数据库和信息系统19.The duration of the activity 工作活动的连续时间20.Placing concrete on site 现场浇筑混凝土21 Placing forms 支设模版22. Installing reinforcing steel 绑扎钢筋23. Pouring concrete 浇筑混凝土24.Finishing the concrete 混凝土养护25. Removing forms 模版拆除26.Position forms on the cleanning station 在清理场合码放模版27. Hierarchical structure 层级结构28.fixed fee 固定费用29.overhead and profit 管理费和利润30.job shop scheduling procedure 现场进度控制程序31.change order 变更单32.cost –plus-fee agreement成本加费用协议33.quantity takeoff 工程量清单34. prequalification 资格预审35、decomposed into 分解为36.From the viewpoint of从某个角度看37.responsible for 对某事负责38.superior to 优于。
(完整word版)工程管理专业英语词汇
1、Construction industry 建筑业2、High-rise apartments 高层公寓3、Institution and commercial building construction 办公和商业用房建设4、Oligopoly 垄断,供过于求5、Specialized industrial construction 专业化工业项目建设6、Infrastructure and heavy construction 重大基础项目建设7、Residential housing construction 住宅类房屋建设8、Take charge 负责9、Single-family house 独户住宅10、Professional consultant 专业咨询人士11、General contractor 总承包商12、Mission-oriented 以目标(任务)为导向的13、Continuity 连续性14、Indispensable 不可或缺的15、Common-place 常见的16、Schedule 进度17、Maximization 最大化18、Communication 沟通19、Certification 认证20、Distinguish 区别,区分21、Predetermined 预定的22、Ingredient 组成部分,成分23、Linear programming 线性规划24、Trade off 均衡,权衡25、Delineation 叙述,说明26、Utilization 使用27、Integration 综合,整合28、Shop drawings 施工图,安装图29、Simultaneously 同时的30、Prebid site 投标前现场31、Nominated subcontractor 指定分包商32、Prequalified 预审合格33、An manual of professional practice 专业人员从业手册34、Risk-reward 风险和回报35、Structural design 结构设计36、Specialized subcontractor 专业分包商37、Work package 工作包38、Construction planning 施工计划39、Technical feasibility 技术可行性40、Construction operations 施工作业41、Structural or foundation details 结构或基础的具体情况42、Ingenuity and creativity 灵活性和创造性43、Construction constractors 施工承包商44、Monitoring and control 监督和控制45、Facility design 设施设计46、Estimate stage 估算阶段47、Evaluation stage 评估阶段48、equity partners 股权伙伴49. 、specifications and drawings 技术规范和图纸50.、Placing concrete on site 现场浇混凝土1、Job-site productivity 工地生产率2、Contractual agreements 合同3、Safety consciousness 安全意识4、Labor productivity 劳动生产率5、Foreign operations 国外施工6、Labor efficiency 劳动效率7、Infrastructure 基础设施8、Linear interpolation 线性内插9、Labor jurisdictions 劳动仲裁10、Non-productive activities 非生产性活动11、On-site 现场12、Labor characteristics 劳动力的特征13、Security sensitivity 安全敏感性14、Recognized strength 公认的实力15、Processing plant 加工厂16、Logistic problems 后勤问题17、Drilling platform 钻井平台18、Building construction 建筑施工19、Material procurement and delivery 材料采购和运输20、Bulk materials 大宗材料21、Overlapping and rehandling 搭接和再处理22、Semi-processed 半加工的,半成品的23、Concrete mix 混凝土拌和物24、Steel beams and columns 钢梁和柱25、. bills of quantity 工程量清单26、. minutes of the conference 会议纪要27、the lowest evaluated cost 经评审的最低造价28、reimbursable expenses 可补偿费用29、.Hierarchical structure 层级结构30、Critical path scheduling 关键线路进度控制程序31、.bonus and penalty clauses 奖励和惩罚条款32、lump-sum agreement 总价合同33、.written authorization 书面授权34、unit-price agreement 单价合同35、Bids and quotations 投标和报价36、Off-the-shelf material 现货材料37、Earthwork to be excavated 土方开挖38 .general procurement notice 通用采购公告39、. conditions of contract 合同条件40、Construction supervision 施工监督41、Freight delivery 货物运输44、Slippage or contraction 延误或提前45、.Marginal efficiency of capital 边际资本收益46、.Equivalent uniform annunual net value 等额净年值47、changes clause 变更条款49、prequalification 资格预审49、limited international bidd ing 有限国际招标50、Unit Cost of Estimetion 单位估价1、Cost estimation 成本估算2、Cost engineering 工程估价3、Profitability 赢利4、Production function 生产函数5、Statistical inference 统计推断6、Construction equipment 施工机具7、General office overhead 总部管理费8、The cost engineer or estimator 估算师9、Cost control 成本控制10、Empirical cost inference 经验成本推论法11、Allocation of joint costs 综合成本的分摊12、Bill of quantities 工程量清单2、Cooling system 冷却系统3、Heat exchanger 热交换器4、Slabs and beams 楼板和梁5、Furnaces 锅炉6、Plus ancillary items 辅助设备7、Formwork 模板8、Detailed Estimates 详细估算9、Preliminary Estimates 详细估算10、Subcontractor Quotations 分包报价11、Construction Procedures 施工方法12、Factored Estimate Formula 系数估算公式13、Reinforcing bars 钢筋14、Building foundation 建筑物基础1、Economic evaluation 经济评价2、Sensitivity 灵敏度3、Planning horizon 规划周期4、Project alternative 备择项目5、Opportunity cost 机会成本6、Financial investment 金融投资7、Minium attractive rate of return 最低收益率8、Social rate discount 社会折现率9、Investment consideration 投资分析10、Decision maker 决策者11、Cash flow profile 现金流分布形态12、Net annual cash flow 年净现金流13、Capital project 资本项目14、Socially desirable programs 社会公益项目15、The Office of Management and Budget 财政部门16、Government agency 政府部门17、linear programming线性规划18、network analysis 网络分析19、Under ordinary circumstances, 在通常情况下20、best price/performance characteristics最优性价比特征21、an acceptable quality levelallowable可接受的质量水平22、a allowable fraction of defective items.可接受的缺陷比例23、ill structured棘手的24、critical ingredients关键因素25、identified as被看作为26、the rate of return资本回收率 cash flow 净现金流量28.financing options 融资方式29.project finance 项目融资30.negative cash balance 负现金结余31.profit measure 利润指标值32.private corporations 私营股份制公司33.Public agencies 公告机构34 instructions to bidders 投标人须知35 . conditions of contract合同条件36.Equivalent uniform annunual net value 等额净年值37.Capital recovory factor 资金回收因子38.Benefit cost ratio 收益费用比39.Profitability index 盈利指数40. prequalification 资格预审41. bidding documents 招标文件42. domestic contractor 国内承包商43.Marginal efficiency of capital 边际资本收益44.Adjusted internal rate of capital 调整后的内部收益率45.Return on investment 投资收益46. international competitive bidd ing 竞争性国际招标47limited international bidd ing 有限国际招标48.national competitive bidd ing 国内竞争性招标49 .general procurement notice 通用采购公告50 substantially responsive 实质性响应1. changes 工程变更2. contract awards 合同授予3.changes clause 变更条款4.publicly financed priject 公共项目融资5.extra work 附加工作6.the prime contractor 主承包商7. pre-construction sercices 施工前服务8.reimbursable expenses 可补偿费用9. overhead and profit 管理费和利润10.Construction planning 施工计划11. chioce of technology 施工技术的选择12.The definition of work tasks 工作任务的定义13.Normative problem 规范性问题14.Cost control 成本控制15.Schedule control 进度控制16.Critical path scheduling procedure关键线路进度控制程序17.Job shop scheduling procedure 工作现场进度控制程序18.Datebases and information systes m 数据库和信息系统19.The duration of the activity 工作活动的持续时间20.Placing concrete on site 现场浇筑混凝土21 Placing forms 支设模版22. Installing reinforcing steel 绑扎钢筋23. Pouring concrete 浇筑混凝土24.Finishing the concrete 混凝土养护25. Removing forms 模版拆除26.Position forms on the cleanning station 在清理场所码放模版27. Hierarchical structure 层级结构28.fixed fee 固定费用29.overhead and profit 管理费和利润30.job shop scheduling procedure 现场进度控制程序31.change order 变更单32.cost –plus-fee agreement成本加费用合同33.quantity takeoff 工程量清单34. prequalification 资格预审35、decomposed into 分解为36.From the viewpoint of从某个角度看37.responsible for 对某事负责38.superior to 优于。
(完整版)工程管理专业英语词汇短语
Part1market demand 市场需求facility 设施the speculative housing market 投机性住宅市场the real estate developer 房地产开发商government agency 政府机构public project 公共项目project management 项目管理the conceptual planning stage 概念规划阶段feasibility 可行性in-house 内部的,内业的the project life cycle 项目生命周期from cradle to grave 从开始到结束knowledge domain 知识领域construction industry 建筑业spectrum 波普,光谱,范围residential housing construction 房屋住宅建设subcontractor 分包商institutional and commercial building construction 办公与商业用房建设specialized industrial construction 专业化工业项目建设infrastructure and heavy construction 重大基础项目建设architectural and engineering(A/E)firm 建筑与工程设计公司consortium 财团,株式会社preliminary design 初步设计general contractor 总承包商on site quality inspection 现场质量监督litigation 法律诉讼shop drawings 施工图constructability 可建造性,可施工性value engineering 价值工程construction contract 施工合同design/construct firm 设计、施工公司turnkey 交钥匙(承发包)模式facility maintenance 设施维护Part2project integration management 项目综合管project scope management 项目范围管理project time management 项目时间管理project cost management 项目成本管理project quality management 项目质量管理project human resource management 项目人力资源管理project communications management 项目沟通管理project risk management 项目风险管理project procurement management 项目采购管理contractual relationships 合同关系changes 工程变更claims 施工索赔mega-projects 巨型项目“functional”organization “职能式”组织“project”organization “项目式”组织suborganizations 次级组织strong matrix-type suborganization 强矩阵式次级组织interpersonal influence 人际间影响力formal authority 正式的授权reward and/or penalty power 奖励和/或惩罚的权利matrix organization 矩阵式组织hierarchical structure 层级结构Part3job-site productivity 工作现场生产率non-productive activities 非生产性工作temporary work stoppage 临时性工作暂停union activities 工作活动performance analysis 绩效分析base labor productivity 基准劳动生产率labor productivity index 劳动力生产指数non-local labor 非当地用工productive labor yield 劳动力产出requisitions 询价purchase orders 订购单subcontracts 分包合同shipping and receiving documents 装船与接收文件invoices 发票bulk materials 大众材料standard off-the-shelf materials 现货材料fabricated members or units 预制构件或单元semi-processed state 半成品状态pre-processed 预加工的pressure vessels 压力容器field assembly 现场装配skilled craftsmen 熟练技工crawler mounting 履带式底盘claim shell 抓铲挖土机`dragline 拉铲挖土机backhoe 反铲挖土机shovel 正铲挖土机bulldozer 推土机rotary-percussion drills 旋转冲击钻bituminous 沥青Part4economic evaluation 经济评价the planning horizon 规划期cash flow profile 现金流量图minimum attractive rate of return(MARR) 最低收益率sensitivity or uncertainty analysis 敏感性或不确定性分析annual benefit 年收益annual cost 年费用net annual cash flow 年净现金流量opportunity cost 机会成本social rate of discount 社会贴现率profit measure利润指标值private corporations 私营股份制公司public agencies 公共机构net future value(NFV) /净终值net present value(NPV) 净现值equivalent uniform annual net value (NUV)等额净年值capital recovery factor 资金回收因子benefit-cost ratio(BCR) 收益-费用比profitability index 盈利指数saving-to-investment ratio(SIR) 存款投资比率absolute numerical measure 绝对指数internal rate of return(IRR) 内部收益率marginal efficiency of capital 边际资本收益return on investment(ROI) 投资收益payback period(PBP) 投资回收期profit maximization利润最大化public sector 公共领域basic principle 基本原理nonnegative 非负的budget constraint 预算限制incremental analysis 追加分析internal rate of return method 内部收益率法Part5Word Bank-financed projects 世界银行融资贷款项目foreign bidders 海外投标人civil works 土木工程I nternational Competitive Bidding(ICB) 竞争性国际招标Limited International Bidding 有限国际招标National Competitive Bidding 国内竞争性招标International Shopping 国际订购Direct Contracting 直接签约General Procurement Notice 通用采购公告prequalification 资格预审bidding documents 招标文件domestic contractors 国内承包商instructions to bidders 投标人须知conditions of contract 合同条件specifications of drawings 技术规范与图纸bill of quantities 工程量清单payment terms 支付条件minutes of the conference 会议纪要pre-bid conferences 标前会议site visits 现场踏勘substantially responsive 实质性响应the lowest evaluated cost 经评审的最低造价Part6the sealed bids 密封的投标报价construction company 建筑公司marketing strategy 市场营销策略long-term goals 长期目标client relationships 客户关系short-term goal 短期目标direct costs estimate 直接费估算mark-up 涨价溢价company or head office overheads 公司或总部管理费unrealistic bids 不切实际的报价owner-contractor agreement 业主与承包商之间订立的合同standard form of agreement 标准合同形式American Institute of Architects(AIA) 美国建筑师协会bonus and penalty clauses 奖励与惩罚条款lump-sum agreement 总价合同changer order 变更单written authorization 书面授权unit-price agreement 单价合同quantity takeoff 工程量清单cost-plus-fee agreements 成本加酬金合同equity partners 股权伙伴rental rates 出租比例percentage fee 百分百酬金合同fixed fee 固定酬金合同changes 工程变更contract award 合同授予changes clause 变更条款publicly financed project 公共融资项目extra work 附加工作the prime contractor 主承包商Part7the International Federation of Consulting Engineering 国际咨询师联合会the FIDIC Conditions of Contract for Constructions FIDIC施工合同条件the General Conditions (FIDIC)通用条件the Particular Conditions (FIDIC)专业条件the Appendix to Tender (FIDIC)投标附录arbitration 仲裁,裁决Dispute Adjudication Board(DBA)争议仲裁委员会Conditions of Contract for Works of Civil Engineering Construction 土木工程施工合同条件Conditions of Contract for Electrical and Mechanical Work 机电安装工程合同条件Conditions of Contract for Design-Build and Turnkey设计-建造于交钥匙合同条件Client/Consultant Model Services Agreement 客户/咨询师服务协议Conditions of Subcontract for Works of Civil Engineering Construction 土木工程分包合同条件Guides to the Use of the Different FIDIC Conditions of Contract 各种FIDIC合同条件应用指南Amicable Settlement of Construction Disputes 施工争端友好解决方式Insurance of Large Civil Engineering Projects 大型土木工程保险The Conditions of Contract for Plant and Design-Build (FIDIC)安装与设计-建造合同The Conditions of Contract for EPC/Turnkey Projects (FIDIC)EPC/交钥匙项目合同条件The Short Form of Contract (FIDIC)简短格式合同The Form of Contract for Dredging and Reclamation Works (FIDIC)疏浚与防洪工程合同格式priced contract with activity schedule 总价合同priced contract with bill of quantities 单价合同target contract with activity schedule 目标总价合同target contract with bill of quantities 目标单价合同cost reimbursable contract 成本补偿合同performance bond 履约保函parent company guarantee 母公司担保advance payment 预付款retention (工程)留置权bonus for early completion 工期提前奖delays damages 误期损害surety 担保financial loan 商业贷款insurance policy 保险政策in breach of contract 合同违约bid bond 投标担保justification (正当的)理由labor and material bond 劳动力与原材料担保lien bond 留置权担保comprehensive general liability insurance 综合责任险professional liability insurance职业责任险workers’compensation insurance 工人补偿险builder’s risk fire insurance 施工方火灾险Part8construction planning 施工计划the choice of technology 施工技术的选择the definition of work tasks 工作任务的定义the estimation of the required resources and durations for individual tasks 所需资源和各项工作持续时间的估算reasoning backward 逆向推理normative problem 规范性问题cost control 成本控制schedule control 进度控制critical path scheduling procedures 关键线路进度控制程序job shop scheduling procedures 工作现场进度控制程序work breakdown 工作分解manufacturing terminology加工制造业术语resource allocations 资源分配fore-runner 先行者laborious and tedious process 复杂和枯燥的过程general models 通用模型databases and information systems 数据库和信息系统the storage and recall of the activities工作活动的存储于记忆manpower 人力,劳动力the duration of the activity 工作活动的持续时间placing concrete on site 现场浇筑混凝土placing forms 支设模板installing reinforcing steel 绑扎钢筋pouring concrete 浇筑混凝土finishing the concrete 混凝土养护removing forms 模板拆除position forms on the cleaning station 在清理场所码放的模板hierarchical structure 层级结构work breakdown structure 工作结构分解precedence relations 先导顺序关系structural integrity结构整体性design drawings 设计图纸milestone events 里程碑事件lag 时间间隔computer based simulation 基于计算机的模拟excavation equipment 开挖机械\Part9critical path method(CPM) 关键路线发predecessor/successor activities先导/后续工作resource constraint 资源约束artificial precedence constraint 人为先导关系约束activity-branch network 双代号网络图dummy activity 虚工作earliest time schedule 最早时间进度latest time schedule 最迟时间进度float 时差,机动时间maneuvering room 可调整的余地free float 自由时差independent float 独立时差total float 总时差inter-relationships 相互关系graphical presentations of project schedules 项目进度的图形表达network diagrams 网络图time-scaled network 时标网络bar or Gantt chart 横道或甘特图horizontal axis 横轴,横坐标vertical axis 纵轴,纵坐标S-curves S型曲线resource graphs 资源图uncertainty associated with the actual durations与实际持续时间相关的不确定性regulatory approval 行政许可adverse weather 不利的天气contingency allowance 应急准备probabilistic perspective概率的角度independent random variables 相互独立的随机变量random fluctuations 随机波动positive correlations正相关over-optimistic 过于乐观的Part10e-construction 工程返工personal injuries 人身伤害conformance 遵守,服从re-evaluation of design decisions设计决策的重要评估tunneling methods 隧道开掘方法actual site conditions 现场的实际状况roadway rehabilitation 公路路面返修quality assurance 质量保证n-site inspections 现场监督检查US Occupational Safety and Health Administration(OSHA)美国职业安全与健康署violation of existing standard 违反现行规范标准employee participation in quality control 质量控制的员工参与statistical methods 统计方法batches of materials 材料批implicit assumption 隐含的假设total quality control 全面质量控制zero defects goal 零缺陷目标quality circles 质量环“optimum”proportion “最佳”的比例non-destructive techniques 非破坏性技术x-ray inspection of welds 焊接的X光检测exhaustive or 100% testing 全数或100%检测lot 母体,总体sampling by attributes 特征抽样sampling by variables 变量抽样direct costs 直接成本indirect costs 间接成本construction accidents 工程事故insurance premiums 保险赔偿unsecured railings 未经保护的围栏on-board electronics面板电子元器件asbestosis 矽肺,石棉肺sewer line 排污管道four lane street 四车道道路Part11construction yard and warehouse management information 施工仓储管理信息concrete pumps 混凝土泵warehouse clerks 仓储管理员daily rental charge 日租金tedious manual task 繁琐的手工作业application programs 应用程序duplicate 复制verbal description 文字描述warehouse inventory database 仓储清单数据库relational data model 关系数据模型data dictionary 数据字典numerical code 数据编码redundancy 冗余aggregate 集料,骨料external models of the information 外部信息模型algebraic theory 代数理论projection 映射advantages of distributed processing 分散式处理的优点dynamic changes in information needs 信息需求的动态变化untidy information 凌乱的信息information flow 信息流preprocessor system 预处理系统independent systems 独立系统geometric information 图形信息。
工程管理专业英语词汇
工程管理专业英语词汇A Cash flow profile现金流量图Credit risk信用风险 As-built drawings竣工图Competitive biddingAnnual net value净年值公开招标 Arbitration仲裁A dashed line虚Contract price合同价格线 Clause条款Activity-on-branch network双代号网络Contract negotiation合同谈判图Contract dispute合同纠纷 Activity-on-node network单代号网络Cost overrun成本超支图 Cost committed承诺成本Cost to date到期成本 A vertical axis纵坐标Archival information档案资料 Cost exposure附加成本Critical path method关键线路法Construction yard施工现场 BBottom-up design自下而上的设计Bids and quotations投标和报价 DBill of quantities工程量清单 detailed engineering design详细的工程设计 Bid estimate 投标估价design methodology设计方法 Benefit cost ratio成本收益率Budgeted cost预算成本 detailed design详细设计drilling and blasting钻孔和爆破detailed estimates详细估算 CConceptual planning stage概念规划阶dispute resolution mechanism争端解决段机制Capital intensive资金密集的 design drawing设计图纸 Competitive bidding竞争性招/投标 dummy activities虚工作 Contract price合同价格claims索document control文档控制赔Constructors建造商 Echanges变更 clause条款 Economic feasibility经济可行性 Conceptual design概念设计 Estimate stage估算阶段 construction operations施工作业evaluation stage评估阶段 Construction contractor施工承包商 equipment utilization and mechanizationConstruction equipment施工设备设备利用率和机械化 Concrete mixers混凝土搅拌机 earthwork to be excavated土方开挖 Cost estimation成本估算Economic evaluation经济评价 Cost control成本控制 Expenditure支出Cost Engineering工程估价 Excavation开掘Construction supervision施工监督 Estimated total cost预计总成本Construction cost建造成本Control estimate控制估算 FConceptual estimate概念设计估算 Feasibility study可行性研究Construction procedures施工方法 Facility operation and maintenance设施Cost indices成本指数的运营与维护 formulation构思 Consumer price index 消费价格指数 Facilities management设施管理 line" chapter, and signature confirmation. Article 17th account manager by the people's bank credit system query print credit report to verify the credit histories and guaranty to the parties. No credit report or credit score, through field surveys or other means to implement the credit situation and external security situation, according to riskFunctional organization职能式组织 Matrix-type suborganization矩阵式次First line supervision基层监督级组织Field management现场管理 Monitoring and control监督与控制 Force-account charges自营工程费 Material procurement and delivery材料Free float自由时差采购和运输Fast track快速路径法 Mortgage抵押 Milestone里程碑 Final checkout最终的竣工验收 Municipal project市政项目 G Monte carlo simulation蒙特卡罗模拟 Gantt chart甘特图NH Horizontal axis水平坐标 Nominated subcontractor指定分包商Non-productive activities非生产性活动 I Net annual cash flow年净现金流 Integrate整合 Net benefit净收益 Negotiation谈Instruction and commercial building 判construction 办公和商业用房建设 Net present value净现值Infrastructure and heavy construction重Net future value净终值大基础项目建设 Numerous alternative plans众多的备选Installation contractors安装承包商方案Ill-defined定义不清的 Network diagrams网络计划图 Inflation通货膨胀Internal rate of return内部收益率 OIntangible asset无形资产 Overlap 搭接,交叠 on-site现场 Interest rate利率 Operation and maintenance managers运In-house overhead expenses内业管理费行与维护经理Independent float独立时差 On-site Installation现场安装 Inspection logs检查日志 Overseer监督者 Overdraft透支 Information transfer andflow信息的传Overlapping and rehandling搭接和再处递与流通 information flow信息理流PL Procurement Management采购管理 Linear programming线性规划 Public agency公共机构 logistics物流 labor productivity劳动Professional services专业服务生产率 Project organization项目式组织 labor jurisdictions劳动仲裁 Preliminary estimates初步估算 logistic problems 后勤问题 Payback period投资回收期 lifting and erecting提升和安装Payment支付leverage杠杆作用 Private corporation民营公司 legal documents法律文件 Predecessor relationship前后顺序关系 lump sum contract总价合同 Pre-qualification of contractors andsub-contractors with regard safety在安M 全方面对承包商和分包商的资格预审 Monthly payments月付款额 Procurement accounts采购账目kore, through field surveys or other means to implement the credit situation and external security situation, according to risreport to verify the credit histories and guaranty to the parties. No credit report or credit sc line" chapter, and signature confirmation. Article 17th account manager by the people's bank credit system query print credit2商Q The feasibility study report可行性研究Quotation报价报告The state of economy经济状况 R Turnkey project/contract交钥匙工程/合Residential housing construction住宅类同房屋建设 risk-reward风险和回报 Top-down design自上而下的设计 Return on investment投资回收率 Technical feasibility技术可行性 Revenues收入Tangible asset有形资产 Real estate properties房地产 Technology choice 技术选择 Total Risk sharing风险分担 float总时差Re-construction返工,重修 Total quality control全面质量管理 Re-evaluation重新评价 Tracing decision跟踪决策 Random sample随机抽样Relational data model关系数据模型 US Unit cost method of estimation单位估Speculative housing market投机性住宅价法市场 Unit price contract单价合同 Scope of the project项目的范围Unforeseen circumstances不可预见事Specialized industrial construction 专业件化工业项目建设 sensitivity灵敏度 VShop drawings施工图 Vendor供货商 Value engineering价Subcontractors 分包商值工程Specialty Contractor专业承包商 Video conferencing电视会议Specialized subcontractor专业分包商Structural design结构设计 WSecurity sensitivity安全敏感性 Work package工作包 Screening estimates匡算 Warranties and guarantees保证和担保 Subcontractorquotations分包商报价 Warehouse management仓库管理 Social rate of discount社会折现率Simulate模拟 sunk cost沉没成缩写本 REITs—real estate investment trusts房Semi-automated半自动化的地产信托(基金)Sub-network子网络图 Statistical PERT—program evaluation and review method统计方法 technology计划评审技术 Sampling by attributes特征抽样 PMBOK—project management body ofSampling by variables变量抽样 knowledge项目管理体系 Sampling plan抽样计划 PMI—the project management instituteStorage and retrieval存储和查询美国项目管理协会ISO—the international organization forT standardization国际标准化组织 The project life cycle项目生命周期OSHA—US occupational safety andThe Real estate developer房地产开发health administration美国职业安全和veys or other means to implement the credit situation and external security situation, according to riskcredit report to verify the credit histories and guaranty to the parties. No credit report or credit score, through field sur line" chapter, and signature confirmation. Article17th account manager by the people's bank credit system query print3 健康署GDP--gross domestic product国内生产总值GNP--Gross National Product国民生产总值MARR--minimum attractive rate ofreturn最低收益率CMC—construction management contractor建设项目管理承包商CAD—computer aided design计算机辅助设计CPA--Certified public accounting特许公共会计师AIA—American institute of architects美国建筑师协会AGC—the associated general contractors美国总承包商会任永富Thursday, December 09,2010kore, through field surveys or other means to implement the credit situation and external security situation, according to risreport to verify the credit histories and guaranty to the parties. No credit report or credit sc line" chapter, and signature confirmation. Article 17th account manager by the people's bank credit system query print credit4。
工程管理专业英语单词汇总
课文中的单词:Lesson 2Engineering projects management 工程管理construction industry 建筑业Specification/provision/ regulation 规范architect 建筑师owner/client/employer 业主general contractor 总承包商speciality contractor 专业承包商manufacturer 制造商material dealer 材料商equipment distributor 设备经销商at a specified time and cost 在规定的时间和成本site condition 现场条件basic and finished material 原材料和加工好的材料contractor 施工方working-plan 进度计划the peak period 顶峰阶段making the site ready 准备好了施工现场stage 阶段cleaning up 清场access road 入场道路warehouse 仓库concrete mixer 混凝土搅拌机construction method 施工方法building stage 施工阶段residential construction 住宅建设subcontractor 分包商Lesson 3industrial building 工业建筑civil building 民用建筑dwelling 居住single-story 单层multi-story ones 多层public building 公共建筑flat 公寓living room 起居室kitchen 厨房toilet 厕所office building 办公楼/写字楼childcare center 幼儿园station 车站exhibition hall 展览馆community center 社区中心grain shop 粮店single-family home 独门独户in highly industrialized 高度工业化wage earner 工薪族suburban 城镇public transportation 公共交通arrangement 布局town-planning 城镇规划reception room 接待室reinforced concrete 钢筋混凝土evenly distributed 均匀的分布evenly distributed load 均布荷载process plant 加工厂school room 书房drawing room 客厅two-bedroom flat 两居室Lesson 4Procurement and delivery 采购和运输bid 出价quotation 报价purchase order 采购单invoice 发票overlapping 搭接best price performance 最佳性价比rehandling 再处理bulk material 大宗散料off-the-shelf material 储存的材料fabricated member or unit 预制构件field storage and installation现场储备semi-processed state 半加工earthwork 土方工程wet concrete mix 湿混凝土拌合物gravel 砾石steel beam 钢梁column 柱子field erection/assembly 现场安装welded 焊接bolted connection 螺栓连接pre-processed/prefabricated 预制field labor 现场劳动力manufactured product 制成品specific craft 特殊工艺craftsmen 工匠electrician 电工pipefitter 管道工freight delivery 货物运输element 构件in stock 库存cumulative 累计inquiry issued to vendor 向供货商询价bid evaluation by designer 评标place purchase order 下订货单preliminary shop drawing 初步安装图slippage or contraction 延长或压缩fabricator 安装施工方cement 水泥brick 转头sand 沙子ready-concrete 预制混凝土Lesson 9bar chart 横道图/甘特图start and finish time 起始时间work progress 工作进度visual effectiveness 直观性critical path method 关键路径法network model 网络图optimal activity timing 最佳活动工序时间network node 网络图节点arrow notation/Activity on Arrow (AOA)双代号网络图following activity 后续工作circle notation/Activity on Node (AON)单代号网络图activity relationship 工序关系activity logic 工序dummy activity 虚工作resource allocation 资源配置feasibility analysis 可行性研究cost of money 资金成本/股息股利budget 预算financing 融资schematic design 初步设计construction drawing 施工图纸procurement 采购interest 利息interest rate 利率turn over 移交working drawing 施工详图duration 工期Lesson 13contractual amount for payment 合同规定的付款额estimator 估算师fabrication and installation 制作和安装nail 钉子screw 螺钉have the vision to see beyond 远见卓识process equipment 加工设备procuring equipment 设备的购买成本wiring 布线permit 许可证insurance 保险permanent document 永久性文件proposal 投标书direct cost 直接费direct construction cost 直接工程费measure cost 措施费indirect cost 间接费fees 规费home-office overhead tax on business 营业税income tax 所得税extra charge of education funds 教育费附加increment tax on land value 土地增值税field overhead 现场管理费Lesson 17contract 合同the Contract Agreement 合同协议书the Letter of Acceptance 中标函the Letter of Tender 投标书condition 合同条件the Specification 规范the Drawing 图纸the Schedule 计划表lump-sum contract 总价合同term 条款specified sum of 规定的总数目furnished 提供common practice 通常做法specified interval 规定间歇earn a profit 获利sustain a loss 承受损失unit-price contract 单价合同cubic 立方码linear 线性英尺concrete pavement 混凝土道路cost-plus-fee contract 成本加酬金合同reimburse 偿还on-site cost 现场费用head office 总部finance the project 酬资performance bond/Performance Security/the Performance Certificate履约保函surety 保证人engaging 雇人specialize 专注于highway 高速公路heavy 重型建筑pipeline 管道municipal 市政工程steel erection 钢铁建造idle equipment 停滞的设备cost-plus-incentive-fee-contract 成本加激励酬金合同cost-plus-a-fixed-fee-contract 成本加固定酬金合同cost-plus-percentage-fee contract 成本加固定百分比酬金合同Lesson 18execute 施工in accordance with 按照instruction 指令consumable 消耗品adequacy 完备性stability 可靠性Site operation 现场作业extent 范围Temporary Work 临时工程submit 提交Particular Condition 专用条件General Condition 一般条件Party’s design 手写信息the Tests on Completion 竣工验收as-built document 竣工文件dismantle 拆卸operation and maintenance manual 操作维修手册reassemble 重新组装taking-over 移交at his cost 自费currency 币种the Appendix to Tender 投标附录Sub-Clause 分条款expiry date 期满日期Lesson 21open/public bidding 公开招标selected bidding/ bid invitation / invitation to bidders 邀请招标bidder 投标者variation 变化regulate 规定deviation 偏离time-consuming 费时的negotiation 议标notice to bidders 投标者需知potential bidder 潜在投标人public work 公共工程the governing authority 政府机构solicits bids 请求投标prescribe【v】规定receipt of bid 接受标书bid forms 招标程序bid analysis 投标分析prebid meeting 标前会议unforeseen circumstance 不可预见的情况signing of the contract 合同签订successful bidder 中标人release of the bid 放弃投标insurer 承保人certifier check 保付支票the construction period 施工期guarantee-warranty periods 保修期deficiency 缺陷default 违约delay of progress 工期延误claim 索赔retention money 留存款prebid conference 标前会议the unpaid balance of the contract 合同未结算价款representative 代表Lesson 22bid opening 开标award of contract 合同授予bidding document 招标文件civil works 土木工程combination of bids 组合标turnkey contract 交钥匙合同commercial bid 商务标technical bid 技术标priced proposal 有价格的标书the date of invitation to bid 招标日期the date for latest delivery of bids 投标截止日期returned unopened 原封不动返还validity of bids 标书有效期the required sureties 被同意的保险人纸条扩充instructions to bidders 投标者需知the proposals 标书bond 担保agreement is the strongest of them all 协议是具有最高效力的prescribed 规定legal residence 法律注册地址provision 规定signature 签名load 荷载concentrated load 集中荷载force 力the loaded member 被加载的构件distributed load 分布荷载uniform 均布nonuniform 非均布weight 自重uniformly distributed load 均布荷载civil engineering 土木工程tunnel 隧道dam 大坝harbor 港口power plat 发电站water and sewage system 给排水系统mass transit 公共交通public facilities 必要基础设施population concentration 聚集地skyscraper 摩天大厦strength 抗压强度building material 建筑材料strength test to destruction 破坏强度试验ductile material 延性材料applying a tensile load 施加一个拉力compression test 抗压试验brittle material 脆性材料tensile strength 抗拉强度prequalification of contractor 资格预审。
(完整版)工程管理专业英语词汇短语
Part1market demand 市场需求facility 设施the speculative housing market 投机性住宅市场the real estate developer 房地产开发商government agency 政府机构public project 公共项目project management 项目管理the conceptual planning stage 概念规划阶段feasibility 可行性in-house 内部的,内业的the project life cycle 项目生命周期from cradle to grave 从开始到结束knowledge domain 知识领域construction industry 建筑业spectrum 波普,光谱,范围residential housing construction 房屋住宅建设subcontractor 分包商institutional and commercial building construction 办公与商业用房建设specialized industrial construction 专业化工业项目建设infrastructure and heavy construction 重大基础项目建设architectural and engineering(A/E)firm 建筑与工程设计公司consortium 财团,株式会社preliminary design 初步设计general contractor 总承包商on site quality inspection 现场质量监督litigation 法律诉讼shop drawings 施工图constructability 可建造性,可施工性value engineering 价值工程construction contract 施工合同design/construct firm 设计、施工公司turnkey 交钥匙(承发包)模式facility maintenance 设施维护Part2project integration management 项目综合管project scope management 项目范围管理project time management 项目时间管理project cost management 项目成本管理project quality management 项目质量管理project human resource management 项目人力资源管理project communications management 项目沟通管理project risk management 项目风险管理project procurement management 项目采购管理contractual relationships 合同关系changes 工程变更claims 施工索赔mega-projects 巨型项目“functional”organization “职能式”组织“project”organization “项目式”组织suborganizations 次级组织strong matrix-type suborganization 强矩阵式次级组织interpersonal influence 人际间影响力formal authority 正式的授权reward and/or penalty power 奖励和/或惩罚的权利matrix organization 矩阵式组织hierarchical structure 层级结构Part3job-site productivity 工作现场生产率non-productive activities 非生产性工作temporary work stoppage 临时性工作暂停union activities 工作活动performance analysis 绩效分析base labor productivity 基准劳动生产率labor productivity index 劳动力生产指数non-local labor 非当地用工productive labor yield 劳动力产出requisitions 询价purchase orders 订购单subcontracts 分包合同shipping and receiving documents 装船与接收文件invoices 发票bulk materials 大众材料standard off-the-shelf materials 现货材料fabricated members or units 预制构件或单元semi-processed state 半成品状态pre-processed 预加工的pressure vessels 压力容器field assembly 现场装配skilled craftsmen 熟练技工crawler mounting 履带式底盘claim shell 抓铲挖土机`dragline 拉铲挖土机backhoe 反铲挖土机shovel 正铲挖土机bulldozer 推土机rotary-percussion drills 旋转冲击钻bituminous 沥青Part4economic evaluation 经济评价the planning horizon 规划期cash flow profile 现金流量图minimum attractive rate of return(MARR) 最低收益率sensitivity or uncertainty analysis 敏感性或不确定性分析annual benefit 年收益annual cost 年费用net annual cash flow 年净现金流量opportunity cost 机会成本social rate of discount 社会贴现率profit measure利润指标值private corporations 私营股份制公司public agencies 公共机构net future value(NFV) /净终值net present value(NPV) 净现值equivalent uniform annual net value (NUV)等额净年值capital recovery factor 资金回收因子benefit-cost ratio(BCR) 收益-费用比profitability index 盈利指数saving-to-investment ratio(SIR) 存款投资比率absolute numerical measure 绝对指数internal rate of return(IRR) 内部收益率marginal efficiency of capital 边际资本收益return on investment(ROI) 投资收益payback period(PBP) 投资回收期profit maximization利润最大化public sector 公共领域basic principle 基本原理nonnegative 非负的budget constraint 预算限制incremental analysis 追加分析internal rate of return method 内部收益率法Part5Word Bank-financed projects 世界银行融资贷款项目foreign bidders 海外投标人civil works 土木工程I nternational Competitive Bidding(ICB) 竞争性国际招标Limited International Bidding 有限国际招标National Competitive Bidding 国内竞争性招标International Shopping 国际订购Direct Contracting 直接签约General Procurement Notice 通用采购公告prequalification 资格预审bidding documents 招标文件domestic contractors 国内承包商instructions to bidders 投标人须知conditions of contract 合同条件specifications of drawings 技术规范与图纸bill of quantities 工程量清单payment terms 支付条件minutes of the conference 会议纪要pre-bid conferences 标前会议site visits 现场踏勘substantially responsive 实质性响应the lowest evaluated cost 经评审的最低造价Part6the sealed bids 密封的投标报价construction company 建筑公司marketing strategy 市场营销策略long-term goals 长期目标client relationships 客户关系short-term goal 短期目标direct costs estimate 直接费估算mark-up 涨价溢价company or head office overheads 公司或总部管理费unrealistic bids 不切实际的报价owner-contractor agreement 业主与承包商之间订立的合同standard form of agreement 标准合同形式American Institute of Architects(AIA) 美国建筑师协会bonus and penalty clauses 奖励与惩罚条款lump-sum agreement 总价合同changer order 变更单written authorization 书面授权unit-price agreement 单价合同quantity takeoff 工程量清单cost-plus-fee agreements 成本加酬金合同equity partners 股权伙伴rental rates 出租比例percentage fee 百分百酬金合同fixed fee 固定酬金合同changes 工程变更contract award 合同授予changes clause 变更条款publicly financed project 公共融资项目extra work 附加工作the prime contractor 主承包商Part7the International Federation of Consulting Engineering 国际咨询师联合会the FIDIC Conditions of Contract for Constructions FIDIC施工合同条件the General Conditions (FIDIC)通用条件the Particular Conditions (FIDIC)专业条件the Appendix to Tender (FIDIC)投标附录arbitration 仲裁,裁决Dispute Adjudication Board(DBA)争议仲裁委员会Conditions of Contract for Works of Civil Engineering Construction 土木工程施工合同条件Conditions of Contract for Electrical and Mechanical Work 机电安装工程合同条件Conditions of Contract for Design-Build and Turnkey设计-建造于交钥匙合同条件Client/Consultant Model Services Agreement 客户/咨询师服务协议Conditions of Subcontract for Works of Civil Engineering Construction 土木工程分包合同条件Guides to the Use of the Different FIDIC Conditions of Contract 各种FIDIC合同条件应用指南Amicable Settlement of Construction Disputes 施工争端友好解决方式Insurance of Large Civil Engineering Projects 大型土木工程保险The Conditions of Contract for Plant and Design-Build (FIDIC)安装与设计-建造合同The Conditions of Contract for EPC/Turnkey Projects (FIDIC)EPC/交钥匙项目合同条件The Short Form of Contract (FIDIC)简短格式合同The Form of Contract for Dredging and Reclamation Works (FIDIC)疏浚与防洪工程合同格式priced contract with activity schedule 总价合同priced contract with bill of quantities 单价合同target contract with activity schedule 目标总价合同target contract with bill of quantities 目标单价合同cost reimbursable contract 成本补偿合同performance bond 履约保函parent company guarantee 母公司担保advance payment 预付款retention (工程)留置权bonus for early completion 工期提前奖delays damages 误期损害surety 担保financial loan 商业贷款insurance policy 保险政策in breach of contract 合同违约bid bond 投标担保justification (正当的)理由labor and material bond 劳动力与原材料担保lien bond 留置权担保comprehensive general liability insurance 综合责任险professional liability insurance职业责任险workers’compensation insurance 工人补偿险builder’s risk fire insurance 施工方火灾险Part8construction planning 施工计划the choice of technology 施工技术的选择the definition of work tasks 工作任务的定义the estimation of the required resources and durations for individual tasks 所需资源和各项工作持续时间的估算reasoning backward 逆向推理normative problem 规范性问题cost control 成本控制schedule control 进度控制critical path scheduling procedures 关键线路进度控制程序job shop scheduling procedures 工作现场进度控制程序work breakdown 工作分解manufacturing terminology加工制造业术语resource allocations 资源分配fore-runner 先行者laborious and tedious process 复杂和枯燥的过程general models 通用模型databases and information systems 数据库和信息系统the storage and recall of the activities工作活动的存储于记忆manpower 人力,劳动力the duration of the activity 工作活动的持续时间placing concrete on site 现场浇筑混凝土placing forms 支设模板installing reinforcing steel 绑扎钢筋pouring concrete 浇筑混凝土finishing the concrete 混凝土养护removing forms 模板拆除position forms on the cleaning station 在清理场所码放的模板hierarchical structure 层级结构work breakdown structure 工作结构分解precedence relations 先导顺序关系structural integrity结构整体性design drawings 设计图纸milestone events 里程碑事件lag 时间间隔computer based simulation 基于计算机的模拟excavation equipment 开挖机械\Part9critical path method(CPM) 关键路线发predecessor/successor activities先导/后续工作resource constraint 资源约束artificial precedence constraint 人为先导关系约束activity-branch network 双代号网络图dummy activity 虚工作earliest time schedule 最早时间进度latest time schedule 最迟时间进度float 时差,机动时间maneuvering room 可调整的余地free float 自由时差independent float 独立时差total float 总时差inter-relationships 相互关系graphical presentations of project schedules 项目进度的图形表达network diagrams 网络图time-scaled network 时标网络bar or Gantt chart 横道或甘特图horizontal axis 横轴,横坐标vertical axis 纵轴,纵坐标S-curves S型曲线resource graphs 资源图uncertainty associated with the actual durations与实际持续时间相关的不确定性regulatory approval 行政许可adverse weather 不利的天气contingency allowance 应急准备probabilistic perspective概率的角度independent random variables 相互独立的随机变量random fluctuations 随机波动positive correlations正相关over-optimistic 过于乐观的Part10e-construction 工程返工personal injuries 人身伤害conformance 遵守,服从re-evaluation of design decisions设计决策的重要评估tunneling methods 隧道开掘方法actual site conditions 现场的实际状况roadway rehabilitation 公路路面返修quality assurance 质量保证n-site inspections 现场监督检查US Occupational Safety and Health Administration(OSHA)美国职业安全与健康署violation of existing standard 违反现行规范标准employee participation in quality control 质量控制的员工参与statistical methods 统计方法batches of materials 材料批implicit assumption 隐含的假设total quality control 全面质量控制zero defects goal 零缺陷目标quality circles 质量环“optimum”proportion “最佳”的比例non-destructive techniques 非破坏性技术x-ray inspection of welds 焊接的X光检测exhaustive or 100% testing 全数或100%检测lot 母体,总体sampling by attributes 特征抽样sampling by variables 变量抽样direct costs 直接成本indirect costs 间接成本construction accidents 工程事故insurance premiums 保险赔偿unsecured railings 未经保护的围栏on-board electronics面板电子元器件asbestosis 矽肺,石棉肺sewer line 排污管道four lane street 四车道道路Part11construction yard and warehouse management information 施工仓储管理信息concrete pumps 混凝土泵warehouse clerks 仓储管理员daily rental charge 日租金tedious manual task 繁琐的手工作业application programs 应用程序duplicate 复制verbal description 文字描述warehouse inventory database 仓储清单数据库relational data model 关系数据模型data dictionary 数据字典numerical code 数据编码redundancy 冗余aggregate 集料,骨料external models of the information 外部信息模型algebraic theory 代数理论projection 映射advantages of distributed processing 分散式处理的优点dynamic changes in information needs 信息需求的动态变化untidy information 凌乱的信息information flow 信息流preprocessor system 预处理系统independent systems 独立系统geometric information 图形信息。
工程管理专业英语总结
工程管理专业英语总结Engineering Management is a dynamic and constantly evolving field that involves the application of engineering principles, methods, and techniques to achieve desired outcomes in various industries. As a result, it requires a strong understanding of technical concepts and the ability to effectively communicate with diverse stakeholders. Here are some key concepts and terms associated with Engineering Management:1. Project Management: The process of planning, executing, and controlling a project to achieve specific goals within a given time frame and budget.2. Technical Management: The ability to manage and coordinate technical resources, including engineering, research and development, and manufacturing processes.3. Quality Management: The process of ensuring that products or services meet or exceed customer expectations through continuous improvement and control of processes.4. Risk Management: The identification, analysis, and mitigation ofrisks that could negatively impact project outcomes.5. Cost Management: The process of controlling project costs through effective budgeting, resource allocation, and negotiation.6. Leadership: The ability to inspire, motivate, and guide others towards achieving a common goal.7. Communication: The ability to convey information clearly and effectively to stakeholders, including clients, engineers, project managers, and team members.8. Sustainability: The practice of designing and implementing engineering solutions that are environmentally, socially, and economically sustainable.9. Engineering Ethics: The principles and values that inform ethical decision-making in engineering, including honesty, transparency, and accountability.Overall, Engineering Management involves a unique mix of technical expertise, management skills, and ethical considerations, and requiresa holistic approach to problem-solving that takes into account the interests of all stakeholders.。
工程管理专业英语单词
历史老照片不能说的秘密慈禧军阀明末清初文革晚清consolidate加固container容器、集装箱contract合同contractor承包商consultant 咨询工程师construction planning施工计划、施工组织设计construction procedure施工方法construction operation施工作业coordinate协调cost estimation成本估算cost engineer估算师、造价工程师cost engineering工程估价creativity创新性craftsman工匠deflation通货紧缩derrick 起重机design estimate设计估算detailed design详细设计detailed estimate详细估算delivery运输demolition拆毁、破坏discounte折现dragline拉铲挖土机drill钻孔duration持续时间dynamite 炸药earthwork to be excavated土方开挖economic evaluation经济评价engineer's estimate工程师估算、标底erection建立、安装estimate 估算estimate stage估算阶段evaluate 评价evaluation stage评估阶段excavation挖掘、开挖execute执行expenditure支出facility 设施facility design 设施设计facilities management设施管理factor系数、因素false work 脚手架D Efeasibility 可行性field management现场管理financing融资formwork模板formula公式formulation构思framework框架freight delivery货物运输function 功能、公式fuctional design 功能设计"functional" organization“职能式”组织fundation基础furnaces 锅炉GDP(Gross Domestic Product)国内生产总值general contractor 总承包商general office overhead 总部管理费GNP(Gross National Product)国民生产总值grout 水泥浆、灌浆hierarchical structure层次结构分解high-rise apartment高层公寓implementation执行、实施incentive 动机incremental analysis增量分析index指数inflation 通货膨胀infrastructure 基础设施infrastructure and heavy construction重大基础设施建设ingenuity灵活性ingredient组成部分initiation启动inspire 鼓励installation contractors安装承包商integration整合interest period计息期interstate roadway州际公路innovation 革新institutional and commercial building写字楼interpersonal 人际的investment consideration投资分析IRR internal rate of return 内部收益率J job-site productivity工地生产率labor characteristic 劳动力特征H F G Ilabor efficiency劳动效率labor jurisdiction劳动仲裁labor productivity劳动生产率lease租约、契约lift举起、电梯linear interpolation线性插值法linear programming线性规划load荷载loan security贷款担保logistic后勤、物流long-term长期MARR minimum attractive rate of return 最低收益率maintenance维持、维护marginal efficiency of capital资本边际收益率matrix矩阵methodology方法论monitor监督、班长mortgage抵押motivation动机、激励multistrory building多层建筑mutually exclusive proposals互斥方案net benefit净收益NFV net future value净终值NPV net present value净现值off-the-shelf material现货材料oligopoly垄断onset 开始on site现场on-site installation现场安装operation运营、操作opportunity cost机会成本overlap重叠overdraft透支overseer监督者owner业主parameter参数PBP payback period 投资回收期pension养老金performance绩效piled river打桩机pipeline管道planning horizon 规划期O L N Mplatform平台prebid site 投标前现场preliminary estimate初步估算prequalify资格预审prequalified 通过资格预审的prestressed concrete member预应力混凝土构件processing plant 加工厂procurement 采购production function生产函数profitability 盈利Project Management Institute项目管理协会"project" organization“项目式”组织public agency公共机构pump 泵quasi-governmental corporation国营企业quotation报价ratio 比率real estate 房地产real estate investmental corporation房地产信托基金receipt 收据reimbursement偿还reinforcing bars 钢筋、钢筋束residential housing construction住宅建筑retail 零售renovation翻修resource资源review复习、检查、审核revenue收入reward回报risk 风险ROI return on investment 投资回收率rotary-percussion drill旋转冲击钻safety consciousness安全意识schedule进度scheduling进度计划scheme计划scope 范围screening estimate匡算security sensitivity安全敏感性sensitivity analysis灵敏度分析semi-processed半成品的sewage 下水道R Q Pshop drawing施工图shovel 正铲挖土机single-family house独户住宅site manager现场经理skyscraper摩天大楼slab 楼板slippage or contraction延误或提前socially desirable programs 社会公益项目social rate of discount社会折现率solvency 清偿specialty contractor专业承包商specification规范、说明statute法规stadium体育场staff(全体)职员stockpile储存strategy 策略strike 罢工structural design结构设计subcontractor分包商subgrade 路基suborganization次级组织supervise 监督superintendent监督、指挥syndicator辛迪加term术语terminal 终端the rate of return收益率time value of money资金时间价值transfer 移交transportation运输tunnel隧道turnkey 交钥匙unforeseen expense不可预见费用utilities building公用事业建筑utilization 利用value engineering价值工程vendor商贩、供货商weld 焊接work package 工作A As-built drawings竣工图Annual net value净年值Arbitration仲裁 A dashed line 虚线Activity-on-branch network双代号网络图Activity-on-node network单代号网络图 A vertical axis纵坐标Archival information档案资料B Bottom-up design自下而上的设计Bids and quotations投标和报价Bill of quantities工程量清单Bid estimate 投标估价Benefit cost ratio成本收益率Budgeted cost预算成本C Conceptual planning stage概念规划阶段Capital intensive资金密集的Competitive bidding竞争性招/投标Contract price合同价格claims索赔Constructors建造商changes变更clause条款Conceptual design概念设计construction operations施工作业Construction contractor施工承包商Construction equipment 施工设备Concrete mixers混凝土搅拌机Cost estimation成本估算Cost control成本控制Cost Engineering工程估价Construction supervision施工监督Construction cost建造成本Control estimate控制估算Conceptual estimate概念设计估算Construction procedures施工方法Cost indices成本指数Consumer price index消费价格指数Cash flow profile现金流量图Credit risk信用风险Competitive bidding公开招标Contract price合同价格Clause条款Contract negotiation合同谈判Contract dispute合同纠纷Cost overrun成本超支Cost committed承诺成本Cost to date到期成本Cost exposure附加成本Critical path method关键线路法Construction yard施工现场D detailed engineering design详细的工程设计design methodology设计方法detailed design详细设计drilling and blasting钻孔和爆破detailed estimates详细估算dispute resolution mechanism争端解决机制design drawing设计图纸dummy activities虚工作document contral文档控制E Economic feasibility经济可行性Estimate stage估算阶段evaluation stage评估阶段equipment utilization and mechanization 设备利用率和机械化earthwork to be excavated土方开挖Economic evaluation经济评价Expenditure支出Excavation开掘Estimated total cost预计总成本F Feasibility study可行性研究Facility operation and maintenance设施的运营与维护formulation构思Facilities management设施管理Functional organization职能式组织First line supervision基层监督Field management现场管理Force-account charges自营工程费Free float自由时差Fast track快速路径法Final checkout最终的竣工验收历史老照片不能说的秘密慈禧军阀明末清初文革晚清2 G Gantt chart甘特图H Horizontal axis水平坐标I Integrate整合Instruction and commercial building construction 办公和商业用房建设Infrastructure and heavy construction重大基础项目建设Installation contractors安装承包商Ill-defined定义不清的Inflation通货膨胀Internal rate of return内部收益率Intangible asset无形资产Interest rate利率In-house overhead expenses内业管理费Independent float独立时差Inspection logs 检查日志Information transfer and flow信息的传递与流通information flow信息流L Linear programming线性规划logistics物流labor productivity劳动生产率labor jurisdictions劳动仲裁logistic problems后勤问题lifting and erecting提升和安装leverage杠杆作用legal documents法律文件lump sum contract总价合同M Monthly payments月付款额Matrix-type suborganization矩阵式次级组织Monitoring and control监督与控制Material procurement and delivery材料采购和运输Mortgage抵押Milestone里程碑Municipal project市政项目Monte carlo simclation蒙特卡罗模拟N Nominated subcontractor指定分包商Non-productive activities非生产性活动Net annual cash flow年净现金流Net benefit净收益Negotiation谈判Net present value净现值Net future value净终值Numerous alternative plans众多的备选方案Network diagrams网络计划图O Overlap 搭接,交叠on-site现场Operation and maintenance managers运行与维护经理On-site Installation现场安装Overseer监督者Overdraft透支Overlapping and rehandling 搭接和再处理P Procurement Management采购管理Public agency公共机构Professional services专业服务Project organization项目式组织Preliminary estimates初步估算Payback period投资回收期Payment支付Private corporation民营公司Predecessor relationship前后顺序关系Pre-qualification of contractors and sub-contractors with regard safety在安全方面对承包商和分包商的资格预审Procurement accounts采购账目Q Quotation报价R Residential housing construction住宅类房屋建设risk-reward风险和回报Return on investment投资回收率Revenues收入Real estate properties房地产Risk sharing风险分担Re-construction返工,重修Re-evaluation重新评价Random sample随机抽样Relational data model关系数据模型3 S Speculative housing market投机性住宅市场Scope of the project项目的范围Specialized industrial construction专业化工业项目建设sensitivity灵敏度Shop drawings 施工图Subcontractors分包商Specialty Contractor专业承包商Specialized subcontractor专业分包商Structural design结构设计Security sensitivity安全敏感性Screening estimates匡算Subcontractor quotations分包商报价Social rate of discount社会折现率Simulate模拟sunk cost沉没成本Semi-automated半自动化的Sub-network子网络图Statistical method 统计方法Sampling by attributes特征抽样Sampling by variables变量抽样Sampling plan抽样计划Storage and retrieval存储和查询T The project life cycle项目生命周期The Real estate developer房地产开发商The feasibility study report可行性研究报告The state of economy经济状况Turnkey project/contract交钥匙工程/合同Top-down design自上而下的设计Technical feasibility技术可行性Tangible asset有形资产Technology choice技术选择Total float总时差Total quality control全面质量管理Tracing decision跟踪决策U Unit cost method of estimation单位估价法Unit price contract单价合同Unforeseen circumstances 不可预见事件V Vendor供货商Value engineering价值工程Video conferencing电视会议W Work package工作包Warranties and guarantees保证和担保Warehouse management仓库管理缩写REITs—real estate investment trusts房地产信托(基金)PERT—program evaluation and review technology计划评审技术PMBOK—project management body of knowledge项目管理体系PMI—the project management institute美国项目管理协会ISO—the international organization for standardization国际标准化组织OSHA—US occupational safety and health administration美国职业安全和健康署GDP--gross domestic product国内生产总值GNP--Gross National Product国民生产总值MARR--minium attractive rate of return最低收益率CMC—construction management contractor建设项目管理承包商CAD—computer aided design计算机辅助设计CPA--Certified public accounting特许公共会计师AIA—American institute of architects美国建筑师协会AGC—the associated general contractors美国总承。
管理科学与工程专业英语词汇
管理科学与工程专业英语词汇
管理科学与工程专业涉及到许多英语词汇,以下是一些常见的词汇:
1. Management Science and Engineering 管理科学与工程。
2. Decision Making 决策。
3. Operations Research 运筹学。
4. Supply Chain Management 供应链管理。
5. Quality Control 质量控制。
6. Project Management 项目管理。
7. Risk Management 风险管理。
8. Industrial Engineering 工业工程。
9. Data Analysis 数据分析。
10. Optimization 优化。
11. Logistics 物流。
12. Information Systems 信息系统。
13. Human Resources 人力资源。
14. Cost Management 成本管理。
15. Strategic Planning 战略规划。
以上词汇涵盖了管理科学与工程专业中的一些关键领域和概念。
希望这些词汇对你有所帮助。
如果你需要更多的词汇或者对特定领
域的词汇感兴趣,请随时告诉我。
建筑工程管理专业英语 (2)
建筑工程管理专业英语概述建筑工程管理是一个涉及规划、设计、施工和运营建筑项目的综合学科。
在这个领域,专业英语是必不可少的工具。
本文将介绍一些在建筑工程管理中常见的专业英语词汇和表达,以帮助学习者更好地理解和运用这些术语。
建筑工程管理职责项目规划•Project planning:项目规划•Feasibility study:可行性研究•Project objectives:项目目标•Project budget:项目预算•Time schedule:时间进度表•Risk assessment:风险评估设计和工程图纸•Architectural design:建筑设计•Structural design:结构设计•MEP (Mechanical, Electrical, Plumbing) design:机电管道设计•Working drawings:施工图纸•Blueprints:蓝图•Specifications:技术规范施工过程•Construction site:施工现场•Construction materials:建筑材料•Excavation:挖掘•Foundation:基础•Concrete pouring:浇筑混凝土•Steel reinforcement:钢筋加固•Framing:框架施工•Plumbing and electrical installation:管道和电气安装•Finishing work:装修工作•Quality control:质量控制•Safety measures:安全措施项目管理•Project management:项目管理•Project manager:项目经理•Stakeholders:利益相关者•Team collaboration:团队协作•Resource allocation:资源分配•Progress monitoring:进度监控•Change management:变更管理•Problem-solving:问题解决运营和维护•Operation and maintenance:运营和维护•Facility management:设施管理•Energy efficiency:能源效率•Preventive maintenance:预防性维护•Emergency repairs:紧急维修•Life cycle cost analysis:寿命周期成本分析建筑工程管理实例为了更好地理解这些专业英语词汇的运用,让我们看一下一个建筑工程管理实例。
工程项目管理常用英语
工程项目管理常用英语一、项目启动阶段常用英语1. Project Initiation(项目启动)- Project Charter(项目章程)- Project Objective(项目目标)- Project Scope(项目范围)- Stakeholder Analysis(利益相关者分析)- Feasibility Study(可行性研究)- Project Kickoff(项目启动)2. Project Planning(项目计划)- Work Breakdown Structure (WBS)(工作分解结构)- Project Schedule(项目进度计划)- Resource Allocation(资源分配)- Risk Assessment(风险评估)- Cost Estimation(成本估算)- Quality Management Plan(质量管理计划)3. Project Execution(项目执行)- Project Team(项目团队)- Project Communication(项目沟通)- Change Management(变更管理)- Issue Tracking(问题追踪)- Progress Monitoring(进展监控)- Deliverable Acceptance(可交付成果验收)4. Project Control(项目控制)- Performance Measurement(绩效测量)- Change Control(变更控制)- Risk Mitigation(风险缓解)- Issue Resolution(问题解决)- Cost Control(成本控制)- Quality Assurance(质量保证)5. Project Closure(项目收尾)- Lessons Learned(经验教训)- Project Review(项目评审)- Project Documentation(项目文档)- Stakeholder Feedback(利益相关者反馈)- Project Handover(项目移交)- Project Closure Report(项目收尾报告)二、常用英语短语和表达- Define project objectives and deliverables.(明确项目目标和可交付成果。
工程管理专业英语词汇
Critical path method关键线路法
Construction yard施工现场
D
detailed engineering design详细的工程设计
design methodology设计方法
detailed design详细设计
drilling and blasting钻孔和爆破
Procurement accounts采购账目
Q
Quotation报价
R
Residential housing construction住宅类房屋建设risk-reward风险和回报
Return on investment投资回收率
Revenues收入
Real estate properties房地产
The feasibility study report可行性研究报告
The state of economy经济状况
Turnkey project/contract交钥匙工程/合同
Top-down design自上而下的设计
Technical feasibility技术可行性
Tangible asset有形资产
Construction contractor施工承包商
Construction equipment施工设备
Concrete mixers混凝土搅拌机
Cost estimation成本估算
Cost control成本控制
Cost Engineering工程估价
Construction supervision施工监督
PERT—program evaluation and review technology计划评审技术
工程英语词汇手册
工程英语词汇手册工程行业是全球范围内最重要和最复杂的领域之一。
随着全球化的发展,工程项目在各个国家和地区增加,因此,掌握与工程相关的英语词汇变得至关重要。
本手册将为读者提供一些经常在工程领域使用的英语词汇及其相应的中文解释,帮助读者扩充工程英语词汇量。
一、建筑工程词汇1. Construction(建筑)- Contractor(承包商):与业主签订合同,负责实施具体的建筑工作。
- Blueprint(蓝图):详细描述建筑物设计和规格的图纸。
- Foundation(地基):承重并传递载荷的土木结构,用于支撑建筑物。
- Reinforcement(钢筋):用于加固混凝土的金属筋条或网格。
2. 桥梁工程- Bridge(桥梁):连接两个地点的结构,通常跨越水体或地形障碍。
- Span(跨度):桥梁支持结构之间的水平距离。
- Abutment(桥台):支撑桥梁的结构,通常为混凝土或石头建成。
- Pylon(桥塔):高度较大的支撑结构,用于提供额外的支持。
3. 电气工程- Generator(发电机):将机械能转换为电能的设备。
- Transformer(变压器):用于改变电压的装置,通常用于输电和配电系统。
- Circuit breaker(断路器):一种用于保护电路免受过电流的装置,可中断电流流动。
二、机械工程词汇1. 设备和机械- Equipment(设备):用于完成特定任务或目标的工具或机器。
- Machine(机器):能够根据预定工作原理进行工作的设备。
- Motor(电动机):将电能转化为机械能的设备。
2. 热能和流体力学- Heat transfer(传热):在物体之间传递热量的过程。
- Fluid(流体):可以流动的物质,包括液体和气体。
- Pressure(压力):作用在物体表面上的力,垂直于该表面,并与表面单位面积成比例。
三、土木工程词汇1. 土壤力学- Soil(土壤):由不同颗粒大小的矿物质、有机物和水混合形成的表层物质。
工程管理专业词汇
建筑工程常用工程词汇 Building Engineering and Construction Vocabulary Project name: Albachiara Printing & Dyeing Plant(Jiaxing)亚曦嘉兴纺织整理厂1. 项目管理project management现场管理site management施工管理construction management政府报批permitting & approvals监理单位supervisory agent质检站quality inspection station设计院design institute协调coordination质量监督quality monitoring工期控制schedule control /工期跟踪schedule tracking安全控制safety control / safety monitoring安全培训safety training安全手册safety manual / handbook每周例会weekly meeting周报weekly report月报monthly report会议记要meeting minutes通知notice记要(备忘录)MOU / memo (memorandum of understanding)指令instruction业主指令client instruction工程管理公司指令Consultant’s instruction监理单位指令super visory agent’s instruction验收acceptance inspection中间验收hold-point inspection / milestone inspection隐蔽工程验收concealed work inspection竣工验收final completion inspection会议记要格式meeting minutes template公司信笺company letterhead文件归档archiving / archive文件签收记录单transmittal2. 人员和单位roles & staff业主client业主工程师client engineer / consultant管理公司project management company = consultant = engineer总承包公司general contractor项目经理project manager施工经理construction manager / site manager政府报批员government permitting liaison土建工程师civil engineer结构工程师structure engineer机电工程师M&E engineer (mechanical & electrical)安全工程师safety engineer质检工程师quality assurance / quality control (QA/QC) engineer档案管理员document control合同经理contract manager采购经理procurement manager / purchasing manager项目控制工程师project controls engineer / manager工地秘书site secretary工人workers分包公司sub-contractors专业分包specialist sub-contractor指定分包designated sub-contractor / supplier供应商suppliers / vendors政府机构authorities / agents总部headquarters3. 开工准备construction preparation进场做开工准备mobilization preparation场地平整site leveling / land grading清理腐土和植物remove cultivation soil and vegetation / site cleaning 受污染土壤contaminated soil受污染水polluted water / river / air pollution水塘pond碎砖瓦砾,废墟rubble垃圾debris / garbage / rubbish / refuse地形地貌terrain搭建临时设施set up temporary facilities安排施工用水、用电、排污arrange construction power, water, sewage 打桩机进场piling machine move in site地质条件geological conditions / terrine开工会议(工程启动会) project kick-off meeting永久水电permanent r water / power开工典礼ground-breaking ceremony开工典礼服务公司GBC service agent搭建主席台/讲台s et up a stage / podium横幅banner汽球balloons临时棚temporary shelter临时停车场/道路temporary parking/roads奠基石corner stone(engraved with project name and ground-breaking date) 土堆soil pile铲子shovels / spade奠基仪式inauguration ceremony出席嘉宾guests政府官员government officials政府机构governmental bureaus / agents施工许可证construction permit地质勘探geo-tech survey / report红线图red-line map (property-line map)植物/花篮plants/flower bouquet邀请函invitation card / letter鞭炮crackers礼花fire work红地毯red carpet主持人host发言speech发言人speaker发言稿speech script礼物give-away gifts晚宴dinner banquet着装要求dress code(晚宴装black tie,商务便装business casual,便装casual) 礼仪小姐model attendants / waitress / ritual girls登记registration登记薄registration book / sing-in book音响系统audio system麦克风microphone扩音器loudspeaker观众audience彩排rehearsal4. 采购purchasing / procurement下定单place PO (purchas ing order)交货期lead time长交货期材料long lead time items催货expediting海关清关customs clearance陆地送货inland transportation运送shipping一批货物shipment卸货unloading仓库storage / warehouse库存inventory帐单invoice / bill发票receipt / legal receipt提货单Bill of Landing / Cargo Bill信用证Letter of Credit (LC)离岸价FOB (Free on Board)到岸价CIF (Cost, Insurance and Freight)5. 工地管理site management工地site / job-site现场管理site management场地布置site layout第一期phase I第二期phase Ⅱ施工段segment / section分段施工segmented construction施工区construction zone生活区living quarter / living compound物料仓储区material storage / storage yard / logistical center 加工区fabrication yard现场办公室site offices工人宿舍worker s’ dormitory门卫间保安guardhouse / security guard围墙fence / boundary fences进场准备mobilization / preparation for construction临时水、电temporary power & water for construction临时排污temporary sewage system工地标志site signage安全标志safety signs / warning signs安全生活用具safety equipment安全帽helmet手套gloves安全鞋safety boots保险带safety tie-back / harness急救箱first-aid kit担架stretcher安全眼镜safety glasses / goggles工作服uniform焊工眼镜面罩welder’s mask监工/工头/组长superintendent / foreman安全拉杆safety barrier安全带子safety banner ( yellow banner)吊车驾驶员crane operator生产组construction crew施工记录construction record施工日记daily log进度Progress进度报告Progress report进度付款Progress payment进度表Progress schedule进度趋势Progress trend / forecast晚间巡逻night patrol工期schedule工期表schedule chart (Microsoft Project)结点milestone检查check / inspect验收inspection流程图flow chart / flow diagram施工计划construction plan / execution plan施工组织计划construction execution plan施工人员组织表site organization chart管理人员management staff工人workers / labor技术人员technical staff / engineers质量员quality inspector日常作业routine operation / daily operation常规施工作业conventional process材料materials设备equipment临时堆放区temporary lay-down area / storage生产设备(进口)临时仓库temporary storage for imported production equipment 租赁的仓库leased warehouse租金/月租金rental / monthly rental桩临时堆放区pile storage yard中间验收hold-point inspection评判标准judgment standards完工complete / completion竣工final completion竣工验收final acceptance inspection工期延误schedule delay超过预定工期ahead of schedule落后预定工期behind of schedule罚款penalty雨季rainy season (5, 6月)工程验收记录inspection record隐蔽工程验收记录concealed work inspection record安全事故报告accident report入住move-in / occupancy关键途径critical path材料样品material sample样品板sample board通过accepted / passed拒收declined / rejected运行不正常mal function有缺陷的产品defective缺陷defects次品substandard products / sub-grade / off-grade product / seconds 变形deformation局布变形local deformation下弯deflection卷曲变形warping / warpage翻边turn-up / turn-over along edge脱落/松动loosing剥落peeling off分离detached隆起swell生锈rust退色color deterioration不均匀unevenness起砂sanding起泡bubbling起皱wrinkling刮痕scratches印痕marks裂缝crack / cracking / fracture细裂缝fissure漏水leaking / leakage渗漏seepage水痕water stain / water marks平整度flatness光滑度smoothness凹凸起伏sags and crests凹凸小麻点dimples and nipples突起物bumps / raised bumps表面凹坑dent (被砸的)返工rework6. 打桩及基础工程piling & foundation work桩pile方桩square pile圆桩round pile导桩pilot pile空心桩hollow pile运桩shipping of piles桩临时堆放区temporary lay-down yard for piles 桩的养护curing (所有混凝土的养护)浇制场地casting yard现场拌挠On-site mixing开控excavation地沟ditch坑pit制作桩帽pile-cap模板form work (steel, timber)支模板erect formwork钢筋笼re-bar cage扎钢筋tie re-bar浇制casting浇制板,梁,柱cast / slab , beam , column浇混凝土pore concrete缓凝剂retarder / retarding agent缓凝混凝土retarded cement按体积配料proportioning by volume散装材料bulk material / in bulk养护curing制作地梁cast ground beams钢结构预埋件cast-in anchor bolts回填土back-fill夯实compacting / compaction振动夯土机vibro-soil compactor设备基础production equipment foundation地基处理soil treatment / foundation treatment 压密注浆injection grouting防渗水层impervious course / layer单层sole course土工布geo-fabric灌浆grouting地下水位underground water table预制桩pre-cast piles打桩机pile driver / piling machine起重机械lifting / appliance / equipment起重滑轮lifting block / chain block导杆guide pillar起重杆lifting rod / suspender定位positioning起吊hoisting打桩piling (drive piles)试桩pile testing抗拨试验uplift load test养护期curing time地面以下below ground level (±0.00)地面以上above ground level7. 地坪工程ground slab地板/楼板slab钢筋re-bar箍筋stirrup砼(混凝土)concrete碎石(骨料)aggregate石块gravel大石块boulder水泥cement地坪浇制ground slab casting沙浆底层mortar bedding表面找平层surface screening表面封闭sealant防水膜water proofing membrane防滑条Non-skid strips (non - slip形容人) / cuts伸缩缝expansion joint沉降缝settlement joint表面硬化处理hardened surface地下管道预埋underground pipes (pre-buried)现场浇铸cast-in-sites / cast-in-place / cast-in-situ倒塌collapse沉降settlement沉降观测settlement survey坡道ramp / slope坡度grade of slope / gradient管道沟pipe ditch8. 钢结构及砖石工程/结构工程steal structure & masonry work/ structure work上部结构superstructure钢结构steel structure地脚螺栓anchor bolt / screw锚座anchor socket螺纹screw thread预埋件cast-in anchor主立柱main columns柱子底座plinth型钢section steel ( H,C,L,□,○) I ,angle主梁main beams次梁secondary beams大梁girder脊梁Ridge beam檩条purlin圈梁ring girder工字钢H-column / H-beam / I-beam / 腹web plate / II双腹double-webbed 屋顶桁架roof truss屋檐eaves屋脊rigid飞檐cornice / upturned eaves门、窗框架window door frames压条gasket / rubber gasket / bead 金属木板墙面板wall panels屋面板roof panels采光带light belt / skylight / meltable skylight panel彩钢板steel sheet彩钢板三明治板(中间有保温)sandwich panels拼接splice (splice joint, spliced connection, splicer)空间网架space gird钢丝网Barbed wire保温层insulation (fiber, foam)表面钢板skin sheet外层external内层internal室内exterior室外interior表面油漆处理surface coating防火涂料fire-proof coating女儿墙parapet wall山墙gable红砖clay bricks层面天沟roof gutter天沟roof valley落水管downspout / down pipe暗雨水管concealed fall pipe护栏(水泥)balustrade落差falling head搭接lap connection屋顶气楼ventilation tower屋顶坡度pitch of roof四坡屋顶hip roof缓坡屋面low pitched roof不上人屋面non-accessible roof百叶窗louver (louver window)铝合金门、窗aluminum doors & windows雨棚canopy小雨棚awning氟碳烤柒FCP (fluorine carbon paint)铝型材aluminum extrusion双层中空玻璃double glazing抗紫外线玻璃low-e glass铸铁cast iron紧固件fastener / fastening bolt夹层mezzanine / mezzanine floor人行桥cat-walk楼梯井staircase well楼梯staircase (single flight, double flight) 螺旋式楼梯spiral stairs圆弧扶梯winding stairs车间workshop辅助建筑subsidiary / auxiliary buildings裙房annex / podium局布承压local bearing局布照明local lighting高杆照明high mast lighting9. 砖石工程masonry work水泥cement水泥标号cement grade (200 300 400)钢筋re-bar (steel re-bar)石子aggregate大石块boulder道砖ballast砂子sand木材timber混凝土concrete钢筋混凝土reinforced concrete (RC)商品混凝土Ready-mixed / plant –mixed混凝土等级concrete grade ( C20, C30, C40)混凝土坍落度试验slump test配方recipe整体式混凝土monolithic concrete整块浇筑monolithic pour整体浇铸integral cast砂浆砌筑mortar bond混合比mix proportion中间层intermediate layer砌块墙block wall人字辅砌herring bond pavement丁砖砌合header bond一丁一顺砌合Flemish bond墙面照平抹灰plastering打磨polishing / sanding涂料paint / painting底漆primer coating过梁lintel门、窗框frames for doors and windows / door jamb / header地砖floor tiles管线预埋管子wire duct / conduit排水系统drainage system检修孔inspection hole = man-hole集水坑collection hole / pit / sinkhole水管工程plumbing work供水water supply排水drainage / sewerage污水管sewer化粪池septic tank过滤池filtering tank / filtration tank蓄水池reservoir排水孔drain hole / sewer outfall / sinkhole混凝土砌块concrete block砂浆mortar ( cement mortar)水泥砂浆抹灰cement mortar plastering现浇梁/板cast-in-site beam/slab (= cast-in-situ) / cast slab, cast beam,cast column 堤dike污泥sludge淤泥,腐土muck soil疏通河道dredge填塞,捣实tamping / stuff10. 机电系统mechanical & electrical systems设备安装equipment installation供电系统power supply and distribution system变压器transformer变电站power sub-station配电房power transformer room高压电柜hi-voltage switchgear低压电柜low-voltage switchgear电缆cable (power cable) 粗电线wire 细电缆桥架cable tray母线槽bus bar / bus rail配电板/箱distribution panels / box信号线cable / signal cable (IT/电话/投影仪)网络/通讯系统IT/telecom systems]网络中的结点node服务器server程控交换机programmed exchanger中转板harbor空调系统air conditioning system / AHU (air handling unit) 冷冻机chiller中央空调centralized AC system温度控制temperature control湿度控制humidity control局布采暖local heating局布通风local ventilation区域吸顶空调VRV ceiling mount AC units独立式空调free-stand unit挂壁式空调wall mount unit控制板control pad / thermostat遥控器remote control风管duct / pipe冷媒管coolant pipe / cooling media冷凝水管condensation pipe冷凝器condenser落水管rain leader风冷冷凝器air cooled condenser空调出风口air outlet回风口air inlet回风管道air return duct散流器diffuser新风make-up air空气压缩机air compressor压缩空气compressed air罩子hood电梯elevator / lift液压电梯hydraulic lift自动扶梯escalator快速滑升门fast-speed overhead door红外线感应infra-red sensor防撞杆bollard / bump post移门sliding door阀门valve球阀ball valve止回阀backwater valve / non-return valve 减压阀reducing valve溢流阀relief valve调节阀regulating valve加气砼air-entrained concrete通风ventilation排废气exhaustion支架bracket牛腿corbel支撑bracing (泛指)支撑柱bracing column撑杆brace (柱条、撑条)吊杆suspender / hanger支杆strut / tie壳case泵壳pump case架板,脚手架gang board大小头变径管reducer / reducing镀锌铁管galvanized iron pipe光钢筋plain bar铜管copper tube盘管coil保护套管protective sailing轴承bearing扬程lift of pump弹性缝resilient joint支承块rest pad花纹钢板raffled plate垫板padding plate油毡roof felt管长pipe clip基座pedestal刚度rigidity柏油毡pitched felt白铁皮galvanized iron sheet阳极电镀anodized镀烙(克罗米)chrome plated法兰flange环箍hoop / hoping / insulation block 垫圈弹簧垫圈washer / spring washer管套collar / sleeve90度接头elbow connector / bend三通Tee joint / connector闷头end-cover压力调节器pressure regulator预应力砼priestesses concrete滑轮pulley减震木垫wooden cushion block柴油diesel润滑油lubrication oil汽油gasoline / gas齿轮gear内套筒inner sleeve绝缘子insulator11. 消防系统fire-fighting system总管main pipeline支管branch pipeline消防水管fire water pipes消防水泵房pump room消防栓fire hydrant消火栓箱hose cabinet软管hose喷嘴nozzle灭火器fire extinguisher喷淋头sprinkler head喷淋灭火系统sprinkling system烟感smoke detector压力表pressure meter备用发电机back-up generator紧急照明灯emergency light疏散指示灯evacuation light消防水池fire water tank消防验收fire marshal inspection防火卷帘门fire roller door防火门fire door旋转门revolving door防暴门blast-resistant door隔音门sound-proof door弹簧门swing door12. 废水处理waste water treatment废水处理站waste water treatment station排水沟/管drainage ditch/pipe排水井drainage well明沟Open drain地漏drainer / drain hole沉淀池sedimentation tank管道沟pipe ditch沉积物sediment13. 室内装修interior decoration / fit-out朝向orientation空房vacant room概念设计schematic des ign放样lay out / set out平面布置floor layout风水geomancy空间利用率space efficiency / floor efficiency门厅foyer门廊(室外)porch走廊过道passage / walkway背景墙logo wall接待大厅lobby接待台reception desk办公区office = open office坐位间过道aisle / walkway走廊hallway / corridor小办公室private office / manager’s office会议室meeting room / conference room公共洗手间common washing room茶水间pantry / tea room / coffee room办公隔断单元cubical / work station办公桌隔断workstation cubical partition隔墙/隔断partitionpartition wall / dry wall / gypsum board / frames / ribs 轻刚龙骨light gauge steel joist承重墙load bearing wall玻璃隔断glass partition护墙板墙裙wall panel花窗lattice window文件柜file cabinet文印间printing and faxing room食物准备间food preparation room清洗间washing room更衣间locker room挂衣柜wardrobe / built-in wardrobe搁板shelves挂衣杆rail衣架hanger壁橱closet食堂厨房canteen / kitchen茶水柜counter / island counter吊柜cupboard / wall-hung cupboard / wall-mounted cupboard 展示柜show case展示架display shelves家具furniture单人沙发armchair长沙发sofa / couch沙发床davenport / divan bed休闲椅lounge chair壁炉fireplace阳台balcony露天大平台terrace清洁工人房janitor’s room娱乐设施recreation facility健身房gym / fitness center地砖floor tilePVC地砖PVC floor tile玻化地砖vitrified floor tile瓷砖ceramic tile防滑地砖anti-slip tile防滑anti-slip防磨损anti-abrasion / anti-friction墙砖wall tile瓷砖ceramic tile多孔砖porous bricks机房server room防静电架空地板anti-static raised floor地毯carpet / carpet tile (块毯) / wall-to-wall (全铺)地毯底衬under-layer / lining门口踏毯door mat挂毯rug承重墙bearing walls / partitions非承重墙non-bearing wall空心墙hollow core wall螺纹接连nipple joint六角螺栓hexagonal head bolt反拱inverted arch拉毛hacking悬挂脚手架hanging scaffold硬木板条地板hardwood strip floor楼板slab楼层floor楼梯staircase单距single flight双距double flight旋转楼梯spiral stair圆弧楼梯winding stair楼梯间staircase楼梯井stair well电梯井elevator shaft垃圾滑道井refuse chute扶手railing / rail / handrail / grab rail拉手Pull / pull bar踏步tread侧踏步riser休息平台landing入口出口entrance / exit吊顶(600x600) suspension ceiling / suspended ceiling吊顶龙骨ceiling joist / sub joint / suspender / double-nead / T-joint T形龙骨石膏板gypsum board石膏板吊顶gypsum board suspension ceiling造型吊顶featured suspension ceiling装饰板ornamental board装饰柱ornamental column镶边margin挑檐overhanging eaves打眼holing吊杆吊筋suspender / hanger (斜inclined 硬stiff 软flex ible)照明灯具lighting fixture吸顶式ceiling mount / ceiling-hung / ceiling hanging工矿灯workshop light日光灯fluorescent lamp泛光灯flood light (外墙、广告牌)卤素灯halogen light白炙灯incandescent light低压卤钨灯low-voltage tungsten halogen lamp霓虹灯neon tube乳白灯泡opal lamp天花嵌入式射灯recessed spot light in ceiling高压汞灯high pressure mercury lamp射灯spot light筒灯down light可调节方向射灯directional spotlight灯带light trough隐形灯槽concealed light trough吊灯pendent lamp / light水晶吊灯crystal pendent light挂壁灯torch照度luminance (流明) LUX开关switch声控开关sound control switch / acoustic control switch 双向开关 2 way switch插座socket / outlet接线板Patch panel可调节亮度开关dimmer / dimmer switch电插座power socket / power outlet网络插座IT/telephone socket线槽/管duct / conduit地插座floor embedded socket防触电式电源插座ground fault interrupt outlet双电源插座dual voltage outlet复式插座duplex outlet (2 pin / 3 pin combination)转换插头adaptor暗线concealed wiring电视插座TV antenna outlet / cable TV outlet保险丝箱fuse box电闸power brake窗帘盒pelmet窗帘杆curtain rail窗台window sill / elbow board百页窗roller shutter窗扉window casement / sash平开窗side-hung window / door窗调窗套window opening / window cas ing单窗single sashed window / casement双窗double sashed window / casement防门窗weather tight window防眩眩玻璃glare control glass防潮水泥垫层moisture-proof / damp-proof cement bedding 猫眼peep hole移门sliding door / panel旋转门revolving door隔音门sound-proof door防暴门blast-resistant door防风窗weather tight window天窗skylight /skylight belt老虎窗dormer window滑轨(上)slide rail滑轨(下)slide track滑轨条guide bead支架support hanger平头flush butt screw平头钉flat head nail / screw平面框架plane frame木门timber door / wooden door木贴面门timber veneer隔汽层vapor barrier五金hardware / ironmongery配件accessories闭门器door closer门吸door stop铰链、合页hinge把手/锁handle / bar / lock榫头rabbet榫头/榫眼plug tenon (tail) / eye (socket)燕尾榫dovetail人字榫herring bond joint内嵌式recessed / flush mount外紧固式surface mount插销latch助推助拉铰链inject / eject hinge移门sliding door移门轨道(上,下)rail, track窗户滑轨guide bead地弹簧floor spring窗钩window catch暗锁mortise lock / bolt插槽slot踢脚线skirting / skirt凹阳台recessed balcony凸阳台cantilever balcony厕所toilet马桶隔间booth卫生洁具sanitary ware手纸器roll-tissue dispenser擦手纸盒paper towel dispenser洗手盆及龙头washing basin and faucet / washing bow拖把洗槽mop washing sink冲淋房shower room马桶toilet 、water closet (WC)小便斗urinal蹲便器squat unit手动manual自动sensor controlled / automatic浴缸bath tub拉手杠grab bar肥皂盒soap dish液体肥皂器liquid soap dispenser毛巾架towel rack毛巾杆towel rail系杆tie bar钢性吊杆rigid hanger / stiff hanger可伸缩凉衣绳retractable washing line浴缸龙头mixer冲淋房shower chamber冲淋头shower head冲淋器shower tower洗手盆washing basin水垢deposit of scale / scale (硬皮的) / gunk(粘软的) 垃圾桶waste bin镜子mirror存水trap壁挂历式取暖器wall radiator木材timber木饰面板wood veneer木纹理grain木节knot三聚氰胺贴面刨花板MFC (melamine faced chipboard)不锈钢stainless steel (sss)纤维板particle board钢化玻璃tempered glass / annealed glass喷砂玻璃frosted glass / sand blasted glass透明玻璃clear glass有色玻璃tinted glass有机玻璃plexiglass水磨石terrazzo大理石marble人造大理石imitation marble花岗岩granite表面纹理texture粗面砖texture tile / rough surface大石砾gravel大石块boulder光泽gloss / glossiness水磨石terrazzo框饰finish casing复合板laminated wood board安全玻璃laminated glass丙烯酸底涂acrylic primer喷漆spray painting乳胶涂料latex paint / emulsion paint( 室外墙面厚) 滚涂刷roller brush环氧涂料epoxy coating (地面)自流坪self-leveling epoxy coating底漆primer / undercoating瓷釉漆enamel paint丙烯涂料acrylic paint榫头rabbet沟缝caulking腻子putty勾缝Pointing / pointing joint勾缝料Pointing stuff勾缝刀Pointing trowel油灰缝Putting joint浇筑缝Joint between cast poring抹灰plastering (墙面砂浆抹灰)抹灰面plaster finishing复合地板laminated timber floor搁栅(龙骨)joist夹板plywood消音板acoustic panels凸窗bay window窗台板elbow board of window / window sill窗帘blinds / curtain / drapery / shade电动窗帘motorized drapery空心抹灰hollow plastering (不好)刮平抹平striking填缝seal crakes / joints大理石贴面marble facing灰饼lime mark企口拼接match joint企口地板matched floor盆景miniature garden微裂缝micro-fissuring假窗mock window护角条corner bead开槽砖notched tile悬挑板overhanging slab架空线overhead line pipe凹缝recessed joint切口,凹口notch层理lamination装玻璃工作glazing花边lace work踢脚板kick panel / kicking panel / skirting 螺旋弹簧helical spring拼花地板overlay flooring / matched floor铺设管道laying pipes找平/刮平leveling找平层leveling course原型prototype锁紧力,咬合力locking force修边nip / nipping阴文incised engraving焊脚leg of weld照明带light band / trough薄板light gauge sheet石灰浆lime paste / slurry灰土垫层lime-soil cushion里衬liner外墙面facade玻璃幕墙curtain wall铝型材aluminum extrusion氟碳烤柒fluorine carbon paint (FCP)硅胶silicon glue / s ilica橡皮垫圈、压条rubber gasket上下推开关窗sash window中空玻璃double-glazing安全玻璃(夹胶玻璃)laminated glass纱窗mosquito screen外挂包裹clad干挂dry fixing湿挂wet fixing龙骨架joist frame定位卡positioning pin分割线/分隔沟division joint重叠overlap墙面抹灰压角条plaster stop拼缝条splicing plate错位拼接staggered joint / alternate joint嵌入(固定)built-in埋入的(小件)embedded (socket box) ( anchor holts)内凹recessed (light)浅槽groove切口槽notch (v形)边缘切口reveal (along edge) 企口突缘flange / raised edge槽条channel木线条molded strip一般的/ architrave 带造型嵌缝的小条子calking strip耐磨涂料high resistance paint防霉涂料mildew resistant paint防潮涂料damp-proof coating防腐涂料corrosion-proof coating防水涂层waterproof coating节能材料energy-saving products / materials防腐材料preserving material环保材料environment friendly products (green products) 拉毛抹灰stucco油毡malthoid混水油漆opaque timber finish (painting)清漆varnish / lacquer paint防潮漆damp-proof paint防锈漆anti-rust paint瓦棱板(波浪板)corrugated glass / panel半亚光涂料semi-gloss latex paint亚光low gloss喷砂玻璃opaque / sand-blasted / frozen glass砂纸sand-paper金属板吊顶metal panel ceiling合金alloy铝合金aluminum alloy刨花板chip board / particle board刨花shavings夹板plywood / plywood panel铝塑板Alucbond (alum and plastic laminated board) 人造大理石artificial marble木贴面夹板plywood with wood veneer木材纹理grain樱桃木cherry wood橡木oak wood松木pine wood榉木beech wood黑胡桃木dark wood树脂resin聚胺脂polyurethane (PU)表面质感surface texture耐用性durability门禁系统door access control system刷卡器sensor pad卡card key密码combination红外线感应探头infra-red motion sensor / detector监视系统surveillance system风格style仿古pseudo-classic现代modern / contemporary后现代post-modern仿旧reconstruction保守conservative传统traditional经典classical新潮fashionable / trendy流行popular前卫cutting-edge落后潮流out-of-fashioned中国元素China elements / flavors浮雕relief sculpture新古典主义neo-classical豪华luxury简洁simple and elegant粗圹rustic步行街pedestrian mall装饰品ornament14. 施工工具tools / 施工设备construction machinery打桩机pile driver打夯机rammer挖土机excavator推土机bulldozer (履带式crawler)压路机roller钻孔机boring machines砼搅拌车concrete agitating truck铲车dumper翻斗卡车dumper track小翻斗车skip car斗bucket / hoe料斗bucket漏斗funnel / silo装料斗hopper塔吊crane履带式起重机caterpillar crane起重半径crane radius吊车/起重机hoisting machine重型heavy duty锤夯hammer tamping起重设备hoisting equipment起重葫芦hoister手拉葫芦chain block卷扬机cable hoist / cable crane / winching hoist / winch 龙门吊gantry crane龙门架portal frame行车overhead traveling crane脚手架scaffolding / scaffold混凝土搅拌车/机concrete mixer / concrete truck卡车truck小卡车pick-up / lorry混凝土振捣机concrete vibrator压缩空气机air compressor氧气瓶oxygen cylinder电焊机welding machine亚弧焊机arc welding machine火焰切割flame cutting千斤顶jack电焊条welding rod钨丝条tungsten超载overload筛子sieve锤子hammer钻枪、冲击钻/电钻impact drill / power drill刨子planer板手wrench锯子saw电锯power saw凿子chisel锉子file风钻pneumatic drill镐pick螺栓、螺帽bolts and nuts螺丝screw自攻螺丝self-tapping screw螺丝刀screw driver钉子nail铆钉rivet平头铆钉flush head rivet铆钉枪rivet pistol钢筋弯折机angle-bender / bar bender老虎钳pincer / clamp刷子brush夹子clamp烙焊lap welding榫接mortise joint木工carpenter电焊工welder电工electrician刮刀chaser超声波探伤ultrasonic detection15. 室外工程yard work / external work道路road伸缩缝expansion joint围墙fence / boundary fence临时板围墙hoarding (施工用)格栅围墙grill fence树篱笆hedge一砖墙one brick wall亭子pavilion小溪creek / brook池塘pound门卫guardhouse红外线探头infra-red motion sensor避雷针lightning rod道路照明灯road light灯杆light pole停车场parking / parking lot停车位berth临时警戒围栏hurdle架空管道hanged pipe螺旋线helical line防滑条non-slip strip 人/ nonskid strips 车踏步前缘nosing凸缘条nosing strip卸货平台loading/unloading dock升降机dock leveler坡道ramp滑升门overhead door转弯半径turning radius大斗sharp减小弯度reduce sharpness柏油碎石路tarmac road柏油路tar road碎石拼的路面crazy paving毛石墙rubble wall毛石护坡rubble mound化学品仓库chemical storage高压电房power station / transformer room 烟囱stake / chimney自动移门automatic sliding door手动移门manual sliding door伸缩门articulated sliding door自动起落杆automatic lift bar带遥控with remote control雨水管、落管downspout / down pipe旗杆flag pole侧石kerb / kerb stone人行道sidewalk溢水沟spillway路边窨井kerb inlet阴沟under drain / under ground sewer 阴沟洞sinkhole混凝土路面concrete pavement路面标志traffic control lines / marks道路分隔线lane division lines斑马线zebra crossing检修孔man-hole绿化landscaping草地grass lawn草皮turf种花种草planting种植土topsoil施肥fertilizing跟土sowing除杂草weeding播种seeding发芽germination护根mulch护树杆stake and tie修剪trim常青树evergreen shrubs trees 灌木shrubs灌木丛shrubbery香樟树camphor tree梧桐树phoenix tree枫树maple tree松树pine tree柳树willow杨树poplar tree棕吕Palm tree柏树cypress白杨树white poplar tree黄杨树box tree银杏树gingko tree冷杉fir竹子bamboo喷泉water fountain绿化带green belt花坛border树篱笆hedge小路path灌溉系统irrigation system草地灯lawn lamp年轮annual rings16. 生产工艺设备production equipment定型机stenterO型染色机 beamJ型染色机jet汽蒸机steamer印花水洗机washing machine蒸化定型机fixing machine平网印花机flat bed printing machine圆网印花机rotary machine逆流漂洗机rope washing machine烘干机dryer打卷机rolling machine装配assemble拆开disassemble设备调试testing and commissioning试运行trial run行车traveling crane振动vibration / shaking隔振vibration absorber / vibration isolator颗粒particle粉末powder碎片chip块chunk退浆scoaring碱减量weight reduction碱性的alkaline配色间color kitchen后整理(开幅定型) finishing定型fixing收缩shrinkage色度chrome耐酸acid-resistance / acid-resisting耐热heat-resisting耐磨损abrasion resisting耐火fire resisting耐碱alkali resisting易燃inflammable易爆combustible密封air-tight / weather tight染料dye stuff纱绽yarn织布weaving。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
Part3
Part5
Word Bank-financed projects 世界银行融资 贷款项目
foreign bidders 海外投标人
civil works 土木工程
International Competitive Bidding(ICB) 性国际招标
竞争
Limited International Bidding 有限国际招标
architectural and engineering(A/E)firm 建筑 与工程设计公司 consortium 财团,株式会社 preliminary design 初步设计 general contractor 总承包商 on site quality inspection 现场质量监督 litigation 法律诉讼 shop drawings 施工图 constructability 可建造性,可施工性 value engineering 价值工程 construction contract 施工合同 design/construct firm 设计、施工公司 turnkey 交钥匙(承发包)模式 facility maintenance 设施维护
unrealistic bids 不切实际的报价 owner-contractor agreement 业主与承包商 之间订立的合同
standard form of agreement 标准合同形式 American Institute of Architects(AIA) 美国 建筑师协会
bonus and penalty clauses 奖励与惩罚条款 lump-sum agreement 总价合同 changer order 变更单 written authorization 书面授权 unit-price agreement 单价合同 quantity takeoff 工程量清单 cost-plus-fee agreements 成本加酬金合同
profit maximization 利润最大化 public sector 公共领域 basic principle 基本原理 nonnegative 非负的 budget constraint 预算限制 incremental analysis 追加分析 internal rate of return method 内部收益率法
crawler mounting 履带式底盘 claim shell 抓铲挖土机 ` dragline 拉铲挖土机 backhoe 反铲挖土机 shovel 正铲挖土机 bulldozer 推土机 rotary-percussion drills 旋转冲击钻 bituminous 沥青
Part4
economic evaluation 经济评价 the planning horizon 规划期 cash flow profile 现金流量图 minimum attractive rate of return(MARR) 最 低收益率 sensitivity or uncertainty analysis 敏感性或 不确定性分析 annual benefit 年收益 annual cost 年费用 net annual cash flow 年净现金流量 opportunity cost 机会成本 social rate of discount 社会贴现率
contractual relationships 合同关系 changes 工程变更 claims 施工索赔 mega-projects 巨型项目 “ functional ”organization “职 能 式 ”组 织 “project ”organization “ 项 目 式 ” 组 织 suborganizations 次级组织 strong matrix-type suborganization 强矩阵式 次级组织
National Competitive Bidding 国内竞争性招 标
International Shopping 国际订购
Direct Contracting 直接签约
General Procurement Notice 通用采购公告
prequalification 资格预审
bidding documents 招标文件
equity partners 股权伙伴 rental rates 出租比例 percentage fee 百分百酬金合同 fixed fee 固定酬金合同
changes 工程变更 contract award 合同授予 changes clause 变更条款 publicly financed project 公共融资项目 extra work 附加工作 the prime contractor 主承包商
profit measure 利润指标值 private corporations 私营股份制公司 public agencies 公共机构
net future value(NFV) / 净终值 net present value(NPV) 净现值 equivalent uniform annual net value (NUV) 等额净年值 capital recovery factor 资金回收因子 benefit-cost ratio(BCR) 收益 -费用比 profitability index 盈利指数 saving-to-investment ratio(SIR) 存款投资比 率 absolute numerical measure 绝对指数 internal rate of return(IRR) 内部收益率 marginal efficiency of capital 边际资本收益 return on investment(ROI) 投资收益 payback period(PBP) 投资回收期
construction industry 建筑业 spectrum 波普,光谱,范围 residential housing construction 房屋住宅建 设 subcontractor 分包商 institutional and commercial building construction 办公与商业用房建设 specialized industrial construction 专业化工 业项目建设 infrastructure and heavy construction 重大基 础项目建设
domestic contractors 国内承包商
instructions to bidders 投标人须知 conditions of contract 合同条件
specifications of drawings 技术规范与图纸
bill of quantities 工程量清单
欢迎下载
-
payment terms 支付条件 minutes of the conference 会议纪要 pre-bid conferences 标前会议 site visits 现场踏勘 substantially responsive 实质性响应 the lowest evaluatt7
the International Federation of Consulting Engineering 国际咨询师联合会 the FIDIC Conditions of Contract for Constructions FIDIC 施工合同条件 the General Conditions ( FIDIC )通用条件 the Particular Conditions (FIDIC )专业条件 the Appendix to Tender ( FIDIC )投标附录 arbitration 仲裁,裁决 Dispute Adjudication Board ( DBA )争议仲 裁委员会 Conditions of Contract for Works of Civil Engineering Construction 土木工程施工合 同条件 Conditions of Contract for Electrical and Mechanical Work 机电安装工程合同条件 Conditions of Contract for Design-Build and Turnkey 设计 -建造于交钥匙合同条件 Client/Consultant Model Services Agreement 客户 /咨询师服务协议 Conditions of Subcontract for Works of Civil Engineering Construction 土木工程分包合 同条件 Guides to the Use of the Different FIDIC Conditions of Contract 各种 FIDIC 合同条件应用指南 Amicable Settlement of Construction Disputes 施工争端友好解决方式 Insurance of Large Civil Engineering Projects 大型土木工程保险 The Conditions of Contract for Plant and Design-Build ( FIDIC )安装与设计 -建造合 同 The Conditions of Contract for EPC/Turnkey Projects ( FIDIC ) EPC/交钥匙项目合同条 件 The Short Form of Contract (FIDIC )简短 格式合同 The Form of Contract for Dredging and Reclamation Works ( FIDIC )疏浚与防洪工 程合同格式 priced contract with activity schedule 总价合