活动脚手架搭设方案

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

活动脚手架搭设方案

Plan of Erection Procedures for Movable Scaffold

目录TABLE OF CONTENTS

1. Prepare explanation编制说明 (3)

2.Reference编制依据 (3)

3.Descprition of gantry搭设方案 (3)

1. PREPARE EXPLANATION编制说明

在*********中设备、管道及电气仪表安装过程中,为了安全施工及方便施工,在施工区域内搭设

移动式脚手架。

We need build movable scaffoldings for safety installed the equipment、piping、electrical and instrument in **********,

2.REFERENCE编制依据

➢现行国家施工规范、标准及规程(但不限于)

National construction criterion, standard and regulations(not limited)

➢《建筑施工高处作业安全技术规范》(JGJ80-91)

Safety Technical Specification on Working in High Place of Building Construction JGJ80-91 ➢《建筑施工扣件式钢管脚手架安全技术规范》JGJ130-2001

《Technical Code on the Safety of Scaffold of Steel Pipes in Fastener Connection for Building

Construction》JGJ130-2001

3、搭设方案PLAN OF ERECTION

3.1 前提条件Prerequisites

➢移动式脚手架由扣件式脚手架搭设。

The movable scaffold must be built in fastener connection.

➢移动式脚手架的各部件在使用前须经过项目部和**的***人员检查合格。

All parts must be checked by **** and the safety supervisors of***** as ok before being put to

use.

➢移动式脚手架不得人力搬运,必须配有脚轮;所有脚轮都须配有自锁装置,使移动脚手架在使用时保持不动。

The movable scaffold must be handled with castors. No manual efforts are allowed in this

regard; all castors are equipped with self-locking device, which serves to hold the movable

scaffold still when it is use.

➢移动式脚手架的作业平台必须满铺脚手板,临边必须搭设踢脚板.

Boards must be completed paved tharough the movable scaffold’s operation platform, and

toe-board must be provided on platform’s edges

➢移动式脚手架必须设置梯子,供上下进出;梯子与脚手架必须固定好或整体制作,确保使用时梯子与脚手架不会分开。

Ladder must be provided for the movable scaffold to allow climbing; sufficient fixation of the ladder and scaffold must be provided or they should be provided as a package whole, hence sparing any hazard of disengagement in future use.

3.2移动式脚手架、梯子的搭设Erection of movable scaffold and ladder

➢移动式脚手架跟其它脚手架一样必须由架子工搭设。操作平台不大于2m×2m Only scaffold setters are allowed to set up movable scaffold, as is must with other scaffold types. The platform area should not be bigger than 2m×2m.

➢移动式脚手架搭设过程中或整改时,禁止架子工以外的职工使用;搭设完毕由HSE部门组织检查,检查合格并挂牌后方可使用。

During the erection or modification, no workers are allowed to use this scaffold short of scaffold setters; the scaffold should not be put to use until it has been checked by HSE supervisors as ok and thereby green tagged.

➢移动脚手架的搭设必须有明确的作业区域,可以用警戒绳圈围。

Specific area of construction should be defined for the erection of movable scaffold. Cordon lines could be set up to identify the area.

➢移动脚手架必须逐层搭设,固定好一层后,有了落脚点(水平架,必须捆扎固定)和安全带的固定点后再另行搭第二层。

Scaffold must be built floor by floor. And no work on the next floor could start until this floor has been strongly fixed and footholds & safety harness anchor points are available (Fixation through firm binding must be provided for horizontal scaffold).

➢移动脚手架作业平台必须有护栏、踢脚板\、水平架上的铺板跳板。

Generally, the movable scaffold must be provided with railings, toe-boards; and tread-boards specifically for horizontal scaffold

➢装有轮子的移动式脚手架操作平台与轮子的接合处应牢固可靠,立柱底端离地面不得超过80mm.

The joint between the platform of the wheeled moveable scaffold and the wheels must be firm and reliable. The distance between the bottom end of the standing pole and the ground surface must not exceed 80mm.

➢移动脚手架不高于5米时,脚手架每侧加斜支撑。如高于5米,需增加扫地杆加固脚手架。