英文广告合同简易版

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

英文广告合同简易版

It Is Necessary To Clarify The Rights And Obligations Of The Parties, To Restrict Parties, And To Supervise Both Parties To Keep Their Promises And To Restrain The Act Of Reckless Repentance.

编订:XXXXXXXX

20XX年XX月XX日

英文广告合同简易版

温馨提示:本协议文件应用在明确协议各方的权利与义务、并具有约束力和可作为凭证,且对当事人双方或者多方都有约制性,能实现监督双方信守诺言、约束轻率反悔的行为。文档下载完成后可以直接编辑,请根据自己的需求进行套用。

Address:

Telephone:

Party B: Address:

Telephone:

According to the provisions of the

contract law of the People's Republic of

China and the relevant laws and

regulations, Party B accepts the

entrustment of the first party and

entrustment with the two parties through

consultation.

First, entrustment:

Two, the way of payment:

1, Party A shall pay 40% of the total cost of the contract, namely ____ yuan (RMB) to Party B, Party B received the money after the start of design.

2. Party B shall provide complete design draft. After confirmation by Party A, the total amount of the total cost shall be paid.

Three. Design time:

1, Party B shall provide complete design draft in __ working days.

2, Party B shall complete the design work of party a company commissioned in _____ years __ month __ day (delay time

by party a reason, work time should be postponed).

Four. The responsibilities and obligations of the two parties:

1, Party B shall, according to the requirements of Party A to finish the related work on time.

2, Party A has the responsibility to fully cooperate with Party B to carry out the work stipulated in this contract and provide relevant information according to the needs of Party B. Party A is responsible for the consequences caused by Party A's delay in the required information.

3. Party A shall provide complete design information before the start of the design, due to Party A's provision of incomplete information and changes in content.

For structural changes, Party A shall pay the corresponding cost of design changes.

4. After Party B receives the complete design information of Party A, it is designed to facilitate the determination of the style of Party A, and Party B begins to design the first draft after the style is determined.

5, Party A has the right to put

forward amendments to the works designed by Party B. The first draft Party A can make a structural modification. After the first draft is determined, the structural modifications should be made. Party A shall pay the corresponding cost separately.

6. The consequences of the delay due to the amendment of Party A shall be borne by Party A.

7, due to the loss caused by post production by Party A alone, the loss caused by problems in the design of the product is borne by Party B. The legal liability caused by copyright, for the

相关文档
最新文档