对外贸易合同样本90 days LC

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

合同

Contract

合同号:LY

Contract No.: LYLS-01-20110124

日期:2011-1-24

Date: 2011-1-24

签约地点:QINGDAO,CHINA

Place: QINGDAO,CHINA

买方:

The buyers:

卖方:

The sellers:

This contract is made by and between the buyer and the seller: whereby the buyer and the seller agree to the under-mentioned goods subject to the terms and conditions as stipulated below:

1.货名、规格及数量:

Commodity name, specifications MFI Quantity Units price

PLASTIC PELLETS (HDPE) 0.3-1.4 500.00MTS USD $/MT

CNF QINGDAO PORT,CHINA 2.总价:

Total value: USD$

3.原产国及制造厂商:

Country of origin & manufacturer: USA

4.装运期限:

Shipping date: NOT LATER THAN MAR 31, 2011

5.装运口岸:

Port of loading: Main port of USA

6.到货口岸:

Port of destination: QINGDAO ,CHINA

7.付款条件:

Terms of payment: 100% of the total value will be paid by L/C at 90 days after sight.

8.包装:需用适合长途海运,防潮、防湿、防震、防锈、耐粗暴搬运的包装,由包装不良

所发生的损失,由于采用不充分或不妥善的防护措施而造成的任何锈损,卖方应负担由此产生的一切费用和/或损失。

Packing: The packages should be suitable for long distance freight transportation and well protected against dampness, moisture, shock, rust and rough handling. The sellers shall be liable for any damage to the goods on account of improper packing and for any rust damage attributable to inadequate or improper protective measures taken by the sellers.

9.单据:卖方凭下列单据向付款银行议付货款:

Seller shall provide these documents as following:

(1)Complete set of clean multimodal transportation documents marked “freight collect”,

blank endorsed, notified the consignee named in the contract. 通知目的口岸收货人,注

明运费到付的空白背书的全套已装船的清洁提单。

(2) 5 copies of invoice, indicating contract number.

已签署的发票五份,注明合同号。

(3)5 copies of packing list, indicating measurement, gross and net weight of each package.

注明单项尺码、毛重及净重的装箱单五份。

(4)Two copies of Manufacture’s or seller’s certificate of quality and quantity.

制造厂或卖方出具的品质及数量证明两份。

(5)Certificate of origin in 1 original and 2copy.

原产地证一式两份。

10.装运条款:卖方保证按时将合同所述货物运往买方港口。

Terms of shipment: The seller shall ship the goods within the shipping date from the port of shipment to the port of destination.

11.装运通知:货物全部装船后,卖方将于10个工作日内将合同编号、商品名称、数量、

毛重、发票金额、船名和开船日期传真通知卖方。

Shipping advice: The seller shall within 10 working days after the completion of the loading of the goods advise by fax the buyers of the contract No., commodity, quantity, invoice value, gross weight, name of vessel and date of sailing.

12. 索赔:货物到达买方后,买方应向中国进出口商品检验检疫局申请对质量、规格、数量

进行初步检验,并出具检验证明书,如发现货物品质、规格、数量与合同不符,除保险公司或船运公司应负责的以外,买方在货到90天内有权换货或索赔,一切费用(如商检费、相关的运费、保险费、仓储费及装卸费等)由卖方承担。

Claims: Within 90 days after the arrival of goods at destination should be quality, specifications or quantity be found not in conformity with the stipulations of the contract except those claims for which the insurance company or the owers of the vessel are liable. the buyers shall, on the strength of the inspection certificate issued by Entry-Exit Inspection and Quarantine of the People’s Republic of China have the right to claim for replacement with new goods or for compensation and all the expenses (such as inspection charges, freight for returning the goods and for sending the replacement insurance premium, storage and unloading charges, etc.) shall be borne by the sellers.

13. 不可抗力:由于人力不可抗拒事故,而卖方交货迟延或不能交货时,责任不在卖方,但

卖方应立即将事故通知买方,并于事故发生后十四天内将事故发生地政府主管机关出具的事故证明用空邮寄交卖方为证。在上述情况下,卖方仍负有采取一切必要措施从速交货的责任。如果事故持续超过十个星期,买方有权撤销本合同。

Force Majeure: The seller shall not be held responsible for any delay in delivery or non-delivery of the goods due to force majeure, which might occur during the process of manufacturing or in the course of loading or transit. However, the seller shall advise the buyer immediately of such occurrence and within 14 days thereafter, the seller shall send by airmail to the buyers for their acceptance a certificate of the accident issued by the competent government authorities of the place where the accident occurs as evidence thereof. Under such circumstances the sellers, however, are still under the obligation to take all necessary measures to hasten the delivery of the goods. In case the accident last for more than ten weeks, the buyers shall have the right to cancel this contract.

相关文档
最新文档