英文缩写中英文对照表
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
缩写说明
Metrics:
HR Dept.:
Lost Work Day Case Rate
Quality Dept.:
COQ: Cost of Quality (质量成本)
WIR: Wiring Incident Report (配线报告)
FTQ: First Time Quality (
WFCC: Worldwide Formal Customer Complaint (所有客户正式的反馈)PPM: Pieces per Million (一百万产品)
RRPPM: Return & Reject Piece Per Million (不合格部品多少钱)IPTV: Incident Per Thousand Vehicles (运输中发生的事故部品)
Engineering Dept.:
C/O: Changeover time (对策转变时间)
C/T: Cycle Time (周期时间)
PDT: Planned Downtime (计划停产期)
LT: Lost Time (损失时间)
DT: Downtime (停产期)
OA: Operational Availability (操作可行性)
OE: Operational Effectiveness(效力的可行性)
PC&L Dept.:
OEM:On time Shipments (及时出货)
IPM: Incident Per Million (事故损失的钱数)
E&O: Excess & Obsolete (超额完成&荒废的)
PRR: Problem Resolving Request (问题分析请求)
MU: Material Utilization (材料的利用)
Others:
Tpct: Total Production Cycle Time (整体生产周期)
MCR: Material Cost Reduction (材料成本的精简)
6SIGMA
DMAIC: Define, Measure, Analysis, Improve, Control
VOC: Voice of Customer
CTQ: Critical to Quality
SIPOC: Supplier, Input, Process, Output, Customer
I&CIM: Innovation, & Continuos Improvement
TMAP: Though Map
PMAP: Process Map
MSE: Measure System Evaluation
FMEA: Failure Modes and Effects Analysis
NEM: Numerical Evaluation of Metrics
ANOVA: Analysis of Variance
DOE : Design of Experiments
LEAN
1.DMS -- Delphi Manufacturing system
EEI : Employee Environment & Involvement
WPO: Workplace Organization
QS: Quality System
OA: Operational Availability
MM: material movement
MSD: Manufacturing System Design
2.KMS -- Kaizen Manufacturing system
3.OSKKK -- Observation, Standardization, Kaizen, Kaizen, Kaizen ……
4.PFP -- People Focus practice
5.VSM— Value Stream Mapping
6.TPM: Total Production Maintenance
7.PMP: Production Maintenance Partnership
8.PM: Planned Maintenance
9.TPS: Toyota Production System
10. SMED: Single Minutes of Exchange Die
12. FIFO: First In First Out
13.5S: Clear (Sort), Organize ( Straighten), Clean(Sweep), Maintain
(Standardize), Continuous Improvement ( Sustain)
14.NWG: Natural Work Group
15.WIP: Work In Process
16.PFEP: Plant For Every Part
17.JIT: Just in Time
18.PDCA: Plan – Do – Check – Action
19.SQIP: Supplier Quality Improvement Process
20.VOC: Voice of Customer
21.MSDS: Material Safety Date Sheets
22.PDP: Product Development Process
23.PTC: Protect The Customer
24.APQP: Advanced Product Quality Planning
25.SPDP: Supplier Performance Development Process
26.QSA: Quality System Assessment
27.SPC: Statistic Process Control
28.PDAP: Production Part Approval
29.DBS: Delphi Business System
30.MSA: Measurement System Analysis
31.FMEA: Failure Mode and Effects Analysis
32.TLCC: Total Life Cycle Cost
Each Function
HR Dept:
HR: Human Resource
PBP: People Business Plan
NWG: Natural Work Group
PPI: People Performance Index
MSDS: Material Safety Data Sheets
OSHA : Occupational Safety and Health Administration
IS&S Dept.
IS&S: Information System and Service
IT: Information Technology
FS: Fourth Shift
MRP: Material Requirement Plan
ERP: Enterprise Resource Plan
SAP: System, Application & Products
JIT: Just – In – Time
SILS: Supply in Line Sequence
OA: Office Automation
ISP: Information Security Policy
FIS: An information System Supporting Audi A4 Production in FAW-VW BF: Back Flush
OS: Operation System