PMP-报名(英文)项目经验描述模板

合集下载
相关主题
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

一.

To realize the equipment life cycle management, optimize the equipment utilization.

IN: Develop project scopes and objectives; write the bidding document. PL: Open tender; design the system architecture; make project plan. EX: Demand investigation; system detailed design; time control; check whether the system functions to meet the needs of users.

MC: Feedback problem; risk management.

CL: Check the archiving documents; complete the online test run and final acceptance.

Project activities: Project completed on schedule. Meet user needs.

二.

Project objective: Implement a new website to trace the vendors’ working hours and generate the monthly report.

IN: Define the project scope; Identify risks;

obtain approval from stakeholders.

PL: Prepare the project plan and develop the work

breakdown structure.

EX: Manage physical move; Manage communication.

MC: Hold daily stand-up meeting; Manage changes to scope, schedule. CL: Final acceptance from customer; Deliver

trainings; Archive the documents.

Production issues are fixed in time. Functions

added. No budget exceed.

三.

The goal of the project is to provide solutions for solar

thermal power control system.

IN: Identify stakeholders of the project and analyze the

different needs of stakeholders.

PL: Determine the team members, establish a incentive mechanism, identify and evaluate risks.

EX: Ensure project delivered on time. Manage changes, measure performance.

MC: Monitor project quality according to

national and industry standards.

CL: Sum up the project experience, sorting of

the project completion data.

The project has been highly recognized by the

customers.

相关文档
最新文档