2014年钻井英语涉外面试题(自编)
海外石油钻井当地雇员英文版考试题 副司钻 1
PROFESSIONAL KNOWLEDGE EXAMINATIONFOR ASSISTANT DRILLERNOTE:1、Exam time:120 MINS。
2、Please fill in the blanks on the left of the standard sealing line according to therequest of invigilator.3、Please read the requirement for all kinds of questions carefully, write youranswers in the right position.4、Don't scribble on the examination paper; Don't write anything irrelevant in thestandard sealing place.一、Single Selection (Form 1~80 questions. Please choose the best answer and fillthe corresponding letter into the parentheses of this question)1. Finish the following sentence with the correct phrase or phrases.“Damag e togauges can be minimized by( )A mechanical vibrationB correctly setting gauge protectorsC liquid filled gauge facesD B and C2. Which of the following is activated by manifold pressure from the BOPControl Unit? ( )A Annular PreventerB Ram PreventerC Mannual ChokeD Gate valve3. Which of the following statements is not true? ( )A Valves on the choke line are opened to allow kick fluid to flow into the chokemanifold when a blowout preventer is closedB Valves on the kill line are closed to allow fluids to be pumped into the annulusC Gate valves are closed to keep fluids out of the choke and kill lines when thesesystems are not in useD Valvees on the kill line are opened to allow fluids to be pumoed into the annulus4. You’ve encountered a kick while drilling at a shallow depth.No BOP stack hasbeen installed.Which of the following would you open to vent the gas? ( )A Choke lineB flowlineC Diverter lineD Suction line5. Select the phrase or phrases that make the following statement true.“Casingis ” ( )A Usually large diameter pipeB Installed to support the wellboreC The space between the string and the open holeD A and B6. Mechanilcal agitators and jet guns are both used to : ( )A Fill the hole on tripsB Transfer fluid to the pumpC Mix and suspend solids in a liquidD Prime the circulating pumps7. Choose the phrase that makes this statement true,”A positive-displacementpump” ( )A Delivers only 60% of the fluid on each strokeB Delivers only 80% of the fluid on each strokeC Delivers approximately the same amount of fluid on each pump strokeD A and B8. Which of the following could result from gas left in the circulating fluid? ( )A An explosionB A change in the properties of the fluid columnC Harm to rig personnelD All of the above9.Which of the following could notresult from air bubbles trapped incirculating fluid? ( )A Altered fluid column propertiesB Accumulation of toxic gas around the rigC Damaged centrifugal pumpsD Accelerated corrosion of steel components10. The flowline sensor is sometimes referred to as the: ( )A Mud return indicatorB Relative flow sensorC Mud level indicatorD A and B11. One of the most common BOPs used while drilling is: ( )A Ram preventerB Rotating headC DiverterD Casinghead spool12. Which of the following is NOT a concern when a ring gasket is installed? ( )A The connections should be well lubricatedB a new gasket should be used each time the joint is made upC extemal loads may deform the ringD the gasket may buckle when the connection is tightenedDONOTCROSSTHISLINEWHENYOUANSWERQUESTIONS13. A blind/shear ram is designed to do what two operations? ( )A Cut tubular equipment and hang off the stringB Cut tubular equipmen and seal the open hole after the cut is madeC seal the open hole and lubricate the stringD seal around any equipment on the string14. An annular preventer is closed by sending pressurized hydraulic fluid into:( )A A closing chamberB The rig air supplyC An opening ChamberD None of the above15. What is used as a precharge material in the BOP control Unit’s accumulatorbottles? ( )A airB nitrogenC watorD hydrogen16. The fluid volume required to close all of the preventers on a BOP stack,once,is 70 gallons,for safety,an extra 50% needs to be on reserve,what total fluid volume meets the safety requirement? ( )A 105 gallonsB 52.5 gallonsC 35gallonsD 175gallons17. The fluid volume required to close all of the preventers on a BOP stack,once ,is 164 gallons.Safety reserve, 50%,What total fluid volume meets the safety requirement? ( )A 105 gallonsB 246 gallonsC 109.33gallonsD 175 Gallons18. Grade refers to the physical properties of the casing material,which of thefollowing is not related to grade? ( ) A burst pressure rating B lengthC tensile strengthD resistance to corrosion19. Rated working pressure is : ( )A the maximum pressure at which a piece of equipment can be used at a specified temperatureB the pressure measured for equipment witn pressure gaugesC only measured for equipment with pressure gaugesD the pressure at which a pressure relief valve will open20. Which of the following cannot cause damage to a pressure gauge? ( )A pressure pulsationB mechanical vibrationC pressure above the gauge’s rangeD pressure below the gauge’s range21. If the flowline sensor reports a decrease in fluid returns: ( )A fluid is being lost to the formationB the pump may have been turn offC pump strokes may have been decreasedD all of the above 22. which of the following is not a consideration when choosing specificationsfor choke system equipment? ( ) A anticipated pressure and temperatureB rated working pressure of the blowout preventersC rated working pressure of the casingD capacity of the pit system23. A BOP Stack has 3 ram preventers-each requires 23 gallons to close.theannular preventer requires 51.24 gallons to close.safety reserve,50%.How many gallons meet the safety requirement? ( )A 180.36 gallonsB 169gallonsC 93.9 gallonsD 120.24 gallons 24. how should gas be allow to expand as it is circulated out of the hole? ( )A uncontrolledB witn no expansionC controlledD no method is better than any other25. which of the following is true regarding liquid kicks? ( )A They don’t mix with well fluidsB They migrate just like gas kicksC They m ay contain “solution” gasD all of the above26. when does a liquid kick because a gas kick? ( )A when formation pressures changeB When the gas comes out of solutionC when drilling into a faultD when a different formation is found27. What type of formation is likely to contain carbon Dioxide? ( )A shaleB limestoneC sandD salt dome 28. The most different kick fluid to circulate out is: ( )A saltwaterB oilC fresh waterD gas29. Which of the following is not a characteristic of a liquid kick? ( )A does not expandB Has a constant densityC Does not migrateD Has a great effect on well pressures30. which of the following is essentially not compressible? ( )A gasB carbon dioxideC methaneD oil 31. After taking a kick, one of the first things to do is: ( )A decide how much pressure to maintain in the wellB decide upon an evacuation routeC call a well control service companyD all of the above32. if the well is shut-in and the gas is allowed to migrate to the surface with noexpansion,what problem can develop? ( ) A surface equipment failureD O N O T C R O S S T H I L I NE W H E N Y O U A N S W E R Q U E S T I O N SB formation damageC casing failureD all of above33. one barrel of gas at 10000feet expands to 2 barrels at 5000feet .what is thegain in pit volume? ( ) A 2barrel gas B 1 barrel gainC no gain, gas is compressibleD not enough information34. When circulating out a gas kick,it is best to: ( )A keep bottomhole pressure constant, so that BHP is just high enough to prevent another influxB keep bottomhole preserue as high as possible to prevent another influxC minimize pit gainD not allow the gas to expand35. What makes kick detection more difficult when using oil-based mud? ( )A high well pressuresB high temperaturesC Gas is highly soluble in oil-based fluidsD High viscosity36. One barrel of gas swabbed into a well at 10000feet depth and allowed toexpand uncontrolled will have a volume at 5000feet of: ( )A four barrelsB three barrelsC two barrelsD one barrel 37. Which of the follwing are formation gas characteristcs? ( )A IS less dense than other formation fluidsB Is highly compressibleC Is usually toxicD All of the above38. When circulating out a gas kick,it is best to: ( )A keepbottomhole pressure as high as possible to prevent another influxB not allow the gas to expandC minimize pit gainD keep bottomhole pressure constant,so that BHP is just high enough to prevent another influx39. which of the following is not a cause of lost circulation? ( )A drill pipe stickingB high mud weight and/or fluid viscosityC Hydrostatic pressure exceeds the strength of the formationD high pressure resulting from bad tripping or drilling practices40. when circulation is stopped, what happened to bottomhole pressure? ( )A bottomhole pressure is reducedB fluid is lost to the formationC frictional pressure is increasedD bottomhole pressure is increased 41. which of the following is not one of the reasons for reduced bottomholepressure in a trip? ( )A reduction of downward pressure from the drill stringB swabbing effect from upward pull on stringC loss of fluid level from removal of pipeD absence of friction pressure when circulating is stopped 42. To avoid insufficient mud weight and a possible kick: ( )A follow proper fluid monitoring& mixing proceduresB always have mud heavier than it needs to beC do not operate when the mud pits are exposed to rainD all of the above43. what is the most dangerous type of intentional flow? ( )A temporary completionB UBDC they are all equally dangerousD drill stem test44. Geologist&engineers can make relatively accurate formation pressurepredictions from: ( )A geological dataB Historical dataC seismic dataD all of the above 45. abnormally pressured formations may result from: ( )A man-made conditionsB fluid migrationC geologic conditionsD all of the above46. The density of the drilling fluid may be unintentionally reduced by: ( )A opening the wrong valve in the mud pit arerB the solids control equipmentC adding too much waterD all of the above47. Gas-cut fluid is most dangerous when drilling: ( )A at all depthsB only on land rigsC at shallow depthsD in deep water 48. which of the following is not a cause of lost circulation? ( )A high mud weight and/or fluid viscosityB hydrostatic pressure execeeds the strength of the formationC drill pipe stickingD high pressures resulting from bad tripping or drilling practices49. which of the following is not one of the reasons for reduced bottomholepressure in a trip? ( )A reduction of dowmward pressure from the drill stringB Swabbing effect from upward pull on stringC absence of friction pressure when circulating is stoppedD loss of fluid level from removal of pipe 50. The calculation of APL is: ( )A Usually the best estimate of the drillerD O N O T C R O S S T H I L I NE W H E N Y O U A N S W E R Q U E S T I O N SB Usually generated by computerC the average of mud return weightsD the averaged mud tank densities51. when connection gas is detected: ( )A formation gases may increaseB mud to formation pressure is changingC swabbing is more likely during a tripD all of the above52. What is “surging ” ? ( )A A force caused by pumping fluid downholeB A suction force caused by raising the stringC the opposite of swabbing-a force that is caused by lowering the bitD all of the above53. why is monitoring fluid level important? ( )A Because detailed records must be kept of each tripB because a fluid level drop lowers hrdrostatic pressureC because a fluid level increase may indicate that there is a kick in the holeD all of the above54. while logging with wireline,what can be used be to shut in a well? ( )A lubricatorB ram preventerC blind ramD all of the above 55. Which of the following statements is not true? ( )A Valves on the choke line are opened to allow kick fluid to flow into the chokemanifold when a blowout preventer is closedB Valves on the kill line are closed to allow fluids to be pumped into the annulusC Gate valves are closed to keep fluids out of the choke and kill lines when thesesystems are not in useD Valves on the kill line are opened to allow fluids to be pumped into the annulus80~100 questions. Please fill your judgment into theparentheses of those question. Fill the parentheses with “√” if this question is right, fill the parentheses with “×” if this question is wrong.)56. ( )When tripping out pipe,it’s considered good kick detection procedure tomeasure the amount of fluid used for fill-up.57. ( )During normal drilling operations, fluid must pass through the flowlinebefore it reaches the solids control equipment.58. ( )On a surface drilling rig,the function of the standpipe pressure gauge isto measure circulating pressure when the fluid pumps are operating.59. ( )The length of the piston determines a positive-displacement pump’svolume and pressure limitations.60. ( )small bubbles of air or other gases trapped in circulating fluid candamage centrifugal pumps.61. ( )An unexpected gain in the volume of the pits is one of severalindications that fluid is being lost to the formation.62. ( )One advantage of installing a blind ram above a pipe ram is that a sealcan be made after the string has been hung off and sheared.63. ( )The BOP stack configuration, 5M-6 5/8-RSRdA includes a dual ram thatwill accommodate more than one string at a time64. ( )The term “pressure relief valve” refers to a blowout preventer that isheld closed, at least in part, by force from the well.65. ( )Gauges that measure accumulator operating pressure should show apressure drop soon after the hydraulic equipment has been functioned successfully.66. ( )A gas blowby occurs when the pressure building in the mud-gasseparating chamber exceeds the hydrostatic pressure of the liquid leg.67. ( )To select an appropriate pressure ga uge for installation,it’s important toconsider how much pressure the gauge is expected to measure.68. ( )A gas blowby occurs when the pressure building in the mud-gasseparating chamber exceeds the hrdyostatic pressure of the liquid leg.69. ( )more gas can be dissolved in oil-base liquids than in water-based somore gas will come out at a given pressure.70. ( )Hydrocarbon gases and hydrogen-based gases are highly soluble inoil-based and synthetic oil-based muds.三、 Answer the question below71. There are a variety of mechanisms that can cause abnormal formation fluidpressures. List 4 of the principle causes below.Answer (a) ———————(1 scores)(b) ———————(1 scores) (c) ———————(1 scores)(d) ———————(1 scores)72. Select the correct sequence of actions1) which should be taken if a well kicks while drilling and the Fast shut-in isto be used.Answer: (3 scores)2) If a well flow while Tripping, which actions should be taken if the Fastshut-in is to be used:Answer:(3 scores)a. A Safety valve (Kelly cock) in the closed position.D O N O T C R O S S T H I L I NE W H E N Y O U A N S W E R Q U E S T I O N Sb. An Inside Blow-Out Preventer (Grey valve).c. An I.B.O.P valve on top of a opened Safety Valve.d. A Safety valve closed with an IBOP valve below it.e. A closed Regan "Fast Shut-off valve".f. An I.B.O.P. valve on top of an opened Regan "Fast Shut-off valve".四、Calculation questions73. Assuming a 10 ppg mud is being circulated at 700 GPM at a depth of 10000ftTVD/MD the circulating pump pressure is 3000 psi. If the circulating friction losses in the system are as follows:Pressure losses through pipe/collars 1200 psiPressure loss across the bit jets 1600 psiPressure loss in the annulus 200 psia. When circulating what is the dynamic bottom hole pressure?Answer..................... (2 scores)b. What is the static bottom hole pressure?Answer..................... (2 scores)c. What is the equivalent circulating density ECD?Answer..................... (2 scores)d. If the pump speed is increased to give 800 GPM, what will the pumppressure be?Answer..................... (2 scores)e. Will this increase in the pump speed have any effect on bottom holepressure?Answer (YES or NO) (2 scores)74. Given the following data:Depth 9850 ft TVDShoe 5500 ft TVDMud 11 ppg (Assume this mud gives an overbalance of 150 psi.) If the top 500 ft of this mud column is cut to 9 ppg and from 500 ft to 1300 ft the mud in the cut to 10.5 ppg, from 1300 ft to 1500 ft the mud is 10.8 ppg. If the rest of the system is uncut, what is the reduction in bottom hole pressure?Answer–––––––––––––––––––––(4 scores)75. Given the following data:Depth 10000ft TVDBit size 8 1/2"Shoe depth 8500ft TVDMud weight 12.6 ppgCollars - 600ft. capacity = 0.0077 bbl/ftMetal displacement = 0.03 bbl/ftDrill-pipe 5" capacity = 0.0178 bbl/ftMetal displacement = 0.0075 bbl/ftCasing/pipe annular capacity = 0.0476 bbl/ftCasing capacity = 0.0729 bbl/ftOne stand of drill-pipe = 94ft.Assuming the 12.6 ppg mud gives an over-balance of 200 psi.a. If 10 st ands of pipe are removed “dry” without filling the hole,what would bethe resultant reduction in bottom-hole pressure?ANSWER........................... (2 scores)b. If 5 stands of pipe had been pulled “wet” without filling the hole, the resultantreduction in bottom-hole pressure would be.ANSWER........................... (2 scores)c. If prior to tripping a 20 barrel slug of 14.6 ppg mud was displaced to prevent awet trip, what would be the expected volume return due to the U-tubing of theheavy mud?ANSWER........................... (2 scores)DONOTCROSSTHILINEWHENYOUANSWERQUESTIONS。
外企面试常见问题114例(中英文对照)
外企面試常見問題114例(中英文對照)1、Have you held other positions like the one you are applying for today?If yes,describe how you pact the expositions to be the same?你過去從事過與你今天應聘的崗位相似的工作嗎?如果是,談一談你的預計他們哪些共同之處?2、What is the most important thing you learned from your previous experience that you will bring to this job?你從以前的工作經歷中學到哪些最重要的東西可以帶到這項工作中來?3、If there were two things you could change in your last (or present ) ob,what would they be and how would you change them?如果在你的前一份(或現在的)工作中,你可以改變兩件事,這兩件事會是什麼?你如何改變它們?4、Please describe your last (or present ) supervisor’s management style。
描述一下你的前任(或現任)主管的管理風格。
5、If you could make one constructive suggestion to your last (or present) CEO,what would it be ?如果你有機會向你的前任(或現任)公司總裁提一個建設性的建議,你會提什麼?6、Can you give a ratio for the amount of time you worked alone to the amount of time you worked with others?在工作中,你獨自工作的時間和你與其他人共同工作的時間各占多大比例?7、How do you feel about present workload ?你對自己目前的工作負荷感覺如何?8、Describe the most significant report or presentation you had to prepare.描述一下你所準備的一次最重要的報告或演講。
海外石油钻井当地雇员英文版考试选择题 (初级工)
1. Which answer is positive kick indicator:(A)A. pit gainB. pump rate increaseC. flow check negative(Flow with pump off)D. trip tank is full2. Select reasons for spacing out the tool joint before shutting in thewell ?(C)A. kill well off bottomB. locate tool joint above rotary tableC. avoid tool joint in the BOP stackD. be able to locate tool joint with annular preventer3. How should the choke manifold be set up to drill when a hard shut in willbe used?(C)A. HCR open Choke openB. HCR closed Choke openC. HCR closed Choke closedD. HCR open Choke closed4. Ten barrels influx in large ID casing causes lower shut-in casing pressuresthan ten barrels in smaller ID casing because.(B)A The kill weight fluid density cannot be circulated as easily.B The height of the influx in the annulus is less in larger casingstrings.C There is more annular friction in small casing strings.D The smaller casing string creates less annular friction.5. What is the pressure for a fluid in TVD 12000ft with density of10ppg.(C)A 8200psiB 7310psiC 6240psiD 5324psi6. What’s function of external thicken at both ends of the drill pipe body(B).A. Enhance drill pipe intensityB. Enhance connection intensity of drill pipe jointC. Improve drill pipe sealing performanceD. Enhance the ability of anti-deflection7. The name of solid natural aggregates formed by one or moreminerals according to certain rules in a variety of geological is (C).A. elementB. mineralC. rockD. formation8. When people come together to lift weights, they should cooperatewith each other, so as to (A).A. lift the heavy object at the same timeB. lift one side of the heavy object firstlyC. lift the heavy object back to backD. lift the heavy object successively9. Traveling system of the rig includes (A), the traveling block, hook anddrill line.A. crown blockB. rotary tableC. swivelD. drawworks10. Legal units of pressure is (C).A. atmB. kgf/cm2C. PaD. MPa11. We can adjust level of manual tong by calibrating (A).A. the adjusting screw on the lower part of the tongB. the balance beam (shaft) on the upper part of the tongC. the adjusting screw on the upper part of the tongD. the balance beam (shaft) on the lower part of the tong12. the size of the safety clamp must be consistent with the (A) of thetubular .A. outer diameterB. internal diameterC. Steel gradeD. Length13. Pulleys can be divided into (A) according to its role.A. fixed pulley and movable pulleyB. single pulley and pulley blockC. shifting pulley and labour saving pulleyD. single-role and multi-role pulley14. The density of water is (B).A. 1kg/m3B. 1000kg/m3C. 1t/cm3D.1000g/cm315. Using a movable pulley, without considering the friction between theobjects, you can save (D) force.A. 1/6B. 1/5C. 1/3D. 1/216. Cutting runs up on the shale shaker due to (A).A. worng rotation direction of motorB.belt pulley is malpositionC.belt is too tightD. belt is too loose17. Which one of the commonly used drilling fuels is hardly lubricative?(D).A. Thread dopeB. GreaseC. Engine oilD. Gasoline18. 1 cubic meters equal to (D) cubic centimeters.A. 102B. 103C. 104D. 10619. When kick occurrs, the data must be observed and recorded doesnot include (D).A. the stand pipe pressureB. casing pressureC.kick volumeD. displacement20. Magma, which is in high temperature and pressure enviormentbeneath the surface of the Earth, after invading crust or spraying out of surface condenses into (B).A. metamorphicB. magmatic rocksC. quartzD. limestone21. Under normal circumstances, the upper strata is (B) than lower strataon formation age.W H E N Y O U A N S W E R Q U E S T I O N SA. earlierB. laterC. not necessarily earlier or laterD. due tostrata22. Which one of the following characteristics does not belong to Engineoil? (A)A.Explosion proofB. Low carbon residueC. Low condensation pointD. anti-wear23. Serious blowout sign is (B).A. overflowB. kickC. pump pressure declineD. pumppressure rise24. The distance that dry powder fire extinguishers should be erectedfrom the fire source is (D) meters.A. 2B. 3C. 5D. 725. When we don’t use hydraulic tong, we should settle all its liquid-gasvalves to (B).A.switch off poisionB. null positionC. open positionD. lowposition26. When travelling block works, (A) pulley rolls most turns than others,so pulleys need to be turned around regularly.A. fast ropeB. dead ropeC. No b ropeD. No c rope27. During drilling process, Kelly should be (B) meters longer than singlejoint.A. 1~2B. 2~3C. 4~5D. 4.5~5.528. The threads on both ends of Kelly are (A)A. left hand upper thread, right hand lower threadB. left hand upper thread, left hand lower threadC. right hand upper thread, left hand lower threadD. right hand upper thread, right hand lower thread29. When using helmet, the interval between the head and the internaltop of the cap generally requires (D) mm.A. 20B. 25C. 45D. 5530. (C) are types of rock that are formed by the deposition of material atthe Earth's surface and within bodies of water. Before being deposited, it was formed by weathering and erosion in a source area, and then transported to the place of deposition by water, wind, mass movement or glaciers which are called agents of denudation.A. BasaltB. Magmatic rocksC. Sedimentary rocksD.Metamorphic31. While lifting weights, our center of gravity should be placed at (B).A. feetB. legsC. backD. arm32. The main role of the Kelly is to (C).A. transfer weight on bitB. extend the drill stringC. transfer torqueD. extend the well depth 33. Which one of the rocks below is metamorphic rock? (D). A. sandstone B. clay stone C. marble D. shale 34. The cathead axis starts rotation before hanging on clutch due to, (A). A. copper sleeve stuck in slide sprocket on the drive shaft B. oil falled into the clutch C. friction plate wear D. clutch stuck 35. When operating the lead tong, we should (B). A. right hand grasping the handle of the tong end, left hand grasping the handle of tong head B. left hand grasping the handle of the tong end, right hand grasping the handle of tong head C. right hand putting on the tong end, left hand grasping the handle of tong head D. right hand grasping the handle of the tong end, left hand putting on the tong head 36. Rig drawworks consists of (D). A. supporting system, transmission system, control system, brake system, lubrication and cooling system B. supporting system, transmission system, balancing system, brake system, lubrication and cooling system C. supporting system, transmission system, pressurization system, brake system, lubrication and cooling system D. supporting system, power system, pressurization system, brake system, lubrication and cooling system 37. While lifting weights, the distance between two feet should be (C) shoulder width. A. greater than B. less than C. equal to D. twice 38. (D) is a naturally occurring solid chemical substance formed through biogeochemical processes, having characteristic chemical composition, highly ordered atomic structure, and specific physical properties. It ranges in composition from pure elements and simple salts to very complex silicates with thousands of known forms. A. Mudstone B. Shale C. Conglomerate D. Mineral 39. Before operating hydraulic tong, we should adjust the the tongs level, so that (A) can be parallel. A. the upper level of tong head and the rotary table B. the upper level of tong head and the horizontal level C. the lower level of tong head and the rotary tableD. the lower level of tong head and the horizontal levelAN SWE RQU E ST ION S40. Before using a slip, we should check (A)A. slip insert, hinge pins, sealing ring, cotter pins, handleB. slip insert, hinge sealing ring, cotter pins, handleC. slip insert, safety latch, sealing ring, cotter pins, handleD. slip insert, hinge pins shaft, sealing ring, cotter pins, handle41. Hydraulic jacks only can be used (B).A. side on groundB. uprightC. upendD. horizontally42. Barreled coring footage is 32 meters, the actual coring is 29.5 meters,so the core recovery rate is (B)A. 82.5%B. 92.2%C. 63.7%D. 100%43. Which one of the below is not the the function of drilling fluid ? (A)A. To transmit torque to tools and bitB. To suspend and release cuttingsC. To control formation pressuresD. To maintain wellbore stability44. The operation procedure of inner tong is (A).A. adjust stance, move the tong to the tubular, forward stance to tight thetong line, back the tong to the right positionB. adjust stance, forward stance to tight the tong line, back the tong tothe right positionC. adjust stance, move the tong to the tubular, forward stance to tight thetong line, push the tong to the right positionD. adjust stance, move the tong to the tubular, push the tong to the rightposition45. The commonly known size of the drill pipe means (B).A.OD of pipe jointsB.OD of pipe bodyC.ID of pipe bodyD.ID ofpipe joints46. The function of drill pipe does not include (D).A. torque transmissionB. conveying drilling fluidC. extending the drill pipe to drill deeperD. to put weight on bit, to avoid well deviation47. 1kg/m3 equal to(A)g/cm3。
海外石油钻井中级工程师考试题(英文版)
TEST PAPERFORMEDIUM DRILLING TECHNICIANTABLE OF CONTENTSOF TEST PAPER FOR MEDIUM DRILLING TECHNICIANTEST GROUP 1TEST GROUP 2Test 1 String the Block in Ordinary Sequence (Mast Type:A)1. Preparation Requirement2. Instructions of Operation and Assessment(1) Operation procedure1) Preparation;2) String the Block;3) Fasten ( Fasten dead line 3 rounds around pulley of dead line anchor, tight itwith pressboard, screw up 6 studs. Tie 300mm long steel line to the dead line end with 2 line clamps, interval between 2 clamps is 50mm. Pull out live end of drill line from inside hole of drawworks drum, pull through lock plate, tie 100mm long steel line to the live end with 2 line clamps, interval between 2 clamps is 50mm) .(2) Instructions of Test Rules1) Test Officer will stop the assessment,if employee operates against rules.2) Full mark of this test is 100 points, the test result will add to group test result asper its proportion.3) Test type: operation test, evaluating according to operation procedures.4) Test purpose: this test is to test employee’s skill of stringing the Block in ordinarysequence.3. Test Time(1) Prepare time: 1 minute ( not included in operation time)(2) Operation time: 10 minute(3) No added points if finish operation within operation time, operation must bestopped after its dead line.4. Test Record TableTest 1 Record TableName: ID: Position: Rig No.:SP-5 / 18Tested by:Checked by: (d)/ (m) /20126 / 18Test 2 Calibrate Weight Indicator1. Preparation Requirement2. Instructions of Operation and Assessment(1) Operation procedure1) Preparation;2) Loose gas discharge screw plugs.3) Calibrate Weight Indicator4) Cleaning site(2) Instructions of Test Rules1) Test Officer will stop the assessment,if employee operates against rules.2) Full mark of this test is 100 points, the test result will add to group test result asper its proportion.3) Test type: operation test, evaluate according to operation procedure.4) Test purpose: this test is to test employee’s skill of Calibrating Weight Indicator.3. Test Time(4) Prepare time: 1 minute ( not included in operation time)(5) Operation time: 10 minute(6) No added points if finish operation within operation time, operation must bestopped after its dead line.4. Test Record TableTest 2 Record TableName: ID: Position: Rig No.:SP-8 / 18Tested by:Checked by: (d)/ (m) /20129 / 18Test 3 Inspect and Maintain Manual Tongs1. Preparation Requirement2. Instructions of Operation and Assessment(1) Operation procedure1) Preparation;2) Check Manual Tong.3) Inspect and Maintain manual tong.(2) Instructions of Test Rules1) Test Officer will stop the assessment,if employee operates against rules.2) Full mark of this test is 100 points, the test result will add to group test result asper its proportion.3) Test type: operation test, evaluate according to operation procedure.4) Test purpose: this test is to test employee’s skill of Inspection and Maintenanceof Manual Tongs.3. Test Time(7) Prepare time: 1 minute ( not included in operation time)(8) Operation time: 10 minute(9) No added points if finish operation within operation time, operation must bestopped after its dead line.4. Test Record TableTest 3 Record TableName: ID: Position: Rig No.:SP-11 / 18Tested by:Checked by: (d)/ (m) /201212 / 18Test 4 Check and Replace the Mud Pump Piston1. Preparation Requirement2. Instructions of Operation and Assessment(3) Operation procedure1) Preparation;2) Dismantlement;3) Measurement and Inspection;4) Assembly.(4) Instructions of Test Rules1) Test Officer will stop the assessment,if employee operates against rules.2) Full mark of this test is 100 points, the test result will add to group test result asper its proportion.3) Test type: operation test, evaluate according to operation procedure.4) Test purpose: this test is to test employee’s skill of checking and replacing themud pump piston.3. Test Time(10) Prepare time: 1 minute ( not included in operation time)(11) Operation time: 10 minute(12) No added points if finish operation within operation time, operation must bestopped after its dead line.4. Test Record TableTest 4 Record TableName: ID: Position: Rig No.:SP-14 / 18Tested by:Checked by: (d)/ (m) /201215 / 18Test 5 Operate Choke Manifold to Standby1. Preparation Requirement2. Instructions of Operation and Assessment(1) Operation procedure1) Check choke manifold;2) Operate choke valve;3) Operate manual gate valve.(2) Instructions of Test Rules1) Test Officer will stop the assessment,if employee operates against rules.2) Full mark of this test is 100 points, the test result will add to group test result asper its proportion.3) Test type: operation test, evaluate according to operation procedure.4) Test purpose: this test is to test employee’s skill of operating choke manifold tostandby.3. Test Time(13) Prepare time: 1 minute ( not included in operation time)(14) Operation time: 10 minute(15) No added points if finish operation within operation time, operation must bestopped after its dead line.4. Test Record TableTest 5 Record TableName: ID: Position: Rig No.:SP-17 / 18Tested by:Checked by: (d)/ (m) /201218 / 18。
出国英语面试常见问题及回答原力文档
出国英语面试常见问题及回答原力文档全文共10篇示例,供读者参考篇1Hi guys! Do you want to know what kind of questions you might get asked in an English interview when you want to go abroad? Let me tell you!Question 1: Can you introduce yourself?Answer: Hi, my name is [Your Name]. I am [Your Age] years old. I live in [Your City]. I love playing sports and reading books.Question 2: Why do you want to study/work abroad?Answer: I want to study/work abroad because I want to experience different cultures, meet new people, and improve my language skills. I believe that studying/working abroad will also help me grow as a person and open up new opportunities for my future.Question 3: What are your strengths and weaknesses?Answer: My strengths are that I am a hardworking person, a good team player, and a quick learner. My weakness is thatsometimes I can be a bit shy when meeting new people, but I am working on improving that.Question 4: How do you deal with challenges?Answer: I deal with challenges by staying positive, working hard, and seeking help from others if needed. I believe that facing challenges is a part of life and it helps me grow and become a better person.Question 5: What are your career goals?Answer: My career goal is to work in a field that I am passionate about and to make a positive impact on society. I also hope to continue learning and growing throughout my career.So there you have it! These are some common questions you might get asked in an English interview when you want to go abroad. Good luck with your interview, and remember to be confident and be yourself!篇2Going for an English interview can be a bit scary, but don't worry! I'm here to help you get ready for some common questions and answers you might face in an interview abroad.Question 1: Can you tell me about yourself?Answer: Sure! My name is Amy and I'm 10 years old. I love playing with my friends and reading books. I also enjoy learning new things and exploring different cultures.Question 2: Why do you want to work/study abroad?Answer: I want to work/study abroad because I think it will be a great opportunity to improve my English skills and experience a new culture. I also want to challenge myself and step out of my comfort zone.Question 3: What are your strengths and weaknesses?Answer: One of my strengths is that I am a good communicator and I enjoy working in a team. However, sometimes I can be a bit shy and I'm working on being more confident.Question 4: How do you handle stress and pressure?Answer: When I feel stressed or under pressure, I like to take a deep breath and focus on solving the problem step by step. I also like to talk to someone I trust to get some advice and support.Question 5: Can you give an example of a time when you worked well in a team?Answer: Yes! In my school project last year, I worked with my classmates to build a robot. We all had different skills and ideas, but through good communication and cooperation, we were able to successfully complete the project.Question 6: How do you stay motivated and productive?Answer: I stay motivated by setting goals for myself and breaking them down into smaller tasks. I also like to reward myself when I accomplish something and stay positive even when things get tough.Remember to be confident, speak clearly, and be yourself in the interview. Good luck!篇3Yo guys! Today I'm gonna talk about some common questions you might get asked in an English interview when you're tryna go abroad! So buckle up, 'cause we're gonna dive right in!Question 1: Can you tell me about yourself?Answer: Sure thing! My name's Sarah, I'm 10 years old, and I love math and science. I'm super excited about the opportunity to study abroad and learn about different cultures.Question 2: Why do you want to study abroad?Answer: Well, I think studying abroad will help me become more independent and open-minded. It'll also give me a chance to improve my English skills and make new friends from around the world.Question 3: What are your strengths and weaknesses?Answer: My strengths are that I'm a hard worker, a good listener, and I love to learn new things. As for weaknesses, I sometimes get nervous speaking in front of a lot of people, but I'm working on it!Question 4: How do you handle challenges or difficult situations?Answer: When faced with a challenge, I like to take a step back, break it down into smaller parts, and come up with a plan to tackle each part. I also like to ask for help from teachers or friends when I need it.Question 5: Where do you see yourself in five years?Answer: In five years, I hope to have graduated from college with a degree in a field I'm passionate about. I also hope to have traveled to new places and made meaningful connections with people from different backgrounds.Alright, that's it for today, folks! Remember to stay calm, be yourself, and have fun in your interview. Good luck! Peace out!篇4Hello everyone! Today, let's talk about some common questions you might be asked in an English job interview. It can feel a little bit scary, but don't worry! I'm going to help you prepare some great answers so you can impress the interviewer.1. Can you tell me about yourself?Sure! My name is Lily, I'm 10 years old, and I love playing soccer and reading books. I am a hardworking student and I always try my best in everything I do.2. What are your strengths?My strengths are that I am a good listener, I'm organized, and I work well in a team. I also have a positive attitude and I'm always willing to learn new things.3. What are your weaknesses?Well, sometimes I can be a bit shy when meeting new people, but I'm working on being more confident. I also tend to get a little bit nervous before big exams, but I always try to stay calm and focused.4. Why do you want to work for our company?I want to work for your company because I admire the work you do and I think I could learn a lot from being a part of your team. I also like that your company values teamwork and creativity.5. Where do you see yourself in five years?In five years, I see myself as a successful student, continuing to learn and grow. I hope to have made new friends and have lots of fun experiences along the way.Remember, it's important to be honest and be yourself in an interview. Good luck, and I know you'll do great! Just remember to smile, stay positive, and show off all the amazing things about you. You've got this!篇5Hello everyone! Today I'm going to share with you some common questions and answers for English interviews abroad. These questions are really important, so make sure you remember them!Question 1: Can you introduce yourself?Answer: Hello! My name is [Your Name]. I am [Your Age] years old and I am from [Your Country]. I am a student at [Your School] and I am studying [Your Grade]. I like to [Your Hobby] and I am excited to have this interview.Question 2: Why do you want to study abroad?Answer: I want to study abroad because I believe it will give me a chance to learn about different cultures and make new friends. I also want to improve my English skills and prepare myself for future opportunities.Question 3: What are your strengths and weaknesses?Answer: My strengths are that I am a hard worker, I am good at teamwork, and I am always willing to learn new things. My weakness is that I sometimes get nervous in new situations, but I am working on overcoming that.Question 4: How do you handle challenges?Answer: I handle challenges by staying calm, thinking positively, and asking for help when I need it. I believe that challenges are opportunities to grow and improve myself.Question 5: Where do you see yourself in five years?Answer: In five years, I see myself finishing my education, starting a career that I love, and traveling to different countries to explore the world.Remember to be confident, smile, and speak clearly during your interviews. Good luck!篇6Hey guys, today I'm gonna talk about some common questions you might get asked during an English interview for going abroad. So let's get started!1. Why do you want to study/work abroad?- Well, I want to study/work abroad because I believe it will give me new experiences, help me improve my language skills, and broaden my horizons.2. What qualities do you possess that make you a good candidate for this opportunity?- I think I am a hardworking, open-minded, and adaptable person. I am also a quick learner and enjoy challenges.3. How do you plan to overcome language barriers?- I plan to immerse myself in the local culture, practice speaking with native speakers, and take language classes if necessary.4. How will you cope with homesickness?- I will keep in touch with my family and friends through video calls and messages, stay busy with activities I enjoy, and make new friends in my new environment.5. What are your long-term goals after studying/working abroad?- My long-term goal is to use the skills and knowledge I gain abroad to contribute to my home country and make a positive impact on society.6. How do you handle stress and pressure?- I try to stay organized, prioritize tasks, and take breaks when needed. I also like to exercise, listen to music, or meditate to relax.Remember, it's important to be yourself and be honest in your responses. Good luck with your interview!篇7Interviewer: Hi there! Thank you for coming in for this English interview. Are you ready?Candidate: Hi! Yes, I'm ready!Interviewer: Great! Let's get started. First question: Can you tell me about yourself?Candidate: Sure! My name is Lily, and I'm in the fifth grade. I love to read books and play soccer with my friends. I also enjoy learning new languages, like English!Interviewer: That's awesome, Lily! Second question: Why do you want to study abroad?Candidate: I want to study abroad because I want to meet new friends from different countries and learn about their cultures. I also want to improve my English skills and become more independent.Interviewer: That's a great answer, Lily! Third question: What makes you a good candidate for studying abroad?Candidate: I think I'm a good candidate because I'm curious, hardworking, and eager to learn. I'm not afraid to try new things and I always do my best in everything I do.Interviewer: Excellent qualities, Lily! Fourth question: How do you plan to overcome any language barriers while studying abroad?Candidate: I plan to practice English every day and talk to my classmates and teachers as much as possible. I also want to join language exchange programs and make friends who can help me improve my English.Interviewer: That's a great plan, Lily! Last question: Where do you see yourself in five years after studying abroad?Candidate: In five years, I see myself as a confident and fluent English speaker. I want to travel the world and meet new people. I also want to use my language skills to help others and make a positive impact on the world.Interviewer: Thank you, Lily, for your great answers! You did an amazing job in this interview.Candidate: Thank you so much! I had a fun time answering your questions. I hope to study abroad and make my dreams come true!篇8Here are some common questions and answers for an English interview:1. What is your name and age?- My name is Sarah and I am 10 years old.2. Can you tell me about yourself?- Sure! I am a student at Happy Elementary School and I love playing soccer and reading books.3. Why do you want to study abroad?- I want to study abroad because I want to learn about different cultures and improve my English skills.4. What is your favorite subject in school?- My favorite subject is English because I love reading and writing in English.5. How do you plan to adapt to a new environment?- I plan to make new friends, explore the city, and participate in different activities to adapt to the new environment.6. How do you handle challenges and obstacles?- I believe in staying positive and never giving up. I face challenges head-on and always try my best to overcome them.7. What are your strengths and weaknesses?- My strengths are that I am a good listener and I am always eager to learn. My weakness is that I can be a bit shy at first, but I am working on being more confident.8. How do you see yourself in the future?- In the future, I see myself as a successful and independent individual who is making a positive impact on the world.9. What do you hope to achieve by studying abroad?- By studying abroad, I hope to broaden my horizons, gain new experiences, and become a more well-rounded individual.10. Do you have any questions for us?- Yes, I would like to know more about the extracurricular activities offered at the school and how I can get involved.I hope these questions and answers help you prepare for your English interview! Good luck!篇9Hello everyone, today I'm going to share with you some common questions and answers for English interviews. Thesequestions are often asked when you are applying for a job or studying overseas. Let's get started!Question 1: Tell me about yourself.Answer: Hi! My name is [Your Name], I am [Your Age] years old. I l ike playing soccer and reading books. I’m a hardworking student and always try my best in everything I do.Question 2: Why do you want to study/work abroad?Answer: I want to study/work abroad because I believe it will help me grow as a person and broaden my horizons. I also want to experience different cultures and meet new people.Question 3: What are your strengths and weaknesses?Answer: My strengths are that I am a good team player, I am organized and I have good communication skills. My weakness is that sometimes I can be a bit shy, but I am working on overcoming it.Question 4: How do you handle stress and pressure?Answer: When I am under stress or pressure, I like to take a break and do something I enjoy like listening to music or going for a walk. It helps me to clear my mind and come back to the task with a fresh perspective.Question 5: Where do you see yourself in 5 years?Answer: In 5 years, I see myself having graduated from university and working in a job that I love. I hope to be successful in my career and continue to learn and grow.Remember, it's important to be honest and confident when answering these questions. Good luck with your interviews!篇10Hello everyone, today I'm going to talk about some common questions and answers for English interviews abroad. Are you ready? Let's get started!1. Can you tell me about yourself?Sure! My name is Sarah, I am 10 years old and I love playing sports and reading books. I also enjoy spending time with my family and friends.2. Why do you want to study abroad?I want to study abroad because I believe it will help me learn new things, meet new people, and experience different cultures. I think it will be a great opportunity for me to grow and develop as a person.3. What are your strengths and weaknesses?My strengths are that I am a good listener, I am hardworking, and I am always willing to learn. My weaknesses are that sometimes I can be shy and I don't always speak up in group settings.4. How do you handle challenges or difficult situations?When I face challenges or difficult situations, I try to stay calm and think about possible solutions. I also like to talk to my family and friends for advice and support.5. What are your goals for the future?My goals for the future are to graduate from university, travel the world, and have a successful career. I also hope to make a positive impact on the world and help others in need.So there you have it, some common questions and answers for English interviews abroad. I hope this was helpful for you. Thanks for listening! Have a great day!。
海外实习、就业英文面试-经典问题汇总
邮轮面试: Personal InformationName:1.What’s your (Chinese) name? Can you tell me your name? May I have your name,please?2.Is there any special meaning in your name? Does it have any different meaning?3.What’s your family name/surname/second name?4.What’s your given name/first name?5.Do you have an English name?6.What’s your English name?7.Why do you choose it as your English name?8.Is there any special meaning in your English name?9.Where do you get your English name? How do you get your English name? Age:10.How old are you? What’s your age?11.When were you born?12.When was your birthday?13.How do you usually celebrate your birthday? What do you usually do on yourbirthday? How do you spend your birthday?14.Did you receive any gift/present? What (gift/present) did you usually receive? Hobby:15.Do you have any hobby?16.What is your specialty?17.What kind of sports do you like?18.How do you keep fit? What do you do to keep in good figure?19.What’s your hobby/hobbies/interest?20.How did you spend the time outside classes?21.What do you like to do in your spare time/free time?22.What do you usually do when you are not working or studying?23.根据回答补充兴趣相关的具体问题Personality24.What kind of person do you think you are? What personality do you have?25.Can you describe your personal character?26.Why do you think you are ?27.Do you get angry easily?Hometown:28.Where do you come from? Where are you from?29.Where is your hometown?30.What’s the location of your hometown? In which part of China is your hometown?31.Can you introduce your hometown to me? Can you tell me something about yourhometown?32.What’s the weather like in your hometown? How about the weather in yourhometown?33.Do you like the weather in your hometown?34.Are there any i nteresting places/scenic spots/ famous places/touristattractions/sceneries in your hometown?35.Which place do you like best? Why?36.Which place do you often go to? Why?37.Is there any special food/snacks/delicious food/specialty in your hometown? Doyou have any famous local products in your city?38.What do you like? Why?39.What’s the difference between your hometown and Qingdao? How is Qingdaodifferent from your hometown? Do you think your hometown is different from Qingdao?40.What do you do to kill the time on the train/in the airplane/on the bus/on thejourney?41.Who pays the ticket for you? How much is it?42.How far is it from your hometown to Qingdao?43.How long does it takes you from your hometown to Qingdao by train/byairplane/by bus?Family:44.Do you mind if I have to ask you some private questions?45.How many people are there in your family? How big is your family? How manyfamily members do you have in your family?46.Besides your parents, do you have any other family members?47.What’s their job? What do they do?48.What is your family income source?49.What’s your father’s job/occupation/work? What does your father do?50.Did you give any present/gift to your father on father’s day?51.What’s your mother’s job/occupation/work? What does your mother do?52.Did you give any gifts to your mother on mother’s day?53.Do your parents agree/support you to work onboard?54.How do you tell/persuade your parents that you want to work onboard?55.Do you spend much time staying with your family?Daily life:56.When do you usually get up?57.When do you usually go to bed?58.When do you eat your breakfast?59.What do you often have for breakfast?60.When do you eat your dinner/supper?61.What do you often have for supper/dinner?62.Do you cook yourself or eat outside?63.Do you smoke?64.Can you drink alcohol?65.What color do you like best?66.Do your hands sweat?67.Is there any scar on your hands?68.Can you speak other languages?69.Can you speak Cantonese? Mandarin70.How long have your stayed in Qingdao? How long have you been in Qingdao?71.When did you come to Qingdao?72.When did you come to Qingdao?73.Why do you come to Qingdao?74.How do you come to Qingdao? How did you come here?75.Why do you come to Qingdao by train/by air/by bus?76.What do you often do in Qingdao?77.Is it the first time for you to come to Qingdao?78.What do you think about Qingdao? What do you know about Qingdao?79.How about your life in Qingdao?80.What are you doing everyday in Qingdao?81.What is the happiest memory of your life?82.What’s your eyesight? Are you short-sighted?83.Do you have makeup every day? Do you often make up?84.If you have a lot of money, what will you do first?85.What do you want most at this moment?86.What was the toughest decision you had to make in your life?87.Tell me about the most difficult person you have had to get along with?88.What is the biggest challenge you’ve faced and how did you deal with it? Educational background:89.Where did you graduate from? Which school do you graduate from?90.What’s your highest education?91.When did you graduate from your school?92.Where is your school?93.How do you think about your school life? Can you tell me something about yourschool life?94.How long have you been learning English?95.When did you start to learn English?96.What do you think about your English?97.How do you improve your English in your daily life?98.How much money do you spend in your school every month?99.Can you tell me some details about your education? What about your education?如果是高中生请继续回答以下问题:100.D id you attend the college entrance examinations?101.What’s your sc ore of the college entrance examinations? How about your college entrance examinations?102.W hy don’t you continue your study? Why not choose to go on with your study?103.W hy do you want to work rather than study?104.W hat lessons/subjects/courses do you often have in high school?105.W hat lessons/subjects/courses do you like best? What’s your favorite lesson/subject/course? Why?如果是专科生或大学生请继续回答以下问题:106.W hich department do you study in?107.W hat’s your major?108.W hy do you choose it to be your major? Why do you study ?109.H ow long have you been learning your major?110.Tell me about the coursesyoucompleted at university, please.111.What kind of lessons/subjects/courses do you often have in your school? 112.What’s your favorite lesson/subject/course? What lessons/subjects/courses do you like most? Why?113.How many years do you spend in your college?114.What certifications do you have? Do you have any certifications?Working experience:115.Are you familiar with hotel service?116.Do you have any related working experience? Do you have hotel working experience? Have you ever worked in hotel? Have you ever been employed? Do you have any practical experience?117.Where did you work before/in the past?118.What kind of hotel is it?119.Can you tell me some detail information about your hotel?120.H ow many star is your hotel?121.When did you start work there?122.W hen did you work there?123.H ow did you find the job?124.W hy did you choose to be a waiter(男服务员)/waitress(女服务员)?125.H ow many guest rooms are there in your hotel?126.H ow many staff are there in your hotel?127.H ow many departments do you know in your hotel? What departments do you know?128.W hat facilities do you have in your hotel?129.W hich department are you in? which department do you work in?130.W hat’s your position?131.What’s your duty/responsibility/job scope?132.W hat are you responsible for?133.H ow many/What restaurants are there in your department?134.H ow many staff are there in your restaurant?135.D o you take shifts to work?136.H ow many shifts do you have?137.W hat’s your working time/timetable/schedule/working hours?138.W hen did you start work and end work every day?139.H ow many days can you rest every month? How many days off do you have? 140.W hat do you think about your last job?141.What do you learn from your last job?142.W hy did you leave/quit your last job? Why did you resign your previous job?What’s the reason for leaving your last job? What made you decide to change jobs?143.D o you know how to slove complaints?144.W hat if the guest can’t understand you? What will you do if the guest can’t understand you?145.W hat was your salary? How much were they paying you if you don’t mind my asking?146.D o you think being a waiter/waitress is not an easy job?147.I f the guest complains that he has waited for a long time, how can you solve it? 148.I f one passenger falls down, what will you do?149.I f you can’t communicate with your guest, what will you do?150.W hat kind of pressure did youfeel on your last job? How did you handle it? 151.Can you describe a situation where you had to do several tasks at the same time? Star Cruise orientation152.W hat do you expect for yourself? Do you have any future plan?153.W hat’s your dream?154.I f you are hired, what will you do? What are your plans if we hire you? What ideas do you have if we hire you?155.I f we hire you, what do you expect to achieve in Star Cruise?156.D o you want to be a leader/manager/supervisor?157.H ow do you know Star Cruise?158.W hat do you know about Star Cruise?159.W hy do you want to join Star Cruise?160.D o you have friends or relatives working in Star Cruise?161.How long do you plan to work in Star Cruise?162.C an you stay there longer?163.W hy should I hire you? What qualifies you for the job?164.D o you know your responsibility as a crew member?165.W hat position do you apply for? What post do you want to apply for?166.W hat type of work will you expect to do at first?167.D o you enjoy working under pressure?168.W hat do you think about working under pressure?169.C an you accept working long hours?170.C an you make up the bed?171.Do you know how to set the table?172.W hat will you do if we reje ct you? What if we don’t hire you?173.C an you stand for long hours?174.A re you confident you can suit a new environment?。
钻井英语口语考试题库
2014年钻井英语口语考试题库编写钻井英语口语考试的考题包括三部分:一、个人热身问题1、包括:家庭、爱好、旅行、工作和学习等。
2、考官任选1-2题请学生做答。
2、考生即时作答,答题时间为1-2分钟。
二、通过抽签抽取钻井专业考题1、教材分为18个单元,考题从中抽取6个题目,考官让学生选择一个号码(1到6)后,老师宣读题目,学生作答。
2、考官问4个相关单元词组,指令和问答,请考生作答。
3、考生有15秒的时间准备。
4、考生就考题做2-3分钟陈述。
三、就钻井现场,考生回答相关问题1、考生30秒的时间准备。
2、考生就考题做3-4分钟陈述。
Test OnePART I: Introduction and General Conversation (about 1 - 2 minutes)In this part, the teacher can choose any one or two of the topics, and let the student answer them in 1-2 minutes.Good afternoon!Sit down, please.Thank you. Now are you ready for the test?First of all, I'd like to know something about you. Could you tell me something about your family ?About FamilyWhere are you from?/Where is your hometown?How long have you lived in your hometown?Is your family a big or a small?/Tell me sth. About it?How often do you visit your family?PART II:Translate the following phrases and sentences of drilling into English, and then answer the following professional questions (About 2-3 minutes)一、Translate the following phrases into English:打捞篮进尺起钻冷凝装置管子站钻井工程师吊环泥浆比重计天车下部钻具结构二、Translate the following sentences into English:1、他们起钻的速度有多快?他们每小时能起30柱钻杆。
船员外派面试
船员外派面试外派面试英语Interview materials General question:1. Please briefly introduce yourself (as an engine cadet机舱实习生) to us. Or tell us something about yourself.2. Please tell me what major专业 you had in the marineuniversity/college/school? 3. What courses (subjects) have you learned during your studies there? Which courses do you like most? Why?4. Why do you want to be a sailor? Are you willing work hard? How long do you want to be a sailor? Do you have any friend as a seaman? What do you know about seaman’s life?5. What other plans do you have for the coming 5 or 6 years?6. Do you think that sailing is a very ideal job for you? Could yourbrother follow your step? 7. If Chief engineer scold 责怪you? Will you fight back回应? Why? 8. Have you got a girlfriend? If you have, will you miss your girlfriend? When you work on board for a whole year? 9. When do you want toget married?10. Do you have hobbies爱好? What hobbies do you like best, why? 11. Which country do you like best?12. What do you think is most important thing on-board ship? Second? Third? (safety)13. If you work on board for one year, will you be very home sick思乡/想家? Do you get a seasick晕船?14. Please name some types of vessels in the world. What types of ship do you like to join? Do you know Tanker油轮? How much do you know Tanker?15. Do you teachers talk English? Do they use English to have lesson? 16.If you have a leave假期, how long do you want to stay home?17. What food do you like? There no Chinese foods in board, how do you feel?18. What will you do in your spare / free time? What kind of leisure activities 业余活动do you do?19. If you are asked to do a lot of jobs on board, will you have some complaint抱怨?20. In your opinion, how can you get along well with other in the work team?如何与别人相处融洽21. Do you know our company? How do you know? What do you know? 22. How many departments 部门are there in a vessel, and what are they? Deck department /engine department23. As far as you know, what equipments are there in the deck/ engine department? What positions are there on board?24. Tell me the whole name of the following anonyms: IMO, STCW78/ 95, SOLAS74, MARPOL 73/ 78, IOPP, ISM.International maritime organizationSeafarers’ training, certification and watch-keeping Safety of life at seaMarine pollution preventionInternational oil pollution preventionInternational safety management25. Have you ever worked on board the training vessel, and with whom did you work together on board the training vessel? How many people were there in your ship? What did you do there?26. Can you use English computer? Can you read / write / listen English? How long have you learnt English?27. Why are you elder大 than your classmate? How do you think of your classmate? 28. What is lifejacket? Lifeboat?救生衣/救生艇 29. How many kindsof Alarm 警报do you know?31. What skills do you offer, that are most relevant in this job? / What skills would you like to develop in this job?32. What motivates you to do this job? /What interest you most about this job? What interests you less?Question for engine cadet: 机舱实习生1. Why do you select to be engineer then not be officer? How many years do you plan to be Chief engineer?2. What is main engine? What are subsidiary engines? Tell me the name of some auxiliary engines.3. Tell me how the fresh water is produced through the fresh water generator?4. If you work as a 3rd engineer, what are your duty hours?5. What are the rough differences between the diesel oil and fuel oil?6. Tell me how about oily water separator and how to treat bilge water.7. Do you know Tanker? How much do you know Tanker? any different in engine room? These are common questions1. Self-introduction/your parents’ job/occupation/personal skills and experiences2. Why do you choose this major?3. Your opinion towards seaman4. Your requirements about working in OOCL5. Say something about your subjects you have learnt6. Describe some basic facilities7. Give some situation, and ask you what to deal with Self-introduction The first one1) Introduce you rself/parents’ job 2) Can you say something about you?3) Can you give a brief introduction about yourself?Name/age/birthplace/hobby/your dreamMy name is and I am 23.I was born in a poor family in Zhoushan.My major is Marine engineering technology. I have some hobbies such as playing basketball, listening to music, seeing western movies and so on. During my school time, I have learned some practical skills and gained some major certificates. Meanwhile, I paid more attention to practising ability by taking part in some activities and associations.I look forward to becoming a member of your company. Thank you! 我是…….今年23岁,我出生在舟山一个贫穷的家庭。
海外项目英语面试问题(共2篇)
海外项目英语面试问题(共2篇)海外项目英语面试问题ell us about yourself.这是一个有关你个性、背景、学习以及工作经历的非常宽泛的问题。
你可以准备一个简洁的回答。
why should we hire you?招聘者正在问有关你的特点和强项的问题。
当然,对求职的公司也要有所了解,你的加入要给对方带来效益才好。
why did you leave your last job?面试人员想要知道你是辞职的,还是被辞退的,或是下岗的,并希望了解原因。
你最好实话实说,职场讲究诚信。
are you willing to relocate?这代表着你是否愿意移居另一个城市或国家。
tell me about your scholastic record.这是指你在学校及大学所学的学科和成绩。
tell me about your extra-cur-ricular activities and interests.这是在问你业余都做些什么和你的兴趣,例如运动、音乐或旅游等。
一个热爱生活的人也会以很好的热情投入工作。
现在,很多企业都比较注意了解求职者的爱好,从外围来考察一个人的综合素质。
how would your last boss describe you?这句话的意思是你的上个老板是如何看待你的。
最好作客观陈述,包括前任老板对你的工作和为人的评价。
what salary are you expecting?招聘者想要知道你对薪资的最低要求。
恭喜你,话谈到这里,说明对方对你已经很有兴趣了。
别狮子大开口,也别委屈了自己。
给自己和对方都留点余地。
#2楼回目录有备无患先知外企英语面试最常见的8个问题海外项目英语面试问题| 2015-11-13 21:351. tell me something about yourself.give me a general introduction about yourself.give me a brief introduction about your education and working experience.please introduce yourself first.2. what’s your goal for future?what will you be in 5 years?what do you think your position will be in 5 years?what’s your blueprint for your future?3. what’s your advantage / disadvantage for this job?what makes you feel confident for this job?why do you like this kind of job?4. tell me your present job description.describe your daily responsibilities.what do you do everyday in your office?5. what kind of person are you?what do you think your colleagues might describe you?what do you think your boss might describe you?what do you think your friends might describe you?6. do you prefer to work with others or by yourself?what kind of people rub you the wrong way?what do you look for in a supervisor?if you were the boss, list the 3 most important persons for you in your business.describe one of your colleagues whom you like best.7. what can you do for us?how does your education relate to this job?describe a goal once you achieved and how you got there. suppose you have a chance to design/evaluate/manage a job, which way do you prefer to do it.what have you learned from previous jobs you have held?8. what’s your expectative salary?what’s your present salary?what do you expect to earn?what if we can’t offer you as you expect?站内搜索:海外项目英语面试问题看了该文章的人还看了:英语的自我介绍面试1、good morning/afternoon/evening, it is really a great honor to have this opportunity/chance to introduce myself. my name is ________. i am graduate空姐英语面试自我介绍hello my name isxx-x.i am xx years old.i graduatedfrom xx-x.i have a dream since i was a child.i dream that one day i can fly in the blue sky like the保研复试面试英语自我介绍good afternoon (morning), professors:it is my great pleasure to be here. first let me introduce myself. i am chenyanlin , majoring in thermal power。
钻井监督面试英语100题词汇表
钻井监视面试英语100题词汇表一、个人情况与简历问答词汇学习world 世界 country 国家American 美国人 nationality 国籍be born 出生 little town 小镇far 远 passport 护照passport number 护照 government passport 因公普通护照private passport 私人护照 home address 家庭地址permanent address 长住地址 certainly 当然Old Elm Street 老榆树大街 old 老的,年龄大的,旧的,elm 榆树 Street 大街work permit 工作许可 three years ago 三年前foreign friend 外国朋友 joined in work 参加工作drilling crew 钻井队 resume in English 英文简历hometown 家乡,老家 little hill village 小山村not far from 离---不远 be located 位于,坐落于north-east part 东北部 kilometer 公里graduated from 毕业于--- High School 高中be admitted 承认,批准,让 Petroleum University 石油大学major 专业 petroleum drilling engineering石油钻井工程take part in 参加 floor-man 钻工be in charge of 担任,承当,负责 six years later 六年后be promoted to be 被提拔为 drilling engineer 钻井工程师tool-pusher 带班队长 rig manager 钻井队长drilling supervisor 钻井监视 deep 深的difficult 困难的 complicated well 复杂井deepest well 最深的井 directional well 定向井degree 度,读数 over 超过biggest deviation 最大井斜 farthest 最远的horizontal displacement 水平位移 bottom of hole 井底well contained salt 含盐井 thickest salt formation 最后的盐层more than 超过,大于二、工作经历问答词汇学习drilling industry 钻井行业 drilling experience 钻井经验field experience 现场经验 types of rig sets 钻机型号,钻机类型kinds of rig 钻机种类 for example 例如,举例electric rig 电动钻机 Top Drive 顶驱,顶部驱动drilling supervisor 钻井监视 rig manager 钻井队长abroad 在国外,到国外 complicated situation 复杂情况sticking 压差卡钻,粘卡 drill pipe parted 断钻具,断钻杆loss of circulation 井漏 overflow 溢流accident of hole 井下事故 key seat sticking 键槽卡钻fishing for 打捞 drill string parted 断钻具,断钻柱cones lost 掉牙轮 resolve blowout 处理井喷kill a well 压井 dispose 处理,解除,排除,对付overshot 卡瓦打捞筒 drilling jar 随钻震击器EZY-Torque 液压锚头 operate the brake 操作刹把tripping out or in 起下钻 start the engine 发动柴油机to change the gears 换挡,倒档 drawworks 钻井绞车upper air spiders 气动吊卡 lower air spiders 气动卡瓦diverter 分流器 drilling top formations 钻上部地层stabbing in cementing 插入式固井 launching head 〔固井用的〕水泥头三、井控技术问答词汇学习〔1-10〕protection 保护,防护 against 逆对,对着,违反,背对blowout 井喷 drilling fluid 钻井液BOP system 防喷系统 difference 差值,差异,不同,区分between 两者之间 sudden 突然push upwards 朝上推 mud column 泥浆柱shoot up 射出,喷出 out of the well 从井里出来reason 原因 ignite 点燃,点火,发火,变热exploding suddenly 突然爆炸 MAASP 最大允许地面套压well control 井控 abbreviation 缩写maximum 最大 allowable 允许的,许可的annular 环形的 surface 外表,地面pressure 压力 condition 条件,状况,处理,形势essential 根本的,不可少的 calculation 计算accurate 准确的 formation 地层strength 强度 casing shoe 套管鞋initiate 开始,着手 drilling ahead 继续钻进under-balanced 欠平衡 situation 情景,情况develop 开展,拓展 increase 增加return 返回,归还 flow 溢流,流动occur 发生 hydrostatic pressure 静压力at any given point 给出的任意位置 in the well-bore 在井depth measurement 测量度深 vertical depth 垂深point of interest 想要的位置 minimize 使最低,最小excess pressure 多余压力 exerted 行使,运用,发挥every time 每次 mud density 泥浆比重pilot hole 领眼 at beginning of each shift 每班开始good operating practices 好的作业措施slow circulating rate pressure 低泵速循环压力installation of diverter 安装分流器词汇学习〔11-20〕circulating out a kick 循环排除溢流 pop-off valve 泥浆泵保险阀first action 第一个行动〔措施〕 close in the well 关井as soon as possible 尽可能快 along 沿着,向前,一道steady rate 稳速 derrick-man 井架工ask 问,要求 slow 慢,放慢mud pump 泥浆泵 down 向下,往下so that 以便,为了 shaker 振动筛,振荡器handle 处理,管理 increase 增加,上升cuttings coming back 返上来的岩屑 at this time 此时the safest course of action 最安全的措施 Pick up off bottom 上提钻具离井底check for flow 观察溢流 circulate bottoms up 循环半周flow- check 观察溢流 periodically 定时,定期perform 执行,完成 during circulation 循环泥浆时in the event of 如果---发生,万一 total loss of circulation 严重井漏statement 述,说法 right or not 对不对depend on 依靠,取决于 mud level in the annulus 环空泥浆液面formation pressure 地层压力 salt formations 盐层usually 通常,一般 permeability 孔隙度be associated with 与---有关 abnormal pressure 异常压力Leak-off tests of formations 地层强度试验evaluate formation strength 评价地层强度mean by ---指的什么意思 overpressure 超高压力with regard to 关于,对于 fluid pressure 液体压力formation fluid pressure 地层液体压力 exceed 超过,胜过,优于normal 通常的,一般的 water hydrostatic pressure水柱静压力pressure gauge readings 压力表读数 determine 确定,决定drill pipe pressure gauge 立管压力表 drilling supervisor 钻井监视lift 提起,上提,上举 float 浮阀active mud system 在用泥浆系统to cause an alarm 拉响警without 没有,如果没有,无 prior 在---之前warning 警告,提醒 during routine operations 正常作业时initiated a drill 开始了演习 generally 一般,通常,总的call 喊,叫人 pit drill 增量演习primary 重要的,根本的,初级的 means of ---方法〔手段〕mud hydrostatic 泥浆静止 while killing a well 压井时pump speed 泵速 casing pressure 套压in order to 为了 keep 保持,维护,控制during SPM change 每分钟泵冲变化时 allow 允许,同意bottom hole pressure steady 井底压力不变 fall 下降词汇学习〔21-30〕while stripping into the hole 强行下钻时drill pipe closed end displacement 钻杆闭端排量at regular intervals 每隔一定的时间或距离bleeding off 排放,放掉 washout 刺了,冲刷坏了adjustable choke 节流阀 recognize 确认,识别,分清both 两,双,二者 leak-off test 地层强度试验carry out 执行,完成 after drilling out casing shoe 钻出套管鞋后new formation 新地层 main function of a diverter 分流器的主要功能direct 正的,顺的,直的,引导 fluid or gas 液体或气体safe distance 安全距离 away from 远离,离开rig floor 钻台 without 没有,如果没有,无closing in the kick 关住溢流 pressure gauge readings 压力表读数calculate 计算 drill pipe pressure gauge立管压力表main purpose 主要功能〔作用〕 choke manifold 节流管汇the overall BOP system 全套防喷系统 safety 安全flexibility 柔性,灵活性 circulating 循环discharging 排出 kick fluid or gas 溢流液体或气体choke valve 节流阀 control back pressure 控制回压while circulating a kick 循环排出溢流时 blow-down line 放喷管线bleed or emergency line 放喷管线 relieve 释放,缓和,减轻large amount of 大量的 release 释放,解放,放出hydrocarbons 烃,碳氢化合物,油气 drill stem 钻柱test 试验,测试 reverse out 反向,倒出,退出,倒退test string 测试钻柱 throughout 全部,到处,任何局部,遍布world 世界 most common 最普遍的,cause of ---原因,---引起 abnormal formation pressure 异常地层压力faults 断层词汇学习〔31-40〕BOP stack 防喷器组合结构 control system 控制系统connect 连接,结合 function test 功能试验perform 执行,完成 during a kill 压井时pump rate 泵速 holding casing pressure constant 控制套压不变affect 影响 bottom hole pressure 井底压力stay constant 保持不变 shut in a kicking well 溢流关井hard shut-in procedure 硬关井程序annular or ram BOP 环形或闸板防喷器both 二者,两,一对,双 maximum 最大限度,最大的available 可采用的 hydraulic pressure 液压drilled gas 钻进气 formation gas 地层气on the second circulation 第二个循环周driller’s method 司钻压井法 held constant 保持压力不变until 一直到,等到 kill mud 压井泥浆reached surface 到达地面 increase 增加,上升wait and weight method 等待压井法,工程师压井法drill pipe pressure drops 立压下降 below 在---之下the line of the graph 设计线 as the kill mud goes down当压井泥浆下行时decrease 下降,减少 mud property changes泥浆性能变化formation fluids 地层液体 enter the hole 进入井gas cut mud 泥浆气侵 always indicate 总显示under-balanced 欠平衡的 trip tank 井控监测罐monitor 监测 mud volume 泥浆量trip out of the hole 起钻 running casing in 下套管wire logging 测井,电测 drilling break or cavern 快钻时与放空slipping and cutting the drilling line 滑大绳与倒大绳词汇学习〔41-50〕calculate KWM 计算压井泥浆比重 shut-in drill pipe pressure 关井立压value 值,数值 shut-in casing pressure 关井套压influx gradient 地层流体压力梯度 type 类型indication 显示,指示,说明 mud flow 泥浆排量increased in return line 出口排量增加 pump pressure 泵压mud density 泥浆比重 decrease 下降,减少inside BOP 钻杆防喷器 at any position 任何部位〔位置〕in the drill string 钻柱 drop-in check valve 投入式回压阀dart valves 投入式回压阀 surface diverter 分流器hooked up 安装 large increase 大量增加flow rate 排量 keep pumping 开着泵close the diverter packer 关分流器 maintain constant 保持稳定,不变bottom hole pressure 井底压力 follow 跟着,随着,沿着the pressure step-down chart 压力下降表recognize 识别,确定,认出 shaker hand 场地工driller 司钻 tell 告诉slow the pumps down 缓慢降低泵速 because 因为too much 太多 shut down 停下flow check 观察溢流 most important 最重要的problem 问题 preventing blowout 防喷precaution 措施,考前须知 drilling top hole 钻上部井眼shallow gas blowout 浅层气井喷 total 总共,总数,共计specific precaution 具体措施 control penetration rate 控制钻速minimize the risk of 把---风险降到最低限度词汇学习〔51-60〕shallow gas 浅层气 without a diverter 不装分流器as soon as 一--- 就--- conductor 导管set 放,安置,安装,就位 float valve 回压阀drilling top-hole 钻上部井眼 advantages 优点disadvantage 缺点 cuttings or sand 岩屑或砂子make connections 接单根 reversing circulation 反循环read 阅读,读,看 directly 直接地hole conditions 井下情况 may cause 可能引起〔发生〕excess of 超过,过量 annulus 环形load with 携带,承载 keeping hole full 保持井灌满泥浆over-pressured formation 超高压地层 procedure 程序,步骤maintain pump rate 控制泵速 change over to 转换为---rig floor 钻台 pick up with pumps running 开着泵上提space out 腾出空间 lower Kelly cock 方钻杆下旋塞above rotary 转盘以上 shut down 停下,关掉nonessential equipment 用不着的设备 turn on 打开,启动rig floor deluge system 钻台供水系统 in order to 为了reduce 减少,下降,减去 chance of ---机会fire or explosion 失火与爆炸 offshore rig 海洋钻机sea 海 around 周围,四周evidence 迹象,根据 break out 突然发生,爆发exact shut-in steps 正确的关键步骤 stop rotating and drilling 停转盘停止钻进raise Kelly 上提方钻杆 top drive 顶驱until 直到,等到 stop pumps 停泵observe well for flow 观察溢流 hydraulically-operated 液动的choke line valve 节流管线液控阀 appropriate BOP 适当的防喷器top pipe rams 上部钻杆闸板 record 记录closed-in drill pipe pressure (Pdp) 关井立压closed-in annulus pressure (Pa) 关井套压prepare 准备 kill the well 压井dril string 钻柱 spare Kelly cock 备用方钻杆下旋塞rotary table 转盘 short pup joint 短钻杆disconnect top drive 卸掉顶驱 remove pup joint 卸掉短钻杆back pressure valve 回压阀 prepare to strip-in 准备强行下钻shut-in drill pipe pressure (SIDPP) 关井立压shut-in casing pressure (SICP) 关井套压determine 决定,确定 data 数据collect 收集,采集 measure 测量,丈量pit-level increase 泥浆罐液面增量 active mud density 在用泥浆比重hole depth 井深 casing shoe 套管鞋depth and size 深度与规 length 长,长度drill collars 钻铤 drill pipes 钻杆record these data 记录这些数据 surface BOP kill sheet 地面压井施工单as quick as possible尽可能快 necessary 必要的,必须的compute 计算 mud density 泥浆比重require 要求,需要 balance 平衡,秤,天平pumping speed 泵速 unless 如果不,除非already 已经,早已 based on 根据,依照preestablish 重新建立 maintain 保养,维持,继续mixing rate 混合速度 barite 重晶石but not more than 不能大于〔多于〕 a number of 一些,许多,假设干pump strokes 泵冲 displace 顶替,替换,移动influx 地层流体 killing graph 压井表格show 展示,示出 stand pipe pressures 立管压力against 对着,逆着,违反 elapsed pump strokes 已完成泵冲数词汇学习〔61-70〕above calculations 以上计算 remain close 保持关闭closed-in pressures 关井压力 observe continuously 连续观察gas migration 气体上串 percolation 渗透,渗入,沥滤continue 继续,连续 rise 上升simultaneously 同时地 initial build-up 开始形成,最初累积unless 如果不,除非 remedial action 补救措施danger 危险 formations breaking down 地层破裂requirement 要求 while killing operation 压井作业时delay 耽误,迟到 with the minimum of 以---最低限度start pumping 开泵 required density 要用的比重select pump speed 选择泵速 from this moment 从此choke pressure Pch 节流压力 annulus pressure 环空压力,套压be referred to as 被称为--- drill pipe pressure 立管压力stand pipe pressure Pst 立管压力 adjust the choke valve 调整节流阀 choke pressure 节流压力 equal 等于,与---相等closed-in annulus pressure关井套压 read 阅读,读出normally 通常,一般 derive from 导出,得出,引来pre-kick 预涌 consider 考虑,思考,认为,注意actual pressure 实际压力 correct 正确的,纠正,改正plot the killing graph 画出压井表格 IWCF 国际井控论坛surface BOP Kill Sheet 地面防喷器压井施工单Keep the pump rate constant 保持泵速不变throughout the killing operation 整个压井过程 ensure 保证,一定actual stand pipe pressure 实际立压 corresponding 相当,对应,符合a number of 一些,假设干,许多 pump strokes 泵冲数read off 读出 graph 图标,图解,图示exceed 超过,胜过,超出 MAASP 最大允许套压remember 记住 time delay 迟到时间adjustment 调整,调试 register 登记,记录,指示Pst gauge 立管压力表 second 第二pressure transmission rate 压力传导速度pressure transmission time 压力传导时间approximately 大约 dependent 依赖,依靠,相关,从属factors 系数 measure 测量record continuously 连续记录 density 比重viscosity 粘度 de-gas treatment 除气处理discard 丢掉,抛弃,报废 contaminated 被污染的heavy mud 重泥浆 possible 可能appear 显示,呈现,显露 zero 零fully 完全地,十分 dead 死亡,死了,死的afterwards 向后,往后 bleed off 排放,排除,排出hydraulically-controlled 液压控制的 side outlet valve 旁通阀doubt 怀疑 as to 至于whether 是否 carry out 执行,完成experiencing 经验,经历 excessive drag 过大的摩阻,遇卡hole cleaning problems 井不干净 losing circulation 井漏during weighting up 加重时 changing out 改变,更改liner size 缸套尺寸 kick control procedure 溢流控制程序at the beginning of each tour 每次接班时with each pump 用每台泵 update 更改,变更bit 钻头 jet 喷嘴determine 决定,确定 desire 希望,愿望,想要kick control procedure 溢流控制程序weight material 加重材料 SCR 低泵速equipment mixing capacities 设备配浆能力specified 具体的,实际的 kick control worksheet 压井施工单Drilling Progam 钻井设计 daily drilling report 钻井日报表isolate 隔离,分开,绝缘 stabilised pump pressure 稳定的泵压pre-determined 预先确定的 drill out the cement 钻水泥塞cement plug 水泥塞 casing shoe 套管鞋new formation 新地层 data obtained 获得的数据treated with care 认真对待 well killing procedures 压井程序mud properties 泥浆性能 anticipate 预期,期望rig gauge 钻井仪表 accurate enough 足够准确measurement 测量,丈量 covering 包括,覆盖preferably 宁愿,更好 pit volume drop 罐液面下降electric rig 电动钻机 rig pump 钻井泵suitable 适当的,相匹配的 lower kelly cock 方钻杆下旋塞IBOP 钻杆防喷器 various pressure ranges 各种压力围back pressure valve 回压阀 uniform 一样的,均匀的increment 增加,增量 stabilise 使稳定,安定cumulative 累积的,渐增的 static pressure 静压力routine 日常的,常规的 circumstance 情节,情况,事实check trip 短起词汇学习〔71-81〕picking up the kelly 上提方钻杆 flow check 观察溢流tool joint 钻具接头 annular preventer 环形防喷器prevent sticking 防卡 differential sticking 压差卡钻possibilitiy 可能性 rotate drill string 旋转活动钻具move the string up 上提活动钻具 same position 一样位置〔岗位〕drilling break 快钻时 daily drilling report 钻井日报表along with 与---一起〔同时〕 flow line 泥浆出口管pump suction 泥浆泵上水口 reverse drilling break 慢钻时slowing of penetration rate 慢钻时 indicate 显示,指出hard gas sand 含气砂岩 rapidly 迅速地rely on 依靠,依赖 flow-show 流量计mud tester 泥浆工 mark 做记号monitor 监测 active mud pit 在用泥浆罐trip tank 井控监测罐 compartment 隔板,隔间,隔舱fluid level 泥浆液面 independently 独立地mud logger 泥浆录井工 specific procedures 具体程序with pumps on 开着泵 pick up the drill string 上提钻具until 直到--- kelly valve 方钻杆旋塞above the rotery table 转盘面之上 with a top drive 用顶驱first tool joint 第一个接头 across the pipe rams 通过闸板防喷器shut off the mud pumps 停泵 Look down 往下看bell nipple 喇叭口 necessary 必要的,必须的remove 卸掉,取出,移开 insert bowls 转盘方瓦electronic sensors 电子传感器 detecte 探测,监测as per 按照,遵照 resume drilling 恢复钻进closely watch 密切观察 pit volume 泥浆罐容量bottoms up 迟到时间,半周 bit trip 换钻头起下钻hydrocarbon zone 油气层 expect 期望,指望,料想,要求encounter 遇到,碰到 initial 最初的,开头的negative 负数,否认的,消极的 additional 增加,添加,附加each time 每次ECD (equivalent circulating density) 当量循环比重exceed 超过,胜过,大于 due to 由于annular friction losses 环空压力降 turn off 关掉,停下make a connection 接单根 hydrostatic pressure 静压力mud and influx 泥浆与地层流体 chart 表格including 包括 check trips 观察溢流短起下钻BHA trips 调整钻具结构起下钻 wire line logging 测井slip or cut drilling line 滑大绳与倒大绳 filling 灌泥浆draining 排泥浆 transfer 转泥浆,倒泥浆direction 方位,方向,引导,指导 responsible for 负责---,对---负责manual 手动,手调的,手册 backup 备用的,代替的contingency 偶然性,偶然事故 dilution 冲淡,稀释,稀度plan 计划 automation failures 自动损坏,失败notify 通知 company representative 甲方代表immediately 立即,马上 irregularity 不正常的,无规律的fill 灌满 displacement volumes 顶替量active surface mud system 地面在用泥浆系统 derrick man 井架工mud tester 泥浆工 shale shakers 振动筛solids control equipment 固控设备 dump line valve 排泄管闸门set up 建立,引起,升高 align 校直,列队,使---成一线discharge valve 排泄阀 line up 调整,排列,使---一致standpipe manifold 立管组装闸门 periodically 定时,定期as needed 根据需要 mud treatment equipment 泥浆处理设备switch off 关掉,停下 unless 如果不,除非mud processing 处理泥浆 surveillance 监视,监视supervision 监视,监视 ensure 保证,sufficient 足够的 space 空间configuration 结构,框架,轮廓 upon 根据,依照,按照instruction 指令recommend 推荐empty空的,排空 start up 启动,打开bring pumps up to 把泵速提到 look at 看,观察switch over to 转接,切换in accordance with 遵照,按照,依据,与---一致。
海外石油钻井当地雇员英文版考试判断题 (中级工)
1. (√) In case there is failure in some equipments during drilling operation, such asmud pump stops for failure, it is necessary to circulate drilling fluid and work drill string as soon as possible.2. (√) When makes up drill collar, derrick man should pay attention to the lift subfrom breaking out, give signal to driller immediately if any abnormal breaking out occurs.3. (√) When works on money-board, derrick man should listen carefully to abnormalnoise of crown block, pay attention to rising position of travelling block, and report to driller in time.4. (×) While working at height, safety belt tail should be fixed to the derrick anglebrace.5. 485 (√) It’s forbidden to riding on travelling block or air hoist to go up and down tomonkey board or derrick.6. (×) The work status of flat valves of choke and kill manifold should be half-openhalf-off state.7. (×) After latching on elevator during POOH drill string, should switch on low-speedclutch to tight the hook spring at one time, and then lift drill pipe at low speed.8. (×) If wellhead pressure is too high, we can use BOP to release pressure slowly.9. (×) Generally drawworks brake pads should be replaced at the same time10. (√) While POOH drill collar, derrick man should fasten drill collar with mule lineafter pulling it to position, preventing it slipping out of pipe finger and ensuring RIH easily in the next trip.11. (×) Overshot can catch fish by grasping its inner wall, and then we can buildpressure in mud pump and break circulation, so as to free the fish through stuck point.12. (√) It is forbidden to start the rotary table with weight on bit during drillingoperation.13. (√) When travelling block rises up, derrick man should pay attention to it andprevent that drill line goes to pipe finger or travelling block crashes on pipe finger or monkey board. He should give signal to driller immediately if any abnormal occurs.14. (×) Trip spear can catch fish by grasping its inner wall of tubular, it may do somedamage to the fish because it only prasps small part of fish.15. (√) When other conditions are not changed, ROP will decrease if dill mud densityincreases.16. (√) Too high viscosity and shear force will increase flow resistance, decrease ROP,and will easily cause downhole problems, such as balled bit, pipe stuck, blowout, lost of circulation, borehole collapse,gas invasion etc.17. (×) Someone should stand near travelling block to watch on it while cutting thedrill line.18. (√) While circulating drilling fluid, if the bottom hole pressure is greater than orequal to formation pressure, overflow may occur if stop circulation.19. (×) If drill bit is stuck for the well hole is only a little bigger than the bit, shouldfirstly trip down fast, and overpull is not allowed.20. (√) When other conditions are not changed, ROP will decrease if dill mudviscosity increases.21. (√) While POOH drill collar, after settling safety clamp, connecting lift sub, shouldfirstly latch on the elevator, and then make up the lift sub with tongs.22. (√) The mud pump circulating pressure will drop when overflow occurs duringdrilling.23. (√) Pulling too fast during POOH or braking too fast during RIH will cause veryexcessive axial vibration of drill pipe.24. (√) The solid phase of drilling fluid should be as low as possible.25. (√) Derrick man should latch on the elevator only after travelling block is stable,and should give signal of running only after elevator is on position.26. (√) If filling drilling fluid is less than drill string displacement during POOH , itmeans overflow occurs.27. (×) In any case, we should try to pull or trip down drill string in the event of pipestuck, and try to pick up and make up Kelly to break circulation, so that we may solve the problem quickly.28. (√) If ROP significantly increases or travelling empty, overflow may occurs.29. (√) During drilling operation, the mud pit level will ascend if overflow occurs.30. (√) “Hard shut in” means shutting in we ll by BOP when choke manifold is closed.31. (√) Drawwoks brake system consists of hydraulically actuated caliper assembly(service calipers and emergency calipers), hydraulic operators control assembly (brake handle) , hydraulic power unit, water cooling assembly and auxiliary break assembly.32. (√) Someone should look after mud pump clutch in driller’s room when replacingmud pump liner, to prevent opening the pump accidently.33. (×) It is not allowed to pull or trip down drill string fast, if annular BOP is operatedby pressure reducing value or buffer accumulator.34. (√) Should test Crown-O-Matic from low gear to high gear one by one.35. (×) 80% rated HP is appropriate if diesel engine will run long-term.36. (√) Before testing Crown-O-Matic, should firstly remove transmission chain andtest the drawworks brake system.37. (×) Choke and Kill Manifold can service as daily filling pipe lines.38. (×) PDC bits are suitable for hard formation and competent formation.39. (√) Most of drill collars are used to give weight to drill bit during drilling operation,so there should be one point of zero tension and zero compression,which is called neutral point.40. (×) Drill pipe near “neutral point” will resist very great tension, and this is oneserious part to resist force in the whole pipe.41.(√)H2S at low concentration may cause irritation of eyes.42.(√)Because H2S tends to move with the wind, it is important to stay upwind of anypotential points of release.43.(√)H2S at High Concentration may cause rapid loss of consciousness and death44.(√)H2S at Moderate Concentration may cause excitement, headaches, dizziness, nausea,vomiting, coughing, and loss of equilibrium.45.(√)For a well shut in, BHP will be equivalent to the HP plus SP.46.(×)When using the choke to adjust pressure during kick circulation it is the Drill PipeGauge that reacts to the adjustment before the Casing pressure gauge.47.(√)For a well shut in, BHP will be equivalent to the HP plus SP.48.(√)Drill pipe Float Valves can prevent well blowout.49.(√)Bowl protectors’ diameter must be large enough.50.(√)Electro-Hydraulic remote control system is acceptable for freezing temperatures.(×)Drilling fluid must be used to flush choke lines and kill lines.51.(×)Only the engineer’s method maintains constant bottom hole pressure52.(×)In the engineer’s method the well is dead when you reach FCP.53.(×)workers wear face shield when they are being lifted in an elevating work platformbasket?54.(√)Normally various gas detect sensors are installed in gas testers.55.(×)Gas testers can be calibrated in workplace irrespective of air condition.56.(√)Usually LEL and content of oxygen can be read from gas testers.57.(√)The deficiency of understanding of contract is one of problems exists in SaudiArabian drilling market58.(√)the solenoid valve is intslled on the main body of TDS.59.(×)well site survey is dispensable to the prepraration of a new drilling campaign.60. (√)Causes of kicks include failure to keep the hole full of mud, swabbing, surging,lost circulation, mud weight not heavy enough, abnormally pressured for-mations, and annular gas flow after cementing.61. (×) Usually, when you pull pipe from the hole, the mud level in the hole increases.62. (×) Swabbing occurs when drilling mud is forced into a formation.63. (×) Surging occurs when drilling mud is pulled into the hole.64. (√) Fo rmation fracture occurs when the pressure exerted on the formation is sohigh that the pressure fractures, or cracks open, the formation.65. (√) If the hydrostatic pressure the mud exerts on bottom is 4,652 psi andformation pressure is higher than 4,652 psi, the well will kick.66. (√)Abnormally high formation pressure can lead to a kick.67. (×)During a cementing operation, the rig crew does not need to be aware of kicksbecause they only occur when drilling ahead.68. (×)Under no circumstances is formation pressure ever allowed to flow into thewellbore.69. (×)Annular gas flow occurs when gaseous formation fluids flow to the surfacethrough the drill pipe.。
海外业务类面试题目(3篇)
第1篇一、自我介绍与职业规划1. 题目:请您用3分钟的时间,用英语或中文进行自我介绍,并简要说明您的职业规划。
解析:这道题目旨在考察应聘者的语言表达能力和自我认知。
应聘者应清晰、自信地介绍自己的教育背景、工作经验、技能特长等,同时表达出自己对海外业务的兴趣和职业规划。
2. 题目:您认为自己在哪些方面具备优势,能够胜任海外业务工作?解析:这道题目考察应聘者对自己的认知和优势分析能力。
应聘者应结合自身实际,从专业知识、技能、工作经验等方面进行分析,突出自己的优势。
二、专业知识与技能1. 题目:请简要介绍您对国际贸易流程的了解。
解析:这道题目考察应聘者对国际贸易基本流程的掌握。
应聘者应从合同签订、信用证、装运、结算等环节进行阐述。
2. 题目:请您谈谈对国际支付方式的了解,以及不同支付方式的特点和适用场景。
解析:这道题目考察应聘者对国际支付方式的掌握。
应聘者应了解常见的支付方式,如电汇、信用证、汇票等,并分析不同支付方式的特点和适用场景。
3. 题目:请举例说明如何进行国际市场调研,以及如何分析竞争对手。
解析:这道题目考察应聘者对市场调研和竞争分析的能力。
应聘者应阐述市场调研的方法,如问卷调查、网络搜索等,并说明如何分析竞争对手的产品、价格、渠道等。
三、业务处理与沟通能力1. 题目:在业务洽谈过程中,客户突然提出更改订单,您会如何应对?解析:这道题目考察应聘者的应变能力和沟通技巧。
应聘者应阐述如何与客户沟通,了解客户需求,并提出合理的解决方案。
2. 题目:如果遇到客户投诉,您会如何处理?解析:这道题目考察应聘者的客户服务意识和解决问题的能力。
应聘者应阐述如何耐心倾听客户投诉,分析问题原因,并提出解决方案。
3. 题目:在跨国沟通中,如何克服文化差异带来的障碍?解析:这道题目考察应聘者的跨文化沟通能力。
应聘者应阐述如何了解不同国家的文化背景,尊重当地习俗,并运用适当的沟通技巧。
四、团队合作与领导能力1. 题目:请您分享一次团队合作的经历,并说明自己在团队中扮演的角色。
2014年钻井英语涉外面试题(自编)
20##涉外英语培训面试题1.Say something about your position as much as you can.As a drilling engineer, working in Saudi market is quite different from working in domestic market. Our main job is to coordinate with third party, convey the instruction to the rig crew, collect data and complete IADC report. We are also responsible for well control, managing the drilling tools, and training the crew members.2.What are the duties of your position?1.Be responsible for the implementation of instruction.2.According to the well design, give some technical advices tothe company if need.3.Coordinate and cooperate with other departments.4.Manage drilling instruments and drilling tools.anize BOP drill and record the results.6.Be responsible for the management of well control.7.Collect data and complete IADC report.8.Train the new arrivals some information about well control. 3.When overflow occurred during drilling, what do you do?1.Give an alarm.2.Open the hydraulic valve to allow the mud fluid to flow to thedegasser.3.Close the annular BOP, then close ram BOP.4.Close the choke valve slowly, don’t exceed the maximumallowed casing pressure.5.Keep the pressure stable, read and record the mud volume.4.What is rigging up and how to rig up? Say something about it.Rigging up means installing all the equipment one by one after mobilization. Usually we install the derrick substructure first, then install the drawworks,platform , rotary table, derrick. At the some time, install the mud tank, mud pump, diesel generating sets, then install the drilling line and pull the derrick up, then install the TDS.5.According to your understanding, what is the different betweenMWD and LWD?MWD means measurement while drilling, it only can measure the data of well , azimuth, and TVD.LWD means logging while drilling, It can not only measure the data of well inclination, azimuth, TVD but also the data of rock resistivity, nature gamma, pore pressure, rock porosity, rock density.6.Basically, what does the hoisting system consist of?The hoisting system consist ofdraw works, crown block, drilling line, traveling block and hook.7.How many types of bits we usually used?They are cone bit <rock bit>, PDC bit, diamond bit, drag bit and coring bit.8.Describe function of mud.The principal function of the mud are:1.To clean the hole2.To cool the bit 3.To prevent the formation form collapse 4.To lubricate the drilling tools5.To balance the formation pressure 6.To remove cuttings form the bottom of the hole.9.How many points do you check daily? What are they?Seven. BOP stack, remote control house, tool sledge, mud tank level sensor, mud volume, mud property, drilling parameters.10.H ow many well killing methods do you know? Describe them? Two.they are the driller’s method and engineer’s method.Driller’s method requires two cycles of circulation. In the first circle, we use old mud to displace contaminated mud out of bore hole. In the second cycle ,weighted mud been pumped into the bore hole to kill the well. Engineer’s method requires only one cycle of circulation. After shut in the well, according to the shut-in pressure, we can calculate the mud density for kill the well, then weight the mud and pump the weighted mud to displace the contaminated mud and kill the well at the same time. 11.W hat can we do if overflow occursin empty well?Give an alarmEnsure the well bore is full of mud and stop pumpingDrain off the metering tank20~30minutes later, monitor and record the rising of fluid level inthe metering tank for 5~10 minutes.12.D o you know about S135 drill pipe? What does S135 mean? Yes, I do. S135 means that the tensile strength is 135kpsi13.W hat kinds of drilling tools does a fishing assembly consist of?It normally consist of make-up sub, safety sub, drilling jar, drill collar and accelerator.14.G enerally, how many bit breakers are there on the drill floor?Describe the size.24〞, 20〞, 17 1/2〞, 12 1/4〞, 9 7/8〞, 8 1/2〞, 6〞15.G enerally,what are the parameters of drilling?Pump pressure, weight on bit, rotary speed, flow rate, torque and so on.16.H ow many kinds of electrical voltage do you have on the well site? Three. 110V, 220V, 380V110-volt is used for imported electrical equipment220-volt is used for office equipment and lighting system380-volt is used for circulation system17.W hat do you call the space between the drill pipe and the sides ofborehole?Annular space18.D escribe some units we usually used in KSA.Inch, foot, gallon, pound, barrel19.W hat is the difference between rotary drilling and TDS drilling?Rotary drilling use rotary table driving the drill string, TDS uses a top motor to drive the drill string.Rotary drilling can make up single joint every time, but TDS can make up stand every time.while tripping.if we want to make a circulation, rotary drilling requires us to make up Kelly at a right position. with TDS, we can make circulation at any time if downhole complicated, we can back ream with TDSWITH TDS, derrick can work on the monkey board easily.20. What is a wildcat well?The wildcat well means to drill a well in a region where there is never been drilled. this kind of test in petroleum mining is called wildcat well 21. How many fishing tools do you know?Overshot, junk mill, junk basket, junk sub, spear, taper tap, box tap,strong magnetic fisher.22. How often do you check the crown-o-matic?Every day. the day shift should check the crown-o-matic.23. When do the H2S drill, what do you do?As soon as the alarm rings, the driller and two floorman done 30-mins SCBA and shut in the well immediately. Then wait for the instruction of company man. All other personnel on the well site done 15-mins SCBA and reach at the Safe Briefing Area.Toolpusher and assistant driller done 30-mins SCBA and go to the drill floor with H2S detector, detect the H2Sand find the sources. Then report it to the supervisor.At the same time, safety officer and medical check the members of personnel. Search team don 30-mins SCBA, to search along the searching route and report the information to safety adviser while return to the Sate Briefing Area.24 .What dose IADC/LCM/BPV/BOP/LNG mean?IADC means international association drilling contractor.LCM means loss circulation material.BPV means by pass valve.BOP means blowout preventer.LNG means liquefy natural gas.25. What do BOP, SPM and RPM stand for?ROP stands for rate of penetration.SPM stands for strokes per minute.RPM stands for rotary revolutions per minutes.26. What is the junk basket used for ?Junk basket is used for fishing junk pieces in bottom hole.27. What is the difference between a kick and a blowout?Kick means the bottom hole pressure can not balance the formation pressure,formation fluid flow into the bore hole.Blowout means formation pressure make mud quickly spurt from wellhead, even reach the height of monkey board.28. How shall we do a flow check?If a well is identified, we should do a flow check first.Ensure the well bore is full of mud, Stop pumping, drain off the metering tank,Monitor and record the rising of the fluid level in the metering tank for 15 minutes<if oil base mud, we need 30 mines>29. How dose a kick occur?Continuous influx of formation fluid, loss of circulation, drill string swabbing effect and so on cause the bottom hole pressure below to the formation pressure, so more and more formation fluid flow into the bore hole, we called this phenomenon a kick.30. What other drilling instrument are used during drilling in addition to the weight indicator, pump pressure gauge and the flow rate gauge?We also use a rotary gauge, a torque gauge, a mud recorder, etc.31 What kinds of hand tools we usually used?There are many kinds, such as monkey wrench, chain wrench, pipe wrench, open-ended spanner, ring spanner, box spanner, screwdriver, hand vice and so on.32阐述个人教育背景关键词;education background I graduated from... my major is....33如何提升个人口语能力How to improve the oral English?34是否做好了出国准备,都做了哪些准备?关键词go abroad, preparation35个人的工作简历有哪些?关键词work experience36名字来历,天气情况等?关键词climate season37个人问题的问询?关键词private family marriage etc38与外国人是否存在文化冲突?关键词foreigner culture shock39典型钻具组合有哪些? 关键词typicalBHA40闲暇时间做些什么?关键词spare time kill time41当地雇员怎么样?如何与之交流合作?关键词local employee communicate cooperate42. 常见的钻井参数有哪些?关键词:parameter, RPM,SPM,WOBetc43. 用过哪些类型的井架?关键词:type, rig,derrick44. 用过哪些尺寸的钻铤或钻杆?关键词:DP,DC,size45. 是否用过螺旋钻铤?关键词:Spiral drill collar46. 5寸钻杆的扣型?或如何连接?关键词:thread, connection47. 用过何种泥浆体系?关键词:type, oil-base, water-base48. 泵压下降的原因有哪些?关键词:pump pressure, drop down, reason49. 泵压下降后应如何处理?关键词:drop down, deal with50. 井控装备有哪些?关键词:well control equipment51. 泥浆泵安全阀设置压力是多少?关键词:pop-off valve, relief valve52. 泥浆的性能主要包括哪些要素?关键词:function, involve53. 用什么手段或者工具监测泥浆性能呢?关键词:instrument monitor54. 远控房都检查哪些地方?关键词:remote control house,inspect55. 如何打超高压?关键词:bypass, pressure56. 防碰天车有哪几种类型?关键词:crown-o-matic, mechanical, electrical, crown saver57. 硫化氢警报响的时候你该做什么?关键词:H2S, alarm, procedure58. 一些缩写的含义?关键词:IADC\BPV\RPM\BHA\WOB etc59. 井口接钻具用什么工具上扣?关键词:hydraulic tong, make up60. 上扣扭矩如何控制? 关键词:pressure gauge, torque, control61.试压时试高压和低压的作用?关键词:pressure test, purpose62.用过的泥浆泵缸套尺寸?关键词: size, liner63.水龙带跳动的原因分析?关键词:reason, shock, hos64.本岗位的岗位职责有哪些?关键词:responsibility65.如何做溢流观察?关键词:flow check66.列举一下固控设备?关键词:solid control equipment67.列举一些手工具?关键词:hand tools68.是否取过IADC证件,什么级别的?关键词:certificate grade69.现在工作的钻机钻深能力?关键词:capacity, rig国际公司口语面试题目1.Please tell me a joke or describe a person.2.Which university did you graduate? What’s your major?3.Please introduce yourself.4.As a driller, what should you do before BOOH?5.As a driller, what should you do to prevent sticking? What should youdo when there is a sticking?6.What should do when the pump pressure is 500PSI?7.How long have you done in your post?8.吸入罐用英文怎么说sank tank9.How many inner BOP tools do you know?10.What’s your feeling when POOH?11.Please describe your routine work12.How many mud property do you know? What are they?13.How do you organize the employees to work14.What will you do before running casing?15.Can you tell me about the type of common crossover of drill pipethread and drill collar thread?16.Describe the engineer´kill method17.Why do we do the slow pump stroke test18.Tell me the working pressure of the remote control consoleaccumulator annular manifold19.On what occasion the air pump would start automatically?20.Have you ever handle any downhole problems21.Tell me the main work of an engineer.22.Please tell me your working experience ?23.What’s the weather like today?24.Do you like your job? And why?25.What’s your hobbies?26.Give me some examples about the drilling problems you have met?27.How do you deal with the lost circulation?28.How do you deal with the overflow?29.How long will you check the crown block?30.How long will you lubricate various equipments?31.Please introduce the circular inspection routs related to your post.32.Blow Out是什么?33.What’s the derrickman’s safety measures?34.What’s the shut in procedures of POOH?35.四七动作是什么?36.中控设备有哪些?37.Why does the pump pressure decrease when operating the bar?笔试题目1. What does H2S stand for? Is it harmful? If it is harmful ,why?2. Have you worked with a SMS <safety management system>? Have you worked with a permit-to-work system? Can you weld on rig floor while drilling and why?3. What pressure if any is used in the rig pump pulsation dampers? What king of gas is used to prechange4. Can we drill with a plugged nozzle when normal circulating pressure is 2800PSI if liners are rated for 4890 PSI5. What does swabbing and surge mean? What are some of the cause6. After a long trip and/or high viscosity mud ,why should you start the mud slowly ? What other practice is recommended7. Drilling 17 1/2〞hole using 8〞and9 1/2〞DC and 5〞DP .What crossover would be required8.How often should the crown be inspected and lubricated。
出国打工英文面试题目(3篇)
第1篇IntroductionAs an international job seeker, preparing for a job interview in a foreign country can be challenging. Understanding the types of questions that are commonly asked during interviews in various industries can help you feel more confident and better prepared. Below, we have compiled a comprehensive list of interview questions that are often asked in different scenarios. This guide is designed to cover a wide range of topics, from basic personal information to technical and cultural adaptability questions.Section 1: Personal Information and Background1. Tell me about yourself.2. Why are you interested in working for our company?3. What motivated you to apply for this position?4. Can you describe your educational background?5. What relevant work experience do you have?6. How would you describe your strengths and weaknesses?7. What are your long-term career goals?8. How do you handle stress and pressure?9. Can you give an example of a time when you faced a difficultsituation at work and how you dealt with it?10. How do you prioritize your tasks?Section 2: Industry and Position-Specific QuestionsFor IT and Technical Positions:11. What programming languages are you proficient in?12. Describe a project you've worked on that you're particularly proud of.13. How do you stay up-to-date with the latest technological advancements in your field?14. What is your experience with software development methodologies such as Agile or Scrum?15. Can you explain how a specific technology or system works?16. How do you approach problem-solving in technical projects?17. What is your experience with database management and SQL?18. Describe a time when you had to troubleshoot a technical issue.For Sales and Marketing Positions:19. Can you tell us about your sales experience?20. What are your strategies for prospecting and closing deals?21. How do you approach customer service issues?22. What are your strengths in building and maintaining client relationships?23. Can you provide an example of a successful marketing campaign you have led?24. How do you analyze market trends and customer behavior?25. What is your experience with digital marketing platforms and tools?For Management Positions:26. What is your leadership style?27. Can you describe a time when you had to motivate a team that was facing challenges?28. How do you handle conflict within a team?29. What experience do you have in managing projects and resources?30. How do you ensure that your team is meeting its objectives?Section 3: Cultural Adaptability and Soft Skills31. How do you handle cultural differences in the workplace?32. What are your language skills, and how would you use them in this role?33. How do you adapt to new and challenging environments?34. What are your communication skills, and how do you ensure effective communication with colleagues and clients?35. Can you describe a time when you worked as part of a diverse team?36. How do you handle feedback, both positive and negative?37. What is your experience with cross-cultural negotiations?38. How do you maintain work-life balance?39. Can you give an example of a time when you had to lead a team through change?40. How do you manage time effectively?Section 4: Interview Scenario Questions41. You are in a meeting with a client, and they disagree with your proposal. How do you handle the situation?42. Imagine you have a project with a tight deadline. How do you prioritize tasks to ensure the project's success?43. You are assigned to a project that is outside of your expertise. How do you approach learning new skills?44. You have a team member who is consistently late to work. How do you address this issue?45. You discover that a colleague is not following company policies. What would you do?Section 5: Behavioral Questions46. Describe a time when you went above and beyond to meet a client's needs.47. Can you tell us about a situation where you had to persuade someone to change their mind?48. What are your strategies for dealing with a difficult or high-maintenance client?49. Describe a time when you were part of a team that failed to meet its goals. What did you learn from the experience?50. How do you handle a situation where you have too many tasks and not enough time to complete them?ConclusionPreparing for an international job interview requires thorough research and preparation. The questions outlined above cover a broad spectrum of topics and can help you anticipate what might be asked during your interview. By practicing your answers to these questions and being ready to discuss your experiences and skills, you can present yourself as a strong candidate and increase your chances of securing the job you desire. Good luck!第2篇Introduction:The following is a comprehensive list of potential interview questions for candidates seeking to work abroad. These questions are designed to assess various aspects of the candidate's suitability for the position, including their language proficiency, cultural adaptability, work ethic, technical skills, and personal motivations. The questions are categorized into different sections to help you navigate through the interview process.Section 1: Background and Personal Information1. Can you please introduce yourself and tell us about your educational background?2. What motivated you to consider working abroad?3. How long have you been working in your current field?4. Can you describe your professional experience in detail, including your job titles and key responsibilities?5. What are your strengths and weaknesses, and how do you plan to address your weaknesses?6. How would you describe your work ethic and attitude towards work?7. Have you ever worked in a multicultural environment? If so, can you share an experience that highlights your ability to work with people from different backgrounds?8. How do you handle stress and pressure in the workplace?9. What are your long-term career goals, and how does working abroad fit into these goals?10. How do you plan to adjust to a new culture and work environment?Section 2: Language Proficiency11. What is your level of proficiency in the language spoken in the country you wish to work in?12. Can you provide examples of how you have used your language skillsin a professional context?13. How do you plan to improve your language skills before and during your time abroad?14. What are your strengths and weaknesses in terms of language communication?15. How would you handle a situation where you encounter a language barrier at work?Section 3: Technical Skills and Work Experience16. What are your technical skills relevant to the job you are applying for?17. Can you describe a project you have worked on that showcases your technical abilities?18. How do you stay updated with the latest developments in your field?19. What tools and software are you proficient in using?20. How do you prioritize tasks and manage your time effectively?21. Can you describe a challenging situation you have faced at work and how you resolved it?22. How do you approach problem-solving in your work?23. What are your expectations regarding the training and support you will receive from your employer abroad?Section 4: Cultural Adaptability24. What cultural differences have you encountered in your previous work experiences?25. How do you plan to overcome cultural differences and adapt to the new environment?26. Can you share an experience where you had to adjust to a new work culture?27. How do you handle conflicts that may arise due to cultural differences?28. What are your expectations regarding the cultural diversity in the workplace?29. How do you plan to integrate into the local community and culture?Section 5: Motivations and Expectations30. What are your main reasons for wanting to work abroad?31. How do you plan to balance work and personal life in a new country?32. What are your expectations regarding the living conditions and cost of living in the country you wish to work in?33. How do you plan to manage financial aspects, such as taxes and savings, while working abroad?34. What are your expectations regarding the support and assistance you will receive from your employer and the local authorities?35. How do you plan to maintain connections with your family and friends back home?Section 6: Questions for the Employer36. Can you describe the typical workday for someone in this position?37. What are the main challenges faced by employees in this role?38. How does the company support its employees in their transition to working abroad?39. What are the opportunities for career development and growth within the company?40. Can you provide more information about the company's culture and values?Conclusion:These questions are designed to help you assess the suitability of a candidate for an international work opportunity. By covering a wide range of topics, you can gain a comprehensive understanding of the candidate's abilities, motivations, and readiness for working abroad. Remember to tailor the questions to the specific requirements of the job and the cultural context of the destination country. Good luck with your interviews!第3篇Introduction:Embarking on an international work experience is a significant step that requires thorough preparation and a clear understanding of thechallenges and opportunities that come with it. This interview guide is designed to help candidates prepare for a job interview where they are seeking employment abroad. The questions are categorized into several sections to cover various aspects of the candidate's skills, experiences, adaptability, and cultural intelligence.Section 1: Background and Work Experience1. Can you tell us about your educational background and how it has prepared you for an international work environment?2. Describe your previous work experience. What roles have you held, and what were your key responsibilities?3. How do you feel your previous work experience has equipped you towork in a culturally diverse setting?4. Can you provide an example of a project you worked on that required collaboration with international colleagues or clients?5. How have you adapted to different work cultures in your past experiences?6. Have you ever worked in a multicultural team? If so, can you share a specific instance where you contributed to the team's success?7. Describe a time when you had to overcome a language barrier in a professional setting. How did you handle it?8. How do you stay updated with global industry trends and advancements in your field?Section 2: Skills and Abilities9. What are your strongest skills, and how do you think they will be beneficial in an international work environment?10. How do you handle stress and pressure in the workplace? Can you provide an example of a stressful situation you've encountered and how you dealt with it?11. Describe a situation where you had to solve a problem creatively. How did you approach it, and what was the outcome?12. How do you prioritize tasks when you are working on multipleprojects simultaneously?13. Can you give an example of a time when you had to negotiate with someone from a different cultural background?14. How do you approach feedback, both positive and constructive, in the workplace?15. Describe a time when you led a team. What strategies did you use to ensure the team's success?Section 3: Adaptability and Cultural Intelligence16. How would you describe your ability to adapt to new environments and cultures?17. Can you give an example of a time when you had to adjust your behavior or communication style to fit a new cultural setting?18. How do you ensure that your communication is effective across different cultures?19. Describe a situation where you had to bridge a cultural gap in a professional context. How did you handle it?20. How do you stay open-minded and respectful of cultural differences in the workplace?21. Can you share an experience where you learned something valuable from a colleague of a different cultural background?22. How do you approach conflict resolution in a culturally diverse team?Section 4: Work Abroad Specifics23. Why do you want to work abroad, and what are your long-term career goals?24. How do you plan to handle the potential financial challenges of working abroad?25. Describe a country where you would like to work and why.26. How do you plan to deal with the cultural differences and potential loneliness that come with living in a foreign country?27. Can you tell us about your language skills and how you plan to improve them if necessary?28. How do you plan to stay connected with your home country whileliving and working abroad?29. What are your expectations of the work-life balance in a foreign country?30. How do you plan to handle the legal and administrative aspects of moving to a new country?Section 5: Questions for the Candidate31. What questions do you have for us about the role or the company?32. Can you tell us about your visa status and any plans you have for obtaining a work permit?33. How do you plan to integrate into the local community and culture?34. What are your expectations regarding professional development and training while working abroad?35. How do you plan to maintain your health and well-being while living in a foreign country?Conclusion:This comprehensive interview guide covers a wide range of questions that are essential for assessing a candidate's suitability for internationalwork experience. By thoroughly preparing for these questions, candidates can demonstrate their readiness to embrace the challenges and opportunities that come with working abroad. Good luck!。
面试常问问题(中英)
TARCR3 Contestant QuestionnaireEach member of your team should complete a separate application form. Both Applications should be submitted together along with a photograph. Please respond completely and honestly.你们队伍的每个成员需要完成一份独立的申请表格。
两份申请表格需同时递交并且附上照片。
请完整并根据事实填写表格。
Personal Information个人信息First name名:Second name姓:Nickname (if any)昵称(如果有请填写)Job occupation职业Do you have a drivers License?有无驾照?Address地址Nationality国籍Phone number电话号码:Sex性别EmailHeight身高Date of Birth出生年月Relationship Status婚姻状况Do you have any children?有无子女?Please list names and ages请填写子女姓名和年龄Do you have any medical conditions? 健康状况?Do you have any allergies?是否有过敏史?2) Team mate information队友信息First Name名Last Name姓How long have you known each other? 相识多久?How did you meet?What is the biggest disappointment you have experienced from your teammate? 你与队友相处过程中最不愉快的一段经历是?How did you resolve it?你是如何解决的?What famous person reminds you of yourself?你与哪位名人比较相似?What famous person reminds you of your teammate?你的队友与哪位名人比较相似?What type of activities do you like to do with your teammate?你与队友喜欢一起参与哪类活动?What time(s) together with your teammate has been most memorable? Why?你与队友之间最难忘的时光是?为什么?What is the worst experience you have ever had with your teammate? Why?你与队友之间最糟糕的一段经历是?为什么?How are you and your teammate most alike?你与队友最相似之处是?How are you and your teammate most different?你与队友最不同之处是?How will being on the Amazing Race change your relationship?参加《极速前进》节目会如何改变你们之间的关系?3) OTHER INFORMATION其他信息Which cities and countries have you lived in before?你之前居住过哪些城市及哪些国家?What scares you most about traveling?旅途中最令你感到害怕的是?What is your opinion of foreigners?你对外国人的看法是?Which locations in the world would you absolutely not travel to? Why? 世界上哪些地方你是根本不会去旅游的?为什么?What languages do you speak?你说哪些语言?What country and place would you most like to visit and why?你最愿意去哪些国家和地方,为什么?What part of the world is least interesting to you and why?世界上哪些地方你最不感兴趣,为什么?Do you get sea sick, air or car sick?你会晕船,晕机或者晕车吗?Have you experienced or treated for any physical or mental illnesses within the last 10 years? YES/NO 在过去的10年中,你是否有生理或心理病史?If yes, please describe in detail若有,请详细描述一下。
石油钻井英语国际化人才口语测试复习资料
1.What’ the drilling parameters we usually use on site? And what about mud parameters?Drilling parameters: WOB, hook load, SPP, RPM, flow rate, torque and so on.Mud parameters: mud weight, viscosity, water loss, solid content, sand content, oil content, mud cake and so on.2.Tell me something about fire fighting equipment we use on site. What are they?Before we spud in, we should prepare enough fire fighting eqiupment and make sure they are in good condition and in right place.The commonly used fire control equipment on site: all kinds of fire extinguishers like foam extinguisher, dry powder extinguisher, CO2(carbon dioxide) extinguisher. Besides we also prepare fire hose, fire pails, fire spades, fire sands,fire blanket and so on. All the equipments should be inspected regularly.3.Can you tell us the wellhead tools and hand tools we commonly used on the floor?Wellhead tools: elevators, slips, safety slips, mud box, bit breakers, lifting subs and so on.Handtools: ring spanner, open- ended spanner, pipe wrench, monkey wrench, box spanner, chain tong, handvice, hacksaw, screwdriver, wire brush, grease gun, hammer and so on.4.Please give us a brief introduction about drilling procedure.Before moving we should inspect the road condition, makesure it is safe for heavy duty equipment to pass. Then we transefer all the drilling equipment to the wellsite and rig up. After that we spud in and drill the surface hole, set the surface casing and cementing. For the second spud we will drill the intermediate hole to the designed depth, then set the intermediate casing and cementing. For the third spud we will drill the production hole to the planned depth until we go through the pay zone. Then perform the wireline logging, set production casing according to the drilling program.5.What are the functions of drilling fluid? What are the effects when the mud density is toohigh or too low?A: 1).clean the bottom of the hole, carry and suspend the cuts;2).protect the wall of the hole;3).cool and lubricate the bit and drill string;4).balance the pressure of the formation;5).assistto break the stones of the formation;6).protect the oil reservoir. 7). Get the data from the formation.B: Reasonable density of the fluid can balance the pressure of the oil, gas and water from the formation and the side pressure of the stone. If the density is too low, the gas, oil and water of the formation will intrude into the well hole, eventually, there will be a kick or blowout.Sometimes, the wall of the hole will lose the stability and collapse at last. Of course, the density also can not be too high, because it will cause fractures on the formation, eventually, there will be a leakage. At the same time, the drilling rate is related to the mud density, when the density is high, the drilling rate will be high, vise verse.6.When the pump pressure decreases/increases, what do you think will be the reason? / Whatproblems can be identified based on the changes of the pump pressure?Reasons of decrease:A. the surface line or standpipe leaksB. the drill-pipe washed outC. circulation lostD. kickE. pumping rate changed or pump broke downF. too many bubbles in the mudG. the mud density becomes lowerH. Someone is weighting up the mudI. Mud level in the tank is too lowJ. bit nozzle fellReasons of increase:A. pumping rate changedB. bit nozzle got blockedC. the down hole motor broke downD. mud density changedE. Formation cavingF. cuttings accumulated too much in the holeG. drill-pipe filter got blockedH. The bit wore outI. bit ballingJ. formation shrinking7.What is the BHA that you commonly use? Give us a example and tell us what does it consistof? The longer the bottom-hole assembly is, the better, isn’t it?1) Rigid, packed hole assembly; pendulum drill-assembly; tapered drill-assembly; drifting drilling assembly; fishing assembly; turbo-drilling assembly.2) turbo-drilling assembly: bit, turbo-drilling tool, (bent sub), non-magnetic drill collar, drill collars; heavy wall drill pipes; drill pipes3) No. The reasonable length of the BHA depends on the weight on bit. Normally, the maximum weight on bit is roughly equal to 70% of the total weight of the BHA.8.How many kinds of down hole complicated conditions do you know? Choose one kind youhave experienced, and tell me something about it?Collapse:the collapse is the phenomena of well bore lost the stabilization。
涉外钻井英语汉语教材
A 钻前准备A1 路桥监测(平台经理与监督对话)监督:你们计划什么时间搬迁?平台经理:如果天气晴朗的话下周六可以搬迁。
监督:准备工作进展得怎么样了?平台经理:按照甲方指令要求全部落实到位。
监督:我最担心的是路桥的状况,这方面有什么问题吗?平台经理: 3天前,我们就已落实了此项工作,准备明天将报告交给你们。
监督:谁负责这项工作?平台经理:我是这项工作的负责人。
监督:请告诉我新老井场之间的距离是多少?平台经理:大约120千米。
监督:路面状况如何?平台经理:有30千米长4米宽的路面,可以满足大型设备的通过。
监督:哪一件设备最大?平台经理:可控硅房。
监督:空中是否有障碍,如高压线、电话线、高架桥等?平台经理:有高压线2处、电话线1处、高架桥1座,高度都在4.5 米以上。
监督:桥梁一共有几座?平台经理:有3座水泥桥。
监督:最大安全负荷是多少吨位?平台经理:40吨。
监督:最重的设备是哪一件?平台经理:绞车,大约38吨。
监督:用多大吨位的车搬运绞车?平台经理:40吨。
A2 井场布局(监督与平台经理对话)监督:你好!李先生。
平台经理:你好!ALEN先生。
监督:我们讨论一下新井场的布局好吗?平台经理:当然可以,我正想向你汇报这个问题。
监督:我要提醒你的是新井场比老井场小了1000平方米。
平台经理:那我们怎么摆放设备才能做到布局合理?监督:我建议材料房集中摆放在井架的右边,正好位于井架与井场办公室之间。
平台经理:好主意!这样我们可节约60平方米的面积。
监督:你认为钻杆爬梨的最佳摆放位置在哪?平台经理:我想能否把钻杆爬梨全部摆放在井场外边的空地上?监督:可以,但一定要方便装卸。
平台经理:还有别的要求吗?如:第三方设备的摆放?监督:没有,上口井你们把第三方的设备布局得非常合理,我很满意。
平台经理:谢谢你的夸奖,这次我们仍会使您满意。
监督:我想会是这样,祝你们好运!平台经理:谢谢,再见。
监督:再见。
A3 装备探伤(监督与安全员对话)监督:你能告诉我上次装备探伤的日期吗?安全员:据日报记录是3月14日。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
2014年涉外英语培训面试题1.Say something about your position as much as you can.As a drilling engineer, working in Saudi market is quite different from working in domestic market. Our main job is to coordinate with third party, convey the instruction to the rig crew, collect data and complete IADC report. We are also responsible for well control, managing the drilling tools, and training the crew members.2.What are the duties of your position?1.Be responsible for the implementation of instruction.2.According to the well design, give some technical advices tothe company if need.3.Coordinate and cooperate with other departments.4.Manage drilling instruments and drilling tools.anize BOP drill and record the results.6.Be responsible for the management of well control.7.Collect data and complete IADC report.8.Train the new arrivals some information about well control. 3.When overflow occurred during drilling, what do you do?1.Give an alarm.2.Open the hydraulic valve to allow the mud fluid to flow to thedegasser.3.Close the annular BOP, then close ram BOP.4.Close the choke valve slowly, don’t exceed the maximumallowed casing pressure.5.Keep the pressure stable, read and record the mud volume.4.What is rigging up and how to rig up? Say something about it.Rigging up means installing all the equipment one by one after mobilization. Usually we install the derrick substructure first, then install the drawworks, platform , rotary table, derrick. At the some time, install the mud tank, mud pump, diesel generating sets, then install the drilling line and pull the derrick up, then install the TDS.5.According to your understanding, what is the different betweenMWD and LWD?MWD means measurement while drilling, it only can measure the data of well , azimuth, and TVD.LWD means logging while drilling, It can not only measure the data of well inclination, azimuth, TVD but also the data of rock resistivity, nature gamma, pore pressure, rock porosity, rock density.6.Basically, what does the hoisting system consist of?The hoisting system consist of draw works, crown block, drilling line, traveling block and hook.7.How many types of bits we usually used?They are cone bit (rock bit), PDC bit, diamond bit, drag bit andcoring bit.8.Describe function of mud.The principal function of the mud are:1.To clean the hole 2.To cool the bit 3.To prevent the formation form collapse 4.To lubricate the drilling tools 5.To balance the formation pressure 6.To remove cuttings form the bottom of the hole.9.How many points do you check daily? What are they?Seven. BOP stack, remote control house, tool sledge, mud tank level sensor, mud volume, mud property, drilling parameters.10.H ow many well killing methods do you know? Describe them?Two. they are the driller’s method and engineer’s method.Driller’s method requires two cycles of circulation. In the first circle, we use old mud to displace contaminated mud out of bore hole. In the second cycle ,weighted mud been pumped into the bore hole to kill the well.E ngineer’s method requires only one cycle of circulation. After shut in the well, according to the shut-in pressure, we can calculate the mud density for kill the well, then weight the mud and pump the weighted mud to displace the contaminated mud and kill the well at the same time.11.W hat can we do if overflow occurs in empty well?Give an alarmEnsure the well bore is full of mud and stop pumpingDrain off the metering tank20~30minutes later, monitor and record the rising of fluid level in the metering tank for 5~10 minutes.12.D o you know about S135 drill pipe? What does S135 mean?Yes, I do. S135 means that the tensile strength is 135kpsi13.W hat kinds of drilling tools does a fishing assembly consist of?It normally consist of make-up sub, safety sub, drilling jar, drill collar and accelerator.14.G enerally, how many bit breakers are there on the drill floor?Describe the size.24”, 20”, 17 1/2”, 12 1/4”, 9 7/8”, 8 1/2”, 6”15.G enerally, what are the parameters of drilling?Pump pressure, weight on bit, rotary speed, flow rate, torque and so on.16.H ow many kinds of electrical voltage do you have on the well site?Three. 110V, 220V, 380V110-volt is used for imported electrical equipment220-volt is used for office equipment and lighting system380-volt is used for circulation system17.W hat do you call the space between the drill pipe and the sides ofborehole?Annular space18.D escribe some units we usually used in KSA.Inch, foot, gallon, pound, barrel19.W hat is the difference between rotary drilling and TDS drilling?Rotary drilling use rotary table driving the drill string, TDS uses a top motor to drive the drill string.Rotary drilling can make up single joint every time, but TDS can make up stand every time.while tripping. if we want to make a circulation, rotary drilling requires us to make up Kelly at a right position. with TDS, we can make circulation at any time if downhole complicated, we can back ream with TDSWITH TDS, derrick can work on the monkey board easily.20. What is a wildcat well?The wildcat well means to drill a well in a region where there is never been drilled. this kind of test in petroleum mining is called wildcat well 21. How many fishing tools do you know?Overshot, junk mill, junk basket, junk sub, spear, taper tap, box tap, strong magnetic fisher.22. How often do you check the crown-o-matic?Every day. the day shift should check the crown-o-matic.23. When do the H2S drill, what do you do?As soon as the alarm rings, the driller and two floorman done 30-minsSCBA and shut in the well immediately. Then wait for the instruction of company man. All other personnel on the well site done 15-mins SCBA and reach at the Safe Briefing Area. Toolpusher and assistant driller done 30-mins SCBA and go to the drill floor with H2S detector, detect the H2S and find the sources. Then report it to the supervisor. At the same time, safety officer and medical check the members of personnel. Search team don 30-mins SCBA, to search along the searching route and report the information to safety adviser while return to the Sate Briefing Area.24 .What dose IADC/LCM/BPV/BOP/LNG mean?IADC means international association drilling contractor.LCM means loss circulation material.BPV means by pass valve.BOP means blowout preventer.LNG means liquefy natural gas.25. What do BOP, SPM and RPM stand for?ROP stands for rate of penetration.SPM stands for strokes per minute.RPM stands for rotary revolutions per minutes.26. What is the junk basket used for ?Junk basket is used for fishing junk pieces in bottom hole.27. What is the difference between a kick and a blowout?Kick means the bottom hole pressure can not balance the formationpressure, formation fluid flow into the bore hole.Blowout means formation pressure make mud quickly spurt from wellhead, even reach the height of monkey board.28. How shall we do a flow check?If a well is identified, we should do a flow check first.Ensure the well bore is full of mud, Stop pumping, drain off the metering tank, Monitor and record the rising of the fluid level in the metering tank for 15 minutes(if oil base mud, we need 30 mines)29. How dose a kick occur?Continuous influx of formation fluid, loss of circulation, drill string swabbing effect and so on cause the bottom hole pressure below to the formation pressure, so more and more formation fluid flow into the bore hole, we called this phenomenon a kick.30. What other drilling instrument are used during drilling in addition to the weight indicator, pump pressure gauge and the flow rate gauge?We also use a rotary gauge, a torque gauge, a mud recorder, etc.31 What kinds of hand tools we usually used?There are many kinds, such as monkey wrench, chain wrench, pipe wrench, open-ended spanner, ring spanner, box spanner, screwdriver, hand vice and so on.32阐述个人教育背景关键词;education background I graduatedfrom... my major is....33如何提升个人口语能力How to improve the oral English?34是否做好了出国准备,都做了哪些准备?关键词go abroad, preparation35个人的工作简历有哪些?关键词work experience36名字来历,天气情况等?关键词climate season37个人问题的问询?关键词private family marriage etc38与外国人是否存在文化冲突?关键词foreigner culture shock39典型钻具组合有哪些? 关键词typical BHA40闲暇时间做些什么?关键词spare time kill time41当地雇员怎么样?如何与之交流合作?关键词local employee communicate cooperate42. 常见的钻井参数有哪些?关键词:parameter, RPM, SPM, WOB etc43. 用过哪些类型的井架?关键词:type, rig, derrick44. 用过哪些尺寸的钻铤或钻杆?关键词:DP, DC, size45. 是否用过螺旋钻铤?关键词:Spiral drill collar46. 5寸钻杆的扣型?或如何连接?关键词:thread, connection47. 用过何种泥浆体系?关键词:type, oil-base, water-base48. 泵压下降的原因有哪些?关键词:pump pressure, drop down, reason49. 泵压下降后应如何处理?关键词:drop down, deal with50. 井控装备有哪些?关键词:well control equipment51. 泥浆泵安全阀设置压力是多少?关键词:pop-off valve, relief valve52. 泥浆的性能主要包括哪些要素?关键词:function, involve53. 用什么手段或者工具监测泥浆性能呢?关键词:instrument monitor54. 远控房都检查哪些地方?关键词:remote control house,inspect55. 如何打超高压?关键词:bypass, pressure56. 防碰天车有哪几种类型?关键词:crown-o-matic, mechanical, electrical, crown saver57. 硫化氢警报响的时候你该做什么?关键词:H2S, alarm, procedure58. 一些缩写的含义?关键词:IADC\BPV\RPM\BHA\WOB etc59. 井口接钻具用什么工具上扣?关键词:hydraulic tong, make up60. 上扣扭矩如何控制? 关键词:pressure gauge, torque, control61.试压时试高压和低压的作用?关键词:pressure test, purpose62.用过的泥浆泵缸套尺寸?关键词: size, liner63.水龙带跳动的原因分析?关键词:reason, shock, hos64.本岗位的岗位职责有哪些?关键词:responsibility65.如何做溢流观察?关键词:flow check66.列举一下固控设备?关键词:solid control equipment67.列举一些手工具?关键词:hand tools68.是否取过IADC证件,什么级别的?关键词:certificate grade69.现在工作的钻机钻深能力?关键词:capacity, rig国际公司口语面试题目1.Please tell me a joke or describe a person.2.Which university did you graduate? What’s your major?3.Please introduce yourself.4.As a driller, what should you do before BOOH?5.As a driller, what should you do to prevent sticking? What should youdo when there is a sticking?6.What should do when the pump pressure is 500PSI?7.How long have you done in your post?8.吸入罐用英文怎么说sank tank9.How many inner BOP tools do you know?10.What’s your feeling when POOH?11.Please describe your routine work12.How many mud property do you know? What are they?13.How do you organize the employees to work14.What will you do before running casing?15.Can you tell me about the type of common crossover of drill pipethread and drill collar thread?16.Describe the engineer´kill method17.Why do we do the slow pump stroke test18.Tell me the working pressure of the remote control consoleaccumulator annular manifold19.On what occasion the air pump would start automatically?20.Have you ever handle any downhole problems21.Tell me the main work of an engineer.22.Please tell me your working experience ?23.What’s the weather like today?24.Do you like your job? And why?25.What’s your hobbies?26.Give me some examples about the drilling problems you have met?27.How do you deal with the lost circulation?28.How do you deal with the overflow?29.How long will you check the crown block?30.How long will you lubricate various equipments?31.Please introduce the circular inspection routs related to your post.32.Blow Out是什么?33.What’s the derrickman’s safety measures?34.What’s the shut in procedures of POOH?35.四七动作是什么?36.中控设备有哪些?37.Why does the pump pressure decrease when operating the bar?笔试题目1. What does H2S stand for? Is it harmful? If it is harmful ,why?2. Have you worked with a SMS (safety management system)? Have you worked with a permit-to-work system? Can you weld on rig floor while drilling and why?3. What pressure if any is used in the rig pump pulsation dampers? What king of gas is used to prechange4. Can we drill with a plugged nozzle when normal circulating pressure is 2800PSI if liners are rated for 4890 PSI5. What does swabbing and surge mean? What are some of the cause6. After a long trip and/or high viscosity mud ,why should you start the mud slowly ? What other practice is recommended7. Drilling 17 1/2”hole using 8”and9 1/2” DC and 5”DP .What crossover would be required8.How often should the crown be inspected and lubricated。