Dagger选拔平台操作说明书

合集下载

Dage 4000中文操作手册 - 完整版 - 0411y08

Dage 4000中文操作手册 - 完整版 - 0411y08

中文操作手冊Version 1Contents第一章 基本介紹1-1 開機步驟-------------------------------------------------------------3 1-2 關機步驟-------------------------------------------------------------5 1-3 基本操作控制 -----------------------------------------------------6 1-4 鍵盤按鍵控制 -----------------------------------------------------7第二章 測試介紹2-1 開始測試-------------------------------------------------------------8 2-2 測試結果-------------------------------------------------------------9 2-3 測試數據分類 -----------------------------------------------------10第三章 軟體設定與教學z Test Group-----------------------------------------------------------11 z New Sample---------------------------------------------------------14 z Result-----------------------------------------------------------------15 z Setup -----------------------------------------------------------------17 z Data Output ---------------------------------------------------------30 z Machine--------------------------------------------------------------35 第四章 校正步驟與GR&R4-1BS&DS 校正步驟 -----------------------------------------------37 4-2WP&TP 校正步驟 ---------------------------------------------41 4-3GR&R 試驗 -------------------------------------------------------44第五章 簡易故障排除5-1 簡易故障排除------------------------------------------------------ 451-1 開機步驟…將Dage 4000 機台旁的開關打開,再將電腦及螢幕的電源打開;電腦 會自動執行Dage 4000 的軟體,螢幕上出現的畫面如下※若是上述畫面未出現,請以手動的方式,用滑鼠點選螢幕上 ’Dage Series4000’ 的捷徑。

Pro 30 Gas Caddy 操作手册说明书

Pro 30 Gas Caddy 操作手册说明书

REV 9/6/17JohnDow Industries, Inc.151 Snyder Ave.Barberton, OH 44203ContentsPageSafety & Warning Instructions 2General Product Description 3Assembly 3Operation 4Storage4Product Specifications4Replacement Parts & Accessories 5Troubleshooting 6Notes7OPERATOR’S MANUAL FC-P30-UL2.INSTRUCTIONS PERTAINING TO THE RISK OR INJURY TO PERSONS.IMPORTANT SAFETY INSTRUCTIONS. SAVE THESE INSTRUCTIONS.READ THIS MANUAL CAREFULLY BEFORE INSTALLING,OPERATING OR SERVICING THIS EQUIPMENTIt is the responsibility of the employer to place this information in thehands of the operator. Keep for future reference.OPERATOR’S MANUALFC-P30-UL3.GENERAL PRODUCT DESCRIPTIONThe Gas Caddy is designed and approved to safely transfer fuel to and from a vehicle. It may be used to safely store fuel during vehicle service. It is approved for use with unleaded gasoline, diesel, kerosene, and E85 (ethanol) fuels.The direction of flow is controlled by a 4-way valve to assure that fuel is filtered in both directions. Caution: Turning the pump in the opposite direction will pump the fuel, but this will cause contaminates inside the filter to be introduced into the fuel stream. Always use the valve to control the direction of flow.The FC-P30 comes standard with a 10 micron filter for use with gasoline. Other filters are available for other fuels. Select the correct filter for the intended application. Proper filter selection is critical to achieving maximum pumping efficiency and to properly remove contaminates from the fuel.Refer to the table shown in REPLACEMENT PARTS AND ACCESSORIES if you intend to pump different fuels.Fuel TypeFilter Type Unleaded Gasoline 10 micron Diesel and Kerosene 30 micron E85 Ethanol1 micronASSEMBLY1.Wrap 2 inch NPT thread on fill tube 4-6 wraps with PTFE tape wrapping clockwise.2.Assemble pump “A” onto tank by threading the “IN” side the pump onto the 3/4 close nipple. Hold the manifold with a 1-1/2 inch adjustable wrench to prevent turning. Turn pump until threads tighten with the final turn positioning the pump.3.Position the handle to the left side of the tank as shown in Figure 1.4.Assemble the pressure hose “B” to the 90° swivel fitting on top of the pump and to the 90° swivel fitting on the filter support. Place a 1-1/16 inch open end wrench on the hose and tighten the swivel using a 1-1/14 inch open end wrench.Tighten securely to prevent leaks. Note: when tight the swiv-el will not rotate.5.Assemble the discharge hose “C” by threading the 3/4 NPT fitting into 90° fitting located on the front of the valve assem-bly. Pace a 1-1/16 inch wrench on the hose and tighten.Tighten with wrench.6.Coil and hang the discharge hose on the hose hanger bracket on the side of the tank.7.Thread the 2 inch fill pipe and cap assembly onto the fitting in the center of the tank. Tighten snugly by hand until secure.Tools and Supplies (not included):•TPFE tape • 1-1/2 inch open end wrench •1-1/16 inch open end wrench •1-1/4 inch open end wrench.10. Remove tape from top of fuel gauge and install plastic indicator cap and plastic nut onto float assembly. Align indicator mark to point diagonally across tank so that float is free to move full range. Tighten nut by hand to secure cap and fuel gage.Fig. 1OPERATOR’S MANUALFC-P30-UL4.OPERATIONSTORAGE1.Always place the valve in the “OFF” position when not in use.2.Wrap and store the hose on the provided hose wrap brack-et.3.Wrap and store the ground wire on the provided wire wrap bracket.4.Locate the park the Gas Caddy on a flat level surface, away from any potential ignition sources, away from any potential hazards that may impact or damage the Gas Caddy.5.Lock the wheel brakes.6.Be certain that the fuel gage vent dome, indicator cap, fill tube and fill tube cap are all present and secure. Replace any missing parts immediately.7.Do not turn the pump handle when not in use as this may accidentally dispense fuel.Fig. 2Fig. 3PRODUCT SPECIFICATIONSWeight (empty):154 lbs (69.5 kg)Capacity:30 gal (114 L)Length:31.25” (88.9 cm)Width:25.00” (63.5 cm)Height:46.00” (117.0 cm)Approx. Flow:5 gpm (19 L pm) @ 110 Rev/minPUMPING FROM GAS CADDY TO VEHICLE1.Position the Gas Caddy near the vehicle and lock the front casters brakes.2.Attach the ground wire clamp to the vehicle to a known ground surface.3.Place the hose inside the fill pipe of the vehicle fuel tank.4.Align valve handle so that the point is position to the “OUT”to vehicle position. (See Fig. 3)5.Turn pump in direction shown on the pump. Turn briskly until pump primes and fluid is visibility flowing in the hose.6.Continue to turn the pump handle to maintain flow to the vehicle.7.Stop turning the handle when the desired amount has been pumped.8. Turn the valve to the “IN” to tank position.9. Uncoil and raise the hose and turn the handle 4-8 turns to return any remaining fuel in the system to the tank.10. Coil and hang the hose on the hanger bracket.11. Turn valve to the “OFF” position.PUMPING FROM VEHICLE TO GAS CADDY1.Position the Gas Caddy near the vehicle and lock the front casters brakes.2.Attach the ground wire clamp to the vehicle to a known ground surface.3.Place the hose inside the fill pipe of the vehicle fuel tank.4.Align valve handle so that the point is to the “IN” to tank position. See figure 2.5.Turn pump in the direction shown on the pump. Turn briskly until pump primes and fluid is visibly flowing in the hose.6.Continue to turn the pump handle to maintain flow to the Gas Caddy.7.Stop turning the handle when the desired amount has been pumped.8.Uncoil and raise the hose and turn the handle 4-8 turns to return any remaining fuel in the system to the tank.9.Coil and hang the hose on the hanger bracket.10. Turn valve to the “OFF” position.OPERATOR’S MANUAL FC-P30-UL5.REPLACEMENT FILTERSFuel TypeFilter Type Part No.Unleaded Gasoline 10 micron 10M-FF Diesel/Kerosene 30 micron 30M-FF E85 Ethanol1 micron1M-FFNote: Coat the O-ring seal with oil or grease before assembly. Hand tighten by turning approximately 1/2 turn after rubber seal contacts the filter support. Do not over-tighten.REPLACEMENT PARTS:1Tank 1_____2Handle 130GC-02C 3Cover 130GC-49-UL 4Wheel (10”)230GC-06-UL 5Caster (5”)230GC-486Fuel Gage (cap/nut)130GC-FGK 7Fuel Gage (complete)1FC-P30-FG 8Vent 130GC-08-VENT 9Fill Tube 130GC-09-0110Fill Cap 130GC-09-0211Hose Assembly 180-593-NI 12Ground Strap 180-57213Valve/Filter Support Asm.130GC-30/3114Manifold130GC-22A 15Hose Kit (3 Hoses)1FC-P30-HK 16Rotary Pump 1JDI-35-UL 17Contents Decal Set 1FC-CON 18Hose Bracket 130GC-4619Ground Wire Bracket130GC-4716141810921912451117Not ShownReplacement Parts & AccessoriesTROUBLESHOOTINGOPERATOR’S MANUALFC-P30-UL6.Pump is hard to turn or poor flowFilter is incorrect size for type of fuelFilter is cloggedReplace filterLoose filterInspect and tightenReplace with correct size filter 1 micron for E85. 10 micron for gasoline, 30 micron for diesel/kerosene Pump is difficult to primeHose not submerged in fuel whentrying to prime Check hose and reposition hose in vehicle fuel tankFuel level gauge does not workFloat positioned diagonally across tankRemove red plastic nut and indicator cap.Remove float mechanism and position so that float is position across tank. Replace cap and nut.Ground wire is damaged or will not clampDamagedReplaceLeak in hose fittingsCheck fittings and tighten Vane sticking Check vanes for contaminationExcessive vane wearCheck vanes for excessive wear and replace Damaged, kinked, or cracked hose Replace with hose assembly Inside of pump is dry or rusted from extended periods of non-useRemove pump out hose by loosening the 90°elbow swivel fitting on top of pump. Spray WD-40 or other light oil into the pump out port. At the same time, turn handle in the opposite direction of the arrow to lubricate the pump. Must turn opposite direction of arrow to prevent pumping fuel from tank.Leak at fittings or pump mount Check fittings and tighten as required. CONDITIONPOSSIBLE CAUSESOLUTIONOPERATOR’S MANUAL FC-P30-ULNOTES7.For Service Assistance Phone Toll Free 1-800-433-0708。

德马格中文操作说明书

德马格中文操作说明书

液压顶出 后退 / 前进
气阀 1-4 打开
中子 抽芯 / 进芯
自动安全门 打开 / 关闭
Rotary table index bolt move in / move out
模厚调整 增加 / 减小
旋转模板 逆时针 /顺时针
提示 “模厚调整”按钮只针对曲轴式机床。“自动安全门”和“气阀 1-4”按钮只有当这些功 能配置以后才起作用。“Rotary table latches”, Rotary table index bolt” and “旋转模板”应 用于带转转模板的多色注塑 。
Sfu服EnRc务tVio页InC面Egr功oup 能组
Afu报LnAc警tRio功Mn能Sgr组oup
Fig. 2: 功能选择键
1.2 手动功能键
在手动和点动模式下可通过下面的按钮(见Fig. 3 和 Fig. 4)进行相应的操作。 Fig. 3: 手动模具装置功能
模具 打开 / 闭合
Rotary table latches move in / move out
4.4
帮助功能键和专家系统 .......................................................................................................19
5
频幕 ..........................................................................................................20
Pfu程RnOc序tGio功Rn能AgrM组oSup
Process 过Pfu程RnOc控tCio制EnS功gSr能oCu组pONTROL

平台使用手册说明书

平台使用手册说明书

平台使用手册2020年7月目录1.文档概述 (1)1.1.编写目的 (1)1.2.浏览器推荐 (1)2.操作说明 (1)2.1.平台注册 (2)2.2.平台登录 (3)2.3.选课——课程中心 (4)2.4.选班——网络班级 (8)2.5.个人中心——学习 (11)2.5.1.我的课程 (11)2.5.2.我的网络班级 (13)2.5.3.课程在线学习 (15)2.5.4.我的证书 (26)2.5.5.调查问卷 (27)2.6.个人中心——动态 (28)2.7.个人中心——消息 (29)2.7.1.通知公告 (29)2.8.个人设置 (30)2.8.1.个人基本信息修改 (30)2.8.2.更换头像 (31)2.8.3.密码修改 (32)1.文档概述1.1.编写目的本手册旨在为国家卫生健康委干部培训中心远程教育培训平台学员提供关于系统的使用说明和注意事项,以使各位学员可以更高效、安全的在平台中进行操作及查询等。

1.2.浏览器推荐为了能更好的访问平台,建议您使用谷歌浏览器、360浏览器极速模式、极速浏览器极速模板等谷歌内核浏览器。

2.操作说明学员在浏览器下输入地址:/cms/,即可打开网站门户页面。

通过该门户系统可以查看管理员发布的新闻公告、培训通知等内容。

同时还可以通过门户系统查看报名管理员推荐的课程资源以及培训班级资源等。

除此之外,还可以在该门户页面中登录到学员工作室,进行在线课程学习,交流互动,如果没有相应账号可以通过点击“注册”按钮,在线立即完成账号注册,账号注册无须管理员审核。

2.1.平台注册点击门户页面的上方的注册按钮,进入到以下注册页面。

根据页面提示输入相应内容,点击注册。

注册成功后,无须管理员审核直接生效。

点击登录,输入用户名密码进行登录操作即可。

2.2.平台登录在用户登录区内输入用户名、密码、验证码,点击登录按钮,即可完成登录操作,登录后显示该学员报名的课程、班级数据,点击“进入个人中心”可跳转到个人工作室。

鼎信通达 DAG3000-32O 模拟接入网关用户手册说明书

鼎信通达 DAG3000-32O 模拟接入网关用户手册说明书

鼎信通达DAG3000-32O模拟接入网关用户手册V1.0深圳鼎信通达股份有限公司地址:深圳南山区西丽街道新科一街万科云城一期7栋A座18楼邮编:518052电话:+86-755-61919966传真:+86-755-26456659邮箱:sales@网址:前言欢迎选购欢迎您选购DAG3000-32O模拟接入网关,深圳鼎信通达股份有限公司为您提供全方位的技术支持,需要更多在线技术支持,请拨打技术支持热线电话:*************。

内容介绍为了更好地帮助您了解和使用DAG3000-32O模拟接入网关,我们编写了该产品的用户手册,本文档主要描述综合接入网关设备的外观、功能特性、设备连接、配置及维护操作方法等。

在使用DAG3000-32O模拟接入网关的过程中,请仔细阅读本手册。

适用对象本手册适合下列人员阅读:●用户●安装、配置和维护DAG3000-32O模拟接入网关的工程师修订记录文档名称文档版本软件版本DAG3000-32O模拟接入网关用户手册V1.0文档约定本文档中所提及的网关或设备均指DAG3000-32O模拟接入网关;文档中标明注意或说明的内容为需要用户特别注意的内容。

目录1产品概述 (5)1.1概述 (5)1.2组网应用 (5)1.3功能和特点 (6)1.4产品外观 (8)2设备连接 (11)2.1注意事项 (11)2.2RJ45线序 (11)2.3设备连接 (12)3基本操作 (14)3.1呼入呼出 (14)3.2电话功能 (14)3.3发送和接收传真 (16)4本地IVR操作 (17)4.1本地设备IP地址查询 (17)4.2恢复出厂设置 (17)4.3设置IP地址 (17)5Web配置 (19)5.1Web登录 (19)5.1.1登录准备 (19)5.1.2登录Web (20)5.2状态和统计 (21)5.2.1系统信息 (21)5.2.2端口状态 (23)5.2.3当前通话 (24)5.2.4RTP会话统计 (24)5.2.5CDR话单 (25)5.2.6录音统计 (25)5.2.7呼叫限制信息 (26)5.3快速配置向导 (26)5.4网络 (28)5.4.1本地网络 (28)5.4.2VLAN参数 (30)5.4.3Qos (31)5.4.4DHCP选项 (31)5.4.5地址解析 (32)5.4.6IPv6网络 (33)5.5SIP服务器 (34)5.6IP策略 (35)5.7Tel策略 (37)5.8端口配置 (39)5.9高级选项配置 (40)5.9.1线路参数 (40)5.9.2FXO参数 (42)5.9.3媒体参数 (46)5.9.4业务参数 (47)5.9.5SIP兼容性 (50)5.9.6NAT穿透 (54)5.9.7快捷拨号 (56)5.9.8功能键 (56)5.9.9系统参数 (58)5.10呼叫和路由配置 (60)5.10.1端口组 (60)5.10.2IP中继 (61)5.10.3路由参数 (62)5.10.4IP->Tel路由 (62)5.10.5Tel->IP/Tel路由 (63)5.10.6呼叫限制 (65)5.11号码变换 (66)5.11.1IP->Tel被叫号码 (66)5.11.2Tel->IP/Tel主叫号码 (67)5.11.3Tel->IP/Tel被叫号码 (68)5.12管理 (69)5.12.1TR069参数 (69)5.12.2SNMP参数 (70)5.12.3Syslog参数 (72)5.12.4Provision (74)5.12.5云服务器 (75)5.12.6远程连接 (75)5.12.7用户管理 (75)5.12.8录音参数 (76)5.12.9Radius配置 (77)5.12.10Action URL (77)5.12.11SIP PNP (78)5.12.12NMS (79)5.13安全设置 (80)5.13.1Web访问控制列表 (80)5.13.2Telnet访问控制列表 (80)5.13.3密码修改 (81)5.14工具 (82)5.14.1固件升级 (82)5.14.2数据备份 (83)5.14.3数据恢复 (83)5.14.4FXO测试 (84)5.14.5Ping测试 (86)5.14.6Tracert测试 (86)5.14.7网络抓包 (87)5.14.8恢复出厂设置 (88)5.14.9设备重启 (88)6术语 (89)1产品概述1.1概述DAG3000-32O是一款多功能语音网关,用于传统交换机到IP语音网关无缝连接,也可用于纯IPPBX连接传统PSTN模拟线路。

ges8操作规程

ges8操作规程

ges8操作规程GES-8操作规程第一章一般规定1.1 目的和适用范围本规程是为了保障GES-8操作过程的安全性和高效性,确保设备的正常运行和维护,适用于所有参与GES-8操作的人员。

1.2 定义1.2.1 GES-8:指一种特定装置或设备。

1.2.2 操作人员:指所有参与GES-8操作的人员。

1.2.3 设备管理人员:指负责设备维护和维修的专业人员。

1.2.4 操作规程:指本文档所规定的操作要求和措施。

第二章操作准备2.1 安全准备2.1.1 操作人员需佩戴个人防护装备,包括安全帽、防护眼镜、防护手套等。

2.1.2 操作人员需熟悉GES-8的结构、原理和操作方法,并具备相关的操作经验。

2.1.3 操作人员需了解相关安全规定和应急处理措施。

2.1.4 操作人员需确保工作环境整洁、安全可靠。

2.2 设备准备2.2.1 设备管理人员需定期对GES-8进行维护和保养,确保设备的正常运行。

2.2.2 操作人员在操作前需检查GES-8的各项指示灯和设备状态,确保设备处于正常工作状态。

2.2.3 操作人员需确保GES-8所需的相关物料和工具齐备,如气体、润滑剂等。

第三章操作流程3.1 准备工作3.1.1 操作人员需按照相关安全规定佩戴个人防护装备。

3.1.2 操作人员需确保工作环境整洁、安全可靠。

3.1.3 操作人员需检查GES-8的指示灯和设备状态,确保设备处于正常工作状态。

3.1.4 操作人员需检查所需物料和工具是否齐备。

3.2 操作步骤3.2.1 操作人员按照操作手册上的步骤进行操作。

3.2.2 操作人员需注意操作的顺序和时机,确保操作的准确性和安全性。

3.2.3 操作人员在操作过程中需严格执行相关安全规定和操作规范,禁止违反操作规范和操作指导。

3.3 结束工作3.3.1 操作人员在操作完成后,需将设备恢复到正常状态。

3.3.2 操作人员需对操作过程中产生的废弃物和污染物进行有效处理。

3.3.3 操作人员需及时上报设备异常情况和维修需求给设备管理人员。

GGD使用说明书

GGD使用说明书

GGD使用说明书GGD使用说明书1.简介1.1 介绍GGD(Global Game Developers)及其功能1.2 本文档的目的与范围2.安装与配置2.1 硬件和软件要求2.2 与安装GGD2.3 配置GGD账户及个人信息2.4 更新和升级GGD3.用户界面3.1 登录界面3.2 主界面概览3.3 导航栏功能介绍3.4 设置界面4.项目管理4.1 创建项目4.2 导入现有项目 4.3 项目管理界面 4.4 文件管理和组织 4.5 版本控制4.6 项目备份和恢复5.游戏开发5.1 新建游戏5.2 游戏界面概述 5.3 场景编辑器5.4 粒子系统编辑器 5.5 角色编辑器5.6 物理引擎配置6.资源管理6.1 导入和管理资源 6.2 图片资源处理 6.3 音频资源处理6.4 动画资源处理6.5 字体资源处理6.6 其他资源处理7.游戏测试与调试7.1 模拟器准备与配置7.2 游戏预览与测试7.3 调试工具介绍7.4 错误日志与调试信息8.发布与分发8.1 目标平台选择与配置8.2 游戏打包与构建8.3 发布到各平台市场8.4 付费与广告设置8.5 版本管理与更新9.常见问题解答9.1 常见安装问题解答9.2 常见编辑器使用问题解答9.3 常见游戏开发问题解答9.4 常见发布与分发问题解答10.附件附件1:GGD快速开始指南附件2:GGD常用快捷键11.法律名词及注释●GGD:Global Game Developers,全球游戏开发者●版本控制:管理和跟踪软件项目修改的过程●场景编辑器:游戏开发工具中用于创建、修改和管理游戏场景的功能模块●粒子系统编辑器:游戏开发工具中用于创建、编辑和控制粒子效果的功能模块●物理引擎:模拟现实世界物理规律的计算机程序集合,用于游戏中的物理模拟●模拟器:用于模拟硬件和运行环境的软件工具●错误日志:记录软件运行时出现的错误和异常信息的日志文件。

J D I G I T A L C D 控制器操作手册说明书

J D I G I T A L C D 控制器操作手册说明书

Read carefully!ENGLISH VersionThis manual contains important safety informations about installation and use of this equipment. Ignoring this informations could result in injuries or damages.It is strictly forbidden to use this equipment withradioactive chemicals!IndexIndexGENERAL DESCRIPTION (4)CONTROL PANEL (4)ELECTRICAL WIRINGS: (5)VIEW ON MENU (6)SETTING SETPOINTS: 1)SETPN (6)Out mA (7)CALIBRATION: 2)CALIB (8)DELAY: 3) Delay (9)RESERVED: 4) Reserv (9)PASSWORD SETUP: 1) New Pw (10)STANDBY SETUP: 2) Stand (10)MANUAL WORKING MODE: 3) Serv (11)ERROR MESSAGES (11)3100 uS1on 2--UP” key“DOWN” key5ELECTRICAL WIRINGS:1 - 2: Power Supply (24VAC* or 115VAC* or 230VAC*). * See instrument's label 3-4: Setpoint 1 output - free contact.5-6: Setpoint2 output - free contact.7-8: Conductivity probe.9-10: Temperature compensation probe. 9 (GND) ; 10 (NTC).11-12: Current output (0÷20mA o 4÷20mA) proportional to read value. 11(-) ; 12 (+).13-14-15-16: See the following paragraph.Note : POWER SUPPLY FUSE PROTECTED (0,2A)Conductivity probes with built in temperature compensation (for example ECDCC/1) have 4 wires +shield.Connect red and black wires to conductivity blocks.Connect white and green wires to temperarure blocks.Connect shield to ground 9 (GND). “SEPR” CONFIGURATION.The instrument is set to work without a proximity sensor. If needed, proximity sensor turns the instrument into stand-by mode if there isn’t flow. Instrument’s display shows “NO FLOW”.Connect “SEPR” to blocks 13(blue), 15(black), 16(brown). Connect together block 14 with block 13.To work without a “SEPR” and with the same functionality use blocks 15 and 16 as a free contact.Connect together block 14 with block 13.Using “SEPR” or the free contact, two instruments can be controlled. Connect block 14 and 15 from master instrument to another instrument “J Digital” (slave). Finally follows the previous described connections for the master instrument.Installation1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16InstallationVIEW ON MENUMake connections and plug the instrument. Instrument’s version message on display confirms that the instrument is on. The display shows also the probe reading status and if setpoints are active. Press “E” for about 4 seconds to enter into setup menu.Note: During setup the instrument is in “Stand-by” mode. If user doesn’t press any key for one minute the instrument will return to normal working mode.To enter into setup menu, a password is needed. If this the first time that user enters into this menu or if the password is not changed, simply press “E”. Use “UP” and “DOWN” keys to scroll.“MAIN” menu is configured as follows:1)Setup: This menu is divided into 1)Setpn ; 2)Calib ; 3)Delay.2)Param: This menu is divided into 1)New Pw ; 2)Stand.3)Serv.: service mode.SETTING SETPOINTS: 1)SETPN“Out 1” and “Out 2” are relay’s driven outputs. The instrument can be programmed to operate in “On/ Off” mode or “Proportional” mode.“Proportional” mode can be selected in % between 10 and 100.Select “SETUP” from “MAIN” menu. Select “SETPN” and press “E”. The display shows:Setpoint1) Out 1Pressing “UP” or “DOWN” key the display will show in succession:Setpoint1) Out 1Setpoint2) Out 2Setpoint3) Out mASelect the setpoint to set (Out 1 or Out 2) using “UP” and “DOWN” keys, press “E” to confirm. “Out mA” allows to set the current output based on two Conductivity values. In the next example setpoint 1 (Out 1) has been set.6SETUP The instrument shows:1a) ->OFF1100uSPressing twice “RIGHT” key the display will show:1b) ->ON1000uS“1a)” and “1b)” are working range values. Every range is set by a value that operates relay output. Using default values, the setpoint 1 will drive a pump that will increase the conductivity value. The pump will switch on for uS values minor than 1000uS and switch off when reaches 1100uS: this is the ON/OFF working mode. The difference between the two uS (1100 e 1000) is called HYSTERESIS. T o avoid damaging the relay do not set Hysteresis under 100uS.PROPORTIONAL mode. The output relay is modulated (ON/OFF) depending on uS values set in 1a) and 1b). Ex.: Proportional mode between 1100uS (0%) and 1000uS (100%). In this way the relay will be on for values between 0 and 1000uS, it will be on for values higher than 1100uS. For values between 1000uS and 1100uS the relay will be on or off depending on calculated percentage.The calculation is based on a 100 seconds time. If Conductivity reaches 1030uS the relay will be on for 70 seconds and off for 30 seconds. To set the PROPORTIONAL functioning mode substitute percentual value to “ON” and “OFF”.It is not possible to enter mixed values (ex.: 100% for SP1 and ON for SP2). In this case it will not possible save them.In proportional mode the instrument doesn’t show % values for setpoints status but only if they are on or off.It is possible modify setpoint status (on,off, %) and setpoint values with RIGHT key on the function to modify and using “UP” and “DOWN” key to change the value. Enter the value and save by pressing “E” to save.Repeat sequence for setpoint 2 (OUT2).Press “E” key to exit from setpoint setting. The display will show “SetPoint Saved” and it return to the previous menu.Out mAThis function allows to program the current output for driving a metering pump or a chart recorder. It is possible to program in 0÷20mA mode or 4÷20mA mode in the working range between 0 and 2000uS. The current output and the working range may be modified. Ex.: it is possible to set 4mA at 0uS and 20mA at 1000uS. In this case, if you connect a metering pump it will dose at the maximum flow at 0uS. The pump will reduce the flow when Conductivity decrease and it will stop at 1000uS. If you connect a chart recorder, a graphic curve will be printed. Use “UP” and “DOWN” keys to change these settings. Press “RIGHT” key to scroll through the options. Press “E” to confirm.7SETUPCALIBRATION: 2)CALIBChoose “CALIB” from “Setup”. Display shows:Calib1)ZeroPress “UP” key. Display shows:Calib2) SlopeZero calibration.When display shows “1) Zero” press “E” to enter into zero calbration procedure. Display shows: R --.--uSC 0.00uSTo calibrate probes (K1) as mod. ECDIC/1 remove it from probe holder and calibrate it to air. Wait until “R” value is stable. ATTENTION: IT IS NOT NECESSARY THAT “R” VALUE WILL BE THE SAME OF “C” VALUE. Press “E” to confirm. Display shows:Calibr.Success.Slope calibration.When display shows “2) Slope” press “E” to enter into slope calbration procedure. Display shows: Temp Cal25°CThis is the buffer solution or the plant temperature. It is not possible modify this value. Press “E” to continue. The instrument will show:Comp.3%This is the temperature compensation coefficient. Modify this value according with the table on the buffer solution / chemical product bottle, using “UP” and “DOWN” keys. Press “E” to confirm. The instrument will show:R --.-- uSC 84uSIf you are using a 84 uS (or a different one compatible with working range) buffer solution press “E”otherwise enter the buffer solution value used by “UP” and “DOWN” keys and press “E”. Connect the probe to the instrument. Insert the probe tip into the 84 uS buffer solution and wait until R value (read value) is stablized and then press “E” to confirm the calibration.ATTENTION: IT IS NOT NECESSARY THAT “R” VALUE WILL BE THE SAME OF “C” VALUE.If the procedure is correct the instrument will show a confirmation message otherwise a numbered error message will be displayed (see table on page 10). Is an error occurred, repeat the procedure.8SETUP DELAY: 3) DelayIt’s possible to set an activation delay for each output when the instrument reaches the setpoint values. Default value is set to 0. Select “DELAY” from “SETUP” menu. The instrument will show:OUT110 Sec.Press “RIGHT” key. The instrument will show:OUT25 Sec.Delay time can be set from 0 (no delay) to 60 seconds. Press “E” to confirm. The display will show the confirmation message “DELAYS SAVED”.9PARAMPASSWORD SETUP: 1) New PwTo avoid undesired access to the instrument a 4 number password may be set. Using “UP” or “DOWN” keys, from “Param” menu choose “1) New Pw”, press “E” to confirm. The display shows: NEW PW-> 0 0 0 0Use “UP” and “DOWN” keys to modify th first digit. Use “RIGHT” key to go on the next digit. Press “E” to confirm. The instrument will show the new password for 2 seconds and then will return to the main menu.STANDBY SETUP: 2) StandFor a good electrodes polarization a delayed startup (every time the instrument is powered) may be set. Select “2)STAND” from “Param” menu. The display will show:STANDBY-> 02 Sec.It is possible to set the delay using “UP” and “DOWN” keys. The time can be set between 0 (no delay) to 60 seconds. Press “E” to confirm. The display will show the confirmation message “Stand-by Saved”for 2 seconds.10SERV. MANUAL WORKING MODE: 3) Serv.This function allows to manual control the external relays contact (SP1 / SP2).The display will show 1 or 2 to show the selected setpoint/output. The output status can be set “ON”or “OFF” using “UP” key for SP1 and “DOWN” key for SP2. “ON” is the status of N.O contact closed and N.C. contact open. “OFF” is the status of N.O. contact open and N.C. contact closed.ERROR MESSAGESIf the display shows an error message, use the following table:ERROR 1:Buffer solution error during calibration. Try again using adifferent buffer solution.ERROR 2:Buffer solution read error during calibration. Try again using adifferent buffer solution.ERROR 3:N/AERROR 4:Offset error. Verify sample and repeat procedure.11When dismantling an instrument please separate material types and send them according to local recycling disposal。

高校人才培养状态数据采集平台 1.2.5 版 安装过程说明

高校人才培养状态数据采集平台 1.2.5 版 安装过程说明

高校人才培养状态数据采集平台1.2.5版安装过程说明本文将详细介绍高等职业院校人才培养状态数据采集平台网络版 1.2.5的安装步骤。

整个安装过程大约持续十分钟左右。

安装主要包括以下几个内容:1.Java 开发环境JDK(建议安装路径不能有空格) 2.PostgreSQL 数据库(建议安装路径不能有空格) 3.初始化PostgreSQL 数据库4.Glassfish 的安装 (建议安装路径不能有空格) 5.Glassfish 的启动与部署注意:服务器的计算机名称不能包含中文汉字本软件的安装步骤如下:步骤一:双击光盘中的Setup.exe 启动安装本软件 1.弹出如图1-1所示欢迎界面。

2. 单击“下一步”按钮,弹出“许可证协议”界面,如图1-2所示。

图1-1 欢迎界面图1-2 “许可证协议”界面3. 仔细阅读相关条款后,如不接受本协议,单击“取消”按钮退出本软件的安装;如接受单击“我接受”按钮,进入“选择安装位置”界面,如图1-3所示。

在此界面可以使用系统默认路径,也可以单击“浏览”按钮选择其他路径。

注意:因为Glassfish 将安装到此路径,所以安装路径中不要包含空格(不宜安装在\Program Files 目录下)。

步骤二:安装Java 开发环境JDK(包含运行环境JRE)。

1. 在图1-3所示界面设置好安装路径后,单击“安装”按钮,弹出如图2-1所示对话框。

选择“是”按钮启动JDK 安装程序,如图2-2所示。

图2-2 JDK 欢迎界面图2-1 即将安装JDK图1-3 “选择安装位置”界面2. 接着弹出“许可证协议”界面,如图2-3所示。

查看相关条款,如不接受许可协议,单击“拒绝”按钮退出JDK 的安装;如接受单击“接受”按钮,进入“自定义安装”界面,如图2-4所示。

在此界面设置安装路径,您可以使用系统默认路径,也可以单击“更改”按钮选择其他路径,建议安装路径不要包含空格。

3. 单击“下一步”,弹出如图2-5所示的界面,显示JDK 的安装进度。

DageX-ray操作

DageX-ray操作
6.1 检测窗口介绍......................................................................................................................10 6.2 开启 X - Ray ........................................................................................................................10 6.3 扫描导视..............................................................................................................................11 6.3.1 <Scan board>......................................................................................................................12 6.3.2 <Scan full> .........................................................................................................................12 6.4 选择观察区域......................................................................................................................13 6.5 调整影像亮度......................................................................................................................13 6.6 移动图像..............................................................................................................................13 6.6.1 放大与缩小.......................................................................................................................14 6.6.2 全屏显示检查 ...................................................................................................................14 6.6.3 键盘的控制.......................................................................................................................14 6.7 高度设定...............................................................................................................................14 6.8 倾斜检测...............................................................................................................................15

Dage4000简单中文手册

Dage4000简单中文手册

Dage 4000 简单操作手册BE FIRST TECHNOLOGY CO., LT锐 峰 先 科 技 术 有 限 公司BE FIRST TECHNOLOGY CO., LT 锐 峰 先 科 技 术 有 限 公 司一.开机将Dage 4000机台右侧的电源开关打开,再将电脑和显示器的电源打开;电脑启动后会在桌面上显示Dage 4000标识;双击此标识,电脑会执行Dage 4000软件程序,显示器屏幕上出现如下画面:点击画面上的OK键,等待程序执行完毕。

开机完毕后,画面显示如下:注意:如果是Dage 4000工作画面显示太小,请使用鼠标点击画面右上角的□键(如下图所示),则工作画面会全屏显示。

二.关机使用鼠标点击工作画面右上角╳键(如下图所示),电脑会自动执行关闭程序。

如果电脑未自动执行关机程序,则使用鼠标点击电脑左下角的“开始”键,然后再点击“关机”即可关闭电脑,最后再将Dage 4000主机右侧电源键关闭。

注意:为了避免造成资料的损失,在未执行关机程序之前,请勿直接关闭电源开关!三.基本操作说明Dage4000在操作方面设计简单实用,符合更多使用者不同的需求。

1.主要界面说明:一般使用者所看到的主要界面如下:2.键盘按键控制:在右手控制手柄旁边有一个16个按键的小键盘,按键的定义如下:1.0 - 9:代表分类代码。

2.T:和主界面右下方的键功能相同,都是用来开始或结束一次测试。

3.R:它的功能有二个:一是旋转Wire Pull的钩针;另外一个为打开或关闭Tweezer Pull的夹具。

4.V:和主界面下方的功能相同,打开或关闭真空,一般多用来固定夹具。

5.↙:和主界面下方的功能相同,设定钩针位置的下限。

(仅限拉力测试)6.#:和书面下方的功能相同,将数值归零。

7.* :将上一笔的测试结果清除。

另外,主界面下方,也是用来打开或关闭真空,但一般多用来固定测试样品。

3.开始测试New Sample (新样本)界面如下:一般在测试时,通常根据客户自己要求确定若干笔测试结果做为一个测试组,测试组的名称和其它的资料在此界面中设定。

Dagger2新手入门与使用基础教程

Dagger2新手入门与使用基础教程

Dagger2新⼿⼊门与使⽤基础教程前⾔前段时间,公司项⽬使⽤到了Dagger2,之前⾃⼰倒是听说过Dagger2,但是⼀直没有去使⽤,主要是因为⼊门难度相对于Rxjava,Retrofit要⾼不少,个⼈觉得这个难度并不是指的使⽤难度,⽽是⼀个理解难度。

很多⼈就是代码照搬,写⼀个Component,⼀个Module就说⾃⼰会⽤Dagger2了,很可能你都不知道为什么你要去写这些。

那么本篇⽂章将告诉你,Dagger2既然增加了代码量,那么,我们为什么还要去使⽤它。

什么是Dagger2Dagger2是Dagger的升级版,是Android⽬前最好⽤的依赖注⼊框架,在编译期间⾃动⽣成代码,负责依赖对象的创建。

第⼀代由Square公司共享出来,第⼆代则是由⾕歌接⼿后推出的。

为什么我要使⽤Dagger2我们使⽤Dagger2的主要⽬的是降低类与类之间的耦合度,举个例⼦。

这⾥有⼀个Person类,我们在这个类⾥⾯,想使⽤RichPerson类中的⽅法,那么我们就需要在Person类中拿到RichPerson的实例,也就是说Person和RichPerson耦合到⼀起了,违背了单⼀职责。

如果还有很多类都要使⽤RichPerson类中的⽅法,那么就会有很多类跟RichPerson这个类耦合起来,⼀旦RichPerson构造⽅法变了,⽐如需要传⼊⼀个id才能使⽤,那么所有使⽤RichPerson的类都需要改,这个⼯作量可不⼩,⽽且这样也违背了开闭原则。

这个时候如果我们使⽤Dagger2,我们就可以在Person类中通过@Inject的⽅式拿到RichPerson实例⽽不需要在Person中去new RichPerson使⽤(基于Kotlin)在项⽬的build.gradle中,添加apply plugin: 'kotlin-kapt'dependencies {kapt 'com.google.dagger:dagger-compiler:2.14.1'implementation 'com.google.dagger:dagger:2.14.1'}这⾥我们就以MVP模式为例1.传统MVP在View层我们想要去获取数据,那么我们就要去通过构造拿到P层对象这边gif我就不演⽰了,单纯的吐司提⽰⽽已,这种传统的MVP会在View层去实例化Persenter2.Dagger2⽅式MVP那么⽤Dagger2的⽅式,我们应该怎么在V层拿到P层的引⽤呢?1.我们需要在P层的构造⽅法中添加⼀个@Inject注解,告诉Dagger2,我是可以通过注解拿到的2.给你任何需要⽤@Inject注解拿对象的类创建⼀个Component类,这⼀步其实就是相当于告诉Dagger2,我这个类需要⽤到@Inject拿对象哦3.Build——>Make Project,Dagger2会⾃动⽣成Dagger+***Component,⽐如4.在V层中通过@Inject和Component拿到实例对象到此,Dagger2基本使⽤完毕,我们可以通过@Inject拿到我们想要的任何对象(这个对象的构造⽅法前⾯需要添加@Inject),并且不需要newV层拿P层,P层拿V层上⾯的⽅式,我们可以在V层拿到P层的引⽤并且去调⽤P层的⽅法,那么如果我们需要在P层中拿到V层的对象,该怎么办呢?给P层也定义⼀个Component?不是的,这⾥,我们需要⽤到⼀个新的知识点,Module那么,什么是Module呢,我个⼈的理解,就是把我本⾝提供出去,给其他类使⽤1.在P层的构造中添加@Inject注解并添加V层的参数2.给V层定义⼀个对应的Module,把⾃⼰提供出去3.创建V层对应的Component,与上⾯不同的事,我们这⾥需要定义⼀个Module4.Build——>Make Project,⾃动⽣成Dagger+***Component5.调⽤可能到这⾥你还是懵的,怎么调⽤⼀下这些⽅法,就把⾃⼰传过去了呢?莫慌,接下来带你去Dagger2⽣成的代码中去看看。

D+R G系列调试说明书(哈尔滨)

D+R G系列调试说明书(哈尔滨)

本手册适用于D+R G系列智能型电动执行机构的安装、调试、使用和维护指导。

警告:调试过程中进行全开/全关位臵设臵时,在接近阀门的全开或全关位臵时,应该为手轮操作,严禁使用点动按钮进行点动操作,否则可能由于位臵走过引起阀门或者执行器的损坏,由于此种原因造成执行器损坏,D+R概不负责。

警告:在安装、调试、使用和维护D+R G系列智能型电动执行机构前,必须仔细阅读本手册,严格按照安全操作规程操作,以防造成人身安全事故。

警告:在操作过程中,必须小心高温、高压、易燃、易爆、有毒及腐蚀性介质和高电压、强大外力等危险情况。

警告:必须严格按照规范、图纸和手册等的要求进行正确的安装、接线、调试、使用、储存和维护,否则有可能导致严重伤害、损坏设备。

目录目录 (2)1 使用安全 (2)2 存放 (3)3 执行器的基本操作 (4)3.1 手轮的操作 (4)3.2 电动操作 (4)3.2.1 霍尔磁性功能按钮 (5)3.2.2 遥控器/手操器的操作 (6)3.2.3 就地/远程操作 (6)3.3 就地显示 (7)3.4 实时状态显示 (7)3.5 控制状态显示 (7)3.6 报警显示 (7)4 执行器的安装 (8)4.1 直行程联接 (9)4.2 角行程联接 (10)5 电气联接 (11)5.1 高度集成CPU控制模块 (11)5.2 接线端子排 (11)5.2.1 接线端子定义 (12)5.2.2 接线原理图 (12)6 调试 (13)6.1 设置程序简介 (13)6.1.1 概述 (13)6.1.2 设置程序的基本框图 (15)6.2 进入执行器的设置程序 (15)6.3 Language/语言设置 (16)6.4 Menu/菜单选项 (18)6.5 Basi_Set/基本设置 (20)6.5.1 Open_pos./全开设置 (20)6.5.2 Close_Pos./全关设置 (21)6.5.3 Death_section/死区调整 (22)6.5.4 Sign_err_pos./信号故障指定位置 (22)6.5.5 Start_Option/开机选项 (24)6.6 Adv_Set高级设置 (25)6.6.1 Logic/正反作用 (26)6.6.2 Open_Speed/开阀速度 (27)6.6.3 Close_Speed/关阀速度 (28)6.6.4 ESD功能 (29)6.6.5 Alarm_COM/报警功能 (29)6.6.6 Sign_Type/信号类型 (30)6.6.7 IrD_Code/遥控号 (31)6.6.8 Reset/恢复设置 (32)6.7 Fact_set/出厂设置 (32)6.7.1 Password/输入密码—进入工厂设置 (33)6.7.2 Change_Key/修改密码 (34)6.7.3 Reduce_range/减速范围 (34)6.7.4 Torque_adj/力矩校准 (34)6.7.5 Torque_Unit/力矩单位 (34)6.7.6 Open_Torque/开阀力矩 (34)6.7.7 Close_Torque/关阀力矩 (35)6.7.8 In_4mA_adj./给定4mA校验 (35)6.7.9 In_20mA_adj./给定20mA校验 (35)6.7.10 Type/型号 (36)6.7.11 No./产品编号 (36)6.7.12 Address/产地 (36)7 设备维护和保养 (37)7.1 设备维护周期 (37)7.2 润滑 (37)8 故障信息及处理一览表 (38)D+R红外设定器可分为遥控器(右图)和手操器(另购)D+R遥控器可按现场要求对执行器的控制、指示及保护功能进行设定。

DAG系列FXSFXO混合语音网关用户手册说明书

DAG系列FXSFXO混合语音网关用户手册说明书

DAG系列FXSFXO混合语音网关用户手册修正记录文档名称DAG系列FXSFXO混合语音网关用户手册文档版本 2.0软件版本20.03.03.05日期2012/03/16作者技术支持目录第一章产品介绍 (1)1.1 概述 (1)1.2 产品外观 (1)1.3 安装方式 (1)1.4 组网应用 (2)1.5 功能和特点 (2)第二章基本操作 (4)2.1 话机操作 (4)2.1.1 拨打电话号码或分机号 (4)2.1.2 直接拨打IP地址 (4)2.2 呼叫保持 (4)2.3 呼叫等待 (5)2.4 呼叫转移 (5)2.4.1盲转(Blind) (5)2.4.2 询问转移(Attend) (5)2.5 三方通话 (6)2.6 电话功能 (6)2.7 发送和接收传真 (7)2.7.1 DAG(FXS)支持四种传真模式: (7)2.7.2 T. 38 和Pass-Through的区别 (7)第三章本地IVR操作 (9)3.1 本地设备IP地址查询 (9)3.2 恢复出厂设置 (9)3.3设置IP地址 (9)第四章WEB配置 (10)4.1 WEB登陆 (10)4.1.1 登陆准备 (10)4.1.2 登陆WEB (10)4.2 导航树目录 (11)4.3状态和统计 (12)4.3.1系统信息 (12)4.3.2 注册信息 (13)4.3.3 TCP/UDP统计 (13)4.3.4 RTP统计 (13)4.4网络配置 (14)4.4.1 本地网络 (14)4.4.2 VLAN参数 (16)4.4.3 MAC克隆(路由模式下可选配置) (18)4.4.4 DHCP服务(路由模式下可选配置) (18)4.4.5 DMZ主机(路由模式下可选配置) (19)4.4.6 转发规则(路由模式下可选配置) (19)4.4.7 静态路由 (20)4.4.8 ARP (20)4.5 SIP服务器 (21)4.6 端口配置 (22)4.7 高级选项配置 (24)4.7.1 FXS参数 (24)4.7.2 媒体参数 (28)4.7.3 SIP参数 (29)4.7.4 传真参数 (33)4.7.5 拨号规则 (34)4.7.6 功能键 (36)4.7.7 系统参数 (38)4.8 呼叫和路由配置 (40)4.8.1 端口组 (40)4.8.2 DAG路由功能介绍 (41)4.8.3 路由参数 (42)4.8.4 IP-Tel (43)4.8.4 Tel-IP路由 (44)4.9 号码变换 (45)4.9.1 IP-Tel 被叫号码 (45)4.9.2 Tel-IP 改变主叫号码 (46)4.9.3 Tel-IP 改变被叫号码 (47)4.10 维护 (49)4.10.1 syslog参数 (49)4.10.2 固件升级 (50)4.10.3 数据备份 (50)4.10.4 数据恢复 (51)4.10.5 ping测试 (51)4.10.6 tracert 测试 (52)4.10.7 密码修改 (53)4.10.8 恢复出厂设置 (54)4.10.9 设备重启 (54)第五章术语 (56)第一章产品介绍1.1概述感谢购买深圳市鼎信通达科技有限公司DAG(以下简称DAG)系列FXSFXO混合模拟语音网关设备,DAG系列FXSFXO模拟混合网关是基于IP网络的接入型网关,为小型企业,家庭式办公,远程办公室和多分支企业提供了一个低成本,操作简单的VoIP方案。

DAGE4000 中文操作手册

DAGE4000 中文操作手册

DAGE4000焊接强度和剪切强度测试仪中文操作说明目录一、界面的认识: (3)1.进入: (4)2.观测: (5)3.设置: (6)4.图形: (8)5.帮助: (9)6.地球仪键: (10)二、参数的设定: (10)1.测试组的参数设定界面。

(10)1. 测试组参数表: (10)2. 测试组选项栏: (11)3. 新样本的设定: (12)4. 测试结果: (12)4.设置项: (13)1. 操作者: (13)2. 用户区域: (14)3.分级列表: (14)3. 校准的设定 (15)4. 图形的设定 (16)5. 单位的设定 (16)6. 进入的设定 (17)5.数据的输出: (18)1. 器件设置: (18)2. 标题头设定: (18)3.主要内容设定: (19)3. 打印输出的设定: (20)5.标题头: (21)6.主要内容: (21)7. 数据分析: (22)8. 数据管理: (22)9. 设备检查: (23)9.设备的设定选项: (24)1.故障诊断: (24)2.设备: (24)三、操作的一般顺序: (25)1. 拉线测试: (25)1. 测试组设定和操作: (25)1.非破坏性: (26)2.破坏性: (26)3.选项: (27)4.测试结果: (27)5.文件的输出: (28)2. 芯片推力测试: (30)1. 测试组选择: (30)1.破坏性: (30)2.非破坏性: (31)3. 推球测试: (32)1.测试组的选择: (32)1.非破坏性 (32)2.破坏性: (32)DAGE4000拉力剪切力测试仪中文操作说明书为了让我们广大的DAGE拉力机的使用者更好的使用世界一流的测试仪,我们特编译了这份中文操作说明书。

手册中的DAGE4000的软件环境也是中文环境,以利于大家的理解,实际生产也可以在中文界面下操作。

手册分为界面认知、参数的设定、如何设定测试参数和具体操作几个部分。

高格软件使用说明书

高格软件使用说明书

目录第一章员工基础设置 (3)1-1.员工部门 (3)1-2.员工资料 (3)1-3.员工口令 (6)1-4.员工权限 (7)1-5.权限组别 (12)第二章客商基础设置 (12)2-1.客户分类 (12)2-2.客户资料 (13)2-3.潜在客户 (23)2-4.厂商分类 (30)2-5.厂商资料 (31)第三章产品基础设置 (38)3-1.仓库设定 (38)3-2.单位设定 (39)3-3.产品分类 (40)3-4.产品资料 (40)3-5.产品工艺路线 (51)3-6.产品BOM设定 (53)3-7.产品属性设定 (57)3-8.促销设定 (57)第四章生管基础设置 (58)4-1.工序设定 (58)4-2.工序群组 (59)4-3.出勤模式 (59)4-4.资源类型 (60)4-5.资源设定 (61)4-6.工作中心 (61)4-7.工厂日历 (63)4-8.节假日设定 (63)第五章财务基础设置 (64)5-1.币别汇率 (64)5-2.会计科目 (65)5-3.凭证字 (67)5-4.凭证摘要 (68)5-5.核算项目 (69)5-6.结算方式 (69)5-7.凭证类别操作 (70)5-8.发票类型设置 (70)5-9.发票基本资料 (71)5-10.付款条件设定 (72)第六章其他基础设置 (72)6-1.专案设定 (72)6-2.加减项 (73)6-3.条文设定 (74)6-4.常用单据 (75)6-5.质检标准设定 (76)第七章系统初始化 (76)7-1.客户产品开账 (76)7-2.厂商产品开账 (79)第八章消息作业 (81)第九章消息初始化设定 (81)第一章员工基础设置1-1. 员工部门菜单流程:『基本』→『员工基础设置』→『员工部门』作业时机:依公司组织划分部门,后续可以员工部门呈现业绩相关报表上线准备:1.公司组织图2.规划部门编码方式栏位说明:1)部门代码(4 Bytes):输入部门之代码,可输入数字(0-9)或英文字母(A-Z或a-z):依公司的组织图,给予部门不同的代码,供后续报表依不同部门来显示各部门销售状况2)部门名称(20 Bytes):输入部门的名称,可输入中文(10个中文字)或英文字母:依不同的部门代码,给予不同的名称Ex:管理部、营业部、行政部…等3)部门主管(4 Bytes):按选取或直接输入部门负责主管之员工代码,系统自动显示「主管姓名」4)单据编码对照:单据编码对照,可在『编码公式对应』中选择「使用部门当自定码」与其对应5)说明(200 Bytes):可任意输入补充说明文字1-2. 员工资料菜单流程:『基本』→『员工基础设置』→『员工资料』作业时机:设定公司员工之相关资料及业务人员之责任金额,以利后续业务相关报表计算及业绩考核之依据栏位说明:【基本】1)员工代码(4 Bytes):输入员工之代码,可输入数字(0-9)或英文字母(A-Z或a-z)2)中文姓名(10 Bytes):输入员工之中文姓名3)员工部门(4 Bytes):按选取或直接输入此员工所属之部门代码:必须输入正确的部门代码,后续部门业绩统计表即根据本栏的设定去计算归属此部门之下的业务员业绩达成率4)英文姓名(20 Bytes):输入员工之英文姓名5)中文职称、英文职称、职等(20 Bytes):分别输入此员工之中文、英文职称及职务等级6)代理人(4 Bytes):按选取或直接输入此员工的职务代理人员工代码,系统自动显示代理人之中文姓名7)员工帐号(20 Bytes):输入员工银行帐号8)高格线上帐号(20 Bytes)、OA账号:输入此员工于高网格线上系统网站()的账号和OA 账号9)到职日期(8 Bytes):输入此员工于贵公司之到职日期10)异动日期(8 Bytes):显示此员工资料最近一次异动的日期:新增员工时此栏预设为系统日期,后续则根据修改此笔资料时之系统日期自动更新;当使用者拥有多套帐目时执行『汇入资料』功能时,相同员工代码之资料是否被覆盖之主要判断依据,系统会保留异动日期较新的资料11)离职日期(8 Bytes):输入此员工于贵公司之离职日期,新增状态下不开放输入12)单据编码对照(2 Bytes):单据编码对照,可在『编码公式对应』中选择「使用签入者当自定码」与其对应13)员工图档(50 Bytes):输入员工相片图档路径及名称:图档规格为.bmp或 .jpg档,pixel值员工图档= 115 ×15014)个人网址、电子信箱(50 Bytes):输入此员工之个人网站网址及电子信箱帐号15)说明(200 Bytes):输入此员工之备注文字记录【联络】此为员工个人基本资料之设定,使用者可视情况选择登录或省略1)生日、性别、血型、身份证字号(20 Bytes):输入此员工之出生日期、性别(男/女)、血型(O/A/B/AB)及身份证字号资料2)婚姻状况、最高学历、健保人数、扶养人数:输入此员工之婚姻状况(未婚/已婚)、最高学历(小学/国中/高中/大专/大学/硕士/博士)、健保及扶养人数资料3)联络电话一、联络电话二、行动电话、呼叫器(20 Bytes):依照栏位要求输入此员工之相关联络电话4)紧急联络人、关系、紧急联络电话、籍贯(20 Bytes):输入此员工之紧急联络相关资料(紧急联络人、两人关系及紧急联络电话)及籍贯5)户籍地址、通讯地址(200 Bytes):输入此员工之户籍及通讯联络地址【预估业绩】输入业务人员之预估业绩,做为后续业绩达成报表计算比较的依据;若非业务人员此标签页资料可省略1)年度:输入此员工责任金额之所属年度2)各月预估业绩:输入员工该年度之各月份之预估业绩:所键入之业绩金额,为计算业务责任基础中之实售业绩、销售利润、销售数量。

DIGGER快速入门

DIGGER快速入门

DIGGER 4.0快速入门制作一个查询程序一般流程:主界面介绍系统运行后主界面大致如下:其中:1:设置应用服务程序运行参数2:利用微软的ODBC程序配置数据源这主要用于非BDE支持的数据源类型(如EXCEL)建议:如果您需要配置的数据可以利用BDE来配置,我们建议利用BDE来进行数据源设置。

3:利用BORLAND公司提供的数据源配置工具设置数据源。

4:显示当前连接服务器的参数。

5:系统主菜单左边有+号者,表示其还有子项目。

用鼠标单击+可展开。

单击右鼠标可获得操作菜单。

6:为当前项目的查询程序设置用户权限。

7:对当前查询项目进行参数设置主要工作有:●重新设计查询程序●手工修改查询程序●为带参数的查询程序配置条件参数●为查询程序设计用户操作界面8:增加新项目这里所指的项目,既可表示各种标题,也可表示一个查询程序。

所增加的新项目,将与当前项目同级9:增加新项目这里所指的项目,既可表示各种标题,也可表示一个查询程序。

所增加的新项目,新增的项目将为当前项目的子项目10:修改当前项目的提示标题11:重新从应用服务程序中提取所有可以利用的查询资源一般情况,SEARCHER。

EXE程序会自动使用CACHE方式记忆查询程序,当应用服务程序中查询程序项目发生变化后,客户的查询目录并不会自动改变,需要用此功能12:系统背景双击之可以修改其色彩13:系统忙指示14:系统提示信息建立一个新的查询请按以下操作继续第一步第二步第三步注意:[通过存储过程来完成]指的是访问大型数据库服务器的查询函数(存储过程),一般情况不用选择此项。

第五步请按界面中的提示输入所需的信息,然后按[确认],如果所输的数据满足系统的需要,则[继续] 按钮会生效。

选择[继续]…..如果您精通您的数据库系统,您可在编辑框中输入您的查询代码,但我们建议您使用系统提供的可视化查询设计工具来自动处理您的查询程序。

请选择 [查询设计]第七步1处表示的是应用服务器中所有查用的数据源双击1处,系统会自动在2 处显示当前数据源中所有的数据表双击2处,系统会自动在3处显示当前数据表的所有的数据,这些数据仅供您浏览。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

Dagger选拔平台(模拟)操作说明书(初版) 本手册主要介绍Dagger选拔平台安装、界面简介、主要功能及使用、常见问题等。

目录
第一章Dagger选拔平台安装
1.下载安装
第二章界面简介
1..Dagger选拔平台基本界面
2.合约界面
3.K线图
4.交易界面
第三章主要功能及使用
1.建仓
1.1跟盘价(市价)建仓
1.2限价委托建仓
2.平仓
2.1跟盘价(市价)平仓
2.2限价平仓(挂单平仓)
3.挂单
4.锁仓
5.止盈、止损
6.手续费
7.交易记录
8.查报表
第四章常见问题
第一章Dagger选拔平台安装
1.下载安装
登录泰旨官网:→下载中心→Dagger选拔平台(模拟),下载完后双击Dagger选拔平台(模拟).exe 进行安装,根据步骤点下一步操作直至安装完成。

注:软件适用遇win7或以上的系统,其他系统上安装可能会有兼容问题或其他并发问题。

部分杀毒软件会误报病毒,添加允许即可正常安装使用。

若发现软件安装异常,可以选择尝试以下方法:
1、关闭杀毒软件再安装
2、进入软件属性勾选兼容性和管理员模式运行
3、更换系统
4、升级电脑。

第二章界面简介1.Dagger选拔平台基本界面
2.合约界面
3.K线图界面
MACD 指标图
4.交易界面
第三章主要功能及使用
1.建仓
1.1跟盘价(市价)建仓
点击合约列表需要购买的品种或选择合约代码→选择委托数量(手)→选择跟盘价(市价)→选择做多(买)或者做空(卖)。

见下图(以做多为例)
1.2限价委托建仓
见下图,选择合约代码→选择委托数量(手数)→输入委托价格→选择做多(买)做空(卖)。

2.平仓
2.1 市价平仓
见下图,右击持仓单→选择平仓
2.2限价平仓(挂单平仓)
挂单平仓时,在持仓单中双击,设置限价委托价格平仓
3.挂单(注:以下为演示过程,数据或有不准)
选择合约查看最新价→选择委托数量(手数)→选择限价委托→选择做多或者做空
见下图,现价委托后,在市价没有到理想价格时,处于排队状态
见下图,当最新价达到委托价后,会自动建仓
4.软件不能开双方向仓;但可以先挂单后,再相反方向开仓,触发挂单时可以锁仓;
5.止盈、止损
见下图,以A50止盈为例,设置止盈点数为11 (A50,跳动1个点6.5元),止损反之
止盈止损的点数是按照价格差来设置的
美原油:成本是50.47开多,想50.98止盈,需要设置50.98-50.47=0.51;
恒指:成本是21123元开多,想21000止损,需要设置21123-21000=113,
6.手续费
详情请查看Dagger选拔大赛全部品种交易规则.pdf
7.交易记录
见下图,点击交易历史能查看交易记录,注:只能查看当天的记录
8.查报表
相关功能还没上线
第四章常见问题
1.界面能缩小吗?
答:界面能拉动缩小,界面颜色暂时不能更改背景颜色
2.软件是分批建单吗?比如我现在下一手多单,十分钟还下一手多单,这两张单是分开的吗?
答:分开的。

3.软件自动折算交易吗?
答:模拟软件中,人民币与美元和港币的汇率分别是6.5和0.84,人名币与欧元的是7.3
4.账号怎么更换交易品种?
答:需要跟客服备案,选好交易品种的账号不能随意更改,一经发现,账号盈利清零,亏损继续累加。

5.能不能申请多个账号?奖金怎么发?
答:能,需要跟客服备案,有且最多两个账号(且两个账号交易的品种均不能相同),盈利情况下,两个账号的奖金都会发。

建议只申请交易一个账号,如进入实盘情况下,公司会综合评定两个账号的收益和交易情况决定是否给予实盘。

6.交易3个品种以上会怎么样?不小心交易第3个品种怎么办?
答:交易规则只允许参赛选手交易至多两个品种;如果需要跟换品种可向客服备案。

不小心错点第三个品种且成交的选手,可以找客服备案,确定该账号交易品种。

在没有跟客服备案的前提下继续交易,一经发现,账号盈利清零,亏损累加。

如该账号达到进入实盘盈利,公司有权不给予实盘.
7.XX几点算隔夜?
品种隔夜(以下时间仍有持仓)恒指晚上11:45-次日9:15
美原油允许全仓过夜,除周末外
A50 凌晨2:00-次日9:00
德指凌晨4:00-下午2:00
IF300 允许持仓30%过夜
国内商品期货
沪金凌晨2:30-次日9:00
沪银凌晨2:30-次日9:00
沪铜凌晨1:00-次日9:00
沪镍凌晨1:00-次日9:00
橡胶晚上11:00-次日9:00
螺纹晚上11:00-次日9:00
沥青晚上11:00-次日9:00
豆粕晚上11:00-次日9:00
豆油晚上11:30-次日9:00
棕榈晚上11:30-次日9:00
塑料下午3:00-次日9:00
PP下午3:00-次日9:00
铁矿晚上11:30-次日9:00
白糖晚上11:30-次日9:00
PTA晚上11:30-次日9:00
郑醇晚上11:30-次日9:00
菜粕晚上11:30-次日9:00 五年期国债下午3:15-次日9:15
十年期国债下午3:15-次日9:15。

相关文档
最新文档