工业厂房工程量造价清单

工业厂房工程量造价清单

⼯业⼚房⼯程量造价清单C 建筑及⼟建⼯程Building & Civil Works16,601,761.76C 1.00地坪⼟⽅⼯程Flooring Earthworks--C 1.01场地平整Levelling of the landm2 - - - - - 3.00-C 1.02Setting Out放样m2 - - - - - 1.50-C 1.03⼟⽅开挖Excavation of basic Earthworkm3 - - - - -25.68-C 1.04⼟⽅外运堆及推平Earthwork Remove Away from & Levellingm3 - - - - -65.00-C 1.05Compaction on Backfill Layer at 150mm thk per layer (Factor 0.95)回填地⾯⼟压实按150mm厚每层 (系数0.95)m2 - - - - -19.00-C 2.00地坪⼯程Flooring Works-4,891,066.24C 2.01放样Setting Outm2 - - - - - 3.00-C 2.02回填场地平整Ground Levelingm2 - - - - - 1.50-C 2.03Compaction On Original Soil Layer (Factor 0.95)C 2.04Original Soil Compaction Test (Min 500m2/1 Test)原⼟⼟⽅压实测试 (最少500m2/⼀次测试)lot 33.00 4.00 1.00 1.00 39.00150.005,850.00C 2.05300mm thk Crusher Run300mm厚级配碎⽯m3 4,856.10 2.10 25.05 - 4,883.25182.40890,704.80 C 2.06Compaction on Gravel Layer at 150mm thick per layer (Factor 0.95)碎⽯基层压实按150mm厚每层 (系数0.95)m3 - -19.00-C 2.07Gravel Compaction Test (Min 500m2/1 test) 碎⽯基层压实测试 (最少500m2/⼀次测试)lot 33.00 4.00 1.00 1.00 39.00300.0011,700.00C 2.08200mm thk C35 Concrete200mm厚C35 混凝⼟m3 3,227.00 - - - 3,227.00506.301,633,830.10C 2.09?8 钢筋@200x200双层双向Reinforcement Bar ?8 @ 200x200 Double Layerboth directionkg 149,492.00 - - - 149,492.00 5.39806,135.61C 2.10Formwork to Slab地坪模板m2 491.10 48.90 13.14 6.66 559.8060.0033,588.00C 2.11Additional Steel Reinforcement Bar at Manhole Openings or other Floor Recesses⼈孔开⼝或其他楼板通道处钢筋加固kg 180.00 - - - 180.00 5.39970.65C 2.12Additional Steel Reinforcement Bar around Column柱⼦周围钢筋加固kg 1,630.00 - - - 1,630.00 5.398,789.78C 2.13100厚C15素混凝⼟垫层Thk 100mm C15 Lean ConcreteC 2.141厚改性⽔泥基弹性防⽔涂料Thk 0.8 mm Cementitious And ReactiveWaterproofingm2 248.00 1,631.00 372.00 92.00 2,343.0042.0098,406.00C 2.1520厚1:3⽔泥砂浆找平层Thk 20mm 1:3 Cement Motar Levelindm2 248.00 1,736.10 372.00 92.00 2,448.1040.0097,924.00C 2.1640厚挤塑聚苯板(XPS)Thk 40mm Extruded Polysyrene Board (XPS)m2 - 1,732.00 - - 1,732.0047.2081,750.40C 2.1720厚1:3⽔泥砂浆找平层Thk 20mm 1:3 Cement Motar Levelindm2 - - - - -9.00-C 2.18150mm厚C20楼板混凝⼟Thk 150mm C20 Concrete to Slabm3 - - - - -506.30-C 2.19?10钢筋@150x150双层双向Reinforcement Bar ?10 @ 150x150 DoubleLayer both directionkg - - - - -5,482.38-C 2.20Metal Aggregate Surface Floor Hardener (6.0kg/m2)⾦属⾻料耐磨地⾯材料表⾯硬化剂 (6.0 kg/m2)m2 16,366.00 25.10 - - 16,391.1036.60599,914.26C 2.21Epoxy Bottom Paint Layer环氧底漆层m2 - 13.74 - - 13.7428.00384.72C 2.222mm Self Levelling Epoxy2厚⾃流平环氧涂层m2 - 167.00 - 167.00253.0042,251.00C 2.23已完成混凝⼟地坪表⾯处理及清洁⼯作Completed Concrete Floor Surface Preparation& Cleaning Worksm2 16,435.00 1,631.00 372.00 92.00 18,530.00 2.5046,325.00Floor Cut Jointm 5,455.00 18.00 - 5,473.0014.0076,622.00C 2.25地坪伸缩缝Floor expansion jointsm 50.50 9.50 16.20 1.80 78.0036.002,808.00C 2.26塑料薄膜(保湿)Plastic Membrane (Humidity Preservation)m2 16,435.00 1,631.00 372.00 92.00 18,530.00 4.0074,120.00C 2.27办公楼地⾯60厚C15垫层60 thick C15 cushion course on office buildingfloorm2 - 1,631.00 371.90 92.00 2,094.9026.6555,837.46C 2.28办公楼地⾯C20细⽯混凝⼟C20 aggregate concrete office building floorm2 248.00 1,607.00 371.00 97.68 2,323.6834.2879,646.46⼯程量 Quantity⾦额 (元) Amount (RMB)项⽬名称Description单位Unit⼚房车间Workshop办公楼OfficeBuilding车间外配套⽤房FacilityBuildingOutsideWorkshop门卫室Guard Room泵房及消防⽔池& Fire WaterTank总数Total综合单价Unit Rate总价Total序号No建筑及⼟建⼯程Building & Civil Works16,601,761.76⼯程量 Quantity⾦额 (元) Amount (RMB)项⽬名称Description 单位Unit⼚房车间Workshop办公楼OfficeBuilding车间外配套⽤房FacilityBuildingOutsideWorkshop门卫室Guard Room泵房及消防⽔池Pump Room& Fire WaterTank总数Total综合单价Unit RateTotal序号NoC建筑及⼟建⼯程Building & Civil Works16,601,761.76⼯程量 Quantity⾦额 (元) Amount (RMB)项⽬名称Description 单位Unit⼚房车间Workshop办公楼OfficeBuilding车间外配套⽤房FacilityBuildingOutsideWorkshop门卫室Guard Room泵房及消防⽔池Pump Room& Fire WaterTank总数Total综合单价Unit Rate总价Total序号NoC16,601,761.76⼯程量 Quantity⾦额 (元) Amount (RMB)项⽬名称Description 单位Unit⼚房车间Workshop办公楼OfficeBuilding车间外配套⽤房FacilityBuildingOutsideWorkshop门卫室Guard Room泵房及消防⽔池Pump Room& Fire WaterTank总数Total综合单价Unit Rate总价Total序号NoC建筑及⼟建⼯程Building & Civil Works16,601,761.76⼯程量 Quantity⾦额 (元) Amount (RMB)项⽬名称Description 单位Unit⼚房车间Workshop房FacilityBuildingOutsideWorkshop门卫室Guard Room泵房及消防⽔池Pump Room& Fire WaterTank总数Total综合单价Unit Rate总价Total序号NoC建筑及⼟建⼯程Building & Civil Works16,601,761.76⼯程量 Quantity⾦额 (元) Amount (RMB)项⽬名称Description 单位Unit⼚房车间Workshop办公楼OfficeBuilding车间外配套⽤房门卫室Guard Room泵房及消防⽔池Pump Room& Fire WaterTank总数Total综合单价Unit Rate总价Total序号NoC建筑及⼟建⼯程Building & Civil Works16,601,761.76⼯程量 Quantity⾦额 (元) Amount (RMB)项⽬名称Description 单位Unit⼚房车间Workshop办公楼OfficeBuilding车间外配套⽤房FacilityBuildingOutsideWorkshop门卫室泵房及消防⽔池Pump Room& Fire WaterTank总数Total综合单价Unit Rate总价Total序号NoC建筑及⼟建⼯程Building & Civil Works16,601,761.76⼯程量 Quantity⾦额 (元) Amount (RMB)项⽬名称Description 单位Unit⼚房车间Workshop办公楼OfficeBuilding车间外配套⽤房FacilityBuildingOutsideWorkshop门卫室Guard Room泵房及消防⽔池Pump Room& Fire Water综合单价Unit Rate总价Total序号NoC建筑及⼟建⼯程Building & Civil Works16,601,761.76⼯程量 Quantity⾦额 (元) Amount (RMB)项⽬名称Description 单位Unit⼚房车间Workshop办公楼OfficeBuilding车间外配套⽤房FacilityBuildingOutsideWorkshop门卫室Guard Room泵房及消防⽔池Pump Room& Fire WaterTank总数Total综合单价Unit Rate总价NoCBrand/Offered byBidder品牌/投标⼈提供incl.incl.incl.incl.incl.incl.incl.incl.incl.only office area incl.incl.incl.Sikafloor 2 SynTop 1 ,6kg/m2 for Antistatic Raised Flooring Floor 3Brand/Offered byBidder品牌/投标⼈提供Brand/Offered byBidder品牌/投标⼈提供Brand/Offered byBidder品牌/投标⼈提供Brand/Offered byBidder品牌/投标⼈提供Brand/Offered by品牌/投标⼈提供Brand/Offered by Bidder品牌/投标⼈提供Brand/Offered by Bidder品牌/投标⼈提供Brand/Offered by Bidder品牌/投标⼈提供。

厂房土建预算方案范本

厂房土建预算方案范本

厂房土建预算方案范本1. 引言本文档旨在提供一个厂房土建预算方案的范本,以便项目团队能够根据实际情况进行相应的预算编制工作。

该预算方案旨在保证施工的质量、安全和进度,并合理控制项目的成本。

2. 预算编制原则在进行厂房土建预算编制时,应遵循以下原则:•精细化:对各项工程进行细化拆分,确保预算准确性。

•合理性:根据实际需求和工程规模,合理确定项目资源配置。

•经济性:在保证质量的前提下,通过工程技术优化,合理控制成本。

3. 预算编制步骤3.1. 工程量清单的编制根据项目设计文件和需求,编制出详细的工程量清单。

清单中应包含各项土建工程的数量、单价和总价。

示例的工程量清单如下表所示:工程名称单位工程量综合单价(元)小计(元)地基处理工程平方米1000 100 100000钢筋混凝土结构立方米5000 500 2500000墙体砌筑工程平方米2000 200 400000屋面防水工程平方米3000 150 450000……………合计35000003.2. 定额的确定根据工程量清单的具体内容,确定各项土建工程的定额。

定额是根据实际工程的特点和施工要求,结合以往相似工程的经验总结得出的。

3.3. 定额综合单价的编制根据定额和市场物价情况,计算出各项土建工程的综合单价。

综合单价由直接费用和间接费用两部分组成,可细分为人工费、材料费、施工机械使用费等。

3.4. 预算金额的计算根据工程量清单和综合单价,计算出各项土建工程的预算金额。

预算金额为工程总价格的汇总。

4. 质量控制措施为保证厂房土建工程的质量,项目团队应采取以下质量控制措施:•严格遵守国家有关建筑标准和技术规范,确保施工质量符合要求。

•严格控制材料质量,杜绝使用劣质材料。

•安排专业监理人员进行现场监督和质量检查,及时发现和解决问题。

•定期组织相关人员进行技术培训,提高施工人员的技术水平。

5. 安全措施为保证厂房土建工程的施工安全,项目团队应采取以下安全措施:•制定详细的施工安全计划,并按计划执行。

建筑工程预算与清单报价

建筑工程预算与清单报价

建筑工程预算与清单报价
建筑工程预算与清单报价是项目建设中非常重要的一部分,它涵盖了建筑工程涉及到的各个方面的费用,包括材料采购、劳动力成本、设备租赁和其他相关费用。

下面是一份建筑工程预算与清单报价的示例,仅供参考:
1. 混凝土工程
- 混凝土材料购买费用:XX万元
- 混凝土浇筑与施工费用:XX万元
2. 钢筋工程
- 钢筋材料购买费用:XX万元
- 钢筋加工与安装费用:XX万元
3. 砌体工程
- 砖块购买费用:XX万元
- 砌体施工费用:XX万元
4. 土石方工程
- 土方开挖费用:XX万元
- 土方回填费用:XX万元
5. 屋面工程
- 瓦片购买费用:XX万元
- 屋面安装费用:XX万元
6. 门窗工程
- 门窗材料购买费用:XX万元
- 门窗安装费用:XX万元
7. 涂料工程
- 涂料购买费用:XX万元
- 涂料施工费用:XX万元
8. 暖通工程
- 暖通设备购买费用:XX万元
- 暖通设备安装费用:XX万元
9. 电气工程
- 电气材料购买费用:XX万元
- 电气安装费用:XX万元
10. 室内装饰工程
- 室内装饰材料购买费用:XX万元
- 室内装饰施工费用:XX万元
以上仅为示例,真实的建筑工程预算与清单报价需要根据具体项目的情况进行调整和细化。

建筑工程预算与清单报价的准确性和全面性对于项目的顺利进行至关重要,因此建议在编制预算与报价时充分考虑各项费用,并与相关专业人士进行深入沟通和确认。

工业厂房预算书

工业厂房预算书

平米
202.7
-0.67
-137
平米
194.6
45.3
8815
平米
194.6 -13.16
-2562
平米
平米 工日
%
194.6
194.6 117.393
4.5
13.33
2595
2.74 5.56 70.45
533 653 317 54255
基价 1.02
318.33 315.59
192.1 16.63 15.11 16.45 16.63 15.11 4466.78 4436.24 4360.82 4820.35 34.91 36.55
直接费 198
2750 11311
7615 611
2179 3114
359 2712
554 745 1317 453 276 7408工程预(结)算书
工程名 称:工业 定额号


t-70 平整场地
t-612换 现浇商品混凝土矩形柱^c30(商)
t-630换 现浇商品混凝土有梁板^c30(商)
t-377换 砌筑加气砼块墙^m7.5-h-3
z-338 砼墙墙面、墙裙抹混合砂浆(柱)
z-341 轻质墙墙面、墙裙抹混合砂浆(外墙内侧)
z-706 砼天棚抹混合砂浆
z-1705 二次搬运及完工清理费
合计
单位 平米 立米 立米 立米 平米 平米 平米 平米 平米 吨 吨 吨 吨 平米 平米
建筑面积: 工程量 194.6 8.64 35.84 39.64 36.72 144.18 189.28 21.6 179.46 0.124 0.168 0.302 0.094 77.8 202.7

通用安装工程预算定额(通风空调工程)

通用安装工程预算定额(通风空调工程)

通用安装工程预算定额(通风空调工程)本文介绍了北京市建设工程计价依据——预算定额通用安装工程预算定额第七册通风空调安装工程。

本定额适用于工业与民用建筑项目中的通风、空调工程。

其中,刷油、防腐蚀、绝热工程,执行第十二册相应项目。

本定额中未包括过跨风管落地支架的制作安装,若设计要求,执行第一章设备支架制作安装相应子目。

通风空调工程系统调试费,按系统工程人工费的14%计算,其中人工费占25%。

设备安装未包括基础浇注及二次灌浆,基础浇注执行第一部分相应项目;二次灌浆执行第三册相应项目。

建筑物檐高以室外设计地坪标高作为计算起点。

本章设备安装定额中,包括随设备配备的设备支架或底部垫料安装,不得另计。

多联体空调室外机安装按制冷量执行相应子目,室内机按安装方式执行风机盘管安装相应子目。

本章各类风机型号的设置参见91SB6-1(2005)《通风与空调工程》图集。

七、在墙内安装轴流风机时,定额不包括墙外弯管和弯管出口端风口的制作和安装。

弯管的制作和安装遵循第二章风管制作安装相应的子目,人工费用乘以系数3.0;风口的制作和安装遵循第七章相应的子目。

八、如果轴流风机安装在混凝土台座上,则执行混(斜)流风机混凝土台座安装子目。

九、混(斜)流风机的吊架制作和安装在定额中包括减振器的安装,减振器的费用另计。

如果减振器的数量与设计要求不同,则可以进行调整,其他费用不变。

十、离心式通风机的安装在定额中包括减振钢台座和减振器的安装。

其中减振钢台座按设备自带考虑,定额中不包括减振器的费用。

如果减振器的数量与设计要求不同,则可以进行调整,其他费用不变。

十一、冷却塔的安装在定额中不包括现场组装的费用。

地脚螺栓按随设备配备考虑。

工程量计算规则本章设备均按设计图示数量计算。

一、空气加热器(冷却器)的安装不分型号,按加热器(冷却器)本身的重量计算。

二、空调器的安装:1.空气幕的类型和安装方式计算;2.空调机组按制冷量(或风量)计算;3.新风净化机按风量和类型计算;4.新风换气机按风量和安装方式计算;5.热回收机组分类型和风量计算;三、风机盘管不分型号,按安装方式计算。

某有限公司厂房建设工程预算书

某有限公司厂房建设工程预算书

*******有限公司厂房建设工程(钢构件)预算书建设单位:******有限公司工程编号:20121001工程名称:**************有限公司厂房(钢构件部分)工程建筑面积:11213.1平方米工程造价:15572798.89元人民币大写:壹仟伍佰伍柒万贰仟柒佰玖拾捌元捌角玖分整经济指标:1388.80元/平方米施工单位:编制单位:编制人:审核单位:审核人:2012年09月26日预算说明书一、编写依据(1)采用的图纸名是由河南金磊建筑设计院设计的*****有限公司二期生产车间工程图纸;(2)收费标准按河南省2008年建设工程工程量清单综合单价标准取值(3)预算基价(直接费):人工费=工程量×人工费单价……式①定额材料费:定额材料费=材料原价+材料运杂费……式②定额机械费=工程量×机械费单价……式③(4)施工措施项目费:包括技术措施费、安全文明施工措施费、二次搬运费、夜间施工措施费、冬雨施工措施费和其他费用等。

现根据实际情况采取下式进行计算:施工组织措施费=技术施工措施费+文明安全施工费+二次搬运费+夜间施工措施费+冬雨施工措施费……式④其中技术措施费按钢构件部分人工费的3%;安全文明费按人工费的17.76%;二次搬运费按人工费的3%;夜间施工措施费按人工费的0.68%,冬雨施工措施费按人工费的0.68%计算(5)调整:人工费差价材料费差价机械费差价(6)间接费:企业管理费:按定额直接费的15%取值……式⑤规费:包括社会保障费、住房公积金、工程定额测定费、建筑意外伤害保险费、工程排污费等。

现根据所知实际情况用下式进行计算:规费=社会保障费+住房公积金+工程定额测定费+意外伤害保险费+工程排污费……式⑥其中社会保障费按7.48元/工日计算;住房公积金按1.70元/工日计算;工程排污费按实际发生额计算,工程定额测定费按0.27元/工日计算,意外伤害保险费按0.60元/工日计算。

定额计价预算表格(成本价)

定额计价预算表格(成本价)

普通钢板矩形风管制作(δ=1.2mm以内 咬口) 大边长1000mm以内 m2
普通钢板矩形风管制作(δ=1.2mm以内 咬口) 大边长1250mm以内 m2
普通钢板矩形风管制作(δ=1.2mm以内 咬口) 大边长2000mm以内 m2
普通钢板矩形风管制作(δ=1.2mm以内 咬口) 大边长2000mm以上 m2
普通钢板圆形风管制作(δ=2mm以内 焊接) 直径450mm以内
m2
普通钢板圆形风管制作(δ=2mm以内 焊接) 直径630mm以内
m2
普通钢板圆形风管制作(δ=2mm以内 焊接) 直径1000mm以内 m2
普通钢板圆形风管制作(δ=2mm以内 焊接) 直径1250mm以内 m2
普通钢板圆形风管制作(δ=2mm以内 焊接) 直径1250mm以上 m2
定额号 % 1-1 1-2 1-3 1-4 1-5 1-6 1-7 1-8 1-9 1-10 1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 1-25 1-26 1-27 1-28 1-29 1-30 1-31 1-32 1-33 1-34 1-35 1-36 1-37 1-38 1-39 1-40 1-41 1-42 1-43
普通钢板矩形风管制作(δ=2mm以内 焊接) 大边长320mm以内 m2
普通钢板矩形风管制作(δ=2mm以内 焊接) 大边长450mm以内 m2
普通钢板矩形风管制作(δ=2mm以内 焊接) 大边长630mm以内 m2
普通钢板矩形风管制作(δ=2mm以内 焊接) 大边长1000mm以内 m2
普通钢板矩形风管制作(δ=2mm以内 焊接) 大边长1250mm以内 m2

压缩空气系统安装工-程-预-算-书

压缩空气系统安装工-程-预-算-书

4559.69 2044.42 2754.95 1050.84 508.93 1391.54 736.37 532.28 488.59 373.88 238.73 62.33 49.05 237.04 360.56 443.44 627.55 179.30 292.08 359.35 459.23 389.19 333.84 238.51 117.09 31.63 30.74 206.25 166.88 122.79 60.55 248.52 750.32 231.34 165.09 154.39 125.83 87.02 34.50 27.66 114.96 168.38 201.29 265.69 69.16 101.12 120.68 159.32 197.85 165.09 113.62 63.06 15.34 15.34 65.46 52.36 39.09 23.02
工 程 预 算 书
工程名称:连运满仓压缩空气系统安装 单价 序号 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 定额号 A1-1046 A1-815 A5-855 项目名称 水冷有油螺杆空压机(电 机500KW/10KV) 循环水泵(电机30KW) 微热再生式干燥机(35KW) 单位 台 台 台 台 台 台 10m 10m 10m 10m 10m 10m 10m 100m 100m 100m 100m 100m 100m 100m 100m 个 个 个 个 个 个 付 付 付 付 工程量 基价 人工费 机械费 基价 第1页 共2页 合计 人工费 57395.59 2089.28 6133.26 8406.72 5218.92 750.32 5783.50 2476.35 771.95 1447.05 783.18 448.50 13.83 155.20 345.18 402.58 664.23 93.37 207.30 241.36 398.30 4748.40 1485.81 2613.26 2270.16 582.92 107.38 1571.04 471.24 899.07 828.72 机械费 7155.05 127.20 2710.44 4277.04 317.94 51.48 7719.50 3461.10 1038.10 1701.31 774.45 53.95 1.46 39.49 69.91 72.78 97.38 33.90 61.42 60.60 81.55 1233.84 462.69 986.24 259.20 134.90 21.07 1801.68 541.53 999.58 561.24

厂房一工程预算表

厂房一工程预算表

1.2
7500.53
分部小计
第九章、楼地面工程
58 98ZJ901-4/4 散水做法
100m2
2.682
2362.75
01012 回填土原土打夯
100m2
2.682
41.55
09003×0.6 垫层砂
10m3
1.609
490.37
09043 砼散水
100m2
2.682
2026.98
09027-5 整体面层加浆抹光随捣随抹5mm^水泥砂浆,1:3
38 06002换 39 06005换 40 06019 41 06006换 42 06013换 43 06014换
工程项目及说明
直形墙墙厚20cm以内^现浇C20砾40(425#) 现浇梁C20砾40(425#) 圈梁、过梁^现浇C20砾40(425#) 平板板厚10cm以内^c25砾40(425) 雨篷(普通)^现浇C20砾40(425#) 天沟^现浇(场)c25砾40(425) 压顶^现浇C20砾40(425#) 牛腿^现浇(场)c25砾40(425) 圆钢筋直径6.5mm 圆钢筋直径8mm 圆钢筋直径10mm 螺纹钢直径12mm 螺纹钢直径14mm 螺纹钢直径16mm 螺纹钢直径18mm 螺纹钢直径20mm 螺纹钢直径22mm 预埋铁件
99834.79 178666.85
41151.88 12742.49
1721.03 26900.75
7016.12 12441.95
2641.08 686.88


序 定额号

工程项目及说明
工程预〖结〗算表
建筑面积:6315.13 m2
工程量
单位
数量

工业厂房工程量造价清单

工业厂房工程量造价清单

C 建筑及土建工程Building & Civil Works 16,601,761.76C 1.00地坪土方工程Flooring Earthworks - -C 1.01场地平整Levelling of the land m2 - - - - - 3.00 -incl.C 1.02Setting Out 放样m2 - - - - - 1.50 -incl.C 1.03土方开挖Excavation of basic Earthwork m3 - - - - - 25.68 -incl.C 1.04土方外运堆及推平Earthwork Remove Away from & Levelling m3 - - - - - 65.00 -incl.C 1.05Compaction on Backfill Layer at 150mm thk per layer (Factor 0.95)回填地面土压实按150mm 厚每层 (系数0.95)m2- - - - - 19.00 -incl.C 2.00地坪工程Flooring Works - 4,891,066.24C 2.01放样Setting Out m2 - - - - - 3.00 -incl.C 2.02回填场地平整Ground Levelingm2 - - - - - 1.50 -incl.C2.03Compaction On Original Soil Layer (Factor 0.95)原有地面土压实 (系数0.95)m216,370.00 1,630.00 438.00 222.00 18,660.00 2.80 52,248.00C 2.04Original Soil Compaction Test (Min 500m²/1Test)原土土方压实测试 (最少500m²/一次测试)lot 33.00 4.00 1.00 1.00 39.00 150.00 5,850.00C 2.05300mm thk Crusher Run 300mm 厚级配碎石m3 4,856.10 2.10 25.05 - 4,883.25 182.40 890,704.80C 2.06Compaction on Gravel Layer at 150mm thick per layer (Factor 0.95)碎石基层压实按150mm 厚每层 (系数0.95)m3 - - 19.00 -incl.C 2.07Gravel Compaction Test (Min 500m²/1 test)碎石基层压实测试 (最少500m²/一次测试)lot 33.00 4.00 1.00 1.00 39.00 300.00 11,700.00C 2.08200mm thk C35 Concrete 200mm 厚C35 混凝土m3 3,227.00 - - - 3,227.00 506.30 1,633,830.10C 2.09Ø8 钢筋@200x200双层双向Reinforcement Bar Ø8 @ 200x200 Double Layer both direction kg 149,492.00 - - - 149,492.00 5.39 806,135.61C 2.10Formwork to Slab 地坪模板m2 491.10 48.90 13.14 6.66 559.80 60.00 33,588.00C2.11Additional Steel Reinforcement Bar atManhole Openings or other Floor Recesses 人孔开口或其他楼板通道处钢筋加固kg180.00 - - - 180.00 5.39 970.65C 2.12Additional Steel Reinforcement Bar around Column柱子周围钢筋加固kg 1,630.00 - - - 1,630.00 5.39 8,789.78C 2.13100厚C15素混凝土垫层Thk 100mm C15 Lean Concrete m3 - 436.00 -incl.C 2.141厚改性水泥基弹性防水涂料Thk 0.8 mm Cementitious And Reactive Waterproofingm2 248.00 1,631.00 372.00 92.00 2,343.00 42.00 98,406.00C 2.1520厚1:3水泥砂浆找平层Thk 20mm 1:3 Cement Motar Levelind m2 248.00 1,736.10 372.00 92.00 2,448.10 40.00 97,924.00C 2.1640厚挤塑聚苯板(XPS)Thk 40mm Extruded Polysyrene Board (XPS)m2 - 1,732.00 - - 1,732.00 47.20 81,750.40only office area C 2.1720厚1:3水泥砂浆找平层Thk 20mm 1:3 Cement Motar Levelind m2 - - - - - 9.00 -incl.C 2.18150mm 厚C20楼板混凝土Thk 150mm C20 Concrete to Slab m3 - - - - - 506.30 -incl.C2.19Ø10钢筋@150x150双层双向Reinforcement Bar Ø10 @ 150x150 Double Layer both directionkg- - - - - 5,482.38 -incl.C 2.20Metal Aggregate Surface Floor Hardener (6.0kg/m²)金属骨料耐磨地面材料表面硬化剂 (6.0 kg/m²)m2 16,366.00 25.10 - - 16,391.10 36.60 599,914.26Sikafloor 2 SynTop 1 ,6kg/m2C 2.21Epoxy Bottom Paint Layer 环氧底漆层m2 - 13.74 - -13.74 28.00 384.72for Antistatic Raised FlooringC 2.222mm Self Levelling Epoxy 2厚自流平环氧涂层m2 -167.00 - 167.00 253.00 42,251.00Floor 3C 2.23已完成混凝土地坪表面处理及清洁工作Completed Concrete Floor Surface Preparation & Cleaning Works m2 16,435.00 1,631.00 372.00 92.00 18,530.00 2.50 46,325.00C 2.24地坪分割缝Floor Cut Joint m 5,455.0018.00 - 5,473.00 14.00 76,622.00C 2.25地坪伸缩缝Floor expansion joints m 50.50 9.50 16.20 1.80 78.00 36.00 2,808.00C 2.26塑料薄膜(保湿)Plastic Membrane (Humidity Preservation)m2 16,435.00 1,631.00 372.00 92.00 18,530.00 4.00 74,120.00C2.27办公楼地面60厚C15垫层60 thick C15 cushion course on office building floorm2- 1,631.00 371.90 92.00 2,094.90 26.65 55,837.46总数Total 综合单价Unit Rate 总价TotalBrand/Offered byBidder品牌/投标人提供序号No 工程量 Quantity金额 (元) Amount (RMB)项目名称Description 单位Unit厂房车间Workshop办公楼Office Building车间外配套用房FacilityBuildingOutsideWorkshop门卫室Guard Room泵房及消防水池Pump Room& Fire WaterTankC建筑及土建工程Building & Civil Works16,601,761.76总数Total综合单价Unit Rate总价TotalBrand/Offered byBidder品牌/投标人提供序号No工程量 Quantity金额 (元) Amount (RMB)项目名称Description单位Unit厂房车间Workshop办公楼OfficeBuilding车间外配套用房FacilityBuildingOutsideWorkshop门卫室Guard Room泵房及消防水池Pump Room& Fire WaterTank办公楼地面C20细石混凝土C建筑及土建工程Building & Civil Works16,601,761.76总数Total综合单价Unit Rate总价TotalBrand/Offered byBidder品牌/投标人提供序号No工程量 Quantity金额 (元) Amount (RMB)项目名称Description单位Unit厂房车间Workshop办公楼OfficeBuilding车间外配套用房FacilityBuildingOutsideWorkshop门卫室Guard Room泵房及消防水池Pump Room& Fire WaterTank240mm thk Aerated Concrete Block Wall LocalC建筑及土建工程Building & Civil Works16,601,761.76总数Total综合单价Unit Rate总价TotalBrand/Offered byBidder品牌/投标人提供序号No工程量 Quantity金额 (元) Amount (RMB)项目名称Description单位Unit厂房车间Workshop办公楼OfficeBuilding车间外配套用房FacilityBuildingOutsideWorkshop门卫室Guard Room泵房及消防水池Pump Room& Fire WaterTankLafarge /KnaufC建筑及土建工程Building & Civil Works16,601,761.76总数Total综合单价Unit Rate总价TotalBrand/Offered byBidder品牌/投标人提供序号No工程量 Quantity金额 (元) Amount (RMB)项目名称Description单位Unit厂房车间Workshop办公楼OfficeBuilding车间外配套用房FacilityBuildingOutsideWorkshop门卫室Guard Room泵房及消防水池Pump Room& Fire WaterTankExterior & Interior Window to be installC建筑及土建工程Building & Civil Works16,601,761.76总数Total综合单价Unit Rate总价TotalBrand/Offered byBidder品牌/投标人提供序号No工程量 Quantity金额 (元) Amount (RMB)项目名称Description单位Unit厂房车间Workshop办公楼OfficeBuilding车间外配套用房FacilityBuildingOutsideWorkshop门卫室Guard Room泵房及消防水池Pump Room& Fire WaterTankFloor CarpetC建筑及土建工程Building & Civil Works16,601,761.76总数Total综合单价Unit Rate总价TotalBrand/Offered byBidder品牌/投标人提供序号No工程量 Quantity金额 (元) Amount (RMB)项目名称Description单位Unit厂房车间Workshop办公楼OfficeBuilding车间外配套用房FacilityBuildingOutsideWorkshop门卫室Guard Room泵房及消防水池Pump Room& Fire WaterTankAlumium Panel Ceiling Armstorong阿姆斯C建筑及土建工程Building & Civil Works16,601,761.76总数Total综合单价Unit Rate总价TotalBrand/Offered byBidder品牌/投标人提供序号No工程量 Quantity金额 (元) Amount (RMB)项目名称Description单位Unit厂房车间Workshop办公楼OfficeBuilding车间外配套用房FacilityBuildingOutsideWorkshop门卫室Guard Room泵房及消防水池Pump Room& Fire WaterTankMop Sink AmericanC建筑及土建工程Building & Civil Works16,601,761.76总数Total综合单价Unit Rate总价TotalBrand/Offered byBidder品牌/投标人提供序号No工程量 Quantity金额 (元) Amount (RMB)项目名称Description单位Unit厂房车间Workshop办公楼OfficeBuilding车间外配套用房FacilityBuildingOutsideWorkshop门卫室Guard Room泵房及消防水池Pump Room& Fire WaterTankMoveable Partition Wall。

工装预算报价范本

工装预算报价范本

工装预算报价范本
尊敬的客户
1.设计费用:
2.材料费用:
工装的材料费用包括地板、墙面、天花、门窗、灯具等。

根据项目需求和材料选择的档次不同,材料费用将有所差异。

为了给您一个大致的预算参考,一般情况下,中档级别的材料费用在500元至800元/㎡之间。

3.人工费用:
人工费用是工装项目中一个重要的部分,根据不同工种、施工难度和工期等因素,人工费用也会有所差异。

一般情况下,人工费用在工程总投资的30%至40%之间。

具体费用根据实际测量和设计确定。

4.辅助设备费用:
辅助设备费用包括空调、消防设备、电线电缆等。

根据项目需求和设备选择的档次不同,费用会有所不同。

根据我们的经验,辅助设备费用一般在工程总投资的10%至15%之间。

5.其他费用:
其他费用可能涉及到运输、检测等项目。

这些费用将根据实际需求确定并进行预算,一般在工程总投资的5%至10%之间。

最后,再次感谢您选择我们公司。

我们期待与您合作,共同完成一个满意的工装项目。

谢谢!
此致敬礼。

标准厂房建设费用预算清单

标准厂房建设费用预算清单

标准厂房建设费用预算清单英文回答:Standard Factory Construction Cost Budget.Materials.Concrete: $200 per cubic yard.Steel: $1,000 per ton.Roofing: $10 per square foot.Windows: $500 per window.Doors: $1,000 per door.Electrical: $50,000 for a 10,000 square foot factory. Plumbing: $25,000 for a 10,000 square foot factory.Labor.Concrete workers: $60 per hour. Steel workers: $75 per hour.Roofers: $40 per hour.Window installers: $30 per hour. Door installers: $40 per hour. Electricians: $50 per hour.Plumbers: $45 per hour.Other Costs.Permits: $5,000。

Inspections: $2,000。

Insurance: $10,000。

Contingency fund: 10% of total budget.Total Budget.The total budget for a standard 10,000 square foot factory is approximately $1,000,000.中文回答:标准厂房建设费用预算清单。

材料。

混凝土,每立方米200美元。

钢材,每吨1000美元。

屋顶,每平方英尺10美元。

门,每扇门1000美元。

电气,10,000平方英尺工厂50,000美元。

管道,10,000平方英尺厂房25,000美元。

一千平米的厂房建筑工程建筑及装修预算表

一千平米的厂房建筑工程建筑及装修预算表

622.61
100m² 0.0720 25145.36 1810.47
100m² 1.3500 23540.32 31779.43
100m² 0.5481 2633.96 1443.67
100m² 21.3044 420.25 8953.17
100m² 54.0724 5637.78 304848.30
7 A3-0001(换) 砖基础
8 A3-0081(换) 混凝土小型空心砌块
9 A4-0007(换) 独立基础
10 A4-0017
基础垫层
11 A4-0020(换) 矩形柱周长 1.8m 以外 混凝土
12 A4-0025(换) 基础梁
13 A4-0028(换) 圈梁 混凝土
14 A4-0046(换) 有梁板厚 100mm 以外 混凝土
52 B2-0070 53 B2-0142 54 B3-0003 55 B3-0005 56 B4-0036 57 B4-0071 58 B4-0073 59 B4-0242 60 B5-0013 61 B5-0228 62 B5-0276
分格嵌缝 白色瓷砖 水泥砂浆粘贴 顶棚水泥砂浆抹灰 顶棚混合砂浆抹灰 无纱镶胶合板门 单扇带亮子 扇安装 单扇平开门 带上亮 双扇平开门 带上亮 塑钢窗 单层 室内单层木门 聚氨酯漆两遍 乳胶漆抹灰两遍 丙烯酸无光外用乳胶漆
2624.15 2502.12 1326.27 3671.29 4539.48 2072.41 1368.14 1581.44 2493.97 540.51 1147.32 1697.41 3667.05 1589.18 4014.26 658.18 229.31 2202.06
2370.92 430.87 416.45 793.00 37764.84 1616.48 908.86 518.87 3338.43 823.74 91.79 8593.99 21155.21 230.43 32804.13 15881.88 4054.20 13934.64

厂房装修工程报价单细致计算厂房装修材料及人工费用

厂房装修工程报价单细致计算厂房装修材料及人工费用

厂房装修工程报价单细致计算厂房装修材料及人工费用1. 概述在进行厂房装修工程时,准确计算报价单是非常重要的。

本文将详细介绍如何细致计算厂房装修所需材料及人工费用。

2. 前期准备在开始计算厂房装修工程报价单之前,我们需要进行一些前期准备工作。

2.1 材料清单针对厂房装修工程,我们需要准备一个材料清单,列出所需材料的种类和数量。

清单中应包括砖瓦、水泥、木材、油漆等装修材料。

2.2 人工费用同样重要的是计算人工费用。

根据厂房装修工程的规模和工期,我们需要确定所需工人的数量和工作时间,以便计算人工费用。

3. 材料费用计算厂房装修材料费用的计算需要根据材料清单和市场价格来进行。

3.1 材料清单的制定在制定材料清单时,我们应根据实际需要确定每种材料的规格和数量。

例如,如果需要使用砖瓦进行墙面装修,我们需要测量墙面的面积,并考虑到砖瓦的浪费率,来确定所需的砖瓦数量。

3.2 市场价格的了解在计算材料费用时,我们需要了解市场上各类材料的价格。

可以通过与供应商联系或者通过互联网进行调查,了解各种材料的市场价位。

3.3 材料费用的计算根据清单中各种材料的数量和对应的市场价格,我们可以计算出每种材料的费用。

将各项材料费用累加即可得到总材料费用。

4. 人工费用计算在计算人工费用时,我们需要考虑到工人的数量、工作时间以及工资标准。

4.1 工人数量的确定根据装修工程的规模和进度要求,我们可以预估所需的工人数量。

如果需要瓦工、木工、油漆工等不同类型的工人,应分别计算各个类型工人的数量。

4.2 工作时间的估算我们需要根据工程的工期来估算工作时间。

例如,如果预计整个装修工程需要20天完成,那么我们可以按照每天8小时来计算工作时间。

4.3 工资标准的确定根据当地的人工市场价位,我们可以确定各类工人的工资标准。

可以参考当地劳动合同以及相关政府规定,确保工资标准的合理性。

4.4 人工费用的计算根据工人数量、工作时间和工资标准,我们可以计算出每种类型工人的总工资。

厂房工程施工预算

厂房工程施工预算

厂房工程施工预算一、编制依据1. 国家及地方相关法律法规、工程建设的强制性标准;2. 工程设计文件、施工图纸及相关技术要求;3. 工程所在地的建筑材料、设备、人工等市场价格;4. 施工组织设计及施工方案;5. 施工单位的管理水平、技术力量、施工经验等;6. 工程项目所在地的自然、地理、气候等条件;7. 工程项目所在地的交通、物流、通讯等基础设施条件;8. 工程项目所在地的环保、安全等要求。

二、预算编制原则1. 科学合理,确保工程质量和安全;2. 全面细致,不遗漏任何一项费用;3. 严谨准确,确保预算执行的可行性;4. 弹性适度,充分考虑工程变更和不可预见因素;5. 动态管理,及时调整预算以适应市场变化。

三、预算内容1. 直接费用:包括人工费、材料费、施工机械使用费、临时设施费等。

(1)人工费:根据施工方案及施工组织设计,结合工程所在地的劳动力市场价格,按工种、工作内容、工程量等因素进行计算。

(2)材料费:根据设计文件和施工方案,结合工程所在地的材料市场价格,按照材料品种、规格、数量等因素进行计算。

(3)施工机械使用费:根据施工方案和工程量,结合工程所在地的机械租赁市场价格,按机械种类、台班数等因素进行计算。

(4)临时设施费:根据施工组织设计,结合工程所在地的租赁价格,按临时设施的种类、数量、使用期限等因素进行计算。

2. 间接费用:包括项目管理费、企业管理费、规费、税金等。

(1)项目管理费:根据工程规模、复杂程度、施工周期等因素,按照一定的费率进行计算。

(2)企业管理费:包括管理人员工资、办公费用、差旅费用等,根据企业实际情况进行计算。

(3)规费:包括施工许可证费用、安全文明施工费、质量监督费等,按照政府规定的标准进行计算。

(4)税金:根据国家税收政策,按照工程造价的一定比例进行计算。

3. 工程风险费:根据工程特点、施工条件、市场环境等因素,充分考虑工程变更、质量缺陷、安全事故等风险,按照一定的费率进行计算。

新乡开发项目标准工业厂房成本测算表

新乡开发项目标准工业厂房成本测算表

1438.0 1438
1,084 2,137 3,190 4,243 5,296
115.3 201.5 287.6 373.8 459.8
819.3 1,036.10 1,220.30 1,414.50 1,585.70
-47.6 312.4 704.1 1,086.7 1,491.5
0 46.9 105.6 163 223.7

2,637.05
1,971 2,956.50
99
0
148
730
1,971 3,687
3,942 7,373
1,971 3,687
3,942 4,927.50
5,913
1,825 2,737.50
【年物料成本 日耗用 】支出额 量,份
1,084
0
1,626
2,000
2,168
4,000
2,710
6,000
50 4000
20
80 4000
32
108 4000 43.2
133 4000 53.2
156 4000 62.4
能耗 43.6 78.8 100.6 136.8 159.6
43.6 78.8 100.6 136.8 159.6
配送费 14.4
28 32 46 60
14.4 28 32 46 60
易耗品 24 36 48 60 72
580
362.5 15 315 100 9
949.8 2755.8
0
6.49
145
29
0
18.125
0
0.75
105
63
25
0 381.3 656.3

仓库空调预算明细表

仓库空调预算明细表

仓库空调预算明细表摘要:一、引言:了解仓库空调预算明细表的背景和重要性二、仓库空调预算明细表的构成要素1.空调设备购置费用2.安装费用3.空调系统设计费用4.空调维护与维修费用5.能源消耗成本6.其他相关费用三、编制仓库空调预算明细表的步骤1.确定空调设备类型和数量2.获取相关费用报价3.计算空调设备购置费用和安装费用4.预算空调系统设计、维护与维修费用5.评估能源消耗成本6.预留一定的备用金四、注意事项1.合理选择空调设备类型2.比较多家供应商报价,争取优惠3.确保预算表详细、全面,避免遗漏4.加强与相关部门沟通,确保预算合理性五、总结:仓库空调预算明细表在项目实施中的重要作用正文:一、引言仓库空调预算明细表是企业在进行仓库空调项目投资时的重要参考依据。

通过对各项费用的详细罗列和计算,有助于企业全面了解项目投资成本,为项目决策提供有力支持。

本文将为您解析仓库空调预算明细表的编制方法及其重要性。

二、仓库空调预算明细表的构成要素1.空调设备购置费用:根据所需空调设备的类型、品牌、规格等因素,结合市场报价,计算购置费用。

2.安装费用:包括空调设备安装、管线铺设、吊装等费用,需根据实际工程量及安装队伍报价计算。

3.空调系统设计费用:聘请专业空调设计师进行系统设计,根据设计复杂度和设计周期等因素确定费用。

4.空调维护与维修费用:预估项目运行过程中的维护和维修成本,包括零部件更换、人工费用等。

5.能源消耗成本:根据空调设备的能效比、运行时间等因素,预估项目运营过程中的能源消耗成本。

6.其他相关费用:如空调系统调试、验收等费用,需根据实际情况进行预算。

三、编制仓库空调预算明细表的步骤1.了解项目需求,确定空调设备类型和数量。

例如,根据仓库面积、温度湿度要求等因素选择合适类型的空调设备。

2.获取相关费用报价,如空调设备购置、安装、设计等。

可通过多家供应商进行比较,以获取更优惠的价格。

3.计算空调设备购置费用和安装费用。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
单位工程预算书
工程名称:表面处理厂房二压缩空气工程
第1页共4页
序号
1 主材:
2 主材:
3 主材:
4 主材:
5 主材:
6 主材:
7 主材:
8 主材:
9 主材:
10 主材:
11 主材:
12 主材:
13 主材:
14 主材:
定额编号
子目名称
C6-0119
低压不锈钢管(电弧焊) 公称 直径 150mm以内
01165067-1
310.82 124.33
61.08
22.18
39
156
162.56 2535.93 1307.12 515.11
10
1560
745.58 223.67
90.45
24.68
4.2
42.47
550.55 220.22
92.2
21.65
4.2
22.44
550.55 2862.86 1198.6
281.48
184.8 45898.78
41.98 1656.11 1344.06 161.35
103.6 40216.28
1362.25 5040.33 1214.64 1064.19
210
7770
832.43 249.74
71.42
47.44
70
210
629.61 188.88
64.79
29.56
61
183
低压不锈钢管件(电弧焊) 公 称直径 100mm以内
01165562-2
低压不锈钢对焊管件公称直径 100mm以内
C6-0811
低压不锈钢管件(电弧焊) 公 称直径 80mm以内
01165562-3
低压不锈钢对焊管件公称直径 80mm以内
C6-0809
低压不锈钢管件(电弧焊) 公 称直径 50mm以内
低压不锈钢管公称直径 以内
150mm
C6-0117
低压不锈钢管(电弧焊) 公称 直径 100mm以内
01165067-2
低压不锈钢管公称直径 以内
100mm
C6-0116
低压不锈钢管(电弧焊) 公称 直径 80mm以内
01165067-3
低压不锈钢管公称直径 内
80mm以
C6-0114
低压不锈钢管(电弧焊) 公称 直径 50mm以内

主材: 01185233-4 不锈钢法兰3041.6MPa DN50

17
C8-0543
螺纹阀门安装 公称直径 15mm 以内

主材: 01185214-4 螺纹阀门DN15

18
C8-0558换
焊接法兰阀门安装 公称直径 32mm以内

主材: 01185226-2 不锈钢球阀Q41F-16DN15
240 104.97
1340 113 59.95 825 70 9.32 298 53.85 298 25 10.09 1880 6.87 1300 147.29 870 5.07 490
1920 314.91
4020 678 359.7 4950 840 894.72 28894.08 5169.6 28608 4800 201.8 37600 219.84 41600 4713.28 27840 324.48 31673.6

21
C6-2999
蒸汽分汽缸安装 每个重 50kg 以内

主材: 01166927-1 配气器

22
C8-0543换
螺纹阀门安装 公称直径 15mm 以内

主材: 01185214-1 不锈钢快速接头DN15

8 3 3 6 6 6 12 96 96.96 96 96 192 20 20 32 32 32 32 64 64.64

主材: 01185226-4 不锈钢法兰3041.6MPa DN15

19
C8-0824
过滤器安装(螺纹连接) 公称 直径 40mm以内

主材: UR200293-2 精过滤器DN40

20
C8-0822
过滤器安装(螺纹连接) 公称 直径 25mm以内

主材: UR200291-2 精过滤器DN25

15
C8-0562换
焊接法兰阀门安装 公称直径 80mm以内

主材: 01185230-1 不锈钢球阀Q41F-16DN80

主材: 01185233-3 不锈钢法兰3041.6MPa DN80

16
C8-0560换
焊接法兰阀门安装 公称直径 50mm以内

主材: 01185228-1 不锈钢球阀Q41F-16DN50
单位
单位
数量
10m
28.4
m
266.39
10m
1.1
m
10.48
10m
26.6
m
253.5
10m
25.5
m
248.37
10m
39.45
m
388.19
10个
3.7

37
10个
0.3

3
10个
0.3

3
10个
0.4

4
10个
15.6

156
10个
0.3
kg
10.11
10个
0.4
kg
5.34
10个
5.2
kg
01165562-4
低压不锈钢对锈钢管件(电弧焊) 公 称直径 32mm以内
01165562-5
低压不锈钢对焊管件公称直径 32mm以内
低压碳钢管挖眼三通补强圈制
C6-2601 作安装(电弧焊) 公称直径
150mm以内
01166966-1 钢板
C6-2599
4.2 177.22
4290
291.78 708.88 17160
253.8
283.76
编制人:
审核人:
编制时间;
单位工程预算书
工程名称:表面处理厂房二压缩空气工程
第2页共4页
序号 定额编号
子目名称
单位
单位
数量
价值
单价
合价
其中(元)
人工费
材料费
主材: 01185233-2 不锈钢法兰3041.6MPa DN150
69.47

4

4
价值
其中(元)
单价
合价
人工费
材料费
304.11 8636.72 2859.03 761.97
696 185408.83
150.35 165.39
91.58
16.63
410.4 4302.22
117.05 3113.53 1831.41 268.66
335.2 84972.53
64.65 1648.58 1270.41 156.32
低压碳钢管挖眼三通补强圈制 作安装(电弧焊) 公称直径 100mm以内
01166966-1 钢板
C6-2599
低压碳钢管挖眼三通补强圈制 作安装(电弧焊) 公称直径 100mm以内
01166966-1 钢板
C8-0565换
焊接法兰阀门安装 公称直径 150mm以内
01185233-1 不锈钢球阀Q41F-16DN150
01165067-4
低压不锈钢管公称直径 内
50mm以
C6-0112
低压不锈钢管(电弧焊) 公称 直径 32mm以内
01165067-5
低压不锈钢管公称直径 内
32mm以
C6-0814
低压不锈钢管件(电弧焊) 公 称直径 150mm以内
01165562-1
低压不锈钢对焊管件公称直径 150mm以内
C6-0812
相关文档
最新文档