某煤矿双立井固定机械设备选型设计

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

某煤矿双立井固定机械设备选型设计

摘要

本次毕业设计是以煤矿双立井固定机械设备选型为设计对象,主要是为一个年产120万吨的矿井设计一套经济而配套的固定机械及运输设备,该矿可采煤层为9号煤,煤层倾角为2°到4°,可采厚度为3.3米,采用双立井开拓方式开采,矿井排水高度为280米,正常涌水量为130m3/h,最大涌水量为250 m3/h,最大涌期为65天,矿井风量为114 m3/s,初期负压为3270Pa,末期负压4130 Pa。该矿设计两个采区,每个采区各设置一个工作面。

该毕业设计主要由井底运输设备的选型设计(包括:采煤机的选型、刮板输送机的选型、转载机的选型、皮带输送机的选型、矿用电机车及矿车的选择和辆数的确定等)、提升设备的选型设计(包括:主井提升系统的选型、副井提升系统的选型等)和流体机械设备的选型设计(包括:中央水泵房的布置及排水方案的确定、水泵的选型和泵台数的确定;通风机房的布置及通风机选型和台数的确定;压风机房的布置及压风机的选型和台数的确定等)。

关键词:运输机械提升机排水设备

Some coal mine double vertical shaft fixed

mechanical device shaping design

Abstract

This graduation project is take the coal mine double vertical shaft fixed mechanical device shaping as the design object, but mainly is one yearly produces 1,200,000 tons mine pits to design set of economies the necessary fixed machinery and the transport vehicle, this ore may mine coal the level is 9 coals, the coal bed inclination angle for 2°to 4°, may pick thickness is 3.3 meters, uses double vertical shaft development way mining, mine pit draining water is highly 280 meters, wells up the water volume is normally 130m3/h, wells up the water volume is most greatly 250 m3/h, wells up the time is most greatly 65 days, the mine pit amount of wind is 114 m3/s, the initial period negative pressure is 3270Pa, last stage negative pressure 4130 Pa.This ore designs two panels, each panel establishes a working surface.

This graduation project mainly by bottom of the well transport vehicle shaping design (including: The coal mining machine shaping, the scraper conveyer shaping, the extension carrier vehicle shaping, the leather belt conveyer shaping, the mineral product electric locomotive and the mine car choice and the number of vehicles indeed grade), the lift technique shaping design (including: Main well promotion system shaping, vice-well promotion system shaping and so on) and fluid machinery equipment shaping design (including: Central water plant arrangement and draining water plan determination, water pump shaping and pump Taiwan number determination; Ventilates the engine room the arrangement and the ventilator shaping and the Taiwan number determination; The air compressor room arrangement and the air compressor shaping and the Taiwan number indeed grade).

Key word: Transport machinery Elevator Drainage

前言

本次毕业设计可能是我学生生涯最后的一次学习机会,在此首先感谢学院和指导老师陈彩萍教授对我设计的支持和帮助,为我以后的工作打下了一个有益的基础。

本设计针对某煤矿双立井固定机械设备选型设计,内容涉及较多,设计时间较长,是一个设计的过程,更是一个学习的过程。通过前面的实地实习,在老师的努力下收集到了较为齐全和准确的相关资料,其中包括了井底运输机械;主、副井提升设备及流体机械设备的了解,为本次设计打下了一个良好的基础。同时涉及的参考文献较多,多数为十几年前的老版本,难免存在一些错误,还望大家见谅。根据设计大纲所要求内容,将设计分为六章,内容主要有三部分,第一部分主要是对井底运输机械选型设计,内容涉及第一章。二到三章为设计的第二部分,也是本次设计的核心内容,主要是对主、副井的提升系统,选择合理的提升设备。最后一部分是流体机械部分的设计,内容涉及第四到六章。整个设计内容可靠、数据可信。若存在问题,希望各位评审老师批评指正。