第一部分重力坝毕业设计第一章基本资料设计洪水位(P = 5 %)上游:510.15m下游:480.12m校核洪水位(P = 1 %)上游:510.64m下游:481.10m正常蓄水位上游:509m死水位:488m可利用河底高程478.5m混凝土容重:24 KN/m3坝前淤沙高程:486m泥沙浮容重 10 KN/m3,内摩擦角为20°混凝土与基岩间抗剪断参数值:f `= 0.6c `= 0.3Mpa坝基基岩承载力:[f]=1000Kpa坝基垫层混凝土:C15坝体混凝土:C15= 22m/s50年一遇最大风速为:v`= 16m/s多年平均最大风速为:v吹程 D =1000m第二章重力坝的断面选取与荷载计算第一节流量-水位关系曲线计算流量-水位关系曲线计算表注:流量-水位关系曲线河谷断面图第二节重力坝坝体断面1.坝顶高程的确定①. 正常水位时gD/v2=9.81×1000/222=20.279.81h/222=0.0076×22-1/12×(9.81×1000/222)1/3h=0.79m当gD/v2=20~250时,h为累计频率h5%的波高∴h1%=h=1.24h5%=0.98m9.81Lm/222=0.331×22-1/2.15×(9.81×1000/222)1/3.75Lm=8.65mh z =π×0.982/8.65×cth(2πH/ Lm)hz=0.35m△h=h1%+h z+h c=0.98+0.35+0.4=1.73m根据公式Q=δsεmB(2g)1/2H3/2 得H={Q/[δsεmB(2g)1/2]}2/3={66.18/[1×1×0.502×24×(2×9.81) 1/2]}2/3 =1.15m设计洪水位=509+1.15=510.15m坝顶高程=509+1.73=510.73m②校核洪水位时gD/v2=9.81×1000/162=38.329.81h/162=0.0076×16-1/12×(9.81×1000/162)1/3h=0.53m当gD/v2=20~250时,h为累计频率h5%的波高∴h1%=h=1.24h5%=0.66m9.81Lm/162=0.331×16-1/2.15×(9.81×1000/162)1/3.75Lm=6.29mh z =π×0.662/6.29×cth(2πH/ Lm)hz=0.22m△h=h1%+hz+hc=0.66+0.22+0.3=1.18m根据公式Q=δsεmB(2g)1/2H3/2 得H={Q/[δεmB(2g)1/2]}2/3={112.56/[1×1×0.502×24×(2×9.81) 1/2]}2/3s=1.64m校核洪水位=509+1.64=510.64m坝顶高程=510.64+1.18=511.82m,故取坝顶高程为512m而该坝的开挖深度为1.5m ∴坝高=512-478.5=33.5m2.坝顶宽度的确定坝顶宽度取坝高的9%,则坝顶宽度=33.5×9%=3.015m,故坝顶宽度取3.5m3.坝面坡度的确定下游面的坡度采用1:0.84.坝基防渗与排水设施的拟订距距坝踵5m处设一个帷幕灌浆断面图如下:第三节荷载计算摩檫系数f 'Γk 、粘聚力C 'ΓK 的材料性能分项系数分别为1.3、3.0, 则相应的设计值:摩檫系数f 'Γ=0.6/1.3=0.46 粘聚力C 'Γ=300/3=100 Kpa选用砼为C15,抗压强度性能分项系数为1.5,则设计值 fc=15000/1.5=10000 Kpa 扬压力系数α为0.2(查表得出) 1.设计洪水位W 1W 2W 3⑴.浪压力P 1=1/2γHL m /2=1/2×9.81×(0.98+0.35+8.65/2)×8.65/2=119.97 KNP 2=1/2γL m 2/4=1/2×9.81×8.652/4=91.75 KNP n = P 1+P 2 =119.97-91.75=28.22 KN P=1.2×P n =1.2×28.22=33.86 KNM 1n =-P 1×[1/3×(h 1%+h z +L m /2)+H 1-L m ]=-119.97×[1/3×(0.98+0.35+8.65/2)+31.65-8.65/2]=-3504.32 KN ·NM1=1.2M1n=1.2×(-3504.32)=-4205.18 KN·NM2n =P2×(1/3×Lm/2+H1-Lm/2)=91.75×(1/3×8.65/2+31.65-8.65/2)=2639.34 KNM2=1.2M2n=1.2×2639.34=3167.21 KN·N⑵.泥沙压力Psk =1/2γsbhs2tan2(45°-φs/2)=1/2×10×7.52×tan2(45°-20°/2)=137.89 KNPn =1.2Psk=1.2×137.89=165.47 KNM=-PnL=-165.47×1/3×7.5=-413.68 KN·N⑶.自重W1=γV1=24×3.5×33.5=2814 KNW2=γV2=24×23.3×29.1×1/2=8136.36 KNW3=γV3=9.81×1/2×1.62×1.62×0.8=10.30 KNW=W1+W2+W3=10960.66 KNM1=W1L1=2814×(26.8/2-3.5/2)=32783.1 KN·NM2=W2L2=8136.36×(26.8/2-3.5-23.3/2)=17357.57 KN·NM3=-W3L3=-10.30×(26.8/2-1/3×1.62×0.8)=-133.57 KN·N⑷.水压力上游:P1=1/2γH12=1/2×9.81×31.652=4913.45 KNM1=-P1L1=-4913.45×1/3×31.65=-51836.90 KN·N下游:P2=1/2γH22=1/2×9.81×1.622=12.87 KNM2=P2L2=12.87×1/3×1.62=6.95 KN·N⑸.浮托力P浮=γH2LB=9.81×1.62×26.8=425.91 KNM=0 KN·N⑹.渗透压力W1=γA1=9.81×1/2×5×[31.65-1.62-0.2×(31.65-1.62)=589.19 KNW2=γA2=9.81×5×0.2×(31.65-1.62)=294.59 KNW3=γA3=9.81×1/2×(26.8-5)×0.2×(31.65-1.62)=642.22 KNWK =W1+W2+W3=1526 KNW=1.2×1526=1831.2 KNM 1K =-W 1L 1=-589.19×(26.8/2-5/3)=-6913.17 KN ·N M 1=1.2 M 1K =8160.35 KN ·NM 2K =-W 2L 2=-1.2×294.59×(26.8/2-5/2)=-3211.03 KN ·N M 2=1.2 M 2K =-3853.24 KN ·NM 3K =-W 3L 3=-1.2×642.22×[26.8/2-5-(26.8-5)/3] =-727.85 KN M 3=1.2 M 3K =-873.42 KN ∑P=5099.91 KN ∑W=8284.51 KN∑M=-16296.96 KN ·N 2.校核洪水位W 1W 2W 3⑴.浪压力P 1=1/2γHL m /2=1/2×9.81×(0.66+0.22+6.29/2)×6.29/2=62.09 KN P 2=1/2γL m 2/4=1/2×9.81×6.292/4=48.52 KNP n = P 1+P 2 =62.09-48.52=13.57 KN P=1.2×P n =1.2×13.57=48.52 KNM1n =-P1×[1/3×(h1%+hz+Lm/2)+H1-Lm]=-62.09×[1/3×(0.66+0.22+6.29/2)+32.14-6.29/2]=-1883.60 KN·NM1=1.2M1n=1.2×(-1883.60)=-2260.32 KN·NM2n =P2×(1/3×Lm/2+H1-Lm/2)=48.52×(1/3×6.29/2+32.14-6.29/2)=1457.70KNM2=1.2M2n=1.2×1457.70=1749.24 KN·N⑵.泥沙压力Psk =1/2γsbhs2tan2(45°-φs/2)=1/2×10×7.52×tan2(45°-20°/2)=137.89 KNPn =1.2Psk=1.2×137.89=165.47 KNM=-PnL=-165.47×1/3×7.5=-413.68 KN·N⑶.自重W1=γV1=24×3.5×33.5=2814 KNW2=γV2=24×23.3×29.1×1/2=8136.36 KNW3=γV3=9.81×1/2×2.6×2.6×0.8=26.53 KNW=W1+W2+W3=10976.89 KNM1=W1L1=2814×(26.8/2-3.5/2)=32783.1 KN·NM2=W2L2=8555.4×(26.8/2-3.5-23.3/3)=17357.57 KN·NM3=-W3L3=-26.53×(26.8/2-1/3×2.6×0.8)=-337.11 KN·N⑷.水压力上游:P1=1/2γH12=1/2×9.81×32.142=5066.76 KNM1=-P1L1=-5066.76×1/3×32.14=-54281.89 KN·N下游:P2=1/2γH22=1/2×9.81×2.62=33.16 KNM2=P2L2=33.16×1/3×2.6=28.74 KN·N⑸.浮托力P浮=γH2LB=9.81×2.6×26.8=683.56 KNM=0 KN·N⑹.渗透压力W1=γA1=9.81×1/2×5×[32.14-2.6-0.2×(32.14-2.6)=579.57 KNW2=γA2=9.81×5×0.2×(32.14-2.6)=289.79 KNW3=γA3=9.81×1/2×(26.5-5)×0.2×(32.14-2.6)=631.74 KNWK =W1+W2+W3=1501.1 KNW=1.2×1501.1=1801.32 KNM1=-1.2W1L1=-1.2×579.57×(26.8/2-5/3)=-8160.35 KN·NM2=-1.2W2L2=-1.2×289.79×(26.8/2-5/2)=-3790.45 KN·NM3=-1.2W3L3=-1.2×631.74×[26.8-5-(26.8-5)/3] =-859.17 KN∑P=5215.35 KN∑W=8072.97 KN∑M=-18184.32 KN·N3. 抗滑稳定极限状态⑴基本组合时,取持久状况对应的设计状况系数ψ=1.0,结构系数γd=1.2γ0ψs(·)= γψ∑P=1.0×1.0×5099.91 =5099.91 KN1/γd R(·)= 1/γd(f'Γ∑W+ C'ΓA)=1/1.2(0.46×8284.51+100×26.8) =5409.06 KN∴γ0ψs(·)<1/γdR(·)即基本组合时满足设计要求⑵偶然组合时,取偶然状况对应的设计状况系数ψ=0.85,结构系数γd=1.2γ0ψs(·)= γψ∑P=1.0×0.85×5215.35 =4433.05 KN1/γd R(·)= 1/γd(f'Γ∑W+ C'ΓA)=1/1.2(0.46×8911.05+100×26.8) =6837.38 KN∴γ0ψs(·)<1/γdR(·)即偶然组合时满足设计要求4. 坝址抗压强度极限状态⑴基本组合时,设计状况系数ψ=1.0,结构系数γd=1.8γ0ψs(·)= γψ(∑W/T-6∑M/T2)×(1+m2)=1.0×1.0×[8284.51/26.8-6×(-16296.96)/26.82] ×(1+0.82) =730.23 Kpa≈0.73 Mpa1/γdR(·)=1/1.8×10000=5555.56 Kpa≈5.56 Mpa∴γ0ψs(·)<1/γdR(·)即基本组合时满足设计要求⑵偶然组合时,设计状况系数ψ=0.85,结构系数γd=1.8γ0ψs(·)= γψ(∑W/T-6∑M/T2)×(1+m2)=1.0×0.85×[8072.97/26.8-6×(-18184.32)/26.82] ×(1+0.82) =631.68 Kpa≈0.63 Mpa1/γdR(·)=1/1.8×10000=5555.56 Kpa≈5.56 Mpa∴γ0ψs(·)<1/γdR(·)即偶然组合时满足设计要求5.上游坝踵不出现拉应力极限状态因上游坝踵不出现拉应力极限状态属正常使用极限状态,故设计状况系数,作用分项系数和材料性能分项系数均采用1.0,扬压力系数直接用0.2代入计算,此处,结构功能的极限值C=0。

重力坝毕业设计 (1)

重力坝毕业设计 (1)

目录摘要: (1)前言 (2)第一部分设计说明书 (3)1基本资料 (3)1.1自然条件及工程 (3)1.2坝址与地形情况 (3)1.3工程枢纽任务与效益 (4)2枢纽布置 (5)2.1枢纽组成建筑物及其等级 (5)2.2坝线、坝型选择 (5)2.3枢纽布置 (8)3洪水调节 (10)3.1基本资料 (10)3.2洪水调节基本原则 (13)3.3调洪演算 (14)3.4调洪计算结果 (17)4非溢流坝剖面设计 (18)4.1设计原则 (18)4.2剖面拟订要素 (19)4.3抗滑稳定分析与计算 (21)4.4应力计算 (22)5溢流坝段设计 (24)5.1泄水建筑物方案比较 (24)5.2工程布置 (25)5.3溢流坝剖面设计 (25)5.4消能设计与计算 (28)6细部构造设计 (32)6.1坝顶构造 (32)6.2廊道系统 (33)6.3坝体分缝 (34)6.4坝体止水与排水 (35)6.5基础处理 (36)6.6混凝土重力坝的分区 (38)第二部分计算说明书 (39)1洪水调节 (39)1.1调洪演算 (39)1.2调洪计算结果及分析 (55)2非溢流坝段计算 (57)2.1非溢流坝段经济剖面尺寸拟定 (57)2.2抗滑稳定分析 (60)2.3 应力分析计算 (65)3消能防冲设计 (68)3.1消力池的水力计算 (68)3.2辅助消能工设计 (71)致谢........................................................ 错误!未定义书签。

参考文献. (73)宁溪水利枢纽毕业设计摘要:宁溪水库枢纽为江北河开发的第一梯级,流域面积共3200km2。

该工程开发任务以发电为主,兼顾防洪。

设计中,基于给定的地质及水文气象等资料,首先进行了重力坝的坝型选择,选取了混凝土实体重力坝坝型;然后进行了水库水位调洪演算,调得设计洪水位345.6m,校核洪水位349.3m;还对挡泄水建筑物的剖面进行设计,确定坝高为54.7m,采用m3⨯表孔溢流,并对挡水坝段进行了抗滑稳定分析及坝体应力分析,结果均满足要求;14最后还对大坝进行细部构造设计,并阐述了关于消能防冲的方案。

水利工程重力坝毕业设计

水利工程重力坝毕业设计

第一章金河金水水利枢纽毕业设计基本资料1.1 流域概况及枢纽任务万江是我国大河流之一,其干流全长1200公里,流域面积25400平方公里,上游95%为山地,河床狭窄,水流湍急;中游大部分为丘陵地带,河床较宽;下游岸为冲积平原,人口最密,农产丰富,为重要农业区域,且有一个中等工业城市,但下游河床淤高,主要靠堤防挡水,每当汛期,常受洪水威胁。

万江流域内物产以农产为主,有稻谷、小麦、玉米、甘薯等,矿产较少,燃料很缺乏。

金河是万江的重要支流,流经万江的上、中游地带,全长250公里,平均坡降为0.0009,流域面积为9200平方公里,河道两岸为山地丘陵,河道狭窄,水流较急,能量蕴藏甚大,但洪水涨落迅速,对万江中下游防洪相当不利。

金河开发计划是配合万江而制定的,为减轻金河洪水对万江中下游农田的威胁,且开发金河能够供应万江中下游工农业日益增长的动力需要,拟在金河与万江汇流处的金水兴建水利枢纽。

本枢纽的主要任务是防洪、发电等综合利用效益。

1.2 坝址地形在本坝址地区,河床狭窄,仅一百多米宽,但随着高程之增高两岸便趋于平坦。

两岸高度在200米以上,海拔高程在400米以上,在坝址处右岸较左岸为陡,右岸平均坡度为0.5左右,左岸为0.4左右。

坝址位于河湾的下游,在坝址上游十余公里有一开阔地带,为形成水库的良好条件。

1.3 坝址地质该区地质构造比较简单,主要岩层为黑色硅质页岩和燧石,上有3-9米左右的覆盖层,系河沙卵石,近风化泥土层及崩石。

其岩层性质为:黑色硅质页岩:属沉积岩,为硅质胶结物之页岩,根据勘测结果,该岩层性质坚硬致密,仅岩石上层10-18米深度存在有裂缝和节理,不很严重,但须加以处理,经过压水试验,岩石之单位吸水量为0.1公升/分钟。

燧石:其岩层不宽,分布于左岸,岩性较黑色硅质页岩为弱。

岩层走向:左岸为南300西,右岸为南50东,倾角为500-700,倾向正向上游:在坝址处,据目前资料尚未发现断层。

硅质页岩的力学性质:(1)天然含水量时的平均容重: 2600公斤/立方米(2)基岩抗压强度: 1000-1200公斤/平方厘米(3)牢固系数 12~15(4)岩石与混凝土之间的的抗剪断摩擦系数为f’=0.85,抗剪断凝聚力系数c’=7.0kg/cm2;抗剪摩擦系数f=0.65。

[混凝土重力坝毕业设计计算书]混凝土重力坝毕业设计

[混凝土重力坝毕业设计计算书]混凝土重力坝毕业设计

[混凝土重力坝毕业设计计算书]混凝土重力坝毕业设计混凝土重力坝毕业设计计算书目录目录1第1章非溢流坝设计21.1坝基而高程de确定21. 2坝顶高程计算21. 2. 1基木组合情况下:21.2.2特殊组合情况下:31. 3坝宽计算41. 4坝而坡度41. 5坝基de防渗与排水设施拟定5第二章非溢流坝段荷载计算52.1计算情况de选择52. 2荷载计算52. 2. 1自重62. 2. 2静水压力及其推力62. 2. 3扬压力de计算72. 2. 4淤沙压力及其推力102. 2. 5波浪压力112. 2. 6 土压力12第3章坝体抗滑稳定性分析133. 2抗滑稳定计算153. 3抗剪断强度计算16第4章应力分析174. 1总则174. 1. 1大坝垂直应力分析174. 1. 2大坝垂直应力满足要求184. 2计算截而为建基面de情况194. 2.1荷载计算194. 2. 2运用期(计入扬压力de情况)204. 2. 3运用期(不计入扬压力de情况)214. 2. 4施工期21第5章溢流坝段设计225. 1泄流方式选择225. 2洪水标准de确定235. 3流量de确定235. 4单宽流量de选择235. 5孔口净宽de拟定235. 6溢流坝段总长度de确定245. 7堰顶高程de确定245. 8闸门高度de确定255. 9定型水头de确定255. 10泄流能力de校核265.11.1溢流坝段剖面图265.11. 2溢流坝段稳定性分析27 (1)正常蓄水情况27 (2)设计洪水情况27 (3)校核洪水情况28第6章消能防冲设计286.1洪水标准和相关参数de 选定296. 2反弧半径de确定296. 3坎顶水深de确定306. 4水舌抛距计算316. 5最大冲坑水垫厚度及最大冲坑厚度32第7章泄水孔DE设计337.1有压泄水孔de设计347. 11孔径Dde拟定347. 12进水口体形设计347. 13 闸门与门槽357. 14渐宽段357. 15出水口357. 15通气孔和平压管35参考文献36毕业设计(论文)任务书题目车家坝河水利枢纽(碾压重力坝设计)(任务起止日期20XX年3月29 ET20XX年6月18 H)院水利水电专业班学生姓名学号指导教师教研室主任院领导第一章非溢流坝设计1. 1坝基而高程de确定由《混凝土重力坝设计规范》可知,坝高100~50米时,重力坝可建在微风化至弱风化中部基岩上,本工程坝高为50~100m,由于本坝址岩层分布主要为石英砂岩,故可确定坝基面高程为832.0m。

水电站重力坝毕业设计

水电站重力坝毕业设计
1.1 流域概况和电站位置.................................................................................... 4 1.2 水文与气象.................................................................................................... 4
本次设计主要完成了拦河大坝剖面设计及大坝细部构造设计,剖面设计主要 包括大坝稳定验算及强度复核计算;最后对溢流坝工作桥进行了结构布置和配筋 计算。
关键词:梧桐口水电站;拦河大坝;剖面设计;细部构造;工作桥;结构布 置;配筋计算。
Abstract
Wutongkou hydropower station is located in Zhejiang Province, Wuxijiang Hu nanzhen.The geological condition of the general, the main building project by concrete non overflow dam, spillway, diversion structures and power house.
I
西华大学毕业设计说明书
3.2.4 横梁.................................................................................................. 40 3.2.5 活动铺板.......................................................................................... 40 3.3 配筋.............................................................................................................. 41 3.3.1 活动铺板配筋设计........................................................................... 41 3.3.2 悬臂板配筋设计.............................................................................. 43 3.3.3 横梁配筋设计.................................................................................. 47 3.3.4 纵梁配筋设计.................................................................................. 49 第四章 结论................................................................................................................57 总结与体会.................................................................................................................. 58 谢辞.............................................................................................................................. 59 参考文献...................................................................................................................... 60

碾压混重力坝毕业设计

碾压混重力坝毕业设计

碾压混重力坝毕业设计碾压混重力坝设计前言某水库工程是河北省和水利部“八·五”重点工程建设项目之一。

该工程是以供水、灌溉、养殖等综合利用为主的大型控制枢纽工程。

青龙河流域水量充沛,控制流域面积6340km2,,多年平均径流量9.6亿m3,是滦河流域较大的一条支流。

但由于降雨、径流的年际年内分配极不均匀,必须修建大型控制工程调节水量,丰富的水资源才能得以充分开发利用。

水库按满足秦皇岛市生活、工业用水和滦河中下游农业用水的需要设计,工程规模是:正常蓄水位141 m,调节库容7.09亿m3,水库库容系数0.77,水量利用系数为70%。

坝后式电站装机容量20Mw。

根据《水利水电枢纽工程等级划分及设计标准》SDJ12-78的规定,一期工程为二等工程,大坝为2级建筑物,正常应用洪水为100年一遇,非常运用洪水为1000年一遇。

辅助建筑物按Ⅲ级设计,临时建筑物按Ⅳ级设计。

枢纽建筑物包括电站坝段,溢流坝段、两岸非溢流坝段。

坝型为碾压混凝土重力坝坝。

底孔坝块两个,孔口进口后接,深式压力管道,进口底高程90.0m,最大单孔泄流量900m3/s。

溢流坝共5孔,孔宽20m,装设8x8m弧形钢闸门。

溢流面采用WES曲线,堰顶高程130,最大泄量3200m3/s,下游防洪允许单宽流量160m3/s,泄水建筑物按100年一遇洪水设计,采用宽尾墩与消力池联合消能方式,枢纽工程总泄量5000m3/s。

水电站为3级建筑物,正常运用洪水为30年一遇,非常运用洪水为200年一遇,电站装机容量20MW,多年平均发电量为6275x104kwh.。

水库上游设计洪水位为142.0m,相应下游水位为92.0m,库容为8.32×108m3,溢流坝相应的泄量为15243m3/s;上游校核洪水位为143.3m,相应下游水位为92.4m,库容为8.70×108m3,溢流坝相应的泄量为19857m3/s;上游正常蓄水位为141m(与汛限水位同高),相应下游水位为86.1m;死水位为90.0m,相应的库容为0.78×108m3。

龙潭水利枢纽(重力坝)毕业设计——西安理工大学

龙潭水利枢纽(重力坝)毕业设计——西安理工大学

9
表 2—5 分期设计洪水


H6
面雨量
177.2 161.1 138.8 122.7 105.8 84.4 67.9 51.7 23.0
(mm)
点雨量 H3 面雨量
165.6 150.5 129.7 114.7 98.9 78.8 63.4 48.3 21.5 138.5 125.9 108.5 95.9 82.7 65.9 53.0 40.4 17.9
2
1.2.2 区域经济发展的需要。
根据《铜川市城市商业网点规划》,全市正全面打造“一城双心”和“北市 区(老城)—黄堡—董家河—耀州区—新区—坡头‘六点一线’”的城市格局,确 定在全市规划建设新区南部装备制造和食品加工、坡头煤电联营、董家河 铝业、黄堡水泥陶瓷、耀州区惠塬水泥等八大工业园区,以拉动全市经济 持续快速增长。然而随着铜川市城市化和工业化进程的加快,水资源短缺 的矛盾已日益突显。作为未来铜川政治、经济、文化、商贸中心的新区, 其人口、工业、商贸已进入一个快速发展时期。全市 80%以上的工业都集中 在铜川新区和工业带所在的石川河流域,缺水矛盾更是显著。因此,为促 进铜川新区和工业带的经济可持续发展,开发龙潭水利枢纽工程势在必行。
1.2 工程特性表
工程名称
表 1-1 龙潭水利枢纽工程特性表 龙潭水利枢纽工程
建设地点
陕西省铜川市耀州区
所在河流
赵氏河
Ⅰ.水文特征 设计洪峰流量(100 年一遇) 校核洪峰流量(1000 年一遇)
Ⅱ.水库特征
669m3/s 1210m3/s
Ⅳ.枢纽主要建筑物
一.挡水建筑物
坝顶高程
717.24m
最大坝高
6
项目
时段

水工建筑物重力坝毕业设计模板

水工建筑物重力坝毕业设计模板

水工建筑物重力坝毕业设计模板××水力发电枢纽工程重力坝设计一、前言1、流域概况及枢纽任务××是罗江上的一条南北向大支流,河流全长295公里,流域面积850平方公里。

流域形状略呈菱形,上下游狭窄,中游宽大,河道坡陡流急,具有暴涨暴落的特性。

本枢纽工程以发电为主,兼顾防洪、灌溉,对航运和木材筏运也适当加以解决。

水库总库容22.6亿立方米,装机容量24.8万千瓦,灌溉上游农田130万亩,确保减免昌州市(福州市)及附近50万亩农田和南江县(南平县)的洪灾。

2、经水文、水利调洪演算确定:死水位200.15m;发电正常水位215.5m,相应下游水位163.88m;设计洪水位216.22m,相应下游水位169.02m,通过河床式溢洪道下泄流量5327.70m3/s;校核洪水位217.14m,相应下游水位169.52m,通过河床式溢洪道下泄流量6120.37 m3/s;泥沙淤积高程174.6m,淤沙干容重14.1KN/m3(浮容重=8.71 KN/m3),孔隙率n=0.45内摩擦角为φ=15o;电站进水口底板高程为186.20m(坝式进水口)。

3、气象资料相应洪水季节50年重现期最大风速的多年平均值为17.3m/s,相应设计洪水位时吹程2.54km,相应校核洪水位时吹程2.66km。

4、地质勘测资料坝址处河床地面高程为146.10m,河床可利用基岩高程为140m,坝与基岩之间摩擦系数为0.7,基岩允许抗压强度为6.3Mpa ,坝基渗透系数(扬压力折减系数或剩余水头系数)α1α2可分别取0.25,0.34。

5、建筑材料有关数据5.1 龄期为90天,强度等级C15标号的混凝土允许抗压强度为4.3Mpa。

5.2 砂石料有3个主要料场:5.2.1 房村料场位于坝上游右岸22公里处,与公路边小山丘相连,附近河岸地形开阔,可供加工堆存之用,分布呈长方形,长1350m,宽234m,表土层3~4m,露出水面0~7m。

桃林口水利枢纽混凝土重力坝设计毕业设计论文

桃林口水利枢纽混凝土重力坝设计毕业设计论文

1.基本资料1.1枢纽概况及工程目的桃林口水库位于河北省青龙县与卢龙县交界处,控制流域面积5060平方公里,占流域面积的80%。

青龙河是滦河较大的支流之一,水量充沛,但年内及年际的水量分配极不均匀,必须兴建大型控制型工程进行调节,丰富的水资源方可得到充分地利用。

水库的主要任务是调节水量,供秦皇岛市和港口码头、钢铁基地及滦河下游地区农业用水,结合引水发电、水面养殖、洪水错峰等。

可得到综合利用的效益。

供水原则是:在满足城市生活、工业用水的同时,对农业用水也给以一定的重视。

特别是移民迁建灌区用水应优先保证;其次是在现在灌区用水及盘家口、大黑丁两库的配套灌区,新增灌区要安排在缺乏地下水的滨海地区。

枢纽工程在三个坝段选择了二条坝线,二种坝型。

I83坝线采用混凝土重力坝,红层坝线采用当地材料坝。

本设计选择I83坝线、混凝土重力坝方案,枢纽建筑物包括主坝、泄水建筑物及电站等,详见“套林口水利枢纽工程平面布置图”。

根据本工程的规模及其在国民经济中的作用,按水电部制定的SDJ12—78设计标准。

水库枢纽工程属大(一)型。

主要建筑物按一级设计,辅助建筑物按三级,临时建筑物按四级设计。

1.2基本资料1.2.1水文分析1.2.1.1年径流青龙河流域水量丰沛,是滦河流域水资源蕴藏量较大的一条支流。

年径流由年降雨产生。

年径流在地区与时间上的分布与年降水基本一致。

年径流在年际间变化悬殊。

套林口实测资料1956~1982年资料中,丰水年1977年达21.34亿立米。

苦水年1981年仅1.667亿立米,相差19.37亿立米,约合12.8倍。

且丰、枯水年连续发生。

多年平均年径流量为9.6亿立米。

1.2.1.2洪水青龙河洪水由于暴雨形成。

本地区暴雨历时短、强度大、地面坡度陡,洪峰陡涨陡落。

一次洪水历时一般为3~5天。

流域南部位于燕山山脉东侧的暴雨中心地带,因此洪水具有峰高量大的特点。

本流域洪水多发生在七、八两月,出现在七月的占34%,出现在八月的占66%。

水电站重力坝毕业设计

水电站重力坝毕业设计
1.1 流域概况和电站位置.................................................................................... 4 1.2 水文与气象...............................................................................................、 专业:
学 生 姓 名:

号:
指 导 教 师:
完 成 时 间:
水电站首部 拦河重力坝设计
2010 级 水利水电工程
西华大学毕业设计说明书
目录
摘要................................................................................................................................ 1 前言................................................................................................................................ 3 第一章 设计基本资料..................................................................................................4
1.2.1 气象条件............................................................................................ 4 1.2.2 水文条件............................................................................................ 5 1.3 湖南镇工程地质............................................................................................ 6 1.4 当地建筑材料和交通状况............................................................................ 7 1.5 设计参数........................................................................................................ 7 第二章 枢纽布置及挡水泄水建筑物..........................................................................8 2.1 枢纽布置........................................................................................................ 8 2.2 挡水泄水建筑物............................................................................................ 8 2.2.1 枢纽等别及大坝级别........................................................................ 8 2.2.2 挡水建筑物........................................................................................ 9 2.2.3 泄水建筑物...................................................................................... 26 2.3 细部构造设计.............................................................................................. 36 2.3.1 坝体分缝.......................................................................................... 36 2.3.2 坝体排水.......................................................................................... 36 2.3.3 廊道.................................................................................................. 36 2.3.4 坝顶.................................................................................................. 37 第三章 溢流坝工作桥结构布置及配筋计算............................................................38 3.1 启闭机的选择.............................................................................................. 38 3.1.1 钢闸门自重估算.............................................................................. 38 3.1.2 启门力 FQ 的计算及启闭机的选择.................................................38

重力坝毕业设计书--王圪堵水电站

重力坝毕业设计书--王圪堵水电站

毕业设计(论文)题目榆林王圪堵水库枢纽布置及重力坝设计专业水利水电工程班级学生指导教师2013 年摘要本毕业设计题目为《榆林王圪堵水库枢纽布置及重力坝设计》,题目来源于王圪堵水库工程实际,属设计类课题。

设计的目的及意义主要在于巩固、扩大和提高所学水利水电理论知识,使其得到实际运用,并使之系统化,锻炼和培养运用所学专业基础理论知识解决工程实际,并进行设计、计算、制图的能力,提高撰写专业技术报告的水平。

在本次设计中,依据所给的水文气象和水利动能资料,采用半图解法进行了该工程的调洪计算,取得了泄水和引水等建筑物的型式、孔口尺寸的大小和设计洪水工况和校核洪水工况下所对应的洪水水位;依据工程地质条件,采用比较筛选法,对该工程进行了坝址选择、坝轴线选择和坝型的选择,取得了大坝枢纽平面布置图;依据工程地质资料和重力坝设计规范要求,采用抗剪断强度公式和材料力学法分别对大坝进行了抗滑稳定分析和应力计算,得到的结果表明大坝的剖面设计满足规范要求;依据调洪计算的结果,采用三圆弧法和WES曲线法对溢流坝段进行了设计,得到溢流坝段的剖面尺寸;依据计算得到的泄水建筑物的形式和水工设计手册第六卷,进行了泄水建筑物的水力计算,得到了溢流坝段的水面线和侧墙的高度。

设计获得了坝型选择和枢纽布置,调洪计算,混凝土重力坝设计,泄水建筑物设计,构造设计,地基处理等成果。

具体设计详见设计说明书,另外除了设计说明书外,还有反映本次设计成果的CAD设计图纸,以及设计过程中攥写的开题报告、外文翻译报告各一份。

所获成果满足设计规范要求、满足毕业设计任务书要求等。

关键词:枢纽布置,混凝土重力坝,非溢流坝,溢流坝,坝体稳定Yu lin wanggedu plugging reservoir project layout and design of gravity damABSTRACTThe design is about the project layout of the wanggedu hydraulic complex and concrete gravity dam. The topic of the design comes from the wanggedu Engineering. The purpose of the design mainly is making the knowledge we learned for water resources and hydraulic engineering into practice and making it systematize, and the ability for designing, computing and writing.In this design, based on the kinetic energy of hydro-meteorological and water conservancy information to, use of semi-graphic method for flood regulating calculation of the project, has made building types, such as discharge and water orifice size size and design flood conditions and check under flood water level of the flood. Based on the engineering geological conditions, using the comparison method, for the project to be the axis of the dam dam site selection, selection and choice of dam type, hub of the dam had been made a floor plan. Based on an engineering geology and gravity dam design code requirements and material mechanics method on shear strength formula respectively on dam stability against sliding analysis and stress calculation, the result indicates that the cross section of the dam design meets regulatory requirements. Flood regulating calculation based on the results of a three-arc method and WES curve method for design of spillway dam section, be overflow dam section dimensions. Based on the calculated discharge structure of hydraulic design manual, sixth form and volume, for hydraulic calculation of discharge structures, got overflow dam of height of the water surface profile and side walls.Design of dam type selection and layout, flood regulating calculation, design of concrete gravity dam, discharge structure design, structural design, Foundation treatment results. Besides of having design instruction to describe the details, there are nine drawings to reflect the design achievements.Resultsobtained meet the design specification requirements and meet the requirements of the design plan descriptions of the graduation, etc.KEY WORDS:layout of hydro project,concrete gravity dam, non-overflow dam,overflow dam,corridor system目录前言 (1)1 工程概述 (2)1.1 工程概况 (2)1.2 工程特性表 (2)2 设计任务及依据 (4)2.1 设计任务及设计阶段 (4)2.2 工程等别及防洪标准 (4)2.3 设计依据 (5)2.3.1 设计标准、规范及规程 (5)2.3.2 设计基本资料 (5)3 基本资料 (6)3.1 水文气象 (6)3.1.1 流域概况 (6)3.1.2 坝址设计与校核洪水成果 (6)3.1.3 气象条件 (7)3.1.4 泥沙资料 (7)3.2 工程地质资料 (8)3.2.1 坝址区工程地质条件 (8)3.2.2 岩土工程特性 (8)3.2.3 坝基工程地质 (9)3.2.4 建筑材料 (9)3.3 水利与水能 (10)3.3.1 坝址下游水位流量关系 (10)3.3.2 枢纽的供水、灌溉和发电等概况 (11)3.4 其他资料 (11)4 枢纽布置设计 (13)4.1 坝址选择 (13)4.2 坝轴线选择 (13)4.3 坝型选择 (14)4.4 泄水和引水等建筑物的型式与孔口尺寸选择 (14)4.5 调洪计算 (15)4.5.1 调洪计算的原理 (15)4.5.2 起调水位的分析与选择 (16)4.5.3 调洪计算的过程 (16)4.5.3.1 泄水隧洞的尺寸计算 (17)4.5.3.2 方案拟订 (18)4.5.3.3 设计洪水工况的调洪的计算 (20)4.5.3.4 校核洪水工况的调洪计算 (27)4.5.3.5 调洪计算成果汇总及分析 (35)4.6 泄水建筑物设计 (36)4.6.1 排沙底孔设计 (36)4.6.2 溢流坝消能防冲计算 (37)4.6.2.1 挑流消能水面线计算 (37)4.6.2.2 溢流坝段挑流消能水力要素的计算 (43)5 混凝土重力坝专题设计 (44)5.1 非溢流坝段设计 (44)5.1.1 坝体断面设计 (44)5.1.2 坝基面荷载作用的标准值计算(以单宽计算) (47)5.1.3 坝基面稳定计算 (48)5.1.4 抗滑稳定分析 (49)5.1.5. 应力分析计算 (50)5.2 溢流坝段设计 (57)5.3 坝基处理 (59)5.3.1 坝基开挖 (59)5.3.2. 坝基帷幕灌浆 (59)5.3.3 坝基固结灌浆 (60)5.3.4 左坝肩防渗墙设计 (60)5.4 坝体构造设计 (60)5.4.1 坝顶构造 (60)5.4.2 廊道系统 (61)5.4.2.1 坝基灌浆廊道 (61)5.4.2.2检查和坝体排水廊道 (62)5.4.3 横缝构造 (62)6 结语 (63)7 致谢 (64)8 参考文献 (65)前言本次毕业设计是根据根据教学要求,对水利水电专业本科毕业生进行的最后一项教学环节。

(精华)重力坝毕业设计模板解析

(精华)重力坝毕业设计模板解析

设计内容一、 确定工程等级由校核洪水位446.31 m 查水库水位———容积曲线读出库容为1.58亿3m ,属于大(2)型,永久性水工建筑物中的主要建筑物为Ⅱ级,次要建筑物和临时建筑物为3级。

一、 确定坝顶高程(1)超高值Δh 的计算Δh = h1% + hz + hcΔh —防浪墙顶与设计洪水位或校核洪水位的高差,m ; H1% —累计频率为1%时的波浪高度,m ;hz —波浪中心线至设计洪水位或校核洪水位的高差,m ; hc —安全加高,按表3-1 采内陆峡谷水库,宜按官厅水库公式计算(适用于0V <20m/s 及 D <20km ) 下面按官厅公式计算h1% , hz 。

11312022000.0076ghgD v v v -⎛⎫= ⎪⎝⎭ 11 3.752.15022000.331mgL gD v v v -⎛⎫= ⎪⎝⎭22l z h Hh cthLLππ=式中:D ——吹程,km ,按回水长度计。

m L ——波长,m z h ——壅高,mV0 ——计算风速h ——当2020250gDv = 时,为累积频率5%的波高h5%;当202501000gDv = 时, 为累积频率10%的波高h10%。

规范规定应采用累计频率为1%时的波高,对应于5%波高,应由累积频率为P (%)的波高hp 与平均波高的关系可按表B.6.3-1 进行换超高值Δh 的计算的基本数据正常蓄水位和设计洪水位时,采用重现期为50 年的最大风速,本次设计027/v m s =;校核洪水位时,采用多年平均风速,本次设计018/v m s =。

a.设计洪水位时Δh 计算: 18902.5760.62311.80m S H m B ===设设 波浪三要素计算如下: 波高:21131229.819.81524.190.0076272727h -⎛⎫⨯⨯=⨯ ⎪⎝⎭h=0.82m 波长:113.752.15229.819.81524.190.331272727mL -⎛⎫⨯⨯=⨯ ⎪⎝⎭m L =8.95m 壅高:220.823.140.378.95z mh h L π==⨯≈2209.81524.197.0527gD v ⨯=≈,故按累计频率为005计算 0.82060.62m m h H =≈,由表B.6.3-1查表换算 故000151.24 1.240.82 1.02h h m =⨯=⨯≈0.4c h m =1%z c h h h h ∆=++1.020.370.41.89m=++=b.校核洪水位时Δh 计算:19277.2561.31314.44m S H m B ===设设 波高:21131229.819.81965.340.0076181818h -⎛⎫⨯⨯=⨯ ⎪⎝⎭h=0.27m波长:113.752.15229.819.81965.340.331181818mL -⎛⎫⨯⨯=⨯ ⎪⎝⎭m L =7.03m 壅高:220.613.140.257.03z mh h L π==⨯≈2209.81965.3429.2318gD v ⨯=≈,故按频率为005计算 0.61063.31m m h H =≈,由由表B.6.3-1查表换算 故000151.24 1.240.270.34h h m =⨯=⨯≈0.3c h m =1%z c h h h h ∆=++0.340.250.30.89m=++=(2)、坝顶高程:a.设计洪水位的坝顶高程: h ∇=+∆设设设计洪水位 445 1.89446.89m=+=b.校核洪水位的坝顶高程: h ∇=+∆校校校核洪水位446.310.89447.20m=+=为了保证大坝的安全,选取较大值,所以选取坝顶高程为447.2m三、 非溢流坝实用剖面的设计和静力校核(1) 非溢流坝实用剖面的拟定拟定坝体形状为基本三角形。

某某重力坝毕业设计

某某重力坝毕业设计

某某重力坝毕业设计(总71页)--本页仅作为文档封面,使用时请直接删除即可----内页可以根据需求调整合适字体及大小--目录前言............................................ 错误!未定义书签。

第一部分设计说明书1基本资料....................................... 错误!未定义书签。

自然条件及工程 (3)坝址与地形情况............................... 错误!未定义书签。

水库规划资料................................. 错误!未定义书签。

2枢纽布置....................................... 错误!未定义书签。

枢纽组成建筑物及其等级...................... 错误!未定义书签。

枢纽布置..................................... 错误!未定义书签。

3洪水调节....................................... 错误!未定义书签。

基本资料..................................... 错误!未定义书签。

洪水调节基本原则 ............................ 错误!未定义书签。

调洪演算.................................... 错误!未定义书签。

4非溢流坝剖面设计............................... 错误!未定义书签。

设计原则.................................... 错误!未定义书签。

剖面拟订要素................................ 错误!未定义书签。

抗滑稳定分析与计算 .......................... 错误!未定义书签。

混凝土重力坝毕业设计

混凝土重力坝毕业设计

分类号编号华北水利水电大学继续教育学院North China Institute of Water Conservancy and Hydroelectric Power 毕业设计题目混凝土重力坝设计专业:水利水电建筑工程层次:姓名:学号:指导教师年 3 月 3 日摘要901水电站枢纽位于H河上游,是第四个梯级电站,系日调节电站,主要任务是发电,兼顾灌溉、供水、调洪。

坝址以上H河流域面积14万平方公里,占H河总流域面积的19%,坝址处多年平均径流量占全流域年平均径流量的47%,水库正常蓄水位为2005米,总库容5.5亿m3,装机容量150万千瓦,工程规模属于一等大型工程。

901水电站枢纽大坝选用砼重力坝,坝段分为非溢流坝段,溢流坝段和底孔坝段。

非溢流坝段:总长316.5m,最大坝高132m,坝体宽13m,最大坝底宽为111.75m;溢流坝段:总长40.5m,分3孔,堰面为WES型,消能方式为挑流式。

底孔段坝:总长48m,底孔与施工导流相结合,出口按二十年一遇洪水控制高程。

水库回水长52km左右,库区分为川、峡两部分,库直段长18km 的峡谷,地形陡峻,河流蜿蜒曲折,谷内发育二级阶地。

库盘为震旦系片麻岩、花岗岩等坚硬基岩组成。

两岸有滑坡10处,较大的一处在右岸距坝2.2km,前沿高程为2240m。

库尾段长32km为地形较开阔的水地川(尖扎盆地)库盘表部主要为第三系及第四系泥岩,砾石层及土层组成,库区两岸山体雄厚,基岩环抱,水库大部分地段库岸是稳定的。

坝址区河流呈近东西向,河道较平直,河谷狭窄,两岸较陡峻。

901水电站枢纽的建设运行,将对H河域的生态环境、经济发展等起到举足轻重的作用,建设此枢纽工程的意义十分深远。

关键词:水电站枢纽砼重力坝生态环境经济发展目录设计说明书 (1)1 工程概况 (1)1.1 枢纽任务与规模 (1)1.2 主要建筑物型式尺寸 (1)1.3 水库特性 (1)1.3.1 水库水位 (1)1.3.2 水电站下游水位 (2)1.3.3 水电站特征参数 (2)1.3.4 溢洪道下游水位 (2)1.3.5 底孔 (2)2 基本设计资料 (3)2.1 水文特性及自然条件 (3)2.2 工程地质 (4)2.2.1 库区地质概况 (4)2.2.2 坝址工程地质条件 (4)2.2.3 地震烈度 (4)2.3 建筑物材料及水源 (4)2.4 坝基岩石的物理力学性质 (5)2.5 水电站枢纽有关参数确定 (5)3 坝型选择与枢纽布置 (6)3.1 坝型选择 (6)3.2 坝轴线选择 (7)3.3坝顶高程确定 (7)3.3.1坝顶高程设计参数 (7)3.3.2坝顶高程的确定 (8)3.3.3枢纽布置 (9)4 非溢流坝段设计 (10)4.1 坝体剖面尺寸 (10)4.2坝体稳定及应力分析 (10)4.2.1 荷载及其组合 (10)4.2.2 作用在坝基面以上的荷载 (11)4.2.3 非溢流坝的稳定计算 (13)4.2.4 非溢流坝的应力计算 (14)5 溢流坝设计 (22)5.1 溢流坝断面尺寸的拟定 (22)5.1.1溢流道尺寸的拟定 (22)5.1.2 堰面尺寸校核 (23)5.1.3 闸墩断面拟定 (23)5.2 下游冲刷坑验算 (23)5.3 溢洪道边墙尺寸拟定 (23)5.4 溢流坝段稳定及应力计算 (24)5.4.1 荷载计算 (24)5.4.2 稳定及应力计算成果分析 (24)6 坝体细部构造 (30)6.1 坝顶细部构造 (30)6.2 廊道系统构造设计 (30)6.3 坝体止水及排水 (31)6.3.1 坝体排水 (31)6.3.2 坝体止水 (31)6.4 坝体分缝 (31)6.5 坝体砼分区 (32)7坝基处理 (33)7.1 地基开挖线的确定 (33)7.2 断层处理 (33)7.3 防渗处理 (33)计算说明书 (34)8 分项计算 (34)8.1 坝顶高程的确定 (34)8.1.1 设计情况下 (34)8.1.2 校核情况下 (34)8.2 非溢流坝段的稳定及应力计算 (34)8.2.1作用在坝基面以上的荷载 (34)8.2.2 作用于错误!嵌入对象无效。

重力坝枢纽毕业设计

重力坝枢纽毕业设计

摘要:××水库工程位于河北省青龙县与卢龙县交界处的青龙河上,距卢龙县约35km,是河北省重点工程建设项目之一。

该工程是以供水、灌溉、发电、养殖等综合利用为主的大型控制枢纽工程。

青龙河流域水量充沛,控制流域面积6340km2,,多年平均径流量9.6亿m3,是滦河流域较大的一条支流。

但由于降雨、径流的年际年内分配极不均匀,必须修建大型控制工程调节水量,丰富的水资源才能得以充分开发利用。

枢纽属一级工程,以供水、灌溉、发电和防洪等综合利用为主的大型控制枢纽工程。

其主要建筑物有:混凝土重力坝、引水建筑物、泄洪建筑物和过坝建筑物等。

本设计的内容是:常态重力坝。

大坝设计洪水标准采用100年一遇,校核洪水标准采用万年一遇。

其余建筑物设计洪水标准采用100年一遇,校核洪水标准采用1000年一遇。

水库正常蓄水位133.7米,设计洪水位136.3米,校核洪水位138.8米。

主体建筑物采用常态混凝土重力坝,坝顶高程142m,坝顶总长度880m。

非溢流重力坝分别布置在左右两岸,分别为1-10号坝段到23-44坝段;最大坝高64m,;溢流坝段布置在中间,总长度为230m,共分12孔,每孔宽15m,为11号坝段到22坝段堰顶高程122.32m;电站引水采用坝内压力钢管,钢管直径6m和3m。

关键词:混凝土重力坝、非溢流坝、溢流坝、施工组织、概预算目录1. 基本资料 (5)1.1 流域概况及枢纽任务 (5)1.2 坝址地形 (5)1.3 坝址地质 (5)1.4 水文气象 (6)1.5 当地材料分布情况 (7)1.6 交通运输 (8)1.7 主要工程技术经济指标表 (9)2.坝址、坝型的确定及枢纽布置 (10)2.1 工程等别确定 (10)2.2 坝址的确定 (10)2.3 坝型的选择 (11)2.4 大坝枢纽建筑物的布置 (13)2.4.1挡水建筑物 (13)2.4.2泻水建筑物 (13)2.4.3输水建筑物 (14)2.5大坝总体布置 (14)2.5.1 溢流坝的布置 (14)2.5.2 非溢流坝的布置 (14)3. 重力坝非溢流坝段设计 (15)3.1 坝顶高程 (15)3.1.1 坝顶高程的确定 (15)3.1.2 坝顶宽度 (16)3.1.3 坝面坡度 (16)3.1.4 坝底宽度 (17)3.2 荷载组合及其计算 (17)3.2.1设计情况 (17)3.2.2 校核情况 (19)3.2.3 抗滑稳定验算与强度验算 (20)4. 重力坝溢流坝段设计 (23)4.1 孔口设计 (23)4.1.1 泄水方式的选择 (23)4.1.2 洪水标准的确定 (23)4.1.3 流量的确定 (23)4.1.4 单宽流量的选择 (23)4.1.5 孔口净宽拟定 (23)4.1.6 溢流坝段总长度确定 (24)4.1.7 堰顶高程的确定 (24)4.1.8 闸门高度的确定 (24)4.1.9 定型设计水头的确定 (24)4.1.10 泄流能力校核 (24)4.2 溢流坝体形设计 (25)4.2.1 顶部曲线段 (25)4.2.2 中间直线段 (25)4.2.3 消能防冲设计 (25)4.3 溢流坝剖面设计 (25)4.4 荷载组合及其计算 (26)4.4.1 设计情况 (27)4.4.2 设计洪水位情况下发生7度地震 (27)4.4.3 校核情况 (27)4.4.4 抗滑稳定验算与强度验算 (27)5. 泄水孔设计 (29)5.1 孔径D的拟定 (29)5.2 进水口体形设计 (29)5.3 闸门与门槽 (30)5.4 渐变段 (30)5.5 出水口 (30)5.6 水力计算 (30)6. 细部构造设计 (31)6.1 坝顶构造 (31)6.1.1 非溢流坝 (31)6.1.2 溢流坝 (31)6.2 坝体分缝与止水 (32)6.2.1 横缝 (32)6.2.2 止水 (32)6.2.3 水平缝 (33)6.3 廊道系统 (33)6.3.1 基础廊道 (33)6.3.2 坝体廊道 (33)6.4 坝体排水 (33)7. 地基处理 (34)7.1 基础开挖与清理 (34)7.2 坝基的防渗处理 (35)7.3 坝基排水 (35)7.4 坝基的固结灌浆 (35)8.施工组织设计 (36)8.1 施工条件分析 (36)8.2 施工组织设计的内容 (37)8.3 施工导流设计 (38)8.3.1 施工导流标准 (38)8.3.2 洪水标准 (38)8.3.3 围堰安全超高 (39)8.3.4 施工导流时段选择 (39)8.3.5 施工导流布置 (39)8.4 截流设计 (40)8.4.1.截流设计标准 (40)8.4.2. 截流设计 (40)8.5 施工程序方法及主要机械 (40)8.5.1.施工程序 (40)8.5.2.施工方法 (41)8.6 对外交通方案的确定 (43)8.7 辅助设施企业及大型临时设施 (44)8.7.1.施工辅助企业 (44)8.7.2.临时设施 (44)8.8 总布置与进度计划 (44)8.8.1.施工总布置 (44)8.8.2.施工进度计划 (45)8.8.3 施工工期保证措施 (46)8.9质量保证体系与措施 (48)8.9.1质量方针及质量目标 (48)8.9.2 质量管理体系 (48)8.9.3 质量控制流程 (48)9. 工程概算 (49)9.1建筑工程费 (50)9.2基础单价 (50)9.3基础单价计算 (51)9.3.1 人工费的计算 (51)9.3.2材料费的计算 (52)9.3.3 砼,砂浆单价计算 (52)9.3.4施工机械台班费计算 (53)9.4单价编制 (53)9.4.1 定额依据 (53)9.4.2 建筑工程单价计算 (53)参考文献 (56)致谢 (60)附表3-3:设计情况下荷载计算成果表 (59)附表3-4:设计洪水位时发生7度地震荷载计算成果表 (60)附表3-5:校核洪水位时荷载计算成果表 (61)附表4-4:设计情况下荷载计算成果表 (62)附表4-5:设计洪水位时发生7度地震荷载计算成果表 (63)附表4-6:校核洪水位时荷载计算成果表 (64)附表4-7:泄流能力校核计算表 (65)1. 基本资料1.1 流域概况及枢纽任务青龙河流域水量充沛,控制流域面积6340km2,,多年平均径流量9.6亿m3,是滦河流域较大的一条支流。

珠江龙川混凝土重力坝设计(大连理工网络函授)

珠江龙川混凝土重力坝设计(大连理工网络函授)

网络教育学院本科生毕业论文(设计)题目:珠江龙川混凝土重力坝设计学习中心: xxxx奥鹏学习中心层次:专科起点本科专业:水利水电工程年级: 20xx年秋季学号: 1111111111111学生: xxx指导教师: xxx完成日期: 20xx年 x 月 x 日目录内容摘要...................................................................................................................... - 1 - 引言............................................................................................................................. - 2 - 1设计资料................................................................................................................... - 3 - 1.1重力坝基本资料..................................................................................................... - 3 -1.1.1流域概况..................................................................................................... - 3 -1.1.2地形、地质 ................................................................................................. - 3 -1.1.3水文地质..................................................................................................... - 3 -1.1.4气象资料..................................................................................................... - 3 -1.1.5淤泥............................................................................................................ - 3 -1.2重力坝工程综合说明....................................................................................... - 3 - 2坝型、坝址选择 ........................................................................................................ - 5 -2.1坝型选择 ........................................................................................................ - 5 -2.2坝址选择 ........................................................................................................ - 5 - 3重力坝非溢流坝段设计.............................................................................................. - 6 -3.1非溢流坝剖面设计 .......................................................................................... - 6 -3.2荷载组合计算 ................................................................................................. - 7 -3.3坝体抗滑稳定分析 (12)3.4应力分析 (12)4坝体细部构造 (14)4.1坝顶构造 (14)4.2坝内廊道 (14)4.3坝体分缝及止水 (14)4.4坝体坝基排水 (15)5地基处理 (16)5.1坝基开挖 (16)5.2帷幕灌浆 (16)5.3坝基排水 (16)5.4固结灌浆 (16)6结论 (18)内容摘要重力坝在各种坝型中往往占有较大的比重。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

目录摘要........................................................ 错误!未定义书签。

前言........................................................ 错误!未定义书签。

第一某些设计阐明书1 工程概况.................................................. 错误!未定义书签。

1.1 工程地理位置........................................ 错误!未定义书签。

1.2 流域概况............................................ 错误!未定义书签。

1.3 工程任务与规模...................................... 错误!未定义书签。

2 基本资料.................................................. 错误!未定义书签。

2.1 水文气象............................................ 错误!未定义书签。

2.2 坝址与地形状况...................................... 错误!未定义书签。

2.3 工程枢纽任务与效益.................................. 错误!未定义书签。

3 枢纽布置.................................................. 错误!未定义书签。

3.1 枢纽构成建筑物及其级别.............................. 错误!未定义书签。

3.2 坝线、坝型选取...................................... 错误!未定义书签。

3.3 枢纽布置............................................ 错误!未定义书签。

4 洪水调节.................................................. 错误!未定义书签。

4.1 基本资料............................................ 错误!未定义书签。

4.2 洪水调节基本原则.................................... 错误!未定义书签。

4.3 调洪演算............................................ 错误!未定义书签。

4.4 调洪计算成果........................................ 错误!未定义书签。

5 非溢流坝剖面设计.......................................... 错误!未定义书签。

5.1 设计原则............................................ 错误!未定义书签。

5.2 剖面拟订要素........................................ 错误!未定义书签。

5.3 抗滑稳定分析与计算.................................. 错误!未定义书签。

5.4 应力计算............................................ 错误!未定义书签。

6 溢流坝段设计.............................................. 错误!未定义书签。

6.1 泄水建筑物方案比较.................................. 错误!未定义书签。

6.2 工程布置............................................ 错误!未定义书签。

6.3 溢流坝剖面设计...................................... 错误!未定义书签。

6.4 消能设计与计算...................................... 错误!未定义书签。

7 细部构造设计.............................................. 错误!未定义书签。

7.1 坝顶构造............................................ 错误!未定义书签。

7.2 廊道系统............................................ 错误!未定义书签。

7.3 坝体分缝............................................ 错误!未定义书签。

7.4 坝体止水与排水...................................... 错误!未定义书签。

7.5 基本解决............................................ 错误!未定义书签。

7.6 混凝土重力坝分区.................................... 错误!未定义书签。

第二某些计算阐明书1 洪水调节.................................................. 错误!未定义书签。

1.1 调洪演算............................................ 错误!未定义书签。

1.2 调洪计算成果及分析.................................. 错误!未定义书签。

2 非溢流坝段计算............................................ 错误!未定义书签。

2.1 非溢流坝段经济剖面尺寸拟定.......................... 错误!未定义书签。

2.2 重力坝非溢流坝段重要荷载............................ 错误!未定义书签。

2.3 抗滑稳定分析........................................ 错误!未定义书签。

2.4 抗剪断强度计算...................................... 错误!未定义书签。

2.5 应力分析计算........................................ 错误!未定义书签。

3 溢流坝段设计.............................................. 错误!未定义书签。

3.1 顶部曲线............................................ 错误!未定义书签。

3.2 反弧段.............................................. 错误!未定义书签。

4 消能防冲设计.............................................. 错误!未定义书签。

4.1 洪水原则和有关参数选定.............................. 错误!未定义书签。

4.2 水舌抛距计算........................................ 错误!未定义书签。

4.3 最大冲坑水垫厚度及最大冲坑厚度...................... 错误!未定义书签。

致谢.................................................. 错误!未定义书签。

参考文献................................................. 错误!未定义书签。

BJ重力坝毕业设计学生:晁阳指引教师:蒋定国三峡大学水利与环境学院摘要:BJ一级水电站位于鹤峰县北佳镇柳月坪,流域面积共303.4km2。

该工程开发任务以发电为主,兼顾防洪。

设计中,基于给定地质及水文气象等资料,一方面进行了重力坝坝型选取,选用了混凝土实体重力坝坝型;然后进行了水库水位调洪演算,调得设计洪水位647.8m,校核洪水位649.8m;还对挡泄水建筑物剖面进行设计,拟定坝高为117m,采用3×12m表孔溢流,并对挡水坝段进行抗滑稳定分析及坝体应力分析,成果均满足规定;最后还对大坝进行细部构造设计,并阐述了关于消能防冲方案。

Abstract:BJ river hydropower is located of Hefeng month County town of North JiaLiu Ping,the basin area of 303.4km2.This project development,giving priority to the task to power of flood control.The design of this project is based on the data of geological and hydrological and meteorological which is given,first select the solid concrete gravity dam to be the type of gravity,and then make the calculus of floodind the reservoir water level ,the result is the design flood level 647.8m and Check flood level 649.8m;also design the water discharge structure with surface hole which size 3×12m overflow and water retaining structure to determine the dam height is 117m and water retaining dam stability analysis for the dam and stress analysis,the results are satisfied Requirements;Finally,detailed structural design of the dam,and elaborated on the energy dissipation of the program.核心词:枢纽布置混凝土重力坝剖面设计荷载计算稳定分析应力分析Keywords:Ground-handling project layout concrete gravity dam Profile design the loadcalculation stability analysis stress analysis前言本次毕业设计是依照依照教学规定,对水利水电专业本科毕业生进行最后一项教学环节。