2×12MW凝汽式火力发电厂电气部分设计摘要本设计主要介绍了某区凝汽式火电站电气部分的相关知识,包括了电气主接线以及厂用电的设计、电气开关的选择、配置继电保护、防雷及接地等各方面的内容。

待建电站第一期工程装机容量和台数为2×12MW,第二期为2×25MW。

总装机容量=2×12+2×25=74MW,小于200MW,单机容量小于50MW,为小型凝汽式火电厂。

当本厂完全投产后,在系统总容量中占据的比列为:74/(4×25+2×25+74)×100%=33%,超过了电力系统检修备用容量与事故备用容量,而且最大负荷利用时间在四千到七千小时之间、包括了Ⅰ类负荷和Ⅱ类负荷,说明该火电站在未来供电系统中占据主要地位。

从负荷特点及电压等级可知,它具有10KV, 110KV 两级电压负荷。

10KV负荷为地方负荷。

110KV接受本厂剩余功率。

×10%=,×10%=。

关键词:凝气式火电厂电气部分 2×12MW + 2×25MWABSTRACTThis design mainly introduces the condenser type selecting good electrical partof the relevant knowledge. It also includes the main electrical wiring and APC design,the choice of electrical switch, configuration relay protection, lightning protection and grounding and so on various aspects of content.The power station is to be built, and its installed capacity and the numbers are 2x 12MW for the first phase of the project, 2 x 25MW for the second phase. The total installed capacity of is equal to 2 x 12 + 2 x 25 = 74MW, but less than 200 MW. The standalone capacity of small condenser type coal-fired plants is less than50MW .After the factory’s production completely, it occupies total capacity in the system, taking as: 74 / (than 4 * 25 + 2 x 25 + 74) x 100% = 33%, which is more thanthe power system maintenance spare capacity and accident the spare capacity. Besides ,the biggest load of the using time is from 4,000 to 7,000 hours, includingtheⅠkind of load and theⅡkind of load. From what have been mentioned above all, which embody that the power-stations play an important role in future power supply system .From the load characteristics and voltage grade we know that it has two levels load voltage both 110KV and 10 KV . 10 KV load is the local load , and 110KV canbe accepted by the rest of power .It may be accepted the maximum power ×10% =MW by factory sending out while the minimum power is ×10%=.Keywords:Coagulation gas type coal-fired plants Electrical parts 2×12MW + 2×25MW目录摘要 0ABSTRACT (I)目录.................................................................................................................................................1 引言 02 电气主接线 (1)系统与负荷资料分析 (1) (1) (1) (2) (2)主变压器的选择与计算 (3) (4) (4) (5)3 厂用电设计 (7)厂用电接线方式的选择 (7) (7) (7) (8)4 短路电流的计算 (9) (9) (10)5 导体和电器设备的选择设计 (14) (14) (14) (15) (15) (15) (16) (16) (17)6 发电厂防雷保护 (20)雷电过电压的形成与危害 (20)电气设备的防雷保护 (20)发电厂和变电所的防雷保护 (20)架空输电线路的防雷保护 (20) (20)配电网的防雷保护 (20)避雷针的配置原则 (21)避雷针位置的确定 (21)避雷器的选择和配置 (21)7 主系统保护配置整定 (24)变压器继电保护配置 (24)发电机继电保护配置整定 (26)110KV线路保护 (28)110KV母线保护 (28)10KV线路保护 (28)10KV母线保护 (29)结论 (30)参考文献 (31)附录1 (32)附录2 (34)致谢 (35)1 引言电气部分的设计需要同时考虑许多复杂的元素,本设计严格依照设计的相关步骤,对原始资料进行分析、拟定主接线方案、计算短路电流和选择主要电器元件、设计防雷接地和直流系统方案,主要侧重于简单的整体设计。

火力发电厂司令图设计内容深度规定

火力发电厂司令图设计内容深度规定

火力发电厂施工图阶段司令图设计内容深度规定备注:本规定来自《电力建设总局-火力发电厂施工图设计成品内容深度》第一章热机专业一、司令图内容深度(-)所依据的原始资料原始资料项目在总则中已作说明,有关细则列下:l、汽轮发电机组设备资料:(l)大体定型设计(2)热平衡计算,有关说明及管道接口允许的推力和力矩等。

2、锅炉设备资料:(1)锅炉总图。

(2)构架总图。

(3)平台楼梯总图。

(4)热膨胀系统图。

(5)烟、风、煤粉管道连接尺寸图。

(6)锅炉范围内管道及其附件布置图。

(7)点火系统图。

(8)基础负荷与于地件图。

(9)炉墙图纸。

(10)炉墙材料及异形砖。

(11)绝热面积统计表。

(12)运转层平面开孔图。

(13)热力计算书。

(14)烟气、空气阻力计算书。

(15)锅炉说明书及锅炉供货范围。

(16)除渣装置总图及吹灰管路布置图。

(17)其它技术资料。

3、有关辅机及附属设备资料:(1)外形尺寸,地脚螺栓位置,直径及长度及检修的特殊要求.(2)动静荷童及转动慢量(Gd2)。

(3)对设届接口的推力和力矩要求,膨胀死点位置。

(4)大型电动机的冷却方式,轴承润滑方式等有关运行检修技术数据.(5)对轴承冷却水,密封水的水质水压及水量、水温要求。

4、保温材料特性。

5、各主铺设备冷却水量及水阻、水质要求。

6,阀门、水泵、风机样本。

7、样本以外的阀门及电传装置资料。

8、有关钢材特性(包括:使用温度,许用应力,弹性模量,膨胀系数等)。

(二)交换资料的项目和内容:1、提供给外专业的资料项目:(l)主厂房布置图(提给暖通、排水、土建、总交、电气、自控等专业)。

(2)主厂房荷重及主要孔洞资料(包括设备,管道大荷重,各层平台荷重,主要孔洞提给土建专业。

)(3)补充和修改汽机本体设计中的汽轮发电机组基础任务书(荷重,孔洞,予埋件提给土建专业。

)(4)锅炉基础任务书(提给土建专业)(5)引风机室及烟道任务书(提给土建,总交专业。

)(6)工业用水资料(水量、水压、水温、水质要求,提给供水专业。

某电站初步设计cad水力电气机械图纸

某电站初步设计cad水力电气机械图纸
DN100技术供水干管 闸阀截止阀电动遥控阀压力表示流信号器滤水器设 备 表序号名 称型号及规格单位数量备 注1自动滤水器245678910台2111213表阀门截止阀闸阀只只只只X13T-10 1/2"5J41T-10 DN1002Z45T-10 DN80只622DSL-1001.0MPaDN100DN100DN50排污至尾水压力变送器只YSB-6660 0-1.0MPa电动遥控阀只2图 例闸阀Z45T-10 DN100只5DC220VM说明:1.根据机组厂家资料,一台机组冷却用水量30t/h,加上其它用水,全站总技术供水量按80t/h计。\P2.机组启动前,自动打开电动球阀向机组供水,待轴承冷却水示流信号器发出信号后,启动机组;机组停机后,自动关闭电动球阀。\P3.机组轴承冷却器进口水压要求:0.15-0.2MPa。\P4.两个滤水器互为备用,当技术供水干管压力降到0.20MPa以下时,压力变送器应向监控系统发出信号,值班人员应手动切换到备用滤水器运行。\P5.消防清水池容积按2个消火栓10分钟的水量考虑。\P6.厂内外建筑消防及其消防设施详见水工建筑设计有关消防的图纸。\P7.设备表中所列量为电站2台机组主要设备的总用量。F取水口栏污栅14压力变送器P15 DN100消防干管 2号机组尾 水 渠DN100蝶阀坑DN80F发电机坑FDN40DN50MDN801号机组段消火栓DN502号机组段消火栓厂内生活用水DN50厂外消火栓DN100表用旋塞消防栓DN100厂外消火栓消火栓箱带发电机灭火续接软管只216171436101010192019201116161412139P5P5DN5014DN50DN401号机组尾 水 渠DN1001213蝶阀坑DN80DN50发电机坑F193DN40F204P19DN5055PDN4020M1010610DN80带控制箱2台3示流信号器只2机组厂家配带自动化元件J145X-10 DN807777闸阀Z15T-10 DN50只3截止阀J41T-10 DN100截止阀消火栓箱只2消火栓箱只2配20米水龙带技术供水系统图18取水口滤网DN100只418 减压阀减压阀YX741X-16 DN100 92浮球阀DN100至检修排水泵至检修排水泵DN100DN100排污DN50DN10011DN100溢流20m 消防清水池93400.00091719浮球阀F745X-10 DN50只1闸阀Z15T-10 DN50只420818185SN50,配QZ16水枪SS100,配QZ19水枪配20米水龙带闸阀Z15T-10 DN40只4DN50接发电机灭火管DN50接发电机灭火管DN100DN100DN50排污至尾水28191811DN50P75机组厂家配带1.0MPa:0.2MPa示流信号器自动化元件只机组厂家配带2SN50,配水枪水带 说明:\P1.渗漏排水\P1.1.根据同类电站的运行情况,渗漏集水井有效容积应大于30立方米。\P1.2.渗漏泵由水位信号器控制,当集水井水位到360.275时,工作泵启动;当集水井水位到360.575时,备用泵启动;当集水井水位降到358.075时停泵;当集水井水位到360.875时,发出报警信号。\P2.检修排水\P2.1.当机组停机检修时,关闭碟阀,将蜗壳存水排放至尾水渠,关闭尾水闸门,手动控制检修排水泵排除尾水渠内积水和尾水闸门漏水。\P2.2.当尾水渠水位降到361.00以下时,即可拆除尾水弯管,用专用闷头将尾水锥管封堵严密,停泵开始机组检修;当机组检修完毕,手动启动水泵排水。当尾水渠水位降到361.00以下时,拆除尾水锥管闷头,装上尾水弯管后,停泵。L图 例止回阀L水位信号器闸阀M潜水电泵离心水泵地漏357.375358.075停泵1号尾水渠DN100445.00排至下游361.500DN15吹扫口DN15吹扫口66445575DN100DN80DN80232排水泵井检修3DN100 检修泵井排水2号尾水渠360.275工作泵启动360.575备用泵启动360.875报警水位9DN80DN8044445.00排至下游设 备 表Z15T-10DN100Z45T-10导轨长4.0m配80GAK Z45T-10KLK-2L-AC-7.5KL80-125KWQ30-32-7.5水泵厂家配带DN100KLBFCV-80型号及规格11检修泵电控箱渗漏集水井MM11取水口拦污栅8渗漏泵电控箱水位信号器1096闸阀7地漏5闸阀序号逆止阀检修排水泵34闸阀2渗漏排水泵名 称1手动控制1只排水系统图只2只1套12只只9只31备1用,可同时启动DN15DN100数量4只只6台2台2单位PN1.0MPa DN8050t/h,20m,5.5kWDN8030t/h,32m,7.5kW备 注DN80DN8033364.105DN100 2号碟阀坑排水DN100 1号碟阀坑排水Dg200渗漏排水管 361.100361.100DN804DN804说明:\P\P1.本站采用的调速器可自动补气,故只设低压气系统。\P2.低压空压机设置两台,一台工作,一台备用,由储气罐上的压力显控器控制:\P 当储气罐压力降至0.65MPa时,工作空压机启动;\P 当储气罐压力降至0.60MPa时,备用空压机启动;\P 当储气罐压力降至0.55MPa时,低压报警;\P 当储气罐压力恢复至0.70MPa时,自动停机;\P 当储气罐压力高于0.74MPa时,安全阀开启并且高压报警。\P3.设备表中为气系统主要设备。111号机组制动柜压力显控器截止阀气水分离器安全阀止回阀制动闸空压机 储气罐图 例闸阀压力变送器PDN15排水DN15161611DN40DN153109排水DN403109排水DN151121065P558DN40 供气干管安装吹扫用气11DN154D20只表阀门7气系统图截止阀截止阀逆止阀安全阀DN15111098J41T-16 DN40Z15T-10 DN15H41T-16 DN40A21H-16C DN256只2只只3只1成品外购成品外购7.5kW机组厂家配带备 注压力变送器压力显控器制动柜气水分离器储气罐空压机名 称4DN1511654231序号FHOG15A-1.6/0.72台YSB-6660 0-1.0MPa1.6m /min 0.7MPa含自动化设备器件YXK-150 0-1.0MPa0.7MPa0.8MPa34.0mDN4032面只1只51台台2型 号 及 规 设 备 表单位格数量说明:\P\P1.本站装机规模小,为简化电站设施和投资,绝缘油处理在本地区中心变电站-樟村坪变电站有偿进行,故本站只设简单的透平油储存、处理系统。\P2.设备表中为全站油系统主要设备。机组轴承油箱透平油净油机压力滤油机图 例移动油泵TP移动式油箱滤纸烘箱H200L油桶排 油5油桶24滤 油P油桶154透平油系统图3DX-1.0 0.1m KCB-18.3 1.83m /h型 号 及 规 设 备 表H3加 油2机组轴承油箱油桶滤纸烘箱移动式油箱移动油泵压力滤油机名 称25431序号200 LLY-50只12数量3台21台台1格台1单位2.2kW(汽油桶)1.0kW备 注P旋塞阀压力真空表计算机监控系统处理单元测点水位测量仪水位传感器压力变送器压力真空表34旋塞阀2YSB-6660 0-1.6MPaXBT-10 1/2"YZ-150 -0.1-0.1MPa只只只压差变送器图 例压力变送器PD布置表仪(计算机监控系统)中控室主机室水位传感器名 称序号1设 备 表WFX-40G RS485 DC5V/12V型 号 及 规 格单位套水力监测系统图4每机2只每机3只6每机一只2备 注数量带LED显示仪2P进水阀前压力栏污栅压差栏污栅后水位尾水位电站毛水头水库水位测量仪表布置置布尾水管进口下游尾水渠内蜗壳进口测点进水阀前栏污栅后水库测量项目全 站 性 监 测进水阀前后压差尾水管进口真空蜗壳进口压力机 组 段 监 测6轴流风机1由电站厂房建筑设计确定BLT35-11 NO3 2737m/h套0.10kW3湖北某电站审 核设 计校 核比 例审 定批 准图 号日 期2004.12机-03初步水力机械工程部分设计审 定设 计校 核审 核批 准比 例湖北某电站日 期机-02图 号2004.12水力机械工程部分初步设计批 准工程部分设计审 核校 核设 计审 定湖北某电站比 例2004.12日 期图 号机-01水力机械初步设 计校 核审 核审 定批 准2004.12部分湖北某电站比 例日 期工程水力机械机-04图 号初步设计湖北某电站比 例审 核校 核设 计批 准审 定水力机械2004.12日 期工程图 号机-05初步部分设计中国专业人士的网络家园;因为专业,所以完美市场部:ivpmarket@ 技术部:ivptech@网易 NetEase电气在线 编辑部:ivpinfo@==中国专业人士的网络家园;因为专业,所以完美市场部:ivpmarket@ 技术部:ivptech@网易电气在线电气设计信息网 编辑部:ivpinfo@==中国专业人士的网络家园;因为专业,所以完美市场部:ivpmarket@ 技术部:ivptech@网易土木在线电气设计信息网 编辑部:ivpinfo@==QQ:447255935Email:xingxinsucai@ TEL:星欣设计图库QQ:396271936

火力发电厂电气部分初步设计设计共50页word资料

火力发电厂电气部分初步设计设计共50页word资料

目录目录 (1)摘要 (3)ABSTRACT (6)1 引言 (7)第一部分说明书 (8)2 变压器选择 (8)2.1变压器的容量、台数的确定原则 (8)2.1.1 具有发电机电压母线接线的主变压器 (8)2.1.2 接两种升高电压母线的联络变压器 (9)2.2变压器型式的选择 (9)2.2.1 相数的选择 (9)2.2.2 绕组数的确定 (10)2.2.3 绕组接线的组别的确定 (10)3 电气主接线 (11)3.1主接线的设计依据 (11)3.1.1 发电厂在电力系统中的地位和作用 (11)3.1.2 发电厂的分期和最终建设规模 (11)3.1.3 负荷大小和重要性 (11)3.1.4 系统备用容量大小 (12)3.2主接线设计的基本要求 (12)3.2.1 可靠性 (12)3.2.2 灵活性 (12)3.2.3 经济性 (13)3.3各种母线接线形式的优缺点及适用范围 (13)3.3.1 单母线接线 (13)3.3.2 单母线分段接线 (13)3.3.3 双母线接线 (14)3.3.4 双母线分段接线 (15)3.3.5 增设旁路母线的接线 (15)3.4发电机的连接方式 (15)3.5限流电抗器的连接方式 (15)3.6主变压器的连接方式 (15)3.7比较选择主接线图 (16)4 厂用电接线 (17)4.1厂用电接线总的要求 (17)4.2厂用母线接线设计 (17)第 1 页5 短路电流计算 (18)5.1电力系统短路电流计算条件 (18)5.1.2 一般规定 (19)5.2电路元件参数的计算 (19)5.3网络变换 (20)5.3.1 △/Y变换 (20)5.3.2 Y/△变换 (20)5.4等值电源的计算 (20)5.4.1 按个别变化计算 (20)5.4.2 按同一变化计算 (20)5.5三相短路电流周期分量的计算 (21)5.5.1 无限大电源供给的短路电流 (21)5.5.2 有限电流供给的短路电流 (21)5.6冲击电流的计算 (21)6 电气设备的选择 (21)6.1电气设备选择的一般要求 (21)6.1.1 一般原则 (21)6.1.2 技术条件 (22)6.2电气设备的选择 (22)6.2.1 母线的选择 (23)6.2.2 高压断路器的选择 (25)6.2.3 隔离开关的选择 (27)6.2.4 电流互感器的选择 (28)6.2.5 电压互感器的选择 (30)6.2.6 限流电抗器的选择 (31)7 高压配电装置 (32)7.1设计原则与要求 (32)7.1.1 总的原则 (32)7.1.2 设计要求 (33)7.260KV配电装置 (33)8 继电保护和自动装置的规划 (33)8.1总则 (33)8.2一般规定 (33)8.3发电机保护 (34)8.4变压器保护 (34)8.5发电机变压器组保护 (35)8.6母线保护 (35)8. 6.1 6~10KV发电机电压母线保护....................................... . (35)8.6.2 60KV母线保护 (35)8.7安全自动装置 (36)8.7.1 一般规定: (36)8.7.2 自动重合闸装置 (36)8.7.3 自动投入装置 (36)8.7.4 自动低频减载装置,系统安全自动控制: (36)8.7.5 自动准同步装置 (37)8.7.6 自动调节励磁装置 (37)8.7.7 自动灭磁装置 (37)9 发电厂和变电所的防雷保护 (37)9.1发电厂和变电所的雷害来源 (37)9.2发电厂、变电所直击雷防护的基本原则 (38)9.3避雷针的设计 (38)9.4避雷器的设计 (39)9.5本厂避雷针的选择 (39)第二部分计算书 (40)2 短路电流计算 (40)2.1系统各元件参数的计算 (40)短路点的短路电流 (40)2.2求K1短路点的电流 (41)2.3求K22.4加装限流电抗器之后的短路计算 (41)2.4.1 加装限流电抗器之后的网络图 (41)2.4.2 计算K短路点的短路电流 (41)1短路点的短路电流 (41)2.4.3 计算K22.5避雷器的选择 (42)总结 (43)致谢: (44)参考文献 (44)附录 (45)A1.14X50MW火力发电厂电气主接线图 (45)A1.24X50MW火力发电厂电气部分60KV配电装置平面图 (45)A1.34X50MW火力发电厂电气部分60KV配电装置进、出线断面图 (45)A1.44X50MW火力发电厂电气部分60KV配电装置防雷保护图 (45)毕业设计(论文)原创性声明和使用授权说明原创性声明本人郑重承诺:所呈交的毕业设计(论文),是我个人在指导教师的指导下进行的研究工作及取得的成果。

2023火电厂地下管网图集

2023火电厂地下管网图集
A:2号锅炉北墙角往东24.7M B:由测量点往北8.50M
A:3号炉凝结水箱外墙往东3.6M B:由测量点在往北3.6M
A:3号炉凝结水箱外墙往东2.3M B:由测量点在往东0M
A:石灰石制浆间北侧墙西墙角往西2.30M B:由测量点在往南25.01M
A:J-2补给水井中心往北7.4M B:由测量点在往北0M
人工定额管理
人工定额管理
人工定额管理
预警管理
设备管理部
预警管理
技术监控预 警 系统缺陷预警 重大危险源 预警 安全性评价预警 防暑降温预 警 防寒防冻预 警
防汛预警
Ⅳ级(一 般)
Ⅲ级 (较重)
Ⅱ 级(严重) Ⅰ
系统无漏泄 预警
系统文明管理预警
系统备品配件预警
系统检修预警
( 预一警般信)、系Ⅲ统号级指(较的重标)级、预Ⅱ别级警(依严据重 )可、能Ⅰ造级成(特的别危严害重程) ,度依、次紧用急蓝程色度、和黄 色发、展橙态色势和一红般 色划表分
A:补给水J-1阀门井往南83.50M B:由测量点在往南0M
管径×壁厚(mm)
管路材质
转角角度
前/后点底高(米)
节点性质
Φ426×6
Q235A
1.832/1.832
分流、节流 蝶 阀 : DZ73X-16C
DN400
Φ426×6
Q235A
1.832/1.832
分流、节流 蝶 阀 : DZ73X-16C
说明
标准摘至《电力建设施工验收及质量验评 标准电气篇》 1.电3.1.2表
安评及二十五项反措
质量验评标准编号:1.电3.1.2表 适用于6000KW及以上固定厂房内的同步汽轮发电机本体检查处理

火力发电厂锅炉电气设备系统图讲解

火力发电厂锅炉电气设备系统图讲解

4.汽轮发电机转子外形图
2021/7/5
7
5.汽轮发电机转子铁心图
2021/7/5
8
6.汽轮发电机转子外形图
2021/7/5
9
发电厂知识点全总结——课件版
来源: 高宝龙♥JF的日志
第二章 发电厂的回热加热系统 第一节 回热加热器的型式按内部汽、水接触方式:分为混合式加热器与表面式加热器; 按受热面的布置方式:分为立式和卧式两种。一、混合式加热器1、特点: ①加热器本体 简单,没有端差,热经济性好; ②系统复杂,回热系统运行安全性、可靠性低、系统投 资大。 ③设备多、造价高、主厂房布置复杂、土建投资大、安全可靠性低,使混合式低 压加热器回热系统应用受到限制。2、混合式加热器的结构.演示文稿3.ppt3、重力混合式 低压加热器回热系统.演示文稿4.ppt特点:①降低了亚临界和超临界汽轮机叶片结铜垢及 真空下的低压加热器氧腐蚀的现象;②提高了热经济性。 二、表面式加热器加热蒸汽与水在加热器内通过金属管壁进行传热,通常水在管内流动, 加热蒸汽在管外冲刷放热后凝结下来成为加热器的疏水(为区别主凝结水而称之为疏水); 演示文稿6.ppt对于无疏水冷却器的疏水温度为加热器筒体内蒸汽压力下的饱和温度;管 内流动的水在吸热升温后的出口温度比疏水温度要低,它们的差值称之为端差. 演示文稿

15、一个人炫耀什么,说明他内心缺 少什么 。。2021年7月 下午3时20分21.7.1615:20Jul y 16, 2021

16、业余生活要有意义,不要越轨。2021年7月16日 星期五 3时20分57秒15:20:5716 July 2021

17、一个人即使已登上顶峰,也仍要 自强不 息。下 午3时20分57秒 下午3时20分15:20:5721.7.16

(完整版)地区性火电厂电气部分的初步设计2×100+4×300MW发电厂说明书毕业设计

(完整版)地区性火电厂电气部分的初步设计2×100+4×300MW发电厂说明书毕业设计

(完整版)地区性火电厂电气部分的初步设计2×100+4×300MW发电厂说明书毕业设计以下文档格式全部为word格式,下载后您可以任意修改编辑。

摘要此次设计的主要任务是2*100MW+4*300MW的地区性火电厂电气部分的初步设计。

首先确定电气主接线方案,选择发电机、主变压器、联络变压器、厂用变压器和启备变压器。

用所选择的发电机与变压器的参数进行标幺值的计算;并做出可能发生各种短路的等值电路图,分别计算各电源对短路点的计算电抗,列出短路计算结果表;通过对各设备最大持续电流的计算,分别对断路器、隔离开关、电压互感器、电流互感器、避雷器、熔断器、全连式分相封闭母线等设备进行选择,并通过短路计算结果中的各短路值对所选的设备进行校验。

了解该电厂励磁系统的原理如设计方法。

关键词:电气主接线;短路计算;设备选择;励磁系统;AbstractThe main assignment of the design is the initial plan of electric with regard to regional fossill—fule plant (2*100MW+4*300MW). To begin with ,we must ensure the project of electric main line .What more ,we select the capacity of generator ,we select generator、transformer、liasion transformer、transformer which used in the factory and enlighten sparetransformer. We can carry out the short circuit calculation .The diagram of equivalent can be make out at the basic of transformer and generator data respectively. At last, we calculate the reactance which the point of short circuit to every power system and lay out the table of short circuit. Interrupter, disconnect switch, busbar, lighting arresters can be selected by way of the calculation. We can check the install we choose via theresult of short circuit. Find out the protection principle of 600MW generator and transformer, know the movement situation of the protection.Keywords: electric main line; short-circuit calculation; equipment choice;符号说明常用符号:--电流--额定电流—基值电流(KA)—基值电压(KV)--额定电压(一次侧)(KV)--二次侧额定电压(V)—电网工作电压(KV)--电压--电抗--电阻--容量--负荷--能量—电势--系统基准容量(MV A)--变压器额定容量专用符号-- 励磁电流--短路电流冲击值(KA)--最大持续工作电流--稳态三相短路电流--0S短路电流周期分量(标幺值) --0S短路电流周期分量(有名值)--断路器的额定开断路器(KA)--断路器极限通过电流峰值(KA)--断路器实际开断时间t秒的短路电流周期分量(KA)--断路器t秒热稳定电流--短路容量(MV A)--支路计算电抗(标幺值)--支路转移电抗(标幺值)--短路电流发热等值时间(又称假象时间)(S)--固有分闸时间(S)--热稳定系数--母线截面系数--经济电流密度目录引言 (1)第一章电气主接线设计 (2)1.1主接线的设计原则和要求 (2)1.2电气主接线的设计步骤 (2)1.2.2 主接线的类型与使用范围 (4)1.2.3 设计方案的介绍 (5)1.2.3 主接线方案的评定 (6)1.3发电机和主变压器的选择 (7)1.3.1 发电机的选择 (7)1.3.2 主变压器和联络变压器的选择 (7)第二章厂用电设计 (10)2.1厂用电的设计原则和基本要求 (10)2.2本厂厂用电主接线设计 (10)2.3厂用变压器的选择 (11)第三章短路电流计算 (13)3.1短路电流计算的目的 (13)3.2短路电流计算的一般规定 (13)3.3短路电流的计算步骤 (14)3.4主接线及厂高压短路电流计算 (14)3.4.1 发电机电抗标么值计算 (14)3.4.2 变压器电抗标么值计算 (15)3.4.3 发电厂电气一次部分各短路点短路电流计算 (16) 第四章电气设备的选择与校验 (28)4.1电气设备选择的一般原则 (28)4.2断路器的选择与校验 (29)4.2.1 断路器的选择原则 (29)4.2.2 断路器的选择与校验 (30)4.3隔离开关的选择与校验 (33)4.4接地开关的选择与校验 (34)4.4.1 接地开关的选择原则 (34)4.4.2 接地开关的选择与校验 (34)4.5电压互感器的选择与校验 (35)4.5.1 电压互感器的选择原则 (35)4.5.2 电压互感器的选择与校验 (36)4.6电流互感器的选择与校验 (36)4.6.1 电流互感器的选择原则 (36)4.6.2 电流互感器的选择与校验 (38)4.7高压熔断器的选择与校验 (39)4.7.1 高压熔断器的选择原则 (39)4.7.2 高压熔断器的选择 (39)4.8避雷器的选择 (40)4.8.1 避雷器的选择原则 (40)4.8.2 避雷器的选择 (41)4.9母线与架空线的选择与校验 (41)4.9.1 母线与架空线的选择原则 (41)4.9.2 母线的选择与校验 (42)4.9.3 架空线的选择 (42)4.9.4 封闭母线的选择 (43)第五章励磁系统的设计 (45)5.1励磁系统的主要作用 (45)5.2励磁系统的初步设计 (45)5.2.1 发电机励磁方式的选择 (45)5.2.2 自并励励磁系统原理及优缺点 (46)5.2.3 100MW发电机微机型自并励励磁系统的设计 (47) 六章发电机的主保护设计 (49)6.1发电机保护配置原则 (49)6.2发电机的纵差动保护 (50)6.3发电机100%定子绕组单相接地保护 (51)6.4发电机定子绕组匝间短路保护 (52)6.5发电机励磁回路接地保护 (53)6.6发电机失磁保护 (54)第七章配电装置的设计 (56)7.1设计原则与要求 (56)7.1.1 配电装置的设计原则 (56)7.1.2 配电装置设计必须满足的要求 (56)7.26~10KV配电装置 (56)7.3220KV配电装置 (57)结论 (58)参考文献 (59)谢辞 (60)引言电力自从应用于生产以来,已成为现代化生产、生活的主要能源,在工农业、交通运输业、国防、科学技术和人民生活等方面都得到了广泛的应用。

火电厂课程设计CAD图

火电厂课程设计CAD图

火电厂课程设计CAD图一、教学目标本课程的教学目标是让学生掌握火电厂的基本原理、结构和工作流程,培养学生运用CAD软件进行火电厂设计和绘图的能力。

具体分为以下三个部分:1.知识目标:学生能够阐述火电厂的基本原理、各类设备和运行机制;了解CAD软件的基本功能和操作方法。

2.技能目标:学生能够熟练运用CAD软件进行火电厂平面图、立面图和剖面图的绘制;具备火电厂设计与绘图的基本能力。

3.情感态度价值观目标:培养学生对火电厂行业的兴趣和热情,提高学生对能源、环保等问题的关注度,培养学生的创新精神和团队合作意识。

二、教学内容本课程的教学内容主要包括火电厂的基本原理、结构和工作流程,以及CAD软件的基本操作和应用。

具体安排如下:1.火电厂基本原理:介绍火电厂的定义、分类和特点,阐述热力发电的基本原理。

2.火电厂结构:讲解火电厂的主要设备,如锅炉、汽轮机、发电机等,以及它们的作用和相互关系。

3.火电厂工作流程:详细介绍火电厂的启动、运行和停机过程,以及各项指标的监测和调整。

4.CAD软件基本操作:教学CAD软件的界面布局、工具使用和命令执行,让学生熟练掌握软件的基本功能。

5.CAD软件在火电厂设计中的应用:通过实际案例,讲解CAD软件在火电厂设计过程中的具体应用,如平面图、立面图和剖面图的绘制。

三、教学方法为了提高教学效果,本课程采用多种教学方法相结合的方式,包括:1.讲授法:教师讲解火电厂的基本原理、结构和运行流程,以及CAD软件的基本操作。

2.案例分析法:分析火电厂设计实例,让学生了解CAD软件在实际工程中的应用。

3.实验法:安排实验室实践环节,让学生动手操作CAD软件,提高实际操作能力。

4.讨论法:学生就火电厂设计和CAD软件应用相关问题进行讨论,培养学生的创新思维和团队合作精神。

四、教学资源为了支持教学内容和教学方法的实施,本课程准备以下教学资源:1.教材:《火电厂设计与CAD绘图》教材,为学生提供系统性的理论知识。

某地区电站厂房设计标准图(共6张)

某地区电站厂房设计标准图(共6张)
Ac图 名bad图 号标题栏尺寸3021.2152401号图3号图2号图120170ab18060127.59042.530mmcd压力表大坝上游全厂性测量机 组 段 测 量尾水管出口压力下游水位上游水位置仪表位置 测量项目测点及仪表位置说明:1.两台机均装量测系统.电站尾水渠蜗壳进口断面尾水管出口断面尾水管进口断面水轮机水力仪表盘压力真空表水力监测系统图蜗壳进口压力尾水管进口压力真空绝缘油系统图变 压 器2.说明:变压器的供排油一律在安装间进行.3.1.透平油系统图图 例0.00说明:1.齿轮油泵软管接头止回阀两台机组的蝴碟阀共用一台油压装置,型号为P油槽车压力滤油机图中尺寸:高程以米计.P回油箱2.WC-DN200减压阀拦污栅滤水器电接点压力表示流信号器离心泵说明:主供水水源取自压力钢管,单元引水,互为备用,1.2.技术供水系统图电磁阀1#2#序 号1F水 箱V=30m314.74DN80DN80WF-DN800.00DN1001.92F排至下游WS-DN80DN50下游尾水渠WF-DN80DN25机组技术供水系统图消防水泵设有全厂总供水管.全厂设有消防与生活干管,水源来自全厂总干管,备用水源取自下游3.尾水池.消防由一台 型水泵供水.KQW80/200-15/2供水系统应随钢管进水压力变化相应调节减压阀,以满足各用水设备的压力 水量的要求,同时防止水压超过允许值.吸水底阀浮子式液位信号器L2.042.04L油 泵ODOS机组漏油箱LOFFDN406.74碟阀漏油箱L总回油箱DN50ODDN50OS接 机1#V真空滤油机6.74OOTOOTUOT3m33m336mV2CY-3.3/3.3-13齿轮油泵台压力滤油机真空滤油机LY-50ZJY-50N=27kWN=1.1kWN=1.1kWHYZ-1.6.2CY-3.3/3.3-1压力滤油机真空滤油机齿轮油泵LY-50N=1.1kW油开关的供排油

2x100MW火电厂电气一次部分设计及发变组保护设计简介

2x100MW火电厂电气一次部分设计及发变组保护设计简介

2x100MW火电厂电气一次部分设计及发变组保护设计电气工程及其自动化07230324 闫毓龙指导教师陈玉武高级工程师摘要本设计内容为2×100MW火力发电厂电气部分初步设计,包括设计说明书和设计图纸两大部分。

设计说明书部分主要编写了火电厂电气主接线方案的确定和厂用电部分的设计;发电机、主变压器的选择以及电气设备配置;短路电流的计算;高压电气设备的选择与校验;防雷保护的规划设计;微机保护的配置与整定计算。

设计图纸分别是:(1)2×100MW火力发电厂电气主接线(2)发电机变压器保护配置图(3)发电机变压器差动保护控制回路图。

关键词:发电厂;变压器;电力系统;继电保护;电气设备AbstractThe content of article is the first steps of 2×100 MW power plant engineering electrical part design. Including design specifications and design drawings of two parts. Prepared some of the major design specifications of electrical power plants and the main connection scheme for the power plant design; Generators, main transformers and electrical equipment configuration choices; Short-circuit current calculation; High-voltage electrical equipment selection and validation; Configuration and microprocessor-based protection setting calculation; Planning and design of lightning protection. Design drawings are: (1) 2x100MW power plant electrical main connection; (2) generator and transformer protection configuration diagram; (3) The generator and transformer differential protection control circuit diagram.Keywords: Power plant; Transformer; Protection; Electrical equipment.一、选题背景火力发电是由发电、变电、输电、配电和用电等环节组成的电能生产和消费的系统。

毕业设计_300mw机组火电厂机务部分--初步设计论文

毕业设计_300mw机组火电厂机务部分--初步设计论文
专业班级: 电厂热能动力工程
学生姓名: 曲悦
学 号: 010311200104
指导教师: 肖弘
沈阳工程学院
毕业设计(论文)任务书
毕业设计(论文)题目:300MW机组火电厂机务
部分初步设计
系 别能源与动力学院班级
学生姓名曲悦学号010311200104
指导教师肖弘职称教授
毕业设计(论文)进行地点:图书馆、教室
(6)绘制300MW、600MW、1000MW机组局部全面性热力系统图(参照本厂的汽轮机系统图、锅炉系统图)
3.对设计说明书、论文撰写内容、格式、字数的要求
毕业设计论文书写格式按学校统一的模版进行。
4.课题完成后应提交成果的种类、数量、质量等方面的要求
毕业设计说明书一本,A4纸打印完成。
5.时间进度安排
(5)全面性热力系统的拟定
锅炉烟风制粉系统、过热蒸汽系统、再热蒸汽系统;主蒸汽管道系统、再热机组旁路系统、主给水管道系统、主凝结水管路系统、回热加热器管道系统、除氧器管道系统、轴封管道系统、高压加热器疏水放气系统、低压加热器疏水放气系统、真空及空气管道系统、开式循环冷却水及闭式循环冷却水系统、润滑油系统、EH油系统、密封油等系统。
任 务 下 达 时 间: 2013 年 3 月 1 日
起止日期:2013年 3月13日起——至 2013年 4月16日止
教研室主任年 月 日批准
1.设计(论文)的原始资料及依据
本题目来源于300MW、600MW、1000MW机组电厂初步设计资料,依据火力发电厂设计技术规程。
2.设计(论文)主要内容及要求
本次设计充分借鉴铁岭电厂设备选型和设计。
关键词:汽轮机,锅炉,热力系统,辅机形式。
Abstract

火电厂电气部分设计

火电厂电气部分设计

工学院毕业设计(论文)题目:火电厂电气部分设计专业:机电专升本班级:09级0班姓名:李珺辉学号:16指导教师:国海日期:2011年5月11日800MW区域性发电厂电气部分设计摘要由发电、变电、输电、配电和用电等环节组成的电能生产与消费系统。

它的功能是将自然界的一次能源通过发电动力装置转化成电能,再经输、变电系统及配电系统将电能供应到各负荷中心。

电气主接线是发电厂、变电所电气设计的首要部分,也是构成电力系统的重要环节。

主接线的确定对电力系统整体及发电厂、变电所本身的运行的可靠性、灵活性和经济性密切相关。

并且对电气设备选择、配电装置配置、继电保护和控制方式的拟定有较大的影响。

电能的使用已经渗透到社会、经济、生活的各个领域,而在我国电源结构中火电设备容量占总装机容量的75%。

本文是对配有4台200MW汽轮发电机的大型火电厂一次部分的初步设计,主要完成了电气主接线的设计。

包括电气主接线的形式的比较、选择;主变压器、启动/备用变压器和高压厂用变压器容量计算、台数和型号的选择;短路电流计算和高压电气设备的选择与校验; 并作了变压器保护。

关键词:发电厂;变压器;电力系统;继电保护;电气设备。

Electrical design of 800MW regional power plantAuthor:AbstractBy the power generation, transformation, transmission and distribution of electricity and energy components, and other aspects of production and consumption systems. It is the function of the natural world through the power of primary energy into electrical energy power plant, then lost, transforming the system and distribution system will supply power to the load centers.Electrical wiring is the main power plant, electric substation designed first and foremost part of the power system is also constitute an important part. Determination of the main cable on the power system as a whole and power plants, substations to run its reliability, flexibility and economy are closely related. And choice of electrical equipment, power distribution equipment configuration, relay protection and control of the means to develop a greater impact. The use of power has infiltrated the social, economic, in all areas of life, and in the power structure of China's thermal power equipment capacity of the total installed capacity of 75%. This article is equipped with 4*200MW turbo-generator of large-scale thermal power plants a part of the preliminary design of the main completed the main electrical wiring design. Including the electrical wiring of the main forms of comparison, the choice; main transformer, the start / stand-by transformer and the high-voltage transformer factory with the capacity of calculation, the number of models and options; short-circuit current calculation and high-voltage electrical equipment selection and validation; and made the protection of transformer .Key words: power plant; transformer; power system; relay; electrical equipment目录1 绪论 (4)1.1 课题背景 (4)1.2 原始资料 (4)1.3 电力工业的发展概况 (5)1.4 我国电力行业发展方针 (5)2 电气主接线设计 (7)2.1 主接线概述 (7)2.2 对原始资料的分析 (7)2.3 拟定可行的主接线方案 (7)3 厂用电的设计 (9)3.1 厂用电源选择 (9)3.2 厂用主变选择 (9)4 短路电流计算 (9)4.1 短路电流计算的目的 (9)4.2 短路电流计算条件 (10)4.3 短路电流分析 (10)5 电气设备的选择 (20)5.1 电气设备选择概述 (20)5.2 电气设备选择的校验内容 (20)5.3 电气设备选择的技术条件 (20)5.4 电气设备选择 (21)6 防雷部分设计 (22)6.1 概述 (22)6.1.1 雷害来源 (22)6.1.2 避雷针作用 (22)6.1.3 避雷针的保护范围 (22)6.2 避雷器的选择原则 (23)6.2.1 型式 (23)6.2.2 额定电压 (24)6.2.3 灭弧电压 (24)6.2.4 工频放电电压 (24)6.2.5 冲击放电电压和残压 (24)6.3 避雷器的选择 (24)7 继电保护及自动装置设计 (25)7.1 继电保护装置 (25)7.2 安全自动装置 (25)结论 (26)参考文献 (27)1 绪论1.1 课题背景由发电、变电、输电、配电和用电等环节组成的电能生产与消费系统。

某地区电站机电气完整设计施工图纸

某地区电站机电气完整设计施工图纸
A1m3AM-%%c57x3.5设备明细表名称型号规格单位备 注中压空压机低压空压机中压储气罐低压储气罐低压储气罐高压电动油泵VF-0.35/30 2EP50-S2V=1.0mP=2.6MPa1V=2.0mP=0.7MPa1V=2.0mP=0.7MPa11333油压装置用气机组制动用气安全阀空气过滤器逆止阀截止阀名称图 例电磁阀图例名称图例名称图例角式止回阀压力表气水分离器软管接头电动高压油泵三通阀电接点压力表说明:1.系统包括厂内中压和低压两个系统,中压供油压装置用气,低压供机组制动、检修密封空气围带及吹扫用气等。2.Байду номын сангаас压装置工作压力为2.5MPa,中压空压机压力为3.0MPa。3.低压系统工作压力为0.7MPa,低压空压机压力为0.86MPa。工业检修用气2500KW4000KW本电站近期装设一台 机组 机 ,一台 机组预留一台 机组位置 远期 机组改造为 机组, 改造为 机组.技术供排水(2# ),系统按远期装机考虑.1.4000KW机(3# ),12000KW8000KW机(1# )8000KW2500KW序号123456排气量排气压力Q=0.35m/min3P=3.0MPa排气压力排气量Q=5.5m/minP=0.86MPa3T1T3仪表三通机组顶转子用至渗漏集水井T1AM-%%c57x3.5AM-%%c45x3.5AM-%%c57x3.5AL-%%C57x3.5T2AL-%%c57x3.5T2至渗漏集水井23m4OFFOFFAL-%%C57x3.5至渗漏集水井OFFm2351#AM-%%c45x3.5AM-%%c45x3.5至 机2#至 机3#AL-%%C57x3.5AL-%%c57x3.5OFF风动具工用气扫用吹OFF装间安OFF气气扫用吹轮机水层OFF至检修密封空气围带排油,气至 机2#至 机至 机3#至 机2#3#电磁空气阀空压机制动闸AL-%%c22x3AL-%%C22x3油压装置AL-%%c22x3OFFOFFAL-%%c57x3.5AL-%%c57x3.5温度信号器空压机室2.61制动柜OFFOFF数量台台台台台台c图 名bad图 号标题栏尺寸3021.2152401号图3号图2号图120170ab18060127.59042.530mmcd混流式电站 1 机组技术供水系统图()SJ-HL-01SJ-HL-04P=15MPa图中高程以导叶中心高程为基准.2.4.图中高程以导叶中心高程为基准。17
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

300MW机组火电厂机务部分初步设计
附图
附图5-1 锅炉烟风制粉系统
沈阳工程学院毕业设计(论文)
附图5-2 过热蒸汽系统
300MW 机组火电厂机务部分初步分析
附图5-3 再热蒸汽系统
侧墙壁式辐射再热器
壁式辐射再热器入口集箱
壁式辐射再热器出口集箱
排空末级再热器出口集箱762×36
至汽机再热蒸汽入口壁式辐射再热器入口集箱
壁式辐射再热器入口集箱
侧墙壁式辐射再热器
排空
762×36
863.6×17.5
108×9HAJ21
ID679.5×34
LBB11末级再热器出口集箱HAJ22
再热器后屏入口集箱
HAJ20
ID679.5×34
LBB12
870×43LBB10
K0401-01
由给水泵间抽头给水来
LAF40LBC10
1066.8×20.6
由汽机冷再热蒸汽来
LAF40AA301
AA551LBC14LBC14
AA552LBC14AA553LBC14AA554
LBC14LBC13
AA551LBC13AA552LBC13AA553
LBC13AA754HAJ20AA753
HAJ20AA751
HAJ20AA752HAJ20HBK40HBK50
HBK40
HBK50
AA552
AA752
AA751AA552
LBB11 LBB12锅炉再热蒸汽系统图
P
M
76×10
AA001
LAF41LAF41CF001
LAF41
LAF42
M
76×10AA001
LAF42CF001
LAF42AA101
LAF41AA101LAF42放水
AA752
AA751M
M
LAF42
LAF42
LAF42LAF41
LAF40AA701
AA701
AA701
AA702
LAF40AA601
LAF40
沈阳工程学院毕业设计(论文)
附图5-4 主蒸汽及旁路管道系统图
300MW机组火电厂机务部分初步分析
附图5-5 主给水管道系统
沈阳工程学院毕业设计(论文)
附图5-6 主凝结水管路系统
300MW机组火电厂机务部分初步分析
附图5-7 回热加热器管道系统
沈阳工程学院毕业设计(论文)
附图5-8 除氧器管道系统
附图5-9 轴封管道系统
沈阳工程学院毕业设计(论文)
附图5-10 高压加热器疏水放气系统
附图5-13 开式循环冷却水系统
附图5-14 闭式循环冷却水系统
附图5-15 润滑油系统
附图5-16 EH供油系统
附图5-17 密封油系统。