4万吨污水处理厂氧化沟工艺设计说明书
合集下载
相关主题
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
南京市建邺区污水管网部分工程设计范围包括污水量预测,污水管平面定线、管道走向、竖向标高、管材、附属构筑物等设计。建邺污水处理厂部分工程设计范围包括进水水质证、二级污水、污泥处理设计、自控仪表设计、建筑和结构设计、污水处理厂总图设计以及相配套的消防、给排水等设计。
1.
(1)贯彻执行国家关于环境保护的政策,符合国家的有关法规、规范及标准。
本污水处理厂占地约为7.2公顷。
关键词:污水管网雨水管网氧化沟浓缩脱水一体化设备
Process design of 40000t/d city sewage treatment plant
Astract
With the develop of our country society economy continuously, Vitalization is gradually increasing, Environmental protection measure of practicLeabharlann Baidul, and with establishing of the Market economy, Draining, As one of the important foundation facilities, also got a fast development. The city in the whole nation almost reform drainpipe net. And still built the dirty water of large quantity disposal the factory to discard the water to proceed to handle to city.
This project is for designing sewerage engineering ofNanjingcity Jianye District.The design includes stremwater drainage system and wastewater collecting system and sewage works .And this design all adopted national latest relevant provision, Standard, with design the norm.
The sewage treatment plant handle the distance travelled by a stream of water being :Sewage→Coarse screens→Sewage elevated pumb house→Fine screens→rotated Grit chamber→Oxidation ditch→Secondary sedimentation tank→UVSterilize in pool→River.
第一章
1.
本毕业设计是对南京市某一污水处理工程的模拟,通过设计,使学生系统的熟悉和掌握环境工程专业图纸设计方面的内容体系、操作程序,培养学生综合运用所学理论知识解决实际问题的能力,为今后从事工程实际设计或施工工作打下基础。
通过本次毕业设计可以培养学生以下几方面的能力:
(1)加深对所学的基础理论、基本技术能和专业知识的理解,培养学生的综合运用所学知识的能力;(2)培养学生独立工作、独立思考和分析解决实际问题的能力,特别是培养学生的创新能力和实践能力;(3)培养学生的图纸设计、文件编辑、文字表达、文献查阅、计算机应用、工具使用等基本工作的实践能力。
管网的体制采用的是分流制。污水处理厂设计规模近期40000m3/d,远期60000m3/d,故本设计按近期设计,远期规划。污水厂二级处理出水排至河流下游。
污水处理厂处理流程为:污水→中格栅→提升泵房→细格栅→钟式沉砂池→氧化沟→二沉池→紫外消毒→出水。
污泥流程:剩余活性污泥→污泥提升泵房→浓缩脱水一化车间→污泥外运。
4万吨污水处理厂氧化沟工艺设计说明书
摘
随着我国社会经济的不断发展,城市化水平的逐步提高,环境保护措施的落实,以及市场经济的建立,排水事业作为城市的重要基础设施这一,也得到了蓬勃的发展。全国大多的城市都对老城区的给排水管网进行了改造,并且还兴建了一大批污水处理厂对城市的生活污水,工业废水进行处理。
本设计是对南京市建邺区某一排水工程设计。其设计范围包括:雨水管网工程、污水管网工程和污水处理厂工程。本次设计均采用了国家最新的有关规定、标准、和设计规范。
The system of pipe netadopts is the bridging system . Sewage treatment plant design scalenow is40000m3/d,in the future dateis60000m3/d . The rainfall is all putd in order intoSan Ming Riverand the handled sewage from the sewage plant put intoRiver.
Sludgedistance travelled by a stream of water:Remaindersludge→sludgeelevated house→the concentration and dehydration workshop→Transport outside thesludge
Covers an area of and act as7.2hectares around in this the sewage treatment plant.
Keywords:solid pipe netrainwater tule netSewage treatment plantOxidation ditchthe concentration and dehydration workshop
1.
(1)贯彻执行国家关于环境保护的政策,符合国家的有关法规、规范及标准。
本污水处理厂占地约为7.2公顷。
关键词:污水管网雨水管网氧化沟浓缩脱水一体化设备
Process design of 40000t/d city sewage treatment plant
Astract
With the develop of our country society economy continuously, Vitalization is gradually increasing, Environmental protection measure of practicLeabharlann Baidul, and with establishing of the Market economy, Draining, As one of the important foundation facilities, also got a fast development. The city in the whole nation almost reform drainpipe net. And still built the dirty water of large quantity disposal the factory to discard the water to proceed to handle to city.
This project is for designing sewerage engineering ofNanjingcity Jianye District.The design includes stremwater drainage system and wastewater collecting system and sewage works .And this design all adopted national latest relevant provision, Standard, with design the norm.
The sewage treatment plant handle the distance travelled by a stream of water being :Sewage→Coarse screens→Sewage elevated pumb house→Fine screens→rotated Grit chamber→Oxidation ditch→Secondary sedimentation tank→UVSterilize in pool→River.
第一章
1.
本毕业设计是对南京市某一污水处理工程的模拟,通过设计,使学生系统的熟悉和掌握环境工程专业图纸设计方面的内容体系、操作程序,培养学生综合运用所学理论知识解决实际问题的能力,为今后从事工程实际设计或施工工作打下基础。
通过本次毕业设计可以培养学生以下几方面的能力:
(1)加深对所学的基础理论、基本技术能和专业知识的理解,培养学生的综合运用所学知识的能力;(2)培养学生独立工作、独立思考和分析解决实际问题的能力,特别是培养学生的创新能力和实践能力;(3)培养学生的图纸设计、文件编辑、文字表达、文献查阅、计算机应用、工具使用等基本工作的实践能力。
管网的体制采用的是分流制。污水处理厂设计规模近期40000m3/d,远期60000m3/d,故本设计按近期设计,远期规划。污水厂二级处理出水排至河流下游。
污水处理厂处理流程为:污水→中格栅→提升泵房→细格栅→钟式沉砂池→氧化沟→二沉池→紫外消毒→出水。
污泥流程:剩余活性污泥→污泥提升泵房→浓缩脱水一化车间→污泥外运。
4万吨污水处理厂氧化沟工艺设计说明书
摘
随着我国社会经济的不断发展,城市化水平的逐步提高,环境保护措施的落实,以及市场经济的建立,排水事业作为城市的重要基础设施这一,也得到了蓬勃的发展。全国大多的城市都对老城区的给排水管网进行了改造,并且还兴建了一大批污水处理厂对城市的生活污水,工业废水进行处理。
本设计是对南京市建邺区某一排水工程设计。其设计范围包括:雨水管网工程、污水管网工程和污水处理厂工程。本次设计均采用了国家最新的有关规定、标准、和设计规范。
The system of pipe netadopts is the bridging system . Sewage treatment plant design scalenow is40000m3/d,in the future dateis60000m3/d . The rainfall is all putd in order intoSan Ming Riverand the handled sewage from the sewage plant put intoRiver.
Sludgedistance travelled by a stream of water:Remaindersludge→sludgeelevated house→the concentration and dehydration workshop→Transport outside thesludge
Covers an area of and act as7.2hectares around in this the sewage treatment plant.
Keywords:solid pipe netrainwater tule netSewage treatment plantOxidation ditchthe concentration and dehydration workshop