××中石化加油站专业技术标

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
3.2项目经理部人员一览表···················································3
3.3项目经理等主要人员资格一览表··········································22
3.4其他··································································40
4.施工部署及施工方案·····················································40
5.HSE管理体系与保证措施··················································54
6.质量保证体系与控制措施·················································56
7.工程进度计划与保证措施·················································65
8.特殊技术措施···························································70
9.人力资源计划···························································71
11.2设备及材料技术规格清单···············································76
12.技术管理······························································78
13.临时设施布置··························································79
17.对招标人关注问题的响应················································87
18.其他··································································92
1.编制依据
《汽车加油加气站设计与施工规范》GB50156-2014
(二)工程质量目标
认真贯彻执行质量体系文件和质量计划,严格按照设计要求和国家有关规范施工,无施工缺陷。确保工程单元工程合格率100%,确保工程质量达到合格工程标准。
(三)施工安全目标
认真贯彻“安全第一,预防为主”的方针,严格执行安全施工生产的规程、规范和安全规章制度,落实各级安全生产责任制及第一责任人制度,坚持“安全为了生产,生产必须安全”的原则,加强安全监测及支护,注重施工人员的劳动保护,确保人员、设备及工程安全,杜绝特大、重大安全事故,杜绝人身死亡事故和重大机械设备事故,减少一般性事故发生。
《建筑给水排水及采暖工程施工质量验收规范》GB-2011
《电气装置安装工程爆炸和火灾危险环境电气装置施工及验收规范》GB50257-2014
《电气装置安装工程接地装置施工及验收规范》GB50169-2010
《自动化仪表工程施工及验收规范》GB50093-2013
10.施工机具设备及试验和检验仪器配置······································72
11.设备材料管理及采购····················································74
11.1设备材料采购管理制度·················································74
《液化天然气(LNG)汽车加气站技术规范》NB/T1001-2011
《建筑地基基础工程施工质量验收规范》GB 50202-2002
《混凝土结构工程施工质量验收规范》GB50204-2010
《钢结构工程施工质量验收规范》GB 50205-2001
《石油化工金属管道工程施工质量验收规范》GB50517-2010
××中石化加油站技术标
———————————————————————————————— 作者:
———————————————————————————————— 日期:

1.编制依据································································1
《建筑装饰装修工程质量验收规范》GB50210-2001
2.总体目标
(一)施工进度目标
本工程计划工期90日历天。
抓住工程施工的重点、难点,加强各科室配合协作,统筹兼顾组织好项目施工;以确保工期为目标,优化施工方案,制定切实有效的工期保障措施,合理安排好施工程序;强化施工设备,提高施工进度保证率,确保实现工期目标。
14.现场安全及文明施工等管理措施··········································80
15.分包管理······························································85
16.文档资料管理制度及实施措施············································85
(四)环保及文明施工目标
以“均衡生产、文明施工、科学管理”为指导思想,在合同实施的同时,同步实施相应的环保措施。施工过程中加强工程施工的通风、除尘,加强弃土场的维护管理,注重水土保持工作,使施工现场各项环保指标达到国标和地方标准、满足合同要求。工地做到整洁、清爽、有序,施工标志齐全、美观,施工工艺科学合理,推进程序化、标准化作业,力争创建安全文明样板工程。
2.总体目标································································1
3.项目管理机构····························································2
3.1项目管理机构及职责·····················································2