扣除C11.5*2.1*0.25*10=7.88
C23*2.1*0.25*10=15.75
C33.9*2.1*0.5*1=2.05
C444.5*2*0.25*1=2.25
33.15+28.28+6.12+19.8-7.88-15.75-2.05-2.25=59.42
三层外墙同二层59.42
33.21+59.42+59.42=152.05
m3
152.05
14
砌筑工程内墙
(6+6+6-0.7*3)*0.2*(3.6-0.6+0.7)*2=23.53
(3.3-0.7)*0.2*(3.6-0.6+0.7)=1.92
(7.2-0.7)*2*(3.6-0.6+0.7)=4.81
(6+6-0.6*2)*0.2*(3.6-0.6+0.7)*4=31.97
(4.5-0.1)*0.2*(3.6-0.5)=2.73
(19.08+1.56+25.92+3.72+2.73)*2+7.8=113.82
扣除M20.9*2.4*18=38.88
M30.75*2.1*4=6.3
113.82-38.88-6.3=68.64
三层内墙同二层68.64
合计91.69+68.64+68.64=228.97
(6+0.1-0.1)*0.2*(3.6-0.5)=3.72
(4.5-0.1)*0.2*(3.6-0.5)=2.73
(23.53+1.92+31.97+3.72+2.73)*2+4.81=132.55
扣除M20.9*2.4*1.6=34.56
M30.75*2.1*4=6.3
132.55-30.56-6.3=91.69
(1.5-0.125-0.15)*(6-0.15+0.1)*0.1=0.73
(3-0.3)*(6-0.15+0.1)*0.1=1.61
(3-0.3)*(3.3-0.3)*0.1=0.81
(3-0.3)*(6-0.3)*0.1*2=3.08
LB4(3.3-0.3)*(6-0.15)*0.1=1.76
(3-0.125+0.1)*(4.5-0.125)*0.1=1.3
(6+0.35+3.3+6+6+1)*2*1=45.2
(15+0.25*2)*2*1=31
3.14*(5.07+0.125+1-5.07-0.1252*1/4=0.79
46.2+45.2+31+0.79=123.29
m2
123.29
12
压板女儿墙
V=(0.06+0.12)*0.3*1/2*{(50.5+0.225*2)*2+8-7.2+(15+0.175*2)*2}=3.6
楼梯板C25 *1.5*0.1*4=2.21
7.68+2.3+0.74+2.21=12.93
m3
12.93
10
台阶C15
(4.5+0.3*3*2)*(1.5+0.3*3)-(1.5-0.3)*(4.5+
0.3)*2=9
m2
9
11
散水C20
(6+0.35+3.3+6+6+0.45+1)*2*1=46.2
序号
分项工程
工程量计算式
单位
定额
工程量
清单
工程量
1
建筑面积
(50.5+0.1)*(15+0.25*2+0.1)=789.36
3.14*(5.07+0.125+0.05)2*1/4-7.2*(5.07-1.5+0.125)
*1/2=8.29
789.26+8.29=797.55
二层三层建筑面积797.55*2=1595.1
0.3*(0.6+0.125)*(6-0.7)*2=2.31
(5-6)
0.3*(0.7+0.15)*(7.2-0.7)=1.66
3*0.3*(0.7+0.125)*(7.2-0.7)=4.83
3.14*(5.07+0.125)*2*1/4*0.25*(0.6+0.1)=1.43
A—B
0.3*(0.6+0.125)*(6-0.6)=1.22
26.1+19.8+1.22=47.12
m3
47.12
5
柱混凝土C30
(3.6+1)*0.7*0.6*40=77.28
(7.2-3.6)*0.7*0.6*40=60.48
(10.8-7.2)*0.7*0.6*40=60.48
m3
198.24
6
构造柱混凝土C25
{0.25*0.5+0.03*(0.25+0.25)}*4=0.31
m3
87.74
3
基础混凝土
(49.8+0.8*2)*(15+0.8*2)*0.5=426.62
{3.14*(5.07+0.8+0.125)2*1/4-7.2*(5.07+0.125-1.5)*1/2}*0.5=7.46
7.2*0.3*0.2*1/2=0.216
扣除(49.8+0.8*2+15+0.8*2)*0.2*0.3=4.08
定额(50.5+0.1)*(15+0.25*2+0.1)=789.36
3.14*(5.07+0.125+0.05)2*1/4-7.2*(5.07-1.5+0.125)
*1/2=8.79
789.26+8.29=797.55
3.14*(5.07+0.125)*2*1/4*0.2*0.3*1/2=0.24
426.62+7.46+0.216-4.08-0.24=429.98
m3
429.98
4
基础梁混凝土C30
(49.8-0.7*9)*0.5*0.3*4=26.1
(15-0.6*3)*0.5*0.3*10=19.8
3.14*(5.07+0.125)*2*1/4*0.5*0.3=1.22
(3-0.125-0.15)*(4.5-0.125)*0.1=1.19
LB5{3.14*(5.07-0.125)2*1/4-(7.2-0.3)*(5.07-1.25)*1/2}*0.1=0.688
6.05*2+1.86+0.6+(20.1+5.22+0.73+1.61+0.81+3.08+86.16
次梁
0.25*(0.5+0.1)*(4.5-0.125)=0.66
0.25*(0.5+0.1)*(6-0.125)=0.88
合计
(1.19+1.15+2.23+1.64+0.47+2.39+2.31+2.39+2.31+1.22
+2.35+2.43+2.52+2.27+3.65)*2+(0.66+0.88)*2+1.66
WB4(3.3-0.3)*(6-0.15)*0.1*2=3.52
WB5{3.14*(5.07-0.125)2*1/4-(7.2-0.3)*(5.07-1.25)
*1/2}*0.1=0.6 6.05+6.05+1.85+0.6+(20.1+10.44+3.52+1.61+0.81+3.08)*2=93.67
m3
228.97
15
女儿墙
50.5*0.25*0.48=6.06
(50.5-7.2)*0.25*0.48=5.2
15*0.25*0.48*2=3.6
3.14*(5.07+0.125)*2*1/4*0.25*0.48=0.98
6.06+5.2+3.6+0.98-1.56=14.28
m3
14.28
16
平整场地
1.76+1.3+1.19)*2=86.16
6.05*2+1.86+0.6+(20.1+5.22+0.73+1.61+0.81+3.08+
1.76+1.3+1.19)*2=86.16
二层同首层楼板
86.16
屋面板WB1(7.2-0.3)*(6-0.15)*0.15=6.05
(7.2-0.3)*(6-0.15)*0.15=6.05
(2-3)
0.3*(0.6+0.1)*(3.3-0.7)*3=1.64
0.3*0.6*(3.3-0.7)=0.47
(3-4)
0.3*(0.6+0.15)*(6-0.7)*2=2.39
0.3*(0.6+0.125)*(6-0.7)*2=2.31
(4-5)
0.3*(0.6+0.15)*(6-0.7)*2=2.39
WB2(6-0.3)*(6-0.15)*0.15*4=20.1
(6-0.15)*(6-0.15+0.1)*0.15*2=10.44
WB3(7.2-0.3)*(3-0.3)*0.1=1.86
(3-0.3)*(6-0.15+0.1)*0.1=1.61
(3-0.3)*(3.3-0.3)*0.1=0.81
(3-0.3)*(6-0.3)*0.1*2=3.08
23.21+19.79+4.28+13.86-2.25-7.88-15.75-2.05=33.21
二层外墙250厚陶粒空心砖(50.5-0.7*9)*0.25*(3.6-0.6)=33.15
(50.5-7.2-0.7*8)*0.25*(36-0.6)=28.28
3.14*(5.07+0.125)*2*1/4*0.25*(3.6-0.6)=6.12
+4.83+1.43=72.04
二层同首层梁72.04
(1.19+1.15+2.23+1.64+0.47+2.39+2.31+2.39+2.31+1.22
2.35+2.43+2.52+2.27+3源自文库65)*2+1.66+4.83+1.43=70.5合计72.04+72.04+70.5=214.58
m3
二层内墙(6+6+6-0.7*3)*0.2*(3.6-0.6)*2=19.08
(3.3-0.7)*0.2*(3.6-0.6)=1.56
(7.2-0.7)*0.2*(3.6-0.6)*2=7.8
(6+6-0.6*2)*0.2*(3.6-0.6)*4=25.92
(6+0.1-0.1)*0.2*(3.6-0.5)=3.72
m3
3.6
13
砌筑工程外墙
一层0.9m以下为250厚加气混凝土砌块(50.5-0.7*9)*0.25*(0.9+0.7)=17.68
(50.5-7.2-0.7*8)*0.25*(0.9+0.7)=15.08
3.14*(5.07+0.125)*2*1/4*0.25*(0.8+0.7)=3.26
(15-0.6*3)*0.5*(0.9+0.7)*2=10.56
214.58
8
板混凝土C30
LB1(7.2-0.3)*(6-0.15)*0.15=6.05
(7.2-0.3)*(6-0.15)*0.15=6.05
LB2(6-0.3)*(6-0.15)*0.15*4=20.1
(6-0.15)*(6-0.15+0.1)*0.15=5.22
LB3(7.2-0.3)*(3-0.3)*0.1=1.86
0.3*(0.6+0.125)*(6-0.6)*2=2.35
0.3*(0.6+0.15)*(6-0.6)*2=2.43
B—C
0.3*(0.6+0.1)*(3-0.6)*5=2.52
C—D
0.3*(0.6+0.1)*(6-0.6)*2=2.27
0.3*(0.6+0.15)*(6-0.6)*3=3.65
总计797.55+1595.1=2392.65
m2
2396.25
2
垫层混凝土
(49.8+0.8*2+0.2)*(15+0.8*2+0.2)*0.1=86.69
{(5.07+0.125+0.8+0.1)2*3.14*1/4-7.2*(5.07+0.125)
*1/2}*0.1=1.05
86.69+1.05=87.74
3.14*(5.07+0.125)*2*1/4*0.25*(3.6-0.6-0.9)=4.28
(15-0.6*3)*0.25*(3.6-0.6-0.9)*2=13.86
扣除M14.5*2*0.25=2.25
C11.5*2.1*0.25*10=7.88
C23*2.1*0.25*10=15.75
C33.9*2.1*0.25*1=2.05
合计86.16+86.16+93.67=265.99
m3
265.99
9
楼梯混凝土
间休息平台C251.2*(3.3-0.15+0.05)*0.1*2=7.68
梯梁C25{0.45*0.3*3.3+0.45*0.2*(3.3-0.2)}*4=2.3
踏步C250.15*0.3*1/2*1.5*11*4=0.74
(0.25*0.5+0.03*0.5*2)*38=2.94
0.31+2.95=3.26*0.48=1.56
m3
1.56
7
纵梁混凝土C30
(1-2)
0.3*(0.6+0.15)*(6-0.7)=1.19
0.3*(0.6+0.125)*(6-0.7)=1.15
0.3*(0.6+0.1)*(6-0.7)*2=2.23
17.68+15.08+3.26+10.56=46.58
扣除M14.5*0.9*0.25=1.01
46.58-1.01=45.57
外墙一层0.9m以上为250厚陶粒空心砌块(50.5-0.7*9)*0.25*(3.6-0.6-0.9)=23.21
(50.5-7.2-0.7*8)*0.25*(3.6-0.6-0.9)=19.79