▪The valves in the valve assembly are activated buy the pendulum when the well is deviated from the vertical. Deviation from vertical as low as 0.2ºare enough to activate the valve.
Field Locations 油田位置
• Foothills of Canadian Rockies. • 加拿大丘陵地带的岩石 • Rock properties with high compressive
strength where 2-5 m/hr typical, 高岩石压 缩强度,平均机械钻速2-5m/h • Formation dips of 70°. • 地层倾角70° • 3°/30m natural build rate. • 自然造斜3°/30m • Extremely high vibration area. • 井下震动极高地区 • Cleanout trip always required prior to running casing. 下套管之前必须通井
下部是液压机械设备 The most important parts are:
重要部件包括: ✓ Pendulum 大钟摆总成 ✓ Valve assembly 阀门总成
✓ Pads. 垫片总成
“Confidential - For Internal Use Only. © 2005 Halliburton. All Rights Reserved.”
The two parts are delivered separately to
the rig site and are easily connected before going in the
hole.
两部分分开运输到井场, 下钻时直接连接
The lower section is a hydro-mechanic device.
How it Works 工作原理
VERTICAL DRILLING DEVICE 垂直钻井设备部分
Piston Assembly 活塞总成
U-Joint and
Pendulum Assembly U型接头与大钟摆总成
Valve Assembly 阀门总成
“Confidential - For Internal Use Only. © 2005 Halliburton. All Rights Reserved.”
“Confidential - For Internal Use Only. © 2005 Halliburton. All Rights Reserved.”
What is it? 什么是V-Pilot?
A tool that utilizes gravity to direct porting of hydraulic fluids to the appropriate pad
● Pivot Joint Assembly
● 枢轴总成 ● Kick Pad Assembly
◦ low friction joint

激活垫片总成
◦ 低摩擦系数接头
◦ Four pistons producing
● Val◦vvaerAiamsbaslexeismidibzelefyosrpceenfdroumlum ● 阀门p总ad成sside force
◦ ◦ ◦四侧li个 向gh能 向活 力t 产 力l塞oa生可d最以ac大产tu的生at大变io钟化n 摆的侧
◦ ◦ F轻low载h荷o激le活s t功hr能ough
◦ pvaidsscotouseldimaminpaitnegmtuod enretrdaupcmedenstystem
◦ 垫o片sc流ill道ati孔on减(少‘w泥at浆er的滞 留hammer’ effect)
利用重力作用直接使流体推击相应的垫片
A vertical drilling system that maintains verticality on the fly with minimal intervention.
最小干预的实时调整的一种垂直钻井系统
A simple, elegant solution that avoids electronics.
高钻压快速钻直的一种钻井工具
“Confidential - For Internal Use Only. © 2005 Halliburton. All Rights Reserved.”
V-Pilot Components 组成部件
The V-Pilot has two sections. The upper section is a modified GeoForce Motor. The lower section is the vertical drilling device. V-Pilot 由两部分组成,上部是改良的GeoForce马达,下部是垂直钻井部分
“Confidential - For Internal Use Only. © 2005 Halliburton. All Rights Reserved.”
How it Works 工作原理
Pivot Joint Assembly 枢轴总成
Valve Assembly 阀门总成
Pad Assembly 垫片总成
V-Pilot 垂直钻井系统
1 What is it? 什么是垂直钻井系统 2. How does it works? 工作原理 3 Where has Sperry Drilling Services used it? 应用情况 4 What’s the results? 使用效果 5 What’s the advantages for this new technology? V-Pilot的优势
▪ When one (or two) valve is opened by the pendulum, it allows the hydraulic fluid to actuate one (or two) of the 4 pistons in the opposite side. ▪ 当一个或两个阀门被大钟摆打开之后,水力流体激活反方 向的4个活塞中一个或两个 ▪The pistons maintain pressure against the hole wall forcing the bit (push-the-bit) to drill laterally bringing the well back to vertical. The pistons will stay extended until the well returns to the vertical and the valve(s) are no longer activated and are retracted by springs. ▪ 活塞推击井壁,使钻具回到垂直状态。活塞的位置一直延 伸直到井眼垂直没有侧向力为止
How it Works 工作原理
▪ The GeoForce motor is powered by the drilling fluid and it’s
shaft rotation is transferred to the shaft in the lower section.
▪ GeoForce马达通过泥浆驱动将动力传递到下部的垂直钻 井设备部分 ▪ The shaft rotation powers up the hydraulic pumps. ▪ 马达传动轴驱动垂直钻井设备的液压泵
V-Pilot™ Vertical Drilling System
Location of extending blades for corre来自百度文库tive force
可延伸的勒板,校正力的大小
“Confidential - For Internal Use Only. © 2005 Halliburton. All Rights Reserved.”
“Confidential - For Internal Use Only. © 2005 Halliburton. All Rights Reserved.”
Field Test Result 试用结果
• Successfully drilled 504 m (1,653 ft) in two runs under AFE target time. • 在满足AFE时间的前提下,两趟钻完成了504米 • Maintained low inclination • 保持了较小的井斜 • Completed entire interval with one roller cone bit – field average is 3-4. • 一支牙轮钻头完成整个井段,而该油田平均需要3-4只 • ROP up to 7 m/hr, at the high end of the field average. • 机械钻速7m/h,是该油田的平均之最。 • Tool proved largely insensitive to WOB – up to 20 tons used. • 最大钻压达到20吨 • Eliminated reaming and back-reaming due to outstanding hole quality • 井眼质量光滑,减少了短起下钻时间和倒划眼时间
简单而严密的无电子元件的解决方案
Designed to increase reliability and temperature capability in harsh drilling conditions
恶劣钻井环境下改善工具的可靠性和抗温能力
A tool that enables fast drilling with high WOB whilst maintaining verticality
“Confidential - For Internal Use Only. © 2005 Halliburton. All Rights Reserved.”
Field Test Result 试用结果
Oman Petroleum Development 阿曼石油公司 12-1/4” Hole Section (637-1659m) 12-/4”井眼 • Max inclinations 0.7 deg 最大井斜0.7度 • Average 0.30 deg 平均井斜0.3度 • Well had 1.93 deg inclination @637m 当时井斜1.93度 • Inclination down to 0.09 deg @ 747m. 井斜0.09度 • V-Pilot Gen III run with 8“ 5/6 5.2 stages GeoForce V-Pilot第三
V-Pilot™
Vertical Drilling System
垂直钻井系统
Sperry Drilling Services September 2008
Jiu Sijun 酒思君
China DD Technical Advisor
“Confidential - For Internal Use Only. © 2005 Halliburton. All Rights Reserved.”
▪ 当产生井斜时,大钟摆系统激活阀门总成的阀门,产生侧 向力,使钻具重新回到垂直状态。最小井斜0.2º时可以激活 阀门。
“Confidential - For Internal Use Only. © 2005 Halliburton. All Rights Reserved.”
How it Works 工作原理
相关文档