FIDIC 条款中英文对照全文
FIDIC红皮书__(中英文对照)
1.1 测量方法12.2 Method of Measurement除非合同中另有规定,无论当地惯例如何:Except as otherwise stated in the Contract and notwithstanding local practice:(a) 测量应该是测量每部分永久工程的实际净值,以及(a) measurement shall be made of the net actual quantity of each item of the Permanent Works, and(b) 测量方法应符合工程量表或其他适用报表。
(b) the method of measurement shall be in accordance with the Bill of Quantities or other applicable Schedules.1.2 估价12.3 Evaluation除非合同中另有规定,工程师应通过对每一项工作的估价,根据第3.5款【决定】,商定或决定合同价格。
每项工作的估价是用依据上述第12.1款和第12.2款商定或决定的测量数据乘以此项工作的相应价格费率或价格得到的。
Except as otherwise stated in the Contract, the Engineer shall proceed in accordance with Sub-Clause 3.5 [Determinations] to agree or determine the Contract Price by evaluating each item of work, applying the measurement agreed or determined in accordance with the above Sub-Clauses 12.1 and 12.2 and the appropriate rate or price for the item.对每一项工作,该项合适的费率或价格应该是合同中对此项工作规定的费率或价格,或者如果没有该项,则为对其类似工作所规定的费率或价格。
FIDIC红皮书1999(中英文对照)
FIDIC红皮书1999(中英文对照)Fédération Internationale Des Ingénieurs-Conseils通用条件General Conditions1.一般规定General Provisions1.1 定义Definitions在包括专用条件和本通用条件的合同条件(“本合同条件”)中,以下措辞和用语的含义如下所述。
除非上下文中另有要求,指当事人和当事各方的词包括公司和其它法律实体。
In the Conditions of Contract ("these Conditions"), which include Particular Conditions and these General Conditions, the following words and expressions shall have the meanings stated. Words indicating persons or parties include corporations and other legal entities, except where the context requires otherwise.1.1.1 合同1.1.1 The Contract1.1.1.1“合同(Contract)”指合同协议书、中标函、投标函、本合同条件、规范、图纸、资料表、以及在合同协议书或中标函中列明的其它进一步的文件(如有时)。
1.1.1.1 "Contract" means the Contract Agreement, the Letter of Acceptance, the Letter of Tender, these Conditions, the Specification, the Drawings, the Schedules, and the further documents (if any) which are listed in the Contract Agreement or in the Letter of Acceptance.1.1.1.2“合同协议书(Contract Agreement)”指第1.6款【合同协议】中所说明的合同协议(如有时)。
最新菲迪克(FIDIC)简明合同格式-中英对照版
菲迪克(F I D I C)简明合同格式-中英对照版菲迪克(FIDIC)文献译丛中英文对照本国际咨询工程师联合会编译中国工程咨询协会1999年第1版Agreement协议书General Conditions通用条件Rules for Adjudication裁决规则Notes for Guidance指南注释Short Form of Contract简明合同格式吕文学陈永强翻译唐萍校译王川徐礼章唐萍审订(1999年第1版)(中英文对照本)(译者对译文的准确度承担全部责任,正式使用发生的争端,以英文原版为准)机械工业出版社菲迪克(FIDIC)授权书I herewith authorize CNAEC to translate FIDIC’s publications (but not the publications as edited by other organizations) into Chinese and publish them.I agree with your statement, as part of the agreement, that you will:a)Provide FIDIC with 10 copies of the translation per document, andb)Make a statement on the inside cover of the translation that the translator takes full responsibility for theaccuracy of the translation and that in case of dispute, the original version in English shall prevail.Peter van der TOGTPublications manager [译文]在此,我授权中国工程咨询协会把FIDIC出版物译成中文并出版(但是,不包括其他组织编写的出版物)。
FIDIC条款中英文对照全文
FOREWORD前言 (补充译文)The terms of the Fourth Edition of the Conditions of Contract for Works of Civil Engineering Construction have been prepared by the Fédération Internationale des Ingénieurs Conseils (FIDIC) and are recommended for general use for the purpose of construction of such works where tenders are invited on an intemational basis. The Conditions, subject to minor modifications, are also suitable for use on domestic contracts.土木工程施工合同条件的第四版已由国际咨询工程师联合会(以下简称为FIDIC)起草完成,并被推荐为以国际性招标为主的同类工程施工的通用条件,如果稍加修改,也适用于国内的招标合同。
The version in English of the Conditions is considered by FIDIC as the official and authentic text for the purpose of translation.本条件的英文版本, FIDIC已将其作为正式的和有效的语言文本,以用于翻译之目的。
In the preparation of the Conditions it was recognised that while there are numerous Clauses which will be generally applicable there are some Clauses which must necessarily vary to take account of the circumstances and locality of the Works. The Clauses of general application have been grouped together in this document and are referred to as Part I - General Conditions. They have been printed in a form which will facilitate their inclusion as printed in the contract documents normally prepared.在对本条件准备的过程中,发现多数条款是可以通用的,同时还考虑到工程所处的不同环境和地区须对某些条款加以必要的改动。
菲迪克(FIDIC)简明合同格式-中英对照版
菲迪克(FIDIC)文献译丛中英文对照本国际咨询工程师联合会编译中国工程咨询协会1999年第1版Agreement协议书General Conditions通用条件Rules for Adjudication裁决规则Notes for Guidance指南注释Short Form of Contract简明合同格式吕文学陈永强翻译唐萍校译王川徐礼章唐萍审订(1999年第1版)(中英文对照本)(译者对译文的准确度承担全部责任,正式使用发生的争端,以英文原版为准)机械工业出版社菲迪克(FIDIC)授权书I herewith authorize CNAEC to translate FIDIC’s publications (but not the publications as edited by other organizations) into Chinese and publish them.I agree with your statement, as part of the agreement, that you will:a)Provide FIDIC with 10 copies of the translation per document, andb)Make a statement on the inside cover of the translation that the translator takes fullresponsibility for the accuracy of the translation and that in case of dispute, the original version in English shall prevail.Peter van der TOGTPublications manager[译文]在此,我授权中国工程咨询协会把FIDIC出版物译成中文并出版(但是,不包括其他组织编写的出版物)。
fidic合同中英文对照版_secret
CONTENTS目录1 General Provisions 一般规定 (9)1.1 Definitions 定义 (9)1.2 Interpretation 解释 (21)1.3 Communications 通信交流 (22)1.4 Law and Language 法律和语言 (24)1.5 Priority of Document 文件优先次序 (24)1.6 Contract Agreement 合同协议书 (25)1.7 Assignment 权益转让 (26)1.8 Care and Supply of Document 文件的照管和提供 (26)1.9 Confidentiality 保密性 (27)1.10 Employer’s Use of Contractor’s Documents雇主使用承包商文件 (28)1.11 Contractor’s Use of Employer’s Documents承包商使用雇主文件 (30)1.12 Confidential Details 保密事项 (30)1.13 Compliance with Laws 遵守法律 (31)1.14 Joint and Several Liability 共同的和各自的责任 (32)2 The Employer 雇主 (33)2.1 Right of Access to the Site 现场进入权 (33)2.2 Permits, Licences or Approves 许可、执照或批准 (35)2.3 Employer’s personnel雇主人员 (36)2.4 Employer’s Financial Arrangements雇主的资金安排 (37)2.5 Employer’s Claims雇主的索赔 (37)3 The Employer’s Administration雇主的管理 (39)3.1 The Employer’s Representative雇主代表 (39)3.2 The Employer’s personnel其他雇主人员 (40)3.3 Delegated Persons 受托人员 (41)3.4 Instructions 指示 (43)3.5 Determinations 确定 (43)4 The Contractor 承包商 (44)4.1 The Contractor’s General Obligations承包商的一般义务 (45)4.2 Performance security 履约担保 (46)4.3 Contractor’s Representative承包商代表 (49)4.4 Subcontractors 分包商 (51)4.5 Nominated Subcontractors 指定的分包商 (52)4.6 Co-operation 合作 (52)4.7 Setting out 放线 (54)4.8 Safety procedures 安全程序 (55)4.9 Quality Assurance 质量保证 (56)4.10 Site Data 现场数据 (57)4.11 Sufficiency of the Contract Price 合同价格 (57)4.12 Unforeseeable Difficulties 不可预见的困难 (58)4.13 Rights of way and Facilities 道路通行权于设施 (59)4.14 Avoidance of Interference 避免干扰 (59)4.15 Access Route 进场通路 (60)4.16 Transport of Goods 货物运输 (62)4.17 Contractor’s Equipment承包商设备 (63)4.18 Protection of the Environment 环境保护 (63)4.19 Electricity, Water and Gas 电、水和燃气 (64)4.20 Employer’s Equipment and Free-Issue Material 雇主设备和免费供应的材料 (65)4.21 Progress Reports 进度报告 (67)4.22 Security of the Site 现场保安 (69)4.23 Contractor’s Operations on Site承包商的现场作业 (70)4.24 Fossils 化石 (71)5 Design 设计 (73)5.1 General Design Obligations 设计义务一般要求 (73)5.2 Contractor’s Documents承包商文件 (75)5.3 Contractor’s Undertaking承包商的承诺 (78)5.4 Technical Standards and Regulations 技术标准和法规 (78)5.5 Training 培训 (80)5.6 As-Built Documents 竣工文件 (80)5.7 Operation and Maintenance Manuals 操作和维修手册 (82)5.8 Design Error 设计错误 (82)6 Staff and Labour 员工 (83)6.1 Engagement of Staff and Labour 员工的雇用 (83)6.2 Rates of Wages and Conditions of Labour 工资标准和劳动条件 (83)6.3 Persons in the Service of Employer 为雇主服务的人员 (84)6.4 Labour Laws 劳动法 (84)6.5 Working Hours 工作时间 (85)6.6 Facilities for Staff and Labour 为员工提供设施 (85)6.7 Health and Safety 健康和安全 (86)6.8 Contractor’s Superintendence承包商的监督 (87)6.9 Contract or’s Personnel承包商人员 (88)6.10 Records of contractor’s Personnel and Equipment承包商人员和设备的记录 (89)6.11 Disorderly Conduct 无序行为 (90)7 Plant, Materials and Workmanship 生产设备、材料和工艺 (90)7.1 Manner of Execution 实施方法 (90)7.2 Samples 样品 (91)7.3 Inspection 检验 (92)7.4 Testing 试验 (93)7.5 Rejection 拒收 (96)7.6 Remedial Work 修补工作 (97)7.7 Ownership of Plant and Materials 生产设备和材料的所有权 (98)7.8 Royalties 土地(矿区)使用费 (99)8 Commencement,Delays and Suspension 开工、延误和暂停 (99)8.1 Commencement of Works 工程的开工 (99)8.2 Time for Completion 竣工时间 (100)8.3 Programme 进度计划 (101)8.4 Extension of Time for Completion 竣工时间延长 (103)8.5 Delays Caused by Authorities 当局造成的延误 (105)8.6 Rate of Progress 工程进度 (106)8.7 Delay Damages 误期损害赔偿费 (107)8.8 Suspension of Work 暂时停工 (108)8.9 Consequences of Suspension 暂停的后果 (109)8.10 Payment for Plant and Materials in Event of Suspension 暂停时对生产设备和材料的付款 (110)8.11 Prolonged Suspension 托长的暂停 (111)8.12 Resumption of Work 复工 (111)9 Tests on Completion 竣工试验 (112)9.1 Contractor’s Obligations承包商的义务 (112)9.2 Delayed Tests 延误的试验 (115)9.3 Retesting 重新试验 (116)9.4 Failure to Pass Tests on Completion 未能通过竣工试验 (116)10 Employer’s Taking Over雇主的接收 (118)10.1 Taking Over of the Works and Sections 工程和分项工程的接收.. 11810.2 Taking Over of Parts of the Works 部分工程的接收 (120)10.3 Interference with Tests on Completion 对竣工试验的干扰 (120)11 Defects Liability 缺陷责任 (121)11.1 Completion of Outstanding Work and Remedying Defects 完成扫尾工作和修补缺陷 (121)11.2 Cost of Remedying Defects 修补缺陷的费用 (122)11.3 Extension of Defects Notification Period 缺陷通知期的延长 (124)11.4 Failure to Remedy Defects 未能修补的缺陷 (125)11.5 Removal of Defective Work 移出有缺陷的工程 (126)11.6 Further Tests 进一步试验 (127)11.7 Right of Access 进入权 (128)11.8 Contractor to Search 承包商调查 (128)11.9 Performance Certificate 履约证书 (129)11.10 Unfulfilled Obligations 未履行的义务 (130)11.11 Clearance of Site 现场清理 (130)12 Tests after Completion 竣工后试验 (131)12.1 Procedure for Tests after Completion 竣工后试验的程序 (131)12.2 Delayed Tests 延误的试验 (133)12.3 Retesting 重新试验 (134)12.4 Failure to Pass Tests after Completion 未能通过的竣工后试验 (135)13 Variations and Adjustments 变更和调整 (137)13.1 Right to Vary 变更权 (137)13.2 Value Engineering 价值工程 (138)13.3 Variation Procedure 变更程序 (139)13.4 Payment in Applicable Currencies 以适用货币支付 (140)13.5 Provisional Sums 暂列金额 (141)13.6 Daywork 计日工作 (143)13.7 Adjustments for Changes in Legislation 因法律改变的调整 (144)13.8 Adjustments for Changes in Cost 因成本改变的调整 (146)14 Contract price and Payment 合同价格和支付 (146)14.1 The Contract Price 合同价格 (146)14.2 Advance payment 预付款 (147)14.3 Application for Interim Payments 期中付款的申请 (150)14.4 Schedule of Payments 付款价格表 (152)14.5 Plant and Materials intended for the Works 拟用于工程的生产设备和材料 (153)14.6 Interim Payments 期中付款 (154)14.7 Timing of Payments 付款的时间安排 (156)14.8 Delayed Payment 延误的付款 (157)14.9 Payment of Retention Money 保留金支付 (158)14.10 Statement at Completion 施工报表 (159)14.11 Application for Final Payment 最终付款的申请 (160)14.12 Discharge 结清证明 (162)14.13 Final Payment 最终付款 (163)14.14 Cessation of Employer’s Liability雇主责任的中止 (163)14.15 Currencies of Payment 支付的货币 (164)15 Termination by Employer 由雇主终止 (166)15.1 Notice to Correct 通知改正 (166)15.2 Termination by Employer 由雇主终止 (167)15.3 Valuation at Date of Termination 终止日期时的估价 (171)15.4 Payment after Termination 终止后的付款 (171)15.5 Employer’s Entitlement to Termination雇主终止的权利 (172)16 Suspension and termination by Contractor由承包商暂停和终止 (173)16.1 Contractor’s Entitlement to Suspend Work承包商暂停工作的权利 (173)16.2 Termination by Contractor 由承包商终止 (175)16.3 Cessation of Work and Removal of Contractor’s Equipment停止工作和承包商设备的撤离 (177)16.4 Payment on Termination 终止时的付款 (178)17 Risk and Responsibility 风险和职责 (179)17.1 Indemnities 保障 (179)17.2 Contractor’s Care of the Works承包商对工程的照管 (181)17.3 Employer’s Risks雇主的风险 (183)17.4 Consequence of Employer’s Risks雇主风险的后果 (184)17.5 Intellectual and Industrial Property Rights 知识产权和工业产权 18517.6 Limitation of Liability 责任限度 (187)18 Insurance 保险 (189)18.1 General Requirements for Insurances 有关保险的一般要求 (189)18.2 Insurance for Works and Contractor’s Equipment工程和承包商设备的保险 (193)18.3 Insurance against Injury to Persons and Damage to Property 人身伤害和财产损害险 (197)18.4 Insurance for Contractor’s Personnel承包商人员的保险 (199)19 Force Majeure 不可抗力 (200)19.1 Definition of Force Majeure 不可抗力的定义 (201)19.2 Notice of Force Majeure 不可抗力的通知 (203)19.3 Duty to Minimise Delay 将延误减至最小的义务 (204)19.4 Consequences of Force Majeure 不可抗力的后果 (204)19.5 Force Majeure Affecting Subcontractor 不可抗力影响分包商 (205)19.6 Optional Termination, Payment and Release 自主选择终止、支付和解除 (206)19.7 Release from Performance under the Law 根据法律解除履约 (208)20 Claims, Disputes and Arbitration 索赔、争端和仲裁 (209)20.1 Contra ctor’s Claims承包商的索赔 (209)20.2 Appointment of the Dispute Adjudication Board 争端裁决委员会的任命 (213)20.3 Failure to Agreement Dispute Adjudication Board 对争端裁决委员会未能取得一致时 (216)20.4 Obtaining Dispute Adjudication Board’s Decision取得争端裁决委员会的决定 (217)20.5 Amicable Settlement 友好解决 (221)20.6 Arbitration 仲裁 (221)20.7 Failure to Comply with Dispute Adjudication Board’s Decision未能遵守争端裁决委员会的决定 (223)20.8 Expiry of Dispute Adjudication Board’s Appointment争端裁决委员会任命期满 (224)1 General Provisions一般规定1.1 Definitions定义In the Conditions of Contract (“these Conditions”), which include Particular Conditions and these General Conditions, the following words and expressions shall have the meaning stated. Words indicating persons or parties include corporation and other legal entities, except where the context requires otherwise.在合同条件(“本条件”),包括专用条件和通用条件中,下列词语和措辞应具有以下所述的含义.除上下文另有要求外,文中人员或当事各方等词语包括公司和其他合法实体.1.1.1 The Contract合同1.1.1.1“Contract”means the Contract Agreement, these Conditions, the Employer’s Requirement, the Tender, and further document (if any) which are listed in the Contract Agreement.“合同”系指合同协议书、本条件、雇主要求、投标书和合同协议书列出的其他文件(如果有).1.1.1.2 “Contract Agreement”means the contract agreement referred to in Sub-Clause 1.6 [Contract Agreement], including any annexed memoranda.“合同协议书”系指第1.6款[合同协议书]中所述的合同协议书及所附各项备忘录.1.1.1.3“Employer’s requirements”means the document entitled employer’s requirements, as included in the Contract, and any additions and modifications to such document in accordance with the Contract. Such document specifies the purpose, scope, and/or design and/or other technical criteria, for the Works.“雇主要求”系指合同中包括的,题为雇主要求的文件,其中列明工程的目标、范围、和(或)设计和(或)其他技术标准,以及按合同对此项文件所作的任何补充和修改.1.1.1.4 “Tender”means the Contractor’s signed offer for the Works and all other documents which the Contractor submitted therewith (other than these Conditions and Employer’s Requirements, if so submitted), as included in the Contract.“投标书”系指包含在合同中的由承包商提交的为完成工程签署的报价,以及随同提交的所有其他文件(本条件和雇主要求除外,如同时提交).1.1.1.5“Performance Guarantees”and “Schedule ofpayments” mean the documents so named (if any), as included in the Contract.“履约保证”和“付款计划表”系指合同中包括的具有上述名称的文件(如果有).1.1.2 Parties and Persons各方和人员1.1.2.1 “Party” means the Employer or the Contractor, as thecontext requires.“当事方(或一方)”根据上下文需要,或指雇主,或指承包商。
FIDIC黄皮书(中英文对照)-6982
FIDIC黄皮书(中英文对照)-6982
Introduction
本文档旨在为读者提供FIDIC黄皮书的中英文对照内容。
黄皮书是国际建筑工程合同中的经典文本之一,涉及工程合同的基本原则和条款。
主要章节
- 第一章:引言
- 第二章:定义和解释
- 第三章:工程合同的建立
- 第四章:承包商的义务
- 第五章:工程师的角色和职责
- 第六章:工期和延期
- 第七章:质量控制和验收
- 第八章:支付条款和索赔
- 第九章:风险分担和责任豁免
- 第十章:争议解决
重要条款概述
以下是黄皮书中的一些重要条款概述:
1. 工程合同的签订必须符合双方的意愿,并且应具备法律效力。
2. 承包商有责任根据合同要求完成工程,并保证工程的质量。
3. 工程师在工程合同中扮演重要角色,负责监督和管理工程的
进行。
4. 工期是工程合同中的重要约定之一,承包商应按时完成工程,如有延期,可能会面临违约和罚款。
5. 质量控制和验收流程的执行对确保工程质量至关重要。
6. 支付条款应明确规定,承包商可以根据工程进展与质量要求
获得相应的款项。
7. 当发生争议时,应采取争议解决机制来解决争议,例如谈判、调解或仲裁。
结论
黄皮书作为国际建筑工程合同的重要参考文本,对于承包商和
工程师有着重要的指导作用。
在签订工程合同时,双方应仔细阅读
并遵守黄皮书中的条款和规定,以确保合同的有效执行和工程的顺
利进行。
FIDIC中英文对照(合同目录)
3.1 The Employer’s Representative 雇主代表 3.2 The Employer’s personnel 其他雇主人员 3.3 Delegated Persons 受托人员 3.4 Instructions 指示 3.5 Determinations 确定
为员工提供设施 6.7 Health and Safety 健康和安全 6.8 Contractor’s Superintendence 承包商的监督 6.9 Contractor’s Personnel 承包商人员 6.10 Records of contractor’s Personnel and Equipment 承包商人员和设备的记录 6.11 Disorderly Conduct 无序行为
1.13 Compliance with Laws 遵守法律 1.14 Joint and Several Liability 共同的和各自的责任
2 The Employer
2.1 Right of Access to the Site 现场进入权 2.2 Permits, Licences or Approves 许可、执照或批准 2.3 Employer’s personnel 雇主人员 2.4 Employer’s Financial Arrangements 雇主的资金安排 2.5 Employer’s Claims 雇主的索赔
13 Variations and Adjustments
13.1 Right to Vary 变更权 13.2 Value Engineering 价值工程 13.3 Variation Procedure 变更程序 13.4 Payment in Applicable Currencies 以适用货币支付 13.5 Provisional Sums 暂列金额 13.6 Daywork 计日工作 13.7 Adjustments for Changes in Legislation 因法律改变的调整 13.8 Adjustments for Changes in Cost 因成本改变的调整
FIDIC合同条款1999(中英文对照)
FIDIC合同条款1999(中英文对照)Fédération Internationale Des Ingénieurs-Conseils通用条件General Conditions1.一般规定1.1 定义在包括专用条件和本通用条件的合同条件(“本合同条件”)中,以下措辞和用语的含义如下所述。
除非上下文中另有要求,指当事人和当事各方的词包括公司和其它法律实体。
1.1.1 合同1.1.1.1“合同(Contract)”指合同协议书、中标函、投标函、本合同条件、规范、图纸、资料表、以及在合同协议书或中标函中列明的其它进一步的文件(如有时)。
1.1.1.2“合同协议书(Contract Agreement)”指第1.6款【合同协议】中所说明的合同协议(如有时)。
1.1.1.3“中标函(Letter of Acceptance)”指雇主对投标文件签署的正式接受函,包括其后所附的备忘录(由合同各方达成并签定的协议构成)。
在没有此中标函的情况下,“中标函”一词就指合同协议书,颁发或接收中标函的日期就指双方签订合同协议书的日期。
1.1.1.4“投标函(Letter of Tender)”指名称为投标函的文件,由承包商填写,包括已签字的对雇主的工程报价。
1.1.1.5“规范(Specification)”指合同中名称为规范的文件,及根据合同规定对规范的增加和修改。
此文件具体描述了工程。
1.1.1.6“图纸(Drawings)”指合同中规定的工程图纸,及由雇主(或代表)根据合同颁发的对图纸的增加和修改。
1.1.1.7“资料表(Schedules)”指合同中名称为资料表的文件,由承包商填写并随投标函提交。
此文件可能包括工程量表、数据、列表、及费率和/或单价表。
1.1.1.8“投标文件(Tender)”指投标函和合同中规定的承包商应随投标函提交的其它所有文件。
1.1.1.9“投标函附录(Appendix to Tender)”指名称为投标函附录并已填写完毕的文件,附于投标函之后并构成投标函的一部分。
FIDIC(合同条款)中英文对照(word版)国际咨询工程师联合会制
CONTENTS目录1General Provisions一般规定 (1)1.1Definitions定义 (1)1.2Interpretation解释 (7)1.3Communications通信交流 (7)1.4Law and Language法律和语言 (8)1.5Priority of Document文件优先次序 (8)1.6Contract Agreement合同协议书 (9)1.7Assignment权益转让 (9)1.8Care and Supply of Document文件的照管和提供 (9)1.9Confidentiality保密性 (10)1.10Employ er’s Use of Contractor’s Documents雇主使用承包商文件 (10)1.11Contractor’s Use of Employer’s Documents承包商使用雇主文件 (11)1.12Confidential Details保密事项 (11)1.13Compliance with Laws遵守法律 (11)1.14Joint and Several Liability共同的和各自的责任 (12)2The Employer雇主 (12)2.1Right of Access to the Site现场进入权 (13)2.2Permits, Licences or Approves许可、执照或批准 (14)2.3Employer’s personnel雇主人员 (14)2.4Employer’s Financial Arrangements雇主的资金安排 (15)2.5Employer’s Claims雇主的索赔 (15)3The Employer’s Administration雇主的管理 (16)3.1The Employer’s Representative雇主代表 (16)3.2The Employer’s personnel其他雇主人员 (16)3.3Delegated Persons受托人员 (17)3.4Instructions指示 (17)3.5Determinations确定 (18)4The Contractor承包商 (18)4.1The Contractor’s General Obligations承包商的一般义务 (18)4.2Performance security履约担保 (19)4.3Contractor’s Representative承包商代表 (20)4.4Subcontractors分包商 (21)4.5Nominated Subcontractors指定的分包商 (22)4.6Co-operation合作 (22)4.7Setting out放线 (23)4.8Safety procedures安全程序 (23)4.9Quality Assurance质量保证 (24)4.10Site Data现场数据 (24)4.11Sufficiency of the Contract Price合同价格 (25)4.12Unforeseeable Difficulties不可预见的困难 (25)4.13Rights of way and Facilities道路通行权于设施 (26)4.14Avoidance of Interference避免干扰 (26)4.15Access Route进场通路 (26)4.16Transport of Goods货物运输 (27)4.17Contractor’s Equipment承包商设备 (28)4.18Protection of the Environment环境保护 (28)4.19Electricity, Water and Gas电、水和燃气 (28)4.20Employer’s Equipment and Free-Issue Material雇主设备和免费供应的材料 (29)4.21Progress Reports进度报告 (30)4.22Security of the Site现场保安 (31)4.23Contractor’s Operations on Site承包商的现场作业 (31)4.24Fossils化石 (32)5Design设计 (33)5.1General Design Obligations设计义务一般要求 (33)5.2Contractor’s Documents承包商文件 (34)5.3Contractor’s Undertaking承包商的承诺 (35)5.4Technical Standards and Regulations技术标准和法规 (35)5.5Training培训 (36)5.6As-Built Documents竣工文件 (36)5.7Operation and Maintenance Manuals操作和维修手册 (37)5.8Design Error设计错误 (37)6Staff and Labour员工 (38)6.1Engagement of Staff and Labour员工的雇用 (38)6.2Rates of Wages and Conditions of Labour工资标准和劳动条件 (38)6.3Persons in the Service of Employer为雇主服务的人员 (38)6.4Labour Laws劳动法 (38)6.5Working Hours工作时间 (39)6.6Facilities for Staff and Labour为员工提供设施 (39)6.7Health and Safety健康和安全 (39)6.8Contractor’s Superintendence承包商的监督 (40)6.9Contractor’s Personnel承包商人员 (40)6.10Records of contractor’s Personnel and Equipment承包商人员和设备的记录 (41)6.11Disorderly Conduct无序行为 (41)7Plant, Materials and Workmanship生产设备、材料和工艺 (42)7.1Manner of Execution实施方法 (42)7.2Samples样品 (42)7.3Inspection检验 (42)7.4Testing试验 (43)7.5Rejection拒收 (44)7.6Remedial Work修补工作 (45)7.7Ownership of Plant and Materials生产设备和材料的所有权 (45)7.8Royalties土地(矿区)使用费 (46)8Commencement,Delays and Suspension开工、延误和暂停 (46)8.1Commencement of Works工程的开工 (46)8.2Time for Completion竣工时间 (47)8.3Programme进度计划 (47)8.4Extension of Time for Completion竣工时间延长 (48)8.5Delays Caused by Authorities当局造成的延误 (49)8.6Rate of Progress工程进度 (49)8.7Delay Damages误期损害赔偿费 (50)8.8Suspension of Work暂时停工 (50)8.9Consequences of Suspension暂停的后果 (51)8.10Payment for Plant and Materials in Event of Suspension暂停时对生产设备和材料的付款 (51)8.11Prolonged Suspension托长的暂停 (52)8.12Resumption of Work复工 (52)9Tests on Completion竣工试验 (52)9.1Contractor’s Obligations承包商的义务 (52)9.2Delayed Tests延误的试验 (54)9.3Retesting重新试验 (54)9.4Failure to Pass Tests on Completion未能通过竣工试验 (54)10Employer’s Taking Over雇主的接收 (55)10.1Taking Over of the Works and Sections工程和分项工程的接收 (55)10.2Taking Over of Parts of the Works部分工程的接收 (56)10.3Interference with Tests on Completion对竣工试验的干扰 (56)11Defects Liability缺陷责任 (57)11.1Completion of Outstanding Work and Remedying Defects完成扫尾工作和修补缺陷 (57)11.2Cost of Remedying Defects修补缺陷的费用 (58)11.3Extension of Defects Notification Period缺陷通知期的延长 (58)11.4Failure to Remedy Defects未能修补的缺陷 (59)11.5Removal of Defective Work移出有缺陷的工程 (60)11.6Further Tests进一步试验 (60)11.7Right of Access进入权 (60)11.8Contractor to Search承包商调查 (60)11.9Performance Certificate履约证书 (61)11.10Unfulfilled Obligations未履行的义务 (61)11.11Clearance of Site现场清理 (62)12Tests after Completion竣工后试验 (62)12.1Procedure for Tests after Completion竣工后试验的程序 (62)12.2Delayed Tests延误的试验 (63)12.3Retesting重新试验 (64)12.4Failure to Pass Tests after Completion未能通过的竣工后试验 (64)13Variations and Adjustments变更和调整 (65)13.1Right to V ary变更权 (65)13.2V alue Engineering价值工程 (66)13.3V ariation Procedure变更程序 (66)13.4Payment in Applicable Currencies以适用货币支付 (67)13.5Provisional Sums暂列金额 (67)13.6Daywork计日工作 (68)13.7Adjustments for Changes in Legislation因法律改变的调整 (69)13.8Adjustments for Changes in Cost因成本改变的调整 (69)14Contract price and Payment合同价格和支付 (70)14.1The Contract Price合同价格 (70)14.2Advance payment预付款 (70)14.3Application for Interim Payments期中付款的申请 (71)14.4Schedule of Payments付款价格表 (72)14.5Plant and Materials intended for the Works拟用于工程的生产设备和材料 (73)14.6Interim Payments期中付款 (74)14.7Timing of Payments付款的时间安排 (74)14.8Delayed Payment延误的付款 (75)14.9Payment of Retention Money保留金支付 (75)14.10Statement at Completion施工报表 (76)14.11Application for Final Payment最终付款的申请 (77)14.12Discharge结清证明 (77)14.13Final Payment最终付款 (78)14.14Cessation of Employer’s Liability雇主责任的中止 (78)14.15Currencies of Payment支付的货币 (78)15Termination by Employer由雇主终止 (79)15.1Notice to Correct通知改正 (80)15.2Termination by Employer由雇主终止 (80)15.3V aluation at Date of Termination终止日期时的估价 (82)15.4Payment after Termination终止后的付款 (82)15.5Employer’s Entitlement to Termination雇主终止的权利 (82)16Suspension and ter mination by Contracto r由承包商暂停和终止 (83)16.1Contractor’s Entitlement to Suspend Work承包商暂停工作的权利 (83)16.2Termination by Contractor由承包商终止 (84)16.3Cessation of Work and Removal of Contractor’s Equipment停止工作和承包商设备的撤离 (85)16.4Payment on Termination终止时的付款 (85)17Risk and Responsibility风险和职责 (86)17.1Indemnities保障 (86)17.2Contractor’s Care of the Works承包商对工程的照管 (87)17.3Employer’s Risks雇主的风险 (88)17.4Consequence of Employer’s Risks雇主风险的后果 (88)17.5Intellectual and Industrial Property Rights知识产权和工业产权 (89)17.6Limitation of Liability责任限度 (90)18Insurance保险 (91)18.1General Requirements for Insurances有关保险的一般要求 (91)18.2Insurance for Works and Contractor’s Equipmen t工程和承包商设备的保险 (93)18.3Insurance against Injury to Persons and Damage to Property人身伤害和财产损害险 (95)18.4Insurance for Contractor’s Personnel承包商人员的保险 (96)19Force Majeure不可抗力 (96)19.1Definition of Force Majeure不可抗力的定义 (96)19.2Notice of Force Majeure不可抗力的通知 (97)19.3Duty to Minimise Delay将延误减至最小的义务 (98)19.4Consequences of Force Majeure不可抗力的后果 (98)19.5Force Majeure Affecting Subcontractor不可抗力影响分包商 (99)19.6Optional Termination, Payment and Release自主选择终止、支付和解除 (99)19.7Release from Performance under the Law根据法律解除履约 (100)20Claims, Disputes and Arbitration索赔、争端和仲裁 (100)20.1Contractor’s Claims承包商的索赔 (100)20.2Appointment of the Dispute Adjudication Board争端裁决委员会的任命 (102)20.3Failure to Agreement Dispute Adjudication Board对争端裁决委员会未能取得一致时 (104)20.4Obtaining Dispute Adjudication Board’s Decision取得争端裁决委员会的决定 (104)20.5Amicable Settlement友好解决 (106)20.6Arbitration仲裁 (106)20.7Failure to Comply with Dispute Adjudication Board’s Decision未能遵守争端裁决委员会的决定 (107)20.8Expiry of Dispute Adjudication Board’s Appointment争端裁决委员会任命期满 (107)1General Provisions一般规定1.1Definitions定义In the Conditions of Contract (“these Conditions”), which include Particular Conditions and these General Conditions, the following words and expressions shall have the meaning stated. Words indicating persons or parties include corporation and other legal entities, except where the context requires otherwise.在合同条件(“本条件”),包括专用条件和通用条件中,下列词语和措辞应具有以下所述的含义.除上下文另有要求外,文中人员或当事各方等词语包括公司和其他合法实体.1.1.1The Contract合同1.1.1.1“Contract”means the Contract Agreement, these Conditions, theEmployer’s Requirement, the Tender, and further document (if any) which are listed in the Contract Agreement.“合同”系指合同协议书、本条件、雇主要求、投标书和合同协议书列出的其他文件(如果有).1.1.1.2“Contract Agreement”means the contract agreement referred to inSub-Clause 1.6 [Contract Agreement], including any annexed memoranda.“合同协议书”系指第1.6款[合同协议书]中所述的合同协议书及所附各项备忘录.1.1.1.3“Employer’s requirements”means the document entitled employer’srequirements, as included in the Contract, and any additions and modifications to such document in accordance with the Contract. Such document specifies the purpose, scope, and/or design and/or other technical criteria, for the Works.“雇主要求”系指合同中包括的,题为雇主要求的文件,其中列明工程的目标、范围、和(或)设计和(或)其他技术标准,以及按合同对此项文件所作的任何补充和修改.1.1.1.4“T ender”means the Contractor’s signed offer for the Works and all otherdocuments which the Contractor submitted therewith (other than these Conditions and Employer’s Requirements, if so submitted), as included in the Contract.“投标书”系指包含在合同中的由承包商提交的为完成工程签署的报价,以及随同提交的所有其他文件(本条件和雇主要求除外,如同时提交).1.1.1.5“Performance Guarantees”and “Schedule of payments”mean thedocuments so named (if any), as included in the Contract.“履约保证”和“付款计划表”系指合同中包括的具有上述名称的文件(如果有).1.1.2Parties and Persons各方和人员1.1.2.1“Party” means the Employer or the Contractor, as the context requires.“当事方(或一方)”根据上下文需要,或指雇主,或指承包商。
学生讲义FIDIC合同中英文对照版
CONTENTS目录一般定 (8)1General Provisions规1.1Definitions定义 (8)1.2Interpretation解释 (18)1.3Communications通信交流 (19)1.4Law and Language法律和语言 (20)1.5Priority of Document文件优先次序 (21)1.6Contract Agreement合同协议书 (22)1.7Assignment权益转让 (22)1.8Care and Supply of Document文件的照管和提供 (23)1.9Confidentiality保密性 (23)1.10Employer’s Use of Contractor’s Documents雇主使用承包商文件 (24)1.11Contractor’s Use of Employer’s Documents承包商使用雇主文件 (25)1.12Confidential Details保密事项 (26)1.13Compliance with Laws遵守法律 (26)1.14Joint and Several Liability共同的和各自的责任 (27)2The Employer雇主 (28)2.1Right of Access to the Site现场进入权 (29)2.2Permits, Licences or Approves许可、执照或批准 (30)2.3Employer’s personnel雇主人员 (31)2.4Employer’s Financial Arrangements雇主的资金安排 (32)2.5Employer’s Claims雇主的索赔 (32)3The Employer’s Administration雇主的管理 (34)3.1The Employer’s Representative雇主代表 (34)3.2The Employer’s personnel其他雇主人员 (35)3.3Delegated Persons受托人员 (35)3.4Instructions指示 (37)3.5Determinations确定 (37)4The Contractor承包商 (39)4.1The Contractor’s General Obligations承包商的一般义务 (39)4.2Performance security履约担保 (40)4.3Contractor’s Representative承包商代表 (43)4.4Subcontractors分包商 (44)4.5Nominated Subcontractors指定的分包商 (45)4.6Co-operation合作 (45)4.7Setting out放线 (47)4.8Safety procedures安全程序 (47)4.9Quality Assurance质量保证 (48)4.10Site Data现场数据 (49)4.11Sufficiency of the Contract Price合同价格 (49)4.12Unforeseeable Difficulties不可预见的困难 (50)4.13Rights of way and Facilities道路通行权于设施 (51)4.14Avoidance of Interference避免干扰 (51)4.15Access Route进场通路 (52)4.16Transport of Goods货物运输 (53)4.17Contractor’s Equipment承包商设备 (54)4.18Protection of the Environment环境保护 (54)4.19Electricity, Water and Gas电、水和燃气 (54)4.20Employer’s Equipment and Free-Issue Material雇主设备和免费供应的材料 (55)4.21Progress Reports进度报告 (57)4.22Security of the Site现场保安 (59)4.23Contractor’s Operations on Site承包商的现场作业 (60)4.24Fossils化石 (61)5Design设计 (63)5.1General Design Obligations设计义务一般要求 (63)5.2Contractor’s Documents承包商文件 (64)5.3Contractor’s Undertaking承包商的承诺 (67)5.4Technical Standards and Regulations技术标准和法规 (67)5.5Training培训 (68)5.6As-Built Documents竣工文件 (69)5.7Operation and Maintenance Manuals操作和维修手册 (70)5.8Design Error设计错误 (70)6Staff and Labour员工 (71)6.1Engagement of Staff and Labour员工的雇用 (71)6.2Rates of Wages and Conditions of Labour工资标准和劳动条件 (72)6.3Persons in the Service of Employer为雇主服务的人员 (72)6.4Labour Laws劳动法 (72)6.5Working Hours工作时间 (73)6.6Facilities for Staff and Labour为员工提供设施 (74)6.7Health and Safety健康和安全 (74)6.8Contractor’s Superintendence承包商的监督 (75)6.9Contractor’s Personnel承包商人员 (76)6.10Records of contractor’s Personnel and Equipment承包商人员和设备的记录 (77)6.11Disorderly Conduct无序行为 (77)7Plant, Materials and Workmanship生产设备、材料和工艺 (79)7.1Manner of Execution实施方法 (79)7.2Samples样品 (80)7.3Inspection检验 (80)7.4Testing试验 (81)7.5Rejection拒收 (83)7.6Remedial Work修补工作 (84)7.7Ownership of Plant and Materials生产设备和材料的所有权 (85)7.8Royalties土地(矿区)使用费 (86)工、延和停 (87)8Commencement,Delays and Suspension开误暂8.1Commencement of Works工程的开工 (87)8.2Time for Completion竣工时间 (88)8.3Programme进度计划 (89)8.4Extension of Time for Completion竣工时间延长 (91)8.5Delays Caused by Authorities当局造成的延误 (92)8.6Rate of Progress工程进度 (92)8.7Delay Damages误期损害赔偿费 (94)8.8Suspension of Work暂时停工 (94)8.9Consequences of Suspension暂停的后果 (95)8.10Payment for Plant and Materials in Event of Suspension暂停时对生产设备和材料的付款 (96)8.11Prolonged Suspension托长的暂停 (97)8.12Resumption of Work复工 (97)竣工 (98)9Tests on Completion试验9.1Contractor’s Obligations承包商的义务 (98)9.2Delayed Tests延误的试验 (100)9.3Retesting重新试验 (101)9.4Failure to Pass Tests on Completion未能通过竣工试验 (101)10Employer’s Taking Over雇主的接收 (103)10.1Taking Over of the Works and Sections工程和分项工程的接收 (103)10.2Taking Over of Parts of the Works部分工程的接收 (104)10.3Interference with Tests on Completion对竣工试验的干扰 (105)缺陷任 (106)11Defects Liability责11.1Completion of Outstanding Work and Remedying Defects完成扫尾工作和修补缺陷 (106)11.2Cost of Remedying Defects修补缺陷的费用 (107)11.3Extension of Defects Notification Period缺陷通知期的延长 (108)11.4Failure to Remedy Defects未能修补的缺陷 (109)11.5Removal of Defective Work移出有缺陷的工程 (110)11.6Further Tests进一步试验 (111)11.7Right of Access进入权 (111)11.8Contractor to Search承包商调查 (112)11.9Performance Certificate履约证书 (112)11.10Unfulfilled Obligations未履行的义务 (113)11.11Clearance of Site现场清理 (113)竣工后 (115)12Tests after Completion试验12.1Procedure for Tests after Completion竣工后试验的程序 (115)12.2Delayed Tests延误的试验 (116)12.3Retesting重新试验 (117)12.4Failure to Pass Tests after Completion未能通过的竣工后试验 (118)更和整 (120)13Variations and Adjustments变调13.1Right to Vary变更权 (120)13.2Value Engineering价值工程 (121)13.3Variation Procedure变更程序 (121)13.4Payment in Applicable Currencies以适用货币支付 (123)13.5Provisional Sums暂列金额 (123)13.6Daywork计日工作 (124)13.7Adjustments for Changes in Legislation因法律改变的调整 (126)13.8Adjustments for Changes in Cost因成本改变的调整 (127)14Contract price and Payment合同价格和支付 (128)14.1The Contract Price合同价格 (128)14.2Advance payment预付款 (129)14.3Application for Interim Payments期中付款的申请 (131)14.4Schedule of Payments付款价格表 (133)14.5Plant and Materials intended for the Works拟用于工程的生产设备和材料 (134)14.6Interim Payments期中付款 (135)14.7Timing of Payments付款的时间安排 (136)14.8Delayed Payment延误的付款 (137)14.9Payment of Retention Money保留金支付 (138)14.10Statement at Completion施工报表 (139)14.11Application for Final Payment最终付款的申请 (140)14.12Discharge结清证明 (141)14.13Final Payment最终付款 (141)14.14Cessation of Employer’s Liability雇主责任的中止 (142)14.15Currencies of Payment支付的货币 (143)15Termination by Employer终由雇主止 (146)15.1Notice to Correct通知改正 (146)15.2Termination by Employer由雇主终止 (146)15.3Valuation at Date of Termination终止日期时的估价 (149)15.4Payment after Termination终止后的付款 (150)15.5Employer’s Entitlement to Termination雇主终止的权利 (151)由承包商停和止16Suspension and termination by Contractor暂终 (152)16.1Contractor’s Entitlement to Suspend Work承包商暂停工作的权利 (153)16.2Termination by Contractor由承包商终止 (154)16.3Cessation of Work and Removal of Contractor’s Equipment停止工作和承包商设备的撤离 (156)16.4Payment on Termination终止时的付款 (157)17Risk and Responsibility风险职责和 (157)17.1Indemnities保障 (158)17.2Contractor’s Care of the Works承包商对工程的照管 (159)17.3Employer’s Risks雇主的风险 (161)17.4Consequence of Employer’s Risks雇主风险的后果 (162)17.5Intellectual and Industrial Property Rights知识产权和工业产权 (163)17.6Limitation of Liability责任限度 (165)18Insurance险保 (166)18.1General Requirements for Insurances有关保险的一般要求 (166)18.2Insurance for Works and Contractor’s Equipment工程和承包商设备的保险 (170)18.3Insurance against Injury to Persons and Damage to Property人身伤害和财产损害险 (173)18.4Insurance for Contractor’s Personnel承包商人员的保险 (175)19Force Majeure不可抗力 (177)19.1Definition of Force Majeure不可抗力的定义 (177)19.2Notice of Force Majeure不可抗力的通知 (179)19.3Duty to Minimise Delay将延误减至最小的义务 (180)19.4Consequences of Force Majeure不可抗力的后果 (180)19.5Force Majeure Affecting Subcontractor不可抗力影响分包商 (181)19.6Optional Termination, Payment and Release自主选择终止、支付和解除 (181)19.7Release from Performance under the Law根据法律解除履约 (183)索、端和仲裁 (184)20Claims, Disputes and Arbitration赔争20.1Contractor’s Claims承包商的索赔 (184)20.2Appointment of the Dispute Adjudication Board争端裁决委员会的任命 (188)20.3Failure to Agreement Dispute Adjudication Board对争端裁决委员会未能取得一致时 (190)20.4Obtaining Dispute Adjudication Board’s Decision取得争端裁决委员会的决定 (191)20.5Amicable Settlement友好解决 (194)20.6Arbitration仲裁 (194)20.7Failure to Comply with Dispute Adjudication Board’s Decision未能遵守争端裁决委员会的决定 (195)20.8Expiry of Dispute Adjudication Board’s Appointment争端裁决委员会任命期满 (196)1General Provisions一般规定1.1Definitions定义In the Conditions of Contract (“these Conditions”), which include Particular Conditions and these General Conditions, the following words and expressions shall have the meaning stated. Words indicating persons or parties include corporation and other legal entities, except where the context requires otherwise.在合同条件(“本条件”),包括专用条件和通用条件中,下列词语和措辞应具有以下所述的含义.除上下文另有要求外,文中人员或当事各方等词语包括公司和其他合法实体.1.1.1The Contract合同1.1.1.1“Contract” means the Contract Agreement, these Conditions,the Employer’s Requirement, the Tender, and further document (if any) which are listed in the Contract Agreement.“合同”系指合同协议书、本条件、雇主要求、投标书和合同协议书列出的其他文件(如果有).1.1.1.2“Contract Agreement” means the contract agreement referredto in Sub-Clause 1.6 [Contract Agreement], including any annexed memoranda.“合同协议书”系指第1.6款[合同协议书]中所述的合同协议书及所附各项备忘录.1.1.1.3“Employer’s requirements” means the document entitledemployer’s requirements, as included in the Contract, and any additions and modifications to such document in accordance with the Contract. Such document specifies the purpose, scope, and/or design and/or other technical criteria, for the Works.“雇主要求”系指合同中包括的,题为雇主要求的文件,其中列明工程的目标、范围、和(或)设计和(或)其他技术标准,以及按合同对此项文件所作的任何补充和修改.1.1.1.4“Tender” means the Contractor’s signed offer for the Works andall other documents which the Contractor submitted therewith (other than these Conditions and Employer’s Requirements, if so submitted), as included in the Contract.“投标书”系指包含在合同中的由承包商提交的为完成工程签署的报价,以及随同提交的所有其他文件(本条件和雇主要求除外,如同时提交).1.1.1.5“Performance Guarantees” and “Schedule of payments” meanthe documents so named (if any), as included in the Contract.“履约保证”和“付款计划表”系指合同中包括的具有上述名称的文件(如果有).1.1.2Parties and Persons各方和人员1.1.2.1“Party” means the Employer or the Contractor, as the contextrequires.“当事方(或一方)”根据上下文需要,或指雇主,或指承包商。
(完整)FIDIC国际合同条款中英文对照.doc
(完整)FIDIC国际合同条款中英文对照.docCONTENTS目录1General Provisions一般规定 (5)1.1Definitions定义 (5)1.2Interpretation解释 (10)1.3Communications通信交流 (11)1.4Law and Language法律和语言 (12)1.5Priority of Document文件优先次序 (12)1.6Contract Agreement合同协议书 (12)1.7Assignment权益转让 (13)1.8Care and Supply of Document文件的照管和提供 (13)1.9Confidentiality保密性 (14)1.10Employer’s Use of Contractor’s Documents雇主使用承包商文件 (14)1.11Contractor’s Use of Employer’s Documents承包商使用雇主文件 (15)1.12Confidential Details保密事项 (15)1.13Compliance with Laws遵守法律 (15)1.14Joint and Several Liability共同的和各自的责任 (16)2The Employer雇主 (16)2.1Right of Access to the Site现场进入权 (16)2.2Permits, Licences or Approves许可、执照或批准 (17)2.3Employer’s personnel雇主人员 (18)2.4Employer’s Financial Arrangements雇主的资金安排 (18)2.5Employer’s Claims雇主的索赔 (18)3The Employer’s Administration雇主的管理 (19)3.1The Employer’s Representative雇主代表 (19)3.2The Employer’s personnel其他雇主人员 (20)3.3Delegated Persons受托人员 (20)3.4Instructions指示 (21)3.5Determinations确定 (21)4The Contractor承包商 (21)4.1The Contractor’s General Obligations承包商的一般义务(22)4.2Performance security履约担保 (22)4.3Contractor’s Representative承包商代表 (23)4.4Subcontractors分包商 (24)4.5Nominated Subcontractors指定的分包商 (25)4.6Co-operation合作 (25)4.7Setting out放线 (26)4.8Safety procedures安全程序 (26)4.9Quality Assurance质量保证 (27)4.10Site Data现场数据 (27)4.11Sufficiency of the Contract Price合同价格 (28)4.12Unforeseeable Difficulties不可预见的困难 (28)4.13Rights of way and Facilities道路通行权于设施 (28)4.14Avoidance of Interference避免干扰 (29)4.15Access Route进场通路 (29)4.16Transport of Goods货物运输 (30)4.17Contractor’s Equipment承包商设备 (30)4.18Protection of the Environment环境保护 (30)4.19Electricity, Water and Gas电、水和燃气 (31)4.20Employer’s Equipment and Free-Issue Material雇主设备和免费供应的材料 (31)4.21Progress Reports进度报告 (32)4.22Security of the Site现场保安 (33)4.23Contractor’s Operations on Site承包商的现场作业 (34)4.24Fossils化石 (34)5Design设计 (35)5.1General Design Obligations设计义务一般要求 (35)5.2Contractor’s Documents承包商文件 (36)5.3Contractor’s Undertaking承包商的承诺 (37)5.4Technical Standards and Regulations技术标准和法规 (37)5.5Training培训 (38)5.6As-Built Documents竣工文件 (38)5.7Operation and Maintenance Manuals操作和维修手册 (39)5.8Design Error设计错误 (39)6Staff and Labour员工 (39)6.1Engagement of Staff and Labour员工的雇用 (40)6.2Rates of Wages and Conditions of Labour工资标准和劳动条件 (40)6.3Persons in the Service of Employer为雇主服务的人员 (40)6.4Labour Laws劳动法 (40)6.5Working Hours工作时间 (41)6.6Facilities for Staff and Labour为员工提供设施 (41)6.7Health and Safety健康和安全 (41)6.8Contractor’s Superintendence承包商的监督 (42)6.9Contractor’s Personnel承包商人员 (42)6.10Records of contractor’s Personnel and Equipment承包商人员和设备的记录 (43)6.11Disorderly Conduct无序行为 (43)7Plant, Materials and Workmanship生产设备、材料和工艺 (43)7.1Manner of Execution实施方法 (43)7.2Samples样品 (44)7.3Inspection检验 (44)7.4Testing试验 (45)7.5Rejection拒收 (46)7.6Remedial Work修补工作 (46)7.7Ownership of Plant and Materials生产设备和材料的所有权(47)7.8Royalties土地(矿区)使用费 (47)8Commencement,Delays and Suspension开工、延误和暂停(48)8.1Commencement of Works工程的开工 (48)8.2Time for Completion竣工时间 (48)8.3Programme进度计划 (49)8.4Extension of Time for Completion竣工时间延长 (50)8.5Delays Caused by Authorities当局造成的延误 (50)8.6Rate of Progress工程进度 (51)8.7Delay Damages误期损害赔偿费 (51)8.8Suspension of Work暂时停工 (52)8.9Consequences of Suspension暂停的后果 (52)8.10Payment for Plant and Materials in Event of Suspension 暂停时对生产设备和材料的付款 (53)8.11Prolonged Suspension托长的暂停 (53)8.12Resumption of Work复工 (53)9Tests on Completion竣工试验 (54)9.1Contractor’s Obligations承包商的义务 (54)9.2Delayed Tests延误的试验 (55)9.3Retesting重新试验 (55)9.4Failure to Pass Tests on Completion未能通过竣工试验 (56)10Employer’s Taking Over雇主的接收 (56)10.1Taking Over of the Works and Sections工程和分项工程的接收 (56)10.2Taking Over of Parts of the Works部分工程的接收 (57)10.3Interference with Tests on Completion对竣工试验的干扰(57)11Defects Liability缺陷责任 (58)11.1Completion of Outstanding Work and Remedying Defects完成扫尾工作和修补缺陷 (58)11.2Cost of Remedying Defects修补缺陷的费用 (59)11.3Extension of Defects Notification Period缺陷通知期的延长 (59)11.4Failure to Remedy Defects未能修补的缺陷 (60)11.5Removal of Defective Work移出有缺陷的工程 (60)11.6Further Tests进一步试验 (61)11.7Right of Access进入权 (61)11.8Contractor to Search承包商调查 (61)11.9Performance Certificate履约证书 (62)11.10Unfulfilled Obligations未履行的义务 (62)11.11Clearance of Site现场清理 (62)12Tests after Completion竣工后试验 (63)12.1Procedure for Tests after Completion竣工后试验的程序(63)12.2Delayed Tests延误的试验 (64)12.3Retesting重新试验 (64)12.4Failure to Pass Tests after Completion未能通过的竣工后试验 (65)13Variations and Adjustments变更和调整 (66)13.1Right to Vary变更权 (66)13.2Value Engineering价值工程 (66)13.3Variation Procedure变更程序 (66)13.4Payment in Applicable Currencies以适用货币支付 (67)13.5Provisional Sums暂列金额 (67)13.6Daywork计日工作 (68)13.7Adjustments for Changes in Legislation因法律改变的调整(69)13.8Adjustments for Changes in Cost因成本改变的调整 (70)14Contract price and Payment合同价格和支付 (70)14.1The Contract Price合同价格 (70)14.2Advance payment预付款 (70)14.3Application for Interim Payments期中付款的申请 (72)14.4Schedule of Payments付款价格表 (73)14.5Plant and Materials intended for the Works拟用于工程的生产设备和材料 (73)14.6Interim Payments期中付款 (74)14.7Timing of Payments付款的时间安排 (74)14.8Delayed Payment延误的付款 (75)14.9Payment of Retention Money保留金支付 (75)14.10Statement at Completion施工报表 (76)14.11Application for Final Payment最终付款的申请 (76)14.12Discharge结清证明 (77)14.13Final Payment最终付款 (77)14.14Cessation of Employer’s Liability雇主责任的中止 (78)14.15Currencies of Payment支付的货币 (78)15Termination by Employer由雇主终止 (79)15.1Notice to Correct通知改正 (79)15.2Termination by Employer由雇主终止 (79)15.3Valuation at Date of Termination终止日期时的估价 (81)15.4Payment after Termination终止后的付款 (81)15.5Employer’s Entitlement to Termination雇主终止的权利(82)16Suspension and termination by Contractor承包商暂停和终止 (82)16.1Contractor’s Entitlement to Suspend Work承包商暂停工作的权利 (82)16.2Termination by Contractor由承包商终止 (83)16.3Cessation of Work and Removal of Contractor’sEquipment停止工作和承包商设备的撤离 (84)16.4Payment on Termination终止时的付款 (84)17Risk and Responsibility风险和职责 (85)17.1Indemnities保障 (85)17.2Contractor’s Care of the Works承包商对工程的照管 (86)17.3Employer’s Risks雇主的风险 (87)17.4Consequence of Employer’s Risks雇主风险的后果 (87)17.5Intellectual and Industrial Property Rights知识产权和工业产权 (88)17.6Limitation of Liability责任限度 (89)18Insurance保险 (89)18.1General Requirements for Insurances有关保险的一般要求(89)18.2Insurance for Works and Contractor’s Equipment工程和承包商设备的保险 (91)18.3Insurance against Injury to Persons and Damage to Property人身伤害和财产损害险 (93)18.4Insurance for Contractor’s Personnel承包商人员的保险(94)19Force Majeure不可抗力 (94)19.1Definition of Force Majeure不可抗力的定义 (95)19.2Notice of Force Majeure不可抗力的通知 (96)19.3Duty to Minimise Delay将延误减至最小的义务 (96)19.4Consequences of Force Majeure不可抗力的后果 (96)19.5Force Majeure Affecting Subcontractor不可抗力影响分包商 (97)19.6Optional Termination, Payment and Release自主选择终止、支付和解除 (97)19.7Release from Performance under the Law根据法律解除履约 (98)20Claims, Disputes and Arbitration索赔、争端和仲裁 (98)20.1Contractor’s Claims承包商的索赔 (99)20.2Appointment of the Dispute Adjudication Board争端裁决委员会的任命 (100)20.3Failure to Agreement Dispute Adjudication Board对争端裁决委员会未能取得一致时 (102)20.4Obtaining Dispute Adjudication Board’s Decision取得争端裁决委员会的决定 (102)20.5Amicable Settlement友好解决 (103)20.6Arbitration仲裁 (104)20.7Failure to Comply with Dispute Adjudication Board’s Decision未能遵守争端裁决委员会的决定 (105)20.8Expiry of Dispute Adjudication Board’s Appointment争端裁决委员会任命期满 (105)1General Provisions一般规定1.1Definitions定义In the Conditions of Contract (“these Conditions”), which include Particular Conditions and these General Conditions, the following words and expressions shall have the meaning stated. Words indicating persons or parties includecorporation and other legal entities, except where the context requires otherwise.在合同条件(“本条件”),包括专用条件和通用条件中,下列词语和措辞应具有以下所述的含义.除上下文另有要求外,文中人员或当事各方等词语包括公司和其他合法实体.1.1.1The Contract合同1.1.1.1“Contract” means the Contract Agreement, theseConditions, the Employer’s Requirement, the Tender, and further document (if any) which are listed in the Contract Agreement.“合同”系指合同协议书、本条件、雇主要求、投标书和合同协议书列出的其他文件(如果有).1.1.1.2“Contract Agreement” means the contract agreement referred to in Sub-Clause 1.6 [Contract Agreement], including any annexed memoranda.“合同协议书”系指第1.6款[合同协议书]中所述的合同协议书及所附各项备忘录.1.1.1.3“Employer’s requirements” means the document entitled employer’s requirements, as inclu ded in the Contract, and any additions and modifications to such document in accordance with the Contract. Such document specifies the purpose, scope, and/or design and/or other technical criteria, for the Works.“雇主要求”系指合同中包括的,题为雇主要求的文件,其中列明工程的目标、范围、和(或)设计和(或)其他技术标准,以及按合同对此项文件所作的任何补充和修改.1.1.1.4“Tender” means the Contractor’s signed offer for the Works and all other documents which the Contractor submitted therewith (other than these Conditions and Employer’s Requiremen ts, if so submitted), as included in the Contract.“投标书”系指包含在合同中的由承包商提交的为完成工程签署的报价,以及随同提交的所有其他文件(本条件和雇主要求除外,如同时提交).1.1.1.5“Performance Guarantees” and “Schedule of payments” mean the documents so named (if any), as included in the Contract.“履约保证”和“付款计划表”系指合同中包括的具有上述名称的文件(如果有).1.1.2Parties and Persons各方和人员1.1.2.1“Party” means the Employer or the Contractor, as the context requires.“当事方(或一方)”根据上下文需要,或指雇主,或指承包商。
FIDIC合同条款中英文对照版
施工合同条件Fédération Internationale Des Ingénieurs-Conseils目录1.一般规定General Provisions (11)1.1定义Definitions (11)1.2解释Interpretation (17)1.3通讯联络Communications (18)1.4法律和语言Law and Language (19)1.5文件的优先次序Priority of documents (19)1.6合同协议书Contract Agreement (20)1.7转让Assignment (20)1.8文件的保管和提供Care and Supply of documents (20)1.9拖延的图纸或指示Delayed Drawings or Instructions (21)1.10雇主使用承包商的文件Employer's Use of Contractor's documents (22)1.11承包商使用雇主的文件Contractor's Use of Employer's documents (22)1.12保密事项Confidential Details (23)1.13遵守法律Compliance with Laws (23)1.14共同的与各自的责任1.14 Joint and Several Liability (23)2.雇主THE EMPLOYER (24)2.1进入现场的权利Right of Access to the Site (24)2.2许可、执照和批准Permits, Licences or Approval (24)2.3雇主的人员Employer's Personnel (25)2.5雇主的索赔Employer's Claims (26)3.工程师THE ENGINEER (26)3.1工程师的职责和权力Engineer's Duties and Authority (26)3.2工程师的授权Delegation by the Engineer (27)3.3工程师的指示Instructions of the Engineer (28)3.4工程师的撤换Replacement of the Engineer (29)3.5决定Determinations (29)4.承包商The Contractor (29)4.1承包商的一般义务Contractor's General Obligations (29)4.2履约保证Performance Security (30)4.3承包商的代表Contractor's Representative (32)4.4分包商subcontractors (32)4.5分包合同利益的转让Assignment of Benefit of Subcontract (33)4.6合作Co-operation (33)4.7放线Setting Out (34)4.8安全措施Safety Procedures (35)4.9质量保证Quality Assurance (35)4.10现场数据Site Data (36)4.11接受的合同款额的完备性Sufficiency of the Accepted Contract Amount (36)4.12不可预见的外界条件Unforeseeable Physical Conditions (37)4.14避免干扰Avoidance of Interference (39)4.15进场路线Access Route (39)4.16货物的运输Transport of Goods (40)4.17承包商的设备Contractor's Equipment (40)4.18环境保护Protection of the environment (40)4.19电、水、气Electricity, Water and Gas (40)4.20雇主的设备和免费提供的材料4.20 Employer's Equipment and Free-Issue Material (41)4.21进度报告Progress Reports (42)4.22现场保安Security of the Site (43)4.23承包商的现场工作Contractor's Operations on Site (43)4.24化石Fossils (44)5.指定分包商 (44)5.1指定分包商的定义Definition of "nominated Subcontractor (45)5.2对指定的反对Objection to Nomination (45)5.3对指定分包商的支付Payments to nominated Subcontractors (45)5.4支付的证据Evidence of Payments (46)6.职员和劳工Staff and Labour (46)6.1职员和劳工的雇用Engagement of Staff and Labour (46)6.2工资标准和劳动条件Rates of Wages and Conditions of Labour (46)6.3为他人提供服务的人员Persons in the Service of Employer (47)6.5工作时间Working hours (47)6.6为职员和劳工提供的设施Facilities for Staff and Labour (47)6.7健康和安全Health and Safety (48)6.8承包商的监督Contractor's Superintendence (48)6.9承包商的人员Contractor's Personnel (49)6.10承包商的人员和设备的记录Records of Contractor's Personnel and Equipment (49)6.11妨碍治安的行为Disorderly Conduct (49)7.永久设备、材料和工艺 (49)7.1实施方式Manner of Execution (49)7.2样本Samples (50)7.3检查Inspection (50)7.4检验Testing (51)7.5拒收Rejection (52)7.6补救工作Remedial Work (52)7.7对永久设备和材料的拥有权Ownership of Plant and Materials (53)7.8矿区使用费Royalties (53)8.开工、延误和暂停Commencement, Delays and Suspension (54)8.1工程的开工Commencement of Works (54)8.2竣工时间Time for Completion (54)8.3进度计划Programme (54)8.5由公共当局引起的延误Delays Caused by Authorities (56)8.6进展速度Rate of Progress (57)8.7误期损害赔偿费Delay Damages (57)8.8工程暂停Suspension of Work (58)8.9暂停引起的后果 (58)8.10暂停时对永久设备和材料的支付 (58)8.11持续的暂停8.11 Prolonged Suspension (59)8.12复工8.12 Resumption of Work (59)9.竣工检验Tests On Completion (59)9.1承包商的义务Contractor's Obligations (59)9.2延误的检验Delayed Tests (59)9.3重新检验Retesting (60)9.4未能通过竣工检验Failure to Pass Tests on completion (60)10.10 雇主的接收Employer’s Taking Over (61)10.1对工程和区段的接收Taking Over of the Works and Sections (61)10.2对部分工程的接收Taking Over of parts of the Works (62)10.3对竣工检验的干扰Interference with Tests on Completion (63)10.4地表需要恢复原状Surfaces Requiring Reinstatement (64)11.缺陷责任Defects Liability (64)11.1完成扫尾工作和修补缺陷Completion of Outstanding Work and Remedying Defects (64)11.3缺陷通知期的延长Extension of Defects Notification Period (65)11.4未能补救缺陷Failure to Remedy Defects (65)11.5清除有缺陷的部分工程Removal of Defective Work (66)11.6进一步的检验Further Tests (66)11.7进入权Right of Access (66)11.8承包商的检查Contractor to Search (66)11.9履约证书Performance Certificate (67)11.10未履行的义务Unfulfilled Obligations (67)11.11现场的清理Clearance of Site (67)12.测量和估价Measurement and Evaluation (68)12.1需测量的工程Works to be Measured (68)12.2测量方法Method of Measurement (68)12.3估价Evaluation (69)12.4省略Omissions (70)13.变更和调整Variations and Adjustments (70)13.1有权变更Right to Vary (70)13.2价值工程value Engineering (71)13.3变更程序Variation Procedure (72)13.4以适用的货币支付Payment in Applicable Currencies (73)13.5暂定金额Provisional Sums (73)13.7法规变化引起的调整Adjustments for changes in Lesgislation (74)13.8费用变化引起的调整Adjustments for Changes in the Cost (75)14.合同价格和支付Contractor price and Payment (77)14.1合同价格The contractor Price (77)14.2预付款Advance Payment (78)14.3期中支付证书的申请Application for Interim Payment Certificates (79)14.4支付表Schedule of Payments (80)14.5用于永久工程的永久设备和材料Plant and Materials (81)14.6期中支付证书的颁发Issue of Interim Payment Certificates (82)14.7支付Payment (83)14.8延误的支付Delayed Payment (83)14.9保留金的支付Payment of Retention money (84)14.10竣工报表Statement of Completion (85)14.11申请最终支付证书Application for Final Payment Certificate (85)14.12结清单Discharge (86)14.13最终支付证书的颁发Issue of Final Payment Certificate (86)14.14雇主责任的终止Cessation of Employer’s Liability (86)14.15支付的货币Currencies of Payment (87)15.雇主提出终止Termination by Employer (88)15.1通知改正Notice to Correct (88)15.3终止日期时的估价 (90)15.4终止后的支付Payment after Termination (90)15.5雇主终止合同的权力 (90)16.承包商提出暂停和终止Suspens on and Termination by Contractor (91)16.1承包商有权暂停工作Contractor's Entitlement to Suspend Work (91)16.2承包商提出终止Termination by Contractor (92)16.3停止工作及承包商的设备的撤离Cessation of Work and Removal of Contractor's Equipment (93)16.4终止时的支付Payment on Termination (93)17.风险和责任Risk and Responsibility (93)17.1保障Indemnities (93)17.2承包商对工程的照管Contractor's Care of the Works (94)17.3雇主的风险Employer's Risks (95)17.4雇主的风险造成的后果Consequences of Employer’s rirks (96)17.5知识产权和工业产权Intellectual and Industrial Property Rights (96)17.6责任限度Limitation of Liability (98)18.保险Insurance (98)18.1有关保险的总体要求General Requirements for insurances (98)18.2工程和承包商的设备的保险Insurance for Works and Contractor’s equipment (100)18.3人员伤亡和财产损害的保险Insurance against Injury to Persons and Damage under to18.4承包商的人员的保险Insurance for Contractor’s Personnel (103)19.不可抗力Force Majeure (103)19.1不可抗力的定义Defination of Force Majeure (103)19.2不可抗力的通知Notice of Force Majeure (104)19.3减少延误的责任Duty to Minimise Delay (105)19.4不可抗力引起的后果Consequences of Force Majeure (105)19.5不可抗力对分包商的影响Force Majeure Affecting Subcontractor (105)19.6可选择的终止、支付和返回Optional Termination, Payment and Release (106)19.7根据法律解除履约Release from Performance under the Law (106)20.索赔、争端和仲裁Claim, Disputes and Arbitration (107)20.1承包商的索赔Contractor's Claims (107)20.2争端裁决委员会的委任Appointment of the Dispute Adjudication Board (109)20.3未能同意争端裁决委员会的委任Failure to Agree Dispute Adjudication Board (110)20.4获得争端裁决委员会的决定Obtaining Dispute Adjudication Board's Decision (111)20.5友好解决Amicable both Settlement (112)20.6仲裁Arbitration (112)20.7未能遵守争端裁决委员会的决定Failure to Comply with Dispute Adjudication Board's Decision 11320.8争端裁决委员会的委任期满Expiry of Dispute Adjudication Board's Appointment (114)Fédération Internationale Des Ingénieurs-Conseils通用条件General Conditions1.一般规定General Provisions1.1 定义Definitions在包括专用条件和本通用条件的合同条件(“本合同条件”)中,以下措辞和用语的含义如下所述。
菲迪克(FIDIC)中英文对照版
CONTENTS目录1General Provisions一般规定 (1)1.1Definitions定义 (1)1.2Interpretation解释 (7)1.3Communications通信交流 (7)1.4Law and Language法律和语言 (8)1.5Priority of Document文件优先次序 (8)1.6Contract Agreement合同协议书 (9)1.7Assignment权益转让 (9)1.8Care and Supply of Document文件的照管和提供 (9)1.9Confidentiality保密性 (10)1.10Employer’s Use of Contractor’s Documents雇主使用承包商文件 (10)1.11Contractor’s Use of Employer’s Documents承包商使用雇主文件 (11)1.12Confidential Details保密事项 (11)1.13Compliance with Laws遵守法律 (11)1.14Joint and Several Liability共同的和各自的责任 (12)2The Employer雇主 (12)2.1Right of Access to the Site现场进入权 (13)2.2Permits, Licences or Approves许可、执照或批准 (14)2.3Employer’s personnel雇主人员 (14)2.4Employer’s Financial Arrangements雇主的资金安排 (15)2.5Employer’s Claims雇主的索赔 (15)3The Employer’s Administration雇主的管理 (16)3.1The Employer’s Representative雇主代表 (16)3.2The Employer’s personnel其他雇主人员 (16)3.3Delegated Persons受托人员 (17)3.4Instructions指示 (17)3.5Determinations确定 (18)4The Contractor承包商 (18)4.1The Contractor’s General Obligations承包商的一般义务 (18)4.2Performance security履约担保 (19)4.3Co ntractor’s Representative承包商代表 (21)4.4Subcontractors分包商 (21)4.5Nominated Subcontractors指定的分包商 (22)4.6Co-operation合作 (22)4.7Setting out放线 (23)4.8Safety procedures安全程序 (23)4.9Quality Assurance质量保证 (24)4.10Site Data现场数据 (24)4.11Sufficiency of the Contract Price合同价格 (25)4.12Unforeseeable Difficulties不可预见的困难 (25)4.13Rights of way and Facilities道路通行权于设施 (26)4.14Avoidance of Interference避免干扰 (26)4.15Access Route进场通路 (26)4.16Transport of Goods货物运输 (27)4.17Contractor’s Equipment承包商设备 (28)4.18Protection of the Environment环境保护 (28)4.19Electricity, Water and Gas电、水和燃气 (28)4.20Employer’s Equipment and Free-Issue Material雇主设备和免费供应的材料 (29)4.21Progress Reports进度报告 (30)4.22Security of the Site现场保安 (31)4.23Contractor’s Operations on Site承包商的现场作业 (31)4.24Fossils化石 (32)5Design设计 (33)5.1General Design Obligations设计义务一般要求 (33)5.2Contractor’s Documents承包商文件 (34)5.3Contractor’s Undertaking承包商的承诺 (35)5.4Technical Standards and Regulations技术标准和法规 (35)5.5Training培训 (36)5.6As-Built Documents竣工文件 (36)5.7Operation and Maintenance Manuals操作和维修手册 (37)5.8Design Error设计错误 (37)6Staff and Labour员工 (38)6.1Engagement of Staff and Labour员工的雇用 (38)6.2Rates of Wages and Conditions of Labour工资标准和劳动条件 (38)6.3Persons in the Service of Employer为雇主服务的人员 (38)6.4Labour Laws劳动法 (38)6.5Working Hours工作时间 (39)6.6Facilities for Staff and Labour为员工提供设施 (39)6.7Health and Safety健康和安全 (39)6.8Contractor’s Superintendence承包商的监督 (40)6.9Contractor’s Personnel承包商人员 (40)6.10Records of contractor’s Perso nnel and Equipment承包商人员和设备的记录 (41)6.11Disorderly Conduct无序行为 (41)7Plant, Materials and Workmanship生产设备、材料和工艺 (42)7.1Manner of Execution实施方法 (42)7.2Samples样品 (42)7.3Inspection检验 (42)7.4Testing试验 (43)7.5Rejection拒收 (44)7.6Remedial Work修补工作 (45)7.7Ownership of Plant and Materials生产设备和材料的所有权 (45)7.8Royalties土地(矿区)使用费 (46)8Commencement,Delays and Suspension开工、延误和暂停 (46)8.1Commencement of Works工程的开工 (46)8.2Time for Completion竣工时间 (47)8.3Programme进度计划 (47)8.4Extension of Time for Completion竣工时间延长 (48)8.5Delays Caused by Authorities当局造成的延误 (49)8.6Rate of Progress工程进度 (49)8.7Delay Damages误期损害赔偿费 (50)8.8Suspension of Work暂时停工 (50)8.9Consequences of Suspension暂停的后果 (51)8.10Payment for Plant and Materials in Event of Suspension暂停时对生产设备和材料的付款 (51)8.11Prolonged Suspension托长的暂停 (52)8.12Resumption of Work复工 (52)9Tests on Completion竣工试验 (52)9.1Contractor’s Obligations承包商的义务 (52)9.2Delayed Tests延误的试验 (54)9.3Retesting重新试验 (54)9.4Failure to Pass Tests on Completion未能通过竣工试验 (54)10Employer’s Taking Over雇主的接收 (55)10.1Taking Over of the Works and Sections工程和分项工程的接收 (55)10.2Taking Over of Parts of the Works部分工程的接收 (56)10.3Interference with Tests on Completion对竣工试验的干扰 (56)11Defects Liability缺陷责任 (57)11.1Completion of Outstanding Work and Remedying Defects完成扫尾工作和修补缺陷 (57)11.2Cost of Remedying Defects修补缺陷的费用 (58)11.3Extension of Defects Notification Period缺陷通知期的延长 (58)11.4Failure to Remedy Defects未能修补的缺陷 (59)11.5Removal of Defective Work移出有缺陷的工程 (60)11.6Further Tests进一步试验 (60)11.7Right of Access进入权 (60)11.8Contractor to Search承包商调查 (60)11.9Performance Certificate履约证书 (61)11.10Unfulfilled Obligations未履行的义务 (61)11.11Clearance of Site现场清理 (62)12Tests after Completion竣工后试验 (62)12.1Procedure for Tests after Completion竣工后试验的程序 (62)12.2Delayed Tests延误的试验 (63)12.3Retesting重新试验 (64)12.4Failure to Pass Tests after Completion未能通过的竣工后试验 (64)13Variations and Adjustments变更和调整 (65)13.1Right to Vary变更权 (65)13.2Value Engineering价值工程 (66)13.3Variation Procedure变更程序 (66)13.4Payment in Applicable Currencies以适用货币支付 (67)13.5Provisional Sums暂列金额 (67)13.6Daywork计日工作 (68)13.7Adjustments for Changes in Legislation因法律改变的调整 (69)13.8Adjustments for Changes in Cost因成本改变的调整 (69)14Contract price and Payment合同价格和支付 (70)14.1The Contract Price合同价格 (70)14.2Advance payment预付款 (70)14.3Application for Interim Payments期中付款的申请 (71)14.4Schedule of Payments付款价格表 (72)14.5Plant and Materials intended for the Works拟用于工程的生产设备和材料 (73)14.6Interim Payments期中付款 (74)14.7Timing of Payments付款的时间安排 (74)14.8Delayed Payment延误的付款 (75)14.9Payment of Retention Money保留金支付 (75)14.10Statement at Completion施工报表 (76)14.11Application for Final Payment最终付款的申请 (77)14.12Discharge结清证明 (77)14.13Final Payment最终付款 (78)14.14Cessation of Employer’s Liability雇主责任的中止 (78)14.15Currencies of Payment支付的货币 (78)15Termination by Employer由雇主终止 (79)15.1Notice to Correct通知改正 (80)15.2Termination by Employer由雇主终止 (80)15.3Valuation at Date of Termination终止日期时的估价 (82)15.4Payment after Termination终止后的付款 (82)15.5Employer’s Entitlement to Termination雇主终止的权利 (82)16Suspension and termination by Contractor由承包商暂停和终止 (83)16.1Contractor’s Entitlement to Suspend Work承包商暂停工作的权利 (83)16.2Termination by Contractor由承包商终止 (84)16.3Cessation of Work and Removal of Contractor’s Equipment停止工作和承包商设备的撤离 (85)16.4Payment on Termination终止时的付款 (85)17Risk and Responsibility风险和职责 (86)17.1Indemnities保障 (86)17.2Contractor’s Care of the Works承包商对工程的照管 (87)17.3Employer’s Risks雇主的风险 (88)17.4Co nsequence of Employer’s Risks雇主风险的后果 (88)17.5Intellectual and Industrial Property Rights知识产权和工业产权 (89)17.6Limitation of Liability责任限度 (90)18Insurance保险 (91)18.1General Requirements for Insurances有关保险的一般要求 (91)18.2Insurance for Works and Contractor’s Equipment工程和承包商设备的保险 (93)18.3Insurance against Injury to Persons and Damage to Property人身伤害和财产损害险 (95)18.4Insurance for Contract or’s Personnel承包商人员的保险 (96)19Force Majeure不可抗力 (96)19.1Definition of Force Majeure不可抗力的定义 (96)19.2Notice of Force Majeure不可抗力的通知 (97)19.3Duty to Minimise Delay将延误减至最小的义务 (98)19.4Consequences of Force Majeure不可抗力的后果 (98)19.5Force Majeure Affecting Subcontractor不可抗力影响分包商 (99)19.6Optional Termination, Payment and Release自主选择终止、支付和解除 (99)19.7Release from Performance under the Law根据法律解除履约 (100)20Claims, Disputes and Arbitration索赔、争端和仲裁 (100)20.1Contractor’s Claims承包商的索赔 (100)20.2Appointment of the Dispute Adjudication Board争端裁决委员会的任命 (102)20.3Failure to Agreement Dispute Adjudication Board对争端裁决委员会未能取得一致时 (104)20.4Obtaining Dispute Adjudication Board’s Decision取得争端裁决委员会的决定 (104)20.5Amicable Settlement友好解决 (106)20.6Arbitration仲裁 (106)20.7Failure to Comply with Dispute Adjudication Board’s Decision未能遵守争端裁决委员会的决定 (107)20.8Expiry of Dispute Adjudication Board’s Appointment争端裁决委员会任命期满 (107)1General Provisions一般规定1.1Definitions定义In the Conditions of Contract (“these Conditions”), which include Particular Conditions and these General Conditions, the following words and expressions shall have the meaning stated. Words indicating persons or parties include corporation and other legal entities, except where the context requires otherwise.在合同条件(“本条件”),包括专用条件和通用条件中,下列词语和措辞应具有以下所述的含义.除上下文另有要求外,文中人员或当事各方等词语包括公司和其他合法实体.1.1.1The Contract合同1.1.1.1“Contract”means the Contract Agreement, these Conditions, theEmployer’s Requirement, the Tender, and further document (if any) which are listed in the Contract Agreement.“合同”系指合同协议书、本条件、雇主要求、投标书和合同协议书列出的其他文件(如果有).1.1.1.2“Contract Agreement”means the contract agreement referred to inSub-Clause 1.6 [Contract Agreement], including any annexed memoranda.“合同协议书”系指第1.6款[合同协议书]中所述的合同协议书及所附各项备忘录.1.1.1.3“Employer’s requirements”means the document entitled employer’srequirements, as included in the Contract, and any additions and modifications to such document in accordance with the Contract. Such document specifies the purpose, scope, and/or design and/or other technical criteria, for the Works.“雇主要求”系指合同中包括的,题为雇主要求的文件,其中列明工程的目标、范围、和(或)设计和(或)其他技术标准,以及按合同对此项文件所作的任何补充和修改.1.1.1.4“Tender”means the Contractor’s signed offer for the Works and all otherdocuments which the Contractor submitted therewith (other than these Conditions and Employer’s Requirements, if so submitted), as included in the Contract.“投标书”系指包含在合同中的由承包商提交的为完成工程签署的报价,以及随同提交的所有其他文件(本条件和雇主要求除外,如同时提交).1.1.1.5“Performance Guarantees”and “Schedule of payments”mean thedocuments so named (if any), as included in the Contract.“履约保证”和“付款计划表”系指合同中包括的具有上述名称的文件(如果有).1.1.2Parties and Persons各方和人员1.1.2.1“Party” means the Employer or the Contractor, as the context requires.“当事方(或一方)”根据上下文需要,或指雇主,或指承包商。
FIDIC红皮书_ 中英文对照
Fédération Internationale Des Ingénieurs-Conseils1.1 测量方法12.2 Method of Measurement除非合同中另有规定,无论当地惯例如何:Except as otherwise stated in the Contract and notwithstanding local practice:(a) 测量应该是测量每部分永久工程的实际净值,以及(a) measurement shall be made of the net actual quantity of each item of the Permanent Works, and(b) 测量方法应符合工程量表或其他适用报表。
(b) the method of measurement shall be in accordance with the Bill of Quantities or other applicable Schedules.1.2 估价12.3 Evaluation除非合同中另有规定,工程师应通过对每一项工作的估价,根据第3.5款【决定】,商定或决定合同价格。
每项工作的估价是用依据上述第12.1款和第12.2款商定或决定的测量数据乘以此项工作的相应价格费率或价格得到的。
Except as otherwise stated in the Contract, the Engineer shall proceed in accordance with Sub-Clause 3.5 [Determinations] to agree ordetermine the Contract Price by evaluating each item of work, applyingthe measurement agreed or determined in accordance with the above Sub-Clauses 12.1 and 12.2 and the appropriate rate or price for the item.对每一项工作,该项合适的费率或价格应该是合同中对此项工作规定的费率或价格,或者如果没有该项,则为对其类似工作所规定的费率或价格。
fidic合同条款黄皮书中英文
fidic合同条款黄皮书中英文FIDIC合同条款1999(中英文对照)FIDIC合同条款1999(中英文对照)Fédération Internationale Des Ingénieurs-Conseils通用条件General Conditions1.一般规定1.1 定义在包括专用条件和本通用条件的合同条件(“本合同条件”)中,以下措辞和用语的含义如下所述。
除非上下文中另有要求,指当事人和当事各方的词包括公司和其它法律实体。
1.1.1 合同1.1.1.1“合同(Contract)”指合同协议书、中标函、投标函、本合同条件、规范、图纸、资料表、以及在合同协议书或中标函中列明的其它进一步的文件(如有时)。
1.1.1.2“合同协议书(Contract Agreement)”指第1.6款【合同协议】中所说明的合同协议(如有时)。
1.1.1.3“中标函(Letter of Acceptance)”指雇主对投标文件签署的正式接受函,包括其后所附的备忘录(由合同各方达成并签定的协议构成)。
在没有此中标函的情况下,“中标函”一词就指合同协议书,颁发或接收中标函的日期就指双方签订合同协议书的日期。
1.1.1.4“投标函(Letter of Tender)”指名称为投标函的文件,由承包商填写,包括已签字的对雇主的工程报价。
1.1.1.5“规范(Specification)”指合同中名称为规范的文件,及根据合同规定对规范的增加和修改。
此文件具体描述了工程。
1.1.1.6“图纸(Drawings)”指合同中规定的工程图纸,及由雇主(或代表)根据合同颁发的对图纸的增加和修改。
1.1.1.7“资料表(Schedules)”指合同中名称为资料表的文件,由承包商填写并随投标函提交。
此文件可能包括工程量表、数据、列表、及费率和/或单价表。
1.1.1.8“投标文件(Tender)”指投标函和合同中规定的承包商应随投标函提交的其它所有文件。
FIDIC国际土木建筑工程承包合同(英汉对照)
FIDIC国际土木建筑工程承包合同(英汉对照)(一) PART I —GENERAL CONDITIONS of CONTRACT 第一部分-合同条款概述Definitions and Interpretation定义和解释1。
1 Definitions定义 In the Contract (ashereinafter defined) the following words and expression_rs shall have the meanings hereby assigned to them, except where the context otherwise requires :本合同(按下文所定义的)中的下列词和用语,除文中另有要求者外,应具有本条所赋予的含义: a. (i)"Employer” means PHU MY HUNG CORPORATION, a company incorporated and registered at Saigon Parking Way Dist.7 HCMC. Vietnam。
“雇主"是PHU MY HUNG CORPORATION公司在Saigon Parking Way Dist。
7 HCMC。
Vietnam注册登记。
(ii)”Contractor" means the person named as such in Part II of these Conditions and the legal successors in title to such person, but not ( except with the consent of the Employer) any assignee of such person。
承包商是指第二部分指定的当事人以及取得此当事人资格的合法继承人,(除非雇主同意)不指此当事人的任何受让人。
国际咨询工程师联合会fidic合同中英文对照版_secret
CONTENTS目录1General Provisions一般规定 (9)1.1Definitions定义 (9)1.2Interpretation解释 (20)1.3Communications通信交流 (21)1.4Law and Language法律和语言 (22)1.5Priority of Document文件优先次序 (23)1.6Contract Agreement合同协议书 (24)1.7Assignment权益转让 (24)1.8Care and Supply of Document文件的照管和提供 (25)1.9Confidentiality保密性 (25)1.10Employer’s Use of Contractor’s Documents雇主使用承包商文件 (26)1.11Contractor’s Use of Employer’s Documents承包商使用雇主文件 (27)1.12Confidential Details保密事项 (28)1.13Compliance with Laws遵守法律 (28)1.14Joint and Several Liability共同的和各自的责任 (29)2The Employer雇主 (31)2.1Right of Access to the Site现场进入权 (31)2.2Permits, Licences or Approves许可、执照或批准 (33)2.3Employer’s personnel雇主人员 (34)2.4Employer’s Financial Arrangements雇主的资金安排 (34)2.5Employer’s Claims雇主的索赔 (35)3The Employer’s Administration雇主的管理 (37)3.1The Employer’s Representative雇主代表 (37)3.2The Employer’s personnel其他雇主人员 (38)3.3Delegated Persons受托人员 (38)3.4Instructions指示 (40)3.5Determinations确定 (40)4The Contractor承包商 (42)4.1The Contractor’s General Obligations承包商的一般义务 (42)4.2Performance security履约担保 (43)4.3Contractor’s Representative承包商代表 (46)4.4Subcontractors分包商 (47)4.5Nominated Subcontractors指定的分包商 (48)4.6Co-operation合作 (49)4.7Setting out放线 (50)4.8Safety procedures安全程序 (51)4.9Quality Assurance质量保证 (52)4.10Site Data现场数据 (52)4.11Sufficiency of the Contract Price合同价格 (53)4.12Unforeseeable Difficulties不可预见的困难 (54)4.13Rights of way and Facilities道路通行权于设施 (54)4.14Avoidance of Interference避免干扰 (55)4.15Access Route进场通路 (56)4.16Transport of Goods货物运输 (57)4.17Contractor’s Equipment承包商设备 (58)4.18Protection of the Environment环境保护 (58)4.19Electricity, Water and Gas电、水和燃气 (59)4.20Employer’s Equipment and Free-Issue Material雇主设备和免费供应的材料 604.21Progress Reports进度报告 (61)4.22Security of the Site现场保安 (64)4.23Contractor’s Operations on Site承包商的现场作业 (64)4.24Fossils化石 (65)5Design设计 (68)5.1General Design Obligations设计义务一般要求 (68)5.2Contractor’s D ocuments承包商文件 (69)5.3Contractor’s Undertaking承包商的承诺 (72)5.4Technical Standards and Regulations技术标准和法规 (72)5.5Training培训 (74)5.6As-Built Documents竣工文件 (74)5.7Operation and Maintenance Manuals操作和维修手册 (75)5.8Design Error设计错误 (76)6Staff and Labour员工 (77)6.1Engagement of Staff and Labour员工的雇用 (77)6.2Rates of Wages and Conditions of Labour工资标准和劳动条件 (77)6.3Persons in the Service of Employer为雇主服务的人员 (78)6.4Labour Laws劳动法 (78)6.5Working Hours工作时间 (79)6.6Facilities for Staff and Labour为员工提供设施 (79)6.7Health and Safety健康和安全 (80)6.8Contractor’s Superintendence承包商的监督 (81)6.9Contractor’s Personnel承包商人员 (82)6.10Records of contractor’s Personnel and Equipment承包商人员和设备的记录 836.11Disorderly Conduct无序行为 (83)7Plant, Materials and Workmanship生产设备、材料和工艺 (85)7.1Manner of Execution实施方法 (85)7.2Samples样品 (86)7.3Inspection检验 (86)7.4Testing试验 (88)7.5Rejection拒收 (90)7.6Remedial Work修补工作 (91)7.7Ownership of Plant and Materials生产设备和材料的所有权 (92)7.8Royalties土地(矿区)使用费 (93)8Commencement,Delays and Suspension开工、延误和暂停 (94)8.1Commencement of Works工程的开工 (94)8.2Time for Completion竣工时间 (95)8.3Programme进度计划 (96)8.4Extension of Time for Completion竣工时间延长 (98)8.5Delays Caused by Authorities当局造成的延误 (99)8.6Rate of Progress工程进度 (100)8.7Delay Damages误期损害赔偿费 (101)8.8Suspension of Work暂时停工 (102)8.9Consequences of Suspension暂停的后果 (102)8.10Payment for Plant and Materials in Event of Suspension暂停时对生产设备和材料的付款 (103)8.11Prolonged Suspension托长的暂停 (104)8.12Resumption of Work复工 (105)9Tests on Completion竣工试验 (105)9.1Contractor’s Obligations承包商的义务 (105)9.2Delayed Tests延误的试验 (108)9.3Retesting重新试验 (109)9.4Failure to Pass Tests on Completion未能通过竣工试验 (109)10Employer’s Taking Over雇主的接收 (111)10.1Taking Over of the Works and Sections工程和分项工程的接收 (111)10.2Taking Over of Parts of the Works部分工程的接收 (113)10.3Interference with Tests on Completion对竣工试验的干扰 (113)11Defects Liability缺陷责任 (114)11.1Completion of Outstanding Work and Remedying Defects完成扫尾工作和修补缺陷 (115)11.2Cost of Remedying Defects修补缺陷的费用 (116)11.3Extension of Defects Notification Period缺陷通知期的延长 (117)11.4Failure to Remedy Defects未能修补的缺陷 (117)11.5Removal of Defective Work移出有缺陷的工程 (119)11.6Further Tests进一步试验 (120)11.7Right of Access进入权 (120)11.8Contractor to Search承包商调查 (121)11.9Performance Certificate履约证书 (121)11.10Unfulfilled Obligations未履行的义务 (122)11.11Clearance of Site现场清理 (123)12Tests after Completion竣工后试验 (124)12.1Procedure for Tests after Completion竣工后试验的程序 (124)12.2Delayed Tests延误的试验 (125)12.3Retesting重新试验 (126)12.4Failure to Pass Tests after Completion未能通过的竣工后试验 (127)13Variations and Adjustments变更和调整 (129)13.1Right to Vary变更权 (130)13.2Value Engineering价值工程 (130)13.3Variation Procedure变更程序 (131)13.4Payment in Applicable Currencies以适用货币支付 (133)13.5Provisional Sums暂列金额 (133)13.6Daywork计日工作 (134)13.7Adjustments for Changes in Legislation因法律改变的调整 (136)13.8Adjustments for Changes in Cost因成本改变的调整 (137)14Contract price and Payment合同价格和支付 (138)14.1The Contract Price合同价格 (138)14.2Advance payment预付款 (139)14.3Application for Interim Payments期中付款的申请 (141)14.4Schedule of Payments付款价格表 (143)14.5Plant and Materials intended for the Works拟用于工程的生产设备和材料 14514.6Interim Payments期中付款 (146)14.7Timing of Payments付款的时间安排 (147)14.8Delayed Payment延误的付款 (148)14.9Payment of Retention Money保留金支付 (149)14.10Statement at Completion施工报表 (150)14.11Application for Final Payment最终付款的申请 (151)14.12Discharge结清证明 (152)14.13Final Payment最终付款 (153)14.14Cessation of Employer’s Liability雇主责任的中止 (153)14.15Currencies of Payment支付的货币 (154)15Termination by Employer由雇主终止 (157)15.1Notice to Correct通知改正 (157)15.2Termination by Employer由雇主终止 (157)15.3Valuation at Date of Termination终止日期时的估价 (161)15.4Payment after Termination终止后的付款 (161)15.5Employer’s Entitlement to Termination雇主终止的权利 (162)16Suspension and termination by Contractor由承包商暂停和终止 (164)16.1Contractor’s Entitlement to Suspend Work承包商暂停工作的权利 (164)16.2Termination by Contractor由承包商终止 (166)16.3Cessation of Work and Removal of Contractor’s Equipment停止工作和承包商设备的撤离 (168)16.4Payment on Termination终止时的付款 (169)17Risk and Responsibility风险和职责 (170)17.1Indemnities保障 (170)17.2Contractor’s Care of the Works承包商对工程的照管 (172)17.3Employer’s Risks雇主的风险 (173)17.4Consequence of Employer’s Risks雇主风险的后果 (174)17.5Intellectual and Industrial Property Rights知识产权和工业产权 (175)17.6Limitation of Liability责任限度 (177)18Insurance保险 (179)18.1General Requirements for Insurances有关保险的一般要求 (179)18.2Insurance for Works and Contractor’s Equipment工程和承包商设备的保险18318.3Insurance against Injury to Persons and Damage to Property人身伤害和财产损害险 (187)18.4Insurance for Contractor’s Personnel承包商人员的保险 (189)19Force Majeure不可抗力 (191)19.1Definition of Force Majeure不可抗力的定义 (191)19.2Notice of Force Majeure不可抗力的通知 (193)19.3Duty to Minimise Delay将延误减至最小的义务 (193)19.4Consequences of Force Majeure不可抗力的后果 (194)19.5Force Majeure Affecting Subcontractor不可抗力影响分包商 (195)19.6Optional Termination, Payment and Release自主选择终止、支付和解除 (195)19.7Release from Performance under the Law根据法律解除履约 (197)20Claims, Disputes and Arbitration索赔、争端和仲裁 (198)20.1Contractor’s Claims承包商的索赔 (198)20.2Appointment of the Dispute Adjudication Board争端裁决委员会的任命 (202)20.3Failure to Agreement Dispute Adjudication Board对争端裁决委员会未能取得一致时 (205)20.4Obtaining Dispute Adjudication Board’s Decision取得争端裁决委员会的决定 (206)20.5Amicable Settlement友好解决 (209)20.6Arbitration仲裁 (209)20.7Failure to Comply with Dispute Adjudication Board’s D ecision未能遵守争端裁决委员会的决定 (211)20.8Expiry of Dispute Adjudication Board’s Appointment争端裁决委员会任命期满 (212)1General Provisions一般规定1.1Definitions定义In the Conditions of Contract (“these Conditions”), which include Particular Conditions and these General Conditions, the following words and expressions shall have the meaning stated. Words indicating persons or parties include corporation and other legal entities, except where the context requires otherwise.在合同条件(“本条件”),包括专用条件和通用条件中,下列词语和措辞应具有以下所述的含义.除上下文另有要求外,文中人员或当事各方等词语包括公司和其他合法实体.1.1.1The Contract合同1.1.1.1“Contract”means the Contract Agreement, these Conditions, theEmployer’s Requirement, the Tender, and further document (if any) which are listed in the Contract Agreement.“合同”系指合同协议书、本条件、雇主要求、投标书和合同协议书列出的其他文件(如果有).1.1.1.2“Contract Agreement”means the contract agreement referred to inSub-Clause 1.6 [Contract Agreement], including any annexed memoranda.“合同协议书”系指第1.6款[合同协议书]中所述的合同协议书及所附各项备忘录.1.1.1.3“Employer’s requirements” means the document entitled employer’srequirements, as included in the Contract, and any additions and modifications to such document in accordance with the Contract. Such document specifies the purpose, scope, and/or design and/or other technical criteria, for the Works.“雇主要求”系指合同中包括的,题为雇主要求的文件,其中列明工程的目标、范围、和(或)设计和(或)其他技术标准,以及按合同对此项文件所作的任何补充和修改.1.1.1.4“Tender”means the Contractor’s signed offer for the Works and allother documents which the Contractor submitted therewith (other than these Conditions and Employer’s Requirements, if so submitted), as included in the Contract.“投标书”系指包含在合同中的由承包商提交的为完成工程签署的报价,以及随同提交的所有其他文件(本条件和雇主要求除外,如同时提交).1.1.1.5“Performance Guarantees”and “Schedule of payments”mean thedocuments so named (if any), as included in the Contract.“履约保证”和“付款计划表”系指合同中包括的具有上述名称的文件(如果有).1.1.2Parties and Persons各方和人员1.1.2.1“Party” means the Employer or the Contractor, as the context requires.“当事方(或一方)”根据上下文需要,或指雇主,或指承包商。
国际工程FIDIC条款公路施工600章附属工程要求,中英文对照218页
DIVISION 600第600部分INCIDENTAL STRUCTURES附属结构SECTIONS 601 – 602 :第601 – 602 节Not Used未使用SECTION 603第 603 节METAL STRUCTURES金属结构603.1 - DESCRIPTION:说明:This work shall consist of the construction or reconstruction or extension of metal underpasses, arch structures culverts and pipelines, referred to jointly as "metal structures", in accordance with these Specifications and in reasonably close conformity with the lines, grades, dimensions, and locations shown on the Drawings or established by the Engineer.根据《技术规范》要求及图纸或工程师确定的线、等级、尺寸和位置等规定,本工程包括施工或重建或金属桥下通道延伸、拱形结构涵洞和管道系统,统称为“金属结构”。
The corrugated metal underpasses have been designed generally for minimum cover over the structure. The plate thickness varies with the size of the structure.The Contractor will be required to furnish details for approval by the Engineer波纹金属桥下通道通常经过设计,可极小覆盖该金属结构。
FIDIC国际土木建筑工程承包合同(英汉对照)
FIDIC国际土木建筑工程承包合同(英汉对照)(一) PART I - GENERALCONDITIONS of CONTRACT 第一部分-合同条款概述Definitions and Interpretation定义和解释1。
1Definitions定义 In the Contract (as hereinafter defined) the following words and expression_rs shall have the meanings hereby assigned to them, except where the context otherwise requires :本合同(按下文所定义的)中的下列词和用语,除文中另有要求者外,应具有本条所赋予的含义: a。
(i) "Employer" means PHU MY HUNG CORPORATION, a company incorporated and registered at Saigon Parking Way Dist。
7 HCMC。
Vietnam. “雇主”是PHU MY HUNG CORPORATION公司在Saigon Parking Way Dist.7 HCMC. Vietnam注册登记。
(ii)”Contractor” means the person named as such in Part II of these Conditions and the legal successors in title to such person, but not ( except with the consent of the Employer) any assignee of such person。
承包商是指第二部分指定的当事人以及取得此当事人资格的合法继承人,(除非雇主同意)不指此当事人的任何受让人。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
Section IV. Part I. General Conditions of Contract 1 仅供内部使用和参考读前说明为了方便大家在工程上对国际咨询工程师联合会编写出版的《土木工程施工国际招标合同第一部分-通用条件》(以下简称FIDIC合同条件) 的使用,本人根据中国航空工业出版社出版发行的本条件的应用指南,已将其第四版发行的内容整理成英汉对照的电子版本。
正文里的条款按原文的两种语言对照录入,只在自己认为明显不妥的地方插入了自己的译法,同时对某些句子的措词和修饰也加进了一点改进意见(原文用红色标注,自己插入的译文和改动用蓝色标注)。
在此需要说明的是,插入的译文和对原译文的一些改动意见,旨在使原译文更接近于中文习惯及增加它的可读性,并不敢妄加更正,仅供对照原译文参考理解。
附录部分没有对应的译文,如:前言、索引、附件,1988年修订版说明和1992年再版修正说明等。
因此,对照英文内容为其增加了中文译文。
由于时间仓促和自己的知识面有限,在翻译和录入过程中难免会出现错误,希望各位领导和同事批评指正。
周彦松 2004年8月29日于金边FOREWORD前言 (补充译文)The terms of the Fourth Edition of the Conditions of Contract for Works ofCivil Engineering Construction have been prepared by the FédérationInternationale des Ingénieurs Conseils (FIDIC) and are recommended forgeneral use for the purpose of construction of such works where tenders areinvited on an intemational basis. The Conditions, subject to minormodifications, are also suitable for use on domestic contracts.土木工程施工合同条件的第四版已由国际咨询工程师联合会(以下简称为FIDIC)起草完成,并被推荐为以国际性招标为主的同类工程施工的通用条件,如果稍加修改,也适用于国内的招标合同。
The version in English of the Conditions is considered by FIDIC as theofficial and authentic text for the purpose of translation.本条件的英文版本, FIDIC已将其作为正式的和有效的语言文本,以用于翻译之目的。
In the preparation of the Conditions it was recognised that while there arenumerous Clauses which will be generally applicable there are some Clauseswhich must necessarily vary to take account of the circumstances and localityof the Works. The Clauses of general application have been grouped togetherin this document and are referred to as Part I - General Conditions. They havebeen printed in a form which will facilitate their inclusion as printed in thecontract documents normally prepared.在对本条件准备的过程中,发现多数条款是可以通用的,同时还考虑到工程所处的不同环境和地区须对某些条款加以必要的改动。
这些通用条款已在本文件里进行了组合,并将其称为“第一部分-通用条件”。
本条件已采用常规准备合同文件的形式印刷出版,以便按同样的印刷格式将其编入合同文件之中。
The General Conditions are linked with the Conditions of Particular Application, referred to as Part II, by the corresponding numbering of the Clauses, so that Parts I and II together comprise the Conditions governing the rights and obligations of the parties.通用条件应与特殊条件(第二部分)结合起来使用,并对应于相应的条款编号参照理解。
所以,第一部分和第二部分将共同组成各方义务和责任的监督条件。
Part II must be specially drafted to suit each individual Contract.第二部分必须给予专门的拟定,以符合合同项下每个单项的情况。
When dredging and certain types of reclamation work are involved special consideration must be given to Part II.当牵涉到清淤、疏浚和某些类型的改造工程时,必须在第二部分里给予专门的考虑与规定。
To assist in the preparation of Part II explanatory material and example clauses are published with the Conditions in a separately bound document entitled “Conditions of Contract for Works of Civil Engineering Construction, Part II - Conditions of Particular Application, with Guidelines for preparation of Part II Clauses, Fourth Edition”.为了帮助准备第二部分的内容,说明性材料和条款样例用另外的封面分开装订并和本条件一起出版,题名为“土木工程建筑施工合同条件第二部分专用条款-准备第四版第二部分条款的指导大纲”。
FIDIC has published a "Guide to the Use of FIDIC Conditions of Contract for Works of Civil Engineering Construction" which includes comments on the provisions of the Fourth Edition of the Conditions. Users of the Fourth Edition may find it helpful to refer to this Guide.FIDIC联合会已出版了一本“土木工程建筑施工合同FIDIC条件的使用指南”,其内容还包括了对第四版条款规定的注释,该版的使用者会发现对本指南的理解是很有帮助的。
It may also be helpful for users to refer to other FIDIC publications, such as: 它还可以帮助使用者参照理解FIDIC的其它出版物,例如:Tendering Procedure (First Edition 1982)投标程序(第一版,1982)Construction, Insurance and Law (1986)工程施工、保险及法律(1986)FIDIC gratefully acknowledges the suggestions and comments it has received during the preparation of this edition from European International Contractors (E1Qas mandatory of Confederation of International Contractors Associations (CICA) with participation of Associated General Contractors of America (AGC).FIDIC在起草第四版期间,欧洲国际承包商商会(EIC)代表国际承包商联盟(CICA)并在美国承包商总会(AGC)的支持下为此提出了不少建议和意见,我们为此谨表谢意!CONTENTS目录PART I: GENERAL CONDITIONS第一部分:通用条件Definitions and Interpretation定义及解释1.1 Definitions 1定义1.2 Headings and Marginal Notes 2标题和旁注1.3 Interpretation 2解释1.4 Singular and Plural 2单数和复数1.5 Notices, Consents, Approvals, Certificates 3and determinations.通知、同意、批准、证明和决定Engineer and Engineer’s Representative工程师及工程师代表2.1 Engineer’s Duties and Authority 3工程师的职责和权利2.2 Engineer’s Representative 3工程师代表2.3 Engineer’s Authority to Delegate 3工程师的授权代表2.4 Appointment of Assistants 3任命助理2.5 Instructions in Writing 3书面指示2.6 Engineer to Act Impartially 4工程师要行为公正Assignment and Subcontracting转让与分包3.1 Assignment of Contract 4合同转让4.1 Subcontracting 4分包4.2 Assignment of Subcontractors' Obligations 4分包商义务的转让Contract Documents合同文件5.1 Language/s and Law 4语言和法律5.2 Priority of Contract Documents 5合同文件的优先次序6.1 Custody and Supply of Drawings and Documents 5图纸和文件的保管与提供6.2 One Copy of Drawings to Be Kept on Site 5现场要保留一套图纸6.3 Disruption of Progress 5工程进度中断6.4 Delays and Cost of Delay of Drawings 5图纸误期和误期的费用6.5 Failure by Contractor to Submit Drawings 5分包商未能提交图纸7.1 Supplementary Drawings and Instructions 6补充图纸和指示7.2 Permanent Works Designed by Contractor 6承包商设计的永久性工程7.3 Responsibility Unaffected by Approval 6批准不影响责任General Obligations一般义务8.1 Contractor's General Responsibilities 6承包商的一般责任8.2 Site Operations and Methods of Construction 6现场作业和施工方法9.1 Contract Agreement 6合同协议书10.1 Performance Security 6履约担保10.2 Period of Validity of Performance Security 7履约担保的有效期10.3 Claims under Performance Security 7根据履约担保的索赔11.1 Inspection of Site 7现场视察12.1 Sufficiency of Tender 7投标文件的完备性12.2 Not Foreseeable Physical Obstructions or Conditions 7不利的外界障碍或条件(不可预见的外界障碍或不利条件)13.1 Work to be in Accordance with Contract 8应按照合同工作(施工)14.1 Programme to be Submitted 8应提交的施工计划14.2 Revised Programme 8修订的施工计划14.3 Cash Flow Estimate to be Submitted 8应提交的现金流通量的估算(应提交现金流量概算表14.4 Contractor not Relieved of Duties or Responsibilities 8不解除承包商的义务和责任15.1 Contractor's Superintendence 8承包商的监督16.1 Contractor’s Employees8承包商的雇员16.2 Engineer at Liberty to Object 8工程师有权提出反对17.1 Setting-out 9放线18.1 Boreholes and Exploratory Excavation 9钻孔和勘探开挖19.1 Safety, Security and Protection of the Environment 9安全、保卫和环境保护19.2 Employer’s Responsibilities9业主的责任20.1 Care of Works 9工程的照管20.2 Responsibility to Rectify Loss or Damage 10弥补损失或损坏的责任20.3 Loss or Damage Due to Employer's Risks 10由于业主风险造成的损失或损坏20.4 Employer's Risks 10业主的风险21.1 Insurance of Works and Contractor's Equipment 10工程和承包商设备的保险21.2 Scope of Cover 11保险范围21.3 Responsibility for Amounts not Recovered 11对未能收回的金额的责任21.4 Exclusions 11保险不包括的项目22.1 Damage to Persons and Property 11人身和财产的损害(人身伤害和财产的损坏)22.2 Exceptions 11例外22.3 Indemnity by Employer 12业主提供的保障23.1 Third Party Insurance (including Employer's Property) 12第三方保险(包括业主的财产)23.2 Minimum Amount of Insurance 12保险的最低数额23.3 Cross Liabilities 12交叉责任24.1 Accident or Injury to Workmen 12人员的事故或受伤24.2 Insurance Against Accident to Workmen 12人员的事故保险25.1 Evidence and Terms of Insurances 12保险证据和条款(保险赔偿的证据和条款)25.2 Adequacy of Insurances 12保险的完备性25.3 Remedy on Contractor's Failure to Insure 12对承包商未办保险的补救办法25.4 Compliance with Policy Conditions 12遵守保险单的条件26.1 Compliance with Statutes, Regulations 13遵守法令、规章27.1 Fossils 13化石28.1 Patent Rights 13专利权28.2 Royalties 13矿区使用费29.1 Interference with Traffic and Adjoining Properties 13对交通和毗邻财产的干扰30.1 Avoidance of Damage to Roads 14避免损坏道路30.2 Transport of Contractor's Equipment or Temporary Works 14承包商设备或临时工程设施的运输30.3 Transport of Materials or Plant 14材料和工程设备的运输30.4 Waterborne Traffic 14水运31.1 Opportunities for Other Contractors 14为其它承包商提供机会31.2 Facilities for Other Contractors 14为其它承包商提供方便32.1 Contractor to Keep Site Clear 15承包商要保持现场清洁33.1 Clearance of Site on Completion 15竣工时的现场清理Labour劳务34.1 Engagement of Staff and Labour 15职员和劳务人员的雇佣35.1 Returns of Labour and Contractor's Equipment 15承包商设备的撤回和劳务人员的遣返Materials, Plant and Workmanship材料、工程设备和工艺36.1 Quality of Materials, Plant and Workmanship 15工程材料、永久性设备及工艺的质量36.2 Cost of Samples 15样品费用36.3 Cost of Tests 15检验费用36.4 Cost of Tests not Provided for 16未规定的检验费用36.5 Engineer's Determination where Tests not Provided for 16工程师关于(对)未规定检验项目的决定37.1 Inspection of Operations 16操作(运行)检查37.2 Inspection and Testing 16检查和检验37.3 Dates for Inspection and Testing 16检查和检验的日期37.4 Rejection 16拒收37.5 Independent Inspection 17独立检查38.1 Examination of Work before Covering up 17工程覆盖前的检查38.2 Uncovering and Making Openings 17剥露和开孔39.1 Removal of Improper Work, Materials or Plant 17不合格工程材料和永久性设备的拆运39.2 Default of Contractor in Compliance 17承包商不遵守指示Suspension暂时停工40.1 Suspension of Work 17暂时停工40.2 Engineer’s Determination following Suspension18暂时停工后工程师的决定40.3 Suspension lasting more than 84 Days 18暂时停工持续84天以上Commencement and Delays开工和误期41.1 Commencement of Works 18工程的开工42.1 Possession of Site and Access Thereto 18现场占有权及其通道42.2 Failure to Give Possession 19未能给出(予)占有权42.3 Rights of Way and Facilities 19道路通行权和设施43.1 Time for Completion 19竣工时间44.1 Extension of Time for Completion 19竣工期限的延长44.2 Contractor to Provide Notification and Detailed Particulars 19承包商应提供的通知和详细申述44.3 Interim Determination of Extension 19临时的延期决定45.1 Restriction on Working Hours 20工作时间的限制46.1 Rate of Progress 20施工进度47.1 Liquidated Damages for Delay 20误期损失赔偿费47.2 Reduction of Liquidated Damages 20误期损失赔偿费的减少48.1 Taking-Over Certificate 21移交证书48.2 Taking-Over of Sections or Parts 21区段或部分的移交48.3 Substantial Completion of Parts 21部分工程的基本竣工48.4 Surfaces Requiring Reinstatement 21地表需要恢复原状Defects Liability缺陷责任49.1 Defects Liability Period 21缺陷责任期49.2 Completion of Outstanding Work and Remedying Defects 22完成剩余工作和修补缺陷49.3 Cost of Remedying Defects 22修补缺陷的费用49.4 Contractor’s Failure to Carry Out Instructions22承包商未执行指示50.1 Contractor to Search 22承包商进行的调查Alterations, Additions and Omissions变更、增添和省略(删减)51.1 Variations 22变更51.2 Instructions for Variations 23变更通知52.1 Valuation of Variations 23变更的估价52.2 Power of Engineer to Fix Rates 23工程师确定费率的权力52.3 Variations Exceeding 15 percent 23变更超过15%52.4 Daywork 24计日工Procedure for Claims索赔程序53.1 Notice of Claims 24索赔通知53.2 Contemporary Records 24同期记录53.3 Substantiation of Claims 25索赔的证明53.4 Failure to Comply 25未能遵守53.5 Payment of Claims 25索赔的支付Contractor’s Equipment, Temporary Worksand Materials承包商的设备、临时工程和材料54.1 Contractor’s Equipme nt, Temporary Works and Materials; Exclusive 25Use for the Works工程专用的承包商的设备、临时工程和材料54.2 Employer not Liable for Damage 25业主对损坏不承担责任54.3 Customs Clearance 25结关54.4 Re-export of Contractor's Equipment 25承包商设备的再出口54.5 Conditions of Hire of Contractor's Equipment 26承包商设备的租用条件54.6 Costs for the Purpose of Clause 63 26用于第63条目的的费用54.7 Incorporation of Clause in Subcontracts 26编入分包合同的条款54.8 Approval of Materials not Implied 26不意味对材料的批准Measurement计量55.1 Quantities 26工程量56.1 Works to be Measured 26需测量工程57.1 Method of Measurement 27测量方法57.2 Breakdown of Lump Sum Items 27包干项目的分项Provisional Sums暂定金额58.1 Definition of "Provisional Sum" 27“暂定金额”的定义58.2 Use of Provisional Sums 27暂定金额的使用58.3 Production of Vouchers 27凭证的出示Nominated Subcontractors指定的分包商59.1 Definition of “Nominated Subcontractors”27“指定的分包商”的定义59.2 Nominated Subcontractors; Objection to Nomination 27指定的分包商;对指定的反对59.3 Design Requirements to be Expressly Stated 28设计要求应明确规定59.4 Payments to Nominated Subcontractors 28对指定的分包商的付款59.5 Certification of Payments to Nominated Subcontractors 28对指定的分包商的支付证书Certificates and Payment证明与支付60.1 Monthly Statements 29月报表60.2 Monthly Payments 29每月的支付60.3 Payment of Retention Money 29保留金的支付60.4 Correction of Certificates 29证书的修改60.5 Statement at Completion 30竣工报表60.6 Final Statement 30最终报表60.7 Discharge 30结清60.8 Final Payment Certificate 30最终支付证书60.9 Cessation of Employer's Liability 30业主责任的终止60.10 Time for Payment 31支付时间61.1 Approval only by Defects Liability Certificate 31仅凭责任缺陷证书的批准62.1 Defects Liability Certificate 31责任缺陷证书62.2 Unfulfilled Obligations 31未履行的义务Remedies补救措施63.1 Default of Contractor 31承包商的违约63.2 Valuation at Date of Termination 32终止日的估价63.3 Payment after Termination 32终止后的付款63.4 Assignment of Benefit of Agreement 32协议利益的转让64.1 Urgent Remedial Work 32紧急补救工作Special Risks特殊风险65.1 No Liability for Special Risks 33对特殊风险不承担责任65.2 Special Risks 33特殊风险65.3 Damage to Works by Special Risks 33特殊风险对工程造成的损害65.4 Projectile, Missile 33炮弹、导弹65.5 Increased Costs arising from Special Risks 33特殊风险引起的费用增加65.6 Outbreak of War 33战争爆发65.7 Removal of Contractor's Equipment on Termination 34合同终止时承包商设备的撤离65.8 Payment if Contract Terminated 34合同终止后的付款Release from Performance解除履约66.1 Payment in Event of Release from Performance 35解除履约时的付款Settlement of Disputes争议的解决67.1 Engineer’s Decision35工程师的决定67.2 Amicable Settlement 35友好解决67.3 Arbitration 36仲裁67.4 Failure to Comply with Engineer's Decision 36未能遵从工程师的决定Notices通知68.1 Notice to Contractor 36致承包商的通知68.2 Notice to Employer and Engineer 36致业主和工程师的通知68.3 Change of Address 36地址的变更Default of Employer业主的违约69.1 Default of Employer 36业主的违约69.2 Removal of Contractor's Equipment 37承包商设备的撤离69.3 Payment on Termination 37终止时的付款69.4 Contractor’s Entitlement to Suspend Work37承包商暂停工作的权利69.5 Resumption of Work 37复工Changes in Cost and Legislation费用和法规的变更70.1 Increase or Decrease of Cost 37费用的增加或减少70.2 Subsequent Legislation 37后继的法规Currency and Rates of Exchange货币及汇率71.1 Currency Restrictions 38货币限制72.1 Rates of Exchange 38汇率72.2 Currency Proportions 38货币比例72.3 Currencies of Payment for Provisional Sums 38为暂定金额支付的货币REFERENCE TO PART IIINDEXTENDERAGREEMENTEDITORIAL AMENDMENTS IN 1988FURTHER AMENDMENTS IN 1992(补充译文)第二部分条款的参照索引投标书协议书1988年修订版1992年再版修订版PART I - GENERAL CONDITIONS第一部分:通用条件Definitions and Interpretation定义及解释Definitions 1.1 In the Contract (as hereinafter defined) thefollowing words and expressions shall have themeanings hereby assigned to them, except wherethe context otherwise requires:在合同(如下文所定义的)中,下列用词与词句,除上下文另有要求者外,应具备本款所赋予的含义。