管道回填计算表格
管道开挖回填计算(模板)1
混凝土
c2 37 56 72 89 107 420 480 540 600 660 720 810 900 990 1080 1200 1320 1430 1535 1655 1775
m3/m 0.044 0.063 0.102 0.139
管内径 壁厚 D t
a
管基尺寸 c1 c2
混凝土
m3/m
600 0.35 700 0.457 800 0.579 900 0.715 1000 0.865 120度 1100 1.029 混凝土 1200 1.302 基础 1350 1.608 1500 1.945 1650 2.315 1800 2.858 2000 3.458 2200 3.932 2400 4.339 2600 5.072 2800 5.862 3000
a 80 80 100 110 130 140 160 180 200 220 240 270 300 330 360 400 440 460 470 510 550
管基尺寸 c1 80 80 100 110 130 140 160 180 200 220 240 270 300 330 360 400 440 460 470 510 550
管内径 壁厚 D t
a
管基尺寸 c1 c2
管内径 壁厚 D t
a
管基尺寸 c1 c2
管内径 壁厚 D t 300 400 500 600 700 800 900 1000 1100 1200 1350 1500 1650 1800 2000 2200 2400 2600 2800 3000 30 40 50 60 70 80 90 100 110 120 135 150 165 180 200 220 230 235 255 275
直埋管道挖沟、回填砂、回填土计算表
445.18 121.64 32.99 7.88 2452.52 743.60 127.60 65.02 9.41 4.67 126.27 44.18 344.90 114.91 579.20 183.98 593.74 180.06 1781.12 592.82 8.19 5.67 422.03 143.75 532.02 173.12 962.25 322.53 6.25 4.63 66.18 25.28 72.43 29.90 15556.97 5038.73
第 1 页,共 2 页
直埋热水管道挖管沟土方、回填砂、土速算表(05N14-P13)无地下水
管道外径 159 159 219 219 219 219 219 219 273 273 273 377 377 公称直径 DN 150 150 200 200 200 200 200 200 250 250 250 350 350 外套管 D 250 250 315 315 315 315 315 315 365 365 365 500 500 沟底宽 管沟长度 (>700)以 后增加高 L (m) 度(m) 950 166.5 950 10.78 1050.41 1080 105.49 1080 7.58 1080 50.67 1080 131.78 1080 211 1080 206.5 713.02 1180 8.17 1180 145.78 1180 175.57 329.52 1450 5.07 1450 19.19 24.26 合 计(m3) 管沟度 H(m) 1.55 1.70 1.12 1.15 1.40 1.45 1.50 1.55 0.85 1.50 1.55 0.85 1.55 放坡系数 挖地槽土 K 方(m3) 0.50 0.50 0.00 0.00 0.50 0.50 0.50 0.50 0.00 0.50 0.50 0.00 0.50 回填砂 (m3) 回填土 (m3) 307.19 24.05 1605.80 46.14 3.56 74.19 209.46 362.33 381.50 1077.17 0.82 247.78 322.16 570.76 -0.37 33.37 33.00 9864.95
管道土方及管道计算表格
井室名称 井室内径m
数量 (座) 井室深m
圆井1# 圆井2# 圆井3#
1
0
2
1.2
0
2.1
1.2
0
1.7
方形井 井室长m 井室宽m
方井1#
2
2
0
2
方井2#
2
2
0
2
方井3#
2
2
0
2
土方合计
放坡系数表
机械挖土
土方类别
放坡起点 深度(m)
人工挖 土 在坑内作
在坑外作
一、二类
业
业
土
1.2 0.5
0.33
0.75
0.0
0.0
19~
20
365
0.0
0.0
20~
21
365
0.0
0.0
21~
22
365
0.0
0.0
22~
23
365
0.0
0.0
23~
24
365
0.0
0.0
合计
0.0
0.0
机械 挖掘机挖土不装车90%
挖土 挖掘机挖土装车
加管 人工清槽挖土(市政)10%
道接 人工挖探槽(探槽宽0.5)
口
无探槽时并入挖掘机挖土不装车
1.28
1.28
1.28
砂垫层厚
0.2
0.2
0.2
0.2
沟上口宽 2.7808
2.7808
2.7808
2.7808
放坡系数
0.268
0.268
0.268
0.268
管沟深
2.8
市政管道决算资料
S307污水管道工程主线沟槽土方开挖、回填计算表
井号 W64 W65 W65 W66 W67 W68 W68 W69 W69 W70 W71 W72 W73 W74 W75 W76 W76 W77 W78 原地面标高 设计管内底 (m) 高程(m) 2.899 3.322 3.322 3.595 2.631 2.463 2.463 2.786 2.786 3.026 2.997 3.096 2.653 3.205 3.395 3.259 3.259 3.395 3.521 -1.494 -1.544 -1.544 -1.594 -1.644 -1.700 -2.300 -2.220 -2.220 -2.150 -2.090 -2.045 -1.988 -1.918 -1.848 -1.768 -1.768 -1.708 -1.657 开挖深度 (m) 4.723 5.196 5.226 5.549 4.635 4.523 5.223 1.90 5.466 5.563 5.733 5.644 1.85 5.698 5.198 5.680 1.85 5.800 5.584 5.487 5.563 5.638 1.90 1.90 10.50 10.64 35.82 31.82 376.0 338.6 2.83 2.83 274.7 248.6 DN1200砼管180度钢筋砼基础 1.85 10.53 75.82 798.4 2.78 587.4 10.62 65.82 698.9 2.78 515.8 1.85 10.06 72.32 727.7 2.78 526.4 1.85 10.08 37.82 381.2 2.78 275.9 DN1200砼管135度钢筋砼基础 10.49 55.82 585.6 2.78 430.3 1.85 10.52 65.12 685.3 2.78 504.1 1.85 10.45 81.32 849.7 2.78 623.4 10.15 0 0.0 2.83 0.0 DN1200砼管180度钢筋砼基础 1.10 1.10 1.10 5.93 5.60 5.04 46.37 44.77 59.335 274.80 250.8 298.9 0.92 0.92 0.92 232.2 209.7 244.4 DN600砼管135度钢筋砼基础 计算宽度 (m) 间距(扣除井位 开挖断面面 沟槽开挖方量 置处灰土回填长 积(m2) (m3) 度(m) 5.26 48.27 253.8 扣除管道结 构断面面积 (m2) 0.92 回填方量 (m2) 管径
给水管道工程量计算表
给水管道每m土石方工程量计算式一、DN600管 每m工程量1、凿除(恢复)车行道砼路面C35厚25cm、弃运20KmA=4.05m2;2、凿除(恢复)车行道砼路面6%水泥石粉层厚40cm、弃运20KmA=3.71m2;3、机械挖沟槽土(石)方、弃运20KmV=(1.3+3.18)/2×(2.05-0.25-0.40)=3.14m3;4、需要恢复砼路面段回填中粗砂回填中粗砂=总挖方-路面恢复量-管材体积(1)、总挖方: V=(4.05+1.3)/2×2.05=5.48m3;(2)、路面恢复:V=(4.05+3.18)/2×0.65=2.35m3;(3)、管材体积:V=π×0.6×0.6/4=0.28m3;(4)、中粗砂: V=5.48-2.35-0.28=2.85m3。
4、不需恢复砼路面段回填中粗砂回填中粗砂=总挖方-管材体积V=5.48-0.28=5.20m3。
二、DN300管 每m工程量(一)、车行道上1、凿除(恢复)车行道砼路面C35厚25cm、弃运20KmA=2.45m2;2、凿除(恢复)车行道砼路面6%水泥石粉层厚40cm、弃运20KmA=2.14m2;3、机械挖沟槽土(石)方、弃运20KmV=(0.8+1.61)/2×0.6=0.72m3;4、需要恢复砼路面段回填中粗砂回填中粗砂=总挖方-路面恢复量-管材体积(1)、总挖方: V=(2.45+0.8)/2×1.25=2.03m3;(2)、路面恢复:V=(2.45+1.61)/2×0.65=1.32m3;(3)、管材体积:V=π×0.3×0.3/4=0.07m3;(4)、中粗砂: V=2.03-1.32-0.07=0.64m3。
5、不需恢复砼路面段回填中粗砂回填中粗砂=总挖方-管材体积V=2.03-0.07=1.96m3。
计算: 复核: 现场代表:给水管道每m土石方工程量计算式(二)、人行道上1、拆除人行道板块(含水泥砂浆)厚10cm、弃运20KmA=2.14m2;2、凿除(恢复)车行道砼路面6%水泥石粉层厚15cm、弃运20KmA=2.01m2;3、机械挖沟槽土(石)方、弃运20KmV=(0.8+1.81)/2×0.75=0.98m3;4、回填中粗砂回填中粗砂=总挖方-管材体积(1)、总挖方: V=(2.14+0.8)/2×1=1.47m3;(2)、管材体积:V=π×0.3×0.3/4=0.07m3;(3)、回填中粗砂=总挖方-管材体积V=1.47-0.07=1.40m3。
管道开挖回填基础工程量计算表
A (槽底)B (管顶面处沟槽宽度)H (槽底至管顶高度)V 90o 扇形面积90o 扇形中三角形面积270o 扇形面积0.60.060.50.10.1050.33 1.72 2.26120.82 1.630.1017360.06480.3052080.330.900.70.070.50.150.1230.33 1.84 2.49340.99 2.150.1384740.08820.4154220.48 1.110.80.080.50.150.1410.33 1.96 2.6926 1.11 2.580.1808640.11520.5425920.53 1.330.90.090.50.20.1580.33 2.08 2.9248 1.28 3.200.2289060.14580.6867180.70 1.5810.10.50.20.1760.33 2.2 3.124 1.4 3.730.28260.180.84780.77 1.831.10.110.60.20.1930.33 2.52 3.5232 1.52 4.590.3419460.2178 1.0258380.92 2.311.20.120.60.250.2110.33 2.64 3.7554 1.69 5.400.4069440.2592 1.220832 1.14 2.641.350.1350.60.250.2370.33 2.824.0542 1.87 6.430.51503850.32805 1.5451155 1.26 3.101.50.150.60.30.2640.333 4.386 2.17.760.635850.405 1.90755 1.57 3.651.650.1650.80.30.290.33 3.58 5.0848 2.289.880.76937850.49005 2.3081355 1.95 4.851.80.180.80.30.3160.33 3.765.3836 2.4611.250.9156240.5832 2.746872 2.11 5.4820.20.80.30.3510.334 5.782 2.713.21 1.13040.72 3.3912 2.336.352.20.220.80.30.3870.33 4.24 6.1804 2.9415.32 1.3677840.8712 4.103352 2.577.272.40.230.80.30.4190.33 4.46 6.5456 3.1617.39 1.6052465 1.02245 4.8157395 2.798.172.60.2350.80.30.450.33 4.67 6.8942 3.3719.49 1.849636625 1.1781125 5.548909875 3.029.072.80.2550.80.30.850.334.917.29263.6122.032.1501346251.36951256.4504038755.308.12c2放坡系数管道断面积基础工程量基础上表面回填至管顶工程量06MS201-190o 砂石基础钢筋混凝土管(8)每m 工程量开挖至管顶土石方工程量图籍编号及名称(页码)管内径D(m)管壁厚t(m)a c1管基尺寸(m)30.2750.80.30.520.335.157.6913.8524.722.4732406251.57531257.419721875 3.5511.28A (槽底)B (管顶面处沟槽宽度)H (槽底至管顶高度)V 120o 扇形面积120o 扇形中三角形面积240o 扇形面积0.40.040.40.10.120.33 1.28 1.66280.580.850.0602880.02494080.1205760.260.410.50.050.40.10.150.33 1.4 1.8620.7 1.140.09420.038970.18840.320.540.60.060.50.10.180.33 1.72 2.26120.82 1.630.1356480.05611680.2712960.430.800.70.070.50.150.210.33 1.84 2.49340.99 2.150.1846320.07638120.3692640.600.990.80.080.50.150.240.33 1.96 2.6926 1.11 2.580.2411520.09976320.4823040.67 1.190.90.090.50.20.270.33 2.08 2.9248 1.28 3.200.3052080.12626280.6104160.87 1.4210.10.50.20.30.33 2.2 3.124 1.4 3.730.37680.155880.75360.96 1.631.10.110.60.20.330.33 2.52 3.5232 1.52 4.590.4559280.18861480.911856 1.16 2.061.20.120.60.250.360.33 2.64 3.7554 1.69 5.400.5425920.2244672 1.085184 1.42 2.361.350.1350.60.250.4050.33 2.824.0542 1.87 6.430.6867180.2840913 1.373436 1.59 2.781.50.150.60.30.450.333 4.386 2.17.760.84780.35073 1.6956 1.94 3.271.650.1650.80.30.4950.33 3.585.0848 2.289.88 1.0258380.4243833 2.051676 2.45 4.351.80.180.80.30.540.33 3.765.3836 2.4611.25 1.2208320.5050512 2.441664 2.68 4.9120.20.80.30.60.334 5.782 2.713.21 1.50720.62352 3.0144 2.98 5.702.20.220.80.30.660.33 4.246.1804 2.9415.32 1.8237120.7544592 3.647424 3.31 6.542.40.230.80.30.7150.33 4.46 6.5456 3.1617.39 2.1403286670.8854417 4.280657333 3.617.362.60.2350.80.30.7680.334.676.89423.3719.492.4661821671.019580774.9323643333.928.1706MS201-1120o 砂石基础钢筋混凝土管(9)c2开挖至管顶土石方工程量管道断面积图籍编号及名称(页码)管内径D(m)管壁厚t(m)管基尺寸(m)放坡系数每m 工程量a c1基础工程量回填至管顶工程量2.80.2550.80.30.8280.33 4.917.29263.6122.03 2.866846167 1.18528121 5.7336923334.289.1530.2750.80.30.8880.335.157.6913.8524.723.2976541671.363452056.5953083334.6510.18A (槽底)B (管顶面处沟槽宽度)H (槽底至管顶高度)V 150o 扇形面积150o 扇形中三角形面积210o 扇形面积0.30.030.40.10.1330.33 1.16 1.46360.460.600.042390.008172360.0593460.250.250.40.040.40.10.1780.33 1.28 1.66280.580.850.075360.014374080.1055040.320.350.50.050.40.10.2220.33 1.4 1.8620.7 1.140.117750.02260440.164850.390.470.60.060.50.10.2670.33 1.72 2.26120.82 1.630.169560.032341680.2373840.540.690.70.070.50.150.3110.33 1.84 2.49340.99 2.150.230790.044223480.3231060.730.860.80.080.50.150.3560.33 1.96 2.6926 1.11 2.580.301440.057496320.4220160.83 1.030.90.090.50.20.40.33 2.08 2.9248 1.28 3.200.381510.07302960.534114 1.06 1.2310.10.50.20.4450.33 2.2 3.124 1.4 3.730.4710.0898380.6594 1.18 1.421.10.110.60.20.4890.33 2.52 3.5232 1.52 4.590.569910.109022760.797874 1.43 1.791.20.120.60.20.5340.33 2.64 3.7224 1.64 5.220.678240.129366720.949536 1.57 2.021.350.1350.60.250.60.33 2.824.0542 1.87 6.430.85839750.1643166 1.2017565 1.94 2.431.50.150.60.30.6670.333 4.386 2.17.76 1.059750.2025702 1.48365 2.35 2.861.650.1650.80.30.7340.33 3.585.0848 2.289.88 1.28229750.24482304 1.7952165 3.02 3.781.80.180.80.30.80.33 3.765.3836 2.4611.25 1.526040.2921184 2.136456 3.30 4.2820.20.80.30.8890.334 5.782 2.713.21 1.8840.3605112 2.6376 3.70 4.992.20.220.80.30.9780.33 4.246.1804 2.9415.32 2.279640.43609104 3.191496 4.11 5.732.40.230.80.31.060.334.466.54563.1617.392.6754108330.51111063.7455751674.516.4606MS201-1150o 砂石基础钢筋混凝土管(10)c2基础工程量回填至管顶工程量图籍编号及名称(页码)管内径D(m)管壁厚t(m)管基尺寸(m)放坡系数每m 工程量开挖至管顶土石方工程量管道断面积a c12.60.2350.80.3 1.1380.33 4.67 6.89423.3719.49 3.0827277080.588675574.315818792 4.907.182.80.2550.80.3 1.2270.33 4.917.2926 3.6122.03 3.5835577080.684256445.016980792 5.378.0630.2750.80.31.3160.335.157.6913.8524.724.1220677080.787024355.7708947925.858.98A (槽底)B (管顶面处沟槽宽度)H (槽底至管顶高度)V 180o 扇形面积180o 扇形面积0.20.030.40.10.130.33 1.06 1.29760.360.420.0265330.0265330.230.140.30.030.40.10.180.33 1.16 1.46360.460.600.0508680.0508680.300.200.40.040.40.10.240.33 1.28 1.66280.580.850.0904320.0904320.380.290.50.050.40.10.30.33 1.4 1.8620.7 1.140.14130.14130.470.390.60.060.50.10.360.33 1.72 2.26120.82 1.630.2034720.2034720.660.570.70.070.50.150.420.33 1.84 2.49340.99 2.150.2769480.2769480.880.710.80.080.50.150.480.33 1.96 2.6926 1.11 2.580.3617280.361728 1.000.850.90.090.50.20.540.33 2.08 2.9248 1.28 3.200.4578120.457812 1.26 1.0310.10.50.20.60.33 2.2 3.124 1.4 3.730.56520.5652 1.41 1.191.10.110.60.20.660.33 2.52 3.5232 1.52 4.590.6838920.683892 1.73 1.501.20.120.60.250.720.33 2.64 3.7554 1.69 5.400.8138880.813888 2.06 1.721.350.1350.60.250.810.33 2.824.0542 1.87 6.43 1.030077 1.030077 2.33 2.041.50.150.60.30.90.333 4.386 2.17.76 1.2717 1.2717 2.80 2.411.650.1650.80.30.990.33 3.585.0848 2.289.88 1.538757 1.538757 3.63 3.171.80.180.80.3 1.080.33 3.765.3836 2.4611.25 1.831248 1.831248 3.99 3.6020.20.80.3 1.20.334 5.782 2.713.21 2.2608 2.2608 4.48 4.202.20.220.80.31.320.334.246.18042.9415.322.7355682.7355685.004.85图籍编号及名称(页码)管内径D(m)管壁厚t(m)管基尺寸(m)放坡系数每m 工程量a c1回填至管顶工程量c2开挖至管顶土石方工程量管道断面积基础工程量06MS201-1180o 砂石基础钢筋混凝土管(11)2.40.230.80.3 1.430.33 4.46 6.54563.1617.39 3.210493 3.210493 5.49 5.472.60.2350.80.3 1.5350.334.67 6.8942 3.3719.49 3.69927325 3.699273255.986.112.80.2550.80.3 1.6550.33 4.917.2926 3.6122.03 4.30026925 4.30026925 6.56 6.8730.2750.80.31.7750.335.157.6913.8524.724.946481254.946481257.167.67A (槽底)B (管顶面处沟槽宽度)H (槽底至管顶高度)V90o 扇形面积90o 扇形中三角形面积270o 扇形面积0.60.0550.50.110.1040.331.712.25120.821.620.0989296250.06301250.2967888750.350.880.70.0550.50.110.1190.33 1.81 2.41720.92 1.940.1287596250.08201250.3862788750.39 1.040.80.060.50.120.1350.33 1.92 2.6064 1.04 2.350.1661060.10580.4983180.45 1.240.90.0650.50.130.1510.332.032.79561.162.800.2082016250.13261250.6246048750.521.4510.070.50.140.1670.33 2.14 2.9848 1.28 3.280.25504650.162450.76513950.60 1.661.20.080.60.160.1990.332.563.56321.524.650.3629840.23121.0889520.832.371.40.090.60.180.2310.332.783.9416 1.765.920.48991850.31205 1.4697555 1.02 2.931.60.10.80.20.2640.33 3.4 4.7228.120.635850.405 1.90755 1.42 4.161.80.1150.80.230.2970.333.635.12162.269.890.8087266250.51511252.4261798751.714.9420.130.80.260.3310.33 3.86 5.5232 2.5211.82 1.00236650.63845 3.0070995 2.03 5.78基础工程量回填至管顶工程量图籍编号及名称(页码)管内径D(m)管壁厚t(m)管基尺寸(m)放坡系数每m 工程量a c1c2开挖至管顶土石方工程量管道断面积06MS201-190o 砂石基础预应力混凝土管(12)A (槽底)B (管顶面处沟槽宽度)H (槽底至管顶高度)V120o 扇形面积120o 扇形中三角形面积240o 扇形面积0.40.050.40.10.1250.331.31.6960.60.900.0654166670.02706250.1308333330.270.430.50.050.40.10.150.33 1.4 1.8620.7 1.140.09420.038970.18840.320.540.60.0550.50.110.1780.33 1.71 2.25120.82 1.620.1319061670.054415110.2638123330.440.790.70.0550.50.110.2030.331.812.41720.921.940.17167950.070847460.3433590.500.930.80.060.50.120.230.33 1.92 2.6064 1.04 2.350.2214746670.09162280.4429493330.58 1.110.90.0650.50.130.2580.33 2.03 2.7956 1.16 2.800.2776021670.114619430.5552043330.67 1.2910.070.50.140.2850.332.142.98481.283.280.3400620.14068170.6801240.771.491.20.080.60.160.340.332.563.5632 1.524.650.4839786670.20021920.967957333 1.08 2.121.40.090.60.180.3950.332.783.94161.765.920.6532246670.27023531.3064493331.322.631.60.10.80.20.450.33 3.4 4.7228.120.84780.35073 1.6956 1.85 3.72管壁厚t(m)06MS201-1120o 砂石基础预应力混凝土管(13)管基尺寸(m)放坡系数每m 工程量a c1c2开挖至管顶土石方工程量管道断面积基础工程量回填至管顶工程量图籍编号及名称(页码)管内径D(m)1.80.1150.80.230.5080.333.635.12162.269.891.0783021670.445647932.1566043332.234.4320.130.80.260.5650.33 3.86 5.5232 2.5211.82 1.3364886670.5528977 2.672977333 2.63 5.19A (槽底)B (管顶面处沟槽宽度)H (槽底至管顶高度)V180o 扇形面积180o 扇形面积0.40.050.40.10.250.331.31.6960.60.900.0981250.0981250.400.310.50.050.40.10.30.33 1.4 1.8620.7 1.140.14130.14130.470.390.60.0550.50.110.3550.33 1.71 2.25120.82 1.620.197859250.197859250.670.560.70.0550.50.110.4050.331.812.41720.921.940.257519250.257519250.760.670.80.060.50.120.460.33 1.92 2.6064 1.04 2.350.3322120.3322120.890.800.90.0650.50.130.5150.332.032.79561.162.800.416403250.416403251.030.9410.070.50.140.570.33 2.14 2.9848 1.28 3.280.5100930.510093 1.18 1.081.20.080.60.160.680.332.563.5632 1.524.650.7259680.725968 1.66 1.541.40.090.60.180.790.332.783.94161.765.920.9798370.9798372.031.9306MS201-1180o 砂石基础预应力混凝土管(14)放坡系数每m 工程量a c1c2开挖至管顶土石方工程量管道断面积基础工程量回填至管顶工程量图籍编号及名称(页码)管内径D(m)管壁厚t(m)管基尺寸(m)标准图籍相关工程量计算表1.60.10.80.20.90.333.44.7228.121.27171.27172.872.711.80.1150.80.23 1.0150.33 3.63 5.12162.269.89 1.61745325 1.617453253.41 3.2420.130.80.261.130.333.865.52322.5211.822.0047332.0047334.003.82A (槽底)B (管顶面处沟槽宽度)H (槽底至管顶高度)V120o 扇形面积120o 扇形中三角形面积240o 扇形面积0.60.0550.10.10.1780.330.91 1.44460.810.950.1319061670.054415110.2638123330.1750.380.70.060.10.10.2050.33 1.02 1.62720.92 1.220.1759446670.07278730.3518893330.2080.480.80.070.1050.1050.2350.33 1.15 1.8397 1.045 1.560.2312086670.09564970.4624173330.2550.610.90.0750.1130.1130.2630.33 1.276 2.04358 1.163 1.930.28848750.11911830.5769750.3100.7510.0850.1280.1280.2930.33 1.426 2.28268 1.298 2.410.35819550.147930120.7163910.3900.941.10.0950.1430.1430.3230.33 1.576 2.52178 1.433 2.940.43543950.179859540.8708790.479 1.151.20.10.150.150.350.33 1.7 2.723 1.55 3.430.5128666670.21217 1.025*******.549 1.341.350.1150.1730.1730.3950.33 1.926 3.08298 1.753 4.390.6532246670.2702353 1.3064493330.711 1.721.50.1250.1880.1880.4380.33 2.126 3.40508 1.938 5.360.8013541670.33113675 1.6027083330.861 2.091.650.140.210.210.4830.332.353.76242.146.540.9746821670.402802581.9493643331.0572.56c2开挖至管顶土石方工程量管道断面积基础工程量回填至管顶工程量(14)图籍编号及名称(页码)管内径D(m)管壁厚t(m)管基尺寸(m)放坡系数每m 工程量a c106MS201-1120o 混凝土基础钢筋混凝土管(16)标准图籍相关工程量计算表1.80.150.2250.2250.5250.332.55 4.0845 2.3257.71 1.153950.4773825 2.3079 1.2363.0120.170.2550.2550.5850.33 2.854.5627 2.5959.62 1.4327820.5927337 2.865564 1.554 3.772.20.1850.2780.2780.6430.33 3.1265.00568 2.84811.58 1.7282821670.714424023.456564333 1.8654.532.40.20.30.30.70.33 3.45.446 3.113.71 2.0514666670.84868 4.102933333 2.197 5.362.60.220.330.330.760.33 3.7 5.9242 3.3716.22 2.418218667 1.0004032 4.8364373332.615 6.352.80.2350.3530.3530.8180.333.976 6.36718 3.62318.74 2.7979755 1.15679847 5.595951 3.0157.3330.250.3750.3750.8750.334.256.80753.87521.423.2054166671.32606256.4108333333.4338.37A (槽底)B (管顶面处沟槽宽度)H (槽底至管顶高度)V 120o 扇形面积120o 扇形中三角形面积240o 扇形面积0.60.060.10.10.180.330.92 1.46120.820.980.1356480.05611680.2712960.1780.390.70.070.1050.1050.210.33 1.05 1.67370.945 1.290.1846320.07638120.3692640.2220.510.80.080.120.120.240.33 1.2 1.9128 1.08 1.680.2411520.09976320.4823040.2910.670.90.090.1350.1350.270.33 1.35 2.1519 1.215 2.130.3052080.12626280.6104160.3680.8410.10.150.150.30.33 1.5 2.391 1.35 2.630.37680.155880.75360.454 1.041.10.110.1650.1650.330.33 1.65 2.6301 1.485 3.180.4559280.18861480.9118560.549 1.261.20.120.180.180.360.33 1.8 2.8692 1.62 3.780.5425920.2244672 1.0851840.654 1.501.350.1350.2030.2030.4050.33 2.026 3.22918 1.823 4.790.6867180.2840913 1.3734360.829 1.901.50.150.2250.2250.450.33 2.25 3.5865 2.025 5.910.84780.35073 1.6956 1.022 2.341.650.1650.2480.2480.4950.332.4763.946482.2287.151.0258380.42438332.0516761.2382.8406MS201-1120o 混凝土基础钢筋混凝土管(17)放坡系数每m 工程量a c1c2开挖至管顶土石方工程量管道断面积基础工程量回填至管顶工程量管壁厚t(m)管基尺寸(m)120o 混凝土基础钢筋混凝土管(16)图籍编号及名称(页码)管内径D(m)标准图籍相关工程量计算表1.80.180.270.270.540.332.7 4.3038 2.438.51 1.2208320.5050512 2.441664 1.4713.3820.20.30.30.60.3334.782 2.710.51 1.50720.62352 3.0144 1.816 4.172.20.220.330.330.660.33 3.35.2602 2.9712.71 1.8237120.7544592 3.647424 2.198 5.042.40.230.3450.3450.7150.33 3.55 5.6653 3.20514.77 2.1403286670.8854417 4.280657333 2.508 5.842.60.2350.3530.3530.7680.33 3.7766.03518 3.42316.79 2.466182167 1.01958077 4.932364333 2.786 6.612.80.2550.3830.3830.8280.33 4.076 6.51338 3.69319.55 2.866846167 1.18528121 5.733692333 3.2547.7030.2750.4130.4130.8880.334.3766.991583.96322.523.2976541671.363452056.5953083333.7598.87A (槽底)B (管顶面处沟槽宽度)H (槽底至管顶高度)V 180o 扇形面积180o 扇形面积0.60.0550.110.110.3550.330.93 1.47120.820.980.197859250.197859250.2350.350.70.060.120.120.410.33 1.06 1.68040.94 1.290.2639170.2639170.2980.460.80.070.140.140.470.33 1.22 1.9328 1.08 1.700.3468130.3468130.3970.610.90.0750.150.150.5250.33 1.35 2.142 1.2 2.100.432731250.432731250.4790.7510.0850.170.170.5850.33 1.51 2.3944 1.34 2.620.537293250.537293250.6030.941.10.0950.190.190.6450.33 1.67 2.6468 1.48 3.190.653159250.653159250.741 1.151.20.10.20.20.70.33 1.8 2.856 1.6 3.720.76930.76930.851 1.341.350.1150.230.230.790.33 2.04 3.2346 1.814.770.9798370.979837 1.101 1.711.50.1250.250.250.8750.332.253.5725.821.202031251.202031251.3292.09管基尺寸(m)放坡系数每m 工程量a c1回填至管顶工程量c2开挖至管顶土石方工程量管道断面积基础工程量120o 混凝土基础钢筋混凝土管(17)图籍编号及名称(页码)管内径D(m)管壁厚t(m)06MS201-1180o 混凝土基础钢筋混凝土管(18)标准图籍相关工程量计算表1.650.140.280.280.9650.332.493.9486 2.217.11 1.46202325 1.46202325 1.638 2.551.80.150.30.3 1.050.33 2.74.284 2.48.38 1.730925 1.730925 1.914 3.0020.170.340.34 1.170.33 3.02 4.7888 2.6810.46 2.149173 2.149173 2.411 3.752.20.1850.370.37 1.2850.33 3.315.2504 2.9412.58 2.592423252.592423252.886 4.512.40.20.40.4 1.40.333.6 5.712 3.214.90 3.0772 3.0772 3.4035.342.60.220.440.44 1.520.33 3.926.2168 3.4817.64 3.627328 3.627328 4.056 6.332.80.2350.470.47 1.6350.33 4.21 6.6784 3.7420.36 4.19696325 4.19696325 4.6657.3030.250.50.51.750.334.57.14423.284.8081254.8081255.3178.35A (槽底)B (管顶面处沟槽宽度)H (槽底至管顶高度)V 180o 扇形面积180o 扇形面积0.60.060.120.120.360.330.96 1.51440.84 1.040.2034720.2034720.2570.370.70.070.140.140.420.33 1.12 1.76680.98 1.410.2769480.2769480.3500.510.80.080.160.160.480.33 1.28 2.0192 1.12 1.850.3617280.3617280.4570.670.90.090.180.180.540.33 1.44 2.2716 1.26 2.340.4578120.4578120.5790.8410.10.20.20.60.33 1.6 2.524 1.4 2.890.56520.56520.715 1.041.10.110.220.220.660.33 1.76 2.7764 1.54 3.490.6838920.6838920.865 1.261.20.120.240.240.720.33 1.92 3.0288 1.68 4.160.8138880.813888 1.029 1.501.350.1350.270.270.810.332.163.40741.895.261.0300771.0300771.3031.9006MS201-1180o 混凝土基础钢筋混凝土管管基尺寸(m)放坡系数每m 工程量a c1c2开挖至管顶土石方工程量管道断面积基础工程量图籍编号及名称(页码)管内径D(m)管壁厚t(m)180o 混凝土基础钢筋混凝土管(18)回填至管顶工程量标准图籍相关工程量计算表1.50.150.30.30.90.332.43.786 2.1 6.50 1.2717 1.2717 1.608 2.341.650.1650.330.330.990.33 2.644.1646 2.317.86 1.538757 1.538757 1.946 2.841.80.180.360.36 1.080.33 2.88 4.5432 2.529.35 1.831248 1.831248 2.316 3.3720.20.40.4 1.20.33 3.25.048 2.811.55 2.2608 2.2608 2.859 4.172.20.220.440.44 1.320.33 3.52 5.5528 3.0813.97 2.735568 2.735568 3.460 5.042.40.230.460.46 1.430.33 3.78 5.9712 3.3216.19 3.210493 3.210493 3.934 5.832.60.2350.470.47 1.5350.33 4.01 6.3464 3.5418.33 3.69927325 3.69927325 4.341 6.592.80.2550.510.51 1.6550.33 4.33 6.8512 3.8221.36 4.30026925 4.30026925 5.0747.6830.2750.550.551.7750.334.657.3564.124.614.946481254.946481255.8658.85A (槽底)B (管顶面处沟槽宽度)H (槽底至管顶高度)V90o 扇形面积90o 扇形中三角形面积270o 扇形面积0.150.0250.080.080.0290.330.360.54480.280.130.007850.0050.023550.0360.060.20.0270.080.080.0370.330.4140.634440.3340.180.0126612650.00806450.0379837950.0440.080.250.0330.080.080.0460.330.4760.737360.3960.240.019596740.0124820.058790220.0530.110.30.040.080.080.0560.330.540.84360.460.320.02833850.018050.08501550.0630.140.350.0450.090.090.0640.330.620.96980.530.420.0379940.02420.1139820.0820.190.40.0470.10.10.0720.330.6941.086040.5940.530.0478920650.03050450.1436761950.1020.24180o 混凝土基础钢筋混凝土管(19)图籍编号及名称(页码)管内径D(m)管道断面积基础工程量回填至管顶工程量管壁厚t(m)管基尺寸(m)06MS201-190o 混凝土基础混凝土管(20)放坡系数每m 工程量a c1c2开挖至管顶土石方工程量标准图籍相关工程量计算表0.450.050.10.10.0810.330.75 1.1790.650.630.0593656250.03781250.1780968750.1140.280.50.0550.110.110.0890.330.83 1.30520.720.770.0730246250.04651250.2190738750.1390.340.60.0650.130.130.1070.330.991.55760.861.100.1045816250.06661250.3137448750.1970.48A (槽底)B (管顶面处沟槽宽度)H (槽底至管顶高度)V 120o 扇形面积120o 扇形中三角形面积240o 扇形面积0.150.0190.080.080.0470.330.3480.524880.2680.120.0092483470.0038259880.0184966930.0390.050.20.0220.080.080.0610.330.4040.617840.3240.170.0155785870.0064447720.0311571730.0480.070.250.0250.080.080.0750.330.460.71080.380.220.023550.00974250.04710.0570.090.30.030.080.080.090.330.520.81040.440.290.0339120.01402920.0678240.0690.120.350.0350.080.080.1050.330.580.910.50.370.0461580.01909530.0923160.0800.150.40.040.080.080.120.330.641.00960.560.460.0602880.02494080.1205760.0930.1990o 混凝土基础混凝土管(20)回填至管顶工程量图籍编号及名称(页码)管内径D(m)管壁厚t(m)管基尺寸(m)06MS201-1120o 混凝土基础混凝土管(21)放坡系数每m 工程量a c1c2开挖至管顶土石方工程量管道断面积基础工程量标准图籍相关工程量计算表0.450.0450.090.090.1350.330.72 1.13580.630.580.0763020.03156570.1526040.1170.240.50.050.10.10.150.330.8 1.2620.70.720.09420.038970.18840.1450.290.60.060.120.120.180.330.96 1.51440.84 1.040.1356480.05611680.2712960.2080.420.150.0250.080.080.050.330.360.54480.280.130.010*******.004330.020*******.0410.050.20.0270.080.080.0630.330.4140.634440.3340.180.0168816870.0070388480.0337633730.0490.080.250.0330.080.080.0790.330.4760.737360.3960.240.0261289870.010*******.0522579730.0600.100.30.040.080.080.0950.330.540.84360.460.320.0377846670.01563130.0755693330.0720.130.350.0450.090.090.110.330.620.96980.530.420.0506586670.02095720.1013173330.0940.180.40.0470.10.10.1230.330.694 1.086040.5940.530.0638560870.0265238480.1277121730.1170.220.450.050.10.10.1370.330.75 1.1790.650.630.0791541670.03286470.1583083330.1310.260.50.0550.110.110.1520.330.83 1.30520.720.770.0973661670.040411890.1947323330.1610.320.60.0650.130.130.1820.330.991.55760.861.100.1394421670.057844470.2788843330.2270.45A (槽底)B (管顶面处沟槽宽度)H (槽底至管顶高度)V 180o 扇形面积180o 扇形面积0.150.0190.080.080.0940.330.3480.524880.2680.120.013872520.013872520.0470.040.20.0220.080.080.1220.330.4040.617840.3240.170.023367880.023367880.0580.060.250.0250.080.080.150.330.460.71080.380.220.0353250.0353250.0700.080.30.030.080.080.180.330.520.81040.440.290.0508680.0508680.0840.110.350.0350.080.080.210.330.580.910.50.370.0692370.0692370.0990.14放坡系数每m 工程量a c1c2开挖至管顶土石方工程量管道断面积基础工程量回填至管顶工程量图籍编号及名称(页码)管内径D(m)管壁厚t(m)管基尺寸(m)06MS201-1180o 混凝土基础混凝土管(22)120o 混凝土基础混凝土管(21)06MS201-1120o 混凝土基础混凝土管(21)标准图籍相关工程量计算表0.40.040.080.080.240.330.64 1.00960.560.460.0904320.0904320.1140.170.450.0450.090.090.270.330.72 1.13580.630.580.1144530.1144530.1450.210.50.050.10.10.30.330.8 1.2620.70.720.14130.14130.1790.260.60.060.120.120.360.330.96 1.51440.84 1.040.2034720.2034720.2570.370.150.0250.080.080.10.330.360.54480.280.130.01570.01570.0490.050.20.0270.080.080.1270.330.4140.634440.3340.180.025322530.025322530.0600.060.250.0330.080.080.1580.330.4760.737360.3960.240.039193480.039193480.0740.090.30.040.080.080.190.330.540.84360.460.320.0566770.0566770.0890.120.350.0450.090.090.220.330.620.96980.530.420.0759880.0759880.1160.150.40.0470.10.10.2470.330.694 1.086040.5940.530.095784130.095784130.1450.190.450.050.10.10.2750.330.75 1.1790.650.630.118731250.118731250.1630.230.50.0550.110.110.3050.330.83 1.30520.720.770.146049250.146049250.1980.280.60.0650.130.130.3650.330.991.55760.861.100.209163250.209163250.2810.4006MS201-1180o 混凝土基础混凝土管(22)180o 混凝土基础混凝土管(22)。
管道回填压实度汇总表
见证
砂实090263
96
92
5
9-2#
三90
92
09.7.21
合格
见证
砂实090263
96
95
6
9-2#
三90
97
09.7.21
合格
见证
砂实090263
96
95
共组压实度,其试验报告份,其中组经建设单位组织有关单位处理,具体处理情况如下:
施工单位意见:
项目经理:(公章)
监理单位意见:
项目总监:(公章)
三95
ห้องสมุดไป่ตู้97
09.7.29
合格
见证
宁波工程学院建工试验室
土实090282
96
95
共组压实度,其试验报告份,其中组经建设单位组织有关单位处理,具体处理情况如下:
施工单位意见:
项目经理:(公章)
监理单位意见:
项目总监:(公章)
建设单位意见:
项目负责人:(公章)
管顶
工程名称:风格城事二期配套道路工程质监登记号:
实测值(%)
试验日期
结论
是否现场见证
检测单位名称
备注
1
9-1#(雨水胸腔)
三95
99
09.7.13
合格
见证
宁波工程学院建工试验室
砂实090205
96
95
2
9-1#(污水胸腔)
三95
95
09.7.13
合格
见证
宁波工程学院建工试验室
砂实090205
96
95
3
9-3#(雨水胸腔)
三95
97
09.7.13
市政给排水管道挖方与回填量计算
金属管 管径(mm) 沟底挖宽(mm) 边坡 横断面面积㎡ 管线长m 填砂量m3 平均覆土厚mm 横断面总面积㎡ 挖方量m3 填土量m3 管径(mm) 沟底挖宽(mm) 边坡 横断面面积㎡ 管线长m 填砂量m3 平均覆土厚mm 横断面总面积㎡ 3 挖方量m 填土量m3 300 ≤500 900 0.5 1.207003718 1460 1762.225428 1101 2.110770734 3081.725271 1216.350843 600 500~1000 1400 0.5 2.809006528 898 2522.487862 902.6 3.442824146 3091.656083 315.3934215 管径(mm) 沟底挖宽(mm) 边坡 横断面面积㎡ 管线长m 填砂量m3 平均埋深mm 横断面总面积㎡ 挖方量m3 填土量m3 管径(mm) 沟底挖宽(mm) 边坡 横断面面积㎡ 管线长m 填砂量m3 平均埋深mm 横断面总面积㎡ 3 挖方量m 填土量m3 非金属管 200 ≤500 1000 0.5 1.545950269 1750 2705.412971 1200 1.975721955 3457.513421 697.15045 600 500~1000 1600 0.5 3.755416689 130 488.2041696 2800 7.415515764 964.0170493 439.0748797
填砂量总计 挖方量总计 填土量总计
4284.71329 6173.381355 1531.744265
填砂量总计 挖方量总计 填土量总计
3193.617141 4421.53047 113ቤተ መጻሕፍቲ ባይዱ.22533
挖深小于5米
简易管道计算表
材料名称 水泥#425 粗砂 碎石0.5-3.2cm 机制砖 人孔口圈及铁 盖 电缆托架 电缆托板 拉力环 带钩穿钉 积水罐 圆钢ф14 圆钢ф8 板方材
单位 单页手井
t
0.14
t
0.63
t
0.36
千块 0.35
套
1
根
2
根
个
2
4
套
KG
KG 立方
米
0.01
小计1 0 0 0 0 0 0 0 0 0 0 0 0 0
螺纹钢重量算法
长度 断面积 (mm2) 重量(KG)
8.8 16 13.90
密度(g/cm3)
6.17
钢的密度为: 7.85g/cm3 ,螺纹钢:6.17g/cm3
4孔路由长度
0
0
150混凝土
250混凝 土
0 0 5786 0
花砖 大理石 普通土 顶管
5786
每层孔数 层数
管孔孔径 开挖上宽 开挖底宽 开挖高度 回填砂高度 回填原土高度
法 钢:6.17g/cm3
回填
0.000 回填
0.000
小计4
小号三 通
64.64 1.48
208 4.67
116.48 2.86
117.12 2.56
64
1
387.84 8.08
0
5.05
129.28 3.03
775.68 26.26
64.64 1.01
2035.2 66.9
825.6 18.8
0
6 人工开挖路面-大理石路面
百平方米
0
7 人工开挖路面-花砖路面
百平方米
0
8 修复混凝土路面(150MM以下)
管道开挖回填基础工程量计算表
管道开挖回填基础⼯程量计算表A (槽底)B (管顶⾯处沟槽宽度)H (槽底⾄管顶⾼度)V 90o 扇形⾯积90o 扇形中三⾓形⾯积270o 扇形⾯积0.60.060.50.10.1050.33 1.72 2.26120.82 1.630.1017360.06480.3052080.330.900.70.070.50.150.1230.33 1.84 2.49340.99 2.150.1384740.08820.4154220.48 1.110.80.080.50.150.1410.33 1.96 2.69261.112.580.1808640.11520.5425920.53 1.330.90.090.50.20.1580.33 2.08 2.9248 1.283.200.2289060.14580.6867180.70 1.5810.10.50.20.1760.33 2.2 3.124 1.4 3.730.28260.180.84780.771.831.10.110.60.20.1930.332.523.5232 1.524.590.3419460.2178 1.0258380.92 2.311.20.120.60.250.2110.33 2.64 3.7554 1.69 5.400.4069440.2592 1.220832 1.14 2.641.350.1350.60.250.2370.33 2.824.0542 1.87 6.430.51503850.32805 1.5451155 1.26 3.101.50.150.60.30.2640.333 4.386 2.17.760.635850.405 1.90755 1.57 3.651.650.1650.80.30.290.33 3.58 5.0848 2.289.880.76937850.49005 2.3081355 1.95 4.851.80.180.80.30.3160.33 3.765.3836 2.4611.250.9156240.5832 2.746872 2.11 5.4820.20.80.30.3510.334 5.782 2.713.21 1.13040.72 3.3912 2.336.352.20.220.80.30.3870.33 4.24 6.1804 2.9415.32 1.3677840.8712 4.103352 2.577.272.40.230.80.30.4190.33 4.46 6.5456 3.1617.39 1.6052465 1.02245 4.8157395 2.798.172.60.2350.80.30.450.33 4.67 6.8942 3.3719.49 1.849636625 1.1781125 5.548909875 3.029.072.80.2550.80.30.850.334.917.29263.6122.032.1501346251.36951256.4504038755.308.12c2放坡系数管道断⾯积基础⼯程量基础上表⾯回填⾄管顶⼯程量06MS201-190o 砂⽯基础钢筋混凝⼟管(8)每m ⼯程量开挖⾄管顶⼟⽯⽅⼯程量图籍编号及名称(页码)管内径D(m)管壁厚t(m)a c1管基尺⼨(m)30.2750.80.30.520.335.151.57531257.419721875 3.5511.28A (槽底)B (管顶⾯处沟槽宽度)H (槽底⾄管顶⾼度)V 120o 扇形⾯积120o 扇形中三⾓形⾯积240o 扇形⾯积0.40.040.40.10.120.33 1.28 1.66280.580.850.0602880.02494080.1205760.260.410.50.050.40.10.150.33 1.4 1.8620.7 1.140.09420.038970.18840.320.540.60.060.50.10.180.33 1.72 2.26120.821.630.1356480.05611680.2712960.430.800.70.070.50.150.210.33 1.842.49340.99 2.150.1846320.07638120.3692640.600.990.80.080.50.150.240.33 1.96 2.6926 1.112.580.2411520.09976320.4823040.67 1.190.90.090.50.20.270.33 2.08 2.9248 1.283.200.3052080.12626280.6104160.87 1.4210.10.50.20.30.33 2.2 3.124 1.4 3.730.37680.155880.75360.96 1.631.10.110.60.20.330.33 2.52 3.5232 1.52 4.590.4559280.18861480.911856 1.16 2.061.20.120.60.250.360.33 2.64 3.7554 1.69 5.400.5425920.2244672 1.085184 1.42 2.361.350.1350.60.250.4050.33 2.824.0542 1.87 6.430.6867180.2840913 1.373436 1.59 2.781.50.150.60.30.450.333 4.386 2.17.760.84780.35073 1.6956 1.94 3.271.650.1650.80.30.4950.33 3.585.0848 2.289.88 1.0258380.4243833 2.051676 2.45 4.351.80.180.80.30.540.33 3.765.3836 2.4611.25 1.2208320.5050512 2.441664 2.68 4.9120.20.80.30.60.334 5.782 2.713.21 1.50720.62352 3.0144 2.98 5.702.20.220.80.30.660.33 4.246.1804 2.9415.32 1.8237120.7544592 3.647424 3.31 6.542.40.230.80.30.7150.33 4.46 6.5456 3.1617.39 2.1403286670.8854417 4.280657333 3.617.362.60.2350.80.30.7680.334.676.89423.3719.492.4661821671.019580774.9323643333.928.1706MS201-1120o 砂⽯基础钢筋混凝⼟管(9)c2开挖⾄管顶⼟⽯⽅⼯程量管道断⾯积图籍编号及名称(页码)管内径D(m)管壁厚t(m)管基尺⼨(m)放坡系数每m ⼯程量a c1基础⼯程量回填⾄管顶⼯程量2.80.2550.80.30.8280.33 4.917.29263.6122.03 2.866846167 1.18528121 5.7336923334.289.1530.2750.80.30.8880.335.157.6913.8510.18A (槽底)B (管顶⾯处沟槽宽度)H (槽底⾄管顶⾼度)V 150o 扇形⾯积150o 扇形中三⾓形⾯积210o 扇形⾯积0.30.030.40.10.1330.33 1.16 1.46360.460.600.042390.008172360.0593460.250.250.40.040.40.10.1780.33 1.28 1.66280.580.850.075360.014374080.1055040.320.350.50.050.40.10.2220.33 1.41.8620.7 1.140.117750.02260440.164850.390.470.60.060.50.10.2670.33 1.722.26120.82 1.630.169560.032341680.2373840.540.690.70.070.50.150.3110.33 1.84 2.49340.992.150.230790.044223480.3231060.730.860.80.080.50.150.3560.33 1.96 2.6926 1.11 2.580.301440.057496320.4220160.83 1.030.90.090.50.20.40.33 2.08 2.9248 1.28 3.200.381510.07302960.534114 1.06 1.2310.10.50.20.4450.33 2.2 3.124 1.4 3.730.4710.0898380.6594 1.18 1.421.10.110.60.20.4890.33 2.52 3.5232 1.52 4.590.569910.109022760.797874 1.43 1.791.20.120.60.20.5340.33 2.64 3.7224 1.64 5.220.678240.129366720.949536 1.57 2.021.350.1350.60.250.60.33 2.824.0542 1.87 6.430.85839750.1643166 1.2017565 1.94 2.431.50.150.60.30.6670.333 4.386 2.17.76 1.059750.2025702 1.48365 2.35 2.861.650.1650.80.30.7340.33 3.585.0848 2.289.88 1.28229750.24482304 1.7952165 3.02 3.781.80.180.80.30.80.33 3.765.3836 2.4611.25 1.526040.2921184 2.136456 3.30 4.2820.20.80.30.8890.334 5.782 2.713.21 1.8840.3605112 2.6376 3.70 4.992.20.220.80.30.9780.33 4.246.1804 2.9415.32 2.279640.43609104 3.191496 4.11 5.732.40.230.80.31.060.334.466.54563.1617.392.6754108330.51111063.7455751674.516.4606MS201-1150o 砂⽯基础钢筋混凝⼟管(10)c2基础⼯程量回填⾄管顶⼯程量图籍编号及名称(页码)管内径D(m)管壁厚t(m)管基尺⼨(m)放坡系数每m ⼯程量开挖⾄管顶⼟⽯⽅⼯程量管道断⾯积a c12.60.2350.80.3 1.1380.33 4.67 6.89423.3719.49 3.0827277080.588675574.315818792 4.907.182.80.2550.80.3 1.2270.33 4.917.2926 3.6122.03 3.5835577080.684256445.016980792 5.378.0630.2750.80.31.3160.334.1220677080.787024355.7708947925.858.98A (槽底)B (管顶⾯处沟槽宽度)H (槽底⾄管顶⾼度)V 180o 扇形⾯积180o 扇形⾯积0.20.030.40.10.130.33 1.06 1.29760.360.420.0265330.0265330.230.140.30.030.40.10.180.33 1.16 1.46360.460.600.0508680.0508680.300.200.40.040.40.10.240.33 1.281.66280.580.850.0904320.0904320.380.290.50.050.40.10.30.33 1.4 1.8620.7 1.140.14130.14130.470.390.60.060.50.10.360.33 1.722.26120.821.630.2034720.2034720.660.570.70.070.50.150.420.33 1.842.49340.99 2.150.2769480.2769480.880.710.80.080.50.150.480.33 1.96 2.6926 1.11 2.580.3617280.361728 1.000.850.90.090.50.20.540.33 2.08 2.9248 1.28 3.200.4578120.457812 1.26 1.0310.10.50.20.60.33 2.2 3.124 1.4 3.730.56520.5652 1.41 1.191.10.110.60.20.660.33 2.52 3.5232 1.52 4.590.6838920.683892 1.73 1.501.20.120.60.250.720.33 2.64 3.7554 1.69 5.400.8138880.813888 2.06 1.721.350.1350.60.250.810.33 2.824.0542 1.87 6.43 1.030077 1.030077 2.33 2.041.50.150.60.30.90.333 4.386 2.17.76 1.2717 1.2717 2.80 2.411.650.1650.80.30.990.33 3.585.0848 2.289.88 1.538757 1.538757 3.63 3.171.80.180.80.3 1.080.33 3.765.3836 2.4611.25 1.831248 1.831248 3.99 3.6020.20.80.3 1.20.334 5.782 2.713.21 2.2608 2.2608 4.48 4.202.20.220.80.31.320.334.246.18042.9415.322.7355682.7355685.004.85图籍编号及名称(页码)管内径D(m)管壁厚t(m)管基尺⼨(m)放坡系数每m ⼯程量a c1回填⾄管顶⼯程量c2开挖⾄管顶⼟⽯⽅⼯程量管道断⾯积基础⼯程量06MS201-1180o 砂⽯基础钢筋混凝⼟管(11)2.40.230.80.3 1.430.33 4.46 6.54563.1617.39 3.210493 3.210493 5.49 5.472.60.2350.80.3 1.5350.334.67 6.8942 3.3719.49 3.69927325 3.699273255.986.112.80.2550.80.3 1.6550.33 4.917.2926 3.6122.03 4.30026925 4.30026925 6.56 6.8730.2750.80.31.7754.946481254.946481257.167.67A (槽底)B (管顶⾯处沟槽宽度)H (槽底⾄管顶⾼度)V90o 扇形⾯积90o 扇形中三⾓形⾯积270o 扇形⾯积0.60.0550.50.110.1040.331.712.25120.821.620.0989296250.06301250.2967888750.350.880.70.0550.50.110.1190.33 1.81 2.41720.92 1.940.1287596250.08201250.3862788750.39 1.040.80.060.50.120.1350.33 1.92 2.6064 1.04 2.350.1661060.10580.4983180.45 1.240.9 0.0650.50.130.1510.332.032.79561.162.800.2082016250.13261250.6246048750.521.4510.070.50.140.1670.33 2.14 2.9848 1.28 3.280.25504650.162450.76513950.60 1.661.20.080.60.160.1990.332.563.56321.524.650.3629840.23121.0889520.832.371.40.090.60.180.2310.332.780.333.635.12162.269.890.8087266250.51511252.4261798751.714.9420.130.80.260.3310.33 3.86 5.5232 2.5211.82 1.00236650.63845 3.0070995 2.03 5.78基础⼯程量回填⾄管顶⼯程量图籍编号及名称(页码)管内径D(m)管壁厚t(m)管基尺⼨(m)放坡系数每m ⼯程量a c1c2开挖⾄管顶⼟⽯⽅⼯程量管道断⾯积06MS201-190o 砂⽯基础预应⼒混凝⼟管(12)A (槽底)B (管顶⾯处沟槽宽度)H (槽底⾄管顶⾼度)V120o 扇形⾯积120o 扇形中三⾓形⾯积240o 扇形⾯积0.40.050.40.10.1250.331.31.6960.60.900.0654166670.02706250.1308333330.270.430.50.050.40.10.150.33 1.4 1.8620.7 1.140.09420.038970.18840.320.540.60.0550.50.110.1780.33 1.71 2.25120.82 1.620.1319061670.054415110.263812333 0.440.790.70.0550.50.110.2030.331.812.41720.920.80.060.50.120.230.33 1.92 2.6064 1.04 2.350.2214746670.09162280.4429493330.58 1.110.90.0650.50.130.2580.33 2.03 2.7956 1.16 2.800.277602167 0.114619430.5552043330.67 1.2910.070.50.140.2850.332.142.98481.283.280.3400620.14068170.6801240.771.491.20.080.60.160.340.332.563.5632 1.524.650.4839786670.20021920.967957333 1.08 2.121.40.090.60.180.3950.332.783.94161.765.920.6532246670.27023531.3064493331.322.631.60.10.80.20.450.33 3.4 4.7228.120.84780.35073 1.6956 1.85 3.72管壁厚t(m)06MS201-1120o 砂⽯基础预应⼒混凝⼟管(13)管基尺⼨(m)放坡系数每m ⼯程量a c1c2开挖⾄管顶⼟⽯⽅⼯程量管道断⾯积基础⼯程量回填⾄管顶⼯程量图籍编号及名称(页码)管内径D(m)1.80.1150.81.0783021670.445647932.1566043332.234.4320.130.80.260.5650.33 3.86 5.5232 2.5211.82 1.3364886670.5528977 2.672977333 2.63 5.19A (槽底)B (管顶⾯处沟槽宽度)H (槽底⾄管顶⾼度)V180o 扇形⾯积180o 扇形⾯积0.40.050.40.10.250.331.31.6960.60.900.0981250.0981250.400.310.50.050.40.10.30.33 1.4 1.8620.7 1.140.14130.14130.470.390.60.0550.50.110.3550.33 1.71 2.25120.82 1.620.197859250.197859250.670.560.7 0.0550.50.110.4050.331.812.41720.921.940.257519250.257519250.760.670.80.060.50.120.460.33 1.92 2.6064 1.04 2.350.3322120.3322120.890.800.90.0650.50.130.5150.332.032.79561.162.800.416403250.416403251.030.9410.070.50.140.570.33 2.14 2.9848 1.28 3.280.5100930.510093 1.18 1.081.20.080.60.160.680.332.563.5632 1.524.650.7259680.725968 1.66 1.541.41.765.920.9798370.9798372.031.9306MS201-1180o 砂⽯基础预应⼒混凝⼟管(14)放坡系数每m ⼯程量a c1c2开挖⾄管顶⼟⽯⽅⼯程量管道断⾯积基础⼯程量回填⾄管顶⼯程量图籍编号及名称(页码)管内径D(m)管壁厚t(m)管基尺⼨(m)标准图籍相关⼯程量计算表1.60.10.80.20.90.333.44.7228.121.27171.27172.872.711.80.1150.80.23 1.0150.33 3.63 5.12162.269.89 1.61745325 1.617453253.41 3.2420.130.80.261.130.333.865.52322.5211.822.0047332.0047334.003.82A (槽底)240o 扇形⾯积0.60.0550.10.10.1780.330.91 1.44460.810.950.1319061670.054415110.2638123330.1750.380.70.060.10.10.2050.33 1.02 1.62720.921.220.1759446670.07278730.3518893330.2080.480.80.070.1050.1050.2350.33 1.15 1.8397 1.045 1.560.2312086670.09564970.4624173330.2550.610.90.0750.1130.1130.2630.33 1.276 2.04358 1.163 1.930.28848750.11911830.5769750.3100.7510.0850.1280.1280.2930.33 1.426 2.28268 1.2982.410.35819550.147930120.7163910.3900.941.10.0950.1430.1430.3230.33 1.576 2.52178 1.433 2.940.43543950.179859540.8708790.479 1.151.20.10.150.150.350.33 1.7 2.723 1.55 3.430.5128666670.21217 1.025*******.549 1.341.350.1150.1730.1730.3950.33 1.926 3.08298 1.753 4.390.6532246670.2702353 1.3064493330.7111.721.50.1250.1880.1880.4380.332.1263.40508 1.938 5.360.8013541670.33113675 1.6027083330.861 2.091.650.140.210.210.4830.332.353.76242.146.540.9746821670.402802581.9493643331.0572.56c2开挖⾄管顶⼟⽯⽅⼯程量管道断⾯积基础⼯程量回填⾄管顶⼯程量(14)图籍编号及名称(页码)管内径D(m)管壁厚t(m)管基尺⼨(m)放坡系数每m ⼯程量a c106MS201-1120o 混凝⼟基础钢筋混凝⼟管(16)标准图籍相关⼯程量计算表1.80.150.2250.2250.5250.332.55 4.0845 2.3257.71 1.153950.4773825 2.3079 1.2363.0120.170.2550.2550.5850.33 2.854.5627 2.5959.62 1.4327820.5927337 2.865564 1.554 3.772.20.1850.2780.2780.6430.33 3.1265.00568 2.84811.58 1.7282821670.714424023.456564333 1.8654.532.40.20.30.30.70.33 3.45.446 3.113.71 2.0514666670.84868 4.102933333 2.197 5.362.60.220.330.330.760.33 3.7 5.9242 3.3716.22 2.418218667 1.0004032 4.8364373332.615 6.352.80.2350.3530.3530.8180.333.976 6.36718 3.62318.74 2.7979755 1.15679847 5.595951 3.0157.3330.250.3750.3750.8750.334.256.80756.4108333333.4338.37A (槽底)B (管顶⾯处沟槽宽度)H (槽底⾄管顶⾼度)V 120o 扇形⾯积120o 扇形中三⾓形⾯积240o 扇形⾯积0.60.060.10.10.180.330.92 1.46120.820.980.1356480.05611680.2712960.1780.390.70.070.1050.1050.210.33 1.05 1.67370.945 1.290.1846320.07638120.3692640.2220.510.80.080.120.120.240.331.2 1.9128 1.08 1.680.2411520.09976320.4823040.2910.670.90.090.1350.1350.270.33 1.352.1519 1.215 2.130.3052080.12626280.6104160.3680.8410.10.150.150.30.33 1.5 2.391 1.352.630.37680.155880.75360.454 1.041.10.110.1650.1650.330.33 1.65 2.6301 1.4853.180.4559280.18861480.9118560.549 1.261.20.120.180.180.360.33 1.8 2.8692 1.62 3.780.5425920.2244672 1.0851840.654 1.501.350.1350.2030.2030.4050.33 2.026 3.22918 1.823 4.790.6867180.2840913 1.3734360.8291.901.50.150.2250.2250.450.332.253.5865 2.025 5.910.84780.35073 1.6956 1.022 2.341.650.1650.2480.2480.4950.332.4763.946482.2287.151.0258380.42438332.0516761.2382.8406MS201-1120o 混凝⼟基础钢筋混凝⼟管(17)放坡系数每m ⼯程量a c1c2开挖⾄管顶⼟⽯⽅⼯程量管道断⾯积基础⼯程量回填⾄管顶⼯程量管壁厚t(m)管基尺⼨(m)120o 混凝⼟基础钢筋混凝⼟管(16)图籍编号及名称(页码)管内径D(m)标准图籍相关⼯程量计算表1.80.180.270.270.540.332.7 4.3038 2.438.51 1.2208320.5050512 2.441664 1.4713.3820.20.30.30.60.3334.782 2.710.51 1.50720.62352 3.0144 1.816 4.172.20.220.330.330.660.33 3.35.2602 2.9712.71 1.8237120.7544592 3.647424 2.198 5.042.40.230.3450.3450.7150.33 3.55 5.6653 3.20514.77 2.1403286670.8854417 4.280657333 2.508 5.842.60.2350.3530.3530.7680.33 3.7766.03518 3.42316.79 2.466182167 1.01958077 4.932364333 2.786 6.612.80.2550.3830.3830.8280.33 4.076 6.51338 3.69319.55 2.866846167 1.18528121 5.733692333 3.2547.7030.2750.4130.4130.8880.334.3766.991583.9633.2976541671.363452056.5953083333.7598.87A (槽底)B (管顶⾯处沟槽宽度)H (槽底⾄管顶⾼度)V 180o 扇形⾯积180o 扇形⾯积0.60.0550.110.110.3550.330.93 1.47120.820.980.197859250.197859250.2350.350.70.060.120.120.410.33 1.06 1.68040.94 1.290.2639170.2639170.2980.460.80.070.140.140.470.33 1.22 1.9328 1.081.700.3468130.3468130.3970.610.90.0750.150.150.5250.33 1.352.142 1.2 2.100.432731250.432731250.4790.7510.0850.170.170.5850.33 1.51 2.3944 1.342.620.537293250.537293250.6030.941.10.0950.190.190.6450.33 1.67 2.6468 1.483.190.653159250.653159250.741 1.151.20.10.20.20.70.33 1.8 2.856 1.6 3.720.76930.76930.851 1.341.350.1150.230.230.790.33 2.04 3.2346 1.814.770.9798370.979837 1.101 1.711.50.1250.250.250.8750.332.253.5725.821.202031251.202031251.3292.09管基尺⼨(m)放坡系数每m ⼯程量a c1回填⾄管顶⼯程量c2开挖⾄管顶⼟⽯⽅⼯程量管道断⾯积基础⼯程量120o 混凝⼟基础钢筋混凝⼟管(17)图籍编号及名称(页码)管内径D(m)管壁厚t(m)06MS201-1180o 混凝⼟基础钢筋混凝⼟管(18)标准图籍相关⼯程量计算表1.650.140.280.280.9650.332.493.9486 2.217.11 1.46202325 1.46202325 1.638 2.551.80.150.30.3 1.050.33 2.74.284 2.48.38 1.730925 1.730925 1.914 3.0020.170.340.34 1.170.33 3.02 4.7888 2.6810.46 2.149173 2.149173 2.411 3.752.20.1850.370.37 1.2850.33 3.315.2504 2.9412.58 2.592423252.592423252.886 4.512.40.20.40.4 1.40.333.6 5.712 3.214.90 3.0772 3.0772 3.4035.342.60.220.440.44 1.520.33 3.926.2168 3.4817.64 3.627328 3.627328 4.056 6.332.80.2350.470.47 1.6350.33 4.21 6.6784 3.7420.36 4.19696325 4.19696325 4.6657.3030.254.57.14423.284.8081254.8081255.3178.35A (槽底)B (管顶⾯处沟槽宽度)H (槽底⾄管顶⾼度)V 180o 扇形⾯积180o 扇形⾯积0.60.060.120.120.360.330.96 1.51440.84 1.040.2034720.2034720.2570.370.70.070.140.140.420.33 1.12 1.76680.98 1.410.2769480.2769480.3500.510.80.080.160.160.480.33 1.28 2.0192 1.121.850.3617280.3617280.4570.670.90.090.180.180.540.33 1.442.2716 1.26 2.340.4578120.4578120.5790.8410.10.20.20.60.33 1.6 2.524 1.4 2.890.56520.56520.715 1.041.10.110.220.220.660.33 1.76 2.7764 1.543.490.6838920.6838920.865 1.261.20.120.240.240.720.33 1.92 3.0288 1.68 4.160.8138880.813888 1.029 1.501.350.1350.270.270.810.332.163.40741.895.261.0300771.0300771.3031.9006MS201-1180o 混凝⼟基础钢筋混凝⼟管管基尺⼨(m)放坡系数每m ⼯程量a c1c2开挖⾄管顶⼟⽯⽅⼯程量管道断⾯积基础⼯程量图籍编号及名称(页码)管内径D(m)管壁厚t(m)180o 混凝⼟基础钢筋混凝⼟管(18)回填⾄管顶⼯程量标准图籍相关⼯程量计算表1.50.150.30.30.90.332.43.786 2.1 6.50 1.2717 1.2717 1.608 2.341.650.1650.330.330.990.33 2.644.1646 2.317.86 1.538757 1.538757 1.946 2.841.80.180.360.36 1.080.33 2.88 4.5432 2.529.35 1.831248 1.831248 2.316 3.3720.20.40.4 1.20.33 3.25.048 2.811.55 2.2608 2.2608 2.859 4.172.20.220.440.44 1.320.33 3.52 5.5528 3.0813.97 2.735568 2.735568 3.460 5.042.40.230.460.46 1.430.33 3.78 5.9712 3.3216.19 3.210493 3.210493 3.934 5.832.60.2350.470.47 1.5350.33 4.01 6.3464 3.5418.33 3.69927325 3.69927325 4.341 6.592.80.2550.510.51 1.6550.33 4.33 6.8512 3.8221.36 4.30026925 4.30026925 5.0747.6830.2750.550.554.124.614.946481254.946481255.8658.85A (槽底)B (管顶⾯处沟槽宽度)H (槽底⾄管顶⾼度)V90o 扇形⾯积90o 扇形中三⾓形⾯积270o 扇形⾯积0.150.0250.080.080.0290.330.360.54480.280.130.007850.0050.023550.0360.060.20.0270.080.080.0370.330.4140.634440.3340.180.0126612650.00806450.0379837950.0440.080.250.0330.080.080.0460.330.4760.737360.3960.240.019596740.0124820.058790220.0530.110.30.040.080.080.0560.330.540.84360.460.320.02833850.018050.08501550.0630.140.350.0450.090.090.0640.330.620 0.0470.10.10.0720.330.6941.086040.5940.530.0478920650.03050450.1436761950.1020.24180o 混凝⼟基础钢筋混凝⼟管(19)图籍编号及名称(页码)管内径D(m)管道断⾯积基础⼯程量回填⾄管顶⼯程量管壁厚t(m)管基尺⼨(m)06MS201-190o 混凝⼟基础混凝⼟管(20)放坡系数每m ⼯程量a c1c2开挖⾄管顶⼟⽯⽅⼯程量标准图籍相关⼯程量计算表0.450.050.10.10.0810.330.75 1.1790.650.630.0593656250.03781250.1780968750.1140.280.50.0550.110.110.0890.330.83 1.30520.720.770.0730246250.04651250.2190738750.1390.340.60.0650.130.130.1070.330.991.55760.860.1045816250.06661250.3137448750.1970.48A (槽底)B (管顶⾯处沟槽宽度)H (槽底⾄管顶⾼度)V 120o 扇形⾯积120o 扇形中三⾓形⾯积240o 扇形⾯积0.150.0190.080.080.0470.330.3480.524880.2680.120.0092483470.0038259880.0184966930.0390.050.20.0220.080.080.0610.330.4040.617840.3240.170.0155785870.0064447720.0311571730.0480.070.250.0250.080.080.0750.330.460.71080.380.220.023550.00974250.04710.0570.090.30.030.080.080.090.330.520.81040.440.290.0339120.01402920.0678240.0690.120.350.0350.080.080.1050.330.580.910.50.370.0 0.040.080.080.120.330.641.00960.560.460.0602880.02494080.1205760.0930.1990o 混凝⼟基础混凝⼟管(20)回填⾄管顶⼯程量图籍编号及名称(页码)管内径D(m)管壁厚t(m)管基尺⼨(m)06MS201-1120o 混凝⼟基础混凝⼟管(21)放坡系数每m ⼯程量a c1c2开挖⾄管顶⼟⽯⽅⼯程量管道断⾯积基础⼯程量标准图籍相关⼯程量计算表0.450.0450.090.090.1350.330.72 1.13580.630.580.0763020.03156570.1526040.1170.240.50.050.10.10.150.330.8 1.2620.70.720.09420.038970.18840.1450.290.60.060.120.120.180.330.961.51440.841.040.1356480.05611680.2712960.2080.420.150.0250.080.080.050.330.360.54480.280.130.010*******.004330.020*******.0410.050.20.0270.080.080.0630.330.4140.634440.3340.180.0168816870.0070388480.030.0330.080.080.0790.330.4760.737360.3960.240.0261289870.010*******.0522579730.0600.100.30.040.080.080.0950.330.540.84360.460.320.0377846670.01563130.0755693330.0720.130.350.0450.090.090.1101.086040.5940.530.0638560870.0265238480.1277121730.1170.220.450.050.10.10.1370.330.75 1.1790.650.630.0791541670.03286470.1583083330.1310.260.50.0550.110.110.1520.330.831.30520.720.770.0973661670.040411890.1947323330.1610.320.60.0650.130.130.1820.330.991.55760.861.100.1394421670.057844470.2788843330.2270.45A (槽底)B (管顶⾯处沟槽宽度)H (槽底⾄管顶⾼度)V 180o 扇形⾯积180o 扇形⾯积0.150.0190.080.080.0940.330.3480.524880.2680.120.013872520.013872520.0470.040.20.0220.080.080.1220.330.4040.617840.3240.170.023367880.023367880.0580.060.250.0250.080.080.150.330.460.71080.380.220.0353250.0353250.0700.080.30.030.080.080.180.330.520.81040.440.290.0508680.0508680.0840.110.350.0350.080.080.210.330.580.910.50.370.0692370.0692370.0990.14放坡系数每m ⼯程量a c1c2开挖⾄管顶⼟⽯⽅⼯程量管道断⾯积基础⼯程量回填⾄管顶⼯程量图籍编号及名称(页码)管内径D(m)管壁厚t(m)管基尺⼨(m)06MS201-1180o 混凝⼟基础混凝⼟管(22)120o 混凝⼟基础混凝⼟管(21)06MS201-1120o 混凝⼟基础混凝⼟管(21)标准图籍相关⼯程量计算表0.40.040.080.080.240.330.64 1.00960.560.460.0904320.0904320.1140.170.450.0450.090.090.270.330.72 1.13580.630.580.1144530.1144530.1450.210.50.050.10.10.30.330.81.2620.70.720.14130.14130.1790.260.60.060.120.120.360.330.96 1.51440.841.040.2034720.2034720.2570.370.150.0250.080.080.10.330.360.54480.280.130.01570.01570.0490.050.20.0270.080.080.1270.330.4140.634440.3340.180.025322530.025322530.0600.060.250.0330.080.080.1580.330.4760.737360.3960.240.039193480.039193480.0740.090.30.040.080.080.190.330.540.84360.460.320.0566770.0566770.0890.120.350.0450.090.090.220.330.620.96980.530.420.0759881.086040.5940.530.095784130.095784130.1450.190.450.050.10.10.2750.330.75 1.1790.650.630.118731250.118731250.1630.230.50.0550.110.110.3050.330.831.30520.720.770.146049250.146049250.1980.280.60.0650.130.130.3650.330.991.55760.861.100.209163250.209163250.2810.4006MS201-1180o 混凝⼟基础混凝⼟管(22)180o 混凝⼟基础混凝⼟管(22)。