部落侏儒工程学任务流程

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

部落侏儒工程学任务流程
(中英文版)
Title: Tribal Dwarf Engineering Task Flow
标题:部落矮人工程学任务流程
---
1.Initial Briefing
Initial briefings are conducted by the tribal elder, where the objectives and expectations of the engineering task are outlined.
初步介绍
初步介绍由部落长者主持,在此环节中会概述工程任务的目标和预期。

2.Resource Collection
Engineers, along with a group of skilled laborers, collect necessary resources such as iron, wood, and stone from the surrounding environment.
资源收集
工程师和一组熟练的劳动力将前往周边环境收集必要的资源,如铁、木材和石头。

3.Blueprint Creation
The lead engineer designs detailed blueprints for the project, which are then reviewed and approved by the tribal elder.
设计蓝图
主管工程师设计详细的工程蓝图,之后由部落长者审查并批准。

4.Workforce Assembly
Skilled workers are assigned to specific tasks based on their expertise, such as blacksmithing, carpentry, or stonemasonry.
组建劳动力
根据他们的专长,如铁匠、木匠或石匠,技能工人被分配到具体的任务。

5.Construction Phase
The construction of the project begins, with workers divided into teams to handle different aspects of the build, such as foundation laying, structural framing, and roofing.
建设阶段
项目开始建设,工人被分成团队处理建筑的不同方面,如打地基、搭建结构框架和屋顶。

6.Quality Assurance
Regular inspections are conducted by the lead engineer to ensure that the project meets the required standards and specifications.
质量保证
主管工程师会定期进行检查,以确保项目符合所需的标准和规格。

7.Testing and Commissioning
Once the construction is complete, the project is tested and commissioned by the engineers to ensure its functionality and durability.
测试和调试
建设完成后,工程师会进行测试和调试,以确保项目的功能性和耐用性。

8.Handover Ceremony
The completed project is presented to the tribe in a ceremony, where the lead engineer and the tribal elder provide a summary of the project and its benefits.
交接仪式
完成的工程项目在典礼上呈现给部落,主管工程师和部落长者会概述项目和它的益处。

9.Feedback and Improvement
The tribe provides feedback on the project, which is used by the engineers to make any necessary improvements or modifications.
反馈和改进
部落会提供关于项目的反馈,工程师会使用这些反馈进行必要的改进或修改。

10.Maintenance and Upkeep
A team of engineers and laborers is responsible for the ongoing maintenance and upkeep of the project to ensure its longevity.
维护和保养
一个由工程师和劳动力组成的团队负责项目的持续维护和保养,以确保其耐用性。

相关文档
最新文档