毕业设计(论文)外文文献翻译文献、资料中文题目:供配电系统文献、资料英文题目:POWER SUPPLY AND DISTRIBUTIONSYSTEM文献、资料来源:文献、资料发表(出版)日期:院(部):专业:班级:姓名:学号:指导教师:翻译日期: 2017.02.14POWER SUPPLY AND DISTRIBUTION SYSTEMABSTRACTThe basic function of the electric power system is to transport the electric power towards customers. The l0kV electric distribution net is a key point that connects the power supply with the electricity using on the industry, business and daily-life. For the electric power, allcostumers expect to pay the lowest price for the highest reliability, but don't consider that it's self-contradictory in the co-existence of economy and reliable.To improve the reliability of the power supply network, we must increase the investment cost of the network construction But, if the cost that improve the reliability of the network construction, but the investment on this kind of construction would be worthless if the reducing loss is on the power-off is less than the increasing investment on improving the reliability .Thus we find out a balance point to make the most economic,between the investment and the loss by calculating the investment on power net and the loss brought from power-off.KEYWARDS:power supply and distribution,power distribution reliability,reactive compensation,load distributionTEXTThe revolution of electric power system has brought a new big round construction,which is pushing the greater revolution of electric power technique along with the application of new technique and advanced equipment. Especially, the combination of the information technique and electric power technique, to great ex- tent, has improved reliability on electric quality and electric supply. The technical development decreases the cost on electric construction and drives innovation of electric network. On the basis of national and internatio- nal advanced electric knowledge, the dissertation introduces the research hotspot for present electric power sy- etem as following.Firstly, This dissertation introduces the building condition of distribution automation(DA), and brings forward two typical construction modes on DA construction, integrative mode and fission mode .It emphasize the DA structure under the condition of the fission mode and presents the system configuration, the main station scheme, the feeder scheme, the optimized communication scheme etc., which is for DA research reference.Secondly, as for the (DA) trouble measurement, position, isolation and resume, This dissertation analyzes the changes of pressure and current for line problem, gets math equation by educing phase short circuit and problem position under the condition of single-phase and works out equation and several parameter s U& , s I& and e I& table on problem . It brings out optimized isolation and resume plan, realizes auto isolation and network reconstruction, reduces the power off range and time and improves the reliability of electric power supply through problem self- diagnoses and self-analysis. It also introduces software flow and use for problem judgement and sets a model on network reconstruction and computer flow.Thirdly, electricity system state is estimated to be one of the key techniques in DA realization. The dissertation recommends the resolvent of bad measurement data and structure mistake on the ground of describing state estimate way. It also advances a practical test and judging way on topology mistake in state estimate about bad data test and abnormity in state estimate as well as the problem and effect on bad data from state measure to state estimate .As for real time monitor and control problem, the dissertation introduces a new way to solve them by electricity break and exceptional analysis, and theway has been tested in Weifang DA.Fourthly, about the difficulty for building the model of load forecasting, big parameter scatter limit and something concerned, the dissertation introduces some parameters, eg. weather factor, date type and social environment effect based on analysis of routine load forecasting and means. It presents the way for electricity load forecasting founded on neural network(ANN),which has been tested it’s validity by example and made to be good practical effect.Fifthly, concerning the lack of concordant wave on preve nting concordant wave and non-power compensation and non-continuity on compensation, there is a topology structure of PWM main circuit and nonpower theory on active filter the waves technique and builds flat proof on the ground of Saber Designer and proves to be practical. Meanwhile, it analyzes and designs the way of non-power need of electric network tre- nds and decreasing line loss combined with DA, which have been tested its objective economic benefit throu- gh counting example.Sixthly, not only do the dissertation design a way founded on the magrginal electric price fitted to our present national electric power market with regards to future trends of electric power market in China and fair trade under the government surveillance, that is group competitio n in short-term trade under the way of grouped price and quantity harmony, but also puts forward combination arithmetic, math model of trading plan and safty economical restriction. It can solve the original contradiction between medium and long term contract price and short term competitive price with improvement on competitive percentage and cut down the unfair income difference of electric factory, at the same time, it can optimize the electric limit for all electric factories and reduce the total purchase charge of electric power from burthen curve of whole electric market network.The distribution network is an important link among the power system. Its neutral grounding mode and operation connects security and stability of the power system directly. At the same time, the problem about neutral grounding is associated with national conditions, natural environment, device fabrication and operation. For example, the activity situation of the thunder and lightning, insulating structure and the peripheral interference will influence the choice of neutral grounding mode Conversely, neutral grounding mode affects design, operation, debugs and developing. Generally in the system higher in grade in the voltage, the insulating expenses account for more sizable proportion at the total price of the equipment. It is very remarkable to bring the economic benefits by reducing the insulating level. Usually such system adopt the neutral directly grounding andadopt the autoreclosing to guarantee power supply reliability. On the contrary, the system which is lower in the voltage adopts neutral none grounding to raise power supply reliability. So it is an important subject to make use of new- type earth device to apply to the distribution network under considering the situation in such factors of various fields as power supply reliability, safety factor, over-voltage factor, the choice of relay protection, investment cost, etc.The main work of this paper is to research and choice the neutral grounding mode of the l0kV distribution network. The neutral grounding mode of the l0kV network mainly adopts none grounding, grounding by arc suppressing coil, grounding by reactance grounding and directly grounding. The best grounding mode is confirmed through the technology comparison. It can help the network run in safety and limit the earth electric arc by using auto-tracking compensate device and using the line protection with the detection of the sensitive small ground current. The paper introduces and analyzes the characteristic of all kind of grounding modes about l0kV network at first. With the comparison with technological and economy, the conclusion is drawn that the improved arc suppressing coil grounding mode shows a very big development potential.Then, this paper researches and introduces some operation characteristics of the arc suppressing coil grounding mode of the l0kV distribution network. And then the paper put emphasis on how to extinguish the earth electric arc effectively by utilizing the resonance principle. This paper combines the development of domestic and international technology and innovative achievement, and introduces the computer earth protection and autotracking compensate device. It proves that the improved arc suppressing coil grounding mode have better operation characteristics in power supply reliability, personal security, security of equipment and interference of communication. The application of the arc suppressing coil grounding mode is also researched in this paper.Finally, the paper summarizes this topic research. As a result of the domination of the arc suppressing coil grounding mode, it should be more popularized and applied in the distribution network in the future.The way of thinking, project and conclusions in this thesis have effect on the research to choose the neutral grounding mode not only in I0kV distribution network but also in other power system..The basic function of the electric power system is to transport the electric power towards customers. The l0kV electric distribution net is a key point that connects the power supply with the electricity using on the industry, business and daily-life. For the electric power, all costumers expect to pay the lowest price for the highest reliability, butdon't consider that it's self-contradictory in the co-existence of economy and reliable. To improve the reliability of the power supply network, we must increase the investment cost of the network con- struction But, if the cost that improve the reliability of the network construction, but the investment on this kind of construction would be worthless if the reducing loss is on the power-off is less than the increasing investment on improving the reliability .Thus we find out a balance point to make the most economic, between the investment and the loss by calculating the investment on power net and the loss brought from power-off. The thesis analyses on the economic and the reliable of the various line modes, according to the characteristics various line modes existed in the electric distribution net in foshan..First, the thesis introduces as the different line modes in the l0kV electric distribution net and in some foreign countries. Making it clear tow to conduct analyzing on the line mode of the electric distribution net, and telling us how important and necessary that analyses are.Second, it turns to the necessity of calculating the number of optimization subsection, elaborating how it influences on the economy and reliability. Then by building up the calculation mode of the number of optimization subsection it introduces different power supply projects on the different line modes in brief. Third, it carries on the calculation and analyses towards the reliability and economy of the different line modes of electric distribution net, describing drafts according by the calculation. Then it makes analysis and discussion on the number of optimization subsection.At last, the article make conclusion on the economy and reliability of different line modes, as well as, its application situation. Accordion to the actual circumstance, the thesis puts forward the beneficial suggestion on the programming and construction of the l0kV electric distribution net in all areas in foshan. Providing the basic theories and beneficial guideline for the programming design of the lOkV electric distribution net and building up a solid net, reasonable layout, qualified safe and efficiently-worked electric distribution net.。
英文文献及翻译:供配电系统(1800字)
供配电系统摘要:电力系统的基本功能是向用户输送电能。
lOkV配电网是连接供电电源与工业、商业及生活用电的枢纽,其网络庞大及复杂。
对于所有用户都期望以最低的价格买到具有高度可靠性的电能。
然而,经济性与可靠性这两个因素是互相矛盾的。
要提高供电网络的可靠性就必须增加网络建设投资成本。
但是,如果提高可靠性使用户停电损失的降低小于用于提高可靠性所增加的投资,那么这种建设投资就没有价值了。
通过计算电网的投资和用户停电的损失,最终可找到一个平衡点,使投资和损失的综合经济性最优。
关键词:供配电,供电可靠性,无功补偿,负荷分配1 引言电力体制的改革引发了新一轮大规模的电力建设热潮从而极大地推动了电力技术革命新技术新设备的开发与应用日新月异特别是信息技术与电力技术的结合在很大程度上提高了电能质量和电力供应的可靠性由于技术的发展又降低了电力建设的成本进而推动了电网设备的更新换代本文就是以此为契机以国内外配电自动化中一些前沿问题为内容以配电自动化建设为背景对当前电力系统的热点技术进行一些较深入的探讨和研究主要完成了如下工作.(1)提出了配电自动化建设的两个典型模式即―体化模式和分立化模式侧重分析了分立模式下的配电自动化系统体系结构给出了软硬件配置主站选择管理模式最佳通讯方式等是本文研究的前提和实现平台.(2)针对配电自动化中故障测量定位与隔离以及供电恢复这一关键问题分析了线路故障中电压电流等电量的变化导出了相间短路工况下故障定位的数学描述方程并给出了方程的解以及故障情况下几个重要参数s U& s I& e I& 选择表通过对故障的自动诊断与分析得出了优化的隔离和恢复供电方案自动实现故障快速隔离与网络重构减少了用户停电范围和时间有效提高配网供电可靠性文中还给出了故障分段判断以及网络快速重构的软件流程和使用方法.(3)状态估计是实现配电自动化中关键技术之一本文在阐述状态估计方法基础上给出了不良测量数据的识别和结构性错误的识别方法针对状态估计中数据对基于残差的坏数据检测和异常以及状态量中坏数据对状态估计的影响及存在的问题提出了状态估计中拓扑错误的一种实用化检测和辩识方法针对窃电漏计电费问题独创性提出一种通过电量突变和异常分析防止窃电的新方法并在潍坊城区配电得到验证.(4)针对配电网负荷预测建模困难参数离散度大以及相关因素多等问题本文在分析常规负荷预测模型及方法基础上引入了气象因素日期类型社会环境影响等参数给出了基于神经网络的电力负荷预测方法实例验证了方法的正确性.(5)针对无源滤波在抑制谐波和无功补偿方面的不足以及补偿度的不连续性本文提出了一种PWM 主电路拓朴结构和基于无功功率理论的有源滤波方案建立了基于Saber Designer 仿真平台仿真分析证明了方案的可行性同时结合配电自动化技术对配电网动态无功优化补偿和降低线损的方法进行了设计分析通过实例计算验证了其客观的经济效益.(6)针对中国电力市场未来的发展趋势以及政府监管下的电力市场公平交易设计了一种适合我国电力市场现状按照电价分组电量协调分组竞价的短期电力交易模式给出了基于边际电价的机组组合算法制订交易计划的数学模型以及安全经济约束等在竞争比例逐步提高的情况下能够较好地解决原有中长期合同电价和短期竞争电价的矛盾减少电厂不公平的收益差异同时也可在电力市场全网的负荷曲线上对所有电厂进行限量优化减少总的系统购电费用.2 配电网分析配电网是电力系统中的一个重要环节,配电网接地方式和安全运行直接关系到电力系统的安全和稳定。
某小区建筑电气设计毕业设计-英文翻译
ICFDM学报2006年第7 期国际设计和制造业协会2006 年6月19-22, 广州, 中国205-208页用于汽车照明的LED(发光二极管)光线系统的设计和制造Suet1,Jiang Jinbo1,Lee WingBun1, Cheung ChiFai1和Eric Cheng21、香港理工大学工业与系统工程系先进光学制造中心。
2、香港理工大学能源电子研究中心电气工程部.摘要: 现代汽车照明系统要求具有高效率、安全和美观的特点。
Freeform(是一套可以融合视觉与触觉来完成复杂3D模型建构的软件。
使用者需要通过Freeform的手柄(代替鼠标用的),即有触觉的雕刻笔来控制和雕刻电脑画面中的3D模型,可以随心所欲地构建任意的模型形状,是一种全新的3D设计软件,目前主要用于玩具、珠宝、鞋底、工艺品的设计,也广泛用于概念设计-----信息来自互联网)反射器和LED 光线系统的设计和制造是汽车照明设计的关键。
非想象光学设计使汽车照明系统设计脱离了传统的光学设计。
组成光学的次要照明所需要的LED 光线系统的几何外形不能由常规的制造过程来完成。
在本文里, 将详细说明由超级精密的Freeform 机器所制造的信号灯和前灯的光学设计和结构。
主题词: 汽车光线系统, LED 光线系统, Freeform, 非球面,超精确度制造, 汽车1介绍:当前, 在汽车照明设备技术之中正发生着巨大的变化。
汽车制造商与供应商和立法者已经达成一致,一起向往车灯发展的明天。
Freeform 前灯是已有的具有高灵活性和简洁性的设计之一。
如果要用数学函数和设计或结构来定义Freeform前灯的Freeform表面通常是有困难的。
撇开不谈Freeform 反射器系统, 高强度固体照明设备技术(LED) 在汽车照明技术中越来越充当着重要的角色。
现今, 大多数汽车制造商正考虑在他们的新车模型中使用高强度LED照明设备,例如:刹车灯、信号灯、尾灯和车厢灯等。
毕业论文外文翻译-高层建筑供配电系统设计
毕业论文外文翻译-高层建筑供配电系统设计Design of Power Supply and Distribution System for High-rise BuildingsAbstractPower supply and distribution system is the lifeline of high-rise buildings. The design of power supply and distribution system is based on the characteristics of high-rise buildings, which requires not only reliable supply of power, but also the safety of electricity utilization and efficient energy consumption. In this paper, the design of power supply and distribution system for high-rise buildings is discussed, focusing on the selection of power supply mode, the design of power distribution system, the design of grounding system, the selection of electrical equipment and the design of lightning protection system. The application of advanced technologies such as distributed power supply, energy management and control system, and intelligent electrical equipment can improve the energy efficiency and utilization of high-rise buildings, reduce energy consumption and carbon emissions, and promote the development of green buildings.Keywords: high-rise buildings; power supply and distribution system; energy efficiency; green buildingsIntroductionHigh-rise buildings are an important symbol of urban development and represent the trend of modern architecture. With the continuous improvement of people’s living standards, the demand for high-rise buildings is increasing. Power supply and distribution system is an essential part of high-rise buildings, which plays a crucial role in the operation and maintenance of buildings. The design of power supply and distribution system for high-rise buildings needs to consider many factors, such as technical performance, safety and reliability, energy efficiency, economic benefits and environmental protection, etc. In recent years, with the rapid development of new energy and advanced technology, the design of power supply and distribution system for high-rise buildings has undergone significant changes, which focus on improving energy efficiency and reducing emissions. This paper analyzes the design of power supply and distribution system for high-rise buildings, summarizes the selection principles and design methods of various systems, and explores the application of new technologies to improve energy efficiency and promote the development of green buildings.1. Selection of Power Supply ModeThe power supply mode is the basic foundation of power supply and distribution system of high-rise buildings. In the selection of power supply mode, it is necessary to consider the characteristics of the building and the surrounding environment, and ensure the reliability and safety of power supply. Currently, the main power supply modes for high-rise buildings are grid-connected power supply and distributed power supply.1.1 Grid-connected Power SupplyGrid-connected power supply is a traditional power supply mode, which is widely used in high-rise buildings. It has the advantages of reliable power supply, convenient operation and maintenance, and stable voltage and frequency. However, grid-connected power supply is vulnerable to natural disasters such as typhoons and earthquakes, and may cause power outages, which will affect the normal life and work of residents. Moreover, the development of distribution network is limited by the capacity of the grid, which may cause overloaded operation and reduce the energy efficiency of high-rise buildings.1.2 Distributed Power SupplyDistributed power supply is a new power supply mode, which can improve the energy efficiency of high-rise buildings and reduce the dependence on the grid. Distributed power supply includes combined heat and power (CHP), solar power, wind power and other renewable energy sources. CHP is a highly efficient power generation technology, which can generate electricity and heat at the same time, and utilize the waste heat for air conditioning and domestic hot water. Solar power and wind power are clean energy sources, which have the advantages of zero emissions and long service life. Distributed power supply can reduce the transmission and distribution losses of power supply, and improve the energy efficiency of high-rise buildings. However, the initial investment of distributed power supply is relatively high, and the technical level of electrical equipment and maintenance management is demanding.2. Design of Power Distribution SystemThe power distribution system is responsible for the power transmission and distribution of high-rise buildings, which should ensure the safety and reliability of the power supply. The design of power distribution system includes the selection of power distribution equipment, the layout of power distribution room, and the calculation of power load.2.1 Selection of Power Distribution EquipmentThe selection of power distribution equipment should meet the requirements of technical performance, safety and reliability, and energy efficiency. The main power distribution equipment includes switchgear, transformer, busbar, distribution panel, etc. The switchgear should have the function of over-current protection, short-circuit protection and earth leakage protection, and should have the advantages of small volume, low noise and high reliability. The transformer should be selected according to the capacity and voltage level, and should have the advantages of low loss, high efficiency and small size. The busbar should have the advantages of high strength, good conductivity and low resistance. The distribution panel should have the functions of metering, control, protection and communication, and should be easy to operate and maintain.2.2 Layout of Power Distribution RoomThe layout of power distribution room should be reasonable and convenient for operation and maintenance. The power distribution room should be located near the power supply entrance, and should have the advantages of good ventilation, dry, clean and spacious. The power distribution room should be equipped with the necessary security measures, such as fire prevention, explosion-proof, and lightning protection.2.3 Calculation of Power LoadThe calculation of power load is the key to the design of power distribution system. The power load includes lighting load, air conditioning load, power load and special load, etc. The calculation of power load should take into account the diversity of load, the possibility of peak load, and the capacity of power supply equipment. The primary consideration is to ensure the safety and reliability of power supply, and then to improve the energy efficiency of power utilization.3. Design of Grounding SystemThe grounding system is an important safety measure for high-rise buildings. The design of grounding system should meet the requirements of electrical safety and electrostatic discharge protection.3.1 Electrical SafetyThe grounding system should have the functions of lightning protection, over-voltage protection, over-current protection and earth leakage protection, etc. The grounding resistance should be less than the specified value, and the grounding wire should have good conductivity and corrosion resistance. The grounding system should be comprehensively tested and maintained regularly.3.2 Electrostatic Discharge ProtectionThe electrostatic discharge protection is to prevent the accumulation of static electricity and the damage of electrical equipment. The design of electrostatic discharge protection includes the selection of anti-static grounding material, the setting of anti-static floor, and the installation of anti-static equipment. The electrostatic discharge protection is especially important for data centers and sensitive electrical equipment.4. Selection of Electrical EquipmentThe selection of electrical equipment is an important part of the design of power supply and distribution system for high-rise buildings. The selection of electrical equipment should meet the requirements of technical performance, safety and reliability, environmental protection and energy efficiency.4.1 Technical PerformanceThe electrical equipment should meet the relevant national and international standards, and have the characteristics of high efficiency, low noise, long service life and easy maintenance. The electrical equipment should have the functions of protection, control, measurement and communication, and should be compatible with the automation system.4.2 Safety and ReliabilityThe electrical equipment should have the functions of over-current protection, short-circuit protection, ground connection protection and lightning protection, etc. The electrical equipment should be installed and maintained by qualified personnel, and should be tested and checked regularly to ensure the safety and reliability of power supply and distribution system.4.3 Environmental Protection and Energy EfficiencyThe electrical equipment should have the advantages of environmental protection and energy efficiency, and should meet the requirements of green building standards. The electrical equipment should have the functions of power monitoring, energy management and control, and should be able to optimize the energy utilization and reduce the energy consumption.5. Design of Lightning Protection SystemThe lightning protection system is an important safety measure for high-rise buildings, which can prevent the damage of lightning to electrical equipment and human life. The design of lightning protection system includes the selection of lightning protection device, the installation of lightning rod, the connection of grounding wire, and the calculation of lightning protection zone.5.1 Selection of Lightning Protection DeviceThe lightning protection device should have the functions of lightning protection, over-voltage protection, surge protection and electromagnetic pulse protection, etc. The lightning protection device should be reliable and durable, and should meet the relevant national and international standards.5.2 Installation of Lightning RodThe lightning rod should be installed on the roof of high-rise buildings, and should be connected with the grounding system. The lightning rod should be placed in a high position, and should be made of light and strong materials, such as aluminum alloy or stainless steel. The lightning rod should be inspected regularly to ensure its effectiveness.5.3 Connection of Grounding WireThe grounding wire should be connected with the lightning rod, the grounding system, and the electrical equipment. The grounding wire should have the advantages of low resistance, good conductivity and corrosion resistance. The grounding wire should be tested and checked regularly to ensure its effectiveness.5.4 Calculation of Lightning Protection ZoneThe calculation of lightning protection zone is the basis for the design of lightning protection system. The lightning protection zone includes the direct lightning strike zone and the induced lightning zone. The direct lightning strike zone is the area covered by the lightning rod, and the induced lightning zone is the area beyond the direct lightning strike zone. The calculation of lightning protection zone should consider the characteristics of lightning, such as the stroke current, the distance from the lightning source, and the soil resistivity.ConclusionThe design of power supply and distribution system for high-rise buildings is a complex and important work. The selection of power supply mode, the design of power distribution system, the design of grounding system, the selection of electrical equipment, and the design of lightning protection system are the main aspects of the design of power supply and distribution system. The application of advanced technologies such as distributed power supply, energy management and control system, and intelligent electrical equipment can improve the energy efficiency and utilization of high-rise buildings, reduce energy consumption and carbon emissions, and promote the development of green buildings. The design of power supply and distribution system for high-rise buildings should adhere to the principles of safety, reliability, energy efficiency, economic benefits and environmental protection, and strive to create a better living and working space for residents.。
电气专业毕业设计外文翻译--小区配电设计
毕业设计(论文)外文参考资料及译文译文题目:Kangle community Power Of Distribution in Yandu Of yancheng盐城市盐都区康乐小区配电设计学生姓名:学号: 0804110437 专业:电气工程及其自动化所在学院:机电工程学院指导教师:职称:讲师2012 年 3 月 3日Power Of community Distribution To DesignABSTRACT:The basic function of the electric power system is to transport the electric power towards customers. The l0kV electric distribution net is a key point that connects the power supply with the electricity using on the industry, business and daily-life. For the electric power, allcostumers expect to pay the lowest price for the highest reliability, but don't consider that it's self-contradictory in the co-existence of economy and reliable.To improve the reliability of the power supply network, we must increase the investment cost of the network construction But, if the cost that improve the reliability of the network construction, but the investment on this kind of construction would be worthless if the reducing loss is on the power-off is less than the increasing investment on improving the reliability .Thus we find out a balance point to make the most economic,between the investment and the loss by calculating the investment on power net and the loss brought from power-off.KEYWORDS:power supply and distribution, power distribution reliability,reactive compensation, load distributionThe revolution of electric power system has brought a new big round construction,which is pushing the greater revolution of electric power technique along with the application of new technique and advanced equipment. Especially, the combination of the information technique and electric power technique, to great ex- tent, has improved reliability on electric quality and electric supply. The technical development decreases the cost on electric construction and drives innovation of electric network. On the basis of national and internatio- nal advanced electric knowledge, the dissertation introduces the research hotspot for present electric power sy- etem as following.Firstly, This dissertation introduces the building condition of distribution automation(DA), and brings forward two typical construction modes on DA construction, integrative mode and fission mode .It emphasize the DA structure under the condition of the fission mode and presents the system configuration, the main station scheme, the feeder scheme, the optimized communication scheme etc., which is for DA research reference.Secondly, as for the (DA) trouble measurement, position, isolation and resume, This dissertation analyzes the changes of pressure and current for line problem, gets math equation by educing phase short circuit and problem position under the condition of single-phase and works out equation and several parameter s U& , s I& and e I& table on problem . It brings out optimized isolation and resume plan, realizes auto isolation and network reconstruction, reduces the power off range and time and improves the reliability of electric power supply through problem self- diagnoses and self-analysis. It also introduces software flow and use for problem judgement andsets a model on network reconstruction and computer flow.Thirdly, electricity system state is estimated to be one of the key techniques in DA realization. The dissertation recommends the resolvent of bad measurement data and structure mistake on the ground of describing state estimate way. It also advances a practical test and judging way on topology mistake in state estimate about bad data test and abnormity in state estimate as well as the problem and effect on bad data from state measure to state estimate .As for real time monitor and control problem, the dissertation introduces a new way to solve them by electricity break and exceptional analysis, and the way has been tested in Weifang DA.Fourthly, about the difficulty for building the model of load forecasting, big parameter scatter limit and something concerned, the dissertation introduces some parameters, eg. weather factor, date type and social environment effect based on analysis of routine load forecasting and means. It presents the way for electricity load forecasting founded on neural network(ANN),which has been tested it’s validity by example and made to be good practical effect.Fifthly, concerning the lack of concordant wave on preve nting concordant wave and non-power compensation and non-continuity on compensation, there is a topology structure of PWM main circuit and nonpower theory on active filter the waves technique and builds flat proof on the ground of Saber Designer and proves to be practical. Meanwhile, it analyzes and designs the way of non-power need of electric network tre- nds and decreasing line loss combined with DA, which have been tested its objective economic benefit throu- gh counting example.Sixthly, not only do the dissertation design a way founded on the magrginal electric price fitted to our present national electric power market with regards to future trends of electric power market in China and fair trade under the government surveillance, that is group competitio n in short-term trade under the way of grouped price and quantity harmony, but also puts forward combination arithmetic, math model of trading plan and safty economical restriction. It can solve the original contradiction between medium and long term contract price and short term competitive price with improvement on competitive percentage and cut down the unfair income difference of electric factory, at the same time, it can optimize the electric limit for all electric factories and reduce the total purchase charge of electric power from burthen curve of whole electric market network.The distribution network is an important link among the power system. Its neutral grounding mode and operation connects security and stability of the power system directly. At the same time, the problem about neutral grounding is associated with national conditions, natural environment, device fabrication and operation. For example, the activity situation of the thunder and lightning, insulating structure and the peripheral interference will influence the choice of neutral groundingmode Conversely, neutral grounding mode affects design, operation, debugs and developing. Generally in the system higher in grade in the voltage, the insulating expenses account for more sizable proportion at the total price of the equipment. It is very remarkable to bring the economic benefits by reducing the insulating level. Usually such system adopt the neutral directly grounding and adopt the autoreclosing to guarantee power supply reliability. On the contrary, the system which is lower in the voltage adopts neutral none grounding to raise power supply reliability. So it is an important subject to make use of new- type earth device to apply to the distribution network under considering the situation in such factors of various fields as power supply reliability, safety factor, over-voltage factor, the choice of relay protection, investment cost, etc.The main work of this paper is to research and choice the neutral grounding mode of the l0kV distribution network. The neutral grounding mode of the l0kV network mainly adopts none grounding, grounding by arc suppressing coil, grounding by reactance grounding and directly grounding. The best grounding mode is confirmed through the technology comparison. It can help the network run in safety and limit the earth electric arc by using auto-tracking compensate device and using the line protection with the detection of the sensitive small ground current. The paper introduces and analyzes the characteristic of all kind of grounding modes about l0kV network at first. With the comparison with technological and economy, the conclusion is drawn that the improved arc suppressing coil grounding mode shows a very big development potential.Then, this paper researches and introduces some operation characteristics of the arc suppressing coil grounding mode of the l0kV distribution network. And then the paper put emphasis on how to extinguish the earth electric arc effectively by utilizing the resonance principle. This paper combines the development of domestic and international technology and innovative achievement, and introduces the computer earth protection and autotracking compensate device. It proves that the improved arc suppressing coil grounding mode have better operation characteristics in power supply reliability, personal security, security of equipment and interference of communication. The application of the arc suppressing coil grounding mode is also researched in this paper.Finally, the paper summarizes this topic research. As a result of the domination of the arc suppressing coil grounding mode, it should be more popularized and applied in the distribution network in the future.The way of thinking, project and conclusions in this thesis have effect on the research to choose the neutral grounding mode not only in I0kV distribution network but also in other power system..The basic function of the electric power system is to transport the electric power towards customers. The l0kV electric distribution net is a key point that connects the power supply withthe electricity using on the industry, business and daily-life. For the electric power, all costumers expect to pay the lowest price for the highest reliability, but don't consider that it's self-contradictory in the co-existence of economy and reliable. To improve the reliability of the power supply network, we must increase the investment cost of the network con- struction But, if the cost that improve the reliability of the network construction, but the investment on this kind of construction would be worthless if the reducing loss is on the power-off is less than the increasing investment on improving the reliability .Thus we find out a balance point to make the most economic, between the investment and the loss by calculating the investment on power net and the loss brought from power-off. The thesis analyses on the economic and the reliable of the various line modes, according to the characteristics various line modes existed in the electric distribution net in foshan..First, the thesis introduces as the different line modes in the l0kV electric distribution net and in some foreign countries. Making it clear tow to conduct analyzing on the line mode of the electric distribution net, and telling us how important and necessary that analyses are.Second, it turns to the necessity of calculating the number of optimization subsection, elaborating how it influences on the economy and reliability. Then by building up the calculation mode of the number of optimization subsection it introduces different power supply projects on the different line modes in brief. Third, it carries on the calculation and analyses towards the reliability and economy of the different line modes of electric distribution net, describing drafts according by the calculation. Then it makes analysis and discussion on the number of optimization subsection.At last, the article make conclusion on the economy and reliability of different line modes, as well as, its application situation. Accordion to the actual circumstance, the thesis puts forward the beneficial suggestion on the programming and construction of the l0kV electric distribution net in all areas in foshan. Providing the basic theories and beneficial guideline for the programming design of the lOkV electric distribution net and building up a solid net, reasonable layout, qualified safe and efficiently-worked electric distribution net.References[1] Wencheng Su. Factories power supply [M]. Machinery Industry Publishing House. 1999.9[2] Jiecai Liu. Factories power supply design guidance [M]. Machinery Industry Publishing House.1999.12[3] Power supply and distribution system design specifications[S].China plans Press. 1996[4] Low-voltage distribution design specifications [S].China plans Press.1996.6译文:小区配电设计摘要:电力系统的基本功能是向用户输送电能。
电气英文文献+翻译
POWER SUPPLY AND DISTRIBUTION SYSTEMABSTRACTThe basic function of the electric power system is to transport the electric power towards customers. The l0kV electric distribution net is a key point that connects the power supply with the electricity using on the industry, business and daily-life. For the electric power, allcostumers expect to pay the lowest price for the highest reliability, but don't consider that it's self-contradictory in the co-existence of economy and reliable.To improve the reliability of the power supply network, we must increase the investment cost of the network construction But, if the cost that improve the reliability of the network construction, but the investment on this kind of construction would be worthless if the reducing loss is on the power-off is less than the increasing investment on improving the reliability .Thus we find out a balance point to make the most economic,between the investment and the loss by calculating the investment on power net and the loss brought from power-off.KEYWARDS:power supply and distribution,power distribution reliability,reactive compensation,load distributionTEXTThe revolution of electric power system has brought a new big round construction,which is pushing the greater revolution of electric power technique along with the application of new technique and advanced equipment. Especially, the combination of the information technique and electric power technique, to great ex- tent, has improved reliability on electric quality and electric supply. The technical development decreases the cost on electric construction and drives innovation of electric network. On the basis of national and internatio- nal advanced electric knowledge, the dissertation introduces the research hotspot for present electric power sy- etem as following.Firstly, This dissertation introduces the building condition of distribution automation(DA), and brings forward two typical construction modes on DA construction, integrative mode and fission mode .It emphasize the DA structure under the condition of the fission mode and presents the system configuration, the main station scheme, the feeder scheme, the optimized communication scheme etc., which is for DA research reference.Secondly, as for the (DA) trouble measurement, position, isolation and resume, This dissertation analyzes the changes of pressure and current for line problem, gets math equation by educing phase short circuit and problem position under the condition of single-phase and works out equation and several parameter s U& , s I& and e I& table on problem . It brings out optimized isolation and resume plan, realizes auto isolation and network reconstruction, reduces the power off range and time and improves the reliability of electric power supply through problem self- diagnoses and self-analysis. It also introduces software flow and use for problem judgement and sets a model on network reconstruction and computer flow.Thirdly, electricity system state is estimated to be one of the key techniques in DA realization. The dissertation recommends the resolvent of bad measurement data and structure mistake on the ground of describing state estimate way. It also advances a practical test and judging way on topology mistake in state estimate about bad data test and abnormity in state estimate as well as the problem and effect on bad data from state measure to state estimate .As for real time monitor and control problem, the dissertation introduces a new way to solve them by electricity break and exceptional analysis, and the way has been tested in Weifang DA.Fourthly, about the difficulty for building the model of load forecasting, big parameter scatter limit and something concerned, the dissertation introduces some parameters, eg. weather factor, date type and social environment effect based on analysis of routine load forecasting and means. It presents the way for electricity load forecasting founded on neural network(ANN),which has been tested it’s validity by example and made to be good practical effect.Fifthly, concerning the lack of concordant wave on preve nting concordant wave and non-power compensation and non-continuity on compensation, there is a topology structure of PWM main circuit and nonpower theory on active filter the waves technique and builds flat proof on the ground of Saber Designer and proves to be practical. Meanwhile, it analyzes and designs the way of non-power need of electric network tre- nds and decreasing line loss combined with DA, which have been tested its objective economic benefit throu- gh counting example.Sixthly, not only do the dissertation design a way founded on the magrginal electric price fitted to our present national electric power market with regards to future trends of electric power market in China and fair trade under the government surveillance, that is group competitio n in short-term trade under the way of grouped price and quantity harmony, but also puts forward combination arithmetic, math model of trading plan and safty economical restriction. It can solve the original contradiction between medium and long term contract price and short term competitive price with improvement on competitive percentage and cut down the unfair income difference of electric factory, at the same time, it can optimize the electric limit for all electricfactories and reduce the total purchase charge of electric power from burthen curve of whole electric market network.The distribution network is an important link among the power system. Its neutral grounding mode and operation connects security and stability of the power system directly. At the same time, the problem about neutral grounding is associated with national conditions, natural environment, device fabrication and operation. For example, the activity situation of the thunder and lightning, insulating structure and the peripheral interference will influence the choice of neutral grounding mode Conversely, neutral grounding mode affects design, operation, debugs and developing. Generally in the system higher in grade in the voltage, the insulating expenses account for more sizable proportion at the total price of the equipment. It is very remarkable to bring the economic benefits by reducing the insulating level. Usually such system adopt the neutral directly grounding and adopt the autoreclosing to guarantee power supply reliability. On the contrary, the system which is lower in the voltage adopts neutral none grounding to raise power supply reliability. So it is an important subject to make use of new- type earth device to apply to the distribution network under considering the situation in such factors of various fields as power supply reliability, safety factor, over-voltage factor, the choice of relay protection, investment cost, etc.The main work of this paper is to research and choice the neutral grounding mode of the l0kV distribution network. The neutral grounding mode of the l0kV network mainly adopts none grounding, grounding by arc suppressing coil, grounding by reactance grounding and directly grounding. The best grounding mode is confirmed through the technology comparison. It can help the network run in safety and limit the earth electric arc by using auto-tracking compensate device and using the line protection with the detection of the sensitive small ground current. The paper introduces and analyzes the characteristic of all kind of grounding modes about l0kV network at first. With the comparison with technological and economy, the conclusion is drawn that the improved arc suppressing coil grounding mode shows a very big development potential.Then, this paper researches and introduces some operation characteristics of the arc suppressing coil grounding mode of the l0kV distribution network. And then the paper put emphasis on how to extinguish the earth electric arc effectively by utilizing the resonance principle. This paper combines the development of domestic and international technology and innovative achievement, and introduces the computer earth protection and autotracking compensate device. It proves that the improved arc suppressing coil grounding mode have better operation characteristics in power supply reliability, personal security, security of equipment and interference of communication. The application of the arc suppressing coil grounding mode is also researched in this paper.Finally, the paper summarizes this topic research. As a result of the domination of the arc suppressing coil grounding mode, it should be more popularized and applied in the distribution network in the future.The way of thinking, project and conclusions in this thesis have effect on the research to choose the neutral grounding mode not only in I0kV distribution network but also in other power system..The basic function of the electric power system is to transport the electric power towards customers. The l0kV electric distribution net is a key point that connects the power supply with the electricity using on the industry, business and daily-life. For the electric power, all costumers expect to pay the lowest price for the highest reliability, but don't consider that it's self-contradictory in the co-existence of economy and reliable. To improve the reliability of the power supply network, we must increase the investment cost of the network con- struction But, if the cost that improve the reliability of the network construction, but the investment on this kind of construction would be worthless if the reducing loss is on the power-off is less than the increasing investment on improving the reliability .Thus we find out a balance point to make the most economic, between the investment and the loss by calculating the investment on power net and the loss brought from power-off. The thesis analyses on the economic and the reliable of the various line modes, according to the characteristics various line modes existed in the electric distribution net in foshan..First, the thesis introduces as the different line modes in the l0kV electric distribution net and in some foreign countries. Making it clear tow to conduct analyzing on the line mode of the electric distribution net, and telling us how important and necessary that analyses are.Second, it turns to the necessity of calculating the number of optimization subsection, elaborating how it influences on the economy and reliability. Then by building up the calculation mode of the number of optimization subsection it introduces different power supply projects on the different line modes in brief. Third, it carries on the calculation and analyses towards the reliability and economy of the different line modes of electric distribution net, describing drafts according by the calculation. Then it makes analysis and discussion on the number of optimization subsection.At last, the article make conclusion on the economy and reliability of different line modes, as well as, its application situation. Accordion to the actual circumstance, the thesis puts forward the beneficial suggestion on the programming and construction of the l0kV electric distribution net in all areas in foshan. Providing the basic theories and beneficial guideline for the programming design of the lOkV electric distribution net and building up a solid net, reasonable layout, qualified safe and efficiently-worked electric distribution net.References[1] Wencheng Su. Factories power supply [M]. Machinery Industry Publishing House. 1999.9[2] Jiecai Liu. Factories power supply design guidance [M]. Machinery Industry Publishing House.1999.12[3] Power supply and distribution system design specifications[S].China plans Press. 1996[4] Low-voltage distribution design specifications [S].China plans Press. 1996.6供配电系统摘要电力系统的基本功能是向用户输送电能。
(完整word版)关于变配电的英文文献1
On architectural design of electrical energy saving methods Abstract : In this paper the architectural design of electrical energy saving, energy—saving methods, from the choice of transformer capacity, power factor compensation, lighting dimmers equipment, motor starter equipment selection, Electrical Design exposition of several energy—saving methods.Keywords : loss of electrical energy saving transformer power factor VVVF lighting energy saving soft starter ,as a result of population increase , industrial development, the improvement of living standards, the consumption of energy has increased dramatically, the energy crisis was imminent.Therefore, the businesses of the energy—saving requirements, secondary energy conservation -- Energy, civil construction, it has become the focus of electrical design。
配电系统无功补偿装置中英文对照外文翻译文献
中英文对照外文翻译(文档含英文原文和中文翻译)Optimization of reactive power compensation indistribution systemThe reactive power compensation for distribution network,as the supplement of substation compensation can effectively improve the power factor, reduce line loss, improve the end voltage, ensure the quality of power supply, also bring good economic benefits for enterprise, has received extensive attention. The distributed reactive compensation, installing power capacitors on feeders, is the main distribution network compensation mode at home and abroad [1], but different installed location and different installed capacity, the benefit is different. With the application of reactive power compensation distribution increase gradually, how to choose appropriate reactive compensation location and compensation capacity to make the maximum benefit with less cost become people's research target. And the optimization of distributed reactive compensation of distribution network was raised .At present, the decision of the best compensation capacity and the best position in actual distribution reactive compensation, usually in accordance with ideal situations, such as, the reactive load along the road distributed uniformly, increasing, diminishing distribution or as isosceles distribution, and so on [2], [9]. This method has clear results, simple calculation, and has a certain engineering practical value. But the actual reactive load distribution is more complex, which is different from the ideal situation. So, in accordance with ideal situations to premise reactive compensation configuration optimization formula may be not satisfied. To study a more general distributed reactive compensation configuration optimized method is needed.This paper studies several kinds of typical optimal allocation of reactive compensation configuration with ideal load distribution. Then it details the distributed reactive compensation optimized mathematical model,- 11 -which is applied to any load distribution or distribution network structure, and gives the effective algorithm. At last, the paper introduces the practical application of the research of the model and the algorithm.The ideal load distribution is refers to the reactive power load distributed along the line meet a kind of ideal regular distribution, for example, in any point the road reactive load is equal, named uniform distribution, the reactive load from the first end increasing or decreasing, named increasing or decreasing distribution, and so on. This is an abstract of the actual load distribution, and in such a hypothesis premise the analytical expressions of the optimal location and capacity can be deduced, which can get the best reduce loss effect. And the results are showed in Table I and Fig 1, which can be chose in practical projects [3], [4], [6].When the actual power distribution is different from the ideal situation, using the results to guide the reactive compensation configuration, the effect may be not beautiful. It needs to study a more general reactive compensation configuration optimized method.The optimization of distribution network distributed reactive compensation is distributed as a mixed integer nonlinear optimization problems, which is to determine the reactive compensation position and capacity with some constraints [5]. Therefore, the compensation position and capacity are the two decision variables. Its mathematical model is a two layers optimized problem with constraint. First is the capacity optimization at determined location, second is the distribution optimization. Based on the optimization mathematical model and algorithm, the corresponding graphical calculation software has been developed. With the optimization results, some power capacitors are installed on ten lOkV rural feederswhich had lower power factor and higher line loss. And the actual operation showed good effect. As shown in Fig 3 and Table II, it is the optimization of a feeder named CHANG 7.the total length is 22.35 km, the conductor type of trunk line is LGJ-120,with a distribution capacity of 4760 kVA. The active power- 12 -was 1904 kW, and the power factor was 0.83. The objective power factor was set at 0.9, so the reactive compensation total capacity was 358 kvar. The parameters including length and conductor type of each section, nameplate parameters of transformers, and the reactive compensation total capacity were set in the graphical software. Yet, the graph of the feeder had been drawn too. Then the results were marked on the feeder graph automatically, such as Fig. 3.As shown in Table II, theory line loss rate got an obvious 0.4149 percents decrement, if reactive compensation devices were installed. Also, under the condition of total capacity, two installations made 0.007 percent lower than one, and three points installation made 0.0003 percent lower than two. Then more compensation installations got more decrement of theory line loss rate, but the decreasing rate become inconspicuous, In contrast, equipment maintenance cost increased a lot. Therefore, two installations were selected onCHANG 7 feeder at last.This work provides scientific and reasonable theory for reactive power optimization of distribution network, and gives a reference for the distribution network loss calculation. Also, it provides the convenience for improving the quality of voltage, energy saving and improving line loss management level.1) For solving distribution network reactive power optimization problem, this paper puts forward the double optimization mathematical model of distribution network distributed reactive compensation, the inner is compensation capacity optimization, the outer layer is the reactive compensation distribution optimization. The model can do distribution reactive compensation optimization with any load distribution and arbitrary distribution network structure forms.2) By introducing Lagrange multiplier and the necessary condition of extreme, the mixed integer nonlinear optimization problem is deduced to a linear one that can be easily solved by Gaussian elimination method. It is- 13 -very imple and efficient for computer programming.3) The model and the algorithm can give different optimized results and loss reduction for different number of capacitor installation. Engineering practice showed that optimized capacitors installation can make line loss rate get an obvious decrement. This research plays an important role in the actual reactive compensation equipment installation of distribution network and line loss management.Reasonable reactive power sources compensation of rural substations h as been becoming a hot issue since Chinese rural electric network alteration. The principal reactive power compensation mode of rural substations is still using fixed compensation capacitor to control voltage and reactive power at present in China. This compensation mode has some problems. such as capacity adjustment requires manual intervention under power outage, the phenomenon of over and under compensation may always happen, the rate of putting into operation of reactive power compensation is relatively low, and so on . At the same time, there is no sampling function at the primary side of the main transformer because of the special devices in rural substations. In order to realize the objectives that the power factor is not less than 0.95 at primary side and not less than 0.9 at secondary side at the highest load, in this paper,some optimal reactive power control strategies for rural substation were proposed. In accordance with the reactive power flow conditions of the rural distribution network , the pros and cons of two control strategies were analyzed. One of the strategies was sampling at the primary side of the main transformer , the other was sampling at the s econdary side and switching control by power factor of secondary side. After comparison of such analysis, an optimal control strategy was p roposed. The data were sampledin the substation secondary side, then t he sampled data were evaluated in equivalence to the primaryside, and then the power factor assessment criteria of primary side were used t o control capacitor switching . The compensation capacity should be c- 14 -alculatedafter electric motor compensation , transformer compensation an d distributed compensation on distribution line.The sampled values at se condary side and active loss and reactive loss of themaintransformer w ere used to calculate compensation capacity to meet the power factor o bjectives of primary side. Through the example calculation and analysiby Applying actual substation data a result were obtained.The result met ap praisal standards and the power factor of main transformer primary sid e was above 0.95 at the highest load . If the power factor of main tran sformer secondary side was above 0.98 , there was no need to co mpensate for substation . If the power factor of main transformer secondaryside was under 0.97,after the compensation by using the p roposed optimal compensation capacity and the primary side power f actor control method, the power facto r of the main transformer se condary side was not less than0.98 and the primary side reaches 0.95. T hese results show that the proposed optimal control strategy and compe nsation capacity calculation method are feasible, and the research haspra ctical significance of making full use of reactive power supply in rural di stribution network.Optimal allocation of reactive power compensation plays an important role in power system planning and design. However, as a non-linear, larg e scale combinatorial . optimization problem, Conventional methods are not normally appropriate for it.A mathematical model is firstly presented in this paper for comprehensive optimal configuration in distribution feeders based on the analysis of engineering factors of reactive power compensation, whose objective is to minimize the annual expenditure involving the devices investment and the income of energy saving, and satisfy all sorts of operation ,fixing and maintenance constrains . The control variable include the capacitor banks’number and capacity of various compensation schemes. RARW-GA algorithm is adopted to solve this problem.The result of calculation and analysis of BenXi Steel group c orporation power system shows that the proposed method is feasible- 15 -and effective.An improved TS algorithm is put forward on the condition that reactive power compensation location and capacity have been identified in rural distribution lines. The Algorithm is based on capacitor optimal on-off model aimed at a minimum network loss, it can control the capacitor on-off according to the load changing and the system operation status and keep real-time voltage qualified and network loss minimum. A distributed control system is designed by using the algorithm to realize reactive power optimization, which is composed of reactive power optimal terminals and background control center. The terminal is in charge of data collection and transmission, on-off instruction receiving and executing. The control center in in charge of receiving data from every compensation point, calling control algorithm to process data, forming and sending instructions. GPRS technology is adopted to realize the system’s foreground-background communication. The actual application in some experimental networks has proved that the system can realize global optimal control for distribution lines, and is suitable to be widely used in rural distribution network.In order to solve the optimization of distribution reactive compensation point and capacity, a double optimized model is proposed, which is sui able for reactive compensation optimizationwith random load distribution or random network structure. For the compensation position and capacity decision variables, the optimized model is described as two layers of optimization with constraint . The outer one is the capacity optimization at determined location , and the inlayer is the location optimization . By introducing Lagrange multiplier, the mixed integer nonlinear optimization is deduced to a linearone that can be easily solve by Gaussian elimination method. For illustration, an application of ten 10kV rural feeders is utilized to show the feasibility of the double optimized model in solving the optimization of distribution reactive compensation point and capacity. Empirical results show that the model can give the optimized result for different number of capacitor installa-- 16 -tion, and the result with highest line loss decrementwill be used as thefi nal decision.The research provides scientific theoretical basis for Reactive compensation and plays a vital role in reactive compensation equipment installation and line loss management.Taking account of the mutual impacts of distributed generation and reactive power , to determine the optimal position and capacity of the compensation device to be installed , the paper proposed an improved Tabu search algorithm for reactive power optimiza-tion . The voltage q uality is considered of the model using minimum network active power l oss as objective Function . It is achieved by maintaining the whole s ystem power lossa minimum thereby reducing cost allocation. On the ba sis of general Tabu search algorithm , the algorithm used memory gu idance search strategy to focus on searching for a local optimum va lue, avoid a global search blindness . To deal with the neighborhood so lution set properly or save algorithm storage space,some corresponding i mprovments are made, thus, it is easily to stop the iteration of partial optimization and it is more probable to achieve the global optimizationb y use of the improved algorithm.Simulations are carried out on standard IEEE 33 test system and results are presented.SupSuperconducting Magnetic Energy Storage SMES) can inject or absorb real and reactive power to or from a power system at a very fast rate on a repetitive basis. These characteristics make the application of SMES ideal for transmission grid control and stability enhancement. Superconducting Magnetic Energy Storage SMES) is an attractive apparatus for some power system applications because it is capable of leveling load demand with high efficiency, compensating for load changes, maintaining a bus voltage, and stabilizing power swings. Power system stability problems have attracted the attention of power system engineers for several decades. Considerable progress has been made on excitation control, governor control, control by static var compensator, etc. Modern power systems, which are growing in size and complexity, are characterized by long distance bulk power transmissions and- 17 -wide area interconnections.In such power systems, undamped power swings of low frequency can occur. This can be a serious problem since the instability often decreases the power transmission capacity. As a result, the power that can be transmitted in steady state and transient situations is limited. If the limit is exceeded, the generator loses synchronous operation and system instabilities occur. SMES may be an effective means of preventing these instabilities, thereby maximizing power transfer to meet increased load demand. A SMES system can be represented in dynamic simulations as a continuous controllable real and reactive power source. In steady-state simulations, SMES can be represented as a continuous controllable reactive power source since it can continuously operate throughout its range of reactive power. However, the output of real power from a SMES device is limited to the amount of energy stored in the coil. The first objective of this research is to determine the optimal internal control scheme needed to decide the controllable active and reactive power based on active and reactive power demanded by the power system. The second objective is to design and simulate SMES external control models which are dependent on the network configuration. The third objective is to determine how the optimal size of a SMES device varies for a given transient stability disturbance when alternative internal control models and external control models are used.With a big number of electric energy consumers and different characters electric energy quality depends on many factors in the modern power networks. It includes: power networks and working condition factors of consumers. One of them is the possibility of reactive power balances with an important reserve providing after emergency modes on the basic knots of the power system and voltage regulation on all networks.As the length of networks of a power system increases in modern conditions, we can reduce the reactive power streams, as well as operational and capital expenses. Rational voltage mode brings to the front plan the- 18 -technical一economic aspects of the power transmission EFFICIENCY. Analyses and economic calculations show that transferring the reactive power by short length lines means of a high voltage justifies. Therefore in most cases reduction of reactive power to the minimum is very effective for economically when the sources of reactive power settle down near the consumption centers.The increase of consumer loading and its structure qualitative causes considerable increase of reactive power and constant reduction of a power factor in distributed power networks [ 1」.Thus, the tendency of modern power systems development is characterized by one side with the increase of reactive power consumption (in some systems to 1 kVAR/kVt), on the other side with decrease of power plant generators usage expediency and possibility for the reactive power compensation purpose [2-5]. In such conditions reactive power compensation attains a specialurgency. Here the optimization's primary goal is optimum placing of reactive power sources andsupport of a necessary reserve of capacity QreZ for voltage regulation on loading knot. For example, Polish power engineers consider that capacity of compensators should be 50% of the established capacity of generators in power plants. In France, Sweden and Germany the capacity of compensators is 35% of active peak loading, in the USA and Japan this volume is 70%. In different power systems of the USA the established capacity of compensators is 100% of generators capacities [6-11].Reactive power compensation problem is a multidimensional problem on the technical andeconomic aspects and consequently it is resulted with the finding of a global extremum of criterion function with the set of local extreme. In this article the voltage support within the technical restrictions and definition of optimal placing of the reactive power sources with a technique of multi-purpose- 19 -optimization of reactive power in the power system is considered. By the problem consideration as one-target optimization within restrictions the criterion function is a linear combination from several factors. The problem decision is a unique optimum version and has lacks of alternative versions, and there is not dependency of an end result from the initial data.Thus, the purpose of reactive power sources optimal placing in a power system consists ofincrease the quality of voltage in all central points of a network, control the stability of the system, reduce the power losses and capacities in networks. As a result these will increase the economic efficiency in the power system. From the economic efficiency point of view the new compensating units intended for installation should be proved and given corresponding optimum recommendations.1 .Methods and multi-purpose optimization compensations algorithms have been developed with support of a necessary reserve for preservation of normal level of voltage taking into account technical restrictions in knots of an electric network of a power system. Results of computerization to realization have shown speed and high efficiency the developed algorithm providing minimization of losses of active capacity in a net.2. Based on genetic algorithm the power and installation locations of the static capacitor banks with the multicriteria optimization technique has given. In this case, as a criterion of optimality the minimum expenses for the installation and exploitation, the minimization of power losses during the required values of voltage and power factor and maximum saving and the minimum self-payment term are accepted.3. The report of the real electricity network is given for two cases: operation without the CB;with optimal placement of CB. The application of the proposed method can reduce the averagepower losses approximately 13一14% in the electric network.- 20 -配电系统无功补偿装置容量优化配电网无功补偿,作为补充的变电站补偿可以有效地提高功率因数,减少线路损耗,提高末端电压,保证供电质量,也能带来良好的企业的经济效益,已得到泛的注意。
住宅小区配电设计外文文献翻译中英文
外文文献翻译(含:英文原文及中文译文)译文字数:3700多字文献出处:J Ehnberg. Power of Community Distribution to Design[J] Value Engineering, 2016, 2(3):14-21英文原文Power of Community Distribution to DesignJ EhnbergABSTRACTThe basic function of the electric power system is to transport the electric power towards customers. The l0kV electric distribution net is a key point that connects the power supply with the electricity using on the industry, business and daily-life. For the electric power, allcostumers expect to pay the lowest price for the highest reliability, but don't consider that it's self-contradictory in the co-existence of economy and reliable.To improve the reliability of the power supply network, we must increase the investment cost of the network construction But, if the cost that improve the reliability of the network construction, but the investment on this kind of construction would be worthless if the reducing loss is on the power-off is less than the increasing investment on improving the reliability .Thus we find out a balance point to make the most economic, between the investment and the loss by calculating the investment onpower net and the loss brought from power-off.KEYWORDS: power supply and distribution, power distribution reliability , reactive compensation, load distributionIn general, major changes to the building include: high voltage and low voltage distribution systems, transformers, and backup power systems. Power systems include power distribution and control, indoor and outdoor lighting systems include all types of lighting, and lightning protection systems include intrusion protection, lightning sensors, grounding, equipotential bonding, and local equipotential bonding. Auxiliary equipotential bonding. In just 20 years, the system has undergone enormous changes in the face of technology and products. Many design ideas have also changed dramatically. Switchgear, such as the first circuit-breaker oil circuit breaker in a high-voltage system, and the subsequent development of an oil circuit breaker, are not only large in size but generally contain oil. Due to the large size of the switchgear, we must also establish a separate equipment room that occupies a large amount of floor area. Vacuum circuit breakers and sulfur hexafluoride circuit breakers are not only small in size, but also have a large short-circuit capacity. The size of the housing is much larger than that of the original cabinets, and the circuit breakers do not have any oil and the fire performance is greatly improved. And circuit breakers and other low-voltage devices are in one room, which saves space and is easy tomanage. In the past, large-capacity low-voltage circuit breakers gradually increased the capacity of the short-circuit current, gradually reduced the scale, and became more stable, making the system safer and more reliable, which facilitated the design. Towards the development of intelligent low-voltage circuit breakers, various parameters of the circuit breaker can be controlled by the bus industry and the signals are transmitted directly to the computer.The appearance of dry-type transformers has brought great convenience to the electrical design of buildings because there is no possibility of leakage of transformer oil and fire so that it can be easily installed in the building itself and even directly into the load center. It also eliminates the transformer's demand for oil and can use dry-type transformers when building large-capacity equipment. Four Taiwanese 2500kV A dry-type transformers have been used in actual engineering design.In terms of using emergency generators, it is much more advanced than in the past in terms of performance and size. In addition to using diesel generators; emergency lighting uses EPS standby power; devices that interrupt power within a millisecond can use UPS.The control of electrical equipment varies from the control of a single component to the control of relays. In addition to the smaller size of the various components for better performance, the specification of thecontrol box is also reduced. Because digital technology is more used in control to achieve the best control status to control the equipment. Further improve the effect of energy conservation.The revolution of electric power system has brought a new big round construction, which is pushing the greater revolution of electric power technique along with the application of new technique and advanced equipment. Especially, the combination of the information technique and electric power technique, to great ex- tent, has improved reliability on electric quality and electric supply. The technical development decreases the cost on electric construction and drives innovation of electric network. On the basis of national and international advanced electric knowledge, the dissertation introduces the research hotspot for present electric power syetem as following.Firstly, This dissertation introduces the building condition of distribution automation(DA), and brings forward two typical construction modes on DA construction, integrative mode and fission mode .It emphasize the DA structure under the condition of the fission mode and presents the system configuration, the main station scheme, the feeder scheme, the optimized communication scheme etc., which is for DA research reference.Secondly, as for the (DA) trouble measurement, position, isolation and resume, This dissertation analyzes the changes of pressure andcurrent for line problem, gets math equation by educing phase short circuit and problem position under the condition of single-phase and works out equation and several parameter s U& , s I& and e I& table on problem . It brings out optimized isolation and resume plan, realizes auto isolation and network reconstruction, reduces the power off range and time and improves the reliability of electric power supply through problem self- diagnoses and self-analysis. It also introduces software flow and use for problem judgement and sets a model on network reconstruction and computer flow.Thirdly, electricity system state is estimated to be one of the key techniques in DA realization. The dissertation recommends the resolvent of bad measurement data and structure mistake on the ground of describing state estimate way. It also advances a practical test and judging way on topology mistake in state estimate about bad data test and abnormity in state estimate as well as the problem and effect on bad data from state measure to state estimate .As for real time monitor and control problem, the dissertation introduces a new way to solve them by electricity break and exceptional analysis, and the way has been tested in Weifang DA.Fourthly, about the difficulty for building the model of load forecasting, big parameter scatter limit and something concerned, the dissertation introduces some parameters, eg. weather factor, date type andsocial environment effect based on analysis of routine load forecasting and means. It presents the way for electricity load forecasting founded on neural network(ANN),which has been tested it’s validity by example and made to be good practical effect.Fifthly, concerning the lack of concordant wave on preve nting concordant wave and non-power compensation and non-continuity on compensation, there is a topology structure of PWM main circuit and nonpower theory on active filter the waves technique and builds flat proof on the ground of Saber Designer and proves to be practical. Meanwhile, it analyzes and designs the way of non-power need of electric network tre- nds and decreasing line loss combined with DA, which have been tested its objective economic benefit throu- gh counting example.Sixthly, not only do the dissertation design a way founded on the magrginal electric price fitted to our present national electric power market with regards to future trends of electric power market in China and fair trade under the government surveillance, that is group competitio n in short-term trade under the way of grouped price and quantity harmony, but also puts forward combination arithmetic, math model of trading plan and safty economical restriction. It can solve the original contradiction between medium and long term contract price and short term competitive price with improvement on competitive percentage and cut down the unfair income difference of electric factory, at the same time,it can optimize the electric limit for all electric factories and reduce the total purchase charge of electric power from burthen curve of whole electric market network.The distribution network is an important link among the power system. Its neutral grounding mode and operation connects security and stability of the power system directly. At the same time, the problem about neutral grounding is associated with national conditions, natural environment, device fabrication and operation. For example, the activity situation of the thunder and lightning, insulating structure and the peripheral interference will influence the choice of neutral grounding mode Conversely, neutral grounding mode affects design, operation, debugs and developing. Generally in the system higher in grade in the voltage, the insulating expenses account for more sizable proportion at the total price of the equipment. It is very remarkable to bring the economic benefits by reducing the insulating level. Usually such system adopt the neutral directly grounding and adopt the autoreclosing to guarantee power supply reliability. On the contrary, the system which is lower in the voltage adopts neutral none grounding to raise power supply reliability. So it is an important subject to make use of new- type earth device to apply to the distribution network under considering the situation in such factors of various fields as power supply reliability, safety factor, over-voltage factor, the choice of relay protection, investment cost, etc.The main work of this paper is to research and choice the neutral grounding mode of the l0kV distribution network. The neutral grounding mode of the l0kV network mainly adopts none grounding, grounding by arc suppressing coil, grounding by reactance grounding and directly grounding. The best grounding mode is confirmed through the technology comparison. It can help the network run in safety and limit the earth electric arc by using auto-tracking compensate device and using the line protection with the detection of the sensitive small ground current. The paper introduces and analyzes the characteristic of all kind of grounding modes about l0kV network at first. With the comparison with technological and economy, the conclusion is drawn that the improved arc suppressing coil grounding mode shows a very big development potential.Then, this paper researches and introduces some operation characteristics of the arc suppressing coil grounding mode of the l0kV distribution network. And then the paper put emphasis on how to extinguish the earth electric arc effectively by utilizing the resonance principle. This paper combines the development of domestic and international technology and innovative achievement, and introduces the computer earth protection and autotracking compensate device. It proves that the improved arc suppressing coil grounding mode have better operation characteristics in power supply reliability, personal security,security of equipment and interference of communication. The application of the arc suppressing coil grounding mode is also researched in this paper.Finally, the paper summarizes this topic research. As a result of the domination of the arc suppressing coil grounding mode, it should be more popularized and applied in the distribution network in the future.The way of thinking, project and conclusions in this thesis have effect on the research to choose the neutral grounding mode not only in I0kV distribution network but also in other power system..The basic function of the electric power system is to transport the electric power towards customers. The l0kV electric distribution net is a key point that connects the power supply with the electricity using on the industry, business and daily-life. For the electric power, all costumers expect to pay the lowest price for the highest reliability, but don't consider that it's self-contradictory in the co-existence of economy and reliable. To improve the reliability of the power supply network, we must increase the investment cost of the network con- struction But, if the cost that improve the reliability of the network construction, but the investment on this kind of construction would be worthless if the reducing loss is on the power-off is less than the increasing investment on improving the reliability .Thus we find out a balance point to make the most economic, between the investment and the loss by calculating the investment onpower net and the loss brought from power-off. The thesis analyses on the economic and the reliable of the various line modes, according to the characteristics various line modes existed in the electric distribution net in foshan..First, the thesis introduces as the different line modes in the l0kV electric distribution net and in some foreign countries. Making it clear tow to conduct analyzing on the line mode of the electric distribution net, and telling us how important and necessary that analyses are.Second, it turns to the necessity of calculating the number of optimization subsection, elaborating how it influences on the economy and reliability. Then by building up the calculation mode of the number of optimization subsection it introduces different power supply projects on the different line modes in brief. Third, it carries on the calculation and analyses towards the reliability and economy of the different line modes of electric distribution net, describing drafts according by the calculation. Then it makes analysis and discussion on the number of optimization subsection.At last, the article make conclusion on the economy and reliability of different line modes, as well as, its application situation. Accordion to the actual circumstance, the thesis puts forward the beneficial suggestion on the programming and construction of the l0kV electric distribution net in all areas in foshan. Providing the basic theories and beneficial guidelinefor the programming design of the lOkV electric distribution net and building up a solid net, reasonable layout, qualified safe and efficiently-worked electric distribution net.Auto-Tune SequenceThe auto-tuning sequence begins after the hysteresis and deviation values have been determined. The tuning process begins when the initial output step is applied to the loop output.This change in output value should cause a corresponding change in the value of the process variable. When the output change drives the PV away from setpoint far enough to exceed the hysteresis boundary a zero-crossing event is detected by the auto-tuner. Upon each zero crossing event the auto-tuner drives the output in the opposite direction.The tuner continues to sample the PV and waits for the next zero crossing event. A total of twelve zero-crossings are required to complete the sequence. The magnitude of the observed peak-to-peak PV values (peak error) and the rate at which zero-crossings occur are directly related to the dynamics of the process. Early in the auto-tuning process, the output step value is proportionally adjusted once to induce subsequent peak-to-peak swings of the PV to more closely match the desired deviation amount. Once the adjustment is made, the new output step amount is written into the Actual Step Size field (ASTEP) of the loop table. The auto-tuning sequence will be terminated with an error, if thetime between zero crossings exceeds the zero crossing watchdog interval time. The default value for the zero crossing watchdog interval time is two hours.中文译文住宅小区配电设计J Ehnberg摘要电力系统的基本功能是向客户输送电力。
电气外文文献及翻译--开关电源设计
外文文献:Switching Power Supply DesignSwitching power supply work in high frequency, high pulse state, are analog circuits in a rather special kind. Cloth boards to follow the principle of high-frequency circuit wiring.First, layout:Pulse voltage connection as short as possible, including input switch connected to the transformer, output transformer to the rectifier tube cable. Pulse current loop as small as possible such as the input filter capacitor is returned to the transformer to the switch capacitor negative. Some out-ended output transformers are the output rectifier to the output capacitor back to transformer circuit X capacitor as close as possible to the input switching power supply, input lines should be avoided in parallel with other circuits, should be avoided. Y capacitor should be placed in the chassis ground terminal or FG connectors. A total of touch induction and transformer to maintain a certain distance in order to avoid magnetic coupling. Such as poor handling of feeling in between inductor and transformer plus a shield, over a number of EMC performance for power supply to the greater impact.General the output capacitor can be used the other two a close rectifier output terminal should be close to, can affect the power supply output ripple index, two small capacitor in parallel results should be better than using a large capacitor. Heating devices to maintain a certain distance, and electrolytic capacitors to extend machine life, electrolytic capacitors is the switching power supply bottleneck life, such as transformers, power control, high power resistors and electrolytic to maintain the distance required between the electrolyte leaving space for heat dissipation , conditions permitting, may be placed in the inlet.Control part to pay attention to: Weak signal high impedance circuit connected to sample the feedback loop as short as in the processing as far as possible avoid interference, the current sampling signal circuits, in particular the current control circuit, easy to deal with some unexpected bad The accident, which had some skill,now to 3843 the circuit example shown in Figure (1) Figure 1 better than Yu Figure 2, Figure 2 Zai full time by observing the current waveform oscilloscope Mingxian superimposed spikes, Youyuganrao limited flow ratio design Zhi Dian low, Figure 1 there is no such phenomenon, there are switch drive signal circuit, switch resistance should be close to the switch driver can switch the work to improve the reliability of this and the high DC impedance voltage power MOSFET driver characteristics. Second, routingAlignment of current density: now the majority of electronic circuit board using insulated copper constitute tied. Common PCB copper thickness of 35μm, the alignment value can be obtained in accordance with 1A/mm experience the value of current density, the specific calculations can be found in textbooks. To ensure the alignment principles of mechanical strength should be greater than or equal to the width of 0.3mm (other non-power supply circuit board may be smaller minimum line width). PCB copper thickness of 70μm is also common in switching power supply, then the current density can be higher.Add that, now Changyong circuit board design tool design software generally items such as line width, line spacing, hole size and so dry plate Guo Jin Xing parameters can be set. In the design of circuit boards, design software automatically in accordance with the specifications, can save time, reduce some of the workload and reduce the error rate.Generally higher on the reliability of lines or line density wiring can be used double panel. Characterized by moderate cost, high reliability, to meet most applications.The ranks of some of the power module products are also used plywood, mainly to facilitate integration of power devices such as transformer inductance to optimize wiring, cooling and other power tube. Good consistency with the craft beautiful, transformer cooling good advantage, but its disadvantage is high cost, poor flexibility, only suitable for industrial mass production.Single-sided, the market circulation of almost universal switching power supply using single-sided circuit board, which has the advantage of lower costs in thedesign and production technology are also taken some measures to ensure its performance.Single PCB design today to talk about some experience, as a single panel with low cost, easy-to-manufacture features, the switching power supply circuit has been widely used, because of its side tied only copper, the device's electrical connections, mechanical fixation should rely on the copper layer, the processing must be careful.To ensure good performance of the mechanical structure welding, single-sided pad should be slightly larger to ensure that the copper and substrate tied good focus, and thus will not be shocked when the copper strip, broken off. General welding ring width should be greater than 0.3mm. Pad diameter should be slightly larger than the diameter of the device pins, but not too large, to ensure pin and pad by the solder connection between the shortest distance, plate hole size should not hinder the normal conditions for the degree of investigation, the pad diameter is generally greater than pin diameter 0.1-0.2mm. Multi-pin device to ensure a smooth investigation documents can also be larger.Electrical connection should be as wide as possible, in principle, should be larger than the width of pad diameter, special circumstances should be connected in line with the need to widen the intersection pad (commonly known as Generation tears), to avoid breaking certain conditions, line and pad. Principle of minimum line width should be greater than 0.5mm.Single-board components to be close to the circuit board. Need overhead cooling device to device and circuit board between the pins plus casing, can play a supporting device and increase the dual role of insulation to minimize or avoid external shocks on the pad and the pin junction impact and enhance the firmness of welding. Circuit board supporting the weight of large parts can increase the connection point, can enhance joint strength between the circuit board, such as transformers, power device heat sink.Single-sided welding pins without affecting the surface and the shell spacing of the prior conditions, it can be to stay longer, the advantage of increased strength of welded parts, increase weld area and immediately found a Weld phenomenon. Shearpin long legs, the welding force smaller parts. In Taiwan, the Japanese often use the device pins in the welding area and the circuit board was bent 45 degrees, and then welding process, its reasoning Ibid. Double panel today to talk about the design of some of the issues, in relatively high number of requests, or take the line density of the larger application environments using double-sided PCB, its performance and various indicators of a lot better than a single panel.Two-panel pad as holes have been high intensity metal processing, welding ring smaller than a single panel, the pad hole diameter slightly larger in diameter than pins, as in the welding process solder solution conducive to penetrate through the top hole solder pad to increase the welding reliability. But there is a disadvantage if the hole is too large, wave soldering tin when the jet impact in the lower part of the device may go up, have some flaws.High current handling of alignment, line width in accordance with pre-quote processing, such as the width is not enough to go online in general can be used to increase the thickness of tin plating solution, the method has a good variety of1. Will take the line set to pad property, so that when the circuit board manufacturing solder alignment will not be covered, the whole hot air normally be tin plated.2. In the wiring by placing pads, the pad is set to take in line shape, pay attention to the pad holes set to zero.3. In the solder layer placed on line, this method is the most flexible, but not all PCB manufacturers will understand your intentions, needed captions. Place the line in the solder layer of the site will not coated solder tinning line several methods as above, to note that, if the alignment of a very wide all plated with tin in solder after the solder will bond a lot and distribution is very uneven, affecting appearance. Article tin can be used generally slender width in the 1 ~ 1.5mm, length can be determined according to lines, tin part of the interval 0.5 ~ 1mmDouble-sided circuit board for the layout, the alignment provides a very selective, make wiring more reasonable. On the ground, the power ground and signal ground must be separated, the two to converge in filter capacitors, in order to avoid a large pulsed current through the signal ground connection instability caused by unexpectedfactors, the signal control circuit grounding point as far as possible, a skill, as far as possible the alignment of the non-grounded wiring layer in the same place, the last shop in another layer of earth. Output line through the filter capacitors, the general first, and then to the load, input line must also pass capacitor, to the transformer, the theoretical basis is to ripple through trip filter capacitor.V oltage feedback sampling, in order to avoid high current through the alignment of the feedback voltage on the sampling point must be the most peripheral power output to increase the load effect of target machine.Alignment change from a wiring layer to another wiring layer generally used hole connected, not through the pin pad device to achieve, because the plug in the device may be damaged when the relationship between this connection, there is current in every passage of 1A, at least two through-hole, through hole diameter is greater than the principle of 0.5mm, 0.8mm generally processed ensure reliability.Cooling devices, in some small power supply, the circuit board traces can be and cooling, characterized by the alignment as generous as possible to increase the cooling area is not coated solder, conditions can even be placed over holes, enhanced thermal conductivity .Today to talk about the aluminum plate in the switching power supply application and multilayer printed circuit in the switching power supply applications.Aluminum plate by its own structure, has the following characteristics: very good thermal conductivity, single Mianfu copper, the device can only be placed in tied copper surface, can not open electrical connection hole so as not to place jumper in accordance with a single panel.Aluminum plate is generally placed patch device, switch, the output rectifier heat conduction through the substrate to go out, very low thermal resistance, high reliability can be achieved. Transformer with planar chip structure, but also through substrate cooling, the temperature is lower than the conventional, the same size transformer with a large aluminum plate structure available output power. Aluminum plate jumper bridge approach can be used. Aluminum plate power are generally composed by the two PCB, another one to place the control circuit board, through thephysical connection between the two boards is integrated.As the excellent thermal conductivity of aluminum plate, in a small amount of manual welding more difficult, solder cooling too fast and prone to problems of a simple and practical way of existing, an ironing ordinary iron (preferably temperature regulation function), over and iron for the last, fixed, and temperature to 150 ℃ and above the aluminum plate on the iron, heating time, and then affix the components according to conventional methods and welding, soldering iron temperature is appropriate to the device easy to , is too high when the device may be damaged, or even copper strip aluminum plate, the temperature is too low welding effect is not good, to be flexible.Recent years, with the multi-layer circuit board applications in switching power supply circuit, printed circuit transformer makes it possible, due to multilayer, smaller spacing also can take advantage of Bianya Qi window section, the main circuit board can be re- Add 1-2 formed by the multilayer printed coil to use the window, the purpose of reducing circuit current density, due to adopt printed coil, reducing manual intervention, transformers consistency, surface structure, low leakage inductance, coupling good . Open-type magnetic core, good heat dissipation. Because of its many advantages, is conducive to mass production, it is widely used. But the research and development of large initial investment, not suitable for small-scale health.Switching power supply is divided into, two forms of isolation and non-isolated, isolated here mainly to talk about switching power supply topologies form below, non-specified, are to isolate the power. Isolated power supply in accordance with the structure of different forms, can be divided into two categories: a forward and flyback. Flyback transformer primary side means that when the Vice-edge conduction cut-off, transformer storage. Close of the primary, secondary side conduction, the energy released to the load of work status, general conventional flyback power multiplex, twin-tube is not common. Forward refers to the primary conduction in transformer secondary side while the corresponding output voltage is induced into the load, the direct transfer of energy through the transformer. According to specifications can be divided into conventional forward, including the single-transistor forward, DoubleForward. Half-bridge, bridge circuits are all forward circuit.Forward and flyback circuits have their own characteristics in the process of circuit design to achieve optimal cost-effective, can be applied flexibly. Usually in the low-power flyback can be adopted. Slightly larger forward circuit can use a single tube, medium-power can use Double Forward circuit or half-bridge circuit, low-voltage push-pull circuit, and the half-bridge work in the same state. High power output, generally used bridge circuit, low voltage can be applied push-pull circuit. Flyback power supply because of its simple structure, and to cut the size of a similar size and transformer inductance, the power supply in the medium has been widely applied. Presentation referred to in some flyback power supply can do dozens of watts, output power exceeding 100 watts would be no advantage to them difficult. Under normal circumstances, I think so, but it can not be generalized, PI's TOP chips can do 300 watts, an article describes the flyback power supply can be on the KW, but not seen in kind.Power output and the output voltage level.Flyback power transformer leakage inductance is a critical parameter, because the power needs of the flyback transformer stored energy, to make full use of transformer core, the general must be open in the magnetic circuit air gap, the aim is to change the core hysteresis back line of the slope, so that transformers can withstand the impact of a large pulse current, which is not core into saturation non-linear state, the magnetic circuit in the high reluctance air gap in the state, generated in the magnetic flux leakage is much larger than completely closed magnetic circuit .Transformer coupling between the first pole is the key factor determining the leakage inductance, the coil to be very close as far as possible the first time, the sandwich can be used around the law, but this would increase the distributed capacitance transformer. Use core as core with a long window, can reduce the leakage inductance, such as the use of EE, EF, EER, PQ-based EI type magnetic core effective than good.The duty cycle of flyback power supplies, in principle, the maximum duty cycle of flyback power supply should be less than 0.5, otherwise not easy loopcompensation may be unstable, but there are some exceptions, such as the U.S. PI has introduced the TOP series chip can work under the conditions of duty cycle is greater than 0.5.Duty cycle by the transformer turns ratio to determine former deputy side, I am an anti-shock view is, first determine the reflected voltage (output voltage reflected through the transformer coupling the primary voltage value), reflecting a certain voltage range of voltage increase is duty cycle increases, lower power loss. Reduce the reflected voltage duty cycle decreases, increases power loss. Of course, this is a prerequisite, when the duty cycle increases, it means that the output diode conduction time, in order to maintain output stability, more time will be to ensure that the output capacitor discharge current, the output capacitor will be under even greater high-frequency ripple current erosion, while increasing its heat, which in many circumstances is not allowed.Duty cycle increases, change the transformer turns ratio, transformer leakage inductance will increase, its overall performance change, when the leakage inductance energy large enough, can switch to fully offset the large account space to bring low-loss, no further increase when the meaning of duty, because the leakage inductance may even be too high against the peak voltage breakdown switch. Leakage inductance as large, may make the output ripple, and other electromagnetic indicators deteriorated. When the duty hours, the high RMS current through the switch, transformer primary current rms and lowered the converter efficiency, but can improve the working conditions of the output capacitor to reduce fever. How to determine the transformer reflected voltage (duty cycle)Some netizens said switching power supply feedback loop parameter settings, work status analysis. Since high school mathematics is rather poor, "Automatic Control Theory," almost on the make-up, and for the door is still feeling fear, and now can not write a complete closed-loop system transfer function, zero for the system, the concept of feeling pole vague, see Bode plot is only about to see is a divergence or convergence, so the feedback compensation can not nonsense, but there are a number of recommendations. If you have some mathematical skills, and then have some timeto learn then the University of textbooks, "Principles of Automatic Control" digest look carefully to find out, combined with practical switching power supply circuit, according to the work of state for analysis. Will be harvested, the Forum has a message, "coach feedback loop to study the design, debugging," in which CMG good answer, I think we can reference.Then today, on the duty cycle of flyback power supply (I am concerned about the reflected voltage, consistent with the duty cycle), the duty cycle with the voltage selection switch is related to some early flyback switching power supply using a low pressure tube, such as 600V or 650V AC 220V input power as a switch, perhaps when the production process, high pressure tubes, easy to manufacture, or low-pressure pipes are more reasonable conduction losses and switching characteristics, as this line reflected voltage can not be too high, otherwise the work order to switch the security context of loss of power absorbing circuit is quite impressive.Reflected voltage 600V tube proved not more than 100V, 650V tube reflected voltage not greater than 120V, the leakage inductance voltage spike when the tubes are clamped at 50V 50V working margin. Now that the MOS raise the level of manufacturing process control, flyback power supplies are generally used 700V or 750V or 800-900V the switch. Like this circuit, overvoltage capability against a number of switching transformer reflected voltage can be done a bit higher, the maximum reflected voltage in the 150V is appropriate, to obtain better overall performance.TOP PI's recommendation for the 135V chipset with transient voltage suppression diode clamp. But his evaluation board generally reflected voltage to be lower than the value at around 110V. Both types have their advantages and disadvantages: Category: shortcomings against over-voltage, low duty cycle is small, a large pulse current transformer primary. Advantages: small transformer leakage inductance, electromagnetic radiation and low ripple index higher switch loss, the conversion efficiency is not necessarily lower than the second.The second category: a large number of shortcomings of power loss, a large number of transformer leakage inductance, the ripple worse. Advantages: Some strongagainst over-voltage, large duty cycle, lower transformer losses and efficiency higher.Reflected voltage flyback power supply and a determining factorReflected voltage flyback power supply with a parameter related to that is the output voltage, output voltage, the lower the larger the transformer turns ratio, the greater the transformer leakage inductance, switch to withstand higher voltage breakdown switch is possible to absorb power consumption is higher, has the potential to permanently absorb the circuit power device failure (particularly with transient voltage suppression diode circuits). In the design of low-voltage low-power flyback power output optimization process must be handled with care, its approach has several:1, using a large core of a power level lower leakage inductance, which can improve the low-voltage flyback power conversion efficiency, reduce losses, reduce output ripple and improve multi-output power of the cross regulation in general is common in household appliances with a switch power, such as CD-ROM drive, DVB set-top boxes.2, if the conditions were not increased core, can reduce the reflected voltage, reducing the duty cycle. Reduce the reflected voltage can reduce the leakage inductance but may reduce the power conversion efficiency, which is a contradiction between the two, must have an alternative process to find a suitable point, replace the transformer during the experiment can detect the transformer original side of the anti-peak voltage, peak voltage to minimize the anti-pulse width, and magnitude of the work safety margin increase converter. Generally reflected voltage 110V when appropriate.3, enhance the coupling, reducing losses, the introduction of new technologies, and the routing process, transformers to meet the security specifications will between the primary and secondary side to insulation measures, such as pad tape, plus side air insulation tape. These will affect the performance of transformer leakage inductance, the reality can be used in production around the primary winding secondary wrapping method. Or sub-system with a triple insulated wire wound to remove the insulation between the initial level, can enhance the coupling, even use wide copper winding.The article refers to low voltage output is less than or equal to 5V output, as thistype of small power supply, my experience is that the power output of more than 20W output can use a forward, get the best value for money, of course, this is not the right decision , and personal habits, relationship between the application environment, the next time to talk about the flyback power supply with a magnetic core, magnetic circuit air gap opening some understanding, I hope you receive adequate guidance.Flyback power transformer core magnetization state at work in one way, it needs to open the air gap magnetic circuit, similar to the pulsating direct current sensor. Part of the magnetic coupling through the air gap. Why I understand the principle of open air gap as follows: As the power ferrite also has a similar rectangle of the operating characteristics (hysteresis loop), operating characteristics curve in the Y-axis magnetic induction (B), now the general production process saturation point in 400mT above, the general value in the design of this value should be more appropriate in the 200-300mT, X-axis magnetic field strength (H) the value of current intensity is proportional to the magnetization. Open magnetic circuit air gap equal to the magnetic hysteresis loop to the X axis tilt, in the same magnetic induction intensity, can withstand a greater magnetizing current, equivalent to core store more energy, this energy cut-off switch When spilled into the load through the transformer secondary circuit, flyback power core to open the air gap is twofold. One is to transfer more energy, and the second to prevent the core into saturation.Flyback Power Transformer magnetization state in one way, not only to pass through the magnetic coupling energy, is also responsible for input and output isolation voltage transform multiple roles. Therefore, the treatment gap need to be very careful, the air gap leakage inductance can become too large, increase the hysteresis loss, iron loss, copper loss increases, affecting the power of the whole performance. Air gap is too small has the potential to transformer core saturation, resulting in damage to powerThe so-called flyback power supply is continuous and discontinuous mode transformer working conditions, working in full load condition in the power transformer complete transfer, or incomplete transmission mode. General design of the working environment, conventional flyback power supply should work incontinuous mode, this switch, circuit loss are relatively small, and can reduce the stress of work input and output capacitors, but that there are some exceptions.Requires in particular that: As the characteristics of the flyback power supply is also more suitable for design into a high-voltage power supply, and high-voltage power transformers generally work in discontinuous mode, I understand the need for as high voltage power supply output voltage of the rectifier diodes. Because of the manufacturing process characteristics, high-tension diode, reverse recovery time is long, low speed, the current continuous state, the diode has a positive bias in the recovery, reverse recovery energy loss is very large, is not conducive to converter performance increase, ranging from reduced conversion efficiency, rectifiers, severe fever, weight is even burnt rectifier. As in the intermittent mode, the diode is reverse biased under zero bias, loss can be reduced to a relatively low level. Therefore, high voltage power supply work in discontinuous mode, and the frequency can not be too high.Another type of flyback power supply work in the critical state, the general type of power supply work in FM, or FM-width-modulated dual-mode, a number of low-cost self-excitation power (RCC) is often used this form in order to ensure stable output transformer As the operating frequency, output current or input voltage change, close to the fully loaded transformer is always maintained at between continuous and intermittent, this power is only suitable for small power output, otherwise the handling characteristics of electromagnetic compatibility will be a headache Flyback switching power supply transformer should work in continuous mode, it required relatively large winding inductance, of course, is to some extent continuous, excessive pursuit of absolute continuity is not realistic, may need a great core, very much coil turns, accompanied by a large leakage inductance and distributed capacitance, worth the trouble. So how does this parameter to determine, through repeated practice, and analysis of peer design, I think, in the nominal voltage input, the output reached 50% and 60% transformer from intermittent, continuous state of transition to more appropriate. Or at the highest input voltage state, the full output, the transformer can transition to the continuous state on it.中文译文:开关电源设计开关电源状态,电源工作在高频率,高脉冲的模拟电路的一个比较特殊的一种。
楼宇供配电系统(英文)
500kV
10kV 35kV
2.1 Introduction
Automation in Power Distribution
◆ How does Power reach us? ◆ Bottlenecks in Power Reliability ◆ The Technology Development Mission
(a) One main + one spare single bus
S1
Main
主供
S2
Spare
备用
10kV Bus
(a) ◆ Two inputs Single bus bar ◆ Save (area and finance )
◆ Service interruption or blackout ( bus failure ) ◆ Building with low reliability requirement or low load
2.1 Introduction
10kV
10kV 0.4kV
110kV
Power station Transformer Distribution substations
110kV User
10kV
2.2 Typical system inside the building
Main Electrical Connection
2.2 Typical system inside the building
(c) Two inputs with generator
S1 Power1
S2 Power2
Self-provided
generator
emergency
供配电系统中英文对照外文翻译文献
中英文对照外文翻译文献(文档含英文原文和中文翻译)POWER SUPPLY AND DISTRIBUTION SYSTEMABSTRACTThe basic function of the electric power system is to transport the electric power towards customers. The l0kV electric distribution net is a key point that connects the power supply with the electricity using on the industry, business and daily-life. For the electric power, allcostumers expect to pay the lowest price for the highest reliability, but don't consider that it's self-contradictory in the co-existence of economy and reliable.To improve the reliability of the power supply network, we must increase the investment cost of the network construction But, if the cost that improve the reliability of the network construction, but the investment on this kind of construction would be worthless if the reducing loss is on the power-off is less than the increasing investment on improving the reliability .Thus we find out a balancepoint to make the most economic,between the investment and the loss by calculating the investment on power net and the loss brought from power-off.KEYWARDS:power supply and distribution,power distribution reliability,reactive compensation,load distributionTEXTThe revolution of electric power system has brought a new big round construction,which is pushing the greater revolution of electric power technique along with the application of new technique and advanced equipment. Especially, the combination of the information technique and electric power technique, to great ex- tent, has improved reliability on electric quality and electric supply. The technical development decreases the cost on electric construction and drives innovation of electric network. On the basis of national and internatio- nal advanced electric knowledge, the dissertation introduces the research hotspot for present electric power sy- etem as following.Firstly, This dissertation introduces the building condition of distribution automation(DA), and brings forward two typical construction modes on DA construction, integrative mode and fission mode .It emphasize the DA structure under the condition of the fission mode and presents the system configuration, the main station scheme, the feeder scheme, the optimized communication scheme etc., which is for DA research reference.Secondly, as for the (DA) trouble measurement, position, isolation and resume, This dissertation analyzes the changes of pressure and current for line problem, gets math equation by educing phase short circuit and problem position under the condition of single-phase and works out equation and several parameter s U& , s I& and e I& table on problem . It brings out optimized isolation and resume plan, realizes auto isolation and network reconstruction, reduces the power off range and time and improves the reliability of electric power supply through problem self- diagnoses and self-analysis. It also introduces software flow and use for problem judgement and sets a model on network reconstruction and computer flow.Thirdly, electricity system state is estimated to be one of the key techniques in DA realization. The dissertation recommends the resolvent of bad measurement data and structure mistake on the ground of describing state estimate way. It also advances a practical test and judging way on topology mistake in state estimate about bad data test and abnormity in state estimate as well as the problem and effect on bad data from state measure to state estimate .As for real time monitor and control problem, the dissertation introduces a new way to solve them by electricity break and exceptional analysis, and the way has been tested in Weifang DA.Fourthly, about the difficulty for building the model of load forecasting, big parameter scatter limit and something concerned, the dissertation introduces some parameters, eg. weather factor, date type and social environment effect based on analysis of routine load forecasting and means. It presents the way for electricity load forecasting founded on neural network(ANN),which has been tested it’s validity by examp le and made to be good practical effect.Fifthly, concerning the lack of concordant wave on preve nting concordant wave and non-power compensation and non-continuity on compensation, there is a topology structure of PWM main circuit and nonpower theory on active filter the waves technique and builds flat proof on the ground of Saber Designer and proves to be practical. Meanwhile, it analyzes and designs the way of non-power need of electric network tre- nds and decreasing line loss combined with DA, which have been tested its objective economic benefit throu- gh counting example.Sixthly, not only do the dissertation design a way founded on the magrginal electric price fitted to our present national electric power market with regards to future trends of electric power market in China and fair trade under the government surveillance, that is group competitio n in short-term trade under the way of grouped price and quantityharmony, but also puts forward combination arithmetic, math model of trading plan and safty economical restriction. It can solve the original contradiction between medium and long term contract price and short term competitive price with improvement on competitive percentage and cut down the unfair income difference of electric factory, at the same time, it can optimize the electric limit for all electric factories and reduce the total purchase charge of electric power from burthen curve of whole electric market network.The distribution network is an important link among the power system. Its neutral grounding mode and operation connects security and stability of the power system directly. At the same time, the problem about neutral grounding is associated with national conditions, natural environment, device fabrication and operation. For example, the activity situation of the thunder and lightning, insulating structure and the peripheral interference will influence the choice of neutral grounding mode Conversely, neutral grounding mode affects design, operation, debugs and developing. Generally in the system higher in grade in the voltage, the insulating expenses account for more sizable proportion at the total price of the equipment. It is very remarkable to bring the economic benefits by reducing the insulating level. Usually such system adopt the neutral directly grounding and adopt the autoreclosing to guarantee power supply reliability. On the contrary, the system which is lower in the voltage adopts neutral none grounding to raise power supply reliability. So it is an important subject to make use of new- type earth device to apply to the distribution network under considering the situation in such factors of various fields as power supply reliability, safety factor, over-voltage factor, the choice of relay protection, investment cost, etc.The main work of this paper is to research and choice the neutral grounding mode of the l0kV distribution network. The neutral grounding mode of the l0kV network mainly adopts none grounding, grounding by arc suppressing coil, grounding by reactance grounding and directly grounding. The best grounding mode is confirmed through the technology comparison. It can help the network run in safety and limit the earth electric arc by using auto-tracking compensate device and using the line protection with the detection of the sensitive small ground current. The paper introduces and analyzes the characteristic of all kind of grounding modes about l0kV network at first. With the comparison with technological and economy, the conclusion is drawn that the improved arc suppressing coil grounding mode shows a very big development potential.Then, this paper researches and introduces some operation characteristics of the arc suppressing coil grounding mode of the l0kV distribution network. And then the paper putemphasis on how to extinguish the earth electric arc effectively by utilizing the resonance principle. This paper combines the development of domestic and international technology and innovative achievement, and introduces the computer earth protection and autotracking compensate device. It proves that the improved arc suppressing coil grounding mode have better operation characteristics in power supply reliability, personal security, security of equipment and interference of communication. The application of the arc suppressing coil grounding mode is also researched in this paper.Finally, the paper summarizes this topic research. As a result of the domination of the arc suppressing coil grounding mode, it should be more popularized and applied in the distribution network in the future.The way of thinking, project and conclusions in this thesis have effect on the research to choose the neutral grounding mode not only in I0kV distribution network but also in other power system..The basic function of the electric power system is to transport the electric power towards customers. The l0kV electric distribution net is a key point that connects the power supply with the electricity using on the industry, business and daily-life. For the electric power, all costumers expect to pay the lowest price for the highest reliability, but don't consider that it's self-contradictory in the co-existence of economy and reliable. To improve the reliability of the power supply network, we must increase the investment cost of the network con- struction But, if the cost that improve the reliability of the network construction, but the investment on this kind of construction would be worthless if the reducing loss is on the power-off is less than the increasing investment on improving the reliability .Thus we find out a balance point to make the most economic, between the investment and the loss by calculating the investment on power net and the loss brought from power-off. The thesis analyses on the economic and the reliable of the various line modes, according to the characteristics various line modes existed in the electric distribution net in foshan..First, the thesis introduces as the different line modes in the l0kV electric distribution net and in some foreign countries. Making it clear tow to conduct analyzing on the line mode of the electric distribution net, and telling us how important and necessary that analyses are.Second, it turns to the necessity of calculating the number of optimization subsection, elaborating how it influences on the economy and reliability. Then by building up the calculation mode of the number of optimization subsection it introduces different power supply projects on the different line modes in brief. Third, it carries on the calculation andanalyses towards the reliability and economy of the different line modes of electric distribution net, describing drafts according by the calculation. Then it makes analysis and discussion on the number of optimization subsection.At last, the article make conclusion on the economy and reliability of different line modes, as well as, its application situation. Accordion to the actual circumstance, the thesis puts forward the beneficial suggestion on the programming and construction of the l0kV electric distribution net in all areas in foshan. Providing the basic theories and beneficial guideline for the programming design of the lOkV electric distribution net and building up a solid net, reasonable layout, qualified safe and efficiently-worked electric distribution net.References[1] Wencheng Su. Factories power supply [M]. Machinery Industry Publishing House. 1999.9[2] Jiecai Liu. Factories power supply design guidance [M]. Machinery Industry Publishing House.1999.12[3] Power supply and distribution system design specifications[S].China plans Press. 1996[4] Low-voltage distribution design specifications [S].China plans Press. 1996.6供配电系统摘要电力系统的基本功能是向用户输送电能。
供配电10kv变配电所设计中英文翻译
Substation DesignPower system is the system of production and consumption of electricity generation, transmission, transformation, distribution and electricity and other aspects of the composition. Its primary function is the energy conversion means through natural generation power into electrical energy, and then by transmission and distribution substation and supplies power to each user. The main structure of the power system has power (hydropower, thermal power plants, nuclear power plants, etc.), substations (boost substation, load center substation, etc.), transmission and distribution lines and load centers. Each power point is also interconnected to achieve energy exchange between different regions and regulation to improve security of supply and economy. Substation transmission line network consisting of the electricity network and is usually called.Substation is from the main terminal , the main transformers, high and low voltage power distribution equipment , relay protection and control systems, the power and DC systems , remote and communication systems , the necessary reactive power compensation device and the main control room and other components . Among them, the main terminal , the main transformers, high and low voltage power distribution equipment , such as belonging to a system ; protection and control systems, the DC system , remote and communication systems are secondary system . Main connection is the most important part of the substation . It determines the function of the substation , construction, investment , operation quality , maintenance conditions and supply reliability. Generally divided into several basic forms single busbar , double busbar , a half breaker and ring wiring and so on. Substation main transformer is the most important equipment , which directly affects the performance and configuration of the advanced nature of the substation , economy and reliability . General need to install substation main transformer 2 to 3 sets ; 330 kV and below , the main transformer is usually a three-phase transformer , its capacity by 5 to 10 years into the expected load selection . In addition, substations and other equipment selection and the overall layout of the site selection also have specific requirements. Substationrelay protection subsystem (including transmission lines and bus protection ) and component protection ( including transformers , reactors and reactive power compensation device protection ) categories. Substation control mode is generally divided into the direct control and optional control two categories.Transformer substation is the main equipment is divided into two-winding transformer, three-winding transformers and autotransformers that high and low voltage windings for each phase of a shared, taking a header from the middle of the high voltage winding qualify as a low-voltage winding of the transformer. V oltage is proportional to the level of the winding turns, the current is inversely proportional to the number of turns. Transformers can be classified according to their role and step-down transformer step-up transformer. The former is used to send end substation power system, which is used by the end of the substation. V oltage transformer and voltage of the power system needs to adapt. In order to maintain acceptable voltage under different load conditions may need to switch the transformer tap. By way of transformer tap switch with load-load and no-load regulating transformer no-load tap changer. OLTC is mainly used by the end of the substation.V oltage and current transformers. Their operating principle is similar to the transformer, which the operating voltage of high voltage equipment and busbar, high current that the device and the bus load or short-circuit current measurement instruments according to a predetermined ratio becomes low voltage relay protection and control equipment and a small current . Operation at rated voltage transformer secondary voltage l00V, current transformer secondary current is 5A or 1A. Current transformer secondary winding is often connected with the load close to a short circuit, please note: never let it open, otherwise it will endanger due to high voltage equipment and personal safety or to the current transformer burned.Switchgear includes circuit breakers, isolating switches, load switches, high voltage fuses are disconnected and close the circuit devices. Breakers are generally composed of a contact system, arc system, operation mechanism, release, housing and so on. The role of the circuit breaker is turned off and the load circuit, and cut off the fault circuitto prevent the accident and ensure safe operation. The high-voltage circuit breakers to breaking 1500V, current 1500-2000A arc, which can be stretched to 2m arc continues to burn is not extinguished. It is a high voltage circuit breaker interrupter must be addressed. Blowing arc extinction of the arc principle is diminished heat free cooling, on the other hand by blowing arc elongated arc reinforced composite and diffusion of charged particles, while the arc gap of charged particles disperse quickly restore the dielectric strength of the medium.Isolation switch (knife) primary role is to isolate the voltage at the device or line maintenance, to ensure safety. It does not disconnect the load current and short-circuit current, should be used in conjunction with the circuit breaker. After a power outage should pull isolation switch before pulling circuit breakers, power transmission should be fit after isolation switch is closed circuit breaker. If misuse will cause equipment damage and personal injury.The ability to be able to disconnect the load switch without disconnecting the load current fault current in normal operation, generally used for high-voltage transformer fuse with or without outlet voltage 10kV and above regular operations.In order to reduce the area substation positive development in recent years, sulfur hexafluoride enclosed Switchgear (GIS). It is the circuit breakers, disconnectors, busbar, grounding switches, transformers, bushing or cable terminals were installed in their prime in concentrated form a seal between the overall enclosure filled with sulfur hexafluoride gas as insulating medium. This combination has a compact structure, small appliances and light weight without affecting atmospheric conditions, long maintenance intervals, no electric shock and electrical noise, etc., have been put into operation before the development of 765kV substation. Currently, its disadvantage is expensive, require high manufacturing and maintenance processes. Ready for operation management of substation is to achieve safe, reliable, reasonable and an important guarantee of economic power. So substation design must meet the requirements, so based on evidence.变电站设计电力系统是由发电、输电、变电、配电和用电等环节组成的电能生产与消费系统。
电气外文文献及翻译---高层建筑供配电系统设计 精品
Power supply system of high-rise building designAbstract: With the continuous development of city size, more and more high-rise buildings, therefore, high-rise building electrical design to the designers had to face. In this paper, an engineering example, describes the electrical design of high-rise buildings and some of the more typical issues of universal significance, combined with the actual practice of an engineering solution to the problem described.Key words: high-rise building; electrical design; distribution; load calculation1 Project OverviewThe commercial complex project, with a total construction area of 405570m2, on the ground floor area of 272330m2, underground construction area of 133240m2, the main height of 99m. Project components are: two office buildings, construction area is 70800m2, 28 layers, the standard story is 3.2m.2 Load Calculation1) Load characteristics: electric load, much larger than the "national civil engineering technical measures" Large 120W/m2 indicators, especially in the electricity load more food, and different types of food and beverage catering different cultural backgrounds also high.2) the uncertainty of a large load, because the commercial real estate rents are often based on market demand, and constantly adjust the nature of the shops, making the load in the dynamic changes.3) There is no specification and technical measures in the different types of commercial projects refer to the detailed parameters of the shops, engineering design load calculation in the lack of data, in most cases to rely on staff with previous experience in engineering design calculations. Load the selection of parameters: for the above problems, the load calculation, the first developer of sales and good communication, to determine the form of layers of the forms and nature of floor area, which is calculated on the basis of electrical load basis; followed to determine parameter index within the unit area of shops is also very important and complex because there is no clear indicator of the specification can refer to; and different levels of economic development between cities is not balanced, power indices are also different; will be in the same city, different regions have different consumer groups .3) the need to factor in the choice: parameters determined, the need for load calculation. Need to factor commonly used method, the calculation will not repeat them. Need to explore is the need for coefficient selection, which in the current specifications, manuals and the "unified technical measures" is also not clear requirements, based on years of design experience that most end shops in the distribution or level within the household distribution box with case Kx generally take a while, in the calculation of the loop route to take 0.7 to 0.8, the distribution transformers in the substation calculations take 0.4 to 0.6.3 substations setLoad calculation based on the results of this project the total installed capacity of transformer 43400Kv.A, after repeated consultations with the power company, respectively, in the project innorthern, central and southern three sections set the three buildings into three power substations, 1 # set 6 sets 2500Kv.A transformer substation, take the northern section of power supply; 2 # 4 1600Kv.A transformer substations located, plus 6 sets 2000Kv.A transformers, take the middle of the power supply, in addition to 5 Taiwan 10Kv.A high-pressure water chillers (total 4000Kv.A); 3 # substation located 2 units plus 2 units 1000Kv.A 2000Kv.A transformers, take the southern section of A, B two office supply. 10Kv power configuration of this project into two points, each at the two 10Kv lines, the power company under the provisions of 10Kv power capacity: maximum load per channel is about to 11000Kv.A, two is the 22000Kv.A, design # 1 , 3 # combination of a substation 10Kv, power line, with a total capacity of 21000Kv.A; 2 # substation transformers and 10Kv, 10Kv chillers sharing a power line, with a total capacity of 22400Kv.A. The design of the substation layout, in addition to meeting regulatory requirements, it also need to consider the high-pressure cabinets, transformers and low voltage power supply cabinet by order of arrangement, especially in low voltage distribution cabinet to feed the cable smooth and easy inspection duty problems are not seriously consider the construction of the cable crossing will cause more long detour, a waste of floor space, and convenient inspections and other issues.4 small fire load power supplyIn the design of large commercial projects often encounter small fire load of electrical equipment and more dispersed distribution, if fed by a substation, a substation will be fed a lot of low-voltage low-current counter circuit breaking capacity circuit breaker and conductor of the dynamic and thermal stability in a certain extent. According to GB50045-1995 "fire protection design of tall buildings," rule "should be used in Fire Equipment dedicated power supply circuit, the power distribution equipment shall be provided with clear signs." Interpretation of the provisions of the power supply circuit means "from the low-voltage main distribution room (including the distribution of electrical room) to last a distribution box, and the general distribution lines should be strictly separated." In this design, the use of methods to increase the level of distribution, that is different from the substation bus segments, respectively, a fire fed a special circuit, set in place two distribution cabinets, distribution cabinets and then the resulting radial allocated to the end of the dual power to vote each box, so that not only meets the specification requirements for dedicated power supply circuit, but also to avoid feeding the substation level of many small current loop.5, the choice of circuit breaker and conductorCommercial real estate projects use the room as the uncertainty in the choice of circuit breakers and conductors must be considered in a certain margin to meet the needs caused by adjustment of the load changes. According to this characteristic, increased use in the design of the plug bus-powered, not only meet the requirements of large carrying capacity, and also allows the flexibility to increase supply and distribution, are reserved in each shaft in the plug-box backup in order to change, according to changes in upper and lower load, to adjust. For example: a bus is responsible for a shaft 1 to 3 layers of power, when a layer due to the change in capacity increases, while the 3-layer capacity is reduced, you can use a spare plug box layer off the 3-layer 1 layer capacity rationing . This level distribution in the substation, select the circuit breaker to choose the setting value when the circuit breaker to adjust to changes at the end to adjust the load setting value; in the bus and the transformer circuit breaker according to the choice of the general framework of values to select . For example: Route certain equipment capacity 530Kv, Kx take 0.7 to calculate current of 704A, select the frame circuit breaker is 1000A, tuning is 800A; currenttransformer for the 1000/50; bus carrying capacity for the 1000A, this road can meet the maximum 1000A current load requirements, even if there is adjustment, power distribution switches and circuit can not make big changes.6 layer distribution box setAccording to the division of layers of fire protection district, respectively numbered as A ~ K layers within the set level shaft for the retail lighting power distribution box, with one on one power supply shops in radial power. Should be noted that the forms of the complex layers of layers of fire partition, does not correspond to the lower, making some of shaft power in charge of the fire district at the same time, also responsible for the power supply adjacent to the fire district. At design time, using the principle of proximity, while also taking into account the burden of the whole trunk load conditions, so that each shaft as far as possible a more balanced load.7 public area distribution box setTaking into account the future needs of the business re-decoration of public areas must be reserved for power. Here the design needs to consider the following points: ①question of how much reserve power, lighting and electricity, which according to GB50034-2004"Architectural Lighting Design Standards" table of Article 6.1.3 and 6.1.8, commercial building lighting power density value, high-end supermarkets, business offices as 20W/m2, under the "decorative lighting included 50% of the total lighting power density calculation" requirements, using the reserved standard 40W/m2. ②In order to facilitate the decoration in each partition set fire lighting in public areas and emergency lighting distribution box distribution box, in order to identify the electrical power distribution decoration cut-off point.③the staircase, storage rooms and other parts of the decoration does not need to do, set the power distribution circuit or a separate distribution box, try not to be reserved from the public area of electricity distribution board fed hardcover out.④control of lighting in public areas, the majority in two ways, namely, C-BUS control system or the BA system, the use of C-BUS has the advantage of more flexible control, each road can be fed out of control, adjustable light control; shortcomings is a higher cost. BA system control advantages of using low cost, simple control; disadvantage is that the exchanges and contacts for the three-phase, three-way control may be related both to open, or both, in the decoration of the contacts required to feed the power supply circuit diverge to avoid failure blackouts.Design of distribution box 8In the commercial real estate design, shop design is often only a meter box, and outlet route back to the needs of the user according to their second design, but the shops are difficult to resolve within the power supply fan coil units, air-conditioning system as a whole can not debug. The project approach is to add a circuit breaker in the meter box for the coil power supply, another way for users to use the second design, as shown below.User distribution box design9 distribution cabinet / box number and distribution circuitsLarge-scale projects are often low voltage distribution cabinet / box number, low-voltage circuits to feed the more often there will be cabinet / box number and line number duplication, resulting in the design and the future looks difficult maintenance and overhaul. The project has three 10Kv substations, 20 transformer, hundreds of low-voltage fed out of the closet, fed the circuit more. Accordance with the International Electrotechnical Commission (IEC) and the Chinese nationalstandard requirements: ①All the distribution number to be simple and clear, not too box and line numbers are not repeated. ②number to simple and clear, not too long. ③distinction between nature and type of load. ④law was easy to find, make viewer at a glance. Based on the above requirements and on the ground, fire district and the underground construction industry form the different conditions, using two slightly different ways. Essential for the underground garage, uses a single comparison, also relatively fire district neat, according to fire district number, such as AL-BL-1 / 1, AP and APE, the meaning of the letters and numbers: AL on behalf of lighting distribution (AP on behalf of Power distribution box, APE on behalf of the emergency power distribution box); BI on behalf of the basement; 1 / 1 for partition 1, I fire box. Above ground is more complex, more fire district, and on the fire district does not correspond to the lower, according to shaft number is better, such as AL-1-A1, AP, and APE, letters and numbers mean: 1 represents a layer; A1 on behalf of A, No. 1 shaft fed a distribution box. Fed a low-voltage circuits, such as the number of uses: W3-6-AL-1-A1, W3-6) indicates that the route back to power supply transformer 3, 6, feed the power distribution cabinet, AL-1-A1, said the then the first loop of the distribution box for the AL-1-A1 and so on, and so on.10 ConclusionWith more and more complex commercial design projects, designers need to continually improve the design level, designed to make fine. These are only bits of the design in the business lessons learned, and the majority of designers want to communicate高层建筑供配电系统设计摘要:随着城市规模的不断发展,高层建筑越来越多,因此,高层建筑电气设计就成为设计者不得不面对的问题。
供配电系统设计英文文献
供配电系统设计英文文献以下是一些供配电系统设计的英文文献:1. "Power System Design" by James A. Reedy, published in 2012 by John Wiley & Sons.2. "Power System Stabilization" by R. W. Knapp and H. W. Zacharias, published in 1963 by John Wiley & Sons.3. "Power System Protection" by E. H. Elser, published in 1968 by John Wiley & Sons.4. "Transmission System Design" by William A. Crothers, published in 1973 by John Wiley & Sons.5. "Power System Control" by T. W. Anderson and R. B. Francis, published in 1968 by John Wiley & Sons.6. "Power System Engineering" by W. J. Lathrop, published in 1976 by John Wiley & Sons.7. "Power Distribution System Design" by R. C. Davis, published in 1970 by John Wiley & Sons.8. "Electric Power Systems Analysis and Design" by R. C. Davis and H. A. Thomas, published in 1975 by John Wiley & Sons.9. "Power System Stability and Control" by P. M. S. Black, published in 1962 by John Wiley & Sons.10. "Electric Power System Security" by G. A. Czarnecki and T. J. Mclaughlin, published in 2000 by John Wiley & Sons.这些文献涵盖了供配电系统设计的各个方面,包括电力系统设计、电力系统稳定控制、电力系统保护和控制、输电系统设计、配电系统设计等。
生态型住宅小区规划设计外文翻译文献
生态型住宅小区规划设计外文翻译文献(文档含中英文对照即英文原文和中文翻译)原文:Analysis and Discussion on the planning and design of modern ecotype housing districtAbstract:in this paper, combined with the practice of many years of planning and design work of the author, analyzes the characteristics and functions of modern ecological residential district, the overall planning and design idea are discussed; and an example is described to illustrate the main points of planning and design of modern ecotype housing district. Keywords:ecological residential area; planning and design; ecological construction; ecological balance; sustainable development1 IntroductionIn recent years, people continue to study methods and approaches to ecological and sustainable development "concept, the design of ecological architecture" become the mainstream of the architectural design, green ecological residential district will emerge as the times require. The author thinks, principles and methods of ecology, sparingly use and transform nature, seeking the most suitable for human survival and sustainable development, the building environment to maintain as an organic, with the structure and function of the whole system, this is the basic principle and the development direction of the ecological architecture.The basic principles of ecology is to maintain the state of equilibrium is relatively stable within the ecosystem -- the planning and construction of ecological balance, ecological residential, can improve the survival of the human and the environment for sustainable development. Ecological residential district is multi-dimensional, three-dimensional, environmental engineering, have practical function, environmental benefits, high technology content and concept of sustainable architecture and architectural patterns, and the balance of natural ecology system of residential building into the region of. Ecological residential areas need not only adapt to the ecological environment, and does not destroy the ecological environment construction, and saving water and energy, improve the ecological environment, the advantages of low pollution,non-toxic, harmless, prolonging the service life of the building, expression of humanized design, good ventilation and lighting, is the human movement seeking harmony with nature the ideal living environment with science and technology means, to form a benign circulation between the building and the natural ecological environmentThe characteristics and function analysis of 2 ecological residential districtCharacteristic of 2.1 ecotype residential quartersEcological residential district in addition to pay attention to comfort, health, but also should reflect the ecological benefit, and showed a relationship between a new human life style and environment, which is characterized in:1) increase the rate of greening. But the green environment is no simple planting flowers, but a combination of ecology, architecture and aesthetics, biological engineering, geography, city and district environmental planning, water resources, properly handle the ecological balance and make full use of green building.2) saving land resources. Pay attention to the use of green building materials, which can save land. The limited land area of the return of human, and the rational use of the contemporary and later generations benefit.3) conservation of water resources. This is not to be ignored in thecontent of the ecological residential development and construction. Water is the source of life, our country is a country short of water, for the reclaimed water and rainwater collection and utilization of resources, far less than the western and some developed countries. We don't have to wait for the water resources expert forecasts to 2025, saving water crisis erupted just research on water resources, by then it's too late.4) the full and effective use of natural resources. Ecological design into the design of residential district, because every ecological system has its own structure and the corresponding material circulation ways and means, the normal state, the circulation and energy flow have a certain stability. Such as the use of light and heat, interior design, the use of energy-saving lamps system, can reduce the cost of the project, and the development of ecological benefit.5) the implementation of classification of garbage treatment. This work does not belong to the residential construction, but it is the green environmental protection, residential property management.Function 2.2 ecological residential districtGreen ecological residential district can keep the city ecosystem biodiversity and regulating regional climate and reduce the total pollutant effects, mainly reflected in the:1) to keep the city ecosystem biodiversity. Biodiversity refers to many biological and ecological environment with complex formation in sum andits corresponding ecological process. The contents include biological species, genetic diversity and ecosystem. In addition, the ecological residential district can ensure the integrity, continuity of the city natural ecological processes, reduce the species distribution city biological and flow resistance, the current transformation of the environment, and to provide the best environment for biological survival and reproduction.2) adjusting regional climate, reducing the total amount of pollutants. Green ecological residential effective use of wall, windowsill, balcony space, planting flowers, trees and other green plants. Can achieve absorbing carbon, oxygen, water purification, adjust the temperature and humidity, improving the regional climate features; reduce city noise, dust, can create a comfortable living environment. In other words, the relative degree of investment environment, green residential high, is not only beneficial to reduce air pollution, provide oxygen, water and soil conservation, improvement of housing climate, but also conducive to the residential area of beauty.3 modern ecotype residential district planning and designIn the bustling city of modern, people asphyxiated by modern building reinforced concrete frame, and want to live can rest in the heart of the green home, become a kind of scarce urban complex city people. In this paper the author in the design concept of ecological living environment, trying to interpret a new modern living communities, so as to create arespect for nature, return to natural free walking home.The ecological environment is the most basic elements of "green" and "water", "green翻译:现代生态型住宅小区规划设计分析探讨摘要本文结合笔者多年规划设计工作实践,分析了现代生态型住宅小区的特点和功能,对其规划设计整体构思进行了详细探讨;并结合实例对现代生态型住宅小区规划设计要点进行了阐述说明。
外文翻译供电技术
外文原文Power Supplying Technology and Intelligent BuildingThe electric distribution system is a part of an electric power system that supplies electric energy to the individual user or consumer .The distribution substations that supply them, the distribution transformers, and appropriate protective and control devices the three general classes of individual user are industrial, residential, and ruralThe three-phase alternating-current (ac) system is practically universal, although a small amount of direct-current systems are in operation .Three-phase transformer and sub transmission lines require three wires, learned phase conductors. Most of the low-voltage three phase distribution systems consist of three phase conductions and a common or neutral conductor ,making a total of four wires .single-phase branches (consisting of two wires)supplied from the three-phase mains are used for single phase utilization in residences, small stores ,and farms, loads are connected in parallel to common supply circuits.The distribution substation is an assemblage of equipment for purpose of switching, changing and regulating the voltage from sub transmission to primary distribution .More important substations are designed so that the failure of a piece of equipment in the substation or one of the sub transmission lines to the substation will not cause an interruption of power to the loadThe primary system leaving the substation is most frequently in the 6-35kV range. A particular voltage used is Ilk line-to-line and fine to neutral (conventionally written 10/.some utilities use a lower voltage, such as 3/ use of voltage in the 35kV class is increasing for its lower electric loss.Secondary voltages are derived from distribution transformers connected to the primary system and they usually correspond to utilization voltages .Most loads are supplied by 380/220volt single-phase four-wire systems, some high power -rate motors require 3kV or 6kV.Good voltage means that the average voltage level is correct ,that variations do not exceed prescribed lima it ,and that sudden momentary changes in level do notcause objectionable light flicker .Utilization voltage varies with changing load on the system ,but a voltage variation of less than 5% at the consumer's meter is common .to achieve this result, distribution systems are designed for a plus and minus voltage spread from the nominal voltages .This is accomplished by proper wire size for the circuits, application of capacitors ,both permanently connected and switched, and the use of voltage regulationsThe electric power substation is an assembly of equipment man electric power system through which electrical energy is passed for transmission, distribution, interconnection ,transformation ,conversion ,or switching. A substation includes a variety of equipment .the principal items are listed and briefly described below.Transformers involve magnetic core and windings to transfer power from one side to the other side at different voltages .Substation transformers range from small size of 50kV·A to large size of several hundred MV﹒A most of transformers are insulated and cooled by oil, and adequate precautions have to be taken for fire hazard, These precautions include adequate distances from other equipment, firewalls fire extinguishing means, and pits and drains for containing leaked oilCircuit breakers,Circuit breakers are required for circuit interruption with the capability of interrupting the highest fault current, usually 20-50times over the normal current, and withstanding high voltage surges that appear after interruption. Switches with normal load-interruption capability are called load break switches.Disconnect witches. Disconnect witches have isolation and connection capability without interruption capability.Bus-bars Bus -bars arc connecting bars or conductors between equipment. Flexible conductor are stretched from insulator to insulator, where more common solid buses (commonly made of aluminum alloy) are installed on insulators in the air or in gas enclosed cylindrical pipesShunt reactors Shunt reactors are often required for compensation of line capacitance whereLong lines are involvedShunt capacitors Shunt capacitors are often required for compensation of inductive components of load currentCurrent transformers and potential transformers,Current transformers and potential transformers are for measuring currents and voltages and provide proportionately low-level currents and voltages for control and protection Control and protection,Control and protection include a) a variety of protectiverelays which can rapidly detect faults anywhere in the substation equipment and lines, determine which part of the systems is faulty ,and give appropriate commands for opening of circuit breakers ;(b) Control equipment for voltage and Current control and proper selection of the system conf gumption ;( c) fault-recording equipment ;( e) metering equipment; and (f) auxiliary power supplies.Many of the control and protection devices are solid-state electronic types, and there is a trend toward digital techniques using microprocessors. Most of the substations are fully automated locally with a provision for manual override .the minimum manual interface required, alone communications channels to the dispatcher in the central office.Good substation grounding is very important for effective relaying and insulation of equipment; the design of the personnel is of substation grounding .It usually consists the governing criterion in of a bare wire grid, laid in the ground; and all equipment groundings points ,tanks, support structures, fences ,shielding wires and poles ,and so forth ,are securely connected to it,the is reduced to be low enough that a fault from high voltage to ground does not create such high potential gradients on the ground, and from the structures to ground ,to present a safe hazard. Good overhead shielding is also essential for outdoor substations, soaps to eliminate the possibility of lighting directly striking the equipment. Shielding is provided by overhead ground wires stretched across the substation or tall grounded poles.中文译文供电技术供电系统是电力系统的一部分,它提供电能给消费者。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
外文文献翻译(含:英文原文及中文译文)译文字数:3700多字文献出处:J Ehnberg. Power of Community Distribution to Design[J] Value Engineering, 2016, 2(3):14-21英文原文Power of Community Distribution to DesignJ EhnbergABSTRACTThe basic function of the electric power system is to transport the electric power towards customers. The l0kV electric distribution net is a key point that connects the power supply with the electricity using on the industry, business and daily-life. For the electric power, allcostumers expect to pay the lowest price for the highest reliability, but don't consider that it's self-contradictory in the co-existence of economy and reliable.To improve the reliability of the power supply network, we must increase the investment cost of the network construction But, if the cost that improve the reliability of the network construction, but the investment on this kind of construction would be worthless if the reducing loss is on the power-off is less than the increasing investment on improving the reliability .Thus we find out a balance point to make the most economic, between the investment and the loss by calculating the investment onpower net and the loss brought from power-off.KEYWORDS: power supply and distribution, power distribution reliability , reactive compensation, load distributionIn general, major changes to the building include: high voltage and low voltage distribution systems, transformers, and backup power systems. Power systems include power distribution and control, indoor and outdoor lighting systems include all types of lighting, and lightning protection systems include intrusion protection, lightning sensors, grounding, equipotential bonding, and local equipotential bonding. Auxiliary equipotential bonding. In just 20 years, the system has undergone enormous changes in the face of technology and products. Many design ideas have also changed dramatically. Switchgear, such as the first circuit-breaker oil circuit breaker in a high-voltage system, and the subsequent development of an oil circuit breaker, are not only large in size but generally contain oil. Due to the large size of the switchgear, we must also establish a separate equipment room that occupies a large amount of floor area. Vacuum circuit breakers and sulfur hexafluoride circuit breakers are not only small in size, but also have a large short-circuit capacity. The size of the housing is much larger than that of the original cabinets, and the circuit breakers do not have any oil and the fire performance is greatly improved. And circuit breakers and other low-voltage devices are in one room, which saves space and is easy tomanage. In the past, large-capacity low-voltage circuit breakers gradually increased the capacity of the short-circuit current, gradually reduced the scale, and became more stable, making the system safer and more reliable, which facilitated the design. Towards the development of intelligent low-voltage circuit breakers, various parameters of the circuit breaker can be controlled by the bus industry and the signals are transmitted directly to the computer.The appearance of dry-type transformers has brought great convenience to the electrical design of buildings because there is no possibility of leakage of transformer oil and fire so that it can be easily installed in the building itself and even directly into the load center. It also eliminates the transformer's demand for oil and can use dry-type transformers when building large-capacity equipment. Four Taiwanese 2500kV A dry-type transformers have been used in actual engineering design.In terms of using emergency generators, it is much more advanced than in the past in terms of performance and size. In addition to using diesel generators; emergency lighting uses EPS standby power; devices that interrupt power within a millisecond can use UPS.The control of electrical equipment varies from the control of a single component to the control of relays. In addition to the smaller size of the various components for better performance, the specification of thecontrol box is also reduced. Because digital technology is more used in control to achieve the best control status to control the equipment. Further improve the effect of energy conservation.The revolution of electric power system has brought a new big round construction, which is pushing the greater revolution of electric power technique along with the application of new technique and advanced equipment. Especially, the combination of the information technique and electric power technique, to great ex- tent, has improved reliability on electric quality and electric supply. The technical development decreases the cost on electric construction and drives innovation of electric network. On the basis of national and international advanced electric knowledge, the dissertation introduces the research hotspot for present electric power syetem as following.Firstly, This dissertation introduces the building condition of distribution automation(DA), and brings forward two typical construction modes on DA construction, integrative mode and fission mode .It emphasize the DA structure under the condition of the fission mode and presents the system configuration, the main station scheme, the feeder scheme, the optimized communication scheme etc., which is for DA research reference.Secondly, as for the (DA) trouble measurement, position, isolation and resume, This dissertation analyzes the changes of pressure andcurrent for line problem, gets math equation by educing phase short circuit and problem position under the condition of single-phase and works out equation and several parameter s U& , s I& and e I& table on problem . It brings out optimized isolation and resume plan, realizes auto isolation and network reconstruction, reduces the power off range and time and improves the reliability of electric power supply through problem self- diagnoses and self-analysis. It also introduces software flow and use for problem judgement and sets a model on network reconstruction and computer flow.Thirdly, electricity system state is estimated to be one of the key techniques in DA realization. The dissertation recommends the resolvent of bad measurement data and structure mistake on the ground of describing state estimate way. It also advances a practical test and judging way on topology mistake in state estimate about bad data test and abnormity in state estimate as well as the problem and effect on bad data from state measure to state estimate .As for real time monitor and control problem, the dissertation introduces a new way to solve them by electricity break and exceptional analysis, and the way has been tested in Weifang DA.Fourthly, about the difficulty for building the model of load forecasting, big parameter scatter limit and something concerned, the dissertation introduces some parameters, eg. weather factor, date type andsocial environment effect based on analysis of routine load forecasting and means. It presents the way for electricity load forecasting founded on neural network(ANN),which has been tested it’s validity by example and made to be good practical effect.Fifthly, concerning the lack of concordant wave on preve nting concordant wave and non-power compensation and non-continuity on compensation, there is a topology structure of PWM main circuit and nonpower theory on active filter the waves technique and builds flat proof on the ground of Saber Designer and proves to be practical. Meanwhile, it analyzes and designs the way of non-power need of electric network tre- nds and decreasing line loss combined with DA, which have been tested its objective economic benefit throu- gh counting example.Sixthly, not only do the dissertation design a way founded on the magrginal electric price fitted to our present national electric power market with regards to future trends of electric power market in China and fair trade under the government surveillance, that is group competitio n in short-term trade under the way of grouped price and quantity harmony, but also puts forward combination arithmetic, math model of trading plan and safty economical restriction. It can solve the original contradiction between medium and long term contract price and short term competitive price with improvement on competitive percentage and cut down the unfair income difference of electric factory, at the same time,it can optimize the electric limit for all electric factories and reduce the total purchase charge of electric power from burthen curve of whole electric market network.The distribution network is an important link among the power system. Its neutral grounding mode and operation connects security and stability of the power system directly. At the same time, the problem about neutral grounding is associated with national conditions, natural environment, device fabrication and operation. For example, the activity situation of the thunder and lightning, insulating structure and the peripheral interference will influence the choice of neutral grounding mode Conversely, neutral grounding mode affects design, operation, debugs and developing. Generally in the system higher in grade in the voltage, the insulating expenses account for more sizable proportion at the total price of the equipment. It is very remarkable to bring the economic benefits by reducing the insulating level. Usually such system adopt the neutral directly grounding and adopt the autoreclosing to guarantee power supply reliability. On the contrary, the system which is lower in the voltage adopts neutral none grounding to raise power supply reliability. So it is an important subject to make use of new- type earth device to apply to the distribution network under considering the situation in such factors of various fields as power supply reliability, safety factor, over-voltage factor, the choice of relay protection, investment cost, etc.The main work of this paper is to research and choice the neutral grounding mode of the l0kV distribution network. The neutral grounding mode of the l0kV network mainly adopts none grounding, grounding by arc suppressing coil, grounding by reactance grounding and directly grounding. The best grounding mode is confirmed through the technology comparison. It can help the network run in safety and limit the earth electric arc by using auto-tracking compensate device and using the line protection with the detection of the sensitive small ground current. The paper introduces and analyzes the characteristic of all kind of grounding modes about l0kV network at first. With the comparison with technological and economy, the conclusion is drawn that the improved arc suppressing coil grounding mode shows a very big development potential.Then, this paper researches and introduces some operation characteristics of the arc suppressing coil grounding mode of the l0kV distribution network. And then the paper put emphasis on how to extinguish the earth electric arc effectively by utilizing the resonance principle. This paper combines the development of domestic and international technology and innovative achievement, and introduces the computer earth protection and autotracking compensate device. It proves that the improved arc suppressing coil grounding mode have better operation characteristics in power supply reliability, personal security,security of equipment and interference of communication. The application of the arc suppressing coil grounding mode is also researched in this paper.Finally, the paper summarizes this topic research. As a result of the domination of the arc suppressing coil grounding mode, it should be more popularized and applied in the distribution network in the future.The way of thinking, project and conclusions in this thesis have effect on the research to choose the neutral grounding mode not only in I0kV distribution network but also in other power system..The basic function of the electric power system is to transport the electric power towards customers. The l0kV electric distribution net is a key point that connects the power supply with the electricity using on the industry, business and daily-life. For the electric power, all costumers expect to pay the lowest price for the highest reliability, but don't consider that it's self-contradictory in the co-existence of economy and reliable. To improve the reliability of the power supply network, we must increase the investment cost of the network con- struction But, if the cost that improve the reliability of the network construction, but the investment on this kind of construction would be worthless if the reducing loss is on the power-off is less than the increasing investment on improving the reliability .Thus we find out a balance point to make the most economic, between the investment and the loss by calculating the investment onpower net and the loss brought from power-off. The thesis analyses on the economic and the reliable of the various line modes, according to the characteristics various line modes existed in the electric distribution net in foshan..First, the thesis introduces as the different line modes in the l0kV electric distribution net and in some foreign countries. Making it clear tow to conduct analyzing on the line mode of the electric distribution net, and telling us how important and necessary that analyses are.Second, it turns to the necessity of calculating the number of optimization subsection, elaborating how it influences on the economy and reliability. Then by building up the calculation mode of the number of optimization subsection it introduces different power supply projects on the different line modes in brief. Third, it carries on the calculation and analyses towards the reliability and economy of the different line modes of electric distribution net, describing drafts according by the calculation. Then it makes analysis and discussion on the number of optimization subsection.At last, the article make conclusion on the economy and reliability of different line modes, as well as, its application situation. Accordion to the actual circumstance, the thesis puts forward the beneficial suggestion on the programming and construction of the l0kV electric distribution net in all areas in foshan. Providing the basic theories and beneficial guidelinefor the programming design of the lOkV electric distribution net and building up a solid net, reasonable layout, qualified safe and efficiently-worked electric distribution net.Auto-Tune SequenceThe auto-tuning sequence begins after the hysteresis and deviation values have been determined. The tuning process begins when the initial output step is applied to the loop output.This change in output value should cause a corresponding change in the value of the process variable. When the output change drives the PV away from setpoint far enough to exceed the hysteresis boundary a zero-crossing event is detected by the auto-tuner. Upon each zero crossing event the auto-tuner drives the output in the opposite direction.The tuner continues to sample the PV and waits for the next zero crossing event. A total of twelve zero-crossings are required to complete the sequence. The magnitude of the observed peak-to-peak PV values (peak error) and the rate at which zero-crossings occur are directly related to the dynamics of the process. Early in the auto-tuning process, the output step value is proportionally adjusted once to induce subsequent peak-to-peak swings of the PV to more closely match the desired deviation amount. Once the adjustment is made, the new output step amount is written into the Actual Step Size field (ASTEP) of the loop table. The auto-tuning sequence will be terminated with an error, if thetime between zero crossings exceeds the zero crossing watchdog interval time. The default value for the zero crossing watchdog interval time is two hours.中文译文住宅小区配电设计J Ehnberg摘要电力系统的基本功能是向客户输送电力。